ML20111B024: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
#REDIRECT [[L-96-010, Monthly Operating Repts for Apr 1996 for Point Beach Nuclear Plant]]
| number = ML20111B024
| issue date = 04/30/1996
| title = Monthly Operating Repts for Apr 1996 for Point Beach Nuclear Plant
| author name = Koudelka M, Maxfield G
| author affiliation = WISCONSIN ELECTRIC POWER CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000266, 05000301
| license number =
| contact person =
| document report number = PBL-96-0109, PBL-96-109, NUDOCS 9605140137
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 10
}}
 
=Text=
{{#Wiki_filter:!
l        ,
l l                          Wisconsin                                                                                                    1
!                        1 Electnc POWER COMPANY Point Beach Nucloor Plant 6610 Nuclear Rd., Two Rivers. VA 54241 (414) 755-2321 l        PBL %-0109                                                                                                                    I l
l May 5,1996 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station PI-137 Washington,DC 20555 l
l Gentlemen:
DOCKETS 50-266 AND 50-301 l        MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 l        Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of April 1996.
Sincerely, Jl/l G. L Maxfield l
PBNP Manager
!        smb Attachments cc:      L. L. Smith, PSCW
;                  NRC Regional Administrator, Region Ill NRC Resident Inspector i              9605140137 960430 PDR      ADOCK 05000266 R                            PDR l
i l                                                                                                                                l-'' I il .subsduy afIIluvauh theny {brp<n6m
 
F OPERATING DATA REPORT                                                                                                                                                                                                                                      '
                                                                                                                                                                                                                                                                                                                                                                                                            ~
DOCKET NO. 50-266 DATE:  05/07/96
* COMPLETED BY:        M. B. Koudelka i
TELEPHONE: 414 755-6480 OPERATING STATUS
: 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1                                                                                            .                          NOTES                                                                                                                                                                          *
: 2. REPORTING PERIOD: April - 1996                                                                                                            .
i
: 3. LICENSED THERMAL POWER (MWT) : 1518.5                                                                                                    .
                                                                                                                                                                                                                                                                                                                                                                                                        .          I
: 4. NAMEPLATE RATING (GROSS MWE): 523.8                                                                                                      .
l
: 5. DESIGN ELECTRICAL RATING (NET MWE) : 497.0                                                                                                .
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : 509.0 .
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) :                                                                                        485.0    .                              .                            .    .  .    .  .  .  .    .  .        .                            .                              .                        .    .    .
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 2 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
: 9.                            POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
: 10. REASONS FOR RESTRICTIONS, (IF ANY) :                                                                                                                                                                                                                                                                                                                                        t NA THIS MONTH                                            YEAR TO DATE                                                                  CUMULATIVE
: 11. HOURS IN REPORTING PERIOD                                                                                                                                                                                              719.0                2,903.0                                                                                                223,391.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                                                                                                                                                                    197.7                2,338.5                                                                                                186,992.9                .
: 13. REACTOR RESERVE SHUTDONN HOURS                                                                                                                                                                                              0.0                    0.0.                                                                                                  667.3
: 14. HOURS GENERATOR ON LINE                                                                                                                                                                                                  154.5                2,292.6                                                                                                183,774.0
: 15. UNIT RESERVE SHUTDOWN HOURS                                                                                                                                                                                                                                                                                                                                                  j 0.0                    0.0                                                                                                  846.9
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                                                                                                                                                                                  170031.0              3410754.0                                                                                  260626903.0
: 17. GROSS ELECTRICAL ENERGY GENERATED                                                                                                                                                                                    56680.0              1161750.0                                                                                            88068120.0
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                                                                                                                                                                                  51251.0              1109759.0                                                                                            83962843.5                    i
: 19. UNIT SERVICE FACTOR                                                                                                                                                                                                        21.5%                  79.0%                                                                                                      82.3%
: 20. UNIT AVAILABILITY FACTOR                                                                                                                                                                                                    21.5%                  79.0%                                                                                                      82.6%
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                                                                                                                                                                                        14.7%                  78.8%                                                                                                      77.2%
: 22. UNIT CAPACITY FACTOR (USING DER NET)                                                                                                                                                                                        14.3%                  76.9%                                                                                                      75.6%
: 23. UNIT FORCED OUTAGE RATE                                                                                                                                                                                                        0.0%                    0.0%                                                                                                      1.5%
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
NONE i
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
 
