ML20087F020: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20087F020
| number = ML20087F020
| issue date = 07/31/1995
| issue date = 07/31/1995
| title = Monthly Operating Repts for Jul 1995 for Sequoyah Nuclear Plant.W/950809 Ltr
| title = Monthly Operating Repts for Jul 1995 for Sequoyah Nuclear Plant
| author name = Hollomon T, Shell R
| author name = Hollomon T, Shell R
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter:,
    '~
'~
Tennessee Valley Authority, Post Omce Box 2000, Soddy-Dasy, Tennessee 37379-2000 August 9, 1995 U.S. Nuclear Regulatory Commission ATTN     Document Control Desk Washington, D.C. 20555 Gentlemen In the Matter of                                           )                 Docket Nos. 50 *27 J
Tennessee Valley Authority, Post Omce Box 2000, Soddy-Dasy, Tennessee 37379-2000 August 9, 1995 U.S. Nuclear Regulatory Commission ATTN Document Control Desk Washington, D.C. 20555 Gentlemen In the Matter of
Tennessee Valley Authority                                 )                             50-328
)
* SEQUOYAH NUCLEAR PLANT (SQN) - JULY 1995 MONTHLY OPERATING REPORT Enclosed is the July 1995 Monthly Operating Report as required by SQN Technical Specification 6.9.1.10.
Docket Nos. 50 *27 J
Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - JULY 1995 MONTHLY OPERATING REPORT Enclosed is the July 1995 Monthly Operating Report as required by SQN Technical Specification 6.9.1.10.
If you have any questions concerning this matter, please call J. W. Proffitt at (615) 843-6651.
If you have any questions concerning this matter, please call J. W. Proffitt at (615) 843-6651.
Sincerely, L4 R. H. Shell
Sincerely, L4 l ~
                              /l~/
/
Manager SQN Site Licensing Enclosure cc     See page 2 s
R. H. Shell
            $Y,"l*')
/
9508150002 950731 PDR     ADOCK 05000327                                                                                 ,
Manager SQN Site Licensing Enclosure cc See page 2 s
R                           PDR
$Y,"l*')
                                                                                                              -    1 I
9508150002 950731 PDR ADOCK 05000327 PDR R
1 I


O . 4                           s l' ll *. . f^_ , y g .
O.
                              - U.S. Nuclear Regulatory Commission
s 4
                              , Page 2 August 9,11995 cc (Enclosure):
l' ll *.
                                      - INPO Records'Conter'                                   !
. f^_, y g.
Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957                           ~!
- U.S. Nuclear Regulatory Commission
, Page 2 August 9,11995 cc (Enclosure):
- INPO Records'Conter' Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957
~!
Mr. D. E. LaBarge, Project Manager
Mr. D. E. LaBarge, Project Manager
                                      . U.S. Nuclear. Regulatory Commission one White Flint, North 11555 Rockville Pike                                     ,
. U.S. Nuclear. Regulatory Commission one White Flint, North 11555 Rockville Pike Rockville,1 Maryland 20852-2739 Mr. Josephisantucci, Manager Advanced Reactor Department
Rockville,1 Maryland 20852-2739 Mr. Josephisantucci, Manager Advanced Reactor Department
- Electric Power Research Institute 3340 Hillview Avenue Palo Alto, California 94304
                                      - Electric Power Research Institute 3340 Hillview Avenue Palo Alto, California 94304                             {
{
NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624                       '
NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator
Regional Administrator                                   ,
.U.S. Nuclear Regulatory Commission Region II-101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 Mr. F. Yost, Director Research Services Utility Data Institute.
                                      .U.S. Nuclear Regulatory Commission                     ,
1200 G Street, NW, Suite 250 Washington, D.C.
Region II-101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711                             !
20005 n
Mr. F. Yost, Director Research Services Utility Data Institute.
- t
1200 G Street, NW, Suite 250 Washington, D.C. 20005                                 -!
-i r
n
n-
                                                                                              -t
                                                                                                -i
                                                  , - , - . r  - , . - . , , - n- .- - ,, .


1 J t
1 J
  -); .a_
t
-);
.a_
4 I
4 I
TENNESSEE VALLEY AUTHORITY i
TENNESSEE VALLEY AUTHORITY i
SEQUOYAH NUCLEAR PLANT MONTHLY OPERATING REPORT TO Tile NUCLEAR REGULATORY COMMISSION     i JULY 1995               4 i
SEQUOYAH NUCLEAR PLANT MONTHLY OPERATING REPORT TO Tile NUCLEAR REGULATORY COMMISSION i
UNIT 1 i
JULY 1995 4
i UNIT 1 i
DOCKET NUMBER 50-327 LICENSE NUMBER DPR777 i
DOCKET NUMBER 50-327 LICENSE NUMBER DPR777 i
UNIT 2               ,
UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79 t
DOCKET NUMBER 50-328         :
LICENSE NUMBER DPR-79 t
L
L


