ML20077H102: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter:9'-
9'-
PHILADELPHI A ELECTRIC COMPANY LIMERICK GENER ATING ST ATION P. O. DOX A S AN ATOG A, PENNSYLV ANI A 19464 (215) 327 1200 mar,2000 J. cogniNo Jn, n.,.....,.
PHILADELPHI A ELECTRIC COMPANY LIMERICK GENER ATING ST ATION P. O. DOX A S AN ATOG A, PENNSYLV ANI A 19464 (215) 327 1200 mar,2000 J. cogniNo Jn,                                                                               l n .,.....,.                                                                                 1 o................,.,..                                                       June 27, 1991        '
June 27, 1991 o................,.,..
Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 U.S. Nuclear Regulatory Corumission Attn: Document Control Desk Washington, DC 20555
Docket Nos.
50-352 50-353 License Nos. NPF-39 NPF-85 U.S.
Nuclear Regulatory Corumission Attn: Document Control Desk Washington, DC 20555


==SUBJECT:==
==SUBJECT:==
Line 26: Line 28:


==Dear Sirs:==
==Dear Sirs:==
 
l This letter provides Philadelphia Electric Company's (PECo's) reply to an NRC Unresolved Item (50-352/91-13-01; 50-353/91-14-01) pertaining to the training and qualification of Radwaste Shippers at Limerick Generating Station (LGS), Units 1 and 2, and a clarification of PECo's commitment to NRC Bulletin 79-19, " Packaging of Low-Level Radioactive Waste for Transport and Burial."
l This letter provides Philadelphia Electric Company's (PECo's) reply to an NRC Unresolved Item (50-352/91-13-01; 50-353/91-14-01) pertaining to the training and qualification of Radwaste Shippers at Limerick Generating Station (LGS), Units 1 and 2, and a clarification of PECo's commitment to NRC Bulletin 79-19, " Packaging of Low-Level Radioactive Waste for Transport and Burial." A written cesponse within 30 days of receipt of this inspection report on l
A written cesponse within 30 days of receipt of this inspection report on l
these issues was requested by the NRC in the cover letter which l       transmitted the NRC Combined Inspection Report Nos. 50-352/91-13 and 50-353/91-14, dated May 23, 1991.
these issues was requested by the NRC in the cover letter which l
The NRC Inspection Report identified that there was a lack of adequate training for some of the Radwaste Shippers at LGS and that
transmitted the NRC Combined Inspection Report Nos. 50-352/91-13 and 50-353/91-14, dated May 23, 1991.
,      this concern was an unresolved item. Upon further revicw of the
The NRC Inspection Report identified that there was a lack of adequate training for some of the Radwaste Shippers at LGS and that this concern was an unresolved item.
;      Radwaste Training and Qualification program we identified l       administrative deficiencies in our training records. These records have since been appropriately corrected. With appropriate documentation in place, ke have determined that all Radwaste shipping personnel had been adequately trained and qualified. The four LGS Radwaste Shippers have had, as a minimum, ^n in-house eight       .
Upon further revicw of the Radwaste Training and Qualification program we identified l
hour Radioactive Material Minimization, Shipping, and Disposal l
administrative deficiencies in our training records.
course specific to LGS, and a thirty-two hour course in Radioactive Waste Packaging, "ransportation, and Disposal. These training records associated with the LGS Radwaste Shippers are currently available for review.
These records have since been appropriately corrected.
9107050179 910627                                                             lI ADOCK 0500                                                           V QQG              lDR                    2
With appropriate documentation in place, ke have determined that all Radwaste shipping personnel had been adequately trained and qualified.
                                                                                                  /)#v
The four LGS Radwaste Shippers have had, as a minimum,
^n in-house eight hour Radioactive Material Minimization, Shipping, and Disposal l
course specific to LGS, and a thirty-two hour course in Radioactive Waste Packaging, "ransportation, and Disposal.
These training records associated with the LGS Radwaste Shippers are currently available for review.
/)#v 9107050179 910627 lI QQG lDR ADOCK 0500 2
V