t POINT BEACH NUCLEAR PLANT                                      DOCKET NO.                                                        50-266 AVERAGE DAILY UNIT POWER LEVEL                                  UNIT NAME                                                        Point Beach. Unit 1 MONTH    APRIL -  1996                                      DATE                                                              5/7/96 COMPLETED BY                                                      M. B. Koudelka TELEPHONE                                                        414-755-6480 AVERAGE                                                                                                                                                AVERAGE                                                                                                AVERAGE DAILY                                                                                                                                            DAILY                                                                                                  DAILY POWER LEVEL                                                                                                                                                        POWER LEVEL                                                                                            POWER LEVEL DAY                                          MWe NET                                                                                                                DAY                        MWe NET                                  DAY                                                    __
MWe NET 1                                                                -3                                                                                                  11                              -2                                    21                                                            -12 2                                                                -2                                                                                                  12                              -2                                    22                                                            -13 3                                                                -2                                                                                                  13                            -2                                      23                                                            -15 4                                                                -2                                                                                                  14                            -2                                    24                                                              30 5                                                                -2                                                                                                  15                            -2                                    25                                                            163 6                                                                -2                                                                                                  16                            -2                                    26                                                            275 7                                                                -2                                                                                                  17                              -2                                    27                                                            326 8                                                                -2                                                                                                  18                              -2                                    28                                                            437 9                                                                -2                                                                                                  19                              -3                                    29                                                            498 10                                                                -2                                                                                                  20                            -11                                    30                                                            498 1
_ . _                                    . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - .                      _ _ _ _ _        x  _ _ _ _
 
POINT BEACH NifCLEAR PLANT                                                                                                                            Docket No.            50-266                      .
Unit Name              Point Beach. Unit i UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                                                                              Date                  May 7.1996 Completed By          M. B. Koudelka                  -
REPORT MONTH 6PRIL - 1996                                                                                                                            Telephone No.        414n55-6480                    -
Method of licensee Evem Duration              Reactor      Report No. System    Component                                                                                                                            Cause and Corrective Action No.      Date  Type'      (Hours)    Reason
* Shut Down'                  Code
* Code'                                                                                                                                To Prevem Recurrence 1    3/30/96  S          564.5      C            1          NA          NA        NA      Scheduled refueling and ---                                                                                                -e (UIR23). Major work items include replacing boric acid / reactor ninkeup water transminers; reactor head shield work; Phase 3D of emergency diesel generator tie-in work; replace IMS-2015/2016 aunospheric steam dump valves; replace HP turbine exhaust cmader piping; station service transformers anchorages; replace eight main steam condenser dump valves; and install containment isolauen valve for N2 supply lines to safety injection.
    'F: Forced            ' Reason:                                          ' Method:                                                                                                          Txhibit G -Instructions S: Scheduled            A - Equipment Failure (explain)                  1 - Manual                                                                                                              for preparation of B - Maintenanc'e or Testing                        2 - Manual Scram                                                                                                      data entry sheets C - Refueling                                      3 - Automatic Scram                                                                                                    LER file (NUREG-0161)
D - Regulatory Restriction                        4 - Continuation of E - Operator Training &                                Previous Shutdown Licensing Exam                                5 - Reduced load F - Administrative                                  6 - Other (explain)                                                                                              8 Exhibit I- Same Source G - Operational Ermr (explain)
H - Other (explain)
(
i I
PBF4328b (03-90)
 