s .
s OPERATIONAL  
OPERATIONAL  


==SUMMARY==
==SUMMARY==
JULY 1995 UNIT 1 Unit 1 generated 713,010 megawatthours (MWh) (gross) electrical power during July with a capacity factor of 83.26 percent.
JULY 1995 UNIT 1 Unit 1 generated 713,010 megawatthours (MWh) (gross) electrical power during July with a capacity factor of 83.26 percent.
Unit I was operating at approximately 48 percent reactor power at the beginning of the month. Power escalation was initiated on July 1 at 2145 EDT. Unit I reached 100 percent power on July 3 at 0508 EDT.
Unit I was operating at approximately 48 percent reactor power at the beginning of the month.
Power escalation was initiated on July 1 at 2145 EDT.
Unit I reached 100 percent power on July 3 at 0508 EDT.
At 1315 EDT on July 17, Unit I reactor tripped following a turbine trip an a result of a trip signal initiated by the A phase main transformer protection circuit. The cause of the event was the sudden pressure relay located on the transformer. The sud. den pressure relays on each of the main transformers were disabled. Unit 1 was taken critical on July 18 at 0642 EDT and was tied to the grid on July 19 at 0337 EDT.
At 1315 EDT on July 17, Unit I reactor tripped following a turbine trip an a result of a trip signal initiated by the A phase main transformer protection circuit. The cause of the event was the sudden pressure relay located on the transformer. The sud. den pressure relays on each of the main transformers were disabled. Unit 1 was taken critical on July 18 at 0642 EDT and was tied to the grid on July 19 at 0337 EDT.
Unit I was operating at approximately 93 percent as of the end of July.
Unit I was operating at approximately 93 percent as of the end of July.
Unit I has started coastdown to the Unit 1 Cycle 7 refueling outage.     ;
Unit I has started coastdown to the Unit 1 Cycle 7 refueling outage.
UNIT 2                               -
UNIT 2 Unit 2 generated 844,350 megawatthours (MWh) (gross) electrical power during July with a capacity factor 99.03 percent. There were no outages or power reductions of greater than 20 percent to report during July.
Unit 2 generated 844,350 megawatthours (MWh) (gross) electrical power during July with a capacity factor 99.03 percent. There were no outages or power reductions of greater than 20 percent to report during July.
Unit 2 was operating at 99.5 percent at the end of July.
Unit 2 was operating at 99.5 percent at the end of July.                 l l
1


i
i
      ';<5 ;'.,' E
';<5
    ;    r 1
;'.,' E r
l
1 AVERACE DAILY UNIT POWER LEVEL
                    ,.,                                        AVERACE DAILY UNIT POWER LEVEL
+
                                                                                                                  +
DOCKET No.
                                  ~
50-327 UNIT No.
DOCKET No.                   50-327         UNIT No. One-           'DATE:   08-03-95         '
One-
COMPLETED BY ' iT.-J. Ho11omon                                     ' TELEPHONES- (615) 843-7528     l MONTH:           ' JULY 1995                                                                       f AVERAGE DAILY POWER LEVEL                     AVFRAGE DAILY POWER LEVEL-Q&%                             (MWe-Neti'               QAl-             (MWe-Net) e h                 1                                 504                   17                 587 L
'DATE:
2                                 844                   18                 -36                     ;
08-03-95
3                              1099                     19                 149 4                             1118                     20                 418                     ,
~
5                              1114                     21                 613                     ,
COMPLETED BY ' iT.-J.
                  .6                               1115                     22                 882                     ,
Ho11omon
l 7                               1115                     23                 955 i
' TELEPHONES- (615) 843-7528 l
8                               1114                     24                 915                     ;
f MONTH:
9                              1113                     25                 917                 .)
' JULY 1995 AVERAGE DAILY POWER LEVEL AVFRAGE DAILY POWER LEVEL-Q&%
10                             1112                     26                 927 11                             1112                     27                 1033 12                             1114                   .28                 1047 13                             1112                     29                 1041 l
(MWe-Neti' QAl-(MWe-Net) e h
14                             1103                     30                 1027 f
1 504 17 587 L
15                             1099                     31                 1015 16~                             1097 l
2 844 18
-36 3
1099 19 149 4
1118 20 418 5
1114 21 613
.6 1115 22 882 l
7 1115 23 955 i
8 1114 24 915 9
1113 25 917
. )
10 1112 26 927 11 1112 27 1033 12 1114
.28 1047 l
13 1112 29 1041 f
14 1103 30 1027 15 1099 31 1015 16~
1097 l
I L
I L
L l
L l
v   a--    - , . - -  -
v a--
* e 4                     ,-,  yy
e 4
 
