| title = Individual Plant Examination of External Events for Severe Accident Vulnerabilities for Pnpp
| title = Individual Plant Examination of External Events for Severe Accident Vulnerabilities for PNPP
| author name =  
| author name =  
| author affiliation = CENTERIOR ENERGY
| author affiliation = CENTERIOR ENERGY
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:._ _    . _ _ _ _ _ . _ _
{{#Wiki_filter:}}
individual Plant Examination of External Events for Severe Accident Vulnerabilities Perry Nuclear Power Plant June 1996 Cleveland Electric illuminating Company
=
P
  =:8a= n8ato PDR
 
PNPP Individu:1 Pl:nt Examination - Ext; mil Ev;nts Abstract An individual plant examination of external events (IPEEE) for severe accident vulnerabilities was performed for the Perry Nuclear Power Plant in response to USNRC Generic Letter 88-20, Supplement 4 dated June 28,1991.
The IPEEE examined potential vulnerabilities in thice broad areas for external events; internal fires, euthquakes and other external hazards such as high winds and tornadoes, external floods, and potential hazards from transportation and nearby facilities.
The methodology used for internal fires was the Electric Power Research Institute (EPRI) Fire Induced Vulnerability Evaluation (FIVE). The FIVE methodology provides a combination of deterministic and probabilistic techniques for examining the internal fire probability and characteristics. FIVE includes a two phase progressive screening with a third phase containing a walkdown/ verification process. The discussion of the Sandia Fire Risk Scoping Study Issues were also included.
Large earthquakes were evaluated using the EPRI Seismic Msrgins methodology. This methodology uses safe shutdown success paths to identify the set of plant components to be evaluated. The components are screened for seismic ruggedness. Those that satisfy the screening criteria require no further evaluation. The remaining components are deterministically evaluated for the review level earthquake defined in NUREG-1407. The seismic capacity for which there is a high confidence of a low probability of failure (HCLPF) was generated for these components. The review level earthquake for Perry is 0.3g.                                                                                        4 Other extemal hazards were evaluated against the 1975 Standard Review Plan (NUREG-75/087). A progressive screening approach was used involving both deterministic and probabilistic techniques.
Acknowledgments The Perry Individual Plant Examination of External Events was performed by a team of personnel from Cleveland Electric Illuminatir ; Company, Hallibunon NUS, and Gilben Commonwealth. The project has benefited from advice and review from Vectra Technologies, Dr. Paul Smith and Mr. Harry Johnson.
The assistance and review by other site organizations was a key factor in ensuring the accuracy of the final report.
1 l
 
PNPP Individual PI:nt Examination - Ext;m:I Ev:nts Project Team                              l CEI                                        NUS l                                                                          >
! M.D. Makar                                    A. Afzali                  ,
S.P. Meyer                                    J. Juliano                ,
S.C. Tomaszewski                              P. Guymer D.J. McGuigan i
G.W. Parry GIC                                        G.P. Rozga l                                                R.F Sacramo C. Chen                                        F. Zikria l
: 11. Ho                                                                    .
D. Keiser R. Schmehl R. Svotelis                                                              !
The Readiness Operation                        Programmatic Solutions Dr. P. Smith                                  H. Johnson Vectra Technologies C. Abou-Jaoude                                                            i J. Amason G. Ashley                                                                ;
D. de la Cruz                                                              l S. Thompson 1
l l                                                                            \
I l
kkk
 
I PNPP Individuil Plint Examinition - Ext:rnil Ev:nts                                                                                                                      !
i; i
1 EX E C U TIVE S U M M A RY... .......... . ..... . . . ... .... . . ..... . . .. . .. ..... ....... . . . . . . . ..... . ... . . . . . ... . . . . . .. .... . .. . . . ... . .. . . . . . . .. 1 -1 6
1.1 Bac kg rou nd a nd Objectives .........................................~................................... ................. 1 -1 1.2 P la nt Fam ilia rization ............................................................................................................ 1 -2                                                                  l t
t
: 1. 3 Ov e ra ll Methodology .. ...... .. .... ... .... ........ ......... .. . . ..... . . . ...... .. .. ..... ... . . . . ... .. . . . .. .. .. . . .. .. . . . . ..... . ..... 1 -2                          !
1.4 S umma ry of Major Findings ............................................................................................... 1 -3 1.4.1 Sei sm ic A s ,a lys is .......................................................................................................... 1 -3                                                                ,
1.4.2 I nternal Fire A naly sis ........................ ........................................................................... 1 -3 1.4.3 High Winds, Floods, and Others.................................................................................. 1 -3                                                                                  i i
1.5 References...........................................................................................................................14                                                                      '
t 2 EXA MI N ATION DESC RIPTION ................................................................................................... 2-1                                                                              !
2.1 1 n trod ucti o n . .. . ... . ... ........ . ........ .. ......... .. ... . . . . .. . .... . . .. . . .... .. ..... .. . . . . . . .. . ...... . ... . . .. ... . . . . . . . .. .. . . . . .. . . .. 2 -1 i 2.2 Conformance with Generic Letter and Supporting Material............................................. 2-1                                                                                                    .
t
: 2. 3 G e ne ra l M eth od olog y . ....... . . . . . .. . .. .. . . .... ... .......... . .... . ... .. . .. ... . ....... . . ... .. . ... . . .. . . . ..... . . . .. . . . ... . . . . ... . 2-1 2.3.1 EPRI Seismic Margin Assessment .............................................................................. 2-1                                                                                      [
2.3.2 Fire-induced Vulnerability Evaluation ......................................................................... 2-2                                                                                    t 2.3.3 High Winds, External Flooding, and Other External Hazards Evaluation................. 2-2                                                                                                              :
2.4 I nfo rmation A ssem bly ............ ................................................................... .......................... 2-3 2.4.1 P la n t La y o ut ... .... . .. ... .... ... . ... . . ... . .. .... .. . ... . . ... . .. ... ... ......... . . . . .... . ....... . .. . . . . . . ... . ... .. . .. .. .. .. . .. . . . 2-3        l 2.4.2 S ou rces of information ........................................................................................ ........ 2-3 2.5 References...........................................................................................................................2-4 i
3 S E I S M I C A N A LY S I S . . . . . ... . .......... . . . .... .. .. . .. ... ........ .. . . . .............. . . . . .. .... . .... .. .. . . .. . .. . . ..... . .. .. . . . . . . ... . . .... 3 - 1 3.1 Seismic Margins Methodology - EPRI Seismic Margin Assessment (Focused-Scope). 3-2 3.1.1 Review of Plant Information, Screening, and Walkdown........................................... 3-3 3.1. 2 S y stem A na ly s is ......................................................................................................... 3 -10 3.1.3 A nalysis of Structu re Response ................................................................................ 3-17 3.1.4 Evaluation of Seismic Capacities of Components and Plant.................................. 3-18 3.1.5 Analysis of Containment Performance ..................................................................... 3-25 3.1.6 Fi re/ Seism ic i nteraction ............................................ ................................................. 3-26 3.2 USl A-46, GI-131 and Other Seismic Safety issues ......................................................... 3-27 l
3.2.1 USI A.45 " Shutdown Decay Heat Removal Requirements".................................... 3-27
                                                                                                                                                                                                                    ~
3.2.2 The Eastern U.S. Seismicity issue (The Charleston Earthquake issue)................. 3-27 3.2.3 USl A-17 " System Interactions in Nuclear Power Plants" ...................................... 3-28 3.2.4 January 31,1986 Leroy Ea rthquake Issues .............................................................. 3-28 i
I 3.3 References.........................................................................................................................3-29 IV
 
i i                                        UNPP Individuil Pirnt Ex minition - Ext: mil Ev:nts i
4 I NTE R N A L F1 R E S A NA LYSI S ..................................................................................................... 4-1 4.1 M eth od ology Selec tio n ................................................................................... .................... 4-1 1
4.2 F i re H aza rd A na ly s i s ................................................................................................... ........ 4-1                                                                          i 4.2.1 Overview.......................................................................................................................4-1                                                                                  !
4.2.2 Assumptions and Other Modeling Considerations for Screening............................... 4-6 l      4.2. 3 A n a ly s i s R es u lts ... .. ..... .... ..... .... .. . .. . .. ..... .. .... . . ... ....... ... .. . . ........................ ............... ........ 4-9 4.3 Review of Plant information and Walkdown.................................................................... 4-12
: 4. 3.1 P!a n t i n forma tion S ou rces ......................................................................................... 4-12
: 4. 3. 2 O uts ta nd i n g M od ifica tion s......................................................................................... 4-13 4.3.3 P l a nt Wa l kdown s .......................................... ............................................. ................. 4-13 4.4 Fire G rowth and Propagation Modeling........................................................................... 4-14 i
4.4.1 Fire Scenario identification and Evaluation.............................................................. 4-15 4.4. 2 Fi re M od e li n g ..... .... ... ..... .. . .............. . . . .. .......... . .... .. .. . ........ . . . . .. ... . . . . .. .. . . . . .. ... . ... . ..... . . . .... 4 -1 6 4.4.3 C haracterization of Ignition Sources ........................................................................ 4-17                                                                                                j l
4.5 Evaluation of Component Fragilities and Failure Modes ............................................... 4-21 l
4.5.1 Cables Serving Safe Shutdown Equipment................................................................ 4-21                                                                                                        l
: 4. 5. 2 Elect rical E q ui pme nt ......................................... ......................................................... 4-21                                                                                1
: 4. 5. 3 i n te rve ni n g C om bu sti bles .......................................................................................... 4-2 2 4.5.4 C haracterization of Secondary Fire Sources............................................................ 4-22 4.6 Fire Detection and S u ppres slon ....................................................................................... 4 22 4.6.1 A u toma tic S u ppres s io n.............................................................................................. 4-2 2
: 4. 6. 2 M a n u al S u pp ress io n ................................................................................................... 4-2 3 4.7 Analysis of Plant System Sequences and Plant Response.............................................. 4-24 4.7.1 Detailed Ar:alysis for Unit 1, Division 2 Switchgear Room...................................... 4-24 4.7.2 C o n trol R oom A naly sis .............................................................................................. 4-3 3 4.7.3Results........................................................................................................................443 4.8 C o n tai n me n t Pe rform a nce .............................................................................. .................. 4-4 5 4.8.1 C o n tai n ment B y pa ss ............................................................................................... .... 44 5 4.8.2 C o ntainment isolation ................................................................................................. 446 4.8.3 Containment Pressure Suppression and Heat Removal............................................ 4 46 4.8.4 C ontainment Performance S ummary ......................................................................... 4-46 1
4.9 Treatment of Fire Risk Seoping Study issues ...................-............................................. 4-47 4.9.1 B a c k g ro u n d . .. . .. .... ..... . . .... .... .. ..... .. .... . ...... ....... . ....... . ... . .. . .. .... .......... . . . . . . . .. . . . .. . . . .. . .. .. . . . . . 4 4 7 4.9.2 SeismiclFire I nteraction s ........................................................................................... 448 4.9.3 Fire Ba rrier Qualifications.......................................................................................... 4-50 4.9.4 M a n ual Fire Fig htin g Effectiveness ........................................................................... 4-52
,      4.9.5 Total Environment Eq uipment Survival .................................................................... 4-57 l      4.9.6 Co ntrol S ystems Interactions .................................................................................... 4-58 l      4. 9.7 C o n c l u s i o n s .... . . . .. . . ..... . . . . .... . . . .. . . . . .. . .. . ... . . . ... . . . ...... ..... .. .. . . . . .. .. .. . .. ... .. . . . . .. . . . . . . . . . . . . .. . . ... . .. 4-5 8 i
l l
4.10 U Sl A-45 a nd Other Safety iss ues .................................................................................. 4-58 4.1 1 R e fe re n c e s ...... . ............. . .... .... .. . .... ... ............ . ....... . .... . .. . ........ .. ....... .. . . ........ . ... . ...... . .... .... .. 4-b 9 v
 
l
;                                                PNPP Individuil Plint Eximination - Extsmil Evants i
l        5 H IG H WI N DS , F LOODS , A N D OTH E RS ......................................... ............................................ 5-1                                                                                                ;
i 5.1 Gene ric Pla nt Desc ription ............................................................................................e ... 5-1 l              5.1.1 S ite Desc ription ........... ........................................................................................ . . .... 5-1                                                                                      i l              5.1.2 identification of Structures, Systems and Components Potentially Susceptible to                                                                                                                                          i l              E x te rn a l E v e nts . . . . .. . ...... . . .... . .. . .. .. . . . . . . . . . . .... . .. . . . . . . . .. . .. .. . . ... .... .... . ... . .. . . .. . .. .. . . . . . ... . . .. .... . . . . . ... .. . .. . . 5-2 1
5.2 Screening or External hazards ........................................................................................... 5-2                                                                                                    l 5.2.1 Desc ription of A pproac h .............................................................................................. 5-2 l
5.2.2 Res ults of Screening Analysis..................................................................................... 5-4                                                                                                  ;
i 5.3HighWinds.......................,.................................................................................................5-4                                                                                            l l              5. 3.1 S trs ig h t Wi nd s . . .... . . . . .... .......... . ...... .. .... . . . . ...... ...... . . ... ... . .. .......... . . . ........ .. . .. ..... ... . . .... . . .... 5-4 l
5.3.2 Tornadoes.....................................................................................................................5-6 l
l 5.3.3Walkdown......................................................................................................................5-6
!          5.4 E xte r n a l F loods .. .. .... .... . . . . .. . ... . . . ...... . ... ....... . . .. . .... ....... . . . . . . ... . . ... . . .... ... . . . . . . .. . . ..... . . ... . . ... .. . ....... 5-7 l              5.4.1 Ge ne ral Pla nt Desc ription ............................................................................................ 5-7 l              5.4.2 Sources of External Flooding ...................................................................................... 5-7                                                                                                  i l              5.4.3 Flooding Caused by Probable Maximum Precipitation (PMP)................................... 5-8 l              5.4.4 Flooding Caused by Fiberglass Pipe Rupture.......................................................... 5-11 l              5.4.5 Flooding Caused by Miscellaneous Events.............................................................. 5-13 l
i 5.4.6 C onclu sion a nd Res ults ............................................................................................. 5-14                                                                                            ;
5.5 Transportation and Nearby Facility Accidents................................................................ 5-15                                                                                                                l
: 5. 5.1 A i rc ra ft im pa ct .. .... .. .. ... . . .. . ... .. .. . . . . . ....... .......... . . .. . ... ..... .. .. ... . ... .. .... . . ... . . ...... .... .. .. . .. . .. . . . . 5-1 5                                  <
: 5. 5.2 Tra ns po rtation A ccide nts .......................................................................................... 5-22 5.5. 3 H aza rd ou s Mate rials ................................................................................................... 5-23
: 5. 5.4 Fixed Facility Acc idents ... ...................................... ........................ ............................ 5-3 3 l          5. 6 C o n c l u sio n s ... ..... . .... . . . ..... . . ... ... ... . . .... . ... ... . ....... . ..... .. . .. .... .. ....... .. . . .. . ........ .. .. .... . . ... .. . . .. . .. . . . . . 5 40 5.7 References.........................................................................................................................5-41 l        6 LICENSEE PARTICIPATION AND INTERNAL REVIEW TEAM ................................................. 6-1 6.1 1 P E E E P rog ra m O rga nization ................................................ ............................................. 6-1 l
6.2 Composition of independent Revbw Team....................................................................... 6-1 6.3 A reas of Review a nd Major Concerns................................................................................ 6-2 6.3.1 Seismic Margins Assessment ..................................................................................... 6-2
: 6. 3. 2 I n te rn a l F i res ... . .... .. .. ... . ... ....... . ....... ..... .. .... .... . ... . . . . .. . .... .. ... ... . . .. . . ..... . . .... . .. . . . . .... ... .... . . . ... 6-2 6.3.3 High Winds, External Floods, and Other External Hazards....................................... 6-3 6.4 Res ol ution of C omme nts .......................................................................... .......................... 6-3 4
l        7 PLANT IMPROVEMENTS AND UNIQUE SAFETY FEATURES ................................................. 7-1 i
7.1 U n iq ue Safety Featu res ........................................................................................... ............ 7-1 7.1.1 Sei sm ic A na lys i s .......................................................................................................... 7-1 V1 l
i
 
PNPP Individu:1 Plint Eximinition - Ext:rn!I Ev:nts 7.1.2 I n te rnal Fire A nalysis ..... ............................................................................................ 7-1 7.1.3 High Winds, Floods, and Others.................................................................................. 7-1                                                                      f 1
7.2 P la nt im provemonts ............................................................................................................ 7-2                                                        j 7.2.1 Seism ic A na lysis ......................................................................................................... . 7-2 l
7.2.2 I nternal Fire A nalysis ................................................................................................... 7-3                                                          '
7.2.3 High Winds, Floods, and Others.................................................................................. 7-3 l
8
 
==SUMMARY==
& CONCLUSIONS (including proposed resolution of USIs, Gls and other issues)81                                                                                                              :
1
!  8.1 Se i s m ic A n aly ses ... ......... .... . . ... .. .... . . . . . ... . ............... .. . . ...... . . . ........... . ... .... .. . . . . . .. . . .. . . . . . . . . .. . .. ... 8 -1
: 8. 2 I n tern al Fi re A na lyses ........................ ................................................................................. 8 -1                                                l 1
8.3 High Winds, Floods, and Other External Hazards............................................................. 8-1                                                                              I 8.4 Recolution of USis, Gls and Other lasues ......................................................................... 8-2 i      8.4.1 USl A-17 " System Interactions in Nuclear Power Plants" ......................................... 8-2 8.4.2 USl A.45 " Shutdown Decay Heat Removal Requirements"....................................... 8-2                                                                                          ;
8.4.3 The Eastern U.S. Seismicity issue (The Charleston Earthquake issue)................... 8-2 l
8.4.4 January 31,1986 Leroy Earthq uake Issues ................................................................ 8-2                                                                            ;
i l
l i
l 4
t l
VI1
 
              -.-  --.-      . - ~      -    --            - . . -      --.            --
PNPP Individuti Pirnt Extmin: tion - Extsmal Evsnts List of Tables Table 2 Summary of Design Features - Perry ........................................................................ 2-5 Table 3 Soccess Path A Systems ......................................................................................... 3-30 Table 3 S uccess Path B Systems ......................................................................................... 3-31 Table 3 Pre-Screening Basis for Structures ........................................................................ 3-32 Table 3 Pre-Screening Basis for Equipment........................................................................ 3-33 Table 3 PNPP Seismic input Scaling Factors ...................................................................... 3-34 l able 3 PNPP Dominant Natural Frequencies of Structures .............................................. 3-35 Table 3 PNPP Percent Critical Damping Values Used for the SMA.................................... 3-36 Ta ble 34 - PN PP Calculated HC LPF Values .............................................................................. 3-37 Table 4 PNPP Eire Areas and Associated Compartments .................................................. 440 Table 4 Fire Induced System Loss and initiating Event Matrix .......................................... 4 62 Table 4 Fire Area / Compartment Screening Results through Phase il Step 2.................... 4-74 Table 4 F2 Calculations for Fire Compartment 1CC3a Fire Scenarios................................. 4-77 l
Table 4 Grouping of Control Room Cabinets....................................................................... 440          l Table 4 Cabinet Equipment Status and Fire Frequency Evaluation................................... 441 Table 4 Screening of Internal Cabinet Fires......................................................................... 446 Table 44 - Control Room Fire Damage States .......................................................................... 448 Table 4 Results of Control Room Analysis .......................................................................... 449 Table 4 Summary of Overall Fire Analysis Results for Areas which Did Not initially Screen 4-91 Table 5 Screening of External Events for PNPP .................................................................. 5 43 l
i
 
PNPP Individu 1 Plant Eximination - Extzmil Ev::nts List of Floures l
Figure 3 Success Path Logic Diagram (Success Path A) ................................................... 3-38 l Figure 3 Success Path Logic Diagram (Success Path B) ................................................... 3-39 Figure 4 Layout of Unit 1, Division 2 Switchgear Room ..................................................... 4-92                      l Fig u re 4 Layout of C ontrol R oom ..................................................................... , .................. 4-93 Figure 4 Example of Control Room Cabinet Fire Growth Event Tree ................................ 4-94 Figure 5 Airways and Airports in the Vicinity of PNPP ........................................................ 5 45 i Figure 5 Nearby Industrial Facilities and Transportation Routes ...................................... 5-46
! Figure 5 Gas Pipelines in the Vicinity of PNPP ................................................................... 5-47 Figure 6 lPEEE Project Organization C hart ........................................................................... 6 4 Fig u re 6 Peer Review Organization ........................................................................................ 6-5 1
e l
IX
 
l.
!                    PNPP Individu:1 Plant Ex::mination - Ext: mil Ev;nts Table of Acronyms i
  ' ADS  Automatic Depressurization System AFSS  Automatic Fire Suppression Systems ARI  Alternate Rod Insertion                                          i ASME  American Society of Mechanical Engineers                        '
ATWS  Anticipated Transient Without Scram                              '
BWR  Boiling Water Reactor CCDP  Conditional Core Damage Probability CDF  Core Damage Frequency                                            :
CDFM  Conservative Deterministic Failure Margin Approach CEI  Cleveland Electric Illuminating Company CFR  Code of Federal Regulations CIEL  Containment Integrity Equipment List CRD  Control Rod Drive CST  Condensate Storage Tank DHR  Decay Heat Removal DOT  Department of Transportation ECCS  Emergency Closed Cooling System EOC  Emergency Operations Center EOF  Emergency Operations Facility EPRI  Electric Power Research Institute ERG  Emergency Response Guidebook f  ESW ' Emergency Service Water System x
 
PNPP Individual Plant Examination - Ext:m I Events FAA  Federal Aviation Administration                                l f                                                                      1 l  FCIA  Fire Compartment Interaction Analysis                          l l  FDS  Fire Damage Scenario j
i FEDB  Fire Events Data Base
* l FIVE  Fire-Induced Vulnerability Evaluation                          :
F.M. Factory Mutual i
FPCC  Fuel Pool Cooling and Clean-Up                                l FRP  Fiberglass Reinforced Plastic FRS  Floor Response Spectra l
FRSS  Fire Risk Scoping Study                                        j G/C  Gilbert / Commonwealth, Inc.
GDC  General Design Criteria                                        '
l GE    General Electric Corporation                                    i
  .GERS  Generic Equipment Ruggedness Spectra GI    Generic Issue GIP  Generic Implementation Procedure GRS  Ground Response Spectrum HCLPF High Confidence of a Low Probability of Failure HCU  Hydraulic Control Unit HGL  Hot Gas Layer HPCS  High Pressure Core Spray System HRR  Heat Release Rate HVAC  Heating, Ventilation, Air Conditioning 101  Integrated Operating Instruction xi
 
PNPP Individual Pl:nt Ex!mination - Ext mil Ev;nts IPE    Individual Plant Examination IPEEE  Individual Plant Examination of External Events LEPC  Lake County Emergency Planning Committee
  'LLNL - Lawrence Livermore National Laboratory l  LOCA  Loss of Coolant Accident LOOP  Loss of Otisite Power LPCI  Low Pressure Coolant Injection LPCS  Low Pressure Core Spray Systera MCC    Motor Control Center l  MG    Motor Generator MMI    Modified MercalliIntensity i
I
  - MZlRWL Minimum Zero Injection RPV Water Level NCC    Nuclear Closed Cooling i
NOAA'  National Oceanographic and Atmospheric Administration
!  NOL    Normal Operating Loads l  NSAC  Nuclear Safety Analysis Center
  -NSRC  Norfolk Southern Railway Company NTSB  National Transportation Safety Board l
l  NUS    Halliburton NUS Corporation l
  -NWS    National Weather Service OBE    Operating Basis Earthquake
!  ONI    Off-Normal Instruction i
i    PAD    Protective Action Distance xii
 
PNPP Individu;l Plant Exrmination - Extemal Events l
l'    PAP          Plant Administrative Procedure L      PCS          Power Conversion System l
l'  -PGA-          Peak Ground Acceleration l    ' PMF '      Probable Maximum Flooding                                                              l i
l                                                                                                        1
    . PMM        Perchloro Methyl Mercaptan (trichloromethane sulfenyl chloride)                        I
!                                                                                                      l PMP'        Probable maximum Precipitation                                                        j j-                                                                                                      J l    PNPP        Perry Nuclear Power Plant                                                            l PRA        Probabilistic Risk Assessment                                                        l 3
i PTI        Periodic Test Instruction '                                                          j l
    - RCIC        Reactor Core Isolation Cooling System .                                              1
    -RCP          Reactor Coolant Pump i
RCS        Reactor Coolant System                                                              'f I                                                                                                      !
ll    RHR        Residual Heat Removal System                                                          l l                                                                                                      :
l    RLE      ' Review Level Earthquake                                                              ,
i RPS        Reactor Protection System                                                            !
l    RPV        Reactor Pressure Vessel i
RRA        Radiologically Restricted Area RRCS        Redundant Reactivity Control System l
l    RRS        Required Response Spectrum                                                            i l
RSP        Remote Shutdown Panel                                                                l SBLOCA      Small Break LOCA                                                                      f h
e    SCBA        Self Contained Breathing Apparatus                                                    !
SEWS        Screening Evaluation Work Sheet                                                      1 l
SI'        System Interaction                                                                    )
xiii
                                                                                                      'I
 
l PNPP Individu:1 Plant Extmination - Extem:I Events                              l l
l                                                                                                                !
i SMA        Seismic Margin Assessment
\                                                                                                                I l        SMM-      Seismic Margins Methodology SPLD      Shutdown Path Logic Diagram ~                                                              ,
!.        SQUG      Seismic Qualification Utility Group                                                        l SRP        Standard Review Plan                                                                        !
SRT        Seismic Review Team                                                                        !
(                                                                                                                !
SRV        Safety Relief Valve                                                                        j t                                                                                                                i c
SSE-      Safe Shutdown Earthquake                                                                    !
I f
L        SSEL      Safe Shutdown Equipment List                                                                ,
t i        SSRAP      Senior Seismic Review and Advisory Panel                                                    i STEL      Short Term Exposure Limit                                                                  l l-                                                                                                              :
TAF        Top of Active Fuel                                                                          !
,                                                                                                                1 TRS        Test Response Spectrum                                                                      ;
i j-        TSEE      Temperature Sensitive Electrical Equipment l        TWA-      Time Weighted Average                                                                      !
f UHS        Uniform Hazard Spectra                                                                      l l        U.L.      Underwriters Laboratories                                                                  :
1                                                                                                                l l
l        USAR      Updated Safety Analysis Report USGS      U.S. Geological Survey USI        Unresolved Safety Issue                                                                    i USNRC      U.S. Nuclear Regulatory Commission
                                                                                                                \
:        ZPA        Zero Period Acceleration                                                                    i xiv
 
I                                                                                                            1 i
l PNPP Individu:1 P!:nt Eximinition - Ext; mil Ev;nts 1 EXECUTIVE
 
==SUMMARY==
 
This document presents the results of the Individual Plant Examination of External Events (IPEEE)          ,
performed in response to USNRC Generic Letter 88-20, Supplement 4 U~U which requested each
, licensee to perform a plant examination of each of their nuclear power plants to search for l
vulnerabilities to severe accidents arising from external events and to propose cost effective safety improvements that reduce or eliminate the important vulnerabilities. The content and format of this        -
D report is in accordance with the USNRC guidance document NUREG-1407
* and provides sufficient information to show how the results were obtained.
This summary includes a discussion on the background and objectives, the plant familiarization            ,
activities, the overall methodologies, and a summary of the study findings.
1.1 Background and Objectives l
The Commission issued a policy statement in 1985 to the effect that, based on available information,
, existing plants pose no undue risk to the public health and safety and that there is no present basis for i immediate action on generic rulemaking or other regulatory requirements for these plants. However, it l was decided that a systematic evaluation of each plant would be beneficial in that it would provide        >
l information on any plant-specific vulnerabilities to accidents and, through their resolution, enhance l
safety. Generic Letter 88-20 was issued and an Individual Plant Examination (IPE) using probabilistic l risk assessment methodology was performed for Perry, submitted to the USNRC on July 15,1992 and            .
approved by the USNRC in a letter dated August 18,1994. The IPE addressed internal events and l
internal flooding. Supplement 4 to the generic letter was issued to extend the analysis to external        !
events. In addition to identifying each vulnerability, it was decided that similar to the IPE, the IPEEE    :
should be performed by a team in which utility personnel played a major part as recommended in the        t generic letter. The general purpose of the IPEEE is also similar to the internal event IPE. Thus the IPEEE would ensure that utility personnel also achieved the following:
      . Develop an appreciation of severe accident behavior.
      . Understand the most likely severe accident sequences that could occur at the plant under full power operating conditions.
      . Gain a qualitative understanding of the overall likelihood of core damage and radioactive material releases.
* If necessary, reduce the overall likelihood of core damage and radioactive material releases by modifying hardware and procedures that would help prevent or mitigate severe accidents.
l l It should be emphasized that the involvement of CEI personnel in all aspects of the analysis and the l development of appropriate support documentation has ensured that the IPEEE addresses potentiel
! plant vulnerabilities to severe accidents as accurately as possible and, therefore, enables the above l objectives to be met.
1-1
 
PNPP Individual Plant Exrmination - Ext:rnil Ev::nts l 1.2 Plant Familiarization l A separate project team was established for each of the three portions of the IPEEE with overall
! coordination provided by the CEI Project Lead. Each team consisted of a number of engineers from l CEI and one or more of several consulting engineering firms.
i The seismic team utilized three CEI individuals with support from Gilbert / Commonwealth, Inc., NUS Corporation, The Readiness Operation and Programmatic Solutions. The internal fire analysis team was led by a CEI fire protection engineer with assistance from Vectra Technologies, Inc. and NUS Corporation. The high winds, floods, and other external hazards analyses were performed by a team consisting of CEI and NUS Corporation engineers.
l l The IPEEE was performed both at the site and in the offices of the consultants. Walkdowns by both CEI and consultant personnel were made as needed to obtain plant specific information. Drawings were available to all individuals involved. All work products were reviewed by the CEI personnel directly involved in the tasks to verify that the information used was accurate.
The Perry Nuclear Power Plant (PNPP) consists of a single operating unit located in Lake County Ohio approximately 7 miles northeast of Painesville and 35 miles northeast of Cleveland. The plart site is located along the southeastern shoreline of Lake Erie on an ancient lake plain approximately 50 feet above the lake low water elevation. The site and its environs con-ist mainly of woodland and former nursery lands. The total area of the site is approximately 1,100 acres and is relatively flat. The land has ,
l a gentle slope toward the lake and is crossed by small streams which drain into the lake. The main          l l plant building are located about 800 feet from the toe of a 45 foot high steep bluff that forms the shoreline.
l PNPP is a 3,579 MWm General Electric BWR/6 with a MarkIII containment. The balance of plant                j systems were engineered by Gilbert Conunonwealth, Inc. The unit started commercial operation in            l November 1987.                                                                                              l 1.3 Overall Methodology The IPEEE for the Perry Nuclear Power Plant was split into three separate sets of analyses:
l
      . Seismic Events f
      . Internal Fires l      . High Winds, Floods, and Other External Hazards l
l A seismic margins analysis (SMA)Iusing l          the EPRI seismic margins methodology (SMM) outlined in the EPRI document NP-6041-SL '' for a focused scope plant was performed to meet the requirements in Generic Letter 88-20, Supplement 4. Two safe shutdown paths were selected and evaluated to demonstrate that they are capable of performing their safe shutdown functions following a 0.3g review level earthquake.
l l                                                        l-2 l
i
 