i l        -
DOCKET NO.      50-266                                                l UNIT NAME        Point Beach Unit 1 l            DATE            May 6, 1996 l            COMPLETED BY    M. B. Koudelka TELEPHONE        414/755-6480                                          l l                                                                                  l l
Unit 1 was in its twenty-third refueling outage and operated at an average of 71 MWe net for the report period.
I Safety-related maintenance included:
1
: 1. 1A06 4.16 kV bus switchgear de ground located and corrected.
: 2. 1CS-466 HX-1A steam generator feedwater regulator control valve cleaned, inspected and body-to-bonnet gasket replaced.
: 3. 1CV-289 P2B charging pump discharge valve repacked.
l l          4. DY-14 safe shutdown panel inverter capacitor, wiring and cooling
;                  fan replaced.
: 5. G-01 and G-02 emergency diesel generator governor setpoint and no load speed adjusted.
!          6. 1MS-317 HX-1B steam generator sample to MS-2084 inlet valve
!                repacked.
: 7. 1MS-2015 and 1MS-2016 HX-1A&B steam generator header atmospheric steam dump control valves replaced.
l          8. 1MS-2082 P29 auxiliary feedwater pump overspeed trip valve stem l                set screw inspected.
l l          9. 1N-32 nuclear instrumentation source range channel resistor, detector and pre-amp replaced.
l          10. IP-2C charging pump varidrive replaced.
: 11. 1P-15A safety injection pump oil sightglass installed.
: 12. IP-29-T turbine-driven auxiliary feedwater pump turbine inboard / outboard bearing oil' changed.
: 13. P38A-M motor-driven auxiliary feedwater pump motor load tested and amptector setpoint verified.
: 14. 1RC-431A T1 pressurizer spray line pressure control valve cage spacer and body-to-bonnet gasket replaced.
l
    ~
 
f
: 15.      1SI-834C T34A&B safety injection accumulator nitrogen inlet isolation test connection and containment isolation valve installed.
t
: 16.      1SI-847A eductor A sodium hydroxide supply check valve replaced.
j              17.      ISW-2908-M HX-15A-D containment recirculation heat exchanger emergency flow control valve motor replaced.
: 18.      1W1C1 containment accident recirculation fan, shaft and l                        spoolpiece balanced.
l
: 19.        1WL-1003A P18 reactor coolant drain tank pump suction switch selector operator replaced.
: 20.        Eight main steam condenser steam dump valves replaced.
l l
j
 
OPERATING DATA REPORT DOCKET NO. 50-301 DATE:                                  05/07/96                                                                                                                  .
COMPLETED BY:                                                                                        M. B. Koudelka TELEPHONE:                                                                              414 755-6480 OPERATING STATUS
: 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2                                    . NOTES                                                                                                                                                                                          .
: 2. REPORTING PERIOD: April - 1996                                                  .
: 3. LICENSED THERMAL POWER (MWT):                          1518.5                  .
: 4. NAMEPLATE RATING (GROSS MWE) :                        523.8                  .
: 5. DESIGN ELECTRICAL RATING (NET MWE) :                            497.0            .
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) :                            509.0 .                                                                                                                                                                                                      .
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):                              485.0        .  .  .                  .    .    .  .    .                              .                              .                            .    .  .  .    .    .                            .    .
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):                                  Power 90%
: 10. REASONS FOR RESTRICTIONS, (IF ANY) :
Self-imposed restriction because of SG tube plugging, pending further evaluation.
THIS MONTH                              YEAR TO DATE                                                                                            CUMULATIVE
: 11. HOURS IN REPORTING PERIOD                                                                                      719.0                                                                    2,903.0                                              208,176.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL                                                                          719.0                                                                    2,903.0                                              182,230.1
: 13. REACTOR RESERVE SHUTDOWN HOURS                                                                                    0.0                                                                                                      0.0                              233.9
: 11. HOURS GENERATOR ON LINE                                                                                        719.0                                                                    2,903.0                                              179,757.4
: 15. UNIT RESERVE SHUTDOWN HOURS                                                                                        0.0                                                                                                      0.0                              302.2
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                                                                982621.0                                                      3966034.0                                                            258498187.0
: 17. GROSS ELECTRICAL ENERGY GENERATED                                                                  336930.0                                                      1360390.0                                                              87863650.0
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                                                              321180.0                                                        1297686.0                                                              83762335.5
: 19. UNIT SERVICE FACTOR                                                                                            100.0%                                                                                      100.0%                                                      86.3%
: 20. UNIT AVAILABILITY FACTOR                                                                                      100.0%                                                                                      100.0%                                                      86.5%
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                                                                            92.1%                                                                                              92.2%                                              82.4%
: 22. UNIT CAPACITY FACTOR (USING DER NET)                                                                            89.9%                                                                                              89.9%                                              81.0%
: 23. UNIT FORCED OUTAGE RATE                                                                                          0.0%                                                                                                      0.0%                                                0.9%
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF RACH) :
Refueling /SGRP, 10/05/96, 70 days
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
 
