ML20078L058: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:
{{#Wiki_filter:Davis-Besse Initial License Exam 2020 Admin JPM RO-A1.1
{{#Wiki_filter:Davis-Besse Initial License Exam 2020 Admin JPM RO-A1.1


Appendix C Rev 11                       Job Performance Measure                         Form ES-C-1 Worksheet ADMIN JPM RO-A1.1 R1 Facility: Davis-Besse                             Task No: 004-006-01-0100 Task
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.1 R1 NUREG-1021, Revision 11 Page 1 of 5 Facility: Davis-Besse Task No: 004-006-01-0100 Task


==Title:==
==Title:==
Line 24: Line 24:


==Reference:==
==Reference:==
2.1.23         (4.3)         Job Performance Measure No: RO-A1.1 (JPM 172)
2.1.23 (4.3)
Job Performance Measure No: RO-A1.1 (JPM 172)
Examinee:
Examinee:
NRC Examiner:                                                           Date:
NRC Examiner:
Date:
Method of testing:
Method of testing:
Simulated Performance ___                         Actual Performance _X_
Simulated Performance ___
Classroom _X_                     Simulator ___               Plant ___
Actual Performance _X_
Classroom _X_
Simulator ___
Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Line 36: Line 41:
The plant conditions are specified in the Initial Conditions and Initiating Cues.
The plant conditions are specified in the Initial Conditions and Initiating Cues.
Task Standard:
Task Standard:
Perform a BWST fill calculation in accordance with Attachment 4 of DB OP-06015, Borated Water Storage Tank Operating Procedure Required Materials: of DB-OP-06015 Calculator General  
Perform a BWST fill calculation in accordance with Attachment 4 of DB OP-06015, Borated Water Storage Tank Operating Procedure Required Materials: of DB-OP-06015 Calculator General  


==References:==
==References:==
None Initiating Cue:
None Initiating Cue:
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
Line 45: Line 49:
No Alternate Path:
No Alternate Path:
No Validation Time:
No Validation Time:
30 minutes NUREG-1021, Revision 11                      Page 1 of 5
30 minutes  


Appendix C Rev 11                   Job Performance Measure                       Form ES-C-1 Worksheet ADMIN JPM RO-A1.1 R1 EXAMINER COPY INITIAL CONDITIONS:
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.1 R1 NUREG-1021, Revision 11 Page 2 of 5 EXAMINER COPY INITIAL CONDITIONS:
The plant is in Mode 5 following a refueling outage The BWST is at 38 feet and 2640 ppmB BAAT 1 is at 12000 ppmB CWRT 1 is at 1100 ppmB The START program is NOT available INITIATING CUES:
The plant is in Mode 5 following a refueling outage The BWST is at 38 feet and 2640 ppmB BAAT 1 is at 12000 ppmB CWRT 1 is at 1100 ppmB The START program is NOT available INITIATING CUES:
The Shift Manager desires the BWST level to be raised to 40.5 feet and boron concentration maintained at 2640 ppmB The Unit Supervisor directs you to perform a BWST fill calculation in accordance with of DB-OP-06015, Borated Water Storage Tank Operating Procedure using Boric Acid Addition Tank 1 and Clean Waste Receiver Tank 1 (Provide the examinee a copy of Attachment 4 of DB-OP-06015 and a calculator)
The Shift Manager desires the BWST level to be raised to 40.5 feet and boron concentration maintained at 2640 ppmB The Unit Supervisor directs you to perform a BWST fill calculation in accordance with of DB-OP-06015, Borated Water Storage Tank Operating Procedure using Boric Acid Addition Tank 1 and Clean Waste Receiver Tank 1 (Provide the examinee a copy of Attachment 4 of DB-OP-06015 and a calculator)
NUREG-1021, Revision 11                  Page 2 of 5


Appendix C Rev 11                   Job Performance Measure                       Form ES-C-1 Worksheet ADMIN JPM RO-A1.1 R1 CANDIDATE COPY INITIAL CONDITIONS:
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.1 R1 NUREG-1021, Revision 11 Page 3 of 5 CANDIDATE COPY INITIAL CONDITIONS:
The plant is in Mode 5 following a refueling outage The BWST is at 38 feet and 2640 ppmB BAAT 1 is at 12000 ppmB CWRT 1 is at 1100 ppmB The START program is NOT available INITIATING CUES:
The plant is in Mode 5 following a refueling outage The BWST is at 38 feet and 2640 ppmB BAAT 1 is at 12000 ppmB CWRT 1 is at 1100 ppmB The START program is NOT available INITIATING CUES:
The Shift Manager desires the BWST level to be raised to 40.5 feet and boron concentration maintained at 2640 ppmB The Unit Supervisor directs you to perform a BWST fill calculation in accordance with of DB-OP-06015, Borated Water Storage Tank Operating Procedure using Boric Acid Addition Tank 1 and Clean Waste Receiver Tank 1 NUREG-1021, Revision 11                  Page 3 of 5
The Shift Manager desires the BWST level to be raised to 40.5 feet and boron concentration maintained at 2640 ppmB The Unit Supervisor directs you to perform a BWST fill calculation in accordance with of DB-OP-06015, Borated Water Storage Tank Operating Procedure using Boric Acid Addition Tank 1 and Clean Waste Receiver Tank 1  


Appendix C Rev 11                       Job Performance Measure                     Form ES-C-1 Worksheet ADMIN JPM RO-A1.1 R1 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments".
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.1 R1 NUREG-1021, Revision 11 Page 4 of 5 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments".
START TIME: _______
START TIME: _______
: 1. PERFORMANCE STEP: Determine Calculation Method STANDARD: Use Method B of Attachment 4 CUE:       None SAT UNSAT
: 1.
: 2. PERFORMANCE STEP: Calculate the initial volume of the BWST
PERFORMANCE STEP: Determine Calculation Method STANDARD: Use Method B of Attachment 4 CUE:
      ........C........
None SAT UNSAT
: 2. PERFORMANCE STEP: Calculate the initial volume of the BWST  
........C........
STANDARD: 12,962 gal/ft x 38 ft + 4316 gal = 496872 gal Enter 496872 gal and 2640 ppmB CUE: None SAT UNSAT
STANDARD: 12,962 gal/ft x 38 ft + 4316 gal = 496872 gal Enter 496872 gal and 2640 ppmB CUE: None SAT UNSAT
: 3. PERFORMANCE STEP: Calculate desired BWST volume after the solution addition
: 3. PERFORMANCE STEP: Calculate desired BWST volume after the solution addition  
      ........C........
........C........
STANDARD: 12,962 gal/ft x 40.5 ft + 4316 gal = 529277 gal Enter 529277 gal and 2640 ppmB CUE: None SAT UNSAT
STANDARD: 12,962 gal/ft x 40.5 ft + 4316 gal = 529277 gal Enter 529277 gal and 2640 ppmB CUE: None SAT UNSAT
: 4. PERFORMANCE STEP: Calculate total volume to be added to the BWST
: 4.
      ........C........
PERFORMANCE STEP: Calculate total volume to be added to the BWST  
STANDARD: 529277 gal - 496872 gal = 32405 gal CUE:       None SAT UNSAT NUREG-1021, Revision 11                      Page 4 of 5
........C........
STANDARD: 529277 gal - 496872 gal = 32405 gal CUE:
None SAT UNSAT  


Appendix C Rev 11                   Job Performance Measure                     Form ES-C-1 Worksheet ADMIN JPM RO-A1.1 R1
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.1 R1 NUREG-1021, Revision 11 Page 5 of 5
: 5. PERFORMANCE STEP: Initiate Part 2 of Section B of Attachment 4 STANDARD: Enter the following values in Part 2:
: 5.
PERFORMANCE STEP: Initiate Part 2 of Section B of Attachment 4 STANDARD: Enter the following values in Part 2:
Volume to be added - 32405 gal Boron concentration of solution - 2640 ppmB Boron source and concentration - BAAT 1, 12,000 ppmB Water source and concentration - CWRT 1, 1100 ppmB CUE: None SAT UNSAT
Volume to be added - 32405 gal Boron concentration of solution - 2640 ppmB Boron source and concentration - BAAT 1, 12,000 ppmB Water source and concentration - CWRT 1, 1100 ppmB CUE: None SAT UNSAT
: 6. PERFORMANCE STEP: Calculate volume of acid solution
: 6.
    ........C........
PERFORMANCE STEP: Calculate volume of acid solution  
STANDARD: 32405 gal x (2640 ppmB - 1100 ppmB) 12000 ppmB - 1100 ppmB             = 4578.3211 gal NOTE: Acceptable range is 4578 to 4579 gal CUE:       None SAT UNSAT
........C........
: 7. PERFORMANCE STEP: Calculate volume of water solution
STANDARD: 32405 gal x (2640 ppmB - 1100 ppmB) 12000 ppmB - 1100 ppmB  
    ........C........
= 4578.3211 gal NOTE: Acceptable range is 4578 to 4579 gal CUE:
STANDARD: 32405 gal - 4578.3211 gal = 27826.6789 gal NOTE: Acceptable range is 27826 to 27827 gal CUE:       None SAT UNSAT
None SAT UNSAT
: 8. PERFORMANCE STEP: Complete Attachment 4 STANDARD: Sign and date attachment CUE:       None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the examinee)
: 7.
END TIME__________
PERFORMANCE STEP: Calculate volume of water solution  
NUREG-1021, Revision 11                    Page 5 of 5
........C........
STANDARD: 32405 gal - 4578.3211 gal = 27826.6789 gal NOTE: Acceptable range is 27826 to 27827 gal CUE:
None SAT UNSAT
: 8.
PERFORMANCE STEP: Complete Attachment 4 STANDARD: Sign and date attachment CUE:
None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the examinee)
END TIME__________  