PNPP Individuil PI:nt Examinition - Ext; mil Ev:nts I
  'Ihe internal fires evaluation was performed using the EPRI Fire-Induced Vulnerability Evaluation l
(FIVE) as described in EPRI document TR-100370.U"I FIVE is a progressive screening approach based on quantifying the frequency of fire ignition in specific plant areas, the availability of automatic j suppression systems, the probability of having sufficient combustibles and heat release to cause          l damage to shutdown systems and the probability of manual suppression efTectiveness.
The approach used for high winds, floods and other external hazards follows the method described in ti NUREG/CR-4839 -51 by performing an initial screening analysis, followed by bounding or detailed analyses as necessary.
1.4 Summary of Major Findings 1.4.1 Seismic Analysis l
The seismic margin assessment results showed that PNPP is capable of attaining shutdown conditions and maintaining them for 72 hours following a review level earthquake (RLE) of 0.3g. During the            I l walkdown, several pieces of equig81 ment were found which did not meet the caveats in the Generic Implementation Procedure (GIP)          developed by the Seismic Qualification Utility Group (SQUG) and, therefore, could not be immediately determined to have a HCLPF of greater than or equal to 0.3g.      '
l Those components not meeting the caveats are discussed further in Section 3.1.3. Analyses subsequent to the walkdown determined that the minimum HCLPF met or exceeded the RLE.
l 1.4.2 Internal Fire Analysis Based on the internal fires evaluation performed for the IPEEE, PNPP has no significant fire hazards of concern. Using the EPRI FIVE methodology the majority of the fire zones were screened out using either qualitative screening or determination that their respective core damage frequencies were less      I 4
l than 10 /yr. More detailed analyses were performed on the remaining fire zones. As a result of the more detailed analyses, most of these fire zones were also shown to have core damage frequencies less 4
! than 10 /yr..
1.4.3 High Winds, Floods, and Others The review of the impact on PNPP of high winds, floods and other external hazards resulted in the conclusion that there are no significant events of concern. A comprehensive screening analysis of those other external hazards identified in the PRA Procedures GuideU41 resulted in supporting the l NUREG-1407 conclusion that only high winds, external floods and transportation and nearby facility accidents need be reviewed in detail. The plant as designed meets the intent of the criteria of the Standard Review Plan of 1975 and thus it is not surprising that these events also do not pose a significant threat to the plant.
?
l-3 1
1
 
I PNPP Individuri Plint Exrmin tion - Ext::m*l Evnnts 1.5 References 1-1  USNRC Generic Letter 88-20, Supplement 4, " Individual Plant Examination of External Events i      (IPEEE) for Severe Accident Vulnerabilities," June 1991.
J 1-2 NUREG-1407, " Procedural and Submittal Guidance for the Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities," Final Report, June 1991.
l-3 EPRI NP-6041-SL, "A Methodology for Assessment of Nuclear Power Plant Seismic Margin,"
Revision 1, August 1991.
1-4 EPRI TR-100370, " Fire-Induced Vulnerability Evaluation (FIVE)," April 1992.
! l-5 NUREG/CR-4839, Ravindra, M.K. and Bannon, H., " Methods for External Event Screening Quantification: Risk Methods Integration and Evaluation Program (RMIEP) Methods
;      Development," July 1992.
l l l-6 NUREG/CR-2300, "PRA Procedure Guide," December 1983.
1-7 NUREG-0800," Standard Review Plan," USNRC, Revision 2, July 1981.
l 1-8 " Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment,"
Seismic Qualification Utility Group, February 1992.
l i
4 1-4 l
l 1
 
l PNPP Individu:1 PI:nt Ex:minition - Ext; mil Ev:nts                                !
l 2 EXAMINATION DESCRIPTION 2.1 Introduction The Perry IPEEE project is aimed at meeting two objectives: satisfying the USNRC requirements for an individual plant examination of external events and providing confidence that external factors do not constitute undue risk to the plant. In this section, it is demonstrated that the project conforms with the USNRC requirements. The general methodology and information used in the course of the study are also discussed.
2.2 Conformance with Generic Letter and Supporting Material Generic Letter 88-20, Supplement 4, identifies a number of requirements in the areas of the examination process, methodology, treatment of outliers and reporting. The IPEEE conforms with the requirements laid out in the generic letter and uses the current supporting material appropriate to the analysis of Perry. However, neither the reactor pressure vessel intemals nor soil-related failures were        i evaluated as part of the seismic portion of the IPEEE. This deviation from the guidance of                    1 NUREG-1407 is based on Generic Letter 88-20, Supplement 5.[24)
It is the belief of the USNRC as stated in the generic letter that the quality and comprehensiveness of the results derived from the IPEEE depend on the rigor with which the utility applies the method of examination and on their commitment to the intent of the IPEEE. It can be seen from the project organization shown in Figure 2.1 that the CEI personnel were involved in the performance of all tasks.
In addition to CEI personnel, assistance from a number of consultants was obtained to produce a comprehensive product.
In-house review of the IPEEE analyses was performed by Perry staff conversant with systems design, structural integrity and phenomenology of the items being examined. In addition to the in-house review, a further review of the examination process and results was performed by an independent              ,
consultant.
The combination of experienced consultants, Perry personnel and an independent review in the performance of the analysis has ensured that the quality and comprehensiveness of the Perry IPEEE results meet the standards imposed by the generic letter.
2.3 General Methodology 2.3.1 EPRI Seismic Margin Assessment The Perry Nuclear Power Plant (PNPP) Seismic Margin Assessment (SMA) was achieved using the l guidelines contained in Generic Letter 88-20, Supplement 4 t2-u and NUREG-1407.[2-21 NUREG-1407, Table 3.1 binned PNPP into those plants which could satisfy the requirements of the generic letter by j performing a " focused scope" SMA for a review level earthquake (RLE) of 0.3g.
The actual evaluation was performed using the Electric Power Research Institute (EPRI) seismic margins methodology for a focused scope plant described in EPRI NP-6041-SLI2-3) as recommended in 2-1
 
PNPP Individu 1 Plint Eximination - Ext:rn l Ev:nts NUREG-1407. The basis of this approach is selection of a minimum set of equipment, designated the safe shutdown equipment list (SSEL), that is required to safely perform a reactor shutdown following a RLE. An assessment is made of the items contained on the SSEL, and the structures containing those items, as to their overall capability to survive an RLE event. Those items capable of w thstanding the RLE event can be screened from further consideration. Any items that cannot be scremi are identified and must be addressed to determine their final outcome.
2.3.2 Fire-induced Vulnerability Evaluation The Fire-Induced Vulnerability Evaluation (FIVE) methodology developed by EPRI is a screening technique based on conservative assumptions using industrial and plant specific data bases for evaluating fire sequences. The overall objective is to determine the availability of plant equipment necessary to achieve and maintain safe and stable shutdown of a nuclear power plant. FIVE consists of three phases.
* Phase I: Fire Area Screen (qualitative analysis)
      . Phase II: Critical Fire Compartment Screen (quantitative analysis)
      . Phase III: Plant Walkdown/ Verification and Documentation In addition, several potentially risk significant items that were identified in the Fire Risk Scoping Study, NUREG/CR-5088,12-s1 are also included in the evaluation.
2.3.3 High Winds, External Flooding, and Other External Hazards Evaluation l
t2 The approach used follows the method described in NUREG/CR-4839                m by performing an initial screening analysis followed by bounding or detailed analyses as necessary.
1 The objective of the screening analysis is to provide confirmation of the NUREG-1407 conclusion that      :
there are no hazards unique to the site that require evaluation, other than those posed by high winds, external floods, and transportation and nearby facility accidents.
The PRA Procedures Guide [2m provides an exhaustive list of potential hazards which is the starting point for the analysis. The screening is performed by reviewing information on the site region and plant design to identify external events that are applicable using the screening criteria described in Section 5 of this report. The data in the safety analysis report on the geologic, seismologic, hydrologic, and meteorological characteristics of the site region as well as present and projected industrial activities in the vicinity of the plant are reviewed for this purpose.
l The evaluation of high wind loading for PNPP was performed by comgaring the PNPP design as described in the Updated Safety Analysis Report (USAR), Section 3.3.1[2 with the USNRC Standard Review Plan,[2m Section 3.3.1," Wind Loading."
External floods were evaluated by examining the four potential flooding sources at Perry; Lake Erie, intense local precipitation, and two small streams which border the site. In addition, the impact of 2-2 i
 
PNPP Individurl PI:nt Eximin tion - Ext:rnri Ev:nts                              j flooding due to Service Water system or Circulating Water system fiberglass pipe rupture was also            i investigated.                                                                                                i l
Accidents involving hazardous chemicals, both toxic and having explosive potential, were evaluated          j for shipping traflic on Lake Erie, road traffic, rail traffic and fixed nearby facilities and gas pipelines.
The risk from aircraft was also evaluated.
1 2.4 Information Assembly The following paragraphs discuss some of the sources ofinformation which were used in the IPEEE analyses. The combination of plant design documents, operating instructions, walkdowns, input from outside organizations, and the collective experience of the IPEEE team form the basis of the IPEEE.          l 2.4.1 Plant Layout                                                                                          i j
The Perry Nuclear Power Plant (PNPP) began as a two unit site. Only Unit I has been completed and is operating. Unit 2 was approximately 40 percent complete when construction activities stopped. Unit 2 has since been formally abandoned. The site is therefore a single unit site as far as the IPEEE analyses are concerned.
The unit is a General Electric BWIU6 with a Mark III containment. The balance of plant systems were engineered by Gilbert Commonwealth. The unit started commercial operation in November 1987.
1 2.4.2 Sources ofInformation The safe shutdown paths developed for the seismic portion of the IPEEE were based on the Perry PRA.
Detailed information was taken from plant drawings and operating instructions. Seismic walkdown preparation depended on plant drawings and spot checks in the field. The seismic walkdowns provided the information used to verify the seismic ruggedness of the safe shut equipment.
l Information used in the HVE methodology came from fire protection design documents. The Perry PRA was also used to determine conditional core damage frequencies for screening out some fire areas.        !
Detailed fire analyses of the remaining fire areas depended on information gathered during fire              !
walkdowns.
Outside organizations, site drawings and local maps provided much of the documentation used for the          i other external hazards. National government agencies were contacted and provided information on transportation related items such as air traffic and Lake Erie shipping. Local government agencies provided information on the storage of hazardous chemicals by nearby industries. Information on the transport of hazardous materials by rail traffic were obtained from the operators of the rail roads in the vicinity of the plant. When needed, specific details on hazardous materials were obtained directly from the nearby facilities storing and using those materials. Site walkdowns were also made to support the high winds and extemal flooding analyses.
1 2-3
(
 
r i
l l                          PNPP Individu 1 Pl:nt Ex:mination - ExtIrn:l Events 2.5 References 2-1  USNRC Generic Letter 88-20, Supplement 4, " Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities," June 1991.
I
'                                                                                                    J 2-2 NUREG-1407, " Procedural and Submittal Guidance for the Individual Plant Examination of      '
External Events (IPEEE) for Severe Accident Vulnerabilities," Final Report, June 1991.
l 2-3 EPRI NP-6041-SL, "A Methodology for Assessment of Nuclear Power Plant Seismic Margin,"
Revision 1, August 1991.
2-4 Ravindra, M.K. and Bannon, H., " Methods for External Event Screening Quantification: Risk    l Methods Integration and Evaluation Program (RMIEP) Methods Development,"                    l NUREG/CR-4839, July 1992.
2-5 NUREG/CR-2300, "PRA Procedures Guide," January 1983.
2-6 Perry Nuclear Power Plant Updated Safety Analysis Report.                                    ;
2-7 NUREG-0800, " Standard Review Plan," USNRC, Revision 2, July 1981.                          f i
l  2-8 NUREG/CR-5088," Fire Risk Scoping Study."                                                    j 2-9 USNRC Generic Letter 88-20, Supplement 5, " Individual Plant Examination of External Events  !
(IPEEE) for Severe Accident Vulnerabilities," September 1995.
l l
i l
i i
l l
i 2-4 l
l I
i
 
PNPP Individuil Pl:nt Ex;mination - Ext; mil Ev::nts l                            Table 2 Summary of Design Features - Perry                                ;
3,579 MW GE Boiling Water Reactor with a 238" diameter Reactor Pressure Vessel (RPV)
High Pressure RPV Iniection Systems                                                                    ;
l  High Pressure Core Spray (HPCS) - motor driven pump backed by Div 3 diesel generator                    '
i  Reactor Core Isolation Cooling (RCIC) - turbine dnven pump                                              1 l
l  Condensate /Feedwater - combination of turbine and motor driven pumps; not diesel backed l
l Low Pressure RPV Iniection Systems                                                                      '
Residual Heat Removal (RHR) in Low Pressure Coolant Injection (LPCI) mode of operation- three independent trains; RHR A motor driven pump backed by Div 1 diesel generator and RHR B l        and C motor driven pumps backed by Div 2 diesel generator Low Pressure Core Spray (LPCS) - motor driven pump backed by Div 1 diesel generator Condensate Transfer Altemate Injection - non-diesel backed motor driven pumps Fast Firewater Altemate Injection - diesel driven fire pump
!  RPV Deoressurization Systems Automatic Depressurization System (ADS) - 8 relief valves supplied with safety related instrument air    ,
i  Manual RPV Depressurization using either the 8 ADS valves and/or the 11 non-ADS relief valves            !
l        supplied with non-safety related instrument air Decav Heat Removal Power Conversion System (PCS) - Decay heat removed via the main steam lines and the condenser l
l  Residual IIeat Removal (RHR) in either Containment Spray or Suppression Pool Cooling modes of l        operation - RHR A and B have heat exchangers for removing decay heat Containment Venting - Containment may be vented using the RHR A or B with the containment spray headers or via the Fuel Pool Cooling and Clean-Up (FPCC) system l
i                                                      2-5 i
i
 
l PNPP Individual Plant Examinction - Extomal Events Table 2 Summarv of Design Features - Perry (Continued) l l  Electrical Design i  Offsite power 2 Standby Diesel Generators supplying power to Division I and Division 2, respectively 1
i  1 Diesel Generator supplying power to Division 3 for HPCS 3 d.c. buses supplied by batteries and backed by Division 1,2 and 3 a.c. power and inverters Containment Structure Mark 111 freestanding steel containment with pressure suppression l
l l
I i
I l
!                                                    2-6 l
;-                                                                                              j
 
PNPP Individuil Plint Eximination - Ext: mil Ev:nts                            !
1                                                                                                            1 3 SEISMIC ANALYSIS                                                                                        l l
l  Methodology Selection                                                                                    i l
The Perry Nuclear Power Plant (PNPP) Seismic Margin Assessment (SMA) was achieved using the              j I3 i
guidelines contained in Generic Letter 88-20, Supplement 4 "U        and NUREG-1407.[3-21 The actual    j l
evaluation was performed using the Electric Power Research Institute (EPRI) seismic margins              !
I3 methodology recommended in NUREG-1407, that being the EPRI NP-6041-SL '33 for a focused scope plant with a review level earthquake (RLE) of 0.3g as binned by NUREG-1407, Table 3.1. The basis of      i this approach is selection of a minimum set of equipment, designated the safe shutdown equipment list    l
,  (SSEL), that is required to safely perform a reactor shutdown following a RLE. An assessment is made      !
!  of the items contained on the SSEL, and the structures containing those items, as to their overall capability to survive an RLE event. Those items capable of withstanding the RLE event can be
  - screened from further consideration. Any items that cannot be screened are identified and must be l  addressed to determine their final outcome.                                                              ,
;    For PNPP, the NUREG/CR-0098 l343 median-centered rock spectrum anchored at 0.3g peak ground              <
acceleration is specified as the horizontal ground RLE for rock-supported buildings. The vertical        l ground RLE is equal to 2/3 times the horizontal ground RLE. Likewise, for soil-supported structures (Diesel Generator Building), the NUREG/CR-0098 median soil spectra anchored at 0.3g was used.
These spectra were specified at grade level in the free field. The PNPP design Safe Shutdown i    Earthquake (SSE) is based on Regulatory Guide 1.60 l343 response spectra anchored at 015g peak          ;
ground acceleration. The 0.3g RLE with respect to the 0.15g SSE provides a sufficient challenge to the  1 PNPP seismic design basis as intended by the SMA evaluation. It is not the intent of this program to l
determine the absolute largest earthquake the site could withstand, only to demonstrate with a high      !
;  degree of confidence that the site could withstand an RLE. This challenge will help in identifying any    {
l-  plant vulnerabilities and any weak links that might limit the plant shutdown capacity.
Safe shutdown success paths were developed to identify the systems that must function to successfully shutdown and cool the reactor following the occurrence of a RLE event. A safe shutdown success path is a combination of systems that is used to accomplish all of the required safe shutdown functions. A L    success path can be depicted in a Shutdown Path Logic Diagron (SPLD). The SPLD for Perry identified 39 systems and 933 components that required evaluation for seismic adequacy.
3-1
 
PNPP Individual Plint Examinrtion - Exttmti Ev:nts i
3.1 J Seismic Margins Methodology - EPRI Seismic Margin Assessment (Focused-Scope)
As discussed previously, NUREG-1407, for focused-scope plants, and the EPRI Seismic Margin Methodology (SMM) was used to perform the seismic analysis.'                                                                  '
e  ~A Seismic Review Team (SRT) was assembled and trained which allowed them to perform                              l the required analyses and walkdowns.                                                                              :
* The selection of the safe shutdown paths and safe shutdown equipment list, SSEL, was assembled to determine the minimum set of equipment required to safely shutdown the reactor.
          . A review of known low seismic ruggedness relays was conducted.                                                  I e    Walkdown information was assembled to enable thorough walkdown evaluation.
          . The seismic capability walkdowns were performed.
          . The SSEL, and associated structures housing those components, were evaluated for their j                seismic capacity.
          . Documentation of the evaluation was completed.                                                                  ;
t The seismic margins analysis guidelines help focus on the identified success paths rather than a re-                          l analysis of the entire plant. The success paths can achieve and maintain a safe shutdown condition for a l
minimum of 72 hours following an RLE event. Structures, systems, and components in the shutdown                              j paths are reviewed and evaluated. The safe shutdown paths and components list were compiled along                            l l
EPRI developed guidelines and formed the basis for the plant walkdowns. Neither reactor pressure vessel internals, nor soil-related failures, were evaluated in this evaluation. This deviation from the guidance of NUREG-1407 is based on Generic Letter 88-20, Supplement 5 I'9                                                    i i
The safe shutdown path walkdown methodology'used at PNPP has been adapted from industry work regarding Unresolved Safety Issue (USI) A-46.I
* Technical research by the Seismic Qualification                              1 Utility Group (SQUG) and the USNRC resulted in an approach for A-46 resolution called the Generic Implementation Procedure (GIP).I'9 Since PNPP was constructed after the implementation of the IEEE 344-1975                                I '* standard for i
qualification of Class I electrical equipment, an A-46 review was not required to be performed.                                l However, the GIP provides the detailed technical approach, generic procedures, and documentation guidance which can be used to verify the seismic adequacy of mechanical and electrical equipment                              i'
,  used in the safe shutdown paths of the plant.
i i  The issue of spurious activation of relays, known as relay chatter, was addressed using the guidance of j  NUREG-1407. The extent of the relay evaluation consisted of a review of the relays in the safe
!  shutdown paths and comparing those found to a compilation of known low-seismic ruggedness relays.
l 3-2                                                                    ,
I                                                                                                                                  :
I l                                                                                                                              _-
 
PNPP Individu 1 PI:nt Enmin tion - Ext: mil Ev:nts                              i All aspects of the SMA were performed under the direction and control of utility personnel.
Consequently, the PNPP seismic margins evaluation was performed as ajoint effort between Cleveland Electric illuminating (CEI), Gilbert / Commonwealth (G/C) and NUS. The consultants listed were used for their expertise in the seismic field and provided valuable guidance in key areas.
3.1.1 Review of Plant Information, Screening, and Walkdown
[
This section provides general plant information, the seismic input, and walkdown method used in the        ,
evaluation.
3.1.1.1 General Plant Information PNPP is located in Lake County, Ohio approximately 7 miles northeast of Painesville and 35 miles northeast of Cleveland, the nearest principal city. The eastern two thirds of the site is within the boundaries of North Peny Village while the western third is within Perry Township.
The plant site is located along the southeastern shoreline of Lake Erie on an ancient lake plain approximately 50 feet above lake low water elevation. The site and its environs consist mainly of          j woodland and former nursery lands. The total area of the plant site is approximately 1,100 acres and relatively flat. The land has a gentle slope toward the lake and is crossed by small streams which drain    i on'.o the lake. The main plant buildings are located about 800 feet from the toe of a 45 foot high steep bluff that forms the shoreline. Upper Devonian shale bedrock underlies the site about 55 feet below the existing ground surface. Bedrock onshore is overlain by approximately 30 feet of very dense till which in turn is overlain by about 25 feet of poorly compacted lacustrine deposits. Thin layers of glacial till  l and beach deposits overlie bedrock at the shore. Pleistocene glaciation induced localized shallow faults    l and folds in the shale beneath the site.
l Subsurface exploration, substantiated by laboratory testing of soil and rock, along with excavation          l experience, confirmed that stratigrahically, the subsurface materials and their respective physical properties were similar throughout the plant site. The Upper Devonian shale strata beneath the site dips less than 5" southeast, but the erosional bedrock surface slopes north toward Lake Erie. Groundwater l
levels ranged between three and five feet below ground surface. The depth to groundwater gradually increased toward Lake Erie.
The bearing characteristics of the lacustrine deposits and upper till with a combined thickness of 35 feet are generally unsuitable for the support of Seismic CategoryI structures. Support for most Seismic CategoryI buildings is provided by lower till and Chagrin shale. Seismic CategoryI                  i structures, such as piping, duct banks, buried fuel oil storage tanks, and the diesel generator building is  l founded on compacted Class A backfill, an imported well-graded sand and gravel fill containing less than 5 percent fines (that is, fraction passing the No. 200 sieve). The lower till exhibits a very low 2
compressibility under static loads up to 6 tons /ft (tsf). The shale is capable of supporting loads to at least 25 tsf without detrimental settlement. Subsurface investigatLn of the cooling water tunnel
;  alignments indicated that Chagrin shale beneath Lake Erie is relatively uniform and generally
!  competent and free from detrimental soft zones.
Shallow deformation exposed by foundation excavation into the Chagrin shale, although unanticipated, was similar in style and origin to that identified during preconstruction site-location geologic 3-3 1
 
PNPP Individual Pl:nt Exrmination - Ext:rn:1 Ev;nts investigation. A similar result was obtained during investigation of surrounding features following the January 31,1986 Leroy earthquake. In this instance the shallow structures are confined to the Cleveland shale directly overlying the Chagrin shale.
An abnormal, small-displacement, thrust fault intersecting the cooling water tunnels, was revealed during tunneling. Studies show that its last movement, an adjustment to glacio-isostatic rebound, occurred in Pleistocene time. None of the site faulting evaluated during initial site investigations, or      !
faults mapped during post Leroy earthquake studies, are capable as defined in Appendix A to                    !
10 CFR 100.
Ohio and adjacent areas are characterized by small infrequent earthquakes with an occasional moderate earthquake. Three moderate earthquakes, one of Modified Mercalli Intensity VII-VIII (MMI) centered in the Anna, Ohio area,185 miles southwest of the site, one ofIntensity VIII (MMI)in the Attica, New York area,160 miles northeast of the site, and the Intensity V-VI (MMI) event centered near Leroy, Ohio,10 miles south of the site, represent the largest earthquakes to have occurred within 200 miles of the site.
The principal buildings and structures housing safety related equipment include the Containment Structure, the Auxiliary Building, the Intermediate Building, the Control Complex, the Diesel Generator Building, and the Emergency Service Water Pumphouse.
These buildings and structures are fotmded upon suitable material for their intended application.
Structures essential to the safe operation and shutdown of the plant are designed to withstand more extreme loading conditions than normally considered in non nuclear design applications. The buildings and intemal structures so designated are designed to provide protection as required from tornadoes, earthquikes, and failure of equipment producing flooding, missiles, jet impingement loads, and pipe whip.
The Containment Structure is a Seismic Category I structure which encloses the reactor vessel, the drywell, suppression pool, upper fuel pool and some of the engineered safety features and support systems. The functional design basis of the Containment, including its penetrations and isolation valves, is to contain with adequate design margin the energy released from a design basis loss-of-coolant accident and to provide a leaktight barrier against the uncontrolled release of radioactive material to the environment. This structure is founded on bedrock.
The Auxiliary and Intermediate Buildings are Seismic CategoryI multistoried reinforced concrete structure that contain safety systems, fuel storage, and necessary auxiliary support syvems. Redundant safety trains in the Auxiliary Building and all other areas of the plant are separated aw protected so that a loss of function of one train will not prevent the other train from performing its safety fuction.
These structures are founded on bedrock or utilize caissons to the bedrock.
l The Contral Complex is a Seismic Category I multistoried, steel and reinforced concrete structure in which many of the control and electrical systems, including required support systems directly related to safety or necessary for plant operations, are located. This structure is founded on bedrock.                  l The Diesel Generator Building is a Seismic CategoryI reinforced concrete structure. The building contains the three diesel generators, three fuel oil day tanks, building ventilation, filters, silencers, and 3-4 l
 
PNPP Individu 1 PI:nt Exrmin tion - Ext:rn:t Ev:nts controls. Each diesel generator and its associated equipment are housed in a separate room within the building. This structure is founded on well compacted Class A fill material.
, The Emergency Service Water Pumphouse is a Seismic CategoryI reinforced concrete structure and contains the emergency service water pumps and associated equipment. Additionally, it houses the        ;
diesel powered fire pump. This building is founded on bedrock.                                          :
3.1.1.2 Seismic Input to Structures and Equipment
* 3.1.1.2.1 The Safe Shutdown and Operating Basis Earthquakes On the basis of the seismology of the site area, the (SSE) is designated as an Intensity VII (MMI) l earthquake occurring close to the site. The resulting maximum horizontal ground acceleration at l foundation level within the competent bedrock at the site is estimated to be in the range of 0.07g to l 0.13g. In order provide an additional margin of conservatism, a value of 0.15g is assigned as the l
maximum horizontal ground acceleration. This value is deemed adequately conservative under Appendix A of 10 CFR 100. Safety related structures, systems and components are designed to ensure safe plant shutdown for two horizontal and one vertical excitations simultaneously.
l The Operating Basis Earthquake (OBE) is designated as one with half the acceleration of the SSE and equivalent to an Intensity VI (MMI) earthquake near the site. The corresponding horizontal acceleration at foundation level would be less than 0.075g.
The design response spectra used for Seismic Category I structures, systems and components were developed in accordance with Regulatory Guide 1.60. The horizontal and vertical design spectra were normalized to 0.15g for SSE and 0.075g for OBE.
3.1.1.2.2 The Review Level Earthquake l Since PNPP is designated as a focused-scope plant, the RLE was set at 0.3g, as required by l NUREG-1407. For the purposes of conducting the seismic capability walkdowns and evaluations, the existing in-structure SSE floor response spectra were conservatively scaled up to the level of the RLE.
3.1.1.3 Seismic Walkdowns This section describes the approach to the seismic capability walkdown, the screening criteria used and the final details of the walkdown.
3.1.1.3.1 Approach j A significant amount of plant information was reviewed and used in the SMA. This includes the PNPP USAR, PRA, and numerous other documents such as drawings, procedures, seismic analyses, and
; seismic qualification test reports. The seismic capability analyses of components and structures, i
including walkdown notes are documented in PNPP Screening Evaluation Work Sheets (SEWS). The SEWS are similar to those developed by SQUG.
l 3-5
 
PNPP Individual Plant Eximination - Ext 2 mal Ev:nts The key element in the EPRI SMA is the performance of a plant walkdown for both the A and B success paths. The approach used to perform the systems and component selection walkdown, and the seismic capability walkdown follows the recommendations of EPRI NP-6041-SL. This includes the following activities:
        . Selection of the assessment team
        . Pre-walkdown preparation e  System and component selection for walkdown e  Seismic capability walkdown The seismic assessment team, all part of the Seismic Review Team (SRT), was comprised of six individuals. The four team members responsible for the actual seismic evaluation all met the qualification requirements of EPRINP-6041-SL. The qualifications included the training and certification to the SQUG walkdown methodology. Four SRT members are G/C personnel, while the remaining two are CEI personnel at the PNPP site. One systems engineer, who developed the A and B safe shutdown paths, provided systems and operations input to the two walkdown teams. Additionally, one walkdown coordinator assisted the teams in developing the daily schedule ofitems to be evaluated.
l The following is a listing of the SRT members, their affiliation and area of expertise.
Mr. Rich Schmehl          Gilbert / Commonwealth              Seismic Engineer Mr. Ry Svotelis            Gilbert / Commonwealth              Seismic Engineer
;        Mr.Hoat Ho                Gilbert / Commonwealth              Seismic Engineer Mr. Stan Tomaszewski      Cleveland Electric Illuminating    Seismic Engineer Mr. Steve Meyer            Cleveland Electric Illuminating    Shutdown Path Systems Engineer Mr. Don Keiser            Gilbert / Commonwealth              Walkdown Coordinator The walkdown team members were technically supported by Dr. Chang Chen, the G/C Task Manager, Dr. Paul Smith of The Readiness Operation (TRO) and Mr. Harry Johnson of Programmatic Solutions.
Either Dr. Paul Smith or Mr. Harry Johnson were available on site at all times to act as an observer l supporting both walkdown teams. Additionally, Dr. Paul Smith participated as a walkdown team member part time.
Prior to the walkdown, preparatory work was performed that consisted of gathering and reviewing j information about the plant design and operation including the USAR, specifications, drawings, l qualification calculations, and existing intemal events PRA. A detailed walkdown procedure was prepared, including the detailed technical approach of each task and the interfaces between the team members and PNPP support personnel. The front-line and support systems for the A and B success paths and the equipment and components in these systems that must function in order for the system to accomplish its safe shutdown function were identified by the system engineer. A system and element
;  selection walkdown was then conducted by a seismic engineer and the system engineer to review a l  majority of components for any obvious seismic problems and to locate and arrange access for equipment j  for the subsequent seismic walkdown. Two independent teams were used during the seismic capability walkdowns.
3-6                                                '
                                                                                                          )
:                                                                                                        1
 
