INDIANA MICHIGAN POWER AEP:NRC:ll63 10 CPR Part 50 Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50 316 Licenso Nos. DPR-58 and DPR 74 EMERGE NY !E PONSE DATA SYSTEM (ERDS)
INDIANA MICHIGAN POWER AEP:NRC:ll63 10 CPR Part 50 Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50 316 Licenso Nos. DPR-58 and DPR 74 EMERGE NY !E PONSE DATA SYSTEM (ERDS)
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555 Attn:       T. E. Murley october 28, 1991
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555 Attn:
T. E. Murley october 28, 1991


==Dear Dr. Murley:==
==Dear Dr. Murley:==
This letter is in response to time recently promulgated rule contained in 10 CFR Part 50, Appendix E. Section VI, which establishes the Emergency Response Data System (ERDS). Specifically, the attachments provido our plan and schedule. Attaclanent 1 contains the implementation plan. Attachment 2 contains the ERDS schedule following the 11 stepa delineated in FUREC-1394, Revision 1.
This letter is in response to time recently promulgated rule contained in 10 CFR Part 50, Appendix E. Section VI, which establishes the Emergency Response Data System (ERDS). Specifically, the attachments provido our plan and schedule. Attaclanent 1 contains the implementation plan. Attachment 2 contains the ERDS schedule following the 11 stepa delineated in FUREC-1394, Revision 1.
Jteachment 3 contains our Plant Attribute Library (PA1.) as delineated in NUREG 1394 Revision 1.
Jteachment 3 contains our Plant Attribute Library (PA1.) as delineated in NUREG 1394 Revision 1.
Our ERDS' implementation plan vas discussed with a member of your staff on October 8, 1991, at the NRC Region III offices in Glen Ellyn, Illinois. We would like to confirm our plaos, as discussed in that riceting:
Our ERDS' implementation plan vas discussed with a member of your staff on October 8, 1991, at the NRC Region III offices in Glen Ellyn, Illinois.
: 1.       Our emergency implementing procedures will be revised to incorporate the ERDS_ functions once the system is operational.
We would like to confirm our plaos, as discussed in that riceting:
: 2.       We will have a configuration control program for the Emergency _ l<esponse Date System. _ The ERDS will _ be maintained according to this configuration control program and in <4ccordance with the final rulo. Our configuration control program will include prud stons to allow NRC to review proposed system modifications which could affect the data co.~ununication protocol in advance of these changes to ensure that t.he changes are compatible-with the ERDS,                             Jf                         I ji     ;
1.
9111040270 911020                                                                                 -
Our emergency implementing procedures will be revised to incorporate the ERDS_ functions once the system is operational.
n          PDR   ADOCK 05000315
2.
: v.         F-                       PDR
We will have a configuration control program for the Emergency _ l<esponse Date System. _ The ERDS will _ be maintained according to this configuration control program and in <4ccordance with the final rulo. Our configuration control program will include prud stons to allow NRC to review proposed system modifications which could affect the data co.~ununication protocol in advance of these changes to ensure that t.he changes are compatible-with the ERDS, Jf I
ji 9111040270 911020 n
PDR ADOCK 05000315 v.
F-PDR


    . _      _ _                . _ . . ~__ _ . _ . _ .___ _ _ . . . _ . _ . ._ _ _ _ _                                  .
. _.. ~__
Dr. 7- E. Murley                                         - 2                     AEP:NitC:1163
Dr. 7-E. Murley 2
                          '3.     Our spwific Data Point Library (DPL) is not complete at this time, due to new cot puter systerns being placed in service to be used to host FJtDS. Our "PL will be subraitted at a later ciata following 1..ata11ation of the Unit 2 Plant Process Computei,                           rhe DPL will be submitted prior to July 1,1992.
AEP:NitC:1163
Unis document has been prepared following Corporate procedures that incorporare a reasonable set of controls. to ensure its accuracy and completenoss prior to s1 &nature by the undersigned.
'3.
Sincerely, MY E.-E. Fitzp t ick Vice President tjw Attachments cc:   D. 11. Williams , J r.
Our spwific Data Point Library (DPL) is not complete at this time, due to new cot puter systerns being placed in service to be used to host FJtDS.
A. A. Blind -     B (dgman J. R. Padgett G. Charnoff A. B. Davis - Region III NRC Resident Inspector                       Bridgman NFEM Section Chief.
Our "PL will be subraitted at a later ciata following 1..ata11ation of the Unit 2 Plant Process Computei, rhe DPL will be submitted prior to July 1,1992.
J. Jolicoeur     AEOD E
Unis document has been prepared following Corporate procedures that incorporare a reasonable set of controls. to ensure its accuracy and completenoss prior to s1 nature by the undersigned.
                                                                                                                              =
Sincerely, MY E.-E.
Fitzp t ick Vice President tjw Attachments cc:
D. 11. Williams, J r.
A. A. Blind -
B (dgman J. R. Padgett G. Charnoff A. B. Davis - Region III NRC Resident Inspector Bridgman NFEM Section Chief.
J. Jolicoeur AEOD E
=
I-
I-
                                                      -,r.,           ,,                  -
-,r.,
                                                                                            ,,,.,9 ,      . - . . - - . . ,
,,,.,9