Davis-Besse Initial License Exam 2020 Admin JPM RO-A1.2
Davis-Besse Initial License Exam 2020 Admin JPM RO-A1.2  


Appendix C Rev 11                       Job Performance Measure                         Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1 Facility: Davis-Besse                               Task No: 004-006-01-0100 Task
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1 NUREG-1021, Revision 11 Page 1 of 6 Facility: Davis-Besse Task No: 004-006-01-0100 Task


==Title:==
==Title:==
Line 90: Line 104:


==Reference:==
==Reference:==
2.1.25         (3.9)         Job Performance Measure No: RO-A1.2 (JPM 272)
2.1.25 (3.9)
Job Performance Measure No: RO-A1.2 (JPM 272)
Examinee:
Examinee:
NRC Examiner:                                                           Date:
NRC Examiner:
Date:
Method of testing:
Method of testing:
Simulated Performance ___                         Actual Performance _X_
Simulated Performance ___
Classroom _X_                     Simulator ___               Plant ___
Actual Performance _X_
Classroom _X_
Simulator ___
Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Line 106: Line 125:


==References:==
==References:==
None Initiating Cue:
None Initiating Cue:
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
Line 112: Line 130:
No Alternate Path:
No Alternate Path:
No Validation Time:
No Validation Time:
30 minutes NUREG-1021, Revision 11                      Page 1 of 6
30 minutes  


Appendix C Rev 11                     Job Performance Measure                   Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1 EXAMINER COPY INITIAL CONDITIONS:
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1 NUREG-1021, Revision 11 Page 2 of 6 EXAMINER COPY INITIAL CONDITIONS:
The plant is in Mode 3 following a reactor trip.
The plant is in Mode 3 following a reactor trip.
Two control rods failed to insert on the trip.
Two control rods failed to insert on the trip.
The START program is not available.
The START program is not available.
The following conditions exist:
The following conditions exist:
* Burnup:     500 EFPD
Burnup:
* Tave:       552°F The Reactor Engineer reports the following values:
500 EFPD Tave:
* Reactivity worth due to transient poisons:     (-) 2.6 %K/K
552°F The Reactor Engineer reports the following values:
* Correction factor for Boron 10 depletion:       0.96
Reactivity worth due to transient poisons:
* Reactivity Anomaly:                             0.0 INITIATING CUES:
(-) 2.6 %K/K Correction factor for Boron 10 depletion:
0.96 Reactivity Anomaly:
0.0 INITIATING CUES:
The Unit Supervisor directs you to determine the boron concentration needed to ensure 1%
The Unit Supervisor directs you to determine the boron concentration needed to ensure 1%
shutdown margin in accordance with Section 14 of DB-NE-06202, Reactivity Balance Calculations, and DB-NE-06201, Reactor Operators Curve Book It is desired to take credit for transient poisons Provide Candidate a copy of;
shutdown margin in accordance with Section 14 of DB-NE-06202, Reactivity Balance Calculations, and DB-NE-06201, Reactor Operators Curve Book It is desired to take credit for transient poisons Provide Candidate a copy of;
* DB-NE-06202
* DB-NE-06202
* DB-NE-06201
* DB-NE-06201
* Ruler and calculator NUREG-1021, Revision 11                    Page 2 of 6
* Ruler and calculator  


Appendix C Rev 11                     Job Performance Measure                   Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1 CANDIDATE COPY INITIAL CONDITIONS:
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1 NUREG-1021, Revision 11 Page 3 of 6 CANDIDATE COPY INITIAL CONDITIONS:
The plant is in Mode 3 following a reactor trip.
The plant is in Mode 3 following a reactor trip.
Two control rods failed to insert on the trip.
Two control rods failed to insert on the trip.
The START program is not available.
The START program is not available.
The following conditions exist:
The following conditions exist:
* Burnup:     500 EFPD
Burnup:
* Tave:       552°F The Reactor Engineer reports the following values:
500 EFPD Tave:
* Reactivity worth due to transient poisons:     (-) 2.6 %K/K
552°F The Reactor Engineer reports the following values:
* Correction factor for Boron 10 depletion:       0.96
Reactivity worth due to transient poisons:
* Reactivity Anomaly:                             0.0 INITIATING CUES:
(-) 2.6 %K/K Correction factor for Boron 10 depletion:
0.96 Reactivity Anomaly:
0.0 INITIATING CUES:
The Unit Supervisor directs you to determine the boron concentration needed to ensure 1%
The Unit Supervisor directs you to determine the boron concentration needed to ensure 1%
shutdown margin in accordance with Section 14 of DB-NE-06202, Reactivity Balance Calculations, and DB-NE-06201, Reactor Operators Curve Book It is desired to take credit for transient poisons NUREG-1021, Revision 11                    Page 3 of 6
shutdown margin in accordance with Section 14 of DB-NE-06202, Reactivity Balance Calculations, and DB-NE-06201, Reactor Operators Curve Book It is desired to take credit for transient poisons  


Appendix C Rev 11                     Job Performance Measure                     Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments".
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1 NUREG-1021, Revision 11 Page 4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments".
START TIME: _______
START TIME: _______
: 1. PERFORMANCE STEP: Determine B (ROCB SDM)
: 1.
    ........C........
PERFORMANCE STEP: Determine B (ROCB SDM)  
........C........
STANDARD: Determine B(ROCB SDM) from Figure 6C. Determines the value to be 1475 to 1485 ppmB and enters this value on Attachment 10.
STANDARD: Determine B(ROCB SDM) from Figure 6C. Determines the value to be 1475 to 1485 ppmB and enters this value on Attachment 10.
COMMENT: Actual value is 1480 ppmB %K/K.
COMMENT: Actual value is 1480 ppmB %K/K.
COMMENT: Sequence NOT required for this JPM except for last step CUE:       None SAT UNSAT
COMMENT: Sequence NOT required for this JPM except for last step CUE:
: 2. PERFORMANCE STEP: Determine CF(B10)
None SAT UNSAT
STANDARD: Enters 0.96 value for CF(B10) value from Initial Conditions CUE:       None SAT UNSAT
: 2.
: 3. PERFORMANCE STEP: Determine Reactivity Worth of HFP Anomaly STANDARD: Enters 0 for anomaly value from Initial Conditions CUE:       None                                                             __________
PERFORMANCE STEP: Determine CF(B10)
SAT UNSAT
STANDARD: Enters 0.96 value for CF(B10) value from Initial Conditions CUE:
: 4. PERFORMANCE STEP: Determine the Differential Boron Worth (DBW).
None SAT UNSAT
STANDARD: Determine DBW value from Figure 5A. Determines value of - 0.00719 to
: 3.
                      - 0.00723 %K/K.
PERFORMANCE STEP: Determine Reactivity Worth of HFP Anomaly STANDARD: Enters 0 for anomaly value from Initial Conditions CUE:
None SAT UNSAT
: 4.
PERFORMANCE STEP: Determine the Differential Boron Worth (DBW).
STANDARD: Determine DBW value from Figure 5A. Determines value of - 0.00719 to  
- 0.00723 %K/K.
COMMENT: Actual value is -0.00721 %K/K. Student may skip this step since it will divide into zero and be zero regardless of the value.
COMMENT: Actual value is -0.00721 %K/K. Student may skip this step since it will divide into zero and be zero regardless of the value.
CUE:       None SAT UNSAT NUREG-1021, Revision 11                    Page 4 of 6
CUE:
None SAT UNSAT  