1 I
l PNPP Individu;l Pl nt Ex2mination - Ext: mil Events                            I i
Specific documentation assembled and evaluated prior to and during the walkdowns included:                  ,
* PNPP Safe Shutdown Paths and Equipment Lists.                                                      [
i e  Plant ammgement drawings.                                                                        :
I e  The sections of the PNPP USAR relating to the seismic design and licensing basis of the          ;
plant.
e  The ground response spectra for the SSE and RLE.                                                  -
i e  Floor response spectra and subsequent scaling factors for the RLE.                                l e ' A sample of construction details of equipment anchorage including drawings and                    l' specifications.
* A sample of pmcurement and seismic qualification testing specification for equipment.
      . Examples of calculations for seismic and anchorage qualifications.
      . Design basis documents for the PNPP structures.                                                  l I
The data obtained was not intended to be the sole basis for the screening of comronents, but assisted the  ;
SRT in their review.
i The structures at PNPP were screened generically. The drawings and analysis models were reviewed for        i details that might indicate seismic vulnerabilities in accordance with the requirements of a focused-scope  ,
SMA. The drawing and structural analysis reviews confirmed that consistent good practice in design        !
detail and analysis was utilized at PNPP. Therefore, a small sample of the details of connections,          ;
reinforcement bar placement, constructionjoints, etc. wasjustified in making the judgments on screening.
j 1
!                                                                                                              1 d
l
                                                                                                              \
3-7
 
PNPP Individu;l Plant Examination - Ext:m;l Ev nts In addition to the 39 systems and 933 components, the following structures housing the equipment were included in the success paths:
l
        . Primary Containment Structure                                                                            :
i e  Shield Building                                                                                      _
* Auxiliary Building
                                                                                                                    ]
1 e  Fuel Handling / Intermediate Building                                                                  j l
        . Control Complex                                                                                        1 e  Diesel Generator Building
        . Emergency Service Water Pumphouse The SRT then conducted the seismic capability walkdown and reviewed the equipment and components                j from both the primary and alternate success paths for seismic adequacy (both structural integrity and            i anchorage) and system interaction (SI). 'Ihe SRT. review consisted of detailed walkdown of the                    ,
representative equipment, and walkby of similar equipment.                                                        l t
3.1.1.3.2 Screening Criteria                                                                                      !
Initially, the SRT pre-screened a number of structures, components, and equipment using the screening            !
criteria guidelines contained in EPRINP-6041-SL. Tables 3.3 and 3.4 provide a general listing of the pre-screened structures and equipment, along with the basis for the pre-screening. The basis for these            l tables are the screening guidelines given in Tables 2-3 and 2-4, respectively, of EPRI NP-6041-SL for the spectral accelerations less than 0.8g.
l During the walkdown, the basis for pre-screening was verified for the success path structures and -              ;
equipment selected for review. The issues and considerations discussed in Appendix A of EPRI                      ;
NP-6041-SL and the judgment of the SRT were used as the basis for verifying that the screened out elements are seismically adequate.
Issues which influence the screening discussed previously are: redundancy provided by multi-train systems, similarity in design and location of redundant trains, treatment of single failures, access to components during walkdowns, and system interactions potential including fire and internal flood sources.
The screening approach, described in additional depth below, is appropriate for modem plants of PNPP's i
vintage. The doctunent review and the system and element selection walkdown verified that uniform
[  practices in accordance with the plant design basis for construction, design and installation were followed.
i                                                                                                                    l During the PNPP walkdown, it was confirmed, as expected, that most items in a given equipment class              j l
y  were either identical or very similar. The plant documentation review and walkdown confirmed that the vast majority of equipment was manufactured, and installed as specified. The screening procedures                i 3-8
 
t PNPP Individuil Plint Eximiniti:n - Ext 2 mil EvInts employed at PNPP for generic categories of equipment and structures contained caveats or inclusion rules from the GIP that were verified during the walkdown. Since the equipment at PNPP was purchased and installed to similar codes and standards the SRT screened generic classes of equipment on the basis of their relative ruggedness and said caveats. The screening sampling size for identical or very similar equipment, in a given equipment class, was one or greater and for similar equipment in a given class with  ,
identical or very similar anchorage was two or greater for each walkdown team. The increased sample for    l anchorage is based on experience that anchorage installations are not always consistent. This approach is  ,
,          consistent with the guidance provided in Appendix D of EPRI NP-6041-SL. Those specific components          l l
which were inspected based on the above approach were considered to be " walked-down." A 100 percent        ;
            " walk-by" of all remaining equipment on the SSEL was employed to check for unique equipment details        i and for seismic interactions.
j The walkdown and inspection of distribution systems that were installed in bulk, such as piping, cable      i trays, HVAC ductwork, electrical conduit, and instrumentation lines were performed on an area basis. To    j accomplish this, the areas where these systems are located were generically inspected rather than selecting specLie trains or runs of these distribution systems. All distribution system elements in the area were walked by. In addition to area walk by of distribution systems, detailed walk downs of a portion of each of the types of distribution systems were performed. Using this approach, distribution system components    :
included in the success paths, as well as elements not included, in the area were evaluated. Upon          ;
completion of the walkdown, the distribution systems were reviewed so as to verify that all the inclusion  !
rules were met. It was confirmed that the design and installation practices at PNPP are consistent, i
therefore, the screening judgment was valid based upon a review of general specifications and drawings for a single run of each generic class of distribution system. As expected the review of the general specifications and drawings did not indicate significant differences in design and installation practice.
Therefore, based on the above discussion, this was determined to be an effective approach and all systems were found to be ruggedly supported.
3.1.1.3.3 Walkdown Preparation To ensure an efficient use of time and to ensure that the scope of the walkdowns focused on the seismic assessment, preparatory work prior to the walkdown was considered vital. This work consisted of reviewing plant seismic design documentation and qualification test reports. The information reviewed included the following items:
* Selected sections, including seismic design basis sections, of the PNPP USAR.
e Plant general arrangement drawings, civil / structural drawings, specifications, and representative anchorage details for equipment in the SSEL.
i                                                                                                                        i j                  e' Sample seismic equipment qualification reports and example equipment anchorage packages.
i                  e  In-structure response spectra for elevations where success path equipment and components          ,
I are located.
i j                  e  Topical and vendor drawings, reports, and calculations.
e  Preliminary list of the success path equipment selected by the system engineer.
f 3-9 i
4 9-+. , . m      ,        _.    ,+w,. e . . - . .      , -
                                                              .# v                  - , , , - , _ _
 
PNPP Individual Pl:nt Ex mination - Extem:I Events                                l l
I Anchorage details and drawings indicated that the equipment anchorage at PNPP is relatively rugged. The constructed anchorage details in the plant was verified during the walkdown and were found to meet or exceed the standard design details.
3.1.1.3.4 Walkdown Process The SRT performed the seismic capability walkdowns throughout a two week period during Refuel                >
Outage 4 (RFO-4). The walkdown consisted of reviewing the success path equipment for structural integrity, anchorage adequacy, and system interaction. Attention was directed to anchorage and system interaction since these would be the major modes of failure for most equipment.                              i The walkdowns were organized so that easily assessable areas were reviewed first. These areas included the Emergency Service Water Pumphouse, Diesel Generator Building and Control Complex.
Once these areas were completed, the contaminated areas, those requiring protective clothing, were          ,
walked down. This included Containment, Drywell, Main Steam Tunnel, Auxiliary Building, and the Fuel IIandling/ intermediate Building. During the walkdowns, the SRT requested and reviewed                  l additional information, such as calculations, drawings, and vendor qualification test reports, to address concerns raised during the inspections or to confirm assumptions. Additionally, cabinets were opened when the SRT had specific interest, such as anchorage details and internal device mountings, that allowed for a visual inspection of the internals and anchorage.
3.1.2 System Analysis 3.1.2.1 Principal Safety Functions The basic requirements for prevention of core damage and prevention or mitigation of the release of fission products can be divided into the following four functions.
* Reactivity Control
* Reactor Coolant System Overpressure Protection l
* Reactor Pressure Vessel (RPV) Level Control e  Containment Overpressure Protection and Fission Product Control (includes decay heat                !
removal)
;  The Perry PRA was used as the basis for defining these functions and identifying the systems needed for accomplishing them.
Successful reactivity control is defined as the rapid insertion of negative reactivity into the core such 4
that the reactor is brought suberitical. This is analyzed as the rapid insertion of a sufficient number of control rods into the core to provide a shutdown rod pattern.
Reactivity control is required to rapidly make the core suberitical to reduce the power generation to the fission product decay heat level. If a seismic margin earthquake were to occur when the plant is operating, 3-10                                                    l l
l 1
 
PNPP Individu:1 Plint Eximin;tinn - Extsmil Ev:nts f
i l
it is likely that the turbine would first trip due to either load rejection or excessive vibrations in the turbine
(
generator unit. The turbine trip would send reactor scram signals to the reactor protection system.                          i Reactivity control is initiated by the reactor protection system and accomplished by the rapid insertion of                  ;
control rods into the core, commonly referred to as a reactor scram. Reactivity control can also be                          j accomplished by injecting a highly concentrated boron solution into the reactor coolant system with high pressure pumps. This emergency boration requires operator action to initiate as well as several other anticipated transient without scram (ATWS) mitigation operator actions. Rapid emergency boration is not considered a viable method of rapid reactivity control during or after a seismic margin event because of                    l the additional stress imposed on the operators from the RLE and the time it takes for shutdown to occur.                    l.
Successful reactor coolant system overpressure protection is defined as the successful operation of plant systems such that the integrity of the reactor coolant system is not endangered. The RPV is                            ,
designed to ASME code which permits a maximum pressure transient of 110 percent of design                                    !
pressure. RPV design pressure is 1,250 psig. I10 percent of design pressure is 1,375 psig. The assumed l        pressure limit for the PRA analysis is, therefore,1,375 psig.
Overpressure protection can be provided by the power conversion system (the main steam lines, condenser and circulating water) or by cycling multiple safety relief valves (SRVs). Following an                            ;
earthquake and loss of offsite power the power conversion system is assumed to be unavailable. This leaves the SRVs as the only mechanism for controlling RPV overpressure. No support systems to the SRVs are necessary for RPV overpressure protection. The SRVs are designed to open against springs l        (Bellville washers)ifneeded.
f Successful RPV level control is defined as the successful operation of plant systems such that RPV water level is maintained above the Minimum Zero Injection RPV Water Level (MZIRWL) or that a
,        high capacity injection system is recovered at the point of reaching the MZIRWL. In such a condition, j        the heat transfer from the fuel rods to the water is sufficient at the relatively low heat flux associated with l        decay heat to result in acceptable fuel rod temperatures. Maintaining adequate water inventory in the RPV l        satisfies the RPV level control function, but the decay heat must still be transferred from the RPV water I
to a heat sink.
Successful containment overpressure protection is defined as maintenance of containment pressure below the Containment Pressure Limit of 40 psig. The results of the containment strength analysis performed for the Individual Plant Examination (IPE) showed that maintaining pressures below 50 psig would prevent containment failure. Therefore, 50 psig has been used to define successful containment overpressure protection.
t For the purposes of this analysis, decay heat is removed from the RPV by steam flow through the SRVs and into the suppression pool. Eventually the suppression pool heats up and causes the containment pressure to rise. The heat is ultimately removed from the containment by the RHR system operating in suppression pool cooling mode or by. venting the containment to the atmosphere. Both of these
;        mechanisms were included as part of this analysis.
i 3.1.2.2 Safe Shutdown Success Paths i        One of the principal objectives of the SMA was to develop an anderstanding of how the systems and plant operators would respond to a review level earthquake.
3-11
 
  .___m.                _ _ . _ _ _ _ _ . _ _ _ _ _ _ . . _ . . _ _                          . _ . . _          _.        _
PNPP Individuti PIInt Eximinition - Exttmil Ev:nts i
i The RLE is assumed to cause a loss of offsite power (LOOP) and, potentially, a small loss of coolant                  j accident (LOCA). Under these conditions, the EPRI methodology stipulates the plant be evaluated for                    !
performing the safety functions necessary to achieve and maintain hot or cold shutdown for 72 hours                    i following the occurrence of a seismic event.
The redundancy and diversity of a nuclear power plant design provides several success paths that can                  l perform the safety functions. For the purposes of the SMA, two separate success paths were chosen which would be available following a loss of offsite power and which could achieve and maintain hot or cold shutdown given an RLE in conjunction with a seismically induced small LOCA.                                    l Success path logic diagrams (SPLD), Figure 3.1 and Figure 3.2, were constructed to identify which                      j systems are needed to accomplish the safety functions. The success criteria from the Perry PRA was also used as the success criteria for this analysis. Once the success paths were established with the                  !
success path logic diagrams, the front-line systems and their support systems were determined using                    l the Perry PRA. The systems included in Success Path A are listed in Table 3.1 by safety function. The                  ;
systems for Success Path B are listed in Table 3.2.
The success paths for the Perry SMA are both redundant and diverse. Although the Reactivity Control                    l and Reactor Coolant System Overpressure Protection safety functions use the same set of systems and                    ;
components for each success path, they are divisionally separated, and highly redundant, i.e., there are              i nineteen SRVs to prevent RCS overpressure.
Success Path A can provide water to the RPV under high reactor pressure conditions. The Containment                    h Overpressure Protection safety function is assumed to be via containment venting through the fuel pool                i cooling and clean-up lines. If the Division 2 diesel generator is unavailable, the Division 3 diesel                  !
generator, by procedure, can be cross-tied to the Division 2 bus to provide motive power for valve                    i operation. Other than electrical buses, no other Division 1 or 2 components are used for RPV Level I
Control or Containment Overpressure Protection.
l        Success Path B is the low pressure success path. It is both diverse and redundant to Success Path A.
For Success Path B, the Automatic Depressurization System is used to depressurize the RPV and allow the low pressure ECCS systems to inject. The Containment Overpressure Protection safety function is accomplished either through containment venting or using the Suppression Pool Cooling Mode of RHR.
3.1.2.3 System Descriptions Safety Relief Valves and Automatic Deore=="rinhon System. B21 The nineteen safety relief valves (SRVs) provide a relief path for steam in the event of a reactor overpressure condition. Each SRV is a spring loaded valve with an extemally attached pneumatic                        <
operating cylinder. Each SRV can operate in either the safety mode or the relief mode. The safety l        mode of all nineteen valves supports the RPV overpressure function. The system is single failure proof and common to the RPV overpressure protection function for both success paths.
]
3-12
 
l l
PNPP Individu"1 Pl nt Eximination - Ext: mil Evrnts Eight of the nineteen valves are designated as part of the Automatic Depressurization System (ADS).
These function in the relief mode as needed to depressurize the RPV in support of the RPV Level Control function for Success Path B.
Control Rod Drive System. C11 For the IPEEE the control rod drive (CRD) system consists of the hydraulic control units (HCU), with the accumulators, associated piping, the control rod drives and controls associated with scramming the reactor. The system is single failure proof and common to the reactivity control function for both success paths.
1 Redundant Reactivity Control Svstem. C22                                                                              )
The redundant reactivity control system (RRCS) is designed to mitigate the potential consequences of an ATWS. It provides control signals to the control rod drive system, the feedwater water control                    ;
system and the reactor recirculation control system. The RRCS attempts to shut down the reactor or                    i reduce reactor power by increasing the amount of negative reactivity in the core.
RRCS consists of two divisions each with two channels. Either division can initiate protective actions.
Power is supplied from Class 1E 125 VDC buses to the alternate rod insertion (ARI) valves and RRCS                    l logic. Because only the control rods were credited with shutting down the reactor for the IPEEE, only that portion of the RRCS associated with ARI was included in the SMA. The RRCS is common to the
                                                                                                                        )
reactivity function for both success paths.
Reactor Protection System. C71
                                                                                                                        )
l  The reactor protection system (RPS) is designed to provide protection against the onset and                          j consequences of conditions that threaten the integrity of the fuel barrier and reactor coolant pressure              i boundary. The RPS consists of two independent, functionally identical trip systems. Each trip system is divided into two independent, functionally identical trip channels. The RPS logic is arranged such that at least one of the two channels in each trip system must de-energize to cause a scram. Because de-energization causes a scram, the power supplies for RPS were not included as part of the IPEEE.
The RPS is common to the reactivity function for both success paths.
Residual Heat Removal Svatem. E12 The residual heat removal (RHR) system is a three train system that automatically restores and maintains the RPV water level following an accident. Two of the trains also remove decay heat from the reactor coolant system, the suppression pool or the containment as required. RHR is a low pressure system that operates in conjunction with ADS. Trains A and B each have two heat exchangers in series downstream of the pumps. Train C has no heat exchangers. Each of the three trains takes suction from l  the suppression pool. Train A receives a.c. and d.c. power from Class IE Division 1 electrical buses.
;  Trains B and C receive a.c. and d.c. power frorn Class 1E Division 2 electrical buses.
Each of the trains support the emergency core cooling safety Ametion of Success Path B via the low                    ;
pressure coolant injection (LPCI) mode of operation of RHR. Cooling water to the heat exchangers in                  l Trains A and B is not required for LPCI. Trains A and B also support the containment overpressure 3-13                                                              j
 
PNPP Individu;l Plini Ex: min; tion - Ext: mil EvInts protection safety function for Success Path B through the suppression pool cooling and containment I
spray modes of operation of RHR. Cooling water flow through the heat exchangers, supplied by the l emergency service water system, is required for these modes of operation.
I In addition to LPCI, suppression pool cooling and containment spray modes of operation, the lines for RHR A and B may also be used to vent the containment in support of Success Path B. The flow path is          I from the containment spray headers, through the containment spray lines, cross-tied to the lines to the      j spent fuel pool inside the fuel handling building and out in the atmosphere.
Low Pressure Core Sorav System. E21 1
The low pressure core spray (LPCS) system automatically provides coolant to the RPV during                  I accidents when the reactor pressure is low. ADS can be used in conjunction with LPCS to attain a low        !
enough reactor coolant system pressure to permit injection. LPCS consists of a single train with motor-operated valves and a motor driven pump. Suction is taken from the suppression pool. LPCS J
receives a.c. and d.c. power from the Class IE Division 1 electrical buses. LPCS is one of several          i injection systems / trains in Success Path B for the RPV level control function.
High Pressure Core Sorav System. F??
The high pressure core spray (HPCS) system automatically provides coolant to the reactor pressure vessel during accidents when the reactor pressure remains high. HPCS consists of a single train with motor-operated valves and a motor driven pump. Suction is taken from two possible water sources, the condensate storage tank (CST) or the suppression pool. HPCS is normally aligned with the CST. When l
a low level in the CST or a high level in the suppression pool is sensed, HPCS suction is automatically aligned to the suppression pool. As a non-seismic tank, the CST was not included for the SMA. HPCS receives a.c. and d.c. power from the Class IE Division 3 electrical buses. HPCS fulfills the RPV level control function for Success Path A.
Fuel Pool Cooling and Clean-Un System. G41 The fuel pool cooling and clean-up (FPCC) system normally removes decay heat generated by spent fuel stored in the fuel storage pools and maintains the purity, clarity and water level in the Upper Pools in the containment. This system may also be used to vent the containment if the containment pressure cannot be maintained below the Con +ainment Pressure Limit provided in the Plant Emergency Instructions.
The FPCC containment venting flowpath is through the eleven skimmers in the Fuel Transfer and l
Storage Pool, the Reactor Well and the Separator Storage Pool in the containment, to the FPCC surge tank and into the fuel handling building atmosphere through the five skimmers in the Spent Fuel I Storage Pool.
l Containment venting via FPCC is the primary mechanism for meeting the containment overpressure protection safety function for Success Path A. All valves with the exception of the inboard containment isolation valve can be opened locally by operators using handwheels. The inboard containment isolation valve is normally powered from a Division 2 Class IE bus. In the event that Division 2 power 3-14 l                                                                            --                              .
 
_- -. .- -          . - - . - . . - - . . . - . - ~ - - . ~ - . - - . .                                      . - . - - -  _ - -
i l
                                                        ' PNPP Individuil Plint Examination - Ext:rn!! Ev::nts is unavailable, the Division 3 Class IE bus can be cross-tied to the Division 2 bus for valve o            manipulation. Division 3 provides the electri:: power for Success Path A.                                              :
l
!            ECCS Pumo Room Cooling Svatem.- M39                                                                                    -
l            The ECCS pump room cooling system dissipates heat generated by the ECCS pump motors, the RCIC                          ,
i            turbine, and associated piping in the ECCS pump rooms and the RCIC pump room. Cooling is                                }
l_          accomplished by circulating room air through cooling coils. Each pump room is provided with its own -
i            cooling unit which automatically starts when its associated train commences operation.
Each of the six independent cooling units take suction from room air in which they are located, passes                -i the air through a roughing filter and a cooling coil before discharging the cooled air in the vicinity of              4 the pump. Class IE a.c. power is divisionally supplied.
[
The room cooler for the HPCS pump room supports Success Path A. The balance of the room coolers,                      !
l            with the exception of the RCIC room cooler, support Success Path B. RCIC is not included in either Success Path A or B.
l Diesel Generator Buildino Ventilation System. M43 l
The diesel generator (D/G) building ventilation system functions to provide ventilating air to the D/G                  l rooms. This air dissipates heat generated by the D/Gs and miscellaneous equipment during operation.                    i Each of the D/G rooms is served by independent trains consisting of two 100 percent capacity fans,                      ;
four 50 percent capacity motor-operated louvers, outside air and recirculation dampers and ductwork.
Trains A and B provide support for the Division 1 and 2 D/Gs used in Success Path B. Train C                            I supports the Division 3 D/G used in Success Path A.
I Emergency Closed Cooling Svstem. P42 The emergency closed cooling (ECC) system is a closed loop system that provides cooling to several of the systems used in Success Path B. ECC is divided into two independent trains, each consisting of a                  i pump, motor-operated valves and a heat exchanger. Train A receives a.c. and d.c. power from the Class 1E Division 1 buses. Cooling for the train A heat exchanger comes from train A of emergency service water (ESW). Train B of ECC is associated with Division 2 Class 1E power and train B of u            ESW. ECC does not provide support for Success Path A.
Emergency Service Water Svstem. P45 l            Emergency service water (ESW) supplies cooling water to equipment required for both normal and l            emergency shutdown of the reactor. The source of water for ESW is Lake Erie. ESW is made up of                            l three independent trains each consisting of a pump and motor-operated valves. Trains A, B and C receive a.c. power from the Class IE buses for Divisions 1,2 and 3 respectively.                                        !
l l
t                                                                                                                                    !'
;            ESW trains A and B support equipment and the removal of decay hen. ior Success Path B. ESW j            train C supports equipment used in Success Path A.
3-15
 
I PNPP Individu11 Pl nt Eximin tion - Ext:rnil Evrnts                              ,
i Safety Related Instrument Air. P57 The safety related instrument air system supplies clean, dry, oil free air to the ADS safety relief valves. !
The system is divided into two independent trains. Each train consists of air filters, air tanks and air    l headers for distribution. During normal plant operation, the system air pressure is maintained by a        !
, non-safety non-diesel backed air compressor. Following an event the air receiver tanks provide the air      ;
i needed for ADS actuation. Trains A and B support the RPV Level Control Function for Success Path B l
j in conjunction with ADS. No support is provided to Success Path A from safety related instrument air.      ,
l Class 1E D.C. Power i
The Class 1E d.c. power system is divisionally separated into Divisions 1,2 and 3. Each of the independent divisions contains batteries (the Unit I and Unit 2 batteries of each division may be          I cross-tied to extend battery life during an event, e.g., Unit 1/ Division I and Unit 2/ Division 1 may be  i cross-tied by procedure), battery chargers, and associated buses. During normal operation, the battery chargers provide the power to maintain the d.c. bus voltages. Upon loss of the a.c. power source to the chargers, the batteries maintain bus voltage until a.c. power is restored.                                  !
                                                                                                              \
For the IPEEE, the duration of the event was assumed to be 72 hours, far longer than the capacity of        ;
the batteries. Restoration of a.c. power via diesel generators was assumed to be needed for long-term      l d.c. power availability. Divisions 1 and 2 support Success Path B and Division 3 supports Success          i l Path A.
i Class 1E A.C. Power t
The Class IE a.c. power system consists of three 4,160 VAC buses, their associated switchgear,480          i VAC buses,120 VAC buses and motor control centers (MCCs). The system is divisionally separated              i into Divisions 1,2 and 3. Normally, off-site power supplies the bus loads. Given an undervoltage signal, diesel generators start and automatically supply power to their buses. The diesel generators also start on a LOCA signal but do not supply the buses unless an undervoltage signal exists.
Divisions 1 and 2 support Success Path B. Division 3 is dedicated to HPCS and its support systems which form Success Path A.
Diesel Generators and Their Sunoort Systems l As noted above, the three diesel generators start and supply power to the 4,160 VAC Division 1,2
; and 3 buses given an undervoltage condition on their associated bus. In addition to D/G building ventilation, ESW and d.c. power, the Division 1 and 2 diesel generators depend on five support systems for their operation: 1) standby D/G starting air,2) standby D/G fuel oil,3) standby D/G jacket water cooling,4) standby D/G lube oil and 5) standby D/G exhaust / intake crankcase.
Although not explicitly modeled in the PRA, the components needed to support long-term diesel f generator operation from these support systems were included in the Safe Shutdown Equipment List
! (SSEI,) for the IPEEE seismic margins assessment. The Division 3 D/G has these same support
! systems incorporated into its design.
3-h i
 
r PNPP Individuil Plint Exrmin: tion - Ext; mil Ev;nts l As with the other divisionally separated systems, Divisions 1 and 2 support Success Path B and Division 3 supports Success Path A.
Remote and Local Panels. H13. H22. & H51 l Although remote and local control and instrumentation panels and racks do not strictly constitute a l separate system, they do have their own equipment I.D. numbers. As such, those panels and instrument racks that support the systems that form Success Paths A and B were also included as part of a " super" system.
! 3.1.2.4 Safe Shutdown Equipment List The Safe Shutdown Equipment List (SSEL) was developed based on the guidance provided in the Generic Implementation 3
Procedure (GIP) for Seismic Verification of Nuclear Power Plant Equipment ' developed by the Seismic Qualification Utility Group (SQUG) for unresolved safety issue USI A-46, Seismic Qualification of Equipment in Operating Plants.34" Diversity, reliability and independence were considered during the development of the SSEL. No reliance was made on alignments of systems that are not included in plant instructions. The equipment identified for seismic evaluation included:
l      e  Active mechanical and electrical equipment which operates or changes state to accomplish a safe shutdown function.
      . Active equipment in systems which support the operation of identified safe shutdown equipment.
i e  Instrumentation needed to confirm that the four safe shutdown functions have been achieved and are being maintained.
* Instrumentation needed to operate the safe shutdown equipment.
e  Tanks and heat exchangers used by or in the identified safe shutdown paths.
Individual cable trays, conduit, piping, instrument lines and HVAC ducts for the various distribution systems were not explicitly listed in the SSEL. However, these items were listed on a generic basis and a sample set of each type of distribution system was walked down.
The SSEL was generated by reviewing the plant drawings, including 1) piping and instrumentation drawings (P&lD), 2) electrical elementary drawings, 3) electrical one-line drawings and 4) HVAC drawings for each of the systems included as part of the success paths.
3.1.3 Analysis of Structure Response
( This section summarizes analysis performed to develop comparisons between the PNPP SSE design spectra and the RLE spectra for structural response.
3-17
 
PNPP Individu11 Pl:nt Eximinati:n - Ext; mal Evsnts 3.1.3.1 Earthquake Spectra Comparison 1
! Three parameters are needed to define the RLE ground spectra. They are peak ground acceleration l (pga), structural damping value, and spectrum shape. Based on a review of the PNPP USAR, the            l l following is found:                                                                                      l l      . The SSE design ground acceleration response spectra are specified for the rock-supported structures at PNPP with peak ground accelerations of 0.15g and 0.lg for horizontal and vertical directions, respectively.
* The structural damping values for reinforced r .icrete structures are 4% and 7% for OBE and SSE, respectively.
According to Generic Letter 88-20, Supplement 4, PNPP is in the 0.3g peak ground acceleration            :
focused-scope bin for the IPEEE program.
The recommended damping values for the seismic design of nuclear power plants are presented in Regulatory Guide 1.61. The recommended values for reinforced concrete structures are 4% and 7% for      :
! OBE and SSE, respectively, and therefore compare favorably with the USAR review findings. This recommended damping is based on the fact that maximum combined stresses dut a static, seismic, and other dynamic loading are significantly lower than the acceptance criteria of 0.5 times yield stress and 1.0 times yield stress for the OBE and SSE respectively.
! EPRI NP-6041-SL, Section 4, page 4-3 states that "[The Regulatory Guide 1.61) values used in seismic design are, for the most part, considered excessively conservative for a SMA." The recommended damping values for the SMA are presented in Table 4-1 of EPRI NP-6041-SL. The recommended damping values for reinforced concrete structures are 5% and 10% for stresses about 0.5 times yield stress and 1.0 times yield stress, respectively, and shown in Table 3.7.
Based on a review of the design-basis and published recommended structural damping values, it was decided to use a structural damping value of 7% for all Seismic Cata',ory I structures within the scope of the PNPP SMA.
3.1.4 Evaluation of Seismic Capacities of Components and Plant 3.1.4.1 Walkdown Results l The seismic capacity walkdowns for PNPP were conducted during an approximate two week period during Refuel Outage 4 and commenced in March 1994. The walkdowns were initiated by Cleveland Electric Illuminating SRT members with assistance from Gilbert / Commonwealth. Additionally, Dr.
Paul Smith and Mr. Harry Johnson provided knowledgeable and experienced assistance to the SRT.
This external expertise gave added assurance that walkdown techniques and methods were being performed in accordance with the intent of Generic Letter 88-20, Supplement 4.
l To maximize efliciency, the walkdowns were planned and performed on an area-by-area basis rather l than by system-by-system. They were structured to facilitate a review of components, piping and
!                                                    3-18
 