                                                                                                                                    . ), ,1                           ,
. ),
          ,4           g
,1
                                                                                                                                                                                                ?
,4 g
?
ATTACIU4ENT 1 *10 AEP:NRC: 1163 ERDS IMPLEMENTATION PIAN s
ATTACIU4ENT 1 *10 AEP:NRC: 1163 ERDS IMPLEMENTATION PIAN s
t p
t p
a l-A
a l-A
                                                                                                                                                                    - , . . , . - , ,..,y.y -.,
.r~.-c
                      .r~.-c ..    . . -- , -. . - . .- - - . , . , . , , . ,        ....,-.,.,,,.,,-n.m,...,,-,-- .~,.,.,r_..rmew         .,4,. y.m.,. .--1...m.,
....,-.,.,,,.,,-n.m,...,,-,--
.~,.,.,r_..rmew
.,4,.
y.m.,.
.--1...m.,
,..,y.y


          . ~ _ _ _ _      _    _ _ _                                                              . _ _ _ _ _ _ . _
. ~ _ _ _ _
      ,                                                                          . .s
..s
                                                                                                                      \
\\
Attachment 1 ERDS IMPLEMENTATION PIAN  
ERDS IMPLEMENTATION PIAN  


==SUMMARY==
==SUMMARY==
 
The Donald C. Cook Nuclear Plant intends to meet the ERDS iuplementation date of February 13, 1993.
The Donald C. Cook Nuclear Plant intends to meet the ERDS iuplementation date of February 13, 1993.           In order to meet the requirements set forth in 10 CFR Part 50, Appendix E, Section VI, the following major items must be completed:
In order to meet the requirements set forth in 10 CFR Part 50, Appendix E, Section VI, the following major items must be completed:
: 1.         Installation of the Unit 2 Plant Process Computer (PPC).
1.
: 2.         Provide Radiation Monitoring System (RMS) data to the Unit 1 FPC, Unit 2 PPC, and the Simulator PPC.
Installation of the Unit 2 Plant Process Computer (PPC).
: 3.         Provide meteorological data (MIDAS) to the Unit 1 PPC, Unit 2 PPC, and the Simulatot PPC.
2.
4         Provide additional process inputs as required by ERDS, currently not on the PPCs, to the Unit 1 PPC, Unft 2 PPC, and the Simulator PPC.
Provide Radiation Monitoring System (RMS) data to the Unit 1 FPC, Unit 2 PPC, and the Simulator PPC.
5,         Install a Real time Data Repository (RDR) computer to host ERDS.
3.
: 6.         Send the ERDS data from the Unit 1 PPC ar.d Unit 2 PPC to
Provide meteorological data (MIDAS) to the Unit 1 PPC, Unit 2 PPC, and the Simulatot PPC.
                                      'the RDR computer, which will output the ERDS data to the NRC and Emergency Response Facilities.
4 Provide additional process inputs as required by ERDS, currently not on the PPCs, to the Unit 1 PPC, Unft 2 PPC, and the Simulator PPC.
The simulator will be connected to ERDS directly from its PPC. We plan to send ERDS information from the simulator to the NRC during emergency preparedness exercises using the Unit 2 ERDS transmission line.
5, Install a Real time Data Repository (RDR) computer to host ERDS.
6.
Send the ERDS data from the Unit 1 PPC ar.d Unit 2 PPC to
'the RDR computer, which will output the ERDS data to the NRC and Emergency Response Facilities.
The simulator will be connected to ERDS directly from its PPC.
We plan to send ERDS information from the simulator to the NRC during emergency preparedness exercises using the Unit 2 ERDS transmission line.
The six work areas. listed above are to be completed under Step 7lof the schedule provided in Attachment'2.
The six work areas. listed above are to be completed under Step 7lof the schedule provided in Attachment'2.
Quarterly testing of the ERDS will be performed in accordance with 10 CFR Part 50, Appendix E, Section VI.
Quarterly testing of the ERDS will be performed in accordance with 10 CFR Part 50, Appendix E, Section VI.


                                                                        ..                                        ,  l 9 '
l 9 '
4 8
4 8
e k
e k
Line 84: Line 107:
f I
f I
L 4
L 4
l i
i
                                                                                                        , , _ _. ._ , 1 l
,, _ _.._, 1 l


Project description
Project description


==Title:==
==Title:==
ERDS IMPLEMENTATION PLAN FOR THE DONALD C. COOK NUCLEAR PLANT Project start:             9-12-91                             Project end:                   2-12-93 (REQUIRED END DATE)
ERDS IMPLEMENTATION PLAN FOR THE DONALD C.
COOK NUCLEAR PLANT Project start:
9-12-91 Project end:
2-12-93 (REQUIRED END DATE)
 
==
Description:==
THIS PIAN CONTAINS THE STEPS REQUIRED TO INCORPORATE THE DONALD C.
COOK NUCLEAR PLANT INTO THE CRDS AS PER NUREG-1394,REV.
1, APP. A i
Legend oeeee Act:.v:.ty 6
Milestone Leeee Locked activity Act:.k'a: tv on critical pai hllycompletedactIvity Completed act10ity Ceeee Part