yy
:Q,- .
:Q,-
                        .                                                                                            't 1
't AVERAGE DAILY UNIT POWER LEVEL 1
              ,. ,                                    AVERAGE DAILY UNIT POWER LEVEL                                   <
- I DOCKET NO.
                                                                                                                      -I DOCKET NO. 50-328                       UNIT No. Two             DATE:   08-03-95 COMPLETED BYs   T.     J.       Ho11cmon                         TELEPHONE:   f615) 843-7528' MONTH:   JULY 1995 l
50-328 UNIT No.
Two DATE:
08-03-95 COMPLETED BYs T.
J.
Ho11cmon TELEPHONE:
f615) 843-7528' MONTH:
JULY 1995 l
1 i
1 i
AVERAGE DAILY POWER LEVEL                             AVERAGE DAILY POWER LEVEL-R&1             (MWe-Net)                             DAX             iMWe-Net) 1               1103                                 17               1096 2               1102                                 18               1097                               ,
AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL-R&1 (MWe-Net)
3                1098                                 19               1094                             ;
DAX iMWe-Net) 1 1103 17 1096 2
4                1101                                 20               1096 5               1098                                 21               1094 6               1096                                 22               1095                             ,
1102 18 1097 3
                .7                 1094                                 23               1096 8               1091                                 24               1093                             ;
1098 19 1094 4
                                                                                                                            ^
1101 20 1096 5
9                1101                                 25               1094 10               1101                                 26               1092 11               1101                                 27               1094-12               1102                                 28               1094 13               1100                                 29               1093 14               1100                                 30               1095 15     __
1098 21 1094 6
1096                                 31               1091 16               1089 h
1096 22 1095
. 7 1094 23 1096 8
1091 24 1093 9
1101 25 1094
^
10 1101 26 1092 11 1101 27 1094-12 1102 28 1094 13 1100 29 1093 14 1100 30 1095 15 1096 31 1091 16 1089 h
je
je
 
:,1.
: ,1 . ..
;)
                  .                                                                                                        ;)
l OPERATING DATA REPORT DOCKET NO.
l OPERATING DATA REPORT
50-327
              ' a                                                                          DOCKET NO. 50-327 DATE 08/03/95 COMPLETED BY T . J . Mo' lomon TELEPHONE (615) 843-7528
' a DATE 08/03/95 COMPLETED BY T. J. Mo' lomon TELEPHONE (615) 843-7528
              ' OPERATING STATUS l Notes                           l
' OPERATING STATUS l Notes l
: 1. Unit Name:   Seouovah Unit One                               l                                 l
1.
: 2.     Reporting Period:   July 1995                               l                                 l
Unit Name:
: 3.     Licensed Thermal Power (MWt): 3411.0                         l                                 l
Seouovah Unit One l
: 4.     Nameplate Rating (Gross MWe): 1220.6                         l                                 l
l 2.
: 5.     Design Electrical Rating (Net MWe): 1148.0                   l.                                 l
Reporting Period:
: 6.     Maximum Dependable Capacity (Gross We): 1151.0               l                                 l
July 1995 l
: 7.     Maximum Dependable Capacity (Net MWe): 1111.0               l                                 l
l 3.
: 8.     If Changes Occur in Capacity Ratings (Item Numbers 3 Throu9h 7) Since Last Report, Give Reasons:
Licensed Thermal Power (MWt): 3411.0 l
: 9.     Power Level To Which Restricted, If Any (Net We):       N/A
l 4.
: 10. Reasons For Restrictions, If Any:             N/A Yr-to-Date This Month                              Cumulative
Nameplate Rating (Gross MWe): 1220.6 l
: 11. Hours in Reporting Period                             744                   5.087           123.456 12 Number of Hours Reactor Was Critical                   726.5                 4.846.6         66.897
l 5.
: 13. Reactor Reserve Shutdown Hours                           0                       0               0
Design Electrical Rating (Net MWe): 1148.0 l.
: 14. Hours Generator On-Line                               705.6                 4.803.8         65.408.1
l 6.
: 15. Unit Reserve Shutdown Hours                             0                       0               0
Maximum Dependable Capacity (Gross We): 1151.0 l
: 16. Gross Thermal Energy Generated (MWH)           2.143.192.6         15.624.103.2       213.200.101
l 7.
: 17. Gross Electrical Energy Generated (MWH)           713.010           5.384.880           72.435.764
Maximum Dependable Capacity (Net MWe): 1111.0 l
: 18. Net Electrical Energy Generated (MWH)             681.175           5.193.220           69.456.633
l 8.
: 19. Unit Service Factor                                     94.8                     94.4             53.0
If Changes Occur in Capacity Ratings (Item Numbers 3 Throu9h 7) Since Last Report, Give Reasons:
: 20. Unit Availability Factor                               94.8                     94.4             53.0
9.
: 21. Unit Capacity Factor (Using MDC Net)                   82.4                     91.9             50.6
Power Level To Which Restricted, If Any (Net We):
: 22. Unit Capacity Factor (Using DER Net)                   79.8                     88.9             49.0
N/A
: 23. Unit Forced Outage Rate                                 5.2                     5.6             35.1
: 10. Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative
: 11. Hours in Reporting Period 744 5.087 123.456 12 Number of Hours Reactor Was Critical 726.5 4.846.6 66.897
: 13. Reactor Reserve Shutdown Hours 0
0 0
: 14. Hours Generator On-Line 705.6 4.803.8 65.408.1
: 15. Unit Reserve Shutdown Hours 0
0 0
: 16. Gross Thermal Energy Generated (MWH) 2.143.192.6 15.624.103.2 213.200.101
: 17. Gross Electrical Energy Generated (MWH) 713.010 5.384.880 72.435.764
: 18. Net Electrical Energy Generated (MWH) 681.175 5.193.220 69.456.633
: 19. Unit Service Factor 94.8 94.4 53.0
: 20. Unit Availability Factor 94.8 94.4 53.0
: 21. Unit Capacity Factor (Using MDC Net) 82.4 91.9 50.6
: 22. Unit Capacity Factor (Using DER Net) 79.8 88.9 49.0
: 23. Unit Forced Outage Rate 5.2 5.6 35.1
: 24. Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of Each):
Unit 1 Cvele 7 refuelina outane is scheduled to becin September 9.1995. with a duration of 50 davs.
Unit 1 Cvele 7 refuelina outane is scheduled to becin September 9.1995. with a duration of 50 davs.
Line 148: Line 191:
t I
t I