__    -          - _ _ . _ _ _ . _ ..                      .. _ _ _ ..          . _ _ .~ . _ _ _ _ _.    ._
PNPP Individu11 Plint Examiniti:n - Extimil Ev:nts supports, cable tray and supports, structures, and seismic interactions in an area during one trip rather than conduct repeated trips to the same area for different reviews. The components associated with          !
both safe shutdown paths plus the containment isolation valves constituted the equipment evaluated          l during the course of the walkdowns. All of the buildings and structures included in the walkdown paths      l are considered Seismic Category I.
l l      Walkdown findings were recorded on Seismic Evaluation Walkdown Sheets (SEWS) obtained from
!      Appendix A of EPRI NP-6041-SL. The SEWS are organized to prompt the user on the various issues I
that should be considered rather than provide a narrowly focused checklist. Equipment anchorage L      adequacy, spatial interactions, ruggedness of mounted equipment, and unusual configurations were some of the issues that were noted during the walkdowns.
l As discussed previously, when components are screened-out, it means that those items are considered
    ' to be seismically adequate with no additional evaluation required for the SMA evaluation. The screened-out components would have an expected High Confidence of Low Probability of Failure (HCLPF) number that is at or above the RLE of 0.3g. The screening process makes it unnecessary to calculate HCLPF numbers for screened-out components. The HCLPF capacity is intended to represent an earthquake level in which there is approximately 95% confidence of less than about 5% failure l      probability. There is no further review activity required for screened-out components. For those
!      components not screened-out, or found to be outliers during the walkdowns, the seismic margin capability (expressed in terms of HCLPF) for any success path is then assessed to be equal to the seismic margin capability of the weakest component in that path.
i The following is a summary of various equipment groups that were evaluated during the walkdown activity.
l Motor-operated valves (MOVs) were evaluated using cantilever (height / weight) screening criteria and        1 allowable stress limits. The height / weight screening is based on SQUG GIP criteria. It involves evaluating the size of the motor operator, cantilever distance, and actual pipe size. Care was taken to note large operators on small diameter piping. Two valves were considered questionable during the walkdowns. One, the shutdown volume drain valve ICIl-F0181, concerned a potential of instrument l      tubing flexibility and the other, valve IE12-F0028A, concerned a junction box' cantilevered off the l      motor operator by conduit. Upon subsequent evaluation, both of these issues were resolved and the l      components are considered acceptable and able to function for a RLE up to 0.3g.
l Instrument racks were walked-down for anchorage adequacy, instrument mountings, and spatial interaction.
Several areas of focus were utilized in the walkdown of the Control Room. The raised floor details were reviewed to determine the adequacy of the anchorage to the embedments in the floor and connections to the termination and control panels. Relay mounting details were inspected and relay
,      chatter is discussed further in Section 3.1.4.2. The seismically qualified ceiling details were reviewed
;      and subsequently inspected to verify the adequacy of bracing. All non-seismically mounted furniture j      (file cabinets, desks, chairs, drawing racks) were reviewed for impact with panels. This is discussed j      further in Section 3.1.4.3.
t 3-19
 
PNPP. Individu11 Pirnt Eximinition - Ext: mil Ev:nts                                  !
l                                                                                                                    !
Pumps, as expected from earthquake experience, were found to be seismically rugged. The vertical pumps employed at PNPP were found to have supports which meet the requirements of EPRI NP-6041-SL for long shaft pumps. Two Emergency Service Water pumps had high anchorage stress                    i l  and were considered outliers during the walkdown. Two pumps had questionable anchorage capacity                  l l  due to existing high stress levels. However, upon subsequent evaluation the anchorage was determined
!  to be adequate for the RLE with a HCLPF value equal to 0.3g.
l I
f Air handlers and fans were found in all areas of the plant. Vibration isolators were targeted in seismic        !
training course as possible weak links in fan anchorage details. No fans were considered outliers during the PNPP walkdown. Ductwork and' air handlers appeared, in the judgment of the SRT, to have been l
built rugged enough to function properly after a RLE.                                                            l I
The hydraulic control units (HCU) for the Control Rod Drive (CRD) system were found to be very                  )
well braced for both vertical and horizontal motion. The HCUs are bolted onto common supports                    l which effectively made each perform as part of a single seismic unit.                                            !
The air accunmlator tanks for the Safety Relief Valves (SRV) were walked down. All of the equipment              ;
and anchorages were found to be seismically rugged.
l
                                                                                                                    )
The diesel generators were walked down to assess the adequacy of anchorage and attachment or                    l auxiliary equipment. The auxiliary modules associated with the Division 1 and 2 diesel engines were              !
was considered to be outliers by the SRT during the walkdown due to unknown anchorage details. The              l Division 3 diesel engine has no auxiliary module. Upon subsequent evaluation, the auxiliary module              ;
was determined to have a HCLPF value slightly greater than 0.3g and therefore is considered                      !
acceptable.                                                                                                      l I
There were no flat bottom metal fluid storage tanks included in the safe shutdown paths. Existing flat          !
bottom tanks were reviewed, however, for problems posed to safe shutdown equipment if the tanks did              j rupture during an earthquake. The tanks in the general vicinity of the plant buildings, the Condensate          i Storage Tank and the Fuel Oil Tank, have dikes to contain any liquid if a rupture occurs. Additionally, the dike for the Condensate Storage Tank, which is located adjacent to the Turbine Building, is                  ,
seismically designed. Therefore, the rupture of these tanks have no impact on safe shutdown equipment during an RLE.
It was confirmed during the walkdown that there are no masonry or concrete block walls located near any equipment on the safe shutdown equipment list. All structures that house success path equipment or structures that could fail, fall and impact any success path equipment were screened out based on the EPRI NP-6041-SL screening guidelines and verification of the screening assumptions.
A question was raised whether a trolley and hoist on the emergency switchgear cabinets should be better secured. After further analysis and review this was determined to be unnecessary except for the hook which should not be left dangling.
All areas of the plant that contain safe shutdown equipment were checked for seismically induced flooding during the walkdowns. No problems were noted in relationship to this issue.
I 3-20                                                        l
 
PNPP Individu 1 PI:nt Examination - Ext:rn:1 Evtnts                                            j As mentioned previously, it is not the intent of this evaluation to determine the largest earthquake the site could withstand. However, for those items considered outliers during the walkdowns, HCLPF                            !
numbers were calculated, where appropriate, and compared to the RLE of 0.3g and found to meet or exceed that value. Table 3-8 provides a listing of the calculated HCLPF values.
Based on the previous discussion, the plant walkdowns have met the intent of the request in Generic Letter 88-20, Supplement 4, using the guidance in EPRI NP-6041-SL.
3.1.4.2 Relay Chatter Evaluation L The relay evaluation for a focused-scope seismic margins evaluation consists of locating and evaluating low seismic ruggedness relays.
l Appendix E of EPRI NP-7148-SL W 21 identifies the relays that have been determined to be " bad actors" or low seismic ruggedness relays. This list was reviewed against PNPP design drawings using l
the two safe shutdown success paths as a guideline to establish which drawings to utilize. The review revealed that the only low seismic ruggedness relay type within the safe shutdown success paths is the l GE HFA relay. Two areas of concem were noted. The first area of concem was the High Pressure Core l Spray (HPCS) diesel generator control circuitry. The second area of concem was in the Reactor
! Protection System (RPS) Motor Generator Set Control circuitry. Reviewing these two systems for l impact which a RLE would have on safe plant shutdown showed that the HPCS circuitry required in-                          l depth evaluation to determine the effects of relay chatter. The RPS system was screened out as not requiring additional evaluation since the low seismic ruggedness relay could result in an inadvertent trip of the recirculation pumps. Since a loss of offsite power is assumed, the recirculation pumps are already assumed lost.
3.1.4.2.1 Method of Analysis
' As discussed previously, only the low seismic ruggedness relays within the HPCS diesel generator circuitry required additional evaluation to determine relay chatter consequences. The methodology used for this relay evaluation is specified in EPRI NP-7148-SL. Since this evaluation only focuses on j the impact of relay chatter for this known specific low seismic ruggedness relay in a specific system,
[ the approach is as follows:
        . Develop the list of GE HFA relays and their associated contacts.
l e  Evaluate the relays / contacts to determine if chatter is acceptable.
        . - Evaluate those relays / contacts for which chatter is not acceptable for operator recovery                      !
action in the control room.
i i                                                                                                                            l 1
I 3-21
 
                                                                                              .            .  .  . ~
: j.                                    PNPP Individu 1 Plant Eximinition - Ext: mil Ev;nts                                  l l
l        The first level of relay screening is to identify those relays for which relay chatter can be considered        :
l          acceptable. Relay chatter can be considered acceptable if the following applies:                              ;
i e  The contacts only energize alarms or annunciator panels.                                                !
l                                                                                                                        +
i                                                                or                                                      :
e  The contact pairs change position m a portion of the circuit which is initially m a specific          -
l                  state (energized or de-energized) and the change in state of the contacts will not affect the state of that portion of the circuit.                                                                  l I                                                                                                                          !
or
                . The electrical circuitry is insensitive to relay chatter (i.e., the relay controlled device may        I respond slowly enough that relay chatter may cause either no operation or only a temporary            j but acceptable spurious operation of the controlled device).                                          '
L l
If chatter of specific relays is not found to be acceptable, the second screening criteria is whether the      [
        - effects of relay chatter can be recovered from changes of state and associated false alarm by relying          i upon the operator's actions to reset the affected relays. This requires addressing the following                l l          questions:                                                                                                      !
e  Does the control room operator have an alarm to wam of component malfunction?
e  Can the control room operator tell from other indications, gauges, meters, etc., that the component has malfunctioned?
e  If the control room operator can determine that a problem exists, can he also determine the l                  cause of the problem from the information available?
l
                . Do current procedures prevent the operator from determining the cause?
Once it has been determined that the control room operator can correctly assess the problem, the next step is to determine what means are available to the operator to correct the problem.                            !
                . Can the control room operator reset the relay from the control room?
l
* Does a plant procedure cover the' problem?
                . If there is no procedure can a new procedure correct the problem?
!              e  Does the control room operator need outside assistance, such as a maintenance technician to correct the problem? If so, is a technician always available when the plant is operating?
(          If the evaluation determines that the electrical circuitry is sensitive to the relay chatter and the relays j          cannot be recovered from changes of state and associated false alarms by operator action, other
!          additional recommendations as listed below may be pursued before re-placing the relay with a seismically qualified one.
3-22
 
PNPP Individual Pirnt Eximination - Ext 2 mil Ev;nts L
e  Test the relay and/or cabinet in question.
          . Redesign and modify the circuit to make the relay function nonessential.
* Relocate the relay to reduce seismic demand imposed upon it.
e  Stiffen the relay mounting or the cabinet in which the relay is located.
It should be noted, however, that in practice nearly any relay chatter impact can be easily corrected in a timely manner without compromising the safety functions. The automatic signal or operator action in the control room typically can be used to place the component in correct operation. Only a very few relays have seal-in circuits that cannot be reversed in a timely manner. Even if the relay has a seal-in
!    circuit, there may be sufficient time for the operator to reset the relay at the electrical cabinet. In such a case, procedures should be available in order to take credit for the operator action.
;    3.1.4.2.2 Details of Analysis A review of the HPCS diesel generator circuitry resulted in a list of 16 GE HFA relays to be considered. Screening was performed to determine the effects of the chatter on each relay / contact pair
;  - and identified those relay / contact pairs which can be considered as chatter acceptable relays or which L    require operator action to reset the relays. Each drawing was reviewed to determine the impact of l    chatter of the contacts associated with each important HFA relay. This review is essentially a failure mode and effects analysis (FMEA) of the relay.
Of the 16 HFA relays in the HPCS control circuitry,11 are classified as chatter acceptable and five as requiring operator action after the RLE.
l    Four of these five relays which require operator action are associated with the diesel generator              ;
!    protective trips which energize the Engine Trip Lockout Relay K15. Annunciators will clearly identify        !
actuation of the engine protective trips and lockout relay. In order to operate the diesel generator          !
following the seismic event, an operator resets the protective trips by push-buttons which reset the individual relays and then performs a hand reset of relay K15. These actions are performed in the            l HPCS diesel generator room.                                                                                  j
    . The fifth relay which requires operator actions to restore equipmmt if the contacts chatter is relay K14      l which trips the HPCS D/G output breaker ifits contacts close.1 operator would be notified of the opening of the HPCS D/G output breaker by the annunicators and can manually reset the tripped breaker.
There are at least 25 minutes available to perform the above actions in accordance with existing Alann        I l    Response Instructions prior to the water level in the RPV reaching the top of active fuel (TAF).
(  - The above review only considers the effects ofindividual relay chatter. The most likely scenario is that
!    the diesel Engine Trip Lockout Relay would be actuated preventing any start of the diesel. The p    actuation of this relay also ensures that the majority of the other chatter susceptible relay contacts in the 3-23                                                      l 1
  ,    e                      ,  ,-          ,-            m                        - ~
                                                                                          -w
 
PNPP Individual Pirnt Ex:mination - Ext: mil Ev:nts control portion of the circuits are in de-energized portions of the circuits and that their chatter would    ;
have no impact.
r 3.1.4.2.3 Summary of Results The chatter of the contacts associated with the low ruggedness HFA relays used in the HPCS diesel generator control circuitry would not significantly impact the safe shutdown of the plant after a RLE        r event at PNPP. This conclusion is based on one of the following criteria:
* Chatter of the low ruggedness relays is acceptable due to one of the following reasons:
a) The functions provided by the relay contacts are not required during the period of strong motion and chatter will not result in these functions being available after the strong      ,
motion subsides.
b) The contacts are associated with de-energized circuits or are for indication only or a combination of the two, and will return to their normal state after the strong motion        i subsides.                                                                                    i t
or l
* Chatter will result in lock out of HPCS diesel generator operation, however, there is sufficient indication what the problem is, the engine trip inputs are easily reset by a push-button switch, and the lockout relay can be manually reset.
                                                                                                                            )
or                                                  ;
e  Chatter will result in trip of the HPCS 4.16 kV bus diesel generator breaker if initially closed. It is unlikely that the breaker would be closed but if trip does occur, there is        i l
sufficient indication what the problem is and the breaker can be manually reset.
3.1.4.3 Seismic SpatialInteractions
{
l
;            The potential for spatial system interaction was considered as part of the seismic walkdown. System l            interaction issues are considered and noted on the screening and evaluation walkdown sheets (SEWS Forms). The following provides examples of what was included:
* Proximity: The proximity of structures to components and componue to components was considered during the walkdown. For example, the proximity of valve operators to structures and other components was considered.
* Seismic 11 over I: Although this was considered in the plant design basis, it also was          !
!                          considered during the walkdowns. Examples include considerations ofinstrument lines and the proximity of block walls to equipment.
* Seismic Spray and Flooding: The possibility of water spray and flooding impact on systems was considered during the walkdown.
3-24
 
PNPP Individual Plant Ex minatum - Extemal Events Specific seismic interaction items looked for during the walkdowru included the follogg:
Overhead potential safety impact hazards which warrant concem. This was anticipated not to be a concern due to a continuing II over I program.
Good housekeeping practices, i.e., portable equipment storage, ladders, cleaning items, etc., properly stored / secured.
l
                -
* Adequate anchorage of nearby Non-Safety Related equipment to prevent impacting item listed on the SSEL.
Potential impact effects of swinging items, i.e., piping, lighting fixtures, doors, etc.,' on other Safety Related items on the SSEL.
Adequate space between items listed on the SSEL and other items to prevent impact from differential displacement or out-of-phase response, i.e., adeqr. ate space between panels / racks and the wall. In lieu of this, adjacent items should be secured together, i.e.,
adjacent panels bolted together.
                  . Flexible connections between points of differential movement.
e  Flex conduit attached to panels and instrument racks.
l-e  Flex tubing / airline connections, i.e., there should be proper offsets in tubing runs to allow for differential movement.
3.1.4.3.1 SpatialInteraction Results The seismic' capability walkdown identified several suspect spatial interaction problems. These problems revolved around maintenance items, such as a storage cabinet, a test bench, office fumiture, a l            fluorescent light fixture, raised floor impact, and a space heater, falling and impacting electrical l            cabinets. The interaction concem with these items, besides damage to the cabinets, was inadvertent l-          relay chatter. The method utilized in evaluating this potential concem included overtum evaluation, l
o raised floor rigidity evaluation, effect ofimpact, and review of essential relays.
The fluorescent light fixture, raised floor and space heater were subsequently evaluated not to be concerns. Resolution of the remaining items include: locking the wheeh, of the test bench, providing an alternate storage cabinet that is shorter, and relocation of the office fumiture. These are considered housekeeping issues and as such are not design changes.
3.1.6 Analysis of Containment Performance l            The process used for evaluation of containment integrity was similar to that used for the safe sh'utdown success paths. In this case the function was prevention of early containment failure. A Containment
;            Integrity Equipment List (CIEL) was developed using plant drawings. This list consisted mostly of isolation valves. Some of the valves on the CIEL were also on the SSEL, primarily the injection valves 3-25 l
 
1 1
PNPP Individu9 Pl:nt Ex:mination - Ext:msl Ev nts for ECCS. A separate walkdown for containment integrity was not performed, but containment integrity components were factored into the overall seismic walkdown.
Based on the Level 2 portion of the PRA, hydrogen control features, such as hydrogen igniters, do not contribute to early containment failure and were not included on the CIEL.
The main objective of the containment analysis is to identify vulnerabilities that involve early failure of containment functions. This includes consideration of containment integrity, containment isolation, and other containment functions.
The guidance in NUREG-1407 states that " generally containment penetrations are seismically rugged, a rigorous fragility analysis is needed only at review levels greater than 0.3g, but a walkdown to evaluate for unusual conditions (i.e., spatial interactions, unique penetration configuration) is recommended." With regard to containment systems, the guidance provided is that " seismic failures of actuation and control systems are more likely to cause isolatL a system failures and should be included in the examination." The major concem dea *, with relay chatter, and is addressed by the low seismic ruggedness relay review and the spatial lateraction review performed during the walkdowns to                !
preclude inadvertent relay activation.                                                                      l l
The containment walkdown consisted of evaluating unusual conditions ,i.e., spatial interactions, unique penetrations, piping hard spots, items / components bridging the seismic gap between the containment liner and integral structure, etc. The containment walkdown was performed by the SRT at the time of the seismic capability walkdown. No unusual conditions or configurations were noted during the containment walkdown. All containment isolation valves met the screening criteria set forth by EPRI NP-6041-SL and all containment penetrations were deemed acceptable.
As stated previously, the main objective of the containment analysis is to identify vulnerabilities that involve early failure of containment functions. The SRT reviews and the walkdown performed of the containment did not identify any vulnerabilities. Therefore, the HCLPF for the containment at PNPP is greater than or equal to 0.3g, based on the results of this evaluation.
3.1.6 Fire / Seismic Interaction Fire / Seismic interactions, effects of suppressants on safety equipment, and control systems interactions we addressed in the IPEEE. As noted on the SEWS forms, during the walkdown, no adverse interactions were found. Therefore, failures of fire protection systems that lead to release of water will not have a detrimental effect on the capability of PNPP to safely shut down the reactor.
Other system interaction issues relate to the potential for the earthquake to result in a fire.
Consequently, a review of the potential fire source was performed to identify any vulnerabilities.
l The only area of concern was the Fire Service Fuel Oil Tank associated with the Diesel Driven Fire l  Pump located in the Emergency Service Witer Pumphouse. This equipment is Non-Safety Related, and
!  therefore at the time of the walkdown no qualification test results, nor seismic design existed to determine the adequacy of the fuel oil tank and stand assembly associated with the diesel fire pump.
l  However, subsequent evaluation has determined that the HCLPF value for the tank and stand assembly is 0.56g, which is well in excess of 0.3g.
3-26
 
l PNPP Individual Pl:nt Ex:minstion - Extern:l Ev:nts Therefore, it is concluded that there are no vulnerabilities due to seismic induced fire or flooding concerns.
i 3.2 USI A45, GI-131 and Other Seismic Safety issues                                                      !
The methodology used in the seismic IPEEE can also be used to address other ongoing programs where seismic events could cause licensee action. USI A-45 " Shutdown Decay Heat Removal Requirements," A-46 " Verification of Seismic Adequacy of Equipment in Operating Plants," GI-131
" Potential Seismic Interaction Involving the Movable In-Core Flux Mapping System Used in                l Westinghouse Plants," and "The Eastern U.S. Sei;micity Issue" are all issues which are classified in      !
this category. These have been subsumed into the IPEEE evaluation per the direction of GL 88-20,          !
Supplement 4 and NUREG-1407. In addition to the above issues, PNPP committed to perform a                l seismic margin assessment following the 1986 Leroy Earthquake. This IPEEE evaluation has                  ,
addressed and resolved those issues directly related to PNPP, which are discussed in additional detail    !
below.
Two of the issues, A-46 and GI-131, are not related to PNPP and as such are not discussed. PNPP is        l not required to perform an A-46 review since the plant was constructed after implementation of the        !
IEEE 344-1975 standard for qualification of Class I electrical equipment. As for GI-131, PNPP is not a Westinghouse plant, it is a General Electric BWR/6 with a Mark III containment. Therefore, this issue also does not apply to PNPP.
i 3.2.1 USl A-45 " Shutdown Decay Heat Removal Requirements" l
The external events portion of USI A-45, " Shutdown Decay Heat Removal Requirements," was                I subsumed into the IPEEE. The decay heat removal issue is addressed by the fact that the SSEL contains the equipment necessary to maintain decay heat removal for a period of 72 hours. This issue      l was evaluated as part of the IPEEE to determine if the risk due to seismic events impacts the            l Category I vulnerability classification assessed in the IPE. No potential vulnerabilities were found that would prevent this system from functioning in the design heat removal role. There were no additional USI A-45 related concerns which developed from the application of the seismic methodology at PNPP.
Therefore, this issue is considered complete for PNPP.
3.2.2 The Eastern U.S. Seismicity issue (The Charleston Earthquake issue)
The Eastern U.S. Seistnicity Issue (formerly called the Charleston Earthquake Issue) was subsumed into the IPEEE. The performance cf the IPEEE provides a resolution to this issue since the work performed on the probabilistic seismic hazard estimates by the USNRC, LLNL, and EPRI played a key role in determining the review level earthquake bins which each plant site was assigned for performing a SMA. The hazard results used in the binning process included those published in 1989 by LLNL.
Recently, LLNL performed new hazard estimates, which the USNRC has published in NUREG-1488.M These new hazard estimates are lower than those published by LLNL in 1989 but remain higher than EPRI published estimates. Based on this new information and reviews conducted by the USNRC plants binned as 0.3g focused-scope plants may modify their evaluation to allow them to be equivalent to reduced-scope evaluations. This information was transmitted to the utilities in GL 88-20, Supplement 5. The PNPP IPEEE has adopted this approach by not including reactor 3-27
 
PNPP Individuil Plint Eximinition - Ext; mil Ev:nts internals and soil-related evaluations. However, seismic capability walkdown outliers were still evaluated to a 0.3g RLE. Therefore, based on the new hazard estimates and the performance of the PNPP IPEEE to a 0.3g RLE level, this issue is considered complete for PNPP.
3.2.3 USl A-17 " System Interactions in Nuclear Power Plants" The external events portion of USI A-17, " System Interactions in Nuclear Power Plants" was subsumed into the IPEEE. Seismic spatial interactions were evaluated in the seismic walkdowns performed for PNPP. These walkdowns were performed in accordance with guidance supplied by EPRI NP-6041-SL. PNPP did not identify any seismic vulnerabilities due to spatial interections.
Therefore, this issue is considered complete for PNPP.
3.2.4 January 31,1986 Leroy Earthquake issues Due to the 1986 Leroy Earthquake, PNPP committed to perform an evaluation to determine the level of available seismic margin. The RLE for the PNPP IPEEE SMA evaluation, set at '13g is exactly twice the SSE of 0.15g utilized in the design of the plant. The successful completion oi .ne PNPP SMA at a 0.3g RLE has shown that significant margin does exist for the site and adequately addresses the post-1986 earthquake commitments. Therefore, this issue is considered complete for PNPP.
4 3-28
 
PNPP Individurl Plant Ex min tion - Ext; mil Ev:nts 3.3 References l
3-1  USNRC Generic Letter 88-20, Supplement 4, " Individual Plant Examination of External Events
        - (IPEEE) for Severe Accident Vulnerabilities," June 1991.                                    ~
3-2 NUREG-1407, " Procedural and Submittal Guidance for the Individual Plant Examination of        ;
External Events (IPEEE) for Severe Accident Vulnerabilities," Final Report, June 1991.
                                                                                                      ]
3  EPRI NP-6041-SL,"A Methodology for Assessment of Nuclear Power Plant Seismic Margin,"
l-Revision 1, AuJust 1991.
3-4 NUREG/CR-0098, " Development of Criteria for Seismic Review of Selected Nuclear Power
)        Plants," May 1978.
l  3-5 Regulatory Guide 1.60, " Design Response Spectra for Seismic Design of Nuclear Power Plants,"
December 1973.
3-6 Generic Letter 87-02, " Verification of Seismic Adequacy of Mechanical and Electrical Equipment in Operating Reactors, Unresolved Safety Issue (USI) A-46," February 1987.
3-7 Seismic Qualification Utility Group, " Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear Plant Equipment," Revision 2, February 1992.
3-8 IEEE 344-1975, "IEEE Guide for Seismic Qualification of Class I Electrical Equipment for Nuclear Power Generating Stations".
l l  3-9 USNRC Generic Letter 88-20, Supplement 5, " Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities," September 1995.
3-10 Unresolved Safety Issue, USI A-46, " Seismic Qualification of Equipment in Operating Plants," ;
        = December 1980.                                                                              ;
3-11 NUREG-1488, " Revised Livermore Seismic Hazard Estimates for 69 Sites East of the Rocky Mountains," April 1994.
3-12 EPRI NP-7148, " Procedure for Evaluating Nuclear Power Plant Relay Seismic Functionality,"
December 1990.
3-29
 
PNPP Individuil Plint Eximin: tion - Ext: mil Ev:nts Table 3 Success Path A Systems Reactivity Control l
l    Control Rod Drive system Reactor Protection System Redundant Reactivity Control System Reactor Coolant System Overoressure Protection Safety Relief Valves Emergency Core Cooling
    . High Pressure Core Spray System Division 3 d.c. Power Division 3 a.c. Power Emergency Service Water System, Train C D/G Building Ventilation System, Division 3 Diesel Room ECCS Pump Room Cooling System, HPCS Pump Room Containment Overoressure Protection Fuel Pool Cooling and Clean-up Division 3 a.c. Power cross-tied to Division 2 a.c. Bus i
l l
l l
l l
l l
3-30
 
PNPP Individual PI:nt Ex mination - Extem_I Ev;nts Table 3 Success Path B Systems Reactivity Control i
Control Rod Drive system                            .
Reactor Protection System Redundant Reactivity Control System Reactor Coolant System Overoressure Protection Safety Relief Valves Emergency Core Cooling Automatic Depressurization System (includes SRVs designated as ADS valves)
Residual Heat Removal System, Trains A, B and C (Low Pressure Coolant injection Mode of Operation)
Low Pressure Core Spray System Emergency Service Water System, Trains A and B Emergency Closed Cooling System, Trains A and B Division 1 and 2 d.c. Power Division 1 and 2 a.c. Power D/G Building Ventilation System, Division 1 and 2 Diesel Rooms ECCS Pump Room Cooling System, RHR A, B & C and LPCS Pump Rooms Safety Related Instrument Air System Containment Overoressure Protection Residual Heat Removal System, Trains A and B (Suppression Pool Cooling Mode of Operation)
Residual Heat Removal System, Trains A and B (Containment Spray Mode of Operatic.1)
Emergency Service Water System, Trains A and B Emergency Closed Cooling System, Trains A and B Division 1 and 2 d.c. Power Division 1 and 2 a.c. Power D/G Building Ventilation System, Division 1 and 2 Diesel Rooms ECCS Pump Room Cooling System, RHR A, B & C and LPCS Pump Rooms Containment Ver ting via Fuel Pool Cooling and Clean-Up Containment Venting via RHR, Trains A and B 3-31 I
 
PNPP Individu 1 Plant Ex:mination - Ext; mil Ev;nts Table 3 Pre-Screening Basis for Structures Types of Structures                        Basis for Screening Out Reinforced Concrete Category 1 Structures    Designed for SSE of 0.15g and construction details verified by drawing review.
Steel Containment Shell                      Steel Pressure Boundary keyed to basemat screened-out by drawing and USAR review.
Containment internal structures.              Designed for SSE of 0.15g and construction details verified by drawing review.
Shear walls, footings, and Containment        Designed for SSE of 0.15g and l  Shield walls.                                construction details verified by drawing review.
l Category I steel and concrete structures. Designed for SSE of 0.15g and construction details verified by drawing review.
Masonry walls.                                Not Applicable - No masonry walls utilized in any Category I structure (verified during walkdowns).
Control room ceilingF.                        Adequate bracing above ceiling confirmed by drawing review and walkdown.
l  Impact between structures.                    Screened-out by drawing review and piping review.
Category 11 structures with safety related    No safety related equipment housed in equipment or with potential to fail          Category II structures at PNPP.
Category I structures.
Dams, levees, dikes                          Not applicable to PNPP.
Soil failure modes                            Not reviewed based on input from Generic Letter 88-20, Supplement 5.
I i
r 3-32
 
I PNPP Individu11 PI:nt Examinrti:n - Ext:rn I Ev nts                            '
Table 3 4 - Pre-Screening Basis for Equipment                                ,
l 3
Types of Equipment                                  Basis for Screening Out NSSS Primary Coolant System (piping and          Screened-out based on review ofintergranular stress      !
vessel)                                          corrosion cracking documentation.                      :
NSSS supports                                    Screened-out based on design included both SSE and      .
LOCA loading (confirmed by USAR review).                I Reactor internals                                Not evaluated based on input from Generic Letter 88-20, Supplement 5.
Control rod drive housings and mechanisms        Lateral seismic support (confirmed drawing review).    !
Category I piping                                Walkdown of representative system performed.
l Valves (Active and Passive)                      Screened-out (caveats confirmed during walkdown, attention was directed to MOVs for 2 inch and under piping).
11 eat Exchangers                                Walkdown of ancharage and supports (anchorage calculation review).                                    J Atmospheric storage tanks                        Not applicable at PNPP, none in the success paths.
Buried tanks                                      Piping connection drawings reviewed.
Batteries and racks                              Battery racks designed for seismic loading, rigid spacers and end restraints present, batteries supported by side rails (confirmed during walkdown).
Diesel Generators (includes engine and skid-      Visual inspection of anchorage and mounting of mounted equipment)                                peripheral equipment performed during walkdown.
Pumps (llorizontal and Vertical)                  Screened-out (caveats confirmed by drawing review and walkdown).
Fans, air handlers, chillers, and compressors    None mounted on vibration isolators (confirmed during walkdown).
HVAC ducting and dampers                          Walkdown of representative system performed.
Cable trays and conduit                          Screened.out (caveats confirmed during walkdown).
Active and passive electrical power distribution  Visual inspection during walkdown of instrument panels, cabinets, switchgear, MCC's, cabinets,    mounting and anchorage.
and racks Transformers                                      Visual inspection of anchorage and coil restraint for dry units during walkdown.
Battery chargers and inverters                    Visual inspection of anchorage during walkdown and review of qualification testing results.
1 & C panels and racks                            Visual inspection of anchorage and equipment mounting during walkdowns along with review of qualification testing results.
Temperature, pressure, and level sensors          Screened-out based on review of qualification testing results.
3-33
 
