OPERATING DATA REPORT DOCKET NO.       50-244 DATE November 12, 1984 COMPLETED BY d"bdM"-' "
c O-
Andrew E. Mc!Iamara TELEPHONE ( 315 ) 524-4446 O_PERATING STATUS                                                               Ext. 301
.l.
: 1. Unit Name:   GINNA STATION. UNIT #1                           Nctes
OPERATING DATA REPORT DOCKET NO.
: 2. Reporting Period:       October. 1984
50-244 DATE November 12, 1984 COMPLETED BY d"bdM"-' "
: 3. Licensed Thermal Power (MWt):                 1s7n               The reactor power level
Andrew E. Mc!Iamara TELEPHONE ( 315 ) 524-4446 O_PERATING STATUS Ext. 301
: 4. Nameplate Rating (Gioss MWe):                   490                was    maintained at 100%
: 1. Unit Name:
a7n                for   the entire report
GINNA STATION. UNIT #1 Nctes
: 2. Reporting Period:
October. 1984
: 3. Licensed Thermal Power (MWt):
1s7n The reactor power level 490 was maintained at 100%
: 4. Nameplate Rating (Gioss MWe):
for the entire report
: 5. Design Electrical Rating (Net MWe):
: 5. Design Electrical Rating (Net MWe):
period.
a7n period.
: 6. Maximum Dependable Capacity (Gross MWe):       490
: 6. Maximum Dependable Capacity (Gross MWe):
: 7. Maximum Dependable Capacity (Net MWe):         470
490
: 7. Maximum Dependable Capacity (Net MWe):
470
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level to Which Restricted, If Any (Net MWe):
: 9. Power Level to Which Restricted, If Any (Net MWe):
: 10. Reasons For Restrictions, if Any:
: 10. Reasons For Restrictions, if Any:
This Month           Yr..to-Da te       Cumulative i1. Ilours In Reporting Period                           745**             7.320.00             130;9a6_00
This Month Yr..to-Da te Cumulative i1. Ilours In Reporting Period 745**
: 12. Number of flours Reactor Was Critical               745**             5,384.73               98,984.71
7.320.00 130;9a6_00
: 13. Reactor Reserve Shutdown llours                       0                       56.23             1.687.55*
: 12. Number of flours Reactor Was Critical 745**
745**             5,316.75               96,828.38
5,384.73 98,984.71
: 14. Ilours Generator On.Line 0                       0                         8. 5_*
: 13. Reactor Reserve Shutdown llours 0
56.23 1.687.55*
745**
5,316.75 96,828.38
: 14. Ilours Generator On.Line 0
0
: 8. 5_*
: 15. Unit Reserve Shutdown llours
: 15. Unit Reserve Shutdown llours
: 16. Gross Thermal Energy Generated (MWil)       1,127,040           7,816,968             134,074.737
: 16. Gross Thermal Energy Generated (MWil) 1,127,040 7,816,968 134,074.737 373,434 2,585,999 43,750,369
: 17. Gross Electrical Energy Generated (MWil)      373,434           2,585,999               43,750,369
: 17. Gross Electrical Energy Generated (MWil)
: 18. Net Electrical Energy Generated (MWil)       355,279           2,457,207               41.483.452
: 18. Net Electrical Energy Generated (MWil) 355,279 2,457,207 41.483.452
: 19. Unit Service Facto,                               100%               72.63%                   73.97%
: 19. Unit Service Facto, 100%
: 20. Unit Availability Facto,                          100%               72.63%                   73.98%
72.63%
: 21. Unit Capacity Factor (Using MDC Net)              101.46%           71.42%                   69.13%       _
73.97%
: 22. Unit Capacity Factor (Using DER Net)               101.46%           71.42%                   69.13%
100%
: 23. Unit Forced Outage Rate                              0%               4.75%                   7.80%
72.63%
73.98%
: 20. Unit Availability Facto, 101.46%
71.42%
69.13%
: 21. Unit Capacity Factor (Using MDC Net)
: 22. Unit Capacity Factor (Using DER Net) 101.46%
71.42%
69.13%
0%
4.75%
7.80%
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each):
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each):
March 2.     1985   -
March 2.
60 dayn
1985 60 dayn
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
: 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):                 Forecast             Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION                                                         ___
: 26. Units in Test Status (Prior to Commercial Operation):
              *Cummulativo Total Commencing January 1, 1975
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
            ** Eastern Day 11aht Savings Time to Eastern Standard Timo 8412110506 041031
*Cummulativo Total Commencing January 1, 1975
                                                                                                                      "'" ""' g p
** Eastern Day 11aht Savings Time to Eastern Standard Timo
[
"'" ""' g [
- --                          N " ^" " ?             E                                                                           4
8412110506 041031 p
N " ^" " ? E 4