== Description:==
===ee A
THIS PIAN CONTAINS THE STEPS REQUIRED TO INCORPORATE THE DONALD C. COOK NUCLEAR PLANT INTO THE CRDS AS PER NUREG-1394,REV. 1, APP. A i
Original start date
Legend oeeee    Act:.v:.ty                                                      6            Milestone Locked activity Ceeee                                                                    Leeee
?
          ===ee    Act:.k'a:
Original end date Discontinuous activity
Part        tv on critical pai hllycompletedactIvity                          Completed act10ity A        Original start date                                             ?             Original end date
.....+
          ..... Discontinuous activity                                           .....+       Baselined milestone GANTT         CRART ERDS IMPLEMENTATION PLAN
Baselined milestone GANTT CRART ERDS IMPLEMENTATION PLAN 1991-r 1992 1992 1M2 1992 ERDS IMPLEMENT ATION PLAN Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan STEP 1 AEP RECE6VES QUESil0NNAIRE Il
                                                        ,        1991- r           1992       ,      1992       ,        1M2       ,      1992       ,
+
ERDS IMPLEMENT ATION PLAN                             Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan STEP 1 AEP RECE6VES QUESil0NNAIRE                     Il
NRC NQTIFIES CONTRACTOR (NUS EI) 0F RECElPT STEP 2 AEP CONTACIED BY NUS-El NUS El TO DISCUSS SURVET 00ESilCNNAIRE ITEMS
                                                                                                                                                        +
+... -
NRC NQTIFIES CONTRACTOR (NUS EI) 0F RECElPT                             .                                                            .      .
+
STEP 2 AEP CONTACIED BY NUS-El                                                         '                *
STEP 3 ARRANGE / CONDUCT SITE SURVEY
                                                        +... -                                  -                              -    +                  -
=
NUS El TO DISCUSS SURVET 00ESilCNNAIRE ITEMS a                .                       .
a NUS TO Visif AEP PRIOR TO RETU"N OF DPL & PAL
STEP 3 ARRANGE / CONDUCT SITE SURVEY                 .            .            =
+
NUS TO Visif AEP PRIOR TO RETU"N OF DPL & PAL         .....                          +                                   -          .
STEP 4 NRC INSTAL L PHONE LINES G COOK PLANT
STEP 4 NRC INSTAL L PHONE LINES G COOK PLANT         +       .                                                                    .                  .
+
DI AL Up TELEPHONE LINES
DI AL Up TELEPHONE LINES
* MC0 EMS ARE SUPPLIED     ennununee.                        .
* MC0 EMS ARE SUPPLIED ennununee.
STEP 5 AEP RETURh5 Dei, AND PAL QUES 110NNAIRE DEFINE DATA POINT / PLANT ATTRIBUTE LIBRARY                     -                          -      ...........
STEP 5 AEP RETURh5 Dei, AND PAL QUES 110NNAIRE DEFINE DATA POINT / PLANT ATTRIBUTE LIBRARY STEP 6 NUS-El DEVELOPS,OFTWARE FCR NRC DPL
STEP 6 NUS-El DEVELOPS ,OFTWARE FCR NRC DPL                   +   +                   .                                                            .
+
IF kEQUIRED: AEP SPECIFIC SOFTWARE Div. BY NUS     4           -      -    +               .      .    ...............n...n STEP 7 AEP DEV/ INSTALL ERDS SOFTWARE / HARDWARE                   -                                                              '                  '
+
UNIT 2 DEVELOP / INSTALL / SITE TCST                 -      ..........n....n......on...                                                        .
IF kEQUIRED: AEP SPECIFIC SOFTWARE Div. BY NUS 4
UNIT 1 DEVELOP / INSTALL / SITE TEST                 -      ......... n......n...................o.............                        .            .
+
COMPLETE ERDS SOFTWARE & PROCEDURES                             '
...............n...n STEP 7 AEP DEV/ INSTALL ERDS SOFTWARE / HARDWARE UNIT 2 DEVELOP / INSTALL / SITE TCST
STEP 8 PRELIMINARY SOFTWARE TESTS: AEP/NUS El                     +                         ,          .
..........n....n......on...
AEP/NU$ El TEST DATA TRANSMISSICW & DEBUG           *                                      +                       *                    .un STEP 9 FORMAL FACTORY SITE TEST AT NUS-El ACCEPTANCE TESTS PER'ORMED AT NUS El                 -            -                                                                            +n UPON SUCCESSFUt Cm PLETION: MOVE TO PRCD. SYS.               *    *      *    *            *  *      *                                        '
UNIT 1 DEVELOP / INSTALL / SITE TEST
STEP 10 FORMAL SITE TEST AEP ERDS SYS. WITH NWC                                         4                             a TEST WITH PLANT PR00. SYS AND NRC OP. CENTER         -
......... n......n...................o.............
STEP 11 AEP ERDS IN PRG)UCTION (CHANGE CONTROL)       -                    -
COMPLETE ERDS SOFTWARE & PROCEDURES STEP 8 PRELIMINARY SOFTWARE TESTS: AEP/NUS El
IMPLEMENT CHANGE CONTROL A 'JUARTERLY TESTS                             -            *        *                          *    *                  **
+
j                                                                   .      ,                      .                          .
AEP/NU$ El TEST DATA TRANSMISSICW & DEBUG
\
+
.un STEP 9 FORMAL FACTORY SITE TEST AT NUS-El ACCEPTANCE TESTS PER'ORMED AT NUS El
+n UPON SUCCESSFUt Cm PLETION: MOVE TO PRCD. SYS.
STEP 10 FORMAL SITE TEST AEP ERDS SYS. WITH NWC 4
a TEST WITH PLANT PR00. SYS AND NRC OP. CENTER STEP 11 AEP ERDS IN PRG)UCTION (CHANGE CONTROL)
IMPLEMENT CHANGE CONTROL A 'JUARTERLY TESTS j
\\