I PNPP Individuil Plint Eximination - Ext; mil Ev;nts Table 3 PNPP Seismic Input Scaling Factors Building                Horizontal Scaling                    Vertical Scaling
!                                                      Factors                                Factors                  j l
Reactor                                          1.62                                    1.62                  ,
i l      Auxiliary                                        1.62                                    1.88 Control Complex                                  1.62                                    1.69 1
Intermediate                                      1.62                                    1.62 Fuel Handling                                    1,62                                    1.62 Diesel Generaor                                  1.62                                    1.88 Emergency Serse Water                            1.62                                    1.85 Pumphouse l
F l
i i
i f
a 3-34 J
 
l PNPP Individu:1 PI:nt Extmin' tion - Ext: mil Ev nts Table 3 FNPP Dominant Natural Frequencies of Structures Building              Horizontal Scaling            Vertical Scaling Factors                        Factors    i Reactor                              2.5 -- 9.0                      2.5 -- 9.0 i
Auxiliary                            2.5 -- 9.0                        18.0 l
Control Complex                      2.5 -- 9.0                        11.0 Intermediate                        2.5 -- 9.0                      2.5 - 9.0  :
                                                                                  )
Fuel Handling                        2.5--9.0                      2.5 - 9.0 Diesel Generator                    2.5 -- 9.0                        18.0 Emergency Service Water              2.5 - 9.0                          17.0 Pumphouse i
4 I
3-35 l
i
 
l l
PNPP Individual Plant Eximination - Ext;rnal Ev:nts l
Table 3 PNPP Percent Critical Damping Values Used for the SMA
!                Structure or Components                      Percent Critical Damping Piping Systems                                                        5.0 Welded Steel Structural Supports                                      5.0          I l
13olted Steel Structural Supports                                      7.0 l
Welded Steel Components Including Electrical Cabinets                  5.0 l Cable Trays                                                            15.0 11VAC Ducting and Supports                                            7.0 1
Welded Steel Tanks Impulsive Mode l                                                                    3.0 to 5.0
                                                                                      );
j    Convective (sloshing) Mode                                        0.5          l l Massive Low-Stress Equipment (pumps, motors, etc.)                    3.0
!                                                                                      i l Lightly Loaded Welded I & C Racks                                      3.0          l t
l l
\                                                                                      c l                                                                                      i r
i l
1 3-36
 
PNPP Individu:1 Plant Exrmin; tion - Ext:rn11 Ev:nts
!                          Table 3 PNPP Calculated HCLPF Values                      l l
l Description of Equipment Evaluated                  Calculated HCLPF Value ;
l    Diesel Generator Engine Control Panel -                                  0.58g      )
1H51-P0054A & B                                                                    l Diesel Generator Control Panel - 1H51-P0055A & B                        0.86g l    Diesel Generator Auxiliary Module -                                      0.30g      ,
IR46-S0001 A & B                                                                    i Diesel Generator Fuel Oil Day Tank-                                      1.18g 1R45-A0003A & B Fire Service Fuel Oil Tank - OP54-A0002                                  0.56g Emergency Service Water Pump Anchorage -                                0.30g iP45-C0001 A & B Shutdown Volume Drain Valve - ICIl-F0181                                0.32g l
l    Motor Operated Valve Junction Box -                                      0.44g l    1E12-F0028A
                                                                                          )
Generic Electrical Equipment Foundation Pads                            0.39g      l
!                                                                                        l 1
4 3-37
 
PNPP Individual Plant Examination - Extemal Events Figure 3 Success Path Logic Diagram (Success Path A) l Reactivity                      RPV Pressure                            RPV Coolant                          Decay Heat Control                              Control                              Level Control                      Removal Rx Scram                        SRVs Open to                          High Pressure                    Long-Term Control Rods in            Control RPV Pressure                            Core Spray                    Containment Heat Removalwith Venting 3-38
 
- - - _ _ - _ = . . . . _ _ _ _ _ _ _ _ _ _
PNPP Individual Plant Examination - Extemal Events Figure 3 Success Path Logic Diagram (Success Path B)
Reactivity                                  RPV Pressure                                                      RPV Coolant                  Decay Heat Control                                            Control                                                    Level Control                Removal -
Rx Scram                                      SRVs Open to                                                  Low Pressure                Long-Term Control Rods in                                  Control RPV Pressure                                                    ECCS            Contamment Heat Removalwith RHR                                          ,
i Long-Term
                                                                                                                                                                            -  Containment Heat Removalwith Venting 1
1
                                                                                                                                                                                                                                        ?
3-39
 
PNPP Individu:1 Plint Exrmin: tion - Ext:rnil Ev;nts 4 INTERNAL FIRES ANALYSIS 4.1 Methodology Selection The EPRI Fire-induced Vulnerability Evaluation (FIVE)l4-2) methodology was selected for the Perry Nuclear Power Plant (PNPP). Specific fire risk essessment issues raised in NUREG-1407I4'U were addressed as described below.
Fire compartments of potential risk significance were identified using the initial qualitative and      ,
quantitative screening steps defined in the FIVE methodology document up to and including Phase I and Phase II, step 2.
Those fire compartments which did not screen out by Phase II, Step 2 were subject to refined fire damage impact evaluations similar to that prescribed in steps 3 to 7 of FIVE, Phase II. The FIVE data and fire modeling techniques were generally retained, supplemented as necessary with information derived from the Fire Risk Analysis Implementation Guide, EPRI NP 3385-Oll *-'I and NSAC 181.l"I Inter-area or compartment propagation analysis was not required based on the integrity of the fire barriers as demonstrated by the review performed to address the Fire Risk Scoping Study, NUREG/CR-5088,I"I issues.
Fire frequencies in particular locations accounted for both U.S. plant generic experiencetu) and area specific fixed ignition sources. The contribution of transient fuels and sources was accounted for by    ,
addressing plant specific procedures for the control of combustibles and ignition sources, as well as by ;
considering periodic inspections for transients.                                                        ;
t Coincident failee of accident mitigating equipment was modeled, accounting for random component          !
failures and human error.
1 Fire Risk Scoping Study Issues were addressed through specifically tailored walkdowns as defined in the  !
FIVE methodology, including seismic fire interactions, effects of fire suppressants on safety related equipment, fire fighter effectiveness, fire barrier effectiveness and control systems interactions.
4.2 Fire Hazard Analysis 4.2.1 Overview The PNPP plant has already undergone an extensive deterministic fire hazards and safe shutdown review    l conducted under the 10 CFR 50 Appendix R program and was demonstrated to be in compliance.                i Although the plant information contained within the Appendix R submittals and supporting documentation provided much of the input to this IPEEE fire analyses, the underlying bases for the two studies are substantially different. Consequently, any findings or conclusions reached conceming potential fire vulnerabilities in no way contradicts or compromises the existing Appendix R analyses.
Differences in the Appendix R and fire IPEEE methodologies include:
4-1 l
l
 
PNPP Individu 1 Plint Ex:mination - Ext:rnil Ev:nts s
issue                            Appendix R                      Fire IPEEE Extent ofequipment damage            Generally assumes all            May use fire modeling to                  l equipment in fire areais        determine extent ofdamage damaged                          from specific sources Likelihood of fire                  Assumes fire may occur          Evaluates fire frequency as a regardless ofsources present    basis for estimating actual risk Coincident equipment failures Assumes equipment                      Considers random failures of unaffected by the fire will be  unaffected equipment available for plant shutdown    coincident with fire damage Opert .or reliability                Assumes operators will take      Considers potential operator actions directed by procedures error and associated                        !
having demonstrated adequate reliability                                    ;
time and access is available Offsite power                        Assumes offsite power            Only assumes offsite power unavailable                      unavailable if shown to be damaged by the fire, otherwise considers random                :
failure probability coincident with the fire Fire protection systems              Has specific requirements        Only addresses and credits fire regarding installation and      protection system operability operability depending upon      for risk significant fire fire hazard                      scenarios l
In theory the contribution to core damage frequency from fires anywhere in the plant may be assessed in detail. However this is impractical, due to the large number of possible scenarios, and is also unnecessary, since fires in many plant areas are incapable of causing significant damage no matter how severe they become. Consequently, the first stage in performing a fire analysis was to perform a systematic screening of all fire areas to identify those plant locations where fires may present a significant hazard.
1 The FIVE methodology qualitative and quantitative screening procedures were applied, as described l      below. The results of this screening are presented in Section 4.2.3 of this report.
4.2.1.1 Qualitative Screening Analysis of the Fire Areas Steps I through 6, described below apply to all plant areas with the exception of the containment. For i
various reasons, principally low fire potential, FIVE permits a less stringent criteria to be applied to the screening of containment fires. Step 7 describes this approach. Further details of the methodology can be found in Sections 5.3 and 6.3.1 of the FIVE methodology document.14-2) l 4-2 l
 
PNPP Individu:1 Pirnt Eximination - Ext;rn l Ev;nts The purpose of this task was to identify the boundaries of the plant fire areas, together with the location of l equipment and cables which, if damaged by fire, would cause a plant shutdown and degradation of                l shutdown paths identified in the PNPP Appendix R Safe Shutdown Capability Report.l"I                    That information was then used in this subtask as a basis for systematically screening out fire areas from          ,
further consideration using the non-probabilistic criteria developed in the FIVE methodology document.        l Further use was made of the information in subsequent tasks.
Steo 1 - Identifv Plant Safe Shutdown Systems The safe shutdown analysis described in the Appendix R Safe Shutdown Capability Report, and PRA models were reviewed to identify the PNPP safety related safe shutdown systems and trains. Both front line and support systems were listed. In the FIVE methodology, the target shutdown mode of operation selected should be consistent with the plant's PRA (FIVE, Section 2-10). In general, the PNPP event trees were constructed to model success paths which lead to hot shutdown. He combination of systems required to achieve this stable condition for a period of 24 hours, following various types ofinitiating events, is discussed in Section 3 of the IPE.l" Steo 2 - Identifv Fire Areas The plant was initially divided into fire areas which are physically separated from one another and have boundaries which comply with the requirements of the FIVE methodology (Definition 2.2). That is, fire area boundaries must have at least a two hour rating with all penetrations sealed with assemblies which have an equivalent rating, or an engineering evaluation must have been performed to determine whether the boundary can withstand the fire hazards within the area and protect important equipment in the area from a fire outside the area.
In several cases, compartments within fire areas were also defined. The compartment boundaries, although not fire rated, were defined where barriers exist which may provide a substantial confinement for heat and products of combustion. Further evaluation of the effectiveness of designated compartment boundaries is performed, as necessary in Step 6.
Steo 3 - Identify Safe Shutdown Eauioment in Each Fire Area and Comoartment Appendix R safe shutdown equipment and the associated cabling located in each fire area are identified in Safe Shutdown Capabilities Report. The location of selected non-Appendix R safety related equipment and cables was determined through drawing review and cable tracing effort. A summary of the damaged and undamaged safe shutdown equipment in each area and compartment was documented.
l i
4-3 l
l
 
l l
                                          ' PNPP Individuil Plint Extminati:n - Ext: mil Evznts                          i l
Stoo 4/5 - Perform Fire Area vs Safe SNMawn System Screenina i
A review of potential fire induced initiating events (e.g., loss of offsite power, LOCA or manual              l shutdown) was performed. This information, combined with that obtained in Step 3 was then used to            '!
determine whether a fire area may be screened out using qualitative screening criteria defined within the FIVE methodology, as follows.
I A fire area was screened out at this stage if:                                                                ;
i e  none of the associated compartment contains any Appendix R safe shutdown equipment or                  i cable                                                                                                  l and                                                l e  a fire in any of the associated compartments may not cause a demand for shutdown Sten 6 - Comoartment ide.J*-7 Interardian and Screenina At this stage the FIVE methodology also provides the option of evaluating individual fire compartments.        l A fire compartment interaction analysis was performed in this step to determine ifinter-compartment propagation could be shown to be ruled out. The evaluation of fire spread between compartments was performed with aid of the screening criteria presented in Section 5.3.6 of the FIVE methodology. Factors such as the characteristics of the inter compartment barrier, combustible loading, and installed fire          !
detection and suppression systems were considered.
Where all boundaries of a compartment could be screened out, i.e., risk of propagation is insignificant,        I then the screening criteria applied in Step 4/5 was re-applied considering only the potential for damage within the compartment.
Those compartments not screened out at this stage were analyzed further in the quantitative analyses.
Steo 7 - Containment Fire Evabatian l          FlVE indicates that containment fires are generally not expected to be risk significant and consequently do not provide data for quantitative evaluation. Several reasons are provided below.
                . A hot gas layer is unlikely to form in most areas which can damage cables.                            I l                e  The small number of historical events during plant operation, a large percentage of which were reactor coolant pump (RCP) fires, are unlikely to occur in the future due to oil collection system design improvements.
                . Previous fire PRAs did not show containment fires to be risk significant.
I i
f e
4-4 l
 
PNPP Individu:1 Pl:nt Ex:minition - Ext: mil EvJnts Consequently, FIVE recommends a qualitative assessment to determine if there are any unique plant features which make the plant more susceptible than those plants examined previously. Specific issues to be addressed are:
1 e    plant experience which might indicate fires have occurred frequently -                                    j i
and                                                  1
                                                                                                                                \
e    the potential for rad = dant trains of critical equipment to be exposed to the same fire plume            l or be in a confined space subject to damage by a hot gas layer.                                            l l                                                                                                                                l l        4.2.1.2 Fire Frequencies The purpose of this task was to evaluate the fire frequency for compartments which were not screened out in the qualitative screening process described above. These frequencies are intended for use in the                    l quantitative screening evaluation and detailed fire analysis.                                                        !
For PNPP, the fire frequency calculations were performed using the methods provided in the FIVE                      I methodology, Phase II, Step 1, and generic fire data information provided in the Fire Events Data                      l Base.M The approach requires the generic fire data to be weighted according to the specific types and                !
quadity of ignition sources present in the area being evaluated. FIVE provides detailed guidance for                  l determining both " Location Weighting Factors" and " Ignition Source Weighting Factors" and a                        !
formalized documentation process for recording input data and calculating fire frequencies.
                                                                                                                                )
The number, type and location of each ignition source was initially evaluated from PNPP drawings and                  :
PNPP Master System Operating Equipment data base. The information was modified as necessaiy as a -
result ofplant walkdowns.
s i
The' area / compartment ignition sources and the fire frequency calculations were evaluated using the FIVE            l software package.                                                                                                      ;
4.2.1.3 Quantitative Scrooning Analysis                                                                              l, l        The FIVE methodology permits screening of a fire area / compartment when either of the following can be 4
l        shown to be less than 10 / year:
l e    the total area / compartment fire ignition frequency
                . . the fire ignition frequency multiplied by the conditional core damage probability given loss of all equipment / cable in the compartment At this screening stage, the PRA model was used to determine the conditional core damage probability (CCDP).
i 4-5
 
PNPP Individuil Plant Eximination - Ext; mil Ev;nts 4.2.2 Assumptions and Other Modeling Considerations for Screening 4.2.2.1 Success Criteria The Appendix R analysis included equipment necessary to achieve cold shutdown. The IPEEE fire l analysis was limited to achieving a stable hot shut down state for a general transient, represented as a loss of the power conversion system (PCS), and loss of offsite power using the same success criteria identified in the Perry PRA. The potential for fire induced LOCAs was reviewed and determined to be insignificant with respect to risk.
l The first step of the FIVE methodology is to identify plant safe shutdown systems. This analysis primarily takes credit for the same shutdown systems as defined in the Appendix R Safe Shutdown Capability Repon for PNPP to achieve stable hot shutdown since the location of equipment and cable associated with these systems is known. However, experience has shown that it is also advantageous at this stage in the analysis to also be able to take credit for some selected additional' systems. For the IPEEE fire analysis, therefore, off-site power supplies to the emergency buses, high pressure core spray system, condensate /feedwater, condensate transfer alternate injection, fast firewater altemate injection and containment venting were also credited. Specific analyses were performed to identify and locate the necessary components and cables to support these functions.
l In summary the following safety functions are required for achieving stable hot shatdown:
Reactivity Control In both the Appendix R and the PRA models, reactivity control is accomplished through insertion of control rods. The effect of a fire will most likely cause rod insertion, through de-energization of the RPS,  i rather than inhibit its operation. There are also several proceduralized methods to manually de-energize the RPS by taking action either within or outside the control room. The potential for fire events to prevent adequate reactivity control is therefore insignificant.
Primarv System integrity Reactor coolant system (RCS) system integrity is required to ensure proper RCS recirculation, pressure control and inventory control can be maintained and heat removed through a steam relief valves.
j liigh Pressure Iniection
! The reactor core isolation cooling system (RCIC), high pressure core spray (HPCS) or condensate /feedwater provide a high pressure flow of water to reactor vessel to assure that sufficient water inventory is maintained in the reactor vessel permitting adequate core cooling to take place.
l 3
4-6
 
l l
!                          PNPP Individuil Pl:nt Eximiniti:n - Extsmil Evsnts
!                                                                                                                      I l Automatic Depressunzation System                                                                                  ]
i The automatic depressurization system (ADS) employs nuclear boiler system pressure relief valves to                ;
relieve high pressure steam to the suppression pool. This system operates when the high pressure                    l L injection systems are unavailable. ADS reduces the reactor pressure vessel (RPV) pressure so that flow              j i from the low pressure injection systems can enter the reactor vessel to cool the core and limit fuel                !
damage.
l Low Prassure iniardian                                                                                              l l
Low pressure injection may be used to maintain RPV inventory in the event of high pressure injection                t failure and successful depressurization of the RPV. Low pressure injection may be accomplished using                3 Trains A, B or C of the residual heat removal (RHR) system or the low pressure core spray (LPCS)                    {
system. In the event that the safety related low pressure injection systems are unavailable, low pressure          j RPV injection can be accomplished with the condensate transfer system or the fire protection system.
i Long-term Heat Removal i
Long term containment heat removal may be achieved using either Train A or Train B of the RHR system in the suppression pool cooling mode or containment spray mode of operation. For continued success of l
RCIC, the suppression pool cooling mode of operation is required. Alternatively, decay heat may be                  -
removed through containment venting via the fuel pool cooling and clean-up system lines or via the RHR lines and containment spray headers.
Process Monitorina l
Instrumentation, both in the control room and at the remote shutdown panel, has been provided to                    {
monitor primary system variables. Additional indication has been provided to monitor and control the                '
safe shutdown systems including support systems. This indication generally includes pump discharge flow and flow rate through essential heat exchangers. Necessary tank level indication is also provided.-
j 1
Suonort Systems 1
Emergency service water, emergency service water screen wash, emergency closed cooling and various HVAC systems were credited in the Appendix R Safe Shutdown Capability Report as being required to support continued operation of the front line systems.
Passive Mechanical Comoonents i
Valves, heat exchangers, and piping systems, which are exposed to the fire, remain structurally intact as a i pressure barrier or structural member of a system. Mechanical components that are exposed to a fire may be actively operated after the fire is extinguished if a local operational capability exists, i.e., a handwheel.
l  However, if there are restrictions for entering the fire affected location, e.g., restriction due to severe i  smoke levels, then the restrictions on performing the local operation noted in the Safe Shutdown l  Capability Report were also accounted for in this analysis.                                                        I 1
l                                                                                                                      !
i 4-7
 
              ~ _ ___        __._. _ . _ . - _ _ _ _ _ _ _ _.                                        _ - _ _ _ _ _ . _ _ _
PNPP Individuil Pl:nt Extmination - Ext 2 mil Evsnts In addition to the above functions, two more support functions have to be provided during a fire event,                      l namely emergency lighting.and communication. These support systems will not be included in this                                j analysis since emergency lighting is located in each fire area with sufficient Appendix R analyses to establish reliability. Portable lighting can also be utilized as needed. Emergency lighting may be                            !
incorporated, as necessary, in the human reliability analysis performed as part of the PRA process of the                    j quantitative analysis. Emergency communication can be achieved by utilizing portable communication                            j systems,                                                                                                                      j
[
4.2.2.2 Fire initiated Events                                                                                                  !
I i
Consistent with the FIVE methodology it has been assumed that a fire will cause a demand for plant                            j shutdown unless it can be shown with confidence that the damage sustained will not result m an                                !
automatic plant trip or the degradation of safety related equipment is such that a shutdown would not be                      l required within 8 hours in order to meet technical specifications.                                                              !
l The analysis utilizes the PNPP PRA initiating event categorization. However, those initiating events                          i which cannot be induced as a result of fire can be ignored. In summary, the categories of fire induced                        l initiating events which are evaluated include-                                                                                t i
e  Loss ofOff-Site Power (Type TI)                                                                                      i e  Transient with Loss of Power Conversion System (PCS) (Type T2)                                                      ;
i e  Transient with PCS Available (Type T3A)                                                                              {
i e  Fire induced LOCA due to stuck open valve                                                                            j i
Loss of OfTsite Power: One area where the fire may result in a loss of offsite power has been specifically                    i
- identified. This fire area is the Unit 1 Turbine Power Complex, ITPC.                                                        j Transient with Loss of PCS: A transient with the loss of PCS, i.e., a transient in which the MSIVs close,                      !
can occur as a result of many different fire induced faults and may even be initiated by the operator in                      j response to spurious signals or technical specification limitations. A loss of PCS transient is assumed to                    j occur given a fire in an area unless specific discussion is provided which excludes any type of fire                          i induced initiating event or identifies a more onerous event, i.e., LOCA or loss of offsite power.                            !
l Transient with PCS Available: A transient with PCS available, i.e., the MSIVs remain open and the condenser is available as a heat sink, can occur as a result of the same type of events described in the                      ;
Transient with Loss of PCS. A transient with PCS available is assumed to occur given a fire in a specific                    l area when no circuits or components are involved that would cause closure of the MSIVs.                                        ,
Loss of Coolant Accidentc: Fire induced LOCA events may occur as a result of electrically operated valves in the RCS spuriously operating. In the Safe Shutdown Capability Report, an evaluation is also                        i performed to demonstrate that the RCS integrity will not be compromised as a result of spurious valve operations resulting from fire induced electrical shorts.
J 4-8 l
l
 
l PNPP Individu11 Pirnt Eximin:ti:n - Ext;rnil EvInts Since the FIVE metodology requires the consideration of random equipment failures in addition to fire      l induced faults (whereas the Appendix R analysis does not), the Safe Shutdown Capability Report analysis of LOCA events was reviewed in order to identify any specific areas where the conclusions reached in the Appendix R study may not necessarily satisfy the IPEEE requirements.
4.2.2.3 Ignition Sources                                                                                  j l
Ignition source information was initially gathered from plant layout drawings and a print out of the Perry Equipment Master System data base, sorted by location. The ignition information was then verified or adjusted as necessary based on plant walkdowns. The approach for counting and categorizing plant locations and ignition sources followed the guidelines provided in the FIVE methodology and supporting documentation.
All electric cable construction utilized at PNPP satisfies the requirements pass the IEEE No. 383 flame test. Thus there is no contribution to fire frequency from self ignited fires in non qualified cable or associated junction box fires at PNPP.
4.2.3 Analysis Results                                                                                    l 4.2.3.1 Qualitative Screening of Fire Areas and Compartments (Phase 1)
The Updated Safety Analysis Report (USAR) designates all fire area barriers at PNPP as 3 hour rated thus satisfying the requirements of the FIVE methodology for designation as independent areas with no      3 potential for as inter-area fire propagation. Four of these areas were subsequently subdivided into        j compartments, namely the Control Complex elevation 599'-0", the Fuel Handling Building, the                l Intermediate Building and the Unit 1 Turbine Power Complex. The interfacing boundaries of these            !
compartments were subsequently examined using the fire compartment interaction analysis (FCIA) approach and were found to meet the screening criteria. A list of fire areas and associated compartments is included as Table 4-1.
l The systems which are potentially lost due to a fire in each area / compartment are summarized in Table 4-2.
l i
l 4-9
 
1 PNPP Individual Plant Extmination - Ext mil Ev nts The qualitative screening analysis was completed using the FIVE methodology, as discussed in Section 4.2.1. The following compartments were screened out:
l-l                        Fire Area /Comot                                    Desenphon lABSTWN                      Auxiliary Building Unit 1 North Stairwell 1ABSTWS                      Auxiliary Building Unit 1 South Stairwell                ;
j                      1CC3b                        Control Complex Elev 620 Unit 1 Div 3 Switchgear Room    j i                      1CC4i                        Control Complex Elev 638 Unit 1 Computer Room              '
1DGlb                        Dieel Building Elev 620 Unit 1 Div 3 D/G Room ITPC/2                      Unit i Turbine Power Complex Sub-basement 2CC3a                        Control Complex Elev 620 Unit 2 Div 1 Switchgear Room
!-                    2CC3b                        Control Complex Elev 620 Unit 2 Div 3 Switchgear Room
'                                                                                                            -l 2CC3e                        Control Complex Elev 620 Unit 2 Div 1 Switchgear Room      l 2CC3d                        Control Complex Elev 620 Unit 2 Remote Shutdown Panel    I l                    2CC3e                        Control Complex Elev 620 Unit 2 Switchgear Room Corridor 2CC4 638/654                  Control Complex Elev 638/654 Unit 2 Elevator Corridor 2CC4f                        Control Complex Elev 638 Unit 2 Div 1 Cable Chase        l l                    2CC4i                        Control Complex Elev 638 Unit 2 Computer Room 2CC5a                        Control Complex Elev 654 Unit 2 Control Room 2CCSTW                        Control Complex South Stairwell 2DG1a                        Diesel Building Elev 620 Unit 2 Div 2 D/G Room            ;
j                    2DG1b                        Diesel Building Elev 620 Unit 2 Div 3 D/G Room 2DG1c                        Diesel Building Elev 620 Unit 2 Div 1 D/G Room l                    CC2 (cmpt CC2/3)              Control Complex Elev 599 (Chemistry Lab) l                    ESW1b                        ESW Pump House-Diesel Fire Pump Room i                    FH (cmpt FH2b)                Fuel Handling Building (Elev 599 Refueling Equipment) l                    IB (cmpt IBS)                Intermediate Building (Elev 582) l                    RWB                            Rad Waste Building UNIT 2 (various)              Unit 2 (Turbine Bldg, TPC, Aux Bldg, and Steam Tunnel)
The screening results through Phase II are provided in Table 4-3.
l l
4-10
 
PNPP Individuil Ptnt Ex:miniti:n - Ext;rn l Evsnts l
l  4.2.3.2 Fire Ignition Frequencies for Quantitative Screening For each of the fire compartments located within the fire areas that were not screened out in the previous steps, estimates of the fire ignition frequency were prepared for use in the quantitative screening and detailed analyses. These estimates were based on data from the Fire Events Database for US Nuclear Power Plants and adjusted for PNPP using information from plant arrangement drawings or other documentation and equipment databases. A summary of the database appears in the FIVE methodology document. The frequencies were then updated based on the plant walkdowns that were performed for this purpose. Table 4-3 contains a summary of the fire area / compartment ignition frequencies.
l 4.2.3.3 Quantitative PRA Screening Analysis (Phase 11, Step 2)
The FIVE methodology includes a second level of screening which provides for a conservative estimation of the contribution to core darnage frequency. Generally, all equipment and cable in an area / compartment were assumed to fail due to a fire. However, in the case of compartment CC2/1 credit was taken for l  Appendix R separation to limit the damage, in accordance with the FIVE approach. Using an event tree l  representative of the most significant failure, the conditional core damage probability was calculated. If j  the product, F2, of the area / compartment ignition frequency, F1, and the conditional core damage 4
l  probability, P2, was less than 10 /yr, the area / compartment was :;creened out.
The majority of the fire areas / compartments were screened out using this approach. The results are shown in Table 4-3. More refined analyses of the unscreened plant areas are discussed in Sections 4.3 to 4.6.
l l
l l
I l
l l
l l
l 4-11
 
__              ..        .        ._.        _        ~
I PNPP Individu 1 Plant Ex min: tion - Ext; mil Ev:nts                                I 4.3 Review of Plant Information and Walkdown 4.3.1 Plant Information Sources                                                                                ,
For this analysis, plant information was obtained from plant drawings, plant instructions, and other        i documents such as the PNPP Individual Plant Examination (IPE),I4-73 the Appendix R Safe Shutdown            .
Capability Report l "3 and the Updated Safety Analysis Repon (USAR).I"3 The USAR defines the fire area boundaries, fire protection features, combustible loadings as well as        ;
location maps showing the position of Appendix R safe shutdown components. The Appendix R Safe Shutdown Capability Report defines the post fire safe shutdown design philosophy and evaluates the -
potential damage to safe shutdown systems within each fire area. This report also addresses associated circuits and the Remote Shutdown System capability which was specifically installed to mitigate transients and equipment loss due to fires in the control room. In addition, assessments for individual f'ne zones and fire areas are provided and it contains a complete discussion of the plant's fire protection program including: organizational responsibilities: fire prevention abilities (control of combustibles and ignition sources, and control of fire protection system impairments); employee training; fire brigade manning, response, training, drills, and equipment; and fire protection systems (detection, alarm and suppression systems).
Implementation of the fire protection program is govemed by specific Plant Administrative Procedures (PAPS) and Periodic Test Instructions (PTIs) which were also reviewed as part of this IPEEE project.
Examples include; PAP-1910 (Fire Protection Program), PAP-1914 (Fire Protection System Operability) and PTI P54-P00041 (Semi Annual Fire Door Inspection).
The above reports provide information on the method of Appendix R compliance, combustible loading analysis, exemption requests and engineering analyses. The existence of these reports is pre-supposed by the FIVE methodology. They were used to obtain the fire area boundary definitions, the safe shutdown and other safety related functions which may be disabled in each fire zone, and the combustible loading characteristics, including cable tray loadings and transient material inventories.
For companments requiring detailed analyses, specific power and control wires were identified through reviews of electrical schematics and control wiring diagrams. Cable routes wem then obtained from the PNPP cable pull sheets. Plant cable tray and conduit drawings were utilized to identify physical locations.
Plant drawings were also used for locating equipment to obtain information about the number and type of ignition sources and targets in each fire area. The plant specific data were used to relate generic fire frequency data obtained from the EPRI fire events database to specific PNPP fire compartments.
l l  Post fire safe shutdown procedures embodied within the Emergency Operating Procedures, Off Normal l  Instructions, e.g., ONI-C61 " Evacuation of Control Room Unit 1," were utilized in defining applicable recovery actions.
References to plant specific documents are identified under applicable sections of the submittal.
4-12 i
 
PNPP Individuil Pl nt Examin . tion - Extzmil Ev:nts 4.3.2 Outstanding Modifications                                                                                                  J NUREG-1407 requires licensees to provide a discussion of the status of Appendix R modifications. There                          i are no outstanding Appendix R modifications at PNPP with the exception of the Thermo-Lag issue.                                  !
The ongoing modifications involving Appendix R are enveloped in the resolution of the Thermo-Lag fire                          !
barrier issues stated in the Perry response to USNRC Bulletin 92-01. This involves the isolation and                            i evaluation of I hour rated raceway barriers. The resolu .on of this issue includes an evaluation of the                        l function of the Appendix R Safe Shutdown circuits protected to determine if a fire rated barrier is needed                      j to meet the requirements of Appendix R, Section III G. This will also eliminate some of the components                          !
and circuits presently identified as Appendix R Safe Shutdown circuits. The overall impact of the Thermo-Lag project on the IPEEE would result in the IPEEE intemal fires evaluation to be conservative,                          !
i.e., in general, the IPEEE did not take credit for I hour rated raceway barriers.                                              !
There were 'two exceptions to this. In Fire Compartments DGld and CC2/4, circuits from each of the Appendix R Safe Shutdown divisions pass through these fire areas. Credit was taken for a 1 hour rated                          I raceway barrier for one of the divisions in DGld. The Bermo-Lag project is evaluating this area for                            !
upgraded fire protection barriers. The circuits in CC2/4 are being assessed in the Hermo-Lag project. If                        !
necessary, upgraded fire pmtection barriers will be placed on some circuits.
4.3.3 Plant Walkdowns Several plant walkdowns were performed for the PNPP fire analysis. The main objective of these                                  i walkdowns was to gather plant data which cannot be readily derived from documented sources in order to                          ;
perform the screening and detailed analyses, as well as complete the evaluaticn of Fire Risk Scoping                            i Study issues. Another objective was to confirm that the information which was obtained from                                    i documented sources is consistent with the as-built, as-operated plant. The main walkdown activities are                        i discussed below.
Walkdowns were carried out to verify plant conditions for the Fire Risk Scoping Study evaluation.                              !
Information pertaini0g to potential seismic-fire interactions, e.g., seismically induced fires from                            ;
i hydrogen, or from stor age of diesel oil, fuel oil or lubricating oil; or seismic actuation of fire suppression systems, were obtained.
A walkdown was abo performed primarily to verify the information in the qualitative and quantitative screening analyses and obtain specific information on the type and location ofignition sources in each compartment.
i 4-13
 
  ~ _ _ . _ _                ,
i PNPP Individual Plant Ex;minati:n - Ext: mil EvInts Several additional walkdowns were performed on an as-required basis with the aim of obtaining information regarding specific plant configurations. For example, information was obtained on:
                  . Type of sealing and venting of electrical cabinets .
e  Type of confinement provided for potential oil spills e ' Separation of redundant components / wireways provided within control room cabinets e  Type and proximity of fire detectors to specific fire sources i
e  Proximity of exposed combustibles to ignition sources                                                  !
* Location and concentration ofcombustibles with respect to inter compartment boundaries All walkdowns were carried out by PNPP, Vectra and NUS personnel. The participants were either fire protection engineers or PRA specialists who, between them, possessed the following qualifications              ,
L i
e Familiarity with the Appendix R Safe shutdown paths, equipment and cable raceway layouts and Post Fire Shutdown Procedures                                                                      ,
e  Familiarity with the plant fire protection design and standards, including fire barrier                !
characteristics, fire detection and suppression systems and fire prevention measures                  j i
i                  e  Understanding of PRA models and assumptions made in fire induced conditional core                    '!
l_                    damage probability analysis                                                                            !
4.4 Fire Growth and Propagation Modeling The second part of the fire analysis dealt specifically with the potentially significant fire areas and l            compartments which could not be eliminated as part of the qualitative and quantitative screening process.
;            As previously stated, the initial quantifications assumed all vulnerable equipment in the fire l~            area / compartment would be damaged in the event of fire. This can obviously be very conservative in many cases. For example, fire damage to an elevated cable tray from a small to medium size fire, on the opposite side of a room, with no interven'mg combustibles, is highly unlikely if not impossible. Us~mg fire damage calculations, many of the fire sources can be shown to be benign based on their size and target range, and can be screened from further consideration. Furthermore, if a fire compartment is protected by an automatic fire suppression system the initial estimate of the probability of equipment damage due to fires can often be substantially reduced. Through a process of eliminating many of the ignition sources as potential causes of significant equipment damage or reducing the estimated probability of such damage, a more realistic (less conservative) estimate of the fire induced risk can be obtained.
l I                                                                    4-14 l
l
 
PNPP Individu 1 PI:nt Eximination - Ext: mil EvInts 4.4.1 Fire Scenario identification and Evaluation The detailed fire analysis is intended to refine the predicted extent of fire damage, as well as take credit for fire detection and suppression systems. Fire damage is refined by studying in more detail, the ignition source / target relationships to identify and evaluate potential fire spread and more realistically predict the likelihood ofequipment damage.
Fire areas / compartments requiring additional evaluation are listed in Table 4-10.
I In performing the detailed fire analysis the following steps were generally applied for each individual fire
! area / compartment.
: 1. A fire scenario assessment was made for each individual fire ignition source identified during the ignition frequency analysis, considering the spatial relationship of the ignition sources to equipment required for safe shutdown and intervening combustibles as well as the size of the enclosure and the fragility of the targets in question. Those ignition sources which were incapable of causing significant damage to safe shutdown equipment, either directly or as a l          result of fire propagation, were screened out.
If the product of the teidual fire frequency, fires capable of causing some damage, and the 4
original conditional core damage probability, P2, was less than 10 then the area was l          screened out and the analysis terminated .
: 2. An assessment of the probability of failure of suppression prior to damage was made based on the type of detection and suppression systems available, Pg.
: 3. The specific damage resulting from individual fires source and propagation scenarios was              t evaluated and a scenario specific conditional core damage probability evaluated, P2'.                  j l
: 4. Finally the frequency of core damage due to individual fire scenarios F 3' was then evaluated from:
F3' = FI' x Ps x P2' Where FI'is the ignition frequency of a specific fire source.
4 If the sum of all the F3' frequencies for a given area / compartment is less than 10 then the area is screened out. For those areas / compartments which do not screen out, containment performance, decay            l heat removal and potential vulnerability issues are addressed.                                                  !
l l                                                                                                                l 4-15 l
 
PNPP Individual Plant Ex: min: tion - Ext: mil EvInts 4.4.2 Fire Modeling                                                                                                  i j
1 The detailed fire modeling was performed in accordance with the FIVE Methodology. Additional                        l guidance ~ was obtained from the EPRI Fire PRA Implementation Guide,M as needed. The ignition                      l' sources, and their respective initiating event frequencies, FI', and the targets were previously determined for each fire area / compartment during the quantitative screening process. For the detailed ana'ysis the ignition source size and buming characteristics, the target damage criteria, and the source-target spatial          ;
relationship are also required. Once these items are known, a fire model can be developed. Four general            l types of fire damage phenomena need to be addressed:                                                                )
e  Damage to an elevated target located in the fire plume directly above a fire source e  Damage to an elevated target located within the ceilingjet but outside the plume l
                                                                                                                        \
e  Damage to a target located in the hot gas layer, but outside the plume and ceiling jet
        . Damage to a target located next to the fire source, exposed to direct thermal radiation l
o The effects of these phenomena may compound, e.g., a target placed in the plume of a fire may receive a            j sub-critical heat flux from plume as well as a sub-critical heat flux from a hot gas layer, but the combined        i heat flux is critical. For these situations, multiple analyses were necessary to evaluate the ultimate              !
potential for damage.                                                                                              )
These phenomena wem analyzed by utilizing Worksheets 1,2 and 3 of the FIVE methodology. The worksheets, and instructions for their use, can be found in Attachment 10.4 of the EPRI FIVE document.              j Input into these worksheets includes physical dimensions, and physical characteristics of sources,                  1 intervening combustibles and targets. The physical dimensions required include the spatial relationship              i' between the sources and targets, component room location, e.g., next to wall, in comer, etc., existence and location of barriers, e.g., fire shielding, and room size. These dimensions were obtained mainly from walkdowns and drawings. The relevant physical characteristics are principally the heat release rate and              i duration of the sources and intervening combustibles, as well as the damage and ignition threshold temperatures and fluxes for targets. The physical characteristics discussed below were selected for this screening analysis.
i i
3 i
l 4-16 i
 
PNPP Individu:1 Plant Ex:mination - Extemal Events 4.4.3 Characterization ofignition Sources For the areas / compartments analyzed in this report, the ignition sources previously determined can be      '
separated into six main groups:
e  large electrical cabinets e  large pumps and compressors
{
e  cable andjunction boxes                                                                              i e miscellaneous small fixed sou:ces e  transient sources a  we' ding sources.
These ignition sources are characterized in the following paragraphs.
Larae Electrical Cabinets                                                                                    i The total frequency of fires associated with electrical cabinets in each area / compartment was determined as part of the screening analysis. Each cabinet was then allocated a fraction of the total cabinet frequency based on its relative size number of sections or bays or the inverse of the total number of cabinets in the area / compartment. The latter approach was used where cabinets were approximately of equal size. For the purpose of this analysis all cabinet fires are conservatively assumed to result in cable ignition inside the cabinet.
All cabinets at PNPP contain IEEE qualified cable. For all cabinets containing IEEE qualified cable only, a heat release rate (HRR) of 65 Btu /s is suggested in Reference 4-3 based on a review of the Sandia          ,
Cabinet Fire Tests.I
* However, since electrical cabinets and panels come in a wide range of sizes, a single HRR was considered to be unrealistic.
For segregated motor control centers (MCC) and small electrical panel fires, the 65 Btu /s HRR was applied. For larger vertical cabinets and benchboards a HRR of 400 Btu /s was assumed based on the          j screening value for closed door vertical cabinet fires containing unqualified cable (AppendixI of            ;
Reference 4-3). Furthermore, the following assumptions were made conceming the cabinet configuration.        l l
4-17
 
l                              PNPP Individu:1 Pl:nt Exrminition - Ext rnil Ev;nts l
l                Cabinet Configuration                              Fire Modeling Assumption No ventilation                                        Cannot propagate (self limiting due to oxygen starvation)
No top penetration                                    Fire soume at height of ventilation louvers, limited radiation, subtract 20% of HRR.
Open top penetration                                  Source at top ofcabinet.
l Sealed top penetration " Fire rated" or judged        Same as no top penetration.
to be capable ofconfining a fire Sealed top penetration "Non-fire rated" Same as open top penetration.
Top penetration is a conduit, and either:            Same as no top penetration if otherwise ventilated.
a) D < 2" and L > l',                              Same as no ventilation if not otherwise ventilated.
b) D = 2" and L > 3', or c) Conduit has rated seal The total combustible loading for all electrical cabinets in each compartment was in some cases available in the USAR.tul From this reference, and walkdown information, an estimate was made as to the total combustible loading of an individual cabinet. If a cabinet combustible loading was not available, individual cabinet combustible loadings were estimated based on known loadings of other sources, and cabinet size information gained during the walkdown.
The fire duration is dependent on the HRR, combustible loading and mass bumout fraction, i.e., the fraction of mass consumed prior to bumout. The mass bumout fraction for electrical cabinets was set to l 0.7 based on review of experimental data obtained in the Sandia Cabinet Fire Tests, and documented in NUREG/CR-4527, Volume 1 of 2.I*l Large Pumos and Comr.ressors Two types of ignition can arise from pump and compressor fires; the motor windings can ignite due to some electrical fault, or bearing grease and oil may leak and burn. In either case, the HRRs are not easily defined.
For motor fires a conservative bounding heat release rate equivalent to a small electrical cabinet is recommended,i.e.,65 Btu /s.l"I The combustible loading was obtained from the USAR, or assumed from other known loadings.
l l For oil fires, the burning rate was determined on a case by case basis, and is dependent upon the physical l properties of the oil, and the spill size. Confined spill areas are dependent upon the amount of oil in the sump, and any confinements, including trays, dikes, floor slopes and drains, etc. Unconfined spill areas
: can be determined using Table 3 of FIVE. The HRR was then determined as the product of the spill area, and the unit heat release rate and combustion efficiency for the oil. The bum duration is dependent on the amount of spilled oil and the HRR.                                                                          !
4-18 l
                                                                                                              ]
 
PNPP Individual Plant Extminition - Extemil Ev;nts                                  ,
l Based on the Fire Events Data Base,tui 18 percent of pump motor fires and 2 percent of compressor fires            !
involved oil spills. These fractions were be factored into the analysis as necessary where such fires were        j i    determined to be significant.                                                                                      .
Cable and Junction Boxes 1
As indicated earlier self ignited cable fires for PNPP were ruled out due to the cables being IEEE 383            ;
rated. For similar reasons significant junction box / cable splice fires and welding induced cable fires          l l
which do not involve transient materials were eliminated in the detailed analysis. This approach is consistent with that adopted in NSAC 181.l" l    Miscellaneous Small Fixed Sources
;. There are numerous fixed fire sources with a low combustible content which are legitimate fire ignition            l l    sources. These sources include small pumps / compressors with either scaled bearings or lubr'cated by l    small amounts of grease or oil, small dry transformers and small ventilation system fans. Due to their low        I l    combustible loading, a conservative bounding heat release rate equivalent to a small electrical cabinet, or l
motor fire is recommended, i.e.,65 Btu /s. If the combustible loading for these sources was not known,              .
[    one was estimated based on other known sources. The estimated values were from 50,000 to 100,000 Btu.              i l
l Transient Sources                                                                                                  !
i i    Transient ignition sources are only. of concem if they are exposed to a critical loading of transient l    ' combustibles. The probability of having an unsuppressed critical loading of a transient combustible exposed in the compartment, Pie, can be estimated as follows:I" Pi e = Ps
* u
* p
* x/2
* In(lix)
!      where:    Psi      =  probability ofnon-suppression u        =  critical floor area ratio p-      =  probability of the critical combustible being exposed l                x        =  F,ci/F,                                                                                    i l                Feci    =
the frequency of having a critical combustible loading present                            l' F.      =  frequency ofinspections for combustibles The PNPP " Control of Transient Combustibles" procedure, PAP-1913, severely restricts the unattended storage of transient ignition sources and combustible loads in the generating facility. In general, transient l    combustible material quantities are restricted, are controlled by permit, are not taken into the plant until required to support the work activity and are promptly removed when no longer required. Flammable and combustible liquids are only used in well ventilated areas using only U.L. listed or F.M. approved containers if rat in the original manufacturer's container. Smoking is not permitted in areas where flammable and u .P>ustible liquids and gases are used, stored or handled. The storage of flammable / combustible materials adjacent to safety related areas is prohibited unless permitted by USAR Section 9A, or are administratively controlled by PAP-1913.
(
!-    Given the strict rules pertaining to transient combustibles, it is highly unlikely that large amounts of
[    debris or liquid combustible would be present for any duration of time. Ilowever, smaller amounts of 4-19 i                                                                                          _
 
PNPP Individuil P! ant Examination - Ext:: mil EvInts maintenance refuse, e.g., cleaning rags, protective clothing (anti-contamination), may not be uncommon in some safety related areas. Therefore, the transient type analyzed for PNPP will consist of moderate amounts of Class A/B mixed combustibles, i.e., paper, oily rags, polyethylene bottles, etc.
A review of heat release test data for fires involving transient material packages selected to characterize typical nuclear power plant transients has been performed by EPRI.*'l The fire types were as follows:
Worst Case Fire Fire Zone Type                                  Typical Fire                      Size Frequently occupied by plant personnel        Human Occupancy:                                310 Btu /s Polyethylene bag, paper cups, towels Only occupied for maintenance,                Maintenance Refuse:                              140 Btu /s inspection and occasional operational        Polyethylene wash bottles, buckets, reasons                                        cardboard, Kimwipes, small amounts of acetone RRA fire zone where used pmtective            Protective Clothing:                            107 Btu /s clothing (anti-contamination) may be          Protective clothing stored in bins or temporarily stored                            polyethylene bags The total combustible loading associated with each of these representative fires was approximately            7 100,000 Btu.
l The type of transient fire, e.g., human occupancy trash, must be determined for each fire compartment on      l a case by case basis. In general, human occupancy trash fires are consistent with normally occupied or heavily trafficked areas, e.g., control room, offices, etc. However, none of the fire compartments analyzed in this detailed analysis, with the exception of the control room which is discu:: sed separately, were of the !
type expected to contain human occupancy trash, so only maintenance refuse or protective clothing              !
transients were modeled. Since the maintenance refuse and protective clothing fires are relatively close in  j size, the former was conservatively chosen to represent both. A bounding 150 Btu /s HRR was chosen to        j encompass all transient combustible fires.                                                                    :
Based on the transient fire type determined for the compartment, critical vertical and horizontal separation  ;
distances were developed for all targets in the room and used to determine the critical floor area ratio, u. l A transient combustible exposure probability, p, of 0.1 was selected based on the guidance provided in        ;
  . FIVE. A Critical Combustible Loading Frequency, F g,      u of 2/ compartment / year was applied. This value was judged to be conservative based on a review of the Periodic Fire inspection Tracking log coupled with discussb.is with plant personnel. Finally, all plant areas are inspected for transient combustibles once per week, giving an a value of 52 for F,. Given these values, Pw is equal to Pai
* u
* 6.266x10-3 ,
where Pat and u are specific to individual fire areas / compartment.
4-20                                                  l
 
l PNPP Individu:1 PI:nt Eximin: tion - Ext:rnil Ev:nts Weldina Sources Hot work sources include work involving welding, brazing, open flame, soldering, grinding and thermal cutting processes. Any activity producing sufficient heat or having the potential for producing sparks or hot material which could cause combustible materials to ignite in the generating facility. Given the stringent administrative control goveming hot work at PNPP defined in PAP-1912, it is not probable for a welding fire to go undetected for any great period of time. Both the welder and the fire watch would be available to detect and extinguish any fires related to " hot work" prior to escalation beyond an incipient l
stage. This is supported by the Fire Events Database"I                                                  which shows that most welding fires were quickly extinguished. Hence, timely manual suppression was generally considered feasible for both welding cable fire and welding / cutting fire ignition sources.
Lastly, since both welding / cutting fires and transient fires involve the ignition of transient combustibles, they were analyzed together. That is, welding / cutting fires will be treated as just another transient ignition source, albeit a readily extinguishable one.
4.5 Evaluation of Component Fragilities and Failure Modes Potential targets are separated into three main categories:
e    cables serving safety related equipment e    electrical equipment e    intervening combustibles 4.5.1 Cables Serving Safe Shutdown Equipment This category is limited to cable serving equipment modeled in the PNPP PRA, i.e., cable that if lost would directly effect the value of P2. All other cable is categorized as an intervening combustible since it may indirectly 'ead to loss of safe shutdown cable. All cable at PNPP is IEEE qualified cable. The threshold damage temperature was assumed to be 700 F for cables sub ected directly to the plume, ceiling jet or hot gas layer, and2 1 Btu /s/ft for cables subjected to radiant heat.y52.53) 4.5.2 Electrical Equipment For electrical cabinets in general, the threshold damage temperature was assumed to be 248 F when 2                                                    '
subjected directly to the plume, ceiling jet or hot gas layer, and 0.88 Btu /s/ft when subjected to radiant heat.l*31 For cabinets containing temperature sensitive electrical equipment, e.g., solid state relays, the threshold damage temperature                            2 was assumed to be 150 F when subj33ected directly to the plume, ceiling jet or hot gas layer, and 0.19 Btu /s/ft when subjected to radiant heat.I Electric motors are assumed to fail at temperatures approximately 20 percent over their operating limit.l*31 Since only some electric motors are targets, i.e., many electric motors are associated with non-safe shutdown components, and each motor may be qualified for a different temperature, they were analyzed on a case-by-case basis.
4-21
 
PNPP Individual Plint Eximin: tion - Ext:rn:l Ev:nts i
1 4.5.3 Intervening Cornbustibles l
The main source of intervening combustible is cable insulation; both safe shutdown and non-safe shutdown. In this case, the most critical parameters are the piloted and spontaneous ignition temperatures.
Any other intervening combustible noted during the walkdowns was dealt with ca a case-by-case oasis.          l The piloted ignition temperature ofIEEE qualified cable is assumed to be 932 F.l4~33 Furthermore, the        !'
; time to piloted ignition of IEEE qualified cable is on the order of 5 to 10 minutes of direct flame impingement.Id-33The spontaneous ignition temperature is conservatively chosen to be equal to the piloted ignition temperature.
l 4.5.4 Characterization of Secondary Fire Sources Overhead cable trays represent the major source of exposed combustible material that 'my ignite and become secondary fire sources. The size of this secondary fire source depends upon the number and size of the cable trays exposed to the primary fire source, and the extent of fire spread. Based on actual tests, fire growth in a cable tray stack is primarily in the vertical direction; however, horizontal spread does occur as the fire progresses from one level to another.
Where required, the effects of secondary ignition of overhead cable trays was modeled in accordance with    I Appendix K of the EPRI Fire PRA Implementation Guidelines.I'~33 4.6 Fire Detection and Suppression Unless the source and target are one and the same, there is the potential to extinguish the fire prior to damage to the target occurs. Targets which are also sources are assumed to be damaged upon ignition.
Fire suppression can be automatic, e.g., wet pipe sprinkler, or Halon system, or manual. In either case, some form of detection must precede suppression. The following sub-sections describe how both automatic and manual fire detection and suppression was incorporated into this analysis.
4.6.1 Automatic Suppression                                                                                  i Credit was taken for automatic fire suppression systems (AFSS) ifit could be shown that the critical equipment in a fire area / compartment would not be damaged prior to successful suppression. In some cases, engineering judgment was used to supply justification for credit of an AFSS. For example, AFSS credit can be given for a small to medium size fire, with respect to room size, well separated from the target if the AFSS is activated by a smoke detector installed on the ceiling. In some cases, more detailed analyses were performed. This involved determining the time to detector response as described in Worksheet A-1 of FIVE, adding any actuation time delay, e.g., most total flooding CO2 and Halon systems have a time delay and warning signal to allow personnel time to evacuate the compartment, and comparing this to the damage time. If the time to damage is greater than the sum of the detection time and the actuation time delay, credit for the AFSS can be given.
l l
4-22                                                ;
i
 
PNPP Individu:1 Pl;nt Eximination - Ext:m:I Ev:nts For cases where AFSS can be credited, a suitable automatic suppression failure rate, Ps was assigned.                l Automatic fire suppression system failure rates obtained from previous studies are published in of                    i Attachment 10.3 of FIVE, and are as follows:
Halon                                                            0.05
                                            - Deluge or Pm-Action Sprinklers                                  0.05 Wet Pipe Sprinkler Systems                                        0.02                      I CO2                                                              0.04                      !
For sources where the use of the AFSS was not justified based on inadequate response time or coverage, the Psa was assigned a value ofone.                                                                                  ;
i 4.6.2 Manual Suppression
{
As with automatic suppression, credit was only taken for manual fire suppression ifit could be shown that            j the time to damage is greater than the combination of the times to detection and suppression. The time to suppression includes the detection time and the time required for fire fighters to assemble at the scene and          ,
extinguish the fire. Detection means can be either manual or from automatic detectors.                                i l
A fire watch equipped with a portable fire extinguisher is required during, and 30 minutes after                      !
completion of any work involving open flames, welding, grinding or temperatures that w3uld exceed the                !
heat ofignition of materials in contact with that work to ensure the work area is safe from fire danger. All          !
welding and cutting fires in the Fire Events Database were detected and extinguished within a few                    l minutes by either the fire watch or the welder. This implies that welding fires detected in the incipient            l stage are easily extinguished by the fire watch. Given the above informatien, manual suppression was                  !
considered possible, with an associated failure probability of 0.1, for all welding fires.                            l i
                                                                                                                  .                      t In all other cases, detection by automatic means, and suppression by the fire brigade was required. The
{
time to automatic detection is calculated as described in Section 4.6.1. In these cases, manual suppression l                  was credited if the time to damage is greater than the sum of the time to detection and the fire brigade response time to the affected fire comp-iment. The fire brigade response times was estimated based on                _j those times recorded during unannounced fire drills.
i If the drill response time is less than the detection-damage interval, the probability of manual suppression failure, Ps., was assigned a value of 0.1. This assumes that if the fire brigade arrives prior to damage, j                    90 percent of the fires will be extinguished prior to further damage. If the detection-damage interval falls i                    in the range of drill response times, Pf. was assigned a value of 0.5, i.e., the fire brigade has a 50 percent        ,
chance of arriving prior to damage. If the drill response time is greater than the detection-damage interval,        l manual suppression was not deemed credible.
l l
I i
4 i
I 4-23                                                        I
 
PNPP Individuil Plint Eximinition - Ext:rnri Ev:nts 4.7 Analysis of Plant System Sequences and Plant Response A representative detailed fire scenario analysis (Fire Compartment ICC3a) employed for general plant areas is presented in Section 4.7.1. The control room analysis, which uses a somewhat unique approach, is discussed in Section 4.7.2. Section 4.7.3 presents a review of the results obtained for all plant areas / compartments considered in the detailed analysis.
4.7.1 Detailed Analysis for Unit 1, Division 2 Switchgear Room 4.7.1.1 General Description of Area Fire Compartment ICC3a is the Unit 1, Division 2 Switchgear Room. It is located at elevation 620'-6" along the north wall of the control complex. It houses the Unit 1 Division 2 4.16 kV and 480 V Class IE switchgear, the Division 2 remote shutdown panel, and the Class 1E 480 V MCCs for power distribution to Unit 1 Division 2 safety-related equipment. Fire detection equipment for the compartment consists of ionization detectors that activate alarms in the control room. Manual carbon dioxide hose reels, water type hose stations and fire extinguishers are provided for fire suppression. A simplified sketch showing the layout of the room is given as Figure 4-1, 4.7.1.2 Ignition Source and Screening Results Summary The fixed fire sources in this compartment include electrical cabinets, junction boxes, an RPS MG set, and transformers. Transient sources, including welding / cutting fires, are credible as well. The total ignition frequency for these sources, F1, was determined in the screening analysis to be 7.994x10'3,and was distributed as follows:
Electrical Cabinets                    3.750x10'3 Junction Box in Qualified Cable        2.554x10''
RPS MG Sets                            2.750x10''
d Transients                              1.887x10 Transformers                            7.802x10" d
Welding / Cutting Fires                5.000x10 Total                                  7.994x10'3 The conditional core damage probability, P2, given loss of all components in this fire area is 7.0lx10''.
The product of P2 and F1 for this fire compartment results in an initial estimated fire induced core d
damage frequency, F2, of 5.604x10 5/yr. Since this is greater than prescribed screening criteria of 10 /yr, further analysis was warranted.
4-24
 
(
                                                                                                                  )
1 PNPP Individu;l Pilnt Examiniti:n - Ext: mil Ev:nts                                ;
4.7.1.3 Fire Scenario Evaluation                                                                                !
Fire scenarios associated with each of the ignition sources are considered in tum in the following subsections.                                                                                                    ,
l i
l  Electncal Cabinets i
The electrical cabinets include 4.16 kV switchgear associated with bus EH-12,480 V buses EF-1-C and
  . EF-1-D,480 V MCCs EFIC07, EFIC08, EFIC09, EFID07, EFID08 and EFID09 and a power supply l  cabinet for post LOCA shutdown, M51-S002. All cabinets, except the post LOCA shutdown power l  supply cabinet, which is a single cabinet, are constructed from a series of vertical cabinets bolted together l  at the sides. For clarity, each of these vertical cabinets will be referred to as a bay. The total area cabinet fire frequency Flc must be divided between the electrical cabinets. However, since some are larger than        i others, an equal split is not warranted. Therefore, a weighted fire frequency, wF1, was calculated based on
;  the fraction of the total number of sections associated with each electrical cabinet, f, as shown below:
Electrical Cabinet Weighted Fire Fi auencies (wF1)
Cabinet        No. of bays        Panel        Weighted Fire Freq
* Cabinet eld            Description      in Cabinet    Fraction (f)          (wF1)              i EH-12 (R22-S006)        4.16kV SWGR            18            0.225            3.069x10' 4
EF-1-C/EF-1-D              480 V Bus            7            0.088            1.194x10 4          '
EFIC07 (R24-S023)          480 V MCC            14            0.175            2.387x10 4
l          EFIC08 (R24-S024)          480 V MCC              4            0.050            6.820x10              :
4 EFIC09 (R24-S025)          480 V MCC              7            0.088            1.194x10              I EFID07(R24-S026)            480 V MCC            19            0.238            3.240x10"              l 480 V MCC                                                      4 EF1D08 (R24-S028)                                  5            0.063            8.525x10 480 V MCC                                                      4 EFID09 (R24-S036)                                  5            0.063            8.525x10 M51-S002                                                                              4 Post LOCA            1            0.013            1.705x10 Power Supply l
l  4.16kV switcheear and 480V Bus cabinet fires                                                                    i l                                                                                                                  1 The 4.16 kV switchgear and 480 V buses have a combined combustible content of approximately                    l 31 MBtu. Given the similarity in section size of these electrical cabinets, it was assumed the 31 MBtu can      i be equally distributed, i.e., each cabinet section contains about 1.25 MBtu of combustible. Furthermore,        l since each of the cabinets is ventilated and/or has open penetrations, in accordance with Section 4.4.3 of this report, a screening HRR of 400 Btu /s was applied.
Various simple fire modeling calculations were performed using the FIVE worksheets to determine potential target damage and time to damage. The results were subsequently used to construct fire i  scenarios with and without timely fire suppression.
4-25
 