Appendix C Rev 11                     Job Performance Measure                     Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1 NUREG-1021, Revision 11 Page 5 of 6
: 5. PERFORMANCE STEP: Determine Transient Poison worth, (tp), for Transient Reactivity Boron Equivalent (B(tr)
: 5.
STANDARD: Enters (-)2.6 %K/K for (tp) value from the Initial Conditions CUE:       None SAT UNSAT
PERFORMANCE STEP: Determine Transient Poison worth, (tp), for Transient Reactivity Boron Equivalent (B(tr)
: 6. PERFORMANCE STEP: Determine Pu-239 worth, (PU-max), for Transient Reactivity
STANDARD: Enters (-)2.6 %K/K for (tp) value from the Initial Conditions CUE:
    ........C........             Boron Equivalent (B(tr)
None SAT UNSAT
: 6.
PERFORMANCE STEP: Determine Pu-239 worth, (PU-max), for Transient Reactivity  
........C........
Boron Equivalent (B(tr)
STANDARD: From Figure 20B, determines a value of 0.1375 to 0.1385 %K/K for (PU-max)
STANDARD: From Figure 20B, determines a value of 0.1375 to 0.1385 %K/K for (PU-max)
COMMENT: Actual value is 0.138 %K/K CUE:       None SAT UNSAT
COMMENT: Actual value is 0.138 %K/K CUE:
: 7. PERFORMANCE STEP: Determine Transient Poison Conversion Factor (TPCF) for
None SAT UNSAT
    ........C........             Transient Reactivity Boron Equivalent, B(tr)
: 7.
PERFORMANCE STEP: Determine Transient Poison Conversion Factor (TPCF) for  
........C........
Transient Reactivity Boron Equivalent, B(tr)
STANDARD: Determines a value of 85 from Table 1 of the ROCB CUE: None SAT UNSAT
STANDARD: Determines a value of 85 from Table 1 of the ROCB CUE: None SAT UNSAT
: 8. PERFORMANCE STEP: Determine CF(B10) for Transient Reactivity Boron Equivalent, B(tr)
: 8.
STANDARD: Enters 0.96 value for CF(B10) value from Initial Conditions CUE:       None SAT UNSAT
PERFORMANCE STEP: Determine CF(B10) for Transient Reactivity Boron Equivalent, B(tr)
: 9. PERFORMANCE STEP: Determine Transient Reactivity Boron Equivalent, B(tr)
STANDARD: Enters 0.96 value for CF(B10) value from Initial Conditions CUE:
    ........C........
None SAT UNSAT
STANDARD: Performs calculation for B(tr) on Attachment 10. Determine value of 217.94 to 218.04 ppmB Comment: Actual value is 217.99 CUE:       None SAT UNSAT NUREG-1021, Revision 11                    Page 5 of 6
: 9.
PERFORMANCE STEP: Determine Transient Reactivity Boron Equivalent, B(tr)  
........C........
STANDARD: Performs calculation for B(tr) on Attachment 10. Determine value of 217.94 to 218.04 ppmB Comment: Actual value is 217.99 CUE:
None SAT UNSAT  


Appendix C Rev 11                 Job Performance Measure                 Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1 NUREG-1021, Revision 11 Page 6 of 6
: 10. PERFORMANCE STEP: Determine Minimum RCS Boron Concentration for 1% SDM
: 10. PERFORMANCE STEP: Determine Minimum RCS Boron Concentration for 1% SDM  
    ........C........
........C........
STANDARD: Performs calculation on Attachment 10. Determine value of 1331 to1343 ppmB COMMENT: Actual value is 1336.9 ppmB CUE:       None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the examinee)
STANDARD: Performs calculation on Attachment 10. Determine value of 1331 to1343 ppmB COMMENT: Actual value is 1336.9 ppmB CUE:
END TIME__________
None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the examinee)
NUREG-1021, Revision 11                Page 6 of 6
END TIME__________  


Davis-Besse Initial License Exam 2020 Admin JPM RO-A2
Davis-Besse Initial License Exam 2020 Admin JPM RO-A2


Appendix C Rev 11                       Job Performance Measure                         Form ES-C-1 Worksheet ADMIN JPM RO-A2 R1 Facility: Davis-Besse                                   Task No:119-035-0100 Task
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A2 R1 NUREG-1021, Revision 11 Page 1 of 5 Facility: Davis-Besse Task No:119-035-0100 Task


==Title:==
==Title:==
Line 191: Line 231:


==Reference:==
==Reference:==
2.2.37         (3.6)         Job Performance Measure No: RO-A2 (NEW-319)
2.2.37 (3.6)
Job Performance Measure No: RO-A2 (NEW-319)
Examinee:
Examinee:
NRC Examiner:                                                           Date:
NRC Examiner:
Date:
Method of testing:
Method of testing:
Simulated Performance ___                         Actual Performance _X_
Simulated Performance ___
Classroom _X_                     Simulator ___               Plant ___
Actual Performance _X_
Classroom _X_
Simulator ___
Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Line 206: Line 251:


==References:==
==References:==
None Initiating Cue:
None Initiating Cue:
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
Line 212: Line 256:
No Alternate Path:
No Alternate Path:
No Validation Time:
No Validation Time:
20 minutes NUREG-1021, Revision 11                      Page 1 of 5
20 minutes  


Appendix C Rev 11                 Job Performance Measure                     Form ES-C-1 Worksheet ADMIN JPM RO-A2 R1 EXAMINER COPY INITIAL CONDITIONS:
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A2 R1 NUREG-1021, Revision 11 Page 2 of 5 EXAMINER COPY INITIAL CONDITIONS:
The Plant is at 100% Power Component Cooling Water Pump 2 is in service Make-up Pump 1 is in service A small leak has developed in the piping near CC269, COMPONENT COOLING NON-ESSENTIAL HEADER TO MAKE-UP PUMPS SUPPLY HEADER TEST CONNECTION INITIATION CUE:
The Plant is at 100% Power Component Cooling Water Pump 2 is in service Make-up Pump 1 is in service A small leak has developed in the piping near CC269, COMPONENT COOLING NON-ESSENTIAL HEADER TO MAKE-UP PUMPS SUPPLY HEADER TEST CONNECTION INITIATION CUE:
The Shift Manager directs you to;
The Shift Manager directs you to;
: 1. Determine the isolation boundaries for CC269, COMPONENT COOLING NON-ESSENTIAL HEADER TO MAKE-UP PUMPS SUPPLY HEADER TEST CONNECTION AND
: 1. Determine the isolation boundaries for CC269, COMPONENT COOLING NON-ESSENTIAL HEADER TO MAKE-UP PUMPS SUPPLY HEADER TEST CONNECTION AND
: 2. List what equipment is affected and recommend what actions should be taken on this page below (Hand Candidate Copy of Operational Schematics OS-021 SH 1 and 2)
: 2. List what equipment is affected and recommend what actions should be taken on this page below (Hand Candidate Copy of Operational Schematics OS-021 SH 1 and 2)  
NUREG-1021, Revision 11                Page 2 of 5


Appendix C Rev 11                 Job Performance Measure                     Form ES-C-1 Worksheet ADMIN JPM RO-A2 R1 CANDIDATE COPY INITIAL CONDITIONS:
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A2 R1 NUREG-1021, Revision 11 Page 3 of 5 CANDIDATE COPY INITIAL CONDITIONS:
The Plant is at 100% Power Component Cooling Water Pump 2 is in service Make-up Pump 1 is in service A small leak has developed in the piping near CC269, COMPONENT COOLING NON-ESSENTIAL HEADER TO MAKE-UP PUMPS SUPPLY HEADER TEST CONNECTION INITIATION CUE:
The Plant is at 100% Power Component Cooling Water Pump 2 is in service Make-up Pump 1 is in service A small leak has developed in the piping near CC269, COMPONENT COOLING NON-ESSENTIAL HEADER TO MAKE-UP PUMPS SUPPLY HEADER TEST CONNECTION INITIATION CUE:
The Shift Manager directs you to;
The Shift Manager directs you to;
: 1. Determine the isolation boundaries for CC269, COMPONENT COOLING NON-ESSENTIAL HEADER TO MAKE-UP PUMPS SUPPLY HEADER TEST CONNECTION AND
: 1. Determine the isolation boundaries for CC269, COMPONENT COOLING NON-ESSENTIAL HEADER TO MAKE-UP PUMPS SUPPLY HEADER TEST CONNECTION AND
: 2. List what equipment is affected and recommend what actions should be taken on this page below NUREG-1021, Revision 11                Page 3 of 5
: 2. List what equipment is affected and recommend what actions should be taken on this page below  