            , .. . . . . -__ - . . . - . . .. , .                - . . . ~ - - . . - . . . - - - . . . .                          . . .. -.-. . . . .  .. . . - .
-... ~ - -.. -... - - -....
4 t
4 t
I _
I _
ATTACllMErlT 3 TO AEP:NRC:1163 Responses to NUREG - 1.394, Revision 1. Appendix 8 PLANT ATTRIhUTE LIBRARY (PAL) 8 E
ATTACllMErlT 3 TO AEP:NRC:1163 Responses to NUREG - 1.394, Revision 1. Appendix 8 PLANT ATTRIhUTE LIBRARY (PAL) 8 E
i                                                                                                                                                                   1.
i 1.
I ',
I ',
l -~
l -~
t i'
t i'
J-.               -
J-.
v-   - --              .,. _ . , , . .              , _ .            ,    , , , _ _ _ , , _ _ _ __ , _                    _
v-


Attachment 3 to AEP:NRC:ll63                                         Page 1 PLANT ATTRIBUTE LIBRARY (PAL)
, to AEP:NRC:ll63 Page 1 PLANT ATTRIBUTE LIBRARY (PAL)
I. Contacts Note:   Please provide name, title, mailing address, ard phone number.
I. Contacts Note:
A. Survey Coordinator (i.e., contact for later clarification of questionnaire ansvers):
Please provide name, title, mailing address, ard phone number.
A.
Survey Coordinator (i.e., contact for later clarification of questionnaire ansvers):
Karl J. Toth American Electric Power Service corp.
Karl J. Toth American Electric Power Service corp.
1 Riverside Plaza Colwnbus , OH 43215 (614) 223 2038 Senior Scientist t     Computer Cardware Specialist (s):
1 Riverside Plaza Colwnbus, OH 43215 (614) 223 2038 Senior Scientist t
Dave W. Fitzcharles                         Cery Hagoniers American Electric Power Service Corp.       Cook Nuclear Plant 1 Riverside Plaza                           1 Cook Place Columbus, OH 43215                         Bridgman, MI 49106 (614) 223 3494                             (616) 465-5901 x1471 Engineer 1                                 Computer Analyst I C. System Coftware Specialist (s):
Computer Cardware Specialist (s):
Dav_     71tzcharles                       Gary Hageniers Amerit   Electric Power Service Corp.     Cook Nuclear Plant 1 Riverside Plaza                           1 Cook Place Columbus, OH 43215                         Bridgman, MI 49106 (614) 223-3494                             (616) 465-5901 x1471 Engineer I                                 Computer Analyst 1 D. Application-level Software Specialist (s):
Dave W.
Dave W. Fitzcharles                         Gary Hageniers American Electric Power Service Corp.       Cook Nuclear Plant 1 Riverside Plaza                           1 Cook Place Columbus, OH 43215                         Bridgman, MI 49106 (614) 223 3494                             (616) 465-5901 x1471 Engineer I                                 Computer Analyst I
Fitzcharles Cery Hagoniers American Electric Power Service Corp.
Cook Nuclear Plant 1 Riverside Plaza 1 Cook Place Columbus, OH 43215 Bridgman, MI 49106 (614) 223 3494 (616) 465-5901 x1471 Engineer 1 Computer Analyst I C.
System Coftware Specialist (s):
Dav_
71tzcharles Gary Hageniers Amerit Electric Power Service Corp.
Cook Nuclear Plant 1 Riverside Plaza 1 Cook Place Columbus, OH 43215 Bridgman, MI 49106 (614) 223-3494 (616) 465-5901 x1471 Engineer I Computer Analyst 1 D.
Application-level Software Specialist (s):
Dave W. Fitzcharles Gary Hageniers American Electric Power Service Corp.
Cook Nuclear Plant 1 Riverside Plaza 1 Cook Place Columbus, OH 43215 Bridgman, MI 49106 (614) 223 3494 (616) 465-5901 x1471 Engineer I Computer Analyst I


s l
s 1 to AEP:NRC:1163 Page 2 E.
l 1
Telephone Systems Specialist (s):
l Attachment 3 to AEP:NRC:1163                                       Page 2 E. Telephone Systems Specialist (s):
Dave J. Stephan Dave B. Vhisenant American Electric Power Service Corp.
Dave J. Stephan                           Dave B. Vhisenant American Electric Power Service Corp.     Cook Nuclear Plant 1 Riverside Plaza                         1 Cook Place Columbus, OH 42?15                         Bridgman, MI 49106 (614) 223-3587                             (616) 465-5901 x1541 Engineering Technologist I                 comm. Tech. I i
Cook Nuclear Plant 1 Riverside Plaza 1 Cook Place Columbus, OH 42?15 Bridgman, MI 49106 (614) 223-3587 (616) 465-5901 x1541 Engineering Technologist I comm. Tech. I i
l
l