PNPP Individu:1 Plint Eximin: tion - Ext:: mil EvInts All cable within the plume (directly above the cabinet) are subject to immediate damage if their elevation            >
is less than about 635'-6", i.e., about 7'-7" above the switchgear or Bus. All cable within the plume are            i subject to ignition if their elevation is less than about 634'-2", i.e., about 6'-3" above the switchgear or Bus.                                                                                                                  i For cable targets not in the plume or ceiling jet but exposed to the hot gas layer (HOL), the time to damage from the 400 Btu /s fire source alone, i.e., ignoring additional HRR fmm buming overhead cable,                !
is about 35 minutes.                                                                                                  l Furthermore, the ceiling jet interface is at about elevation 635'-9", i.e., about 7'-10" above the switchgear        i or Bus. For cable targets in the ceiling jet, a minimum of 2' from the plume, the time to damage is over              :
17 minutes.                                                                                                          l If the HGL were to substantially descend below the source, the potential for damage to temperature                    l sensitive electrical equipment (TSEE), and other electrical equipment exists.                                        !
i Damage to TSEE, which is limiting with respect to other electrical equipment, will occur in                          i approximately 15 minutes.                                                                                            ;
I With respect to the increased HGL temperature rise from buming overhead cable, damage is not expected                l to occur any earlier than the 15 minutes predicted above based on the following. The time to piloted ignition ofIEEE qualified cable is on the order of 5 to 10 minutes of direct fiame impingement.I*'' Some            i amount of time is also required for both fire growth of the ignition source, and growth of the secondary cable fire. Plots of HRR vs. time oflarge cabinet fires from tests at Sandia plotted in Attachment 10.3 of          i FIVE, suggest that several minutes are required for the cabinet fire to reach high HRRs. This same growth period is anticipated for the overhead cable as well. Thus, the sum of the ignition source fire growth period, the 5 to 10 minutes required to ignite the cable and the additional cable fire growth period is              j
;    probably on the order of 10 to 15 minutes. Furthermore, if the HGL were to truly descend below the                  !
i elevation of the fires, the buming efficiency would likely be reduced as oxygen is replaced by the products of combustion. And lastly, heat loss factors from test data were on the order of 0.79 to 0.93 at
!    2.5 minutes,0.94 to 0.98 at 5 minutes, and were increasing at test termination. Hence, the 0.7 and 0.8 heat          !
loss factors used in Tables A-2 and A-4 are conservative values. Therefore, it is judged that no damage to          i TSEE will occur until at least 15 minutes into the scenario.
L l    Damage to TSEE is also possible from radiant exposure. Radiant exposure is only assumed credible for non-shielded source-target pairs. Hence, for a 4.16 kV switchgear fire, only adjacent 4.16 kV cabinet
    ' sections and the 480 V Bus are exposed. Likevise for a 480 V Bus fire, only adjacent 480 V cabinet sections and the 4.16 kV switchgear are exposed.
    .The critical radiant heat flux distance was determined to be less than 8'-3". However, the 480 V Bus and 4.16 kV switchgear are perpendicularly separated by about 8'-6". Hence, radiant damage to the 480 V bus from the 4.16 kV switchgear is not predicted, and vice versa.
a If the fire can be promptly extinguished, only the source, adjacent cabinet sections and targets in the
;    plume are assumed damaged. There is no automatic suppression in this fire compartment. The limiting
;    time for manual suppression, Ts, is 15 minutes based on the time to damage of TSEE. If the time to detector actuation, To, plus the fire brigade response time, T,, is less than Te, manual suppression can be 4-26 l
 
  . _ _ _ . . _ _ _ _ _ _ .                _ .            _ . _ _ _ - . _ _ _ _ _ ~ _ - _ _ _ _ _                      . _ - .
l l
PNPP Individuil Plant Examinition - Ext; mil Ev:nts                                    l 1
credited. The detector response time was evaluated using FIVE worksheets as described in the following paragraph.
l The maximum distance from any 4.16 kV switchgear or 480 V Bus section to the nearest smoke detector is 30 feet. Based on the methods described in FIVE, the estimated time to smoke detector response, To, is            !
on the order of 16 seconds. This calculation was based on the predicted target temperature rise, a                  j detection device rated temperature rise (38'F), and detector time constant of 10 seconds recommended by              }
FIVE. Therefore, manual suppression can be credited if the fire brigade response time is less than about 15 minutes.
Fire brigade response times for Fire Compartment ICC3a are on the order of 10 minutes. Therefore, T.                l is greater than Td+ T,, and manual suppression can be credited. In accordance with Section4.6.2, a probability of manual suppression failure, P%, of 0.1 was applied.
l Given the above information, numerous fire scenarios exist involving the 4.16 kV switchgear and 480 V Bus. However they can be categorized into two main types, namely; those where manual suppression is                  t successful, and those where it is not. When manual suppression is successfbl, damage is still credible for          j the source, all targets in the plume, and all targets in the ceiling jet within two feet of the source cabinet. If - !
manual suppression fails, all components in the room are assumed to fail.
l Based on this rationale, eight potential fire damage states and associated frequencies were defined for the          ;
l              4.16 kV switchgear. Similarly seven scenarios were defined for the 480 V Bus. These scenarios together              ;
with their contribution to fire induced CDF are described in Table 4-4.                                              <
Other Electrical Cabinets                                                                                            1 The other electrical cabinets include the MCCs and the post LOCA power supply cabinet, M51-S002. As                  j previously stated, the MCCs are constructed of several vertical cabinets bolted together to form an l              elongated vertical cabinet. Each vertical cabinet, or section, consists of several stacked cubicles which are open to one another. A 65 Btu /s fire source was used in this case.
!              There is a total of 24,960,000 Btu in the Fire Compartment ICC3a MCCs. Assuming each of the 54 MCC bays is equally loaded, and has a mass burnout fraction of 0.7, the total heat released from any
;              one MCC cabinet section is approximately 325,000 Btu. Some initial screening calculations were
,              performed on these fires as described below.
l A 65 Btu /s MCC fire will not produce a hot gas layer sufficient to damage overhead cable. The ceiling jet interface is at about elevation 636'-2". Also, for cables outside the plume, but in the ceiling jet, no damage is expected unless the conduit is within 7 inches of the MCC. This assumes that the MCC is against the wall thereby increasing the effective heat release rate. Next, by using the same source height and heat loss fraction used for the 4.16 kV switchgear and 480 V Bus, it was shown that TSEE is not susceptible to damage from a hot gas layer formed from an MCC fire which descends to near the floor.                                  I
>                                                                                                                                    l t              Finally, the critical radiant heat flux distances to electrical equipment and TSEE from any 65 Btu /s source
;              are about l'-6" and 3'-4", respectively. Note that the two closest MCCs, i.e., electrical equipment, EFlD07 and EFID08, are about 2 feet apart. Also, the closest distance between the 4.16 kV switchgear or 4-27 i
i
 
(                                                      PNPP Individuil Plant Examination - Exttmal Evsnts 480 V Bus, i.e., TSEE, and any MCC is about 4 feet. Therefore, the only concern for MCC fires are l
targets in the plume.
I With respect to the post LOCA shutdown power supply, an estimate of about 15 pounds of combustible material, plastics and cable insulation, was made based on visual inspection during the walkdown
!                        resulting in a combustible content of about 150,000 Btu. Assuming a 0.7 mass bumout ratio, a total heat t
release of about 100,000 Btu is expected. Furthermore, as with the MCC, the small size would indicate that a heat release rate of 65 Btu /s is credible. Since M51-S002 is smaller than an MCC, all damage ranges are bounded by that of the MCC except for the ceilingjet damage range.
ne ceiling jet temperature is a function of the effective heat release rate, and since this cabinet is in a comer, its effective heat release rate is higher than that of any MCC. Damage is not expected for cables in the ceilingjet at least 6 inches away from M51-S002. Note that although the effective heat release rate for
                        ' M51-S002 is greater than that for an MCC fire due to the location factor, the horizontal separation distance from the ceiling jet is actually 1 inch less. His is due to the fact that the post LOCA shutdown panel is a much shorter cabinet than the MCCs, and therefore, the distance between the source and ceiling is greater for M51-S002.
i                        It was noted during the walkdown that the MCCs were constructed with no openings between adjacent individual bays, and cable bundles were generally vertical. Therefore, based on review of cabinet fire tests
[ Appendix H of Ref 4-3], fire spread between open top MCC sections is not likely, and was assumed to not occur. It was also noted during the walkdown that the conduit penetrations in three of the six MCCs, EFlC07, EFIC08 and EFID09, were sealed.
Since each MCC panel is constructed of several cubicles filled with electrical equipment and cable, very little free volume is available. Therefore, a fire in an MCC section would likely self extinguish due to oxygen' starvation before propagation to an adjacent section. Therefore, cabinet fire propagation for the          1 sealed MCCs was assumed to not occur.
As stated above, MCCs EFIC07, EFIC08 vcd EFID09 are sealed. Therefore, damage is limited to the loss of the safe shutdown equipment served by these MCCs. These scenarios are included Table 4-4.
EFIC09 is an open top MCC located in the center of the room. Two conduits, IR22C205X and IR33C5520X, pass over the MCC, but do not contain safe shutdown cable. Three trays would be in the plume of a fire from this MCC. Trays 1356 and 1649 contain cable for safe shutdown equipment and
,                        would be damaged. Simple FIVE fire modeling demomtrates that tray 1649 would be the only tray with l                        undamaged cable. Piloted ignition of only tray 273 is hkely, i.e., plume temperature rise at target is much l                        greater than 932*F. However, since cable in trays 1356 and 273 would be damaged, both Methods A                    ;
!                        and B would fail; hence, MCC EFIC09 is not screened. This scenario (# 17) is included in Table 4-4.
!                                                                                                                                            I i                        EFID07 and EFID08 are open top MCCs located against the south wall of the room. Several conduits j                        pass over or near these MCCs, but do not contain safe shutdown cable. For a fire in either MCC, three l
trays would always be in the plume,271,1321 and 1320, all of which contain cable for Methods A and B.
l 1                        These trays have vertical separation distances of l'-11",3'-3" and 4'-7", respectively, from either MCC.          !
Also, depending on which panel the fire occurred in, an additional vertical tray (1371,1372,1373,1374, 3
1375,1376,1377,1378,1384 or 1385) carrying Method B cable would be in the plume.
i j                                                                              4-28 i
 
PNPP Individuil Pl~nt Ex:mination - Ext; mil Evznts Simple FIVE fire modeling demonstrates that cable in all of the trays would be damaged and trays 271 and 1321 are likely to ignite, thereby damaging safe shutdown equipment. Therefore, neither MCC EF1 D07 nor EFlD08 was screened. These scenarios (#'s 18 and 19) are included in Table 4-4.
M51-002 is an open top cabinet located near the northwest comer of the room. Several conduits pass over or near this cabinet, but only 1R33C5423B, which is vertically separated from M51-002 by 7'-0",
contains safe shutdown cable. For a fire in this cabinet, five trays would be in the plume,363,1605,1809, 1317 and 272. These trays have vertical separation distances of 3'-8", 3'-8", S'-0", 6'-4" and 7'-6",
respectively. Trays 1317 and 272 contain safe shutdown cable, the others contain do not.
Simple FIVE fire modeling demonstrates that all cable with at least a 6'-8" vertical separation distance would not be damaged. Trays 363,1605 and 1809 would most likely ignite, thereby probably damaging tray 272 and conduit IR33C5423B as well. Therefore, since safe shutdown equipment would be damaged, M51-S002 was not screened. This scenario (# 20) is included in Table 4-4.
Junction Boggs -
Although " Junction Box in Qualified Cable" is listed as a potential ignition source as part of the FIVE Phase II, Step i evaluation, it is not considered a significant risk as discussed in Section 4.4.3.
RPS MG Sets An RPS MG Set is contained in a totally er; closed room within this fire area. The room has an approximate area of 170 ff. There is very lble combustible material in this room, only a small amount of cable, two small transformers and the MG Set. The MG Set is lubricated by a small amount of grease.
Also, the plant walkdown confirmed that there was no concentration of combustibles near the boundary and no combustible pathway exists between the MG Set room and the remainder of the fire area.
The total combustible content in the RPS MG Set room is estimated to be less than 3 MBtu. Therefore,
  . the combustible loading for the room is less than about 18,000 Btu /ff. Since this room has automatic smoke detection, the combustible loading is less than 20,000 Btu /ff, and there is no concentration of combustibles near the boundary or combustible pathway across the boundary, the MG Set room was treated like a separate fire compartment.
A fire in the MG Set room would at most cause a reactor scram trip. Since no shutdown components          .j would be disabled, the RPS MG Set and the transformers in the room (see Transformers subsection            ;
l  below) were screened from the analysis.
l Transformers                                                                                                ,
There are eight transformers in the fire area. Two are large 4,160/480 V transformers, EHF-1-C              l (R23-S011) and EHF-1-D (R23-S012), and six are small (less than about 50 KVA) transformers,
. R25-S034, R25-S5002, R25-S027, R25-S035, R25-S128 and R71-S076. All of the transformers are vented near or at the top, and are dry t pe. The transformer fire frequency, Flig, was equally divided among all eight transformers (9.753x10'y/ transformer year).
i 4-29
 
PNPP Individu 1 Plint Eximin: tion - Ext:rn 1 Ev:nts R25-S034 and R25-S5002, are contained in the MG Set room, and as discussed above are screened from the analysis.
R23-S011 and R23-S012 are large transformers with a fairly large amount of combustible in the form of cable insulation. Much of the insulation is in the interior windings and is not accessible; however, these sources will be assumed equal to the 400 Blu/s cabinet sources. Therefore, the 480 V Bus cabinet sections they are attached to would be considered damaged, i.e., adjacent cabinet sections are assumed damaged.
Due to the separation distance of at least 8'-6", radiative damage to the 4.16 kV switchgear is not predicted.
Both transformers are within the 30 foot range used to calculate smoke detector response. Therefore, in        !
the same way as employed for the large electrical cabinets, a P. of 0.1 was applied for these large            {
transformer fires. Recall that even if suppression is successful, damage is still credible for the source, adjacent cabinet sections, all targets in the plume, and all targets in the ceiling jet within two feet of the source transformer. If manual suppression fails, all components in the room are assumed to fail. The R23-S011 and R23-S012 fire scenarios can be characterized as follows.
R23-S011 is the large 4,160/480 V transformer attached to the west end of, and is the normal power supply to,480 V bus EF-1-C. A fire in this transformer would result in a loss of power to EF-1-C if the EF-1-C to EF-1-D cross-tie breaker could not be closed. Since a section of EF-1-C is adjacent to R23-S011, a ground fault was assumed to occur to the bus, and therefore, re-energization of the bus by closing the cross-tie breaker is not credible. Targets in the plume or ceiling jet of a potential fire in R23-S011 include cables in trays 272,366,1317 and 1608 and six conduits. Trays 272,1317 and 1608 contain shutdown cable, whereas tray 366 does not. The conduits include IC95R157B, IC95R158B, IR22C204X, IR25B266X, IR33B27X and IR33R1438B; none contain cable serving shutdown equipment.
As in the case of cabinet fires, transformer fires are categorized as suppressed and non-suppressed. The resultant two R23-S011 fire scenarios (#'s 25 and 26) are listed in Table 4-4.
R23-S012 is the large 4,160/480 V transformer attached to the east end of, and is the normal power supply to,480 V bus EF-1-D. A fire in this transformer would result in a loss of power to EF-1-D if the EF-1-C to EF-1-D cross-tie breaker could not be closed. Since a section of EF-1-D is adjacent to R23-S012, a ground fault was assumed to occur to the bus, and therefore, re-energization of the bus by closing the cross-tie breaker is not credible.
Targets in the plume or ceiling jet of a potential fire in R23-S012 include cables in trays 272, 366, 597, 1317,1608 and 1649 and six conduits. All but tray 366 contains cable associated with safe shut down equipment. The conduits include IR33Cl219X, IR33Cl220X, IR33Cl221X, IR33Cl222X, IR33R1338X and 1R33R1369C; none contain safe shutdown cables.
The resultant two R23-S012 fire scenarios (#'s 27 and 28) are listed in Table 4-4.
The remaining transformers are all telatively small transformers with minimal combustible material. They are assumed to contain about 200,000 Btu of bumable combustible (based on comparison of other combustibles in the room - 100,000 Btu for M51-S002, and 325,000 Btu /MCC cabinet), and are expected 4-30 1
 
PNPP Individu;l Plant Ex:mination - Ext; mil Ev:nts to burn with a HRR of about 65 Btu /s. Therefore, they are bounded by the criteria of the other 65 Btu /s sources, i.e., only targets in the plume are of concem.
R25-S027 is a located in the center on the room. Several conduits pass near this transformer, but do not contain safe shutdown cable. This source is, therefore, screened out as having little or no impact on the fire induced core damage frequency for ICC3a.
R25-S035 is located against the north wall of the room 6etween EFIC07 and EFIC08. R25 5035 is no closer than 2 feet to either MCC. Since the critical radiant heat flux distance for electrical equipment is about l'-6", no radiant damage is expected to either MCC from a potential fire in R25-S035. Here are no conduits passing near this transformer. The closest trays in the plume are 370 and 1318 which have respective vertical separation distances of 4'-2" and 5'-6".
Simple FIVE fire modeling demonstrates that cables in tray 1318 are not subject to damage. Those in tray 370 may be damaged, but would not ignite, i.e., plume temperature rise at target is less than 932'F - Toms.
However, tray 370 contains no shutdown cables and the source can therefore be screened out.
Transformers R25-S128 and R71-S076 are located against the north wall of the room more than 5 feet from the 480 V bus. Since the critical radiant heat flux distance for sensitive electrical equipment is about 3'-4", no radiant damage is expected to the 480 V Bus from a potential fire either transformer. Here are no conduits passing near these transformers containing shutdown cables. The only tray in the plume of either transformer is 597 which does contain shutdown cable. Tray 597 has a vertical separation distance of 6'-2" above both transformers.
Simple FIVE fire modeling shows that cables in tray 597 are not subject to damage. Therefore, since no safe shutdown components are damaged, R25-S128 and R71-S076 can be screened from further analysis.
Transients and Weldina/ Cutting Fires In accordance with Section 4.4.3, transient combustibles left in the area are likely to be maintenance refuse with a combustible loading of about 100,000 Btu, and a HRR of 150 Btu /s. Using the FIVE worksheets, critical cable heights of 6'-4", 8'-0" and 10'-3" were calculated for transient fires in the center of a room, against a wall, and in a comer, respectively. Out-of-plume damage only occurs inches from the source. Direct radiant damage was found to be possible when the source was within 2'-2" of cable.
With respect to electrical equipment, not even TSEE, damaged at 150 F, would be subject to damage vom the HGL formed by a transient fire. However, direct radiant damage was found to be possible when the transient source was within 2'-4" of electrical equipment, and within 5'-0" of TSEE.
Also, since there is no automatic suppression in this fire compartment, Pa, was set to 1.0 for transient fires, i.e., no automatic or manual suppression, and 0.1 for welding / cutting fires (see Section 4.6.2).
Finally, based on the previously calculated critical vertical and horizontal separation distances discussed above, the critical floor area ratio, u, was conservatively calculated to be 0.46.
A, 4-31
 
PNPP Individuil Plint Ex minition - Extsmil EvInts Inserting the values listed above for Pm and u into the equation for Pw (see Section 4.4.3), a probability of 2.882x10'' was calculated for P for transients, and 2.882x10" for welding / cutting fires. The product of 4                        4 +
F1 and the sum of Pe for both transient and welding / cutting fires,6.876x10      (1.887x10" x 2.882x10 d
5.000x10" x 2.882x10 ) is the probability of having an unsuppressed critical loading of a transient combustible exposed to a transient or welding / cutting ignition source in the compartment. For the purposes of this screening analysis, these unsuppressed transient fires are assumed to damage all equipment in the room. The transient and welding / cutting fire scenario (# 33) is listed in Table 4-4.
4.7.1.4 Determination of Core Damage Frequency l In order to determine the effects of each fire scenario, it was necessary to determine which safe shutdown j equipment would be lost due to fire damage to the associated individual components cable trays and f conduits.
The worst case impact due to fires in this area was determined during the screening analysis which 4
j evaluated the CCDP given all equipment disabled as 7.0lx10 . In this case the dominant core damage i sequence involved successful injection followed by random failure oflong-term heat removal (via RHR or venting). Consequently, emphasis was placed on identifying the precise level of damage to the heat removal functions (-W and -Y) in each scenario. Table 4-4 summarizes the results of this investigation in tenns of the functions served by individual target cable trays and components. As a result four unique damage states were identified and assigned to particular fim scenarios:
e  Fire Damage State 0 is identical to the worst case condition identified in the screening and results in loss of RHR B heat removal via suppression pool cooling and containment spray, as well as containment venting paths via FPCC, MSIVs and containment spray train B. This may occur due to fires which occur in the 4.16 kV switchgear, non suppressed electrical fires which disable specific overhead trays (with no opportunity for suppression) or electrical fires with failure of timely manual suppression which msult in room temperatures beyond the limits for sensitive electrical equipment.
      . Fire Damage State 1 results in loss of RHR B heat removal via suppression pool cooling and containment spray, as well as containment venting via MSIV paths B and D. However, venting via both containment spray paths A, FPCC and MSIV paths A and C remain operable. This may occur due to fires in MCCs EFIC09, EFID07 or EFlD08 which damage trays directly overhead but is suppressed prior to causing excessive room temperatures.
      . Fire Damage State 2 results in loss of RHR B heat removal via suppression pool cooling and containment spray, as well as venting via FPCC and all MSIV paths. However, venting via both containment spray paths A and B remain operable. This may occur due to fires in 480 V Bus EF-1-C which damage trays directly overhead but is suppressed prior to causing excessive room temperatures.
:      e  Fire Damage State 3 does not result in significant damage.
i 4
. The total core damage fmquency for all 33 Fire Area ICC3a fire scenarios is 1.%x10 /yr.
4-32 i
 
i PNPP Individu11 Pirnt Ex: min: tion - Extsmil Ev:nts                            ;
L  4.7.2 Control Room Analysis                                                                                  l l
l 4.7.2.1 General Approach                                                                                      l l
The general philosophy for fire evaluation of control room fires follows the approach suggested in            i NSAC 181 I'* and EPRI document RP 3385-01.I''3I It is similar to that adopted in other areas but differs in two respects.
f
: 1. Detailed fire propagation analysis was not performed since there are no acceptable models for        !
modeling propagation within and from cabinets. Instead various assumptions were made, supported by the results of the Sandia cabinet fire tests'#I  l      in which all tested fires self-extinguished, and by the reports of control room fires in the Fire Events Data Base.I"I        l The following general assumptions were adopted:
l
            . No inter-cabinet fire spread is assumed since individual cabinets are separated by                ,
!                double steel walls.                                                                            :
            . Fire spread between cabinet bays, which are separated by a single thickness steel wall, may occur. However, the delay time for propagation (> 15 minutes) is such that control l-              room evacuation would have occurred at or about the same time. Therefore, inter-bay fire propagation is generally not a significant concem from a risk perspective.
            . No damage to equipment adjacent cabinets is assumed due to the intervening double steel walls.                                                                                    j i
e  Fire damage to equipment in adjacent cabinet bays may occur if the fire is not                  ;
extinguished in a timely manner.
: 2. Regardless of the level of damage which is actually sustained as result of a fire, the              ;
production of smoke may necessitate the evacuation of the Control Room. Under such                  l circumstances the operators will isolate the Control Room and shutdown the plant using the          3 Division 1 Remote Shutdown Panel (RSP). Re-entry into the control room is credited for the j            operation of long term heat removal functions (providing that the associated controls are not l            damaged) which are not required for several hours.
l l  The evaluation of control room fires required analysis to detennine those cabinets or combination of i  cabinet bays in which enclosed fires might cause significant degradation of accident mitigating systems.
Fire scenarios in such cabinets were evaluated individually. Fires in the remaining cabinets were evaluated as a group for their potential to cause the operators to evacuate the Control Room and shutdown the plant using the Remote Shutdown Panel, or locally operated equipment.
1 i
-  The methods for frequency analysis, propagation analysis and suppression analysis are discussed in the        !
following sections.                                                                                          l i
i 4-33
 
PNPP Individu;l Plint Extmin: tion - Exttmil Ev:nts L
l                4.7.2.2 Description of Area and Associated Fire Protection l.
l The general layout of the Control Room is shown in Figure 4-2.
l                The Control Room (Fire Area ICC5a) is situated on the fifth level of the control complex at elevation 654'-6" and is separated from other adjacent fire areas by three-hour rated fire barriers. All penetrations have 3 hour-rated seals. The combustible loading in the Control Room is approximately 171,818 Btu /ft2, Safe shutdown equipment located in this fire area consists of consoles and control panels. All circuits
;                enter and leave the control room via termination cabinets located against the north and south walls of the i                control room. Cables are routed between various panels via cable ducts located in the steel plate raised l
floor sections. Redundant divisions of cabling are routed in separate cable ducts and generally in separate bays of the termination cabinets.
l                The control room HVAC system, M25, and the Control Room Emergency Recirculation System, M26, operate in conjunction with each other using shared ducts and fans. In the smoke clear mode, the M25 i
supply and exhaust fans operate with a flow rate of 30,000 cfm equivalent to a purge rate is about 5 air changes per hour.
                . Fire detection in the Control Room consists of heat detectors and ionization smoke detectors covering the    l
:                floor section modules and ionization detectors covering the control room proper. There is no automatic
!                fire suppression system installed in the Control Room. Fire suppression equipment consists of manually activated carbon dioxide total flooding system for the cable ducts in the sub-floor sections. The sub-floor l
l                is divided into three main sections and should a fire occur in may one of these the ducts, all the ducts in    l
              . the entire section are flooded simultaneously. Manual water type hose stations and water, Halon, dry chemical and carbon dioxide type fire extinguishers are also provided for back-up suppression.
In the event of a fire in this area, normal control of all accident mitigating systems could be lost or i                operators could be forced to evacuate the Control Room. In such cases operators would preferably use the Division 1 Remote Shutdown Panel (RSP) located in Fire Area ICC3d to shutdown the plant from outside the main control room. Control functions are isolated from the main control room and control power supplies are duplicated / protected as necessary such that a fault in the main control room will not interfere with control from the RSP. The back-up Division 2 RSP, in conjunction with individual breaker switches in the Division 2 switchgear room, may also be utilized if necessary. However, the same degree r                of control power protection is not provided in this case. In such cases operators would follow integrated I
operating instruction 101-11.M i
l l
c l
4-34 l
l
 
_..m  . _ _ . ,          _..__ _._ _ _ . _ .                          __    ._            _ . ~ _ _ _ . _.        _  -
PNPP Individu 1 Pirnt Ex:minati:n - Ext mil Ev:nts 4.7.2.3 Fire Hazard Review The fire frequency in the Control Room was evaluated in the screening analysis (FIVE Phase II Step 2) as l        1.033x10-2/yr, i.e., about one control room fire for every 100 years of reactor operation. This fire frequency is comprised of the following contributions:                                                              j Control room location frequency                    9.500x10''/yr d
Plant Wide Sources                                  8.300x10 /yr i
In fact, the Fire Events Data Baseful on page 3-17 indicates that plant wide component based fires should not be applicable to the Control Room since no control room fires weir considered in plant-wide bins.                l l        The plant wide sources include transient combustibles, welding cable fires and welding / cutting fires. The          l l        PNPP. FIVE analysis is, therefore, overly conservative and a fire frequency of 9.5x10''/yr is more                  j appropriate.
.        The Control Room fire frequency is based on twelve fires which actually occurred in contml rooms,                    :
l        eleven of which were cabinet fires and one of which was a kitchen fire. None of the fires have been of              i I        significant severity and all were extinguished or self extinguished within a few minutes. No control room
!        fires to date have required evacuation of the Control Room.                                                          l v
l        Potential sources of fire in the PNPP control room include the control panels, termination cabinets,                i electrical junction boxes, and transient sources / combustibles.
In the control room, transient fires do not pose a significant risk because it is continuously occupied and the likelihood that a transient fire would not be detected and suppressed in its incipient stage is very            j small. Furthermore, since there are no exposed fixed combustible materials in the room there is no                  !
possibility of a growing transient induced fire. Transient fires are therefore discounted.                          ;
Fires induced by electrical termination faults located in the termination cabinets orjunction boxes are not          j considered significant fire sources given the low operating currents and over-current protection devices.            l Even if a small fire were to develop in the tennination cabinets or the under floor ducts the fire would not        ;
propgate due to the lack of a fresh air supply and the use of IEEE 383 cable. A comprehensive fire                  l analysis of the raised floor sections,tu2) including full scale fire tests, found that a ventilated fire initiated  l in one section, using simulated transient material, will neither propagate through the installed combustible        !
material (cable insulation) nor will'any damage to cable in an adjacent floor section occur. Thus in the highly unlikely event that a fire did occur, damage would be confined to one electrical division.
;        Thus, the only potentially significant control room fires postulated are those which occur in control j        panels. This is consistent with the approach adopted in NSAC 181.l"I                                                '
l l
L l
I 4-35 i
 
PNPP Individu 1 Pl:nt Eximination - Ext; mil Ev nts i
l l 4.7.2.4 Fire Induced Equipment Failures for Enclosed Cabinet Fires                                            ;
l
>                                                                                                              I Fire-induced equipment failures in a cabinet were evaluated as described in the following subsections.      ;
Determine Critical Cabinets                                                                                  ,
Determine critical cabinets whose fire-induced failum would degrade safety related equipment reoired        i for hot shutdown.
l                                                                                                              <
Information derived from control room design drawings which associate one or more electrica! 9ivisions l with each cabinet, supplemented with additional cable tracing efforts were utilized to define or bound the l potential system loss due to a fire in each control room cabinet. Cabinets serving Offsite Power supplies,  2 RCIC, IIPCS, ADS valves and the FPCC valves and MSIVs which could be used for containment venting were specifically identified. Other system failures were assumed if the particular cabinet under consideration contained associated divisional control equipment, e.g., LPCS was assumed to fail due to a fire in any cabinet designated as Division 1.                                                                ,
All control room fires were assumed to result in a permanent loss of main feedwater/ condensate and other balance of plant systems.
As a first step in identifying significant fire locations, cabinets have been grouped according to the potential fire impact on shutdown capability, as shown in Table 4-5.
The specific cabinets which fall into each group are listed in Table 4-6.
Determine the likelihood of a fire occurrina in a critical cabinet The frequency of fire in each individual cabinet is evaluated as a function of the relative size of each cabinet and the overall cabinet fire frequency for the entire control room. This approach attempts to account for the relative number of potential ignition sources in cabinets of different size.
Each of the cabinets (see Figure 4-2) are divided into separate bays, each bay being of approximately similar size, with the exception of the main console. Consequently, the relative size of each cabinet can be j measured in terms of the number of associated bays.
Therefore, for example, the frequency of fire for the Emergency Core Cooling Bench Board (P601) is calculated as follows:                                                                                      )
          = F1 (control room) x              No. of bavs in P601 Total No. of bays in all cabinets (183) l i
(
l
          = 9.500x10'3/yr x 7/183 = 3.634x10"/yr The number of bays in each cabinet and the associated fire frequency is shown in Table 4-6.
4-36
 
f PNPP Individu;l Plant Ex:minatirn - Exttmil Evsnts Datarmine Fire Severity to Fail Critimi Furw*ims Determine how severe a fire would have to be to fail the critical functions supponed by a particular cabinet bay or combination of connected cabinet bays.
The equipment located within a PNPP control room cabinet is separated from adjacent cabinets by double steel walls. The cabinets themselves are subdivided into separate bays. In many cases a single bay will only contain equipment associated with one electrical division. However, in cases whem this separation is not maintained, conductors associated with different divisions are separated according to IEEE 384 separation criteria.
The only ignition sources present within the electrical cabinets occur due to electrical faults. If the l  damage can be confined locally to the site of the overload, which is in fact the most likely situation given historical experience with control room fires, i.e., the faulted component or associated wiring, the resulting impact will be bounded by the random failure of the component itself, which has aheady been          ,
,  accounted for in the intemal events PRA model. Consistent with the Sandia cabinet fire tests, it was            l l  assumed that a fire in one of the contml room cabinets will generally not impact equipment in another -        l (see discussion above). However, a fire in one bay of a cabinet, if not extinguished in a timely manner,        j may damage components in adjacent bays. All equipment in the cabinet bay in which the fire originates,        j or propagates to, was assumed to fail immediately.                                                            ;
i It therefore remains to determine what opportunity exists for extinguishing a fire before it can develop      !
and damage components in an adjacent bay. The evidence from the Sandia cabinet fire tests can be used          ;
,  to establish the time required for the progression of fire damsge. These tests indicate that between 8.5 and  l l  11.5 minutes, i.e., about 10 minutes, elapsed between smoke first being observed coming from a cabinet        i l  initiation and significant heat generation,10 to 20 kW. This is tenned the pre-growth fire development        ;
phase. The tests also indicate that once fire growth begins it may progress rapidly, as may the rise in        l cabinet air temperature.                                                                                      !
l Ionization fire detectors located in the PNJP control room ceiling will detect the fire shonly after the initial smoke emission. Thus, allowing 3 moutes for the detectors to actuate, credit will be given for preventing inter-bay fire damage propagation wain the first 8 minutes after fire detection. This is termed the pre-growth phase. Once the fire damage has preagated to other cabinets bays all functions associated with those bays are assumed to fail.                                                                          .
l                                                                                                                !
l  Since cabinet bays are separated by steel walls, fire propagation (as opposed to damage propagation) l  beyond the original bay is expected to progress slowly and until this occurs no damage is expected in          ;
l  bays beyond the bays directly adjacent to the bay in which the fire originates. Therefore, the fire duration    l required for damage to occur beyond directly adjacent bays is expected to be considerably longer than          l 10 minutes. Such damage is considered to be bounded by the control room evacuation scenarios. Control room evacuation, according to the modeling assumptions, is required in all cases, within 20 minutes, if manual suppression has not been implemented. At this time all equipment served by the entire cabinet in
!  which the fire occurs is assumed to be' permanently disabled unless attemate controls are available on the l  Division 1 Remote Shutdown Panel.
4-37 l                                                                                                                  i l
4                                                                                  - _ _ _ _ _ _ _ _ _ _ _
 