    ~,
~,
i i     74   ,                                                                                                            l i.L
i i
      +
74 i.L
:/           . , ,                                      OPERATING DATA REPORT j?
+
DOCKET NO. 50-328 DATE 08/03/95 COMPLETED BY   T. J. Ho11amon TELEPHONE (615) 843-7528 OPERATING STATUS l Notes                       l
:/
: 1. Unit Name:     Seavovah Unit Two                                 l                             l
OPERATING DATA REPORT j?
: 2. Reporting Period: July 1995                                       l                             l-
DOCKET NO.
: 3. Licensed Thermal Power (Wt): 3411.0                             l                             l
50-328 DATE 08/03/95 COMPLETED BY T. J. Ho11amon TELEPHONE (615) 843-7528 OPERATING STATUS l Notes l
: 4. Nameplate Rating (Gross We): 1220.6                               l-                             l S. Design Electrical Rating (Net We): 1148.0                         l                             l
1.
: 6. Maximum Dependable Capacity (Gross We): 1146.0                   l                             l
Unit Name:
: 7. Maximum Dependable Capacity (Net We): 1106.0                     l                             l
Seavovah Unit Two l
: 8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
l 2.
r
Reporting Period: July 1995 l
: 9. Power Level To Which Restricted, If Any (Net W e):       N/A
l-3.
: 10. Reasons For Restrictions, If Any:       N/A This Honth       Yr-to-Date           Cumulative
Licensed Thermal Power (Wt): 3411.0 l
: 11. Hours in Reporting Period 744               5.087           115.416
l 4.
: 12. Number of Hours Reactor Was Critical               744.0             4.589.7           68.946
Nameplate Rating (Gross We): 1220.6 l-l S.
: 13. Reactor Reserve Shutdown Hours                       'O                   O                 O     i
Design Electrical Rating (Net We): 1148.0 l
: 14. Hours Generator On-Line                             744.0             4.475.1           67.184.8
l 6.
: 15. Unit Reserve Shutdown Hours                           0                   0                 0
Maximum Dependable Capacity (Gross We): 1146.0 l
: 16. Gross Thermal Energy Generated (WH)         2.522.066.4       14.823.405.6       212.350.868
l 7.
: 17. Gross Electrical Energy Generated (WH)       844.350           5.058.753         72.066.362
Maximum Dependable Capacity (Net We): 1106.0 l
: 18. Net Electrical Energy Generated (HWH)         814.278           4.870.453 _       68.984.635
l 8.
: 19. Unit Service Factor                                 100.0                 88.0             58.2
If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
: 20. Unit Availability Factor                             100.0                 88.0             58.2
r 9.
: 21. Unit Capacity Factor (Using HOC Net)                   99.0                 86.6             54.0   '
Power Level To Which Restricted, If Any (Net W e):
: 22. Unit Capacity Factor (Using DER Net)                   95.3                 83.4             52.1
N/A
: 23. Unit Fort:ed Outage Rate                               0.0                 12.0             34.0
: 10. Reasons For Restrictions, If Any:
N/A This Honth Yr-to-Date Cumulative
: 11. Hours in Reporting Period 744 5.087 115.416
: 12. Number of Hours Reactor Was Critical 744.0 4.589.7 68.946
: 13. Reactor Reserve Shutdown Hours
'O O
O i
: 14. Hours Generator On-Line 744.0 4.475.1 67.184.8
: 15. Unit Reserve Shutdown Hours 0
0 0
: 16. Gross Thermal Energy Generated (WH) 2.522.066.4 14.823.405.6 212.350.868
: 17. Gross Electrical Energy Generated (WH) 844.350 5.058.753 72.066.362
: 18. Net Electrical Energy Generated (HWH) 814.278 4.870.453 _
68.984.635
: 19. Unit Service Factor 100.0 88.0 58.2
: 20. Unit Availability Factor 100.0 88.0 58.2
: 21. Unit Capacity Factor (Using HOC Net) 99.0 86.6 54.0
: 22. Unit Capacity Factor (Using DER Net) 95.3 83.4 52.1
: 23. Unit Fort:ed Outage Rate 0.0 12.0 34.0
: 24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
I
I
                    -                  -          -e- -      ,      ,
-e-


j
j UNIT SHUTDOWNS AND POWER REDUCTIONS.
                                                                                                                                                                                                                                                                                . DOCKET Im:       50-127-2 UNIT SHUTDOWNS AND POWER REDUCTIONS.                                                                                                    tmIT NAfE:             One
. DOCKET Im:
_        ' DATE:- 08/03ME                   .
50-127-tmIT NAfE:
                                                                                                                                                - REPORT MONTH:                 July 1995                                                                                   : COMPLETED BY:T. J. Ho' aman *
One 2
:TELEPMDNE:(6151 84:i-7528                       j; Method of                   Licensee                                         .
' DATE:- 08/03ME
Cause and Correctivet.                         , ,
- REPORT MONTH:
Duration                           Shutting Down                 Event                       Systy'                                                                   Action to '                 . -
July 1995
Compgnent
: COMPLETED BY:T. J. Ho'
;                                                    No.                   Date       Type             (Hours)       Reason               Reactor3                    Report No.                   Code             Code                                             -Prevent Recurrence               ;-
' aman *
3 4              950717       F               38.37         A                         3                     50-327/95010                   FK                 RLY                       At 1315 EDT on July 17. the Unit 1 i-
:TELEPMDNE:(6151 84:i-7528 j;
                                                                                                                                                                                                                                                    - reactor tripped following a turbine trip as a result of a trip signal initiated by the A phase main transformer protection circuiti The cause of the event was the failure of the sudden pressure .
Method of Licensee Cause and Correctivet.
Duration Shutting Down Event Systy' Compgnent Action to '
3 No.
Date Type (Hours)
Reason Reactor Report No.
Code Code
-Prevent Recurrence 4
950717 F
38.37 A
3 50-327/95010 FK RLY At 1315 EDT on July 17. the Unit 1 3
i-
- reactor tripped following a turbine trip as a result of a trip signal initiated by the A phase main transformer protection circuiti The cause of the event was the failure of the sudden pressure.
relay on the A transformer. The -
relay on the A transformer. The -
sudden pressure relays on each of the Units 1 and 2 main transformers were disabled. The transformer was returned to service, and the unit was taken critical on July 18 and tied to the grid on July 19 at 0337 EDT.
sudden pressure relays on each of the Units 1 and 2 main transformers were disabled. The transformer was returned to service, and the unit was taken critical on July 18 and tied to the grid on July 19 at 0337 EDT.
4 8
4 8
t l
t l
I:F Forced                           2 p ,,,,;                                                                       3Method:                                                             4 Exhibit G-Instructions S: Scheduled                       A-Equipment Failure (Explain):                                                   1-Manual                                                                 for Preparation of Data B-Maintenance or Test                                                           2-Manual Scram                                                             Entry sheets for Licensee
I: Forced p,,,,;
                                                                                  .C-Refueling                                                                   Automatic Scram                                                           Event Report (LER) File D-Regulatory Restriction                                                       4-Continuation of Existing Outage                                         (NUREG-1022)
3 4
                                                                                  - E-Operator Training and License Examination                                     5-Reduction F-Administrative-                                                               9-Other.
2 F
G-Operational Error (Explain)                                                                                                                   - 5 Exhibit                         I-Same Source 4
Method:
H-Other (Explain)
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain):
  -mm- .._.,.___ m. -.nm._.m_..__.-_.,_-_i.u.m_.--_.-_________.______s.m                   4'w-*Wt ',we       W-mm4   eWW e' p._wn..T'T 'ee   -d'W+- *rmT-F6" 4eu4+     1=-'Wei*--'eP-Mwn'er+-tu     We T D'r'*W'       "r Mf MY't'-F4r+-M=f*g--pi'41r+-HF>?-                   7T- Tgwgr i+.g 4rg m   T -siett-er
1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee
.C-Refueling Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-1022)
- E-Operator Training and License Examination 5-Reduction F-Administrative-9-Other.
G-Operational Error (Explain)
- 5 Exhibit I-Same Source H-Other (Explain) 4
-mm-m.
-.nm._.m_..__.-_.,_-_i.u.m_.--_.-_________.______s.m 4'w-*Wt
',we W-mm4 eWW e'
p._wn..T'T
'ee
-d'W+-
*rmT-F6" 4eu4+
1=-'Wei*--'eP-Mwn'er+-tu We T
D'r'*W' "r
Mf MY't'-F4r+-M=f*g--pi'41r+-HF>?-
7T-Tgwgr i+.g 4rg m
T
-siett-er