Appendix C Rev 11                 Job Performance Measure                       Form ES-C-1 Worksheet ADMIN JPM RO-A2 R1 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A2 R1 NUREG-1021, Revision 11 Page 4 of 5 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".
START TIME: _______
START TIME: _______
NOTE: STEPS CAN BE PERFORMED IN ANY SEQUENCE
NOTE: STEPS CAN BE PERFORMED IN ANY SEQUENCE
: 1. PERFORMANCE STEP: Determines that valve CC1460 must be closed
: 1.
    ........C........
PERFORMANCE STEP: Determines that valve CC1460 must be closed  
STANDARD: Identifies CC1460, CCW TO MAKE-UP PUMP HEADER INLET will be closed NOTE: CC125, CCW TO MAKE-UP PUMP & EMERGENCY INSTRUMENT AIR COMPRESSOR HEADER INLET ISOLATION is also acceptable CUE:       None SAT UNSAT
........C........
: 2. PERFORMANCE STEP: Determines that valve CC127 must be closed
STANDARD: Identifies CC1460, CCW TO MAKE-UP PUMP HEADER INLET will be closed NOTE: CC125, CCW TO MAKE-UP PUMP & EMERGENCY INSTRUMENT AIR COMPRESSOR HEADER INLET ISOLATION is also acceptable CUE:
    ........C........
None SAT UNSAT
: 2.
PERFORMANCE STEP: Determines that valve CC127 must be closed  
........C........
STANDARD: Identifies CC127, MAKE-UP PUMP 1 CCW INLET STOP CHECK TO LUBE OIL COOLER will be closed CUE: None SAT UNSAT
STANDARD: Identifies CC127, MAKE-UP PUMP 1 CCW INLET STOP CHECK TO LUBE OIL COOLER will be closed CUE: None SAT UNSAT
: 3. PERFORMANCE STEP: Determines that CC128 should be closed (stop check valve)
: 3.
STANDARD: Identifies CC128, MAKE-UP PUMP 2 CCW INLET STOP CHECK TO LUBE OIL COOLER will be closed CUE:       None SAT UNSAT NUREG-1021, Revision 11                  Page 4 of 5
PERFORMANCE STEP: Determines that CC128 should be closed (stop check valve)
STANDARD: Identifies CC128, MAKE-UP PUMP 2 CCW INLET STOP CHECK TO LUBE OIL COOLER will be closed CUE:
None SAT UNSAT


Appendix C Rev 11                     Job Performance Measure                     Form ES-C-1 Worksheet ADMIN JPM RO-A2 R1
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A2 R1 NUREG-1021, Revision 11 Page 5 of 5
: 3. PERFORMANCE STEP: Identifies the effect of isolating CC269 will have on plant
: 3.
    ........C........             equipment COMMENT: CC1460, CCW TO MAKE UP PUMP HEADER INLET, supplies non-essential CCW to the Makeup Pumps and the Makeup Pump Aux Gear Oil Systems.
PERFORMANCE STEP: Identifies the effect of isolating CC269 will have on plant  
........C........
equipment COMMENT: CC1460, CCW TO MAKE UP PUMP HEADER INLET, supplies non-essential CCW to the Makeup Pumps and the Makeup Pump Aux Gear Oil Systems.
When CC1460 is closed, Makeup Pump oil bearing cooling water will be supplied by the respective CCW Essential Lines for the Makeup Pumps.
When CC1460 is closed, Makeup Pump oil bearing cooling water will be supplied by the respective CCW Essential Lines for the Makeup Pumps.
MU Pump operation without CCW cooling shall be limited to a maximum of 1 hour.
MU Pump operation without CCW cooling shall be limited to a maximum of 1 hour.
STANDARD: Identifies that closing CC1460 OR CC125 will isolate non-essential cooling water to MUP 1 Recommends starting CCW Pump 1 to supply essential header cooling water to MUP 1 NOTE: Swap MUPs is also acceptable CUE:       None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examinee)
STANDARD: Identifies that closing CC1460 OR CC125 will isolate non-essential cooling water to MUP 1 Recommends starting CCW Pump 1 to supply essential header cooling water to MUP 1 NOTE: Swap MUPs is also acceptable CUE:
END TIME __________
None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examinee)
NUREG-1021, Revision 11                    Page 5 of 5
END TIME __________  


Davis-Besse Initial License Exam 2020 Admin JPM RO-A3
Davis-Besse Initial License Exam 2020 Admin JPM RO-A3  


Appendix C Rev 11                       Job Performance Measure                         Form ES-C-1 Worksheet ADMIN JPM RO-A3 R1 Facility: Davis-Besse                             Task No: 000-044-05-0100 Task
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A3 R1 NUREG-1021, Revision 11 Page 1 of 5 Facility: Davis-Besse Task No: 000-044-05-0100 Task


==Title:==
==Title:==
Line 256: Line 306:


==Reference:==
==Reference:==
2.3.5         (2.9)         Job Performance Measure No: RO-A3 (JPM 316)
2.3.5 (2.9)
Job Performance Measure No: RO-A3 (JPM 316)
Examinee:
Examinee:
NRC Examiner:                                                   Date:
NRC Examiner:
Date:
Method of testing:
Method of testing:
Simulated Performance ___                         Actual Performance _X_
Simulated Performance ___
Classroom _X_                     Simulator ___               Plant ___
Actual Performance _X_
Classroom _X_
Simulator ___
Plant ___
Read to the examinee:
Read to the examinee:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.
Line 272: Line 327:


==References:==
==References:==
DB-OP-02531, SG Tube Leaks, Attachment 1, SG Tube Leak Rate calculations Chemistry Data Sheet Initiating Cue:
DB-OP-02531, SG Tube Leaks, Attachment 1, SG Tube Leak Rate calculations Chemistry Data Sheet Initiating Cue:
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.
Time Critical Task:
Time Critical Task:
No Validation Time:
No Validation Time:
15 minutes NUREG-1021, Revision 11                      Page 1 of 5
15 minutes  


Appendix C Rev 11                 Job Performance Measure                   Form ES-C-1 Worksheet ADMIN JPM RO-A3 R1 EXAMINER COPY INITIAL CONDITIONS:
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A3 R1 NUREG-1021, Revision 11 Page 2 of 5 EXAMINER COPY INITIAL CONDITIONS:
The unit is at 100% power SG 1 has a tube leak Pressurizer level is 220 inches and steady The Computer Calculation for RCS Leakage is NOT available EO reports Steam Jet Air Ejector flow is 15 scfm INITIATING CUE:
The unit is at 100% power SG 1 has a tube leak Pressurizer level is 220 inches and steady The Computer Calculation for RCS Leakage is NOT available EO reports Steam Jet Air Ejector flow is 15 scfm INITIATING CUE:
The Shift Manager directs you to perform a SG Tube Leak calculation using
The Shift Manager directs you to perform a SG Tube Leak calculation using DB-OP-02531  
* DB-OP-02531
*, RCS LEAK RATE CALCULATION Section 4, Leak Rate Estimation Using RE 1003A or RE 1003B Provide the examinee a copy of DB-OP-02531 Attachment 1, RCS Leak Rate Calculation Pictures of RE 1003A and RE 1003B Chemistry Data Sheet  
* Attachment 1, RCS LEAK RATE CALCULATION
* Section 4, Leak Rate Estimation Using RE 1003A or RE 1003B Provide the examinee a copy of
* DB-OP-02531 Attachment 1, RCS Leak Rate Calculation
* Pictures of RE 1003A and RE 1003B
* Chemistry Data Sheet NUREG-1021, Revision 11                  Page 2 of 5


Appendix C Rev 11                 Job Performance Measure                   Form ES-C-1 Worksheet ADMIN JPM RO-A3 R1 CANDIDATE COPY INITIAL CONDITIONS:
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A3 R1 NUREG-1021, Revision 11 Page 3 of 5 CANDIDATE COPY INITIAL CONDITIONS:
The unit is at 100% power SG 1 has a tube leak Pressurizer level is 220 inches and steady The Computer Calculation for RCS Leakage is NOT available EO reports Steam Jet Air Ejector flow is 15 scfm INITIATING CUE:
The unit is at 100% power SG 1 has a tube leak Pressurizer level is 220 inches and steady The Computer Calculation for RCS Leakage is NOT available EO reports Steam Jet Air Ejector flow is 15 scfm INITIATING CUE:
The Shift Manager directs you to perform a SG Tube Leak calculation using
The Shift Manager directs you to perform a SG Tube Leak calculation using DB-OP-02531  
* DB-OP-02531
*, RCS LEAK RATE CALCULATION Section 4, Leak Rate Estimation Using RE 1003A or RE 1003B  
* Attachment 1, RCS LEAK RATE CALCULATION
* Section 4, Leak Rate Estimation Using RE 1003A or RE 1003B NUREG-1021, Revision 11                  Page 3 of 5