                =     . - .              _      --    .
=
                                                            . o Attachment 3 to AEP:NRC:1163                                         Page 3 III. Selection of Data Feeders A. How many data feeders are there (six maximum)?
o
. to AEP:NRC:1163 Page 3 III. Selection of Data Feeders A.
How many data feeders are there (six maximum)?
Unit 1 - 1 Data Feeder Unit 2 - 1 Data Feeder Simulator - Same as Unit 2 Data Feeder (planned)
Unit 1 - 1 Data Feeder Unit 2 - 1 Data Feeder Simulator - Same as Unit 2 Data Feeder (planned)
B. Identify the selected data feeder and provide the following for each:
B.
(1)     a short description of the categories os data points it will provide (e.g. met, rad, or plant data points, by unit) and (2)     the rationale for selecting it if r.nother system can alao provide its categories of data points.
Identify the selected data feeder and provide the following for each:
(1) a short description of the categories os data points it will provide (e.g. met, rad, or plant data points, by unit) and (2) the rationale for selecting it if r.nother system can alao provide its categories of data points.
Only one data feeder per unit and it will provide all of the categories of data required.
Only one data feeder per unit and it will provide all of the categories of data required.
C. Which data feeder is the site time determining feeder? This should be the feeder which is providing the majority of the data points.
C.
Which data feeder is the site time determining feeder? This should be the feeder which is providing the majority of the data points.
Only one data feeder per unit.
Only one data feeder per unit.
5
5


_  ._  _ .~.. _ ._._..                    -_ _ ._ _.___....- -__ _.                    .
_.~.. _._._..
                                                                                                                  . _ - , , =   . - _ .
. _ -,, =
                                                                                                    .    ,a i
,a i
Attachment 3'to AEP:NRC:ll63                                                           Page 4 IV. Data Feeder Information (Applicable to Unit 1, Unit 2/ Simulator data feeder)
, 'to AEP:NRC:ll63 Page 4 IV. Data Feeder Information (Applicable to Unit 1, Unit 2/ Simulator data feeder)
Note:         A new Section IV must be filled out for-each feeder system aslected.
Note:
A new Section IV must be filled out for-each feeder system aslected.
General Questions
General Questions
                            ;1.     Identification of Data Feeder a,         What is the name in local parlance given to this data feecer (e.g., Emergency Response Information System)? Please give                             >
;1.
both the acronym and the stords forming it.
Identification of Data Feeder a,
What is the name in local parlance given to this data feecer (e.g., Emergency Response Information System)? Please give both the acronym and the stords forming it.
Real-time Data Repository (RDR) b.
Real-time Data Repository (RDR) b.
;                                                Is this the site time determining feeder?
Is this the site time determining feeder?
Yes
Yes c.
: c.         How often will this feeder transmit an update net to the ERDS (in seconds)?                                                                     .
How often will this feeder transmit an update net to the ERDS (in seconds)?
60 seconds-2-. Hardware Software Environscnt
60 seconds-2-
: a.         l Identify the asaufa:turer and model number of the data feeder hardwkre.
Hardware Software Environscnt a.
92C MICROVAX 4000 (anticipated, but may change)
l Identify the asaufa:turer and model number of the data feeder hardwkre.
: b.           Identify tts operating system.
92C MICROVAX 4000 (anticipated, but may change) b.
L                                                           VMS Version-5.X l :-
Identify tts operating system.
: c.          What method of timekeeping is implemented on this feeder
L VMS Version-5.X l :-
                                              . system (Daylight Savings, Standard. Greenwich)?
What method of timekeeping is implemented on this feeder c.
Daylight Savings Time
. system (Daylight Savings, Standard. Greenwich)?
: d.           In what time zone is this feeder located?
Daylight Savings Time d.
L                                                           Eastern i
In what time zone is this feeder located?
L Eastern i