_ _ _ - - , - - , - , - - - - - ,    3 POINT BEACH NUCLEAR PLANT                                                                                                        DOCKET NO. 50-301                    ,
AVERAGE DAILY UNIT POWER LEVEL                                                                                                      UNIT NAME      Point Beach, Unit 2 MONTH    APRIL -            1996                                                                                                DATE          5/7/96 COMPLETED BY  M. B. Koudelka TELEPHONE      414-755-6480 AVERAGE                                          AVERAGE                                                                                                        AVERAGE DAILY                                            DAILY                                                                                                            DAILY POWER LEVEL                                      POWER LEVEL                                                                                                    POWER LEVEL DAY    MWe NET        DAY                              MWe NET                                                                                        DAY              MWe NET 1        447          11                                448                                                                                            21                445 2        447          12                                464                                                                                            22                446 3        446          13                                430                                                                                            23                446 4        447          14                                447                                                                                            24                450 5        447          15                                448                                                                                            25                442 6        447          16                                448                                                                                          26                447 7      428            17                                448                                                                                            27                442 8      447            18                                449                                                                                          28                450 9      448            19                                447                                                                                            29                446 10      447          20                                445                                                                                            30                445
 
                                                                                                                                                                                                                                                                                                                    ~ - -      ~ ~ -      '
POINT BEACH NUCLEAR PLANT                                                          Docket No.                  50-266                    .
Unit Name                  Point Beach. Unit 2 UNIT SHUTDOWNS AND POWER REDUCTIONS                                                                                        Date                        May 7.1996 Completed By                M. B. Koudelka                    '
REPORT MONTH APRIL - 1996                                                    Telephone No.              414 055-6480
* Method of Duration                                      Reactor                    Licensee Event                                                  System    Component                                            Cause and Corrective Action No. Date                Type'                  (Hours)                      Reason
* Shut Down'                    Report No.                                                  Code'      Code'                                                        To Prevent Recunence NA      NA                    NA                        NA                        NA                  NA                                    NA                                              NA        NA        NA
            'F: Forced                                    ' Reason:                                                                                                                                    ' Method:                                    ' Exhibit G -Instructions
,            S: Scheduled                                  A - Equipment Failure (explain)                                                                                                              1 - Manual                                  for preparation of B - Maintenance or Testing                                                                                                                  2 - Manual Scram                            data entry sheets C - Refueling                                                                                                                                3 - Automatic Scrum                          LER file (NUREG-0161)
D - Regulatory Restriction                                                                                                                  4 - Continuation of E - Operator Training &                                                                                                                          Previous Shutdown Licensing Exam                                                                                                                      5 - Reduced Load F- Administranve                                                                                                                            6 - Other (explain)                        5 Exhibit I- Same Source G - Operational Error (explain)
H - Other (explain) i PBF-0028b (03-90)
                                                                                                                                                                                                                                      -=                      ._        -                      -        - - - -        -            -
 
                                                                        -1 i
l l*      .
1  e i
1 l
1 1                                                                          1 i
i l          DOCKET NO. 50-301 UNIT NAME      Point Beach Unit 2 DATE          May 6, 1996 COMPLETED BY  M. B. Koudelka                                  1 I          TELEPHONE      414/755-6480                                    l 1
,          Unit 2 operated at an average of 446 MWe net for the report i          period.                                                        I l
l l
l i
l I
i                                                                          ;
l l
l i}}

Revision as of 01:19, 13 December 2024