PNPP Individu:1 Plint Ex:minition - Extsmil Evsnts                                                    ;
l Determine the Prah=Miity of Crikal Comoonent Dammaa within a CmNnet or Adininina OmNnets l
The probability and extent of component damage.is dependent upon the probability of non-suppression during the pre-growth phase discussed above. The probability of non-suppression of control room fires as                        ;
a function of time was obtained using a model to interpret the control room fire durations in the EPRI                          ;
data base. Such a model is developed in Appendix J of the EPRI Fire PRA Implementation Guide.14-31                            j The probability of non-suppression derived from the model (Case 1 is recommended) is:                                          ;
2                                            ,
p(non-suppression within 7 minutes) = 4.9x10 4.7.2.5 Adverse Effects of Smoke                                                                                                :
Determine the Level of Smoke which Will imonir the Effectiveness of the Ooerators                                              !
I' I4 The Sandia cabinet fire tests " indicate that fires were self-sustaining and did produce sufficient l quantities of smoke to cause visual impairment with purge rates as high as 14 room air changes per hour.
L All of the actual control room fires reported in the Fire Events Data Base (FEDB) were small, but this                        !
may have been because they were extinguished early. Since there are no tools available for assessing smoke production and the evidence from the historical fires is not conclusive, it was assumed that any fire                    '
is capable of producing sufficient smoke given that it is allowed to continue buming for a sufficient period of time.                                                                                                                t Determine Time Av-n-bla to Sunareas Fire                                                                                      ,
Determine how much time is available to suppress the fire before the smoke concentration reaches the                            f level of visual impairment, at which time the operators are assumed to evacuate the Control Room. There                        !
l are eleven Sandia tests for which information is available for smoke build up.                                              'i l                                                                                                                                .
I Six tests were performed in a small enclosure,11,016 ft' with ventilation rates about 14 room air changes                      l per hour. However, only one of these was electrically initiated (Test PCTS) and indicated visual                                ,
obscuration within 13 minutes with time zero being the point at which smoke was first observed from the                        ;
cabinet. Five tests were performed in larger enclosures of 48,000 ff, two of which were electrically                            l l initiated. In both of the electrically initiated, large enclosure tests, the control room control board was                    ;
j obscured within 20 minutes after smoke was first observed based on visual observations. The ventilation rate in one case was I room air change per hour and in the other,8 room changes per hour. For the large enclosure tests, the ventilation system did not appear to substantially effect the rate of smoke build up.
The volume of the PNPP Unit 1/ Unit 2 control room envelope is approximately 367,000 ff. However, the effective volume of the Unit I control room is less than half, i.e., about 100,000 ff (compared with 48,000 ff in the SNL large enclosure tests).
The normal number of air changes per hour is one . However, this may be increased to 5 changes per hour
; m the smoke purge mode.
:                                                                                                                                  1 l Based on the above discussion it is concluded that the rate of smoke build up in the PNPP control room will not be any faster than that observed for large test enclosure. That is smoke obscuration of the control
[ board will not occur for at least 20 minutes after smoke begins to escape from the cabinet. Again allowing i                                                                                                                                  '
4-38
 
PNPP Individu 1 PI:nt Ex min tion - Ext:: mil Ev:;nts i
3 minutes to activate one of the area ionization detectors,17 minutes would be available to extinguish the i fire prior the necessity for control room evacuation.
Ten minutes was selected by Sandia and used in the NUREG-1150 fire studies for Peach Bottom and l Surry. EPRI selected a time interval of 15 minutes for their NSAC 181 control room analyses.                    i Determine the Probability of Detection and Sucoression Prior to Visual imoairment I
I l Using the HCR approach to detennine probability of non-suppression within the time frames availeble l prior to the control boards being obscured, the probability is determined to be:
4 p(non-suppression within 17 minutes) = 2.0x10 l
4.7.2.6 Screening of Potentially Significant Cabinet Fires Based on the review performed in Section 4.7.2.4, the control cabinets were grouped according to the immediate impact of fires on accident mitigating systems. An initial screening of cabinets was performed assuming that a fire originating in any bay of a given cabinet destroys the entire cabinet, i.e., inter-bay fire propagation was assumed to be 1.0.
The frequency of fires associated with each cabinet group was evaluated in Table 4-6. The conditional core damage probability given the damage associated with each group was evaluated using the internal events PRA model as discussed in Section4.7.2.8. The screening core damage frequency results are summarized in Table 4-7.
It was concluded that the contribution from fire scenarios confined to cabinets associated with groups la, Ib, Ic, Id. 2a,2c,3c,4a, and 4b do not present a significant fire risk regardless of the extent ofinter-bay propagation. However, fires in groups 2b, 3a and 3b cabinets may be significant and therefore inter-bay propagation scenarios were addressed for those cases. Fire growth in all cabinets leading control room evacuation was also addressed.
4.7.2.7 Examination of Non-Screened Cabinet Fire Scenarios The various growth stages, probabilities and fire damage states were defined t.nd evaluated for each cabinet utilizing a fire growth event tree approach similar to that shown in the example provided as Figure 4-3. The end points of each event tree represents a particular fire damage state and associated frequency. Eighteen unique damage states were identified and are summarized in Table 4-8.
Fire scenarios originating in Groun 2b cabinets Group 2b consists of one cabinet, P870, which is the bench board located on the south side of the i horseshoe. This cabinet consists of 9 bays only two of which, A and B, contain any equipment credited for shutdown. Bays C to J include controls for the neutral division and are assumed to result in a loss of feedwater and the Power Conversion System (PCS) only.
l A fire in Bay A may lead to a loss of offsite power. If the fire is not extinguished prior to growth, i.e.,
I within 8 minutes, equipment in adjacent Bay B, is assumed to also fail, resulting in a loss of Division 2 4-39
 
I l
PNPP Individu:1 Plint Eximin: tion - Ext; mil EvInts                            ,
l            control. If the fire is not extinguished within a further 9 minutes, control room evacuation is assumed to              !
be required. Similarly a fire in Bay B may lead immediately to a loss of control of Division 2 systems, L
l            and damage may propagate to Bay A if the fire is not extinguished in a timely manner. Fires in Bay C,
!            although not significant immediately, may propagate to Bay B.                                                            !
!                                                                                                                                      I l
Fire scenarios oriainatina in Grouo 3a Cabhets                                                                          l Group 3a consists of 18 cabinets which were initially identified a:, potentially giving rire to a loss of control of Division I and 2 systems from the control room in the event of a fire. However, on closer inspection the function of equipment associated with many of these cabinets, although safety related, is .              ,
l            not required for safe plant shutdown. The list of Group 3a cabinets finally identified as containing safe                :
I            shutdown equipment was as follows:
l l                          P680                  Unit 1 Control Console                                                              !
P691                  Division 1 RPS and Instrument Auxiliary Relay Panel                                  l P692                  Division 2 RPS and Instrument Auxiliary Relay Panel                                  ;
P693                  Division 3 RPS and Instmment Auxiliary Relay Panel                                  l P694                  Division 4 RPS and Instrument Auxiliary Relay Panel                                  :
P800                  HVAC Control Panel                                                                  !
P868                  Analog Loop Div 2 Instruments                                                        i P877                  Diesel Generator Bench Board P904                  Common HVAC P623                  Auxiliary Relay Panel P869                  DivisionalInstruments                                                                ;
P680 Unit 1 Control Console l
l Although this panel is designated as containing safe shutdown equipment designated Division 1 and Division 2, only the RPS system would be affected. Since this system is fail safe with respect to fire damage and there are other means ofinitiating reactor scram which do not rely on this equipment, the impact of fires which are confined to this console is negligible. The fire growth event tree for this cabinet therefore addresses fire suppression prior to control room evacuation only.
P691 Division 1 RPS and Instrument Auxiliary Relay Panel P692 Division 2 RPS and instrument Auxiliary Relay Panel l
P693 Division 3 RPS and instrument Auxiliary Relay Panel                                                                l P694 Division 4 RPS and instrument Auxiliary Relav Panel                                                                !
These cabinets contains two bays both of which are assumed to result in an immediate loss of control of Division i and Division 2 systems in the event of a fire. The fire growth event tree for these cabinets,
;              therefore, addresses fire suppression prior to control room evacuation only.
i 4-40 1
 
PNPP Individuil Pl:nt EximinItian - Ext; mil EvInts P800 HVAC Control Panel This cabinet contains 5 bays. Bays A and E contain neutral division equipment only. Bay D contains
              - Division 2 designated equipment only. Bay C contains Division 1 designated only. Bay B contains both Division 1 and Division 2 designated equipment.
P868 ' Analoo Loon Div 2 Instruments This cabinet contains 3 bays.                    Bay A and BayB includes Division 1 and Division 2 designated equipment. Bay C contains Division 2 designated equipment only.
P877 Diesel Generator Bench Board This cabinet contains 2 bays. Bay A contains Division 1 designated equipment. Bay B contains Division 2 designated equipment.
P904 Common HVAC This cabinet contains 3 bays. Bay A contains Division 2 designated equipment. Bay B contains Division I designated equipment. Bay C controls neutral division equipment.
P623 Auxiliarv Relay Panel This is a single bay cabinet containing Division 1 and Division 2 designated equipment. A fire in this cabinet is assumed to result in an immediate loss of control of all Division 1 and Division 2 equipment.
P869 DivisionalInstruments This cabinet contains 3 bays. Bay A and Bay B contain Division I and Division 2 designated equipment.
Bay C contains Division 1 designated equipment.
Fire scenarios oriainatina in Groun 3b cahinets                                                                                                                      k Group 3b consists of one cabinet, P601, which is the Emergency Core Cooling benchboard located on the north side of the horseshoe. This cabinet consists of 7 bays. Bay A contains equipment designated Division 1. This bay was also detennined to contain equipment associated with HPCS. Bays B and C contain equipment designated Division 2. Bays D and E contain Division 2 designated equipment. Bay F contains Div 1 and 2 designated equipment. Bay G contains neutral division equipment and is assumed to have no immediate impact on shutdown systems other than the loss of feedwater and PCS.
4-41
 
PNPP Individu 1 PI:nt Examiniti:n - Ext: mil Evznts 4.7.2.8 Fire Scenario Quantification l
The quantification of the PRA model for control room fire sequences was performed in an identical                {
manner to that adopted for the quantitative screening analysis.                                                  ,
l      The contributions to the frequency of each damage state from each fire scenario, inc! Ming the cabinet groups screened earlier are summarized and totaled in Table 4-9.
l
;      The conditional core damage probability associated with each damage state is evaluated by requantifying l
l      the intemal events model accounting for the equipment disabled due to fire as well as any pertinent                ;
l      recovery actions. In performing this analysis, the following assumptions were followed-                          ;
e      The fire induced initiating events modeled were loss of offsite power (Type Tl event tree) or        .
transient with a loss ofPCS (Type T2 event tree).                                                  l l            e        Human error probabilities for short term operator actions (within the first hour) were              !
;                    increased by a factor of 5 to account for the increased stress and distraction arising from the    r l                    control room fire and the need, in some cases, to operate equipment from the Division 1 RSP.        l l
e        In the event of damage to ADS Division 1 and2 equipment or the need control room l                    evacuation RCS depressurization and low pressure injection is not feasible since only 3 SRVs        )
i                    can be controlled from outside the control room. A minimum of four valves was assumed to I                    be required for success.
            .        In the event of control room evacuation, operators may re-enter the control room or use local        l switches in order to establish long term heat removal providing the specific fire damage to        j control room circuits does not prevent this. Division 1 suppression pool cooling is always          !
operable from the Division 1 RSP, regard.less of control room damage. However, the                  l Division 1 containment spray and all Division 2 systems may not be available to function.
The product of the aggregated fire damage state frequencies and the corresponding CCDPs give the fire induced core damage frequencies for each state shown in Table 4-9.
1 i
l i
i r
4-42
 
e PNPP Individu:1 Plant Exrmination - Ext; mil Ev:nts i
4.7.3 Results                                                                                                                i i
The results of the detailed fire analysis for the seventeen fire area / compartments which did not screen l
during the screening phases of FIVE are summarized in Table 4-10. Following the detailed analysis, the                      l fire induced core damage frequencies for t.even of the areas / compartments remain above the screening                      I 4
criteriaof10 /yr.Theseare:                                                                                                  j i
ICC5a          Unit 1 Control Room                                                  1.06x10 5 33.9 1CC3a          Unit 1 Division 2 Switchgear Room                                            4 1.05x10  33.5 4
ITPC/l        Unit 1 Turbine Power Complex - Switchgear Room 3.38x10                          10.5                    l CCl                                                                                          4 Control Complex Elevation 599'                                        2.03x10    6.5                    j ICC3c                                                                                        4 Unit 1 Division 1 Switchgear Room                                    1.98x10    6.3                    i FH3                                                                                          4 Fuel Handling Building Elevation 620'                                l.63x10    5.2 ITB                                                                                          4 Unit 1 Turbine Building                                              1.30x10    4.2
                  ' Fire Zone 1CC5a, the Unit 1 Control Room and Fire Zone 1CC3a, the Unit 1 Division 2 Switchgear Room, are the most significant contributors. The top fire induced core damage sequences are summarized in the following subsections.                                                                                                )
The contributions from the Unit 1 Turbine Power Complex, the Fuel Handling Building and the Unit 1 Turbine Building essentially represent screening values. Additional detailed modeling would most 4
certainly reduce their contribution below 10 /yr.
4.7.3.1 Fire Zone 1CC5a - Unit 1 Control Room The contributions to core damage frequency arising from fires in the Unit 1 Control Room are evaluated in Table 4-8. The fire induced core damage frequency, F3, for the Unit 1 Control Room is 1.06x104 /yr.
The most significant fire scenarios are described below.
Fire in Anv Control Room Panel e-ina Control Room Eveatian A fire in any Unit 1 Control Room panel which is not suppressed prior to the need for control room evacuation is assumed to result in an initial loss of control for all systems from the Unit 1 Control Room.
Operators attempt to shut down using RCIC from the Division 1 Remote Shutdown Panel. Operators may subsequently use Train A, or Train B in some cases, of suppression pool cooling. Control would be fmm the remote shutdown panel or by re-entering the comrol room after extinguishing the fire. The dominant 4
fire damage scenarios (FDS) involve random failure of the RCIC system. The CDF is 5.66x10 /yr for FDS 3, FDS 6, FDS 17 and FDS 18 for a fire involving control room evacuation.                                                ;
1 4-43
 
a l
l PNPP Individu 1 Plint Eximin: tion - Ext: mal Ev:nts                              !
Fire in Panel P601                                                                                          !
i A fire in Panel P601, Bays C, D, E or G, which is not suppressed prior to damage being sustained in the      l adjacent bays or a fire in Bay F which is suppressed is assumed the result in damage to Division I and      l Division 2 systems. These systems could include RCIC, ADS and those components associated with containment venting via the fuel pool cooling and cleanup system. The operators attempt to shut down
(
using HPCS (controlled from the Panel P601, Bay A) or RCIC (controlled from the remote shutdown l
panel and Train A of RHR in suppression pool cooling (also controlled form the remote shutdown panel).      !
Containment venting via the MSIVs could be used in conjunction with HPCS. These systems fail due to          l l
      - random faults resulting in a CDF of 1.18x10-6/yr for FDS 7.                                                  i l
l
;      Fire in ' nel 625 or P873 or in Bays A or B of P601                                                          ,
A fire in Group lb single bay Panels P625 or P873 or confined to Bays A or B of Panel P601 is assumed l      to result in the loss of HPCS and all Division 1 systems except RCIC. Operators attempt to shutdown          '
;      using RCIC or ADS and low pressure systems associated with Train B of RHR. However, these systems l      fhil due to random faults. The fire induced CDF is 7.08x10~7/yr from FDS 13.
i' Fire in Bavs B or C of Panel P870 or in Bays A. B or C of Panel P871 A fire in Panel P870 confined to Bays B.or C or in Panel P871 in Bays A, B or C which is suppressed prior to control room evacuation is assumed to result in damage to Division 2 systems. These include the valves used for containment venting via the fuel pool cooling and cleanup system. Operators attempt to        l shutdown using either RCIC or HPCS and Train A of RHR in suppression pool cooling or containment            i
!      spray modes of operation. However, these systems fail due to random faults principally from maintenance      l l      unavailability and human interaction difficulties. The CDF is 6.24x10'7/yr for FDS 15.
l                                                                                                                    !
Fire in Bays D or E of Panel P800. Bay C of Panel P868 Bay B of Panel P877. Bay A of Panel P904 or          !
l      in Group 2a Panels A Fire in Bays D or E of Panel P800, Bay C of Panel P868, Bay B of Panel P877, Bay A of Panel P904 or in Group 2a Panels is assumed to lead to the loss of all Division 2 systems. This excludes the RCIC l      ' isolation valve. Operators attempt to shutdown using RCIC and TrainB of ADS and low pressure injection systems. However, these systems fhil due to random faults. The CDF is 6.04x10'7/yr for FDS 14.
l l
6
.r 4-44 4
 
PNPP Individu 1 Pl:nt Ex min: tion - Ext; mil Ev:nts 4.7.3.2 Fire Zone 1CC3a - Unit 1 Division 2 Switchgear Room The risk is dominated principally by fires in the 4.16kV switchgear and 480 V bus sections which damage overhead cable. Such fires lead to a permanent loss of RHR Train B as well as the loss of containment venting paths via the fuel pool cooling and cleanup system, Train B of containment spray, and MSIVs (FDS 0). Random failures of RHR Train A subsequently lead to core damage. This is somewhat conservative for two reasons:
            . Overhead cable trays located in the plume of the fire are assumed to be damaged with a probability of 1.0. No credit was taken for fires being extinguished prior to such damage (either from self or manual extinguishment).
          . All fires are assumed to lead to a permanent loss of equipment. In reality, it is likely that buses may be re-energized once the fire has been extinguished and the damaged sections repaired or isolated.
Other less important contributors include fires in the 480 V MCCs and the transformers which damage overhead cable trays.
4.8 Containment Performance The evaluation of containment performance following core damage resulting from fires requires the consideration of mechanisms which may lead to containment bypass via hi-lo interfaces, failure of containment isolation or degradation of the availability of heat removal systems. NUREG-1407, Section 4.1.4 indicates that the focus should be on identifying containment failure mechanisms which are significantly different from those found in the internal events IPE.
4.8.1 Containment Bypass Containment bypass pathways are identified and evaluated in the IPE. Likewise, the Appendix R Safe Shutdown Capability Report, Section 2.2, identifies and dispositions such pathways with respect to the potential for fire damage to initiate LOCAs via these paths. Fire induced mechanical failures are not considered credible. Spurious valve operation due to control and power circuit damage caused by fires was examined, as discussed in Section4.2.2. No significant fire induced bypass mechanisms were identified.
4-45
 
PNPP Individuil Pirnt Ex min tion - Ext rnil Ev:nts 4.8.2 Containmentisolation l
i Containment isolation failure was also considered in the IPE, the principal mechanism being associated with isolation valve failure to close. Containment penetration pathways determined to be a potential
                                                                                                              )
concern in the IPE analysis are isolated by mechanical check valves, air operated valves which fail closed on loss of air supply or power to their solenoid valves or electrically operated (a.cid.c.) valves. Fire damage will not impact the operation of check valves ard is likely to lead to actuation of containment isolation in the case of air operated valves. In the event of fire induced damage which does not prevent l closure of air or electrically operated containment isolation valves, manual recovery actions may be taken.
Since fire induced accidents do not lead to vessel failures, several hours would be available to take such action. Furthermore, the most risk significant fire scenarios are located in the switchgear room and the control room which are well away from the containment penetration areas where the isolation valves are located. Thus, access to the containment isolation valves would not be impaired due to the effects of the fire. The likelihood of failure of containment isolation following fire scenarios is not significant and no '
new mechanisms ofisolation failure were identified.
4.8.3 Containment Pressure Suppression and Heat Removal I
The availability of containment heat removal systems including RHR and various containment vent paths      I
, following core damage was explicitly modeled in the PRA event trees, and their status reflected in me l plant damage state binning process. The contribution of the dominant Unit 1 Control Room and Unit 1        1 Division 2 Switchgear Room fire scenarios involving loss of these systems is as follows:
4 1CC5a Contiol Room                          2.2x10 5
1CC3a Division 2 Switchgear Room            1.0x10 4.8.4 Containment Performance Summary I
1 In conclusion, containment performance issues have been specifically addressed in the fire analysis. No    l l vulnerabilities which could cause early failures of containment or containment bypass were identified.
The frequency of core damage scenarios involving loss of containment heat removal systems is estimated i to be 1.2x10 5/yr. This estimate is dominated by the Unit 1 Division 2 Switchgear Room fire scenarios, which as discussed above, have certain inherent conservatisms particularly when considering the potential for recovery in the time frame for initiation oflong term containment heat removal (on the order of 15 to 20 hours).
l l
4-46
 
PNPP Individu11 Plint Eximinition - Ext; mil EvInts                          l 4.9 Treatment of Fire Risk Scoping Study issues 4.9.1 Background Under the USNCR-sponsored Fire Protection Research Program, Sandia National Laboratories developed the Fire Risk Scoping Study: Current Perception of Unaddressed Fire Risk Issues (NUREG/CR-5088),
hereafter referred to as the "FRSS." The objectives of this study were to:
          . Reassess certain fire risk scenarios, in light of the availability of enhanced fire event databases and improved fire modeling techniques.
          . Identify significant fire risk issues that may not have been addressed adequately, or at all, under earlier fire risk assessments, and to attempt to quantify the impact of these issues.-
          . Review current regulatory criteria and guidance, and plant fire protection programs, to assess whether the identified risk scenarios are adequately enveloped by these programs.
The issues identified and addressed by the FRSS include six categories:
l l
e  Potential seismic / fire interactions.
e  Fire barrier qualification issues.
* Manual fire fighting effectiveness.
          . Total environment equipment survival.
* Potential control systems interactions.
          . Improved analytical codes.
I The above issues, which were not addressed by earlier " fire" probabilistic risk assessments (PRAs), are  j required to be assessed as an integral part of the Individual Plant Examination for External Events (IPEEE). A structured approach to addressing the first five of these issues is presented in the
    " Fire-Induced Vulnerability Evaluation (FIVE)," EPRI Report TR-100370. The FIVE report provides an overall methodology for addressing the " fire" portion of the IPEEE process; the FRSS issues are but one element of the IPEEE process.
The sixth FRSS issue, conceming analytical codes, does not require a plant-specific evaluation or
,    response, as the use of current-day analytical codes, i.e., COMPBRN IIIe, is incorporated as an integral j    part of the FIVE, Phase II, methodology. Accordingly, this analysis is limited to a Perry Nuclear Power l    Plant (PNPP) specific assessment of only the first five issues.
i I
4-47 l
 
l PNPP Individual Plant Extmination - Extemil Ev2nts 4.9.2 Seismic /Fireinteractions
(    This issue involves three concems:
l-e .1he potential for seismically-induced fires.
e  The potential for seismically-induced actuation of fire suppression systems.
e  The potential for seismically-indmai failure or rupture of fire suppression systems.
The above events have obvious implications on both postulated fire scenarios and potential for disruption of the safe-shutdown capability.
  ' 4.9.2.1 Seismically induced Fires This-issue considers the potential leakage or rupture of flammable or combustible liquid gas lines or tanks / containers during a seismic event, which could create fire hazards. The potential hazards to be addressed include:
          . Hydmgenpiping e  Diesel fuel oil piping, day tanks, and storage tanks.
i l
e Turbine lubricating oil storage tank (s) and associated piping.
        -
* Turbine generator (hydrogen envelope).
* Hydrogen seal oil unit and associated piping and tanks.
* Hydrazine storage tanks and associated piping.
The specific location of these and similar hazards are identified through the Fire Walkdown Phase of the
!    IPEEE process, and the seismic ruggedness of each identified component was addressed under the Seismic Walkdown Phase. No potential vulnerabilities were identified. See Section 3.1.6.
4.9.2.2 Seismic Actuation of Fire Suppression Systems This issue considers the potential for inadvertent actuation of suppression systems during a seismic event, and the resultant effects on safety / safe-shutdown related components and systems. The effects of concem include both flooding and wetting effects caused by runoff / spray, i
4-48
 
PNPP Individual Plant Examin: tion 'dxt: mal Events Automatic fire suppression systems located in fire areas / zones containing safety / safe-shutdown related equipment include the following:
Fire Area / Zone    Suppression System Type 1ABic          Automatic Sprinkler System 1AB3b          Automatic Sprinkler System CC1a          Automatic Sprinkler System CCIb          Automatic Sprinkler System CCic          Automatic Sprinkler System CC2a          Automatic Sprinkler System CC2b          Automatic Sprinkler System CC2c          Automatic Sprinkler System 1CC4a          Automatic Sprinkler System ICC4b          Automatic Sprinkler System 1CC4e          Automatic Sprinkler System 1CC4f          Automatic Sprinkler System 1DG1a            Automatic CO2 System 1DG1b            Automatic CO2 System IDGlc            Automatic CO2System IB2          Automatic Sprinkler System IB3          Automatic Sprinkler System The cables installed at PNPP are capable of withstanding water spray and/or immersion hence, no problems should arise with the operation of a water spray system in areas containing only redundant cables. All other sprinkler areas containing safe shutdown components contain only one train of equipment.
Automatic fire suppression systems installed within a fire area containing a single train of shutdown components and cables are designed to activate and operate within one fire area only. T .erefore, an inadvenent activation of the fire suppression system will only effect one component or one train of cables, and as in the case of a single fire, redundant divisions are not affected by this single event.
In addition, these water type fire suppression systems are designed to operate where the fire is located; this is accomplished by the use of closed heads operated by a fusible link. Therefore, wholesale operation is avened. In the event of a pipe rupture, floor drains are provided to adequately drain water away from affected equipment withoutjeopardizing the redundant train.
4-49 i
l 6
 
(
l PNPP Individu:1 PI:nt Extminati:n - Ext m;l Ev:nts By PNPP intemal memoranda, a review of the IEN 83-41 issues (Actuation of Fire Suppression System Causing Inoperability of Safety-Related Equipment) was documented. This review concluded the concems raised in the Information Notice fell into the categories of design, sealing, shielding and drainage. The concems related to design were considered to have already been adequately addressed.
Furthermore, with the implementation of actions pertaining to sealing and to shielding and drainage, the remaining concems were adequately addressed. Consequently, this review, and the resolution of the i subsequent commitments, is considered to adequately envelope the issue of seismically-induced actuation l of PNPP automatic fire suppression systems.
4.9.2.3 Seismic Degradation of Fire Suppression Systems This issue addresses the seismic installation of suppression system piping and appurtenances, and the potential for seismically-induced mechanical failure of these systems. The issue is focused on the l potential effects on the safe-shutdown capability caused by suppression system equipment dislodging during a seismic event, and falling onto the subject equipment.
The location of fire suppression piping with respect to safe-shutdown equipment, and the potential
! effects, from the perspective of possible impact of equipment falling onto safe-shutdown components, is l
addressed under the Seismic Walkdown Phase of the IPEEE. No potential vulnerabilities were identified.
See Section 3.1.6 for further discussion.
The potential for an earthquake to result in a fire was evaluated as part of the seismic walkdown effort.
One area of concem was identified with the Fire Service Fuel Oil Tank located in the ESW Pumphouse Diesel Fire Pump Room. The tank was evaluated as having a HCLP of 0.3g. See Section 3.1.6 for further discussion.
4.9.3 Fire Barrier Qualifications l
This issue is primarily concemed with the installation md maintenan.c of fire barriers and fire barrier penetration seals, including electrical and mechanical seals, as well as f te doors and fire dampers.
l l
4.9.3.1 Fire Barriers Fire barriers, defined as "any fire-rated wall or radiant heat shield protecting safety-related equipment and cable," are inspected at least once per 18 months, or every refueling outage, in accordance with PTl P54-P0054. Appendix R cable wrap is inspected every 18 months, or every refueling outage in accordance with PTI P54-P0075.
Any barriers found unacceptable are immediately reported to the Control Room Unit Supersisor, who shall take appropriate actions as defined in PAP-1914. Fire barriers which do not meet the inspection i criteria may be deemed acceptable if a Fire Barrier Removal Permit is active on the barrier. PAP-1914 causes a Fire Barrier Removal Permit to be issued on any fire barrier removal, and ensures appropriate
, compensatory measures are taken to protect the area.
i 4-50 L
 
PNPP Individuil Pirnt Ex min tion - Ext: mil Ev;nts 4.9.3.2 Fire Doors The fire door maintenance and inspection program consists ofinspections, verifications and operability tests. Periodic Test Instruction PTI P54-P0040 describes the semi-annual operability check of magnetically held open fire doors. PTI P54-P0041 describes the semi-annual fire door inspection. Daily l fire door verifications are perfonned in accordance with PTI P54-P0044. These tests are all performed in l accordance with the requirements of PAP-1923, NFPA-80 and Section 9.5.1.4 of the USAR.
4.9.3.3 Penetration Seal Assemblies l
Penetration Seal Insoection