                                                                                          . s
s
      ~
~
Attachment'3 to AEP:NRC:1163                                                 Page 5
Attachment'3 to AEP:NRC:1163 Page 5 3.
: 3. Data Communication Details a, . Can.this data feeder provide synchronous serial data communications (RS-232 C) with full-modem control?
Data Communication Details a,.
Yes
Can.this data feeder provide synchronous serial data communications (RS-232 C) with full-modem control?
: b. Vill this feeder transmit in ASCII or EBCDIC?
Yes b.
ASCII
Vill this feeder transmit in ASCII or EBCDIC?
: c. Can this feader transmit at a serial baud rate of 2400 bps?
ASCII c.
Can this feader transmit at a serial baud rate of 2400 bps?
If not, at what baud rate can it transmit?
If not, at what baud rate can it transmit?
Yes
Yes d.
: d. Does the. operating system support ION /IOFF flow controlf Yes
Does the. operating system support ION /IOFF flow controlf Yes 1.
: 1.       Are any problems foreseen with the NRC using ION /IOFF to control the transmission of. data?
Are any problems foreseen with the NRC using ION /IOFF to control the transmission of. data?
No
No e.
: e. If it is not feasible to reconfigure a serial port for the ERDS linkup (i.e., change the baud rate, phrity, etc.) .
If it is not feasible to reconfigure a serial port for the ERDS linkup (i.e., change the baud rate, phrity, etc.).
pitase explain why.
pitase explain why.
Not applicable
Not applicable f.
: f. Do any ports currently exist for the ERDS linkupf No
Do any ports currently exist for the ERDS linkupf No 1.
: 1.       If-not, is it possible to add additional ports?
If-not, is it possible to add additional ports?
                                                  'Yes, by buying a new computer.
'Yes, by buying a new computer.
: 2.     ~If yes, will the port be used. solely by the FRDS or shared with other non-emergency-time-useraf Civ,
2.
                                                -details.
~If yes, will the port be used. solely by the FRDS or shared with other non-emergency-time-useraf Civ,
-details.
The port will be usad solely by ERDS.
The port will be usad solely by ERDS.
1
1


        . , .                                                                                l l
\\
                                                                                              \
l httachment 3 to AEP:NRC: 1163 Page 6 4.
l httachment 3 to AEP:NRC: 1163                                       Page 6 l
Data Feeder Physical Environment and Management a.
: 4. Data Feeder Physical Environment and Management
Where is the data feeder located in terms of the TSC, EOF, and control room?
: a. Where is the data feeder located in terms of the TSC, EOF, and control room?
It is planned to be in plant process computer room, which is above the control room, b.
It is planned to be in plant process computer room, which is above the control room,
Is the data feeder protected from loss of supply of electricity?
: b. Is the data feeder protected from loss of supply of electricity?
Yes, it is planned to be protected, c.
Yes, it is planned to be protected,
Is there a human operator for this da:a feeder?
: c. Is there a human operator for this da:a feeder?
No 1.
No
If so, how many hours a day is the feeder attended?
: 1. If so, how many hours a day is the feeder attended?
l-l l
l-l l
L}}
L}}

Latest revision as of 03:09, 14 December 2024

Responds to Recently Promulgated 10CFR50,App E,Section VI Which Establishes Emergency Response Data Sys.Implementation Plan & Schedule & Plant Attribute Library,Per Rev 1 to NUREG-1394 Encl
ML20085L602
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/28/1991
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-1394 AEP:NRC:1163, NUDOCS 9111040270
Download: ML20085L602 (13)


Text

.

m.

_.._.m__

~

latfar.a Michigap -

Power tampary.

P C. O n tfM I Cetamhus 01437IS

+

INDIANA MICHIGAN POWER AEP:NRC:ll63 10 CPR Part 50 Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50 316 Licenso Nos. DPR-58 and DPR 74 EMERGE NY !E PONSE DATA SYSTEM (ERDS)

U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555 Attn:

T. E. Murley october 28, 1991

Dear Dr. Murley:

This letter is in response to time recently promulgated rule contained in 10 CFR Part 50, Appendix E.Section VI, which establishes the Emergency Response Data System (ERDS). Specifically, the attachments provido our plan and schedule. Attaclanent 1 contains the implementation plan. Attachment 2 contains the ERDS schedule following the 11 stepa delineated in FUREC-1394, Revision 1.

Jteachment 3 contains our Plant Attribute Library (PA1.) as delineated in NUREG 1394 Revision 1.

Our ERDS' implementation plan vas discussed with a member of your staff on October 8, 1991, at the NRC Region III offices in Glen Ellyn, Illinois.

We would like to confirm our plaos, as discussed in that riceting:

1.

Our emergency implementing procedures will be revised to incorporate the ERDS_ functions once the system is operational.

2.

We will have a configuration control program for the Emergency _ l<esponse Date System. _ The ERDS will _ be maintained according to this configuration control program and in <4ccordance with the final rulo. Our configuration control program will include prud stons to allow NRC to review proposed system modifications which could affect the data co.~ununication protocol in advance of these changes to ensure that t.he changes are compatible-with the ERDS, Jf I

ji 9111040270 911020 n

PDR ADOCK 05000315 v.

F-PDR

. _.. ~__

Dr. 7-E. Murley 2

AEP:NitC:1163

'3.

Our spwific Data Point Library (DPL) is not complete at this time, due to new cot puter systerns being placed in service to be used to host FJtDS.

Our "PL will be subraitted at a later ciata following 1..ata11ation of the Unit 2 Plant Process Computei, rhe DPL will be submitted prior to July 1,1992.

Unis document has been prepared following Corporate procedures that incorporare a reasonable set of controls. to ensure its accuracy and completenoss prior to s1 nature by the undersigned.

Sincerely, MY E.-E.

Fitzp t ick Vice President tjw Attachments cc:

D. 11. Williams, J r.

A. A. Blind -

B (dgman J. R. Padgett G. Charnoff A. B. Davis - Region III NRC Resident Inspector Bridgman NFEM Section Chief.

J. Jolicoeur AEOD E

=

I-

-,r.,

,,,.,9

. ),

,1

,4 g

?