Appendix C Rev 11                   Job Performance Measure                     Form ES-C-1 Worksheet ADMIN JPM RO-A3 R1 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments".
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A3 R1 NUREG-1021, Revision 11 Page 4 of 5 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments".
START TIME:
START TIME:
: 1. PERFORMANCE STEP: Record Date and time STANDARD: Correct date and time used CUE: None SAT UNSAT
: 1.
: 2. PERFORMANCE STEP: Record Steam Jet Air Ejector radiation levels
PERFORMANCE STEP: Record Date and time STANDARD: Correct date and time used CUE: None SAT UNSAT
    ........C........
: 2.
PERFORMANCE STEP: Record Steam Jet Air Ejector radiation levels  
........C........
STANDARD: Correctly read RE 1003A (1.02E4 cpm) and RE 1003B (3.97E3 cpm)
STANDARD: Correctly read RE 1003A (1.02E4 cpm) and RE 1003B (3.97E3 cpm)
CUE: None SAT UNSAT
CUE: None SAT UNSAT
: 3. PERFORMANCE STEP: Convert RE readings (cpm) to Ci/cc
: 3.
    ........C........
PERFORMANCE STEP: Convert RE readings (cpm) to Ci/cc  
........C........
STANDARD: Correctly multiply SJAE reading by conversion factor:
STANDARD: Correctly multiply SJAE reading by conversion factor:
RE 1003A = 6.63E-05 Ci/cc RE 1003B = 1.27E-04 Ci/cc COMMENT: Acceptable Range RE 1003A = 6.6E-05 to 6.7E-05Ci/cc RE 1003B = 1.2E-04 to 1.3E-04Ci/cc CUE: None SAT UNSAT NUREG-1021, Revision 11                  Page 4 of 5
RE 1003A = 6.63E-05 Ci/cc RE 1003B = 1.27E-04 Ci/cc COMMENT: Acceptable Range RE 1003A = 6.6E-05 to 6.7E-05Ci/cc RE 1003B = 1.2E-04 to 1.3E-04Ci/cc CUE: None SAT UNSAT  


Appendix C Rev 11                   Job Performance Measure                     Form ES-C-1 Worksheet ADMIN JPM RO-A3 R1
Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A3 R1 NUREG-1021, Revision 11 Page 5 of 5
: 4. PERFORMANCE STEP: Record Steam Jet Air Ejector (SJAE) flow from FI1002
: 4.
    ........C........
PERFORMANCE STEP: Record Steam Jet Air Ejector (SJAE) flow from FI1002  
........C........
STANDARD: Correctly record 15 scfm, as given in the initial cue by an EO CUE: None SAT UNSAT
STANDARD: Correctly record 15 scfm, as given in the initial cue by an EO CUE: None SAT UNSAT
: 5. PERFORMANCE STEP: Record the latest RCS Xe-133 activity from Chemistry
: 5.
    ........C........
PERFORMANCE STEP: Record the latest RCS Xe-133 activity from Chemistry  
........C........
STANDARD: Refers to the Chemistry Data Sheet, correctly record RCS Xe-133 activity (6.66E-03 Ci/cc)
STANDARD: Refers to the Chemistry Data Sheet, correctly record RCS Xe-133 activity (6.66E-03 Ci/cc)
CUE: None SAT UNSAT
CUE: None SAT UNSAT
: 6. PERFORMANCE STEP: Calculate primary-to-secondary tube leak using RE 1003B
: 6.
    ........C........
PERFORMANCE STEP: Calculate primary-to-secondary tube leak using RE 1003B  
........C........
STANDARD: Correctly calculate tube leak using RE 1003B (2.14 gpm)
STANDARD: Correctly calculate tube leak using RE 1003B (2.14 gpm)
COMMENT: Acceptable Range 2 to 3 gpm CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examinee)
COMMENT: Acceptable Range 2 to 3 gpm CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examinee)
END TIME_________
END TIME_________  
NUREG-1021, Revision 11                    Page 5 of 5


CLEAR PO NU        W Page 1 of 2                                     SS    E ER DAVIS-BE                            TION STA CHEMISTRY ANALYSES STATUS                                                                          7 3   Li CH EMISTRY PRIMARY (RCS)                                             SECONDARY (FEEDWATER)
CHEMISTRY ANALYSES STATUS Page 1 of 2 Li 7
Date: Today                                                   Date: Today Specification                       Value                       Specification                               Value 5                             O2       <2               ppb     5                           O2             <2                         ppb 50                           Cl-     0.73               ppb     20                       N2H4             74                         ppb 50                             F-     0.94             ppb     10                       SiO2             <5                         ppb 50                         SO4-2     0.19             ppb     1                         Na+             0.06                       ppb DBRM-CHEM-0001                 Li     1.27             ppm     3                           Cl-             0.28                       ppb 25 - 50                       H2       37.3             cc/kg   1                         SO4-2             <0.064                     ppb 10                           Zinc     4.84             ppb     5                   Total Iron             0.37                       ppb 1.0                 DEI-131           1.23E-4     &#xb5;Ci/gm       2                         ETA               2.53                       ppm
3 D
*2x steady state value I-131           3.42E-5     &#xb5;Ci/gm       6                       MPA               7.28                       ppm
A V
*Increase of 0.01         Xe-133     6.66E-03 &#xb5;Ci/gm           <100 Condensate Dissolved O2                 8.1                         ppb
I S
*<1.0 Xe-133/Xe-135 Ratio             0.85                       CEI-R (Month): 0.04           CEI-R (Rolling): 0.23 100/               Specific Act.       0.15         &#xb5;Ci/gm       Issues/Challenges: None.
B E
100/   Maximum Limit           913         &#xb5;Ci/gm             Makeup Tank Pressure Band: 30-40 psig BORON (PPM)                                           Primary-To-Secondary Leakage
S S
                                            **Acceptable Vessel      Measured    Effective                        Time     Date     Based on RI-1003: <1.98 gal per day Range RCS             291                                         0800   10/11/19     Based on DB-CH-03031: <5 gal per day PZR             345                                         1640   10/4/19       Details for RE1003A/B Equivalent cpm 2626 - 2772                            for OTSG leakage are on page 2 of 2 BWST           2748       2711                             0955   10/8/19 BAAT 1           11372       11297         7954 - 12994       0130   10/5/19                       NOTES
E N
* IF any Fuel Integrity Action Level is BAAT 2          12165        12153        7954 - 12994      0123  9/28/19        reached, THEN make notifications in accordance with NOP-NF-1102, Fuel CWRT 1             2691       2684           2626-2772         0920   8/27/19       Integrity Monitoring and Assessment.
U C
CWRT 2             1149                                         1730   8/23/18 CFT 1         2916       2903           2626 - 3465       1048   9/19/19
L E
                                                                                    ** Acceptable Range is for Effective CFT 2         2880       2880           2626 - 3465       1425   9/19/19         boron results and accounts for 1%
A R
SFP           2608       2576             630           0820   10/8/19         analysis uncertainty. Effective boron results are corrected for Boron-10 Refuel Canal       N/A                       Per COLR         N/A       N/A         depletion.
P O
Comments:
W E
R S
T A
T I
O N
C H
E M
I S
T R
Y PRIMARY (RCS)
SECONDARY (FEEDWATER)
Date: Today Date:
Today Specification Value Specification Value 5
O2 <2 ppb 5
O2  
<2 ppb 50 Cl- 0.73 ppb 20 N2H4 74 ppb 50 F- 0.94 ppb 10 SiO2  
<5 ppb 50 SO4-2 0.19 ppb 1
Na+
0.06 ppb DBRM-CHEM-0001 Li 1.27 ppm 3
Cl-0.28 ppb 25 - 50 H2 37.3 cc/kg 1
SO4-2  
<0.064 ppb 10 Zinc 4.84 ppb 5
Total Iron 0.37 ppb 1.0 DEI-131 1.23E-4  
&#xb5;Ci/gm 2
ETA 2.53 ppm  
*2x steady state value I-131 3.42E-5  
&#xb5;Ci/gm 6
MPA 7.28 ppm  
*Increase of 0.01 Xe-133 6.66E-03 &#xb5;Ci/gm  
<100 Condensate Dissolved O2 8.1 ppb  
*<1.0 Xe-133/Xe-135 Ratio 0.85 CEI-R (Month): 0.04 CEI-R (Rolling): 0.23 Issues/Challenges: None.
100/
Specific Act.
0.15  
&#xb5;Ci/gm 100/ Maximum Limit 913  
&#xb5;Ci/gm Makeup Tank Pressure Band: 30-40 psig BORON (PPM)
Primary-To-Secondary Leakage Vessel Measured Effective
**Acceptable Range Time Date Based on RI-1003: <1.98 gal per day RCS 291 0800 10/11/19 Based on DB-CH-03031: <5 gal per day PZR 345 1640 10/4/19 Details for RE1003A/B Equivalent cpm for OTSG leakage are on page 2 of 2 BWST 2748 2711 2626 - 2772 0955 10/8/19 BAAT 1 11372 11297 7954 - 12994 0130 10/5/19 NOTES
* IF any Fuel Integrity Action Level is reached, THEN make notifications in accordance with NOP-NF-1102, Fuel Integrity Monitoring and Assessment.
BAAT 2 12165 12153 7954 - 12994 0123 9/28/19 CWRT 1 2691 2684 2626-2772 0920 8/27/19 CWRT 2 1149 1730 8/23/18 CFT 1 2916 2903 2626 - 3465 1048 9/19/19  
** Acceptable Range is for Effective boron results and accounts for 1%
analysis uncertainty. Effective boron results are corrected for Boron-10 depletion.
CFT 2 2880 2880 2626 - 3465 1425 9/19/19 SFP 2608 2576 630 0820 10/8/19 Refuel Canal N/A Per COLR N/A N/A Comments:  