ms         -
ms
                                                                                )
)
I                                                                       l l
I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.       50-244 UNIT   #1, Ginna Station DATE   November 12, 1984     j COMPLETED BY   WLme-r         h     l Andrew E. Mch'amara J
50-244 UNIT
TELEPHONE   1 (315) 524-4446 Ext. 301 at Ginna MONTH   October, 1984
#1, Ginna Station DATE November 12, 1984 j
      ' DAY AVERAGE DAILY POWER LEVEL       DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                           (MWo-Not)
COMPLETED BY WLme-r h
: 1.           474                   17.             478
Andrew E.
: 2.           474                   18.             478
Mch'amara J
: 3.           475                   19.             479
TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH October, 1984
: 4.           475                   20.             478
' DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
: 5.           476                   21.             477
(MWo-Not) 1.
: 6.           476                   22.             477
474 17.
: 7.           477                   23.             477
478 2.
: 8.           477                   24.             478
474 18.
: 9.           477                   25.             478
478 3.
: 10.         478                   26.             477
475 19.
: 11.         477                   27.             477
479 4.
: 12.         476                   28.             478 (25 hrs)*
475 20.
: 13.           476                   29.             477
478 5.
: 14.           477                   30.             477
476 21.
: 15.         478                   31.             477
477 6.
: 16.           479
476 22.
477 7.
477 23.
477 8.
477 24.
478 9.
477 25.
478 10.
478 26.
477 11.
477 27.
477 12.
476 28.
478 (25 hrs)*
13.
476 29.
477 14.
477 30.
477 15.
478 31.
477 16.
479
* Eastern Daylight Savings Time to Eastern Standard Time.
* Eastern Daylight Savings Time to Eastern Standard Time.
INSTRUCTIONS On thin format, list the average daily unit power lovel in NWo-Net for each day in the reporting month. Compute to the nearcot whole megawatt.
INSTRUCTIONS On thin format, list the average daily unit power lovel in NWo-Net for each day in the reporting month.
Compute to the nearcot whole megawatt.


a w
a w
IXX:KET NO.         50-244 UNITNAME #1,Giana Ssation
IXX:KET NO.
* UNIT SHUTDOWN AND POWER REDUCTIONS                     DATE N           ber 12. 1984     .,
50-244 UNITNAME #1,Giana Ssation UNIT SHUTDOWN AND POWER REDUCTIONS DATE N ber 12. 1984 a -
a -
-? 8 M%W COMPLETED fly Andrew E. McNamara REPORT MONTH OCTOBER. 1984 TELEPIIONE f315) 524-4446 Ext. 301 Ginna Station n
COMPLETED fly
..I n
                                                                                                                          -? 8 M%W Andrew E. McNamara REPORT MONTH OCTOBER. 1984           TELEPIIONE f315) 524-4446 Ext. 301 Ginna Station n
!*3 Eq Licentee C*"se a cer,.ctive 1.c =I Event
                          -      Eq n
-e W.
                                                ..I
Dese 2.
* Licentee C*"se a cer,.ctive W.            Dese      2. i3        $    1.c*: =I     Event         !*
i3 3, -
                                                                            -e         !*3 3, -                   Action se
Action se jj I
                          #    jj         I   i d ",
i d ",
2      g Repeet #       d3         10 '
Repeet #
u Prevent Recurrence o
d3 10 '
No outages or power reductions to report.
Prevent Recurrence 2
I                     2                                             3                             4 F: Forced             Reason:                                       Method:                         Exhibit G - Instructions S: Scheduled         A-Equipment Failure (Explain)                 1-L aual                       for Preparation of Data B-Maintenance w Test                           2-moual Scram.                 Entry Sheets for Licensee C-Refueling                                   3-Automatic Scram.             Event Report (LER) File (NUREG-D-Regulatory Restriction                       4-Other (Explain)               0161)
g u
E-Operata Training a: License Examination F-Administrative                       <
o No outages or power reductions to report.
G-Operaticaal Error (Explain)                                               I                                      w
I 2
.w. i e .. in..       H-Other (Explain)                                                             Exhibit 1 - Same Source
3 4
F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-L aual for Preparation of Data B-Maintenance w Test 2-moual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operata Training a: License Examination F-Administrative I
G-Operaticaal Error (Explain) w
.w.
i e.. in..
H-Other (Explain)
Exhibit 1 - Same Source