ATTACIU4ENT 1 *10 AEP:NRC: 1163 ERDS IMPLEMENTATION PIAN s

t p

a l-A

.r~.-c

....,-.,.,,,.,,-n.m,...,,-,--

.~,.,.,r_..rmew

.,4,.

y.m.,.

.--1...m.,

,..,y.y

. ~ _ _ _ _

..s

\\

ERDS IMPLEMENTATION PIAN

SUMMARY

The Donald C. Cook Nuclear Plant intends to meet the ERDS iuplementation date of February 13, 1993.

In order to meet the requirements set forth in 10 CFR Part 50, Appendix E, Section VI, the following major items must be completed:

1.

Installation of the Unit 2 Plant Process Computer (PPC).

2.

Provide Radiation Monitoring System (RMS) data to the Unit 1 FPC, Unit 2 PPC, and the Simulator PPC.

3.

Provide meteorological data (MIDAS) to the Unit 1 PPC, Unit 2 PPC, and the Simulatot PPC.

4 Provide additional process inputs as required by ERDS, currently not on the PPCs, to the Unit 1 PPC, Unft 2 PPC, and the Simulator PPC.

5, Install a Real time Data Repository (RDR) computer to host ERDS.

6.

Send the ERDS data from the Unit 1 PPC ar.d Unit 2 PPC to

'the RDR computer, which will output the ERDS data to the NRC and Emergency Response Facilities.

The simulator will be connected to ERDS directly from its PPC.

We plan to send ERDS information from the simulator to the NRC during emergency preparedness exercises using the Unit 2 ERDS transmission line.

The six work areas. listed above are to be completed under Step 7lof the schedule provided in Attachment'2.

Quarterly testing of the ERDS will be performed in accordance with 10 CFR Part 50, Appendix E, Section VI.

l 9 '

4 8

e k

i t

ATTAClliiENT 2 TO AEP:NRC:1163 ERDS SCIIEDULE Q

f I

L 4

i

,, _ _.._, 1 l

Project description

Title:

ERDS IMPLEMENTATION PLAN FOR THE DONALD C.

COOK NUCLEAR PLANT Project start:

9-12-91 Project end:

2-12-93 (REQUIRED END DATE)

==

Description:==

THIS PIAN CONTAINS THE STEPS REQUIRED TO INCORPORATE THE DONALD C.

COOK NUCLEAR PLANT INTO THE CRDS AS PER NUREG-1394,REV.

1, APP. A i

Legend oeeee Act:.v:.ty 6

Milestone Leeee Locked activity Act:.k'a: tv on critical pai hllycompletedactIvity Completed act10ity Ceeee Part

===ee A

Original start date

?

Original end date Discontinuous activity

.....+

Baselined milestone GANTT CRART ERDS IMPLEMENTATION PLAN 1991-r 1992 1992 1M2 1992 ERDS IMPLEMENT ATION PLAN Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan STEP 1 AEP RECE6VES QUESil0NNAIRE Il

+

NRC NQTIFIES CONTRACTOR (NUS EI) 0F RECElPT STEP 2 AEP CONTACIED BY NUS-El NUS El TO DISCUSS SURVET 00ESilCNNAIRE ITEMS

+... -

+

STEP 3 ARRANGE / CONDUCT SITE SURVEY

=

a NUS TO Visif AEP PRIOR TO RETU"N OF DPL & PAL

+

STEP 4 NRC INSTAL L PHONE LINES G COOK PLANT

+

DI AL Up TELEPHONE LINES

  • MC0 EMS ARE SUPPLIED ennununee.

STEP 5 AEP RETURh5 Dei, AND PAL QUES 110NNAIRE DEFINE DATA POINT / PLANT ATTRIBUTE LIBRARY STEP 6 NUS-El DEVELOPS,OFTWARE FCR NRC DPL

+

+

IF kEQUIRED: AEP SPECIFIC SOFTWARE Div. BY NUS 4

+

...............n...n STEP 7 AEP DEV/ INSTALL ERDS SOFTWARE / HARDWARE UNIT 2 DEVELOP / INSTALL / SITE TCST

..........n....n......on...

UNIT 1 DEVELOP / INSTALL / SITE TEST

......... n......n...................o.............

COMPLETE ERDS SOFTWARE & PROCEDURES STEP 8 PRELIMINARY SOFTWARE TESTS: AEP/NUS El

+

AEP/NU$ El TEST DATA TRANSMISSICW & DEBUG

+

.un STEP 9 FORMAL FACTORY SITE TEST AT NUS-El ACCEPTANCE TESTS PER'ORMED AT NUS El

+n UPON SUCCESSFUt Cm PLETION: MOVE TO PRCD. SYS.

STEP 10 FORMAL SITE TEST AEP ERDS SYS. WITH NWC 4

a TEST WITH PLANT PR00. SYS AND NRC OP. CENTER STEP 11 AEP ERDS IN PRG)UCTION (CHANGE CONTROL)

IMPLEMENT CHANGE CONTROL A 'JUARTERLY TESTS j

\\

-... ~ - -.. -... - - -....

4 t

I _

ATTACllMErlT 3 TO AEP:NRC:1163 Responses to NUREG - 1.394, Revision 1. Appendix 8 PLANT ATTRIhUTE LIBRARY (PAL) 8 E

i 1.

I ',

l -~

t i'

J-.

v-

, to AEP:NRC:ll63 Page 1 PLANT ATTRIBUTE LIBRARY (PAL)

I. Contacts Note:

Please provide name, title, mailing address, ard phone number.

A.

Survey Coordinator (i.e., contact for later clarification of questionnaire ansvers):

Karl J. Toth American Electric Power Service corp.

1 Riverside Plaza Colwnbus, OH 43215 (614) 223 2038 Senior Scientist t

Computer Cardware Specialist (s):

Dave W.

Fitzcharles Cery Hagoniers American Electric Power Service Corp.

Cook Nuclear Plant 1 Riverside Plaza 1 Cook Place Columbus, OH 43215 Bridgman, MI 49106 (614) 223 3494 (616) 465-5901 x1471 Engineer 1 Computer Analyst I C.

System Coftware Specialist (s):

Dav_

71tzcharles Gary Hageniers Amerit Electric Power Service Corp.

Cook Nuclear Plant 1 Riverside Plaza 1 Cook Place Columbus, OH 43215 Bridgman, MI 49106 (614) 223-3494 (616) 465-5901 x1471 Engineer I Computer Analyst 1 D.

Application-level Software Specialist (s):

Dave W. Fitzcharles Gary Hageniers American Electric Power Service Corp.

Cook Nuclear Plant 1 Riverside Plaza 1 Cook Place Columbus, OH 43215 Bridgman, MI 49106 (614) 223 3494 (616) 465-5901 x1471 Engineer I Computer Analyst I

s 1 to AEP:NRC:1163 Page 2 E.

Telephone Systems Specialist (s):

Dave J. Stephan Dave B. Vhisenant American Electric Power Service Corp.

Cook Nuclear Plant 1 Riverside Plaza 1 Cook Place Columbus, OH 42?15 Bridgman, MI 49106 (614) 223-3587 (616) 465-5901 x1541 Engineering Technologist I comm. Tech. I i

l

=

o

. to AEP:NRC:1163 Page 3 III. Selection of Data Feeders A.

How many data feeders are there (six maximum)?

Unit 1 - 1 Data Feeder Unit 2 - 1 Data Feeder Simulator - Same as Unit 2 Data Feeder (planned)

B.

Identify the selected data feeder and provide the following for each:

(1) a short description of the categories os data points it will provide (e.g. met, rad, or plant data points, by unit) and (2) the rationale for selecting it if r.nother system can alao provide its categories of data points.

Only one data feeder per unit and it will provide all of the categories of data required.

C.

Which data feeder is the site time determining feeder? This should be the feeder which is providing the majority of the data points.

Only one data feeder per unit.

5

_.~.. _._._..

. _ -,, =

,a i

, 'to AEP:NRC:ll63 Page 4 IV. Data Feeder Information (Applicable to Unit 1, Unit 2/ Simulator data feeder)

Note:

A new Section IV must be filled out for-each feeder system aslected.

General Questions

1.

Identification of Data Feeder a,

What is the name in local parlance given to this data feecer (e.g., Emergency Response Information System)? Please give both the acronym and the stords forming it.

Real-time Data Repository (RDR) b.

Is this the site time determining feeder?

Yes c.

How often will this feeder transmit an update net to the ERDS (in seconds)?

60 seconds-2-

Hardware Software Environscnt a.

l Identify the asaufa:turer and model number of the data feeder hardwkre.

92C MICROVAX 4000 (anticipated, but may change) b.

Identify tts operating system.

L VMS Version-5.X l :-

What method of timekeeping is implemented on this feeder c.

. system (Daylight Savings, Standard. Greenwich)?

Daylight Savings Time d.

In what time zone is this feeder located?

L Eastern i

s

~

Attachment'3 to AEP:NRC:1163 Page 5 3.

Data Communication Details a,.

Can.this data feeder provide synchronous serial data communications (RS-232 C) with full-modem control?

Yes b.

Vill this feeder transmit in ASCII or EBCDIC?

ASCII c.

Can this feader transmit at a serial baud rate of 2400 bps?

If not, at what baud rate can it transmit?

Yes d.

Does the. operating system support ION /IOFF flow controlf Yes 1.

Are any problems foreseen with the NRC using ION /IOFF to control the transmission of. data?

No e.

If it is not feasible to reconfigure a serial port for the ERDS linkup (i.e., change the baud rate, phrity, etc.).

pitase explain why.

Not applicable f.

Do any ports currently exist for the ERDS linkupf No 1.

If-not, is it possible to add additional ports?

'Yes, by buying a new computer.

2.

~If yes, will the port be used. solely by the FRDS or shared with other non-emergency-time-useraf Civ,

-details.

The port will be usad solely by ERDS.

1

\\

l httachment 3 to AEP:NRC: 1163 Page 6 4.

Data Feeder Physical Environment and Management a.

Where is the data feeder located in terms of the TSC, EOF, and control room?

It is planned to be in plant process computer room, which is above the control room, b.

Is the data feeder protected from loss of supply of electricity?

Yes, it is planned to be protected, c.

Is there a human operator for this da:a feeder?

No 1.

If so, how many hours a day is the feeder attended?

l-l l

L