CLEAR PO NU        W Page 2 of 2                                 SS    E ER DAVIS-BE                            TION STA CHEMISTRY ANALYSES STATUS                                                                7 3   Li CH EMISTRY RE 1003A/B Equivalent cpm for OTSG Leakage Date determined Today Based on RCS Xe-133 6.66E-03 &#xb5;Ci/cc Based on FI 1002 15 cfm RE 1003A                 RE 1003B Efficiency used for calculation   6.5E-9       &#xb5;Ci/cc/cpm   3.2E-8               &#xb5;Ci/cc/cpm 5 GPD           1.2E2       cpm         1.5E2               cpm 30 GPD           1.5E2       cpm         1.5E2               cpm 75 GPD           2.0E2       cpm         1.6E2               cpm 150 GPD           2.9E2       cpm         1.8E2               cpm Increase of 30 GPD           3.5E1       cpm         7.1E0               cpm Comment:
CHEMISTRY ANALYSES STATUS Page 2 of 2 Li 7
Completed by                                                         Date/Time               /
3 D
Verified by                                                           Date/Time               /
A V
Reviewed by                                                           Date/Time               /
I S
B E
S S
E N
U C
L E
A R
P O
W E
R S
T A
T I
O N
C H
E M
I S
T R
Y RE 1003A/B Equivalent cpm for OTSG Leakage Date determined Today Based on RCS Xe-133 6.66E-03 &#xb5;Ci/cc Based on FI 1002 15 cfm RE 1003A RE 1003B Efficiency used for calculation 6.5E-9  
&#xb5;Ci/cc/cpm 3.2E-8  
&#xb5;Ci/cc/cpm 5 GPD 1.2E2 cpm 1.5E2 cpm 30 GPD 1.5E2 cpm 1.5E2 cpm 75 GPD 2.0E2 cpm 1.6E2 cpm 150 GPD 2.9E2 cpm 1.8E2 cpm Increase of 30 GPD 3.5E1 cpm 7.1E0 cpm Comment:
Completed by Date/Time  
/
Verified by Date/Time  
/
Reviewed by Date/Time  
/
Shift Manager}}
Shift Manager}}

Latest revision as of 00:27, 15 December 2024

RO Admin JPMs
ML20078L058
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/27/2020
From: Gregory Roach
FirstEnergy Nuclear Operating Co
To:
NRC/RGN-III/DRS/OLB
Roach G
Shared Package
ML19121A165 List:
References
Download: ML20078L058 (29)


Text

Davis-Besse Initial License Exam 2020 Admin JPM RO-A1.1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.1 R1 NUREG-1021, Revision 11 Page 1 of 5 Facility: Davis-Besse Task No: 004-006-01-0100 Task

Title:

Perform a BWST Fill Calculation K/A

Reference:

2.1.23 (4.3)

Job Performance Measure No: RO-A1.1 (JPM 172)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom _X_

Simulator ___

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Perform a BWST fill calculation in accordance with Attachment 4 of DB OP-06015, Borated Water Storage Tank Operating Procedure Required Materials: of DB-OP-06015 Calculator General

References:

None Initiating Cue:

The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.

Time Critical Task:

No Alternate Path:

No Validation Time:

30 minutes

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.1 R1 NUREG-1021, Revision 11 Page 2 of 5 EXAMINER COPY INITIAL CONDITIONS:

The plant is in Mode 5 following a refueling outage The BWST is at 38 feet and 2640 ppmB BAAT 1 is at 12000 ppmB CWRT 1 is at 1100 ppmB The START program is NOT available INITIATING CUES:

The Shift Manager desires the BWST level to be raised to 40.5 feet and boron concentration maintained at 2640 ppmB The Unit Supervisor directs you to perform a BWST fill calculation in accordance with of DB-OP-06015, Borated Water Storage Tank Operating Procedure using Boric Acid Addition Tank 1 and Clean Waste Receiver Tank 1 (Provide the examinee a copy of Attachment 4 of DB-OP-06015 and a calculator)

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.1 R1 NUREG-1021, Revision 11 Page 3 of 5 CANDIDATE COPY INITIAL CONDITIONS:

The plant is in Mode 5 following a refueling outage The BWST is at 38 feet and 2640 ppmB BAAT 1 is at 12000 ppmB CWRT 1 is at 1100 ppmB The START program is NOT available INITIATING CUES:

The Shift Manager desires the BWST level to be raised to 40.5 feet and boron concentration maintained at 2640 ppmB The Unit Supervisor directs you to perform a BWST fill calculation in accordance with of DB-OP-06015, Borated Water Storage Tank Operating Procedure using Boric Acid Addition Tank 1 and Clean Waste Receiver Tank 1

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.1 R1 NUREG-1021, Revision 11 Page 4 of 5 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments".

START TIME: _______

1.

PERFORMANCE STEP: Determine Calculation Method STANDARD: Use Method B of Attachment 4 CUE:

None SAT UNSAT

2. PERFORMANCE STEP: Calculate the initial volume of the BWST

........C........

STANDARD: 12,962 gal/ft x 38 ft + 4316 gal = 496872 gal Enter 496872 gal and 2640 ppmB CUE: None SAT UNSAT

3. PERFORMANCE STEP: Calculate desired BWST volume after the solution addition

........C........

STANDARD: 12,962 gal/ft x 40.5 ft + 4316 gal = 529277 gal Enter 529277 gal and 2640 ppmB CUE: None SAT UNSAT

4.

PERFORMANCE STEP: Calculate total volume to be added to the BWST

........C........

STANDARD: 529277 gal - 496872 gal = 32405 gal CUE:

None SAT UNSAT

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.1 R1 NUREG-1021, Revision 11 Page 5 of 5

5.

PERFORMANCE STEP: Initiate Part 2 of Section B of Attachment 4 STANDARD: Enter the following values in Part 2:

Volume to be added - 32405 gal Boron concentration of solution - 2640 ppmB Boron source and concentration - BAAT 1, 12,000 ppmB Water source and concentration - CWRT 1, 1100 ppmB CUE: None SAT UNSAT

6.

PERFORMANCE STEP: Calculate volume of acid solution

........C........

STANDARD: 32405 gal x (2640 ppmB - 1100 ppmB) 12000 ppmB - 1100 ppmB

= 4578.3211 gal NOTE: Acceptable range is 4578 to 4579 gal CUE:

None SAT UNSAT

7.

PERFORMANCE STEP: Calculate volume of water solution

........C........

STANDARD: 32405 gal - 4578.3211 gal = 27826.6789 gal NOTE: Acceptable range is 27826 to 27827 gal CUE:

None SAT UNSAT

8.

PERFORMANCE STEP: Complete Attachment 4 STANDARD: Sign and date attachment CUE:

None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the examinee)

END TIME__________

Davis-Besse Initial License Exam 2020 Admin JPM RO-A1.2

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1 NUREG-1021, Revision 11 Page 1 of 6 Facility: Davis-Besse Task No: 004-006-01-0100 Task

Title:

Determine the boron concentration needed to ensure 1% SDM with two stuck rods K/A

Reference:

2.1.25 (3.9)

Job Performance Measure No: RO-A1.2 (JPM 272)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom _X_

Simulator ___

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Determine the boron concentration needed to ensure 1% SDM with two stuck rods Required Materials:

DB-NE-06202 DB-NE-06201 Calculator and ruler General

References:

None Initiating Cue:

The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.

Time Critical Task:

No Alternate Path:

No Validation Time:

30 minutes

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1 NUREG-1021, Revision 11 Page 2 of 6 EXAMINER COPY INITIAL CONDITIONS:

The plant is in Mode 3 following a reactor trip.

Two control rods failed to insert on the trip.