1
1
      ,,0.S. Nuclear Regulatory Commission                       June 27, 1991 Document Control Desk                                             Page 2 l
,,0.S. Nuclear Regulatory Commission June 27, 1991 Document Control Desk Page 2 Additionally, in response to your request for a clarification of our commitment to NRC Bulletin 79-19, we have reviewed our records and have confirmed our commitment to implement this Bulletin.
l Additionally, in response to your request for a clarification of our commitment to NRC Bulletin 79-19, we have reviewed our records and have confirmed our commitment to implement this Bulletin. NRC Bulletin 79-19 was issued August 10, 1979, to facilities holding an operating license. This Bulletin requested that licensees take several actions (e.g., training) to assure the safe transfer, packaging, and transport of low-level radioactive waste. The Bulletin required a written response outlining each licensee's implementation plan. At that time, LGS Units 1 and 2 were under construction and not licensed operating facilities, therefore, .;c e not required to provide a written response to this Bulletin. However, PECo did implement and committed to maintain the requirements of this Bulletin prior to receiving a facility operating license. This commitment was docanented in the LGS Final Safety Analysis Report (FSAR) Table 13.2-1," Matrix of LGS Training Program Guidelines," prior to obtaining an operating license from the NRC fot LGS, Units 1 and 2. Section 13.2, " Training," of the FSAR was subsequently reviewed by the NRC in accordance pith the applicable Standard Review Plan and the NRC approved our training program and associated lesson plans, which 'mplement the requirements of Bulletin 79-19. This NRC approval is documented in the original Safety Evaluation Report, NUR''G 0 9 91.
NRC Bulletin 79-19 was issued August 10, 1979, to facilities holding an operating license.
This Bulletin requested that licensees take several actions (e.g.,
training) to assure the safe transfer, packaging, and transport of low-level radioactive waste.
The Bulletin required a written response outlining each licensee's implementation plan.
At that time, LGS Units 1 and 2 were under construction and not licensed operating facilities, therefore,.;c e not required to provide a written response to this Bulletin.
However, PECo did implement and committed to maintain the requirements of this Bulletin prior to receiving a facility operating license.
This commitment was docanented in the LGS Final Safety Analysis Report (FSAR) Table 13.2-1," Matrix of LGS Training Program Guidelines," prior to obtaining an operating license from the NRC fot LGS, Units 1 and 2.
Section 13.2, " Training," of the FSAR was subsequently reviewed by the NRC in accordance pith the applicable Standard Review Plan and the NRC approved our training program and associated lesson plans, which 'mplement the requirements of Bulletin 79-19.
This NRC approval is documented in the original Safety Evaluation Report, NUR''G 0 9 91.
If you have any further questions of require additional information, please contact us.
If you have any further questions of require additional information, please contact us.
Very truly yours, 7'
Very truly yours, 7'
[j       \
[j
                                                              \,Y       .
\\
WGS/cah                                       -
\\,Y WGS/cah cc:
cc:   T. T. Martin, Administrator, Region I, USNRC T. J. Kenny, USNRC Serior Resident-Inspector, LGS
T. T. Martin, Administrator, Region I, USNRC T.
                                                                                .l
J.
Kenny, USNRC Serior Resident-Inspector, LGS
.l
[
[
l l
.}}
l
,                                                                                  l
                                .                            .}}

Latest revision as of 01:31, 15 December 2024

Responds to Unresolved Item Noted in Insp Repts 50-352/91-13 & 50-353/91-14 Re Training & Qualification of Radwaste Shippers at Facility & Clarification of Commitment to NRC Bulletin 79-19 Re Packaging of Low Level Radwaste
ML20077H102
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 06/27/1991
From: Doering J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-79-19, NUDOCS 9107050179
Download: ML20077H102 (2)


Text

9'-

PHILADELPHI A ELECTRIC COMPANY LIMERICK GENER ATING ST ATION P. O. DOX A S AN ATOG A, PENNSYLV ANI A 19464 (215) 327 1200 mar,2000 J. cogniNo Jn, n.,.....,.

June 27, 1991 o................,.,..

Docket Nos.

50-352 50-353 License Nos. NPF-39 NPF-85 U.S.

Nuclear Regulatory Corumission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Limerick Generating Station, Units 1 and 2 Reply to an NRC Unresolved item (50-352/91-13-01; 50-353/91-14-01)

Associated With NRC Combined Inspection Report Nos. 50-352/91-13 and 50-353/91-14

Dear Sirs:

l This letter provides Philadelphia Electric Company's (PECo's) reply to an NRC Unresolved Item (50-352/91-13-01; 50-353/91-14-01) pertaining to the training and qualification of Radwaste Shippers at Limerick Generating Station (LGS), Units 1 and 2, and a clarification of PECo's commitment to NRC Bulletin 79-19, " Packaging of Low-Level Radioactive Waste for Transport and Burial."

A written cesponse within 30 days of receipt of this inspection report on l

these issues was requested by the NRC in the cover letter which l

transmitted the NRC Combined Inspection Report Nos. 50-352/91-13 and 50-353/91-14, dated May 23, 1991.

The NRC Inspection Report identified that there was a lack of adequate training for some of the Radwaste Shippers at LGS and that this concern was an unresolved item.

Upon further revicw of the Radwaste Training and Qualification program we identified l

administrative deficiencies in our training records.

These records have since been appropriately corrected.

With appropriate documentation in place, ke have determined that all Radwaste shipping personnel had been adequately trained and qualified.

The four LGS Radwaste Shippers have had, as a minimum,

^n in-house eight hour Radioactive Material Minimization, Shipping, and Disposal l

course specific to LGS, and a thirty-two hour course in Radioactive Waste Packaging, "ransportation, and Disposal.

These training records associated with the LGS Radwaste Shippers are currently available for review.

/)#v 9107050179 910627 lI QQG lDR ADOCK 0500 2

V

1

,,0.S. Nuclear Regulatory Commission June 27, 1991 Document Control Desk Page 2 Additionally, in response to your request for a clarification of our commitment to NRC Bulletin 79-19, we have reviewed our records and have confirmed our commitment to implement this Bulletin.

NRC Bulletin 79-19 was issued August 10, 1979, to facilities holding an operating license.

This Bulletin requested that licensees take several actions (e.g.,

training) to assure the safe transfer, packaging, and transport of low-level radioactive waste.

The Bulletin required a written response outlining each licensee's implementation plan.

At that time, LGS Units 1 and 2 were under construction and not licensed operating facilities, therefore,.;c e not required to provide a written response to this Bulletin.

However, PECo did implement and committed to maintain the requirements of this Bulletin prior to receiving a facility operating license.

This commitment was docanented in the LGS Final Safety Analysis Report (FSAR) Table 13.2-1," Matrix of LGS Training Program Guidelines," prior to obtaining an operating license from the NRC fot LGS, Units 1 and 2.

Section 13.2, " Training," of the FSAR was subsequently reviewed by the NRC in accordance pith the applicable Standard Review Plan and the NRC approved our training program and associated lesson plans, which 'mplement the requirements of Bulletin 79-19.

This NRC approval is documented in the original Safety Evaluation Report, NURG 0 9 91.

If you have any further questions of require additional information, please contact us.