| title = Responds to NRC 830909 Ltr Re Violations Noted in IE Insp Repts 50-348/83-21 & 50-364/83-19.Corrective Actions: Detailed Review of Fire Protection Program Underway. Extension of 60 Days Requested for Response
| title = Responds to NRC Re Violations Noted in IE Insp Repts 50-348/83-21 & 50-364/83-19.Corrective Actions: Detailed Review of Fire Protection Program Underway. Extension of 60 Days Requested for Response
| author name = Clayton F
| author name = Clayton F
| author affiliation = ALABAMA POWER CO.
| author affiliation = ALABAMA POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8310250479
| document report number = NUDOCS 8310250479
| title reference date = 09-09-1983
| package number = ML20080T847
| package number = ML20080T847
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
Line 17: Line 18:


=Text=
=Text=
{{#Wiki_filter:r             .
{{#Wiki_filter:r Memng AsMr6es Alabama Power Company i.
Memng AsMr6es Alabama Power Company
600 North 18th Street
: i.
. Post Offico Box 2641 Birmirgham, Alabama 35291 Telephone 205 783-6081
* 600 North 18th Street
{J $ [j P O P
        . Post Offico Box 2641 Birmirgham, Alabama 35291 Telephone 205 783-6081                           {J $ [j P O P 'I! $ d ..
'I! $ d..e ATLAC^.i W W
e
.,, mp, 3,,
    ,  . ,, mp, 3,,                                     ATLAC^.i W W O'$c'%fg"'                                                                             AlabamaPbwer a s-~m acucsymm 83 SEP27 a7: 52 September 21, 1983 Docket No. 50-364 50-348 U. S. Nuclear Regulatory Commission Region II, Suita 3100 Division of Froject and Resident Programs 101 harietta Street N. W.
O'$c'%fg"'
Atlanta, GA 30303 Attention:         Mr. D. M. Verrelli, Chief - Project Branch 1 Inspection Repoet Nos. 50-348/83-21 and 50-36A/83-19 Gentlemen:
AlabamaPbwer 83 SEP27 a7: 52 a s-~m acucsymm September 21, 1983 Docket No. 50-364 50-348 U. S. Nuclear Regulatory Commission Region II, Suita 3100 Division of Froject and Resident Programs 101 harietta Street N. W.
Atlanta, GA 30303 Attention:
Mr. D. M. Verrelli, Chief - Project Branch 1 Inspection Repoet Nos. 50-348/83-21 and 50-36A/83-19 Gentlemen:
The NRC findings of the safety inspection conducted by W. H. Miller at Farley on August 16 - 19, 1983 (Report Nos. 50-348/83-21 and 50-364/83-19) have resulted in Alabama Power Company initiating a detailed review of several areas of the fire protection program.
The NRC findings of the safety inspection conducted by W. H. Miller at Farley on August 16 - 19, 1983 (Report Nos. 50-348/83-21 and 50-364/83-19) have resulted in Alabama Power Company initiating a detailed review of several areas of the fire protection program.
Procedures have already been revised to correct items A.1 and A.2 listed in Appendix A, Notice of Violation, but evaluation of A.3 continues.
Procedures have already been revised to correct items A.1 and A.2 listed in Appendix A, Notice of Violation, but evaluation of A.3 continues.
Extensive evaluation is also being done to determine the appropriate corrective action for item B of Appendix A. A detailed explanation of Alabama Power Company's corrective action in response to each of these items will be submitted in the formal response to the inspection report.
Extensive evaluation is also being done to determine the appropriate corrective action for item B of Appendix A.
As part of the above mentioned review, Alabama Power Company is                           '
A detailed explanation of Alabama Power Company's corrective action in response to each of these items will be submitted in the formal response to the inspection report.
also conducting a detailed comparison of Amendment 5 of the Farley Fire Protection Reevaluation Program (FPPR) to Amendment 4 of the FPPR to show that the changes are administrative and organizational in nature (reflecting the implementation of committed actions) and do not alter Alabama Power Company's licensing commitment to ensure adequate fire protection at Farley Nuclear Plant (FNP).                         In addition, Alabama Power Company has initiated a review of all design changes affecting fire protection systems implemented since receipt of operating licenses on each unit to ensure that the design process and field implementation did not inadvertently result in a degradation of the fire protection systems relied upon in FNP fire hazards analysis.
As part of the above mentioned review, Alabama Power Company is also conducting a detailed comparison of Amendment 5 of the Farley Fire Protection Reevaluation Program (FPPR) to Amendment 4 of the FPPR to show that the changes are administrative and organizational in nature (reflecting the implementation of committed actions) and do not alter Alabama Power Company's licensing commitment to ensure adequate fire protection at Farley Nuclear Plant (FNP).
In addition, Alabama Power Company has initiated a review of all design changes affecting fire protection systems implemented since receipt of operating licenses on each unit to ensure that the design process and field implementation did not inadvertently result in a degradation of the fire protection systems relied upon in FNP fire hazards analysis.
8310250479 831006 PDRADOCK05000g G
8310250479 831006 PDRADOCK05000g G


L   -
L
      .    .Mr. D. M. Verrelli                                     September 21, 1983 U. S. Nuclear Regulatory Commission                     Page 2 Based on che time required. to perform the detailed review described above, . Alabama Power Company requests a 60 day extension to the response date indicated in the NRC letter dated September 9,1983 which transmitted the formal inspection reports. A telephone discussion of this request was held between Mr. Floyd Cantrell and f1r. R. L. George on September 16, 1983.
.Mr. D. M. Verrelli September 21, 1983 U. S. Nuclear Regulatory Commission Page 2 Based on che time required. to perform the detailed review described above,. Alabama Power Company requests a 60 day extension to the response date indicated in the NRC {{letter dated|date=September 9, 1983|text=letter dated September 9,1983}} which transmitted the formal inspection reports.
A telephone discussion of this request was held between Mr. Floyd Cantrell and f1r. R. L. George on September 16, 1983.
If there are any questions regarding this request, please contact this office.
If there are any questions regarding this request, please contact this office.
Yours truly, i
Yours truly, i
R >Q Cra+ 152 F. L. Clayton, JrI F LCJ r/DRB : grs-D5 cc:   Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford i
R >Q Cra+ 152 I
  ~
F. L. Clayton, Jr F LCJ r/DRB : grs-D5 cc:
g                                                     r I
Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford i
h L}}
~
g r
I h
L}}

Latest revision as of 08:30, 14 December 2024

Responds to NRC Re Violations Noted in IE Insp Repts 50-348/83-21 & 50-364/83-19.Corrective Actions: Detailed Review of Fire Protection Program Underway. Extension of 60 Days Requested for Response
ML20080T853
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 09/21/1983
From: Clayton F
ALABAMA POWER CO.
To: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20080T847 List:
References
NUDOCS 8310250479
Download: ML20080T853 (2)


Text

r Memng AsMr6es Alabama Power Company i.

600 North 18th Street

. Post Offico Box 2641 Birmirgham, Alabama 35291 Telephone 205 783-6081

{J $ [j P O P

'I! $ d..e ATLAC^.i W W

.,, mp, 3,,

O'$c'%fg"'

AlabamaPbwer 83 SEP27 a7: 52 a s-~m acucsymm September 21, 1983 Docket No. 50-364 50-348 U. S. Nuclear Regulatory Commission Region II, Suita 3100 Division of Froject and Resident Programs 101 harietta Street N. W.

Atlanta, GA 30303 Attention:

Mr. D. M. Verrelli, Chief - Project Branch 1 Inspection Repoet Nos. 50-348/83-21 and 50-36A/83-19 Gentlemen:

The NRC findings of the safety inspection conducted by W. H. Miller at Farley on August 16 - 19, 1983 (Report Nos. 50-348/83-21 and 50-364/83-19) have resulted in Alabama Power Company initiating a detailed review of several areas of the fire protection program.

Procedures have already been revised to correct items A.1 and A.2 listed in Appendix A, Notice of Violation, but evaluation of A.3 continues.

Extensive evaluation is also being done to determine the appropriate corrective action for item B of Appendix A.

A detailed explanation of Alabama Power Company's corrective action in response to each of these items will be submitted in the formal response to the inspection report.

As part of the above mentioned review, Alabama Power Company is also conducting a detailed comparison of Amendment 5 of the Farley Fire Protection Reevaluation Program (FPPR) to Amendment 4 of the FPPR to show that the changes are administrative and organizational in nature (reflecting the implementation of committed actions) and do not alter Alabama Power Company's licensing commitment to ensure adequate fire protection at Farley Nuclear Plant (FNP).

In addition, Alabama Power Company has initiated a review of all design changes affecting fire protection systems implemented since receipt of operating licenses on each unit to ensure that the design process and field implementation did not inadvertently result in a degradation of the fire protection systems relied upon in FNP fire hazards analysis.

8310250479 831006 PDRADOCK05000g G

L

.Mr. D. M. Verrelli September 21, 1983 U. S. Nuclear Regulatory Commission Page 2 Based on che time required. to perform the detailed review described above,. Alabama Power Company requests a 60 day extension to the response date indicated in the NRC letter dated September 9,1983 which transmitted the formal inspection reports.

A telephone discussion of this request was held between Mr. Floyd Cantrell and f1r. R. L. George on September 16, 1983.

If there are any questions regarding this request, please contact this office.

Yours truly, i

R >Q Cra+ 152 I

F. L. Clayton, Jr F LCJ r/DRB : grs-D5 cc:

Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. J. P. O'Reilly Mr. E. A. Reeves Mr. W. H. Bradford i

~