NARRATIVE  
NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.     50-244 UNIT Ginna Station, Unit #1 DATE   November 12, 1984 COMPLETED BY           b W ome A Andrew E. McNamara TELEPHONE   1 (315) 524-4446   __
OF OPERATING EXPERIENCE DOCKET NO.
EXT. 301 at Ginna MONTH   October 1984 The reactor power level was maintained at 100% for the report period.
50-244 UNIT Ginna Station, Unit #1 DATE November 12, 1984 COMPLETED BY b W ome A Andrew E.
McNamara TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH October 1984 The reactor power level was maintained at 100% for the report period.
i f
i f
i
i


y-               __
y-
;r. '       -.,-
;r. '
GINNA STATION MAINTENANCE REPORT  
GINNA STATION MAINTENANCE REPORT  


==SUMMARY==
==SUMMARY==
'~
'~
OCTOBER, 1984 F                       s                                                 .
OCTOBER, 1984 F
During the month of October, routine maintenance and' inspections were
s routine maintenance and' inspections were During the month of October,
[             -performed.
[
-performed.


r _
r _
O,/
O,/
yq wr~n e -                                                                        . ... 5' N 'u b ' O ~m jer.q a                                                                       ,f
yq N 'u b ' O ~m
                                                                                                    ~
.... 5' "4 h R40:
                                                                                                          "4 "yh
wr~n e -
                                                                                                                't -
't
R40:0N/i F                                                                       rJJi w-3 u ,-f''''- [
~
g ;;   _
jer.q a
,f 3
"y 0N/i F rJJi u,-f''''- [
w-g ;;
ROCHESTER GAS AND ELECTRIC CORPORATION
ROCHESTER GAS AND ELECTRIC CORPORATION
* 89 EAST AVENUE, ROCHESTER, N.Y.14649                     M T E L E Pe40N E anc. coon n. 546 2700 GINNA STATION November 12, 1984 Director, Office of Management Information and Program Analysis U.S. NUCLEAR REGULATORY COMMISSION Washington, DC 20555
* 89 EAST AVENUE, ROCHESTER, N.Y.14649 M
T E L E Pe40N E anc. coon n. 546 2700 GINNA STATION November 12, 1984 Director, Office of Management Information and Program Analysis U.S. NUCLEAR REGULATORY COMMISSION Washington, DC 20555


==Subject:==
==Subject:==
Line 134: Line 199:


==Dear Sir:==
==Dear Sir:==
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of October, 1984.
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of October, 1984.
Very truly yours, kfLDruceA. Snow Plant Superintendent DAS/ceg Attachments cc:   Dr. Thomas E. Murley NRC (1) h
Very truly yours, kfLDruceA. Snow Plant Superintendent DAS/ceg Attachments cc:
                                                                      '\'}}
Dr. Thomas E. Murley NRC (1) h
'\\'
- -}}

Latest revision as of 05:36, 13 December 2024

Monthly Operating Rept for Oct 1984
ML20100L231
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/31/1984
From: Mcnamara A, Snow B
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
References
NUDOCS 8412110506
Download: ML20100L231 (6)


Text

r o

c O-

.l.

OPERATING DATA REPORT DOCKET NO.

50-244 DATE November 12, 1984 COMPLETED BY d"bdM"-' "

Andrew E. Mc!Iamara TELEPHONE ( 315 ) 524-4446 O_PERATING STATUS Ext. 301

1. Unit Name:

GINNA STATION. UNIT #1 Nctes

2. Reporting Period:

October. 1984

3. Licensed Thermal Power (MWt):

1s7n The reactor power level 490 was maintained at 100%

4. Nameplate Rating (Gioss MWe):

for the entire report

5. Design Electrical Rating (Net MWe):

a7n period.