J _;
J _;
DOCKET NO:   '50-328' UNIT SHUTDOWNS AND POWER REDUCTIONS                                                           UNIT NAME:       Two                                                 ;t-DATE:   08/03/95                                               'T REPORT PONTH:     Julv 1995                                                             COMPLETED BY:T. J. Ho'llomon 3;
DOCKET NO:
                                                                                                                                                                                                          -TELEPHONE:(615) 84 M S28 '.
'50-328' UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME:
Method of       Licenses       .
Two
Cause and Corrective-   *                            ' '
;t-DATE:
Duration             Shutting Down     Event       System               Component                               Action to No.     Date     Type I    (Hours)     Reason 2    Reactor3        Report No. Code 4
08/03/95
Code 5
'T REPORT PONTH:
Prevent Recurrence.      .
Julv 1995 COMPLETED BY:T. J. Ho'llomon 3;
-TELEPHONE:(615) 84 M S28 '.
Method of Licenses Cause and Corrective-Duration Shutting Down Event System Component Action to I
2 3
4 5
No.
Date Type (Hours)
Reason Reactor Report No.
Code Code Prevent Recurrence.
4 There were no outages or power.
4 There were no outages or power.
reductions of greater than.
reductions of greater than.
20 percent to report during July.
20 percent to report during July.
1 I:F Forced       2 p,,,,,                                         3Method:
1 I: Forced p,,,,,
                                                                                                                                                                            '# Exhibit G-Instructions S: Scheduled     A-Equipment Failure (Explain)                     1-Manual                                                       for Preparation of Data -
Method:
B-Maintenance or Test '                           2-Manual Scram                                                 Entry sheets for Licensee .
2 3
C-Refueling                                       3-Automatic Scram                                             Event Report (LER) File D-Regulatory Restriction-                         4-Continuation of Existing Outage                               (NUREG-1022)                                                                               j E-Operator Training and License Examination       5-Reduction F-Administrative                                 9-Other G-Operational Error (Explain)                                                                         5 Exhibit         I-Same Source .
'# xhibit G-Instructions F
E S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data -
B-Maintenance or Test '
2-Manual Scram Entry sheets for Licensee.
C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction-4-Continuation of Existing Outage (NUREG-1022) j E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other 5
G-Operational Error (Explain)
Exhibit I-Same Source.
H-Other (Explain)
H-Other (Explain)
_ _ . - . - _ _ _ - . - . _ _ _ - - . _ . _ - _ . . ..                                                                                                                        . . . . . . . .                                      . . . . . . _ . _ _ _ _ _ _ _ _ _ _ . - - . -}}
...... _. _ _ _ _ _ _ _ _ _ _. - -. -}}

Latest revision as of 14:28, 13 December 2024

Monthly Operating Repts for Jul 1995 for Sequoyah Nuclear Plant
ML20087F020
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/31/1995
From: Hollomon T, Shell R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9508150082
Download: ML20087F020 (10)


Text

,

'~

Tennessee Valley Authority, Post Omce Box 2000, Soddy-Dasy, Tennessee 37379-2000 August 9, 1995 U.S. Nuclear Regulatory Commission ATTN Document Control Desk Washington, D.C. 20555 Gentlemen In the Matter of

)

Docket Nos. 50 *27 J

Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - JULY 1995 MONTHLY OPERATING REPORT Enclosed is the July 1995 Monthly Operating Report as required by SQN Technical Specification 6.9.1.10.

If you have any questions concerning this matter, please call J. W. Proffitt at (615) 843-6651.

Sincerely, L4 l ~

/

R. H. Shell

/

Manager SQN Site Licensing Enclosure cc See page 2 s

$Y,"l*')

9508150002 950731 PDR ADOCK 05000327 PDR R

1 I

O.

s 4

l' ll *.

. f^_, y g.

- U.S. Nuclear Regulatory Commission

, Page 2 August 9,11995 cc (Enclosure):

- INPO Records'Conter' Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957

~!

Mr. D. E. LaBarge, Project Manager

. U.S. Nuclear. Regulatory Commission one White Flint, North 11555 Rockville Pike Rockville,1 Maryland 20852-2739 Mr. Josephisantucci, Manager Advanced Reactor Department

- Electric Power Research Institute 3340 Hillview Avenue Palo Alto, California 94304

{

NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator

.U.S. Nuclear Regulatory Commission Region II-101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 Mr. F. Yost, Director Research Services Utility Data Institute.

1200 G Street, NW, Suite 250 Washington, D.C.

20005 n

- t

-i r

n-

1 J

t

-);

.a_

4 I

TENNESSEE VALLEY AUTHORITY i

SEQUOYAH NUCLEAR PLANT MONTHLY OPERATING REPORT TO Tile NUCLEAR REGULATORY COMMISSION i

JULY 1995 4

i UNIT 1 i

DOCKET NUMBER 50-327 LICENSE NUMBER DPR777 i

UNIT 2 DOCKET NUMBER 50-328 LICENSE NUMBER DPR-79 t

L

s OPERATIONAL

SUMMARY

JULY 1995 UNIT 1 Unit 1 generated 713,010 megawatthours (MWh) (gross) electrical power during July with a capacity factor of 83.26 percent.

Unit I was operating at approximately 48 percent reactor power at the beginning of the month.

Power escalation was initiated on July 1 at 2145 EDT.

Unit I reached 100 percent power on July 3 at 0508 EDT.

At 1315 EDT on July 17, Unit I reactor tripped following a turbine trip an a result of a trip signal initiated by the A phase main transformer protection circuit. The cause of the event was the sudden pressure relay located on the transformer. The sud. den pressure relays on each of the main transformers were disabled. Unit 1 was taken critical on July 18 at 0642 EDT and was tied to the grid on July 19 at 0337 EDT.

Unit I was operating at approximately 93 percent as of the end of July.

Unit I has started coastdown to the Unit 1 Cycle 7 refueling outage.

UNIT 2 Unit 2 generated 844,350 megawatthours (MWh) (gross) electrical power during July with a capacity factor 99.03 percent. There were no outages or power reductions of greater than 20 percent to report during July.

Unit 2 was operating at 99.5 percent at the end of July.

i

';<5

'.,' E r

1 AVERACE DAILY UNIT POWER LEVEL

+

DOCKET No.

50-327 UNIT No.

One-

'DATE:

08-03-95

~

COMPLETED BY ' iT.-J.

Ho11omon

' TELEPHONES- (615) 843-7528 l

f MONTH:

' JULY 1995 AVERAGE DAILY POWER LEVEL AVFRAGE DAILY POWER LEVEL-Q&%

(MWe-Neti' QAl-(MWe-Net) e h

1 504 17 587 L

2 844 18

-36 3

1099 19 149 4

1118 20 418 5

1114 21 613

.6 1115 22 882 l

7 1115 23 955 i

8 1114 24 915 9

1113 25 917

. )

10 1112 26 927 11 1112 27 1033 12 1114

.28 1047 l

13 1112 29 1041 f

14 1103 30 1027 15 1099 31 1015 16~

1097 l

I L

L l

v a--

e 4

yy

Q,-

't AVERAGE DAILY UNIT POWER LEVEL 1

- I DOCKET NO.

50-328 UNIT No.

Two DATE:

08-03-95 COMPLETED BYs T.

J.

Ho11cmon TELEPHONE:

f615) 843-7528' MONTH:

JULY 1995 l

1 i

AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL-R&1 (MWe-Net)

DAX iMWe-Net) 1 1103 17 1096 2

1102 18 1097 3

1098 19 1094 4

1101 20 1096 5

1098 21 1094 6

1096 22 1095

. 7 1094 23 1096 8

1091 24 1093 9

1101 25 1094

^

10 1101 26 1092 11 1101 27 1094-12 1102 28 1094 13 1100 29 1093 14 1100 30 1095 15 1096 31 1091 16 1089 h

je

,1.
)

l OPERATING DATA REPORT DOCKET NO.

50-327

' a DATE 08/03/95 COMPLETED BY T. J. Mo' lomon TELEPHONE (615) 843-7528

' OPERATING STATUS l Notes l

1.

Unit Name:

Seouovah Unit One l

l 2.

Reporting Period:

July 1995 l

l 3.

Licensed Thermal Power (MWt): 3411.0 l

l 4.

Nameplate Rating (Gross MWe): 1220.6 l

l 5.

Design Electrical Rating (Net MWe): 1148.0 l.

l 6.

Maximum Dependable Capacity (Gross We): 1151.0 l

l 7.

Maximum Dependable Capacity (Net MWe): 1111.0 l

l 8.

If Changes Occur in Capacity Ratings (Item Numbers 3 Throu9h 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net We):

N/A

10. Reasons For Restrictions, If Any:

N/A This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 744 5.087 123.456 12 Number of Hours Reactor Was Critical 726.5 4.846.6 66.897
13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 705.6 4.803.8 65.408.1
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 2.143.192.6 15.624.103.2 213.200.101
17. Gross Electrical Energy Generated (MWH) 713.010 5.384.880 72.435.764
18. Net Electrical Energy Generated (MWH) 681.175 5.193.220 69.456.633
19. Unit Service Factor 94.8 94.4 53.0
20. Unit Availability Factor 94.8 94.4 53.0
21. Unit Capacity Factor (Using MDC Net) 82.4 91.9 50.6
22. Unit Capacity Factor (Using DER Net) 79.8 88.9 49.0
23. Unit Forced Outage Rate 5.2 5.6 35.1
24. Shutdowns Scheduled Over Next 6 Months (Type Date, and Duration of Each):

Unit 1 Cvele 7 refuelina outane is scheduled to becin September 9.1995. with a duration of 50 davs.

25. If Shut Down At End Of Report Period Estimated Date of Startup:

l l

t I

~,

i i

74 i.L

+

/

OPERATING DATA REPORT j?

DOCKET NO.

50-328 DATE 08/03/95 COMPLETED BY T. J. Ho11amon TELEPHONE (615) 843-7528 OPERATING STATUS l Notes l

1.

Unit Name:

Seavovah Unit Two l

l 2.

Reporting Period: July 1995 l

l-3.

Licensed Thermal Power (Wt): 3411.0 l

l 4.

Nameplate Rating (Gross We): 1220.6 l-l S.

Design Electrical Rating (Net We): 1148.0 l

l 6.

Maximum Dependable Capacity (Gross We): 1146.0 l

l 7.

Maximum Dependable Capacity (Net We): 1106.0 l

l 8.

If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:

r 9.

Power Level To Which Restricted, If Any (Net W e):

N/A

10. Reasons For Restrictions, If Any:

N/A This Honth Yr-to-Date Cumulative

11. Hours in Reporting Period 744 5.087 115.416
12. Number of Hours Reactor Was Critical 744.0 4.589.7 68.946
13. Reactor Reserve Shutdown Hours

'O O

O i

14. Hours Generator On-Line 744.0 4.475.1 67.184.8
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (WH) 2.522.066.4 14.823.405.6 212.350.868
17. Gross Electrical Energy Generated (WH) 844.350 5.058.753 72.066.362
18. Net Electrical Energy Generated (HWH) 814.278 4.870.453 _

68.984.635

19. Unit Service Factor 100.0 88.0 58.2
20. Unit Availability Factor 100.0 88.0 58.2
21. Unit Capacity Factor (Using HOC Net) 99.0 86.6 54.0
22. Unit Capacity Factor (Using DER Net) 95.3 83.4 52.1
23. Unit Fort:ed Outage Rate 0.0 12.0 34.0
24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup:

I

-e-

j UNIT SHUTDOWNS AND POWER REDUCTIONS.

. DOCKET Im:

50-127-tmIT NAfE:

One 2

' DATE:- 08/03ME

- REPORT MONTH:

July 1995

COMPLETED BY:T. J. Ho'

' aman *

TELEPMDNE:(6151 84:i-7528 j;

Method of Licensee Cause and Correctivet.

Duration Shutting Down Event Systy' Compgnent Action to '

3 No.

Date Type (Hours)

Reason Reactor Report No.

Code Code

-Prevent Recurrence 4

950717 F

38.37 A

3 50-327/95010 FK RLY At 1315 EDT on July 17. the Unit 1 3

i-

- reactor tripped following a turbine trip as a result of a trip signal initiated by the A phase main transformer protection circuiti The cause of the event was the failure of the sudden pressure.

relay on the A transformer. The -

sudden pressure relays on each of the Units 1 and 2 main transformers were disabled. The transformer was returned to service, and the unit was taken critical on July 18 and tied to the grid on July 19 at 0337 EDT.

4 8

t l

I: Forced p,,,,;

3 4

2 F

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain):

1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee

.C-Refueling Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuation of Existing Outage (NUREG-1022)

- E-Operator Training and License Examination 5-Reduction F-Administrative-9-Other.

G-Operational Error (Explain)

- 5 Exhibit I-Same Source H-Other (Explain) 4

-mm-m.

-.nm._.m_..__.-_.,_-_i.u.m_.--_.-_________.______s.m 4'w-*Wt

',we W-mm4 eWW e'

p._wn..T'T

'ee

-d'W+-

  • rmT-F6" 4eu4+

1=-'Wei*--'eP-Mwn'er+-tu We T

D'r'*W' "r

Mf MY't'-F4r+-M=f*g--pi'41r+-HF>?-

7T-Tgwgr i+.g 4rg m

T

-siett-er

J _;

DOCKET NO:

'50-328' UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME:

Two

t-DATE

08/03/95

'T REPORT PONTH:

Julv 1995 COMPLETED BY:T. J. Ho'llomon 3;

-TELEPHONE:(615) 84 M S28 '.

Method of Licenses Cause and Corrective-Duration Shutting Down Event System Component Action to I

2 3

4 5

No.

Date Type (Hours)

Reason Reactor Report No.

Code Code Prevent Recurrence.

4 There were no outages or power.

reductions of greater than.

20 percent to report during July.

1 I: Forced p,,,,,

Method:

2 3

'# xhibit G-Instructions F

E S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data -

B-Maintenance or Test '

2-Manual Scram Entry sheets for Licensee.

C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction-4-Continuation of Existing Outage (NUREG-1022) j E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other 5

G-Operational Error (Explain)

Exhibit I-Same Source.

H-Other (Explain)

...... _. _ _ _ _ _ _ _ _ _ _. - -. -