The START program is not available.

The following conditions exist:

Burnup:

500 EFPD Tave:

552°F The Reactor Engineer reports the following values:

Reactivity worth due to transient poisons:

(-) 2.6 %K/K Correction factor for Boron 10 depletion:

0.96 Reactivity Anomaly:

0.0 INITIATING CUES:

The Unit Supervisor directs you to determine the boron concentration needed to ensure 1%

shutdown margin in accordance with Section 14 of DB-NE-06202, Reactivity Balance Calculations, and DB-NE-06201, Reactor Operators Curve Book It is desired to take credit for transient poisons Provide Candidate a copy of;

  • DB-NE-06202
  • DB-NE-06201
  • Ruler and calculator

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1 NUREG-1021, Revision 11 Page 3 of 6 CANDIDATE COPY INITIAL CONDITIONS:

The plant is in Mode 3 following a reactor trip.

Two control rods failed to insert on the trip.

The START program is not available.

The following conditions exist:

Burnup:

500 EFPD Tave:

552°F The Reactor Engineer reports the following values:

Reactivity worth due to transient poisons:

(-) 2.6 %K/K Correction factor for Boron 10 depletion:

0.96 Reactivity Anomaly:

0.0 INITIATING CUES:

The Unit Supervisor directs you to determine the boron concentration needed to ensure 1%

shutdown margin in accordance with Section 14 of DB-NE-06202, Reactivity Balance Calculations, and DB-NE-06201, Reactor Operators Curve Book It is desired to take credit for transient poisons

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1 NUREG-1021, Revision 11 Page 4 of 6 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments".

START TIME: _______

1.

PERFORMANCE STEP: Determine B (ROCB SDM)

........C........

STANDARD: Determine B(ROCB SDM) from Figure 6C. Determines the value to be 1475 to 1485 ppmB and enters this value on Attachment 10.

COMMENT: Actual value is 1480 ppmB %K/K.

COMMENT: Sequence NOT required for this JPM except for last step CUE:

None SAT UNSAT

2.

PERFORMANCE STEP: Determine CF(B10)

STANDARD: Enters 0.96 value for CF(B10) value from Initial Conditions CUE:

None SAT UNSAT

3.

PERFORMANCE STEP: Determine Reactivity Worth of HFP Anomaly STANDARD: Enters 0 for anomaly value from Initial Conditions CUE:

None SAT UNSAT

4.

PERFORMANCE STEP: Determine the Differential Boron Worth (DBW).

STANDARD: Determine DBW value from Figure 5A. Determines value of - 0.00719 to

- 0.00723 %K/K.

COMMENT: Actual value is -0.00721 %K/K. Student may skip this step since it will divide into zero and be zero regardless of the value.

CUE:

None SAT UNSAT

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1 NUREG-1021, Revision 11 Page 5 of 6

5.

PERFORMANCE STEP: Determine Transient Poison worth, (tp), for Transient Reactivity Boron Equivalent (B(tr)

STANDARD: Enters (-)2.6 %K/K for (tp) value from the Initial Conditions CUE:

None SAT UNSAT

6.

PERFORMANCE STEP: Determine Pu-239 worth, (PU-max), for Transient Reactivity

........C........

Boron Equivalent (B(tr)

STANDARD: From Figure 20B, determines a value of 0.1375 to 0.1385 %K/K for (PU-max)

COMMENT: Actual value is 0.138 %K/K CUE:

None SAT UNSAT

7.

PERFORMANCE STEP: Determine Transient Poison Conversion Factor (TPCF) for

........C........

Transient Reactivity Boron Equivalent, B(tr)

STANDARD: Determines a value of 85 from Table 1 of the ROCB CUE: None SAT UNSAT

8.

PERFORMANCE STEP: Determine CF(B10) for Transient Reactivity Boron Equivalent, B(tr)

STANDARD: Enters 0.96 value for CF(B10) value from Initial Conditions CUE:

None SAT UNSAT

9.

PERFORMANCE STEP: Determine Transient Reactivity Boron Equivalent, B(tr)

........C........

STANDARD: Performs calculation for B(tr) on Attachment 10. Determine value of 217.94 to 218.04 ppmB Comment: Actual value is 217.99 CUE:

None SAT UNSAT

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A1.2 R1 NUREG-1021, Revision 11 Page 6 of 6

10. PERFORMANCE STEP: Determine Minimum RCS Boron Concentration for 1% SDM

........C........

STANDARD: Performs calculation on Attachment 10. Determine value of 1331 to1343 ppmB COMMENT: Actual value is 1336.9 ppmB CUE:

None SAT UNSAT TERMINATING CUES: This JPM is complete. (Terminated by the examinee)

END TIME__________

Davis-Besse Initial License Exam 2020 Admin JPM RO-A2

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A2 R1 NUREG-1021, Revision 11 Page 1 of 5 Facility: Davis-Besse Task No:119-035-0100 Task

Title:

Determine isolation boundary and effect on safety related equipment K/A

Reference:

2.2.37 (3.6)

Job Performance Measure No: RO-A2 (NEW-319)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom _X_

Simulator ___

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues Task Standard:

Identify boundary for isolating CC269 and recommend starting CCW Pump 1 to supply cooling water to MUP 1 or swap MUPs due to loss of non-essential cooling within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Required Materials:

Operational Schematics OS-021 SH 1 and 2 General

References:

None Initiating Cue:

The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.

Time Critical Task:

No Alternate Path:

No Validation Time:

20 minutes

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A2 R1 NUREG-1021, Revision 11 Page 2 of 5 EXAMINER COPY INITIAL CONDITIONS:

The Plant is at 100% Power Component Cooling Water Pump 2 is in service Make-up Pump 1 is in service A small leak has developed in the piping near CC269, COMPONENT COOLING NON-ESSENTIAL HEADER TO MAKE-UP PUMPS SUPPLY HEADER TEST CONNECTION INITIATION CUE:

The Shift Manager directs you to;

1. Determine the isolation boundaries for CC269, COMPONENT COOLING NON-ESSENTIAL HEADER TO MAKE-UP PUMPS SUPPLY HEADER TEST CONNECTION AND
2. List what equipment is affected and recommend what actions should be taken on this page below (Hand Candidate Copy of Operational Schematics OS-021 SH 1 and 2)

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A2 R1 NUREG-1021, Revision 11 Page 3 of 5 CANDIDATE COPY INITIAL CONDITIONS:

The Plant is at 100% Power Component Cooling Water Pump 2 is in service Make-up Pump 1 is in service A small leak has developed in the piping near CC269, COMPONENT COOLING NON-ESSENTIAL HEADER TO MAKE-UP PUMPS SUPPLY HEADER TEST CONNECTION INITIATION CUE:

The Shift Manager directs you to;

1. Determine the isolation boundaries for CC269, COMPONENT COOLING NON-ESSENTIAL HEADER TO MAKE-UP PUMPS SUPPLY HEADER TEST CONNECTION AND
2. List what equipment is affected and recommend what actions should be taken on this page below

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A2 R1 NUREG-1021, Revision 11 Page 4 of 5 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is NOT critical unless denoted in the "Comments".

START TIME: _______

NOTE: STEPS CAN BE PERFORMED IN ANY SEQUENCE

1.

PERFORMANCE STEP: Determines that valve CC1460 must be closed

........C........

STANDARD: Identifies CC1460, CCW TO MAKE-UP PUMP HEADER INLET will be closed NOTE: CC125, CCW TO MAKE-UP PUMP & EMERGENCY INSTRUMENT AIR COMPRESSOR HEADER INLET ISOLATION is also acceptable CUE:

None SAT UNSAT

2.

PERFORMANCE STEP: Determines that valve CC127 must be closed

........C........

STANDARD: Identifies CC127, MAKE-UP PUMP 1 CCW INLET STOP CHECK TO LUBE OIL COOLER will be closed CUE: None SAT UNSAT

3.

PERFORMANCE STEP: Determines that CC128 should be closed (stop check valve)

STANDARD: Identifies CC128, MAKE-UP PUMP 2 CCW INLET STOP CHECK TO LUBE OIL COOLER will be closed CUE:

None SAT UNSAT

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A2 R1 NUREG-1021, Revision 11 Page 5 of 5

3.

PERFORMANCE STEP: Identifies the effect of isolating CC269 will have on plant

........C........

equipment COMMENT: CC1460, CCW TO MAKE UP PUMP HEADER INLET, supplies non-essential CCW to the Makeup Pumps and the Makeup Pump Aux Gear Oil Systems.

When CC1460 is closed, Makeup Pump oil bearing cooling water will be supplied by the respective CCW Essential Lines for the Makeup Pumps.