6. Maximum Dependable Capacity (Gross MWe):

490

7. Maximum Dependable Capacity (Net MWe):

470

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, if Any:

This Month Yr..to-Da te Cumulative i1. Ilours In Reporting Period 745**

7.320.00 130;9a6_00

12. Number of flours Reactor Was Critical 745**

5,384.73 98,984.71

13. Reactor Reserve Shutdown llours 0

56.23 1.687.55*

745**

5,316.75 96,828.38

14. Ilours Generator On.Line 0

0

8. 5_*
15. Unit Reserve Shutdown llours
16. Gross Thermal Energy Generated (MWil) 1,127,040 7,816,968 134,074.737 373,434 2,585,999 43,750,369
17. Gross Electrical Energy Generated (MWil)
18. Net Electrical Energy Generated (MWil) 355,279 2,457,207 41.483.452
19. Unit Service Facto, 100%

72.63%

73.97%

100%

72.63%

73.98%

20. Unit Availability Facto, 101.46%

71.42%

69.13%

21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 101.46%

71.42%

69.13%

0%

4.75%

7.80%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each):

March 2.

1985 60 dayn

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Cummulativo Total Commencing January 1, 1975
    • Eastern Day 11aht Savings Time to Eastern Standard Timo

"'" ""' g [

8412110506 041031 p

N " ^" " ? E 4

ms

)

I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT

  1. 1, Ginna Station DATE November 12, 1984 j

COMPLETED BY WLme-r h

Andrew E.

Mch'amara J

TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna MONTH October, 1984

' DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWo-Not) 1.

474 17.

478 2.

474 18.

478 3.

475 19.

479 4.

475 20.

478 5.

476 21.

477 6.

476 22.

477 7.

477 23.

477 8.

477 24.

478 9.

477 25.

478 10.

478 26.

477 11.

477 27.

477 12.

476 28.

478 (25 hrs)*

13.

476 29.

477 14.

477 30.

477 15.

478 31.

477 16.

479

  • Eastern Daylight Savings Time to Eastern Standard Time.

INSTRUCTIONS On thin format, list the average daily unit power lovel in NWo-Net for each day in the reporting month.

Compute to the nearcot whole megawatt.

a w

IXX:KET NO.

50-244 UNITNAME #1,Giana Ssation UNIT SHUTDOWN AND POWER REDUCTIONS DATE N ber 12. 1984 a -

-? 8 M%W COMPLETED fly Andrew E. McNamara REPORT MONTH OCTOBER. 1984 TELEPIIONE f315) 524-4446 Ext. 301 Ginna Station n

..I n

!*3 Eq Licentee C*"se a cer,.ctive 1.c =I Event

-e W.

Dese 2.

i3 3, -

Action se jj I

i d ",

Repeet #

d3 10 '

Prevent Recurrence 2

g u

o No outages or power reductions to report.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-L aual for Preparation of Data B-Maintenance w Test 2-moual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operata Training a: License Examination F-Administrative I

G-Operaticaal Error (Explain) w

.w.

i e.. in..

H-Other (Explain)

Exhibit 1 - Same Source

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT Ginna Station, Unit #1 DATE November 12, 1984 COMPLETED BY b W ome A Andrew E.

McNamara TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH October 1984 The reactor power level was maintained at 100% for the report period.

i f

i

y-

r. '

GINNA STATION MAINTENANCE REPORT

SUMMARY

'~

OCTOBER, 1984 F

s routine maintenance and' inspections were During the month of October,

[

-performed.

r _

O,/

yq N 'u b ' O ~m

.... 5' "4 h R40:

wr~n e -

't

~

jer.q a

,f 3

"y 0N/i F rJJi u,-f'- [

w-g ;;

ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EAST AVENUE, ROCHESTER, N.Y.14649 M

T E L E Pe40N E anc. coon n. 546 2700 GINNA STATION November 12, 1984 Director, Office of Management Information and Program Analysis U.S. NUCLEAR REGULATORY COMMISSION Washington, DC 20555

Subject:

Monthly Report for October, 1984 Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of October, 1984.

Very truly yours, kfLDruceA. Snow Plant Superintendent DAS/ceg Attachments cc: