ML20094D534: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
REACTOR'C00LANT SYSTEM REACTOR COOLANT SYSTEM LEAKAGI | REACTOR'C00LANT SYSTEM REACTOR COOLANT SYSTEM LEAKAGI OPERATIONAL LEAKAGE | ||
~ | |||
' SURVEILLANCE REOUIREMENTS 4.4.6.2.2 a | |||
Re or Coolant System Pressure Isolation Valve - w--*'' > ir. | |||
4.4.6.2.2 | T:5': | ||
T:5': | ?.' _ shall be demonstrated OPERABLE by verifying e wi n ts limit: | ||
_ shall be demonstrated OPERABLE by verifying e wi | age a. | ||
'At least once per 18 months, b.' | |||
Prior.to returning the valve to service following maintenance, | Prior to entering MODE 2 whenever the plant has been in COLD SHUTDOWN for 7. days or more and if leakage testing has not been l | ||
performed in the previous 9 months, Prior.to returning the valve to service following maintenance, c. | |||
' repair, or replacement work on the valve, and d. | |||
manual action or flow through the valve.t | Within 24 hours following valve actuation due to automatic or 1 | ||
manual action or flow through the valve.t l | |||
As outlined in the ASME Code, Section XI, paragraph IW-3427_(b). | |||
e. | e. | ||
The provisions of Specification 4.0.4 are not applicable for. entry inte MODE 3 or 4. | |||
l l | l l | ||
& Not app /s'alle. +c BHM pumps gA sod te CucPion (So/afion yclV43 Gnd fbLlY bffGSS c h u A. | |||
valves. | |||
SEABROOK - UNIT 1 3/4 4-23 Amendment No. 9511060054 951030 PDR ADOCK 05000443 P | |||
PDR}} | |||
Latest revision as of 09:45, 13 December 2024
| ML20094D534 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 10/30/1995 |
| From: | NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO) |
| To: | |
| Shared Package | |
| ML20094D532 | List: |
| References | |
| NUDOCS 9511060054 | |
| Download: ML20094D534 (1) | |
Text
-
REACTOR'C00LANT SYSTEM REACTOR COOLANT SYSTEM LEAKAGI OPERATIONAL LEAKAGE
~
' SURVEILLANCE REOUIREMENTS 4.4.6.2.2 a
Re or Coolant System Pressure Isolation Valve - w--* > ir.
T:5':
?.' _ shall be demonstrated OPERABLE by verifying e wi n ts limit:
age a.
'At least once per 18 months, b.'
Prior to entering MODE 2 whenever the plant has been in COLD SHUTDOWN for 7. days or more and if leakage testing has not been l
performed in the previous 9 months, Prior.to returning the valve to service following maintenance, c.
' repair, or replacement work on the valve, and d.
Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following valve actuation due to automatic or 1
manual action or flow through the valve.t l
As outlined in the ASME Code,Section XI, paragraph IW-3427_(b).
e.
The provisions of Specification 4.0.4 are not applicable for. entry inte MODE 3 or 4.
l l
& Not app /s'alle. +c BHM pumps gA sod te CucPion (So/afion yclV43 Gnd fbLlY bffGSS c h u A.
valves.
SEABROOK - UNIT 1 3/4 4-23 Amendment No. 9511060054 951030 PDR ADOCK 05000443 P