MU Pump operation without CCW cooling shall be limited to a maximum of 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

STANDARD: Identifies that closing CC1460 OR CC125 will isolate non-essential cooling water to MUP 1 Recommends starting CCW Pump 1 to supply essential header cooling water to MUP 1 NOTE: Swap MUPs is also acceptable CUE:

None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examinee)

END TIME __________

Davis-Besse Initial License Exam 2020 Admin JPM RO-A3

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A3 R1 NUREG-1021, Revision 11 Page 1 of 5 Facility: Davis-Besse Task No: 000-044-05-0100 Task

Title:

Calculate Steam Generator Tube Leak Rate K/A

Reference:

2.3.5 (2.9)

Job Performance Measure No: RO-A3 (JPM 316)

Examinee:

NRC Examiner:

Date:

Method of testing:

Simulated Performance ___

Actual Performance _X_

Classroom _X_

Simulator ___

Plant ___

Read to the examinee:

I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues.

When you complete the task successfully, the objective for this job performance measure will be satisfied.

Initial Conditions:

The plant conditions are specified in the Initial Conditions and Initiating Cues.

Task Standard:

Determine SG Tube leak rate Required Materials:

Calculator General

References:

DB-OP-02531, SG Tube Leaks, Attachment 1, SG Tube Leak Rate calculations Chemistry Data Sheet Initiating Cue:

The Initiating Cues are specified in the Examiner/Student Copy Performance Measure pages.

Time Critical Task:

No Validation Time:

15 minutes

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A3 R1 NUREG-1021, Revision 11 Page 2 of 5 EXAMINER COPY INITIAL CONDITIONS:

The unit is at 100% power SG 1 has a tube leak Pressurizer level is 220 inches and steady The Computer Calculation for RCS Leakage is NOT available EO reports Steam Jet Air Ejector flow is 15 scfm INITIATING CUE:

The Shift Manager directs you to perform a SG Tube Leak calculation using DB-OP-02531

  • , RCS LEAK RATE CALCULATION Section 4, Leak Rate Estimation Using RE 1003A or RE 1003B Provide the examinee a copy of DB-OP-02531 Attachment 1, RCS Leak Rate Calculation Pictures of RE 1003A and RE 1003B Chemistry Data Sheet

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A3 R1 NUREG-1021, Revision 11 Page 3 of 5 CANDIDATE COPY INITIAL CONDITIONS:

The unit is at 100% power SG 1 has a tube leak Pressurizer level is 220 inches and steady The Computer Calculation for RCS Leakage is NOT available EO reports Steam Jet Air Ejector flow is 15 scfm INITIATING CUE:

The Shift Manager directs you to perform a SG Tube Leak calculation using DB-OP-02531

  • , RCS LEAK RATE CALCULATION Section 4, Leak Rate Estimation Using RE 1003A or RE 1003B

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A3 R1 NUREG-1021, Revision 11 Page 4 of 5 PERFORMANCE INFORMATION NOTE: Critical steps denoted with a "C". Failure to meet any one of these standards for this item constitutes failure. Sequence is assumed unless denoted in the "Comments".

START TIME:

1.

PERFORMANCE STEP: Record Date and time STANDARD: Correct date and time used CUE: None SAT UNSAT

2.

PERFORMANCE STEP: Record Steam Jet Air Ejector radiation levels

........C........

STANDARD: Correctly read RE 1003A (1.02E4 cpm) and RE 1003B (3.97E3 cpm)

CUE: None SAT UNSAT

3.

PERFORMANCE STEP: Convert RE readings (cpm) to Ci/cc

........C........

STANDARD: Correctly multiply SJAE reading by conversion factor:

RE 1003A = 6.63E-05 Ci/cc RE 1003B = 1.27E-04 Ci/cc COMMENT: Acceptable Range RE 1003A = 6.6E-05 to 6.7E-05Ci/cc RE 1003B = 1.2E-04 to 1.3E-04Ci/cc CUE: None SAT UNSAT

Appendix C Rev 11 Job Performance Measure Form ES-C-1 Worksheet ADMIN JPM RO-A3 R1 NUREG-1021, Revision 11 Page 5 of 5

4.

PERFORMANCE STEP: Record Steam Jet Air Ejector (SJAE) flow from FI1002

........C........

STANDARD: Correctly record 15 scfm, as given in the initial cue by an EO CUE: None SAT UNSAT

5.

PERFORMANCE STEP: Record the latest RCS Xe-133 activity from Chemistry

........C........

STANDARD: Refers to the Chemistry Data Sheet, correctly record RCS Xe-133 activity (6.66E-03 Ci/cc)

CUE: None SAT UNSAT

6.

PERFORMANCE STEP: Calculate primary-to-secondary tube leak using RE 1003B

........C........

STANDARD: Correctly calculate tube leak using RE 1003B (2.14 gpm)

COMMENT: Acceptable Range 2 to 3 gpm CUE: None SAT UNSAT TERMINATING CUES: This JPM is complete (Terminated by the examinee)

END TIME_________

CHEMISTRY ANALYSES STATUS Page 1 of 2 Li 7

3 D

A V

I S

B E

S S

E N

U C

L E

A R

P O

W E

R S

T A

T I

O N

C H

E M

I S

T R

Y PRIMARY (RCS)

SECONDARY (FEEDWATER)

Date: Today Date:

Today Specification Value Specification Value 5

O2 <2 ppb 5

O2

<2 ppb 50 Cl- 0.73 ppb 20 N2H4 74 ppb 50 F- 0.94 ppb 10 SiO2

<5 ppb 50 SO4-2 0.19 ppb 1

Na+

0.06 ppb DBRM-CHEM-0001 Li 1.27 ppm 3

Cl-0.28 ppb 25 - 50 H2 37.3 cc/kg 1

SO4-2

<0.064 ppb 10 Zinc 4.84 ppb 5

Total Iron 0.37 ppb 1.0 DEI-131 1.23E-4

µCi/gm 2

ETA 2.53 ppm

  • 2x steady state value I-131 3.42E-5

µCi/gm 6

MPA 7.28 ppm

  • Increase of 0.01 Xe-133 6.66E-03 µCi/gm

<100 Condensate Dissolved O2 8.1 ppb

  • <1.0 Xe-133/Xe-135 Ratio 0.85 CEI-R (Month): 0.04 CEI-R (Rolling): 0.23 Issues/Challenges: None.

100/

Specific Act.

0.15

µCi/gm 100/ Maximum Limit 913

µCi/gm Makeup Tank Pressure Band: 30-40 psig BORON (PPM)

Primary-To-Secondary Leakage Vessel Measured Effective

    • Acceptable Range Time Date Based on RI-1003: <1.98 gal per day RCS 291 0800 10/11/19 Based on DB-CH-03031: <5 gal per day PZR 345 1640 10/4/19 Details for RE1003A/B Equivalent cpm for OTSG leakage are on page 2 of 2 BWST 2748 2711 2626 - 2772 0955 10/8/19 BAAT 1 11372 11297 7954 - 12994 0130 10/5/19 NOTES
  • IF any Fuel Integrity Action Level is reached, THEN make notifications in accordance with NOP-NF-1102, Fuel Integrity Monitoring and Assessment.

BAAT 2 12165 12153 7954 - 12994 0123 9/28/19 CWRT 1 2691 2684 2626-2772 0920 8/27/19 CWRT 2 1149 1730 8/23/18 CFT 1 2916 2903 2626 - 3465 1048 9/19/19

    • Acceptable Range is for Effective boron results and accounts for 1%

analysis uncertainty. Effective boron results are corrected for Boron-10 depletion.

CFT 2 2880 2880 2626 - 3465 1425 9/19/19 SFP 2608 2576 630 0820 10/8/19 Refuel Canal N/A Per COLR N/A N/A Comments:

CHEMISTRY ANALYSES STATUS Page 2 of 2 Li 7

3 D

A V

I S

B E

S S

E N

U C

L E

A R

P O

W E

R S

T A

T I

O N

C H

E M

I S

T R

Y RE 1003A/B Equivalent cpm for OTSG Leakage Date determined Today Based on RCS Xe-133 6.66E-03 µCi/cc Based on FI 1002 15 cfm RE 1003A RE 1003B Efficiency used for calculation 6.5E-9

µCi/cc/cpm 3.2E-8

µCi/cc/cpm 5 GPD 1.2E2 cpm 1.5E2 cpm 30 GPD 1.5E2 cpm 1.5E2 cpm 75 GPD 2.0E2 cpm 1.6E2 cpm 150 GPD 2.9E2 cpm 1.8E2 cpm Increase of 30 GPD 3.5E1 cpm 7.1E0 cpm Comment:

Completed by Date/Time

/

Verified by Date/Time

/

Reviewed by Date/Time

/

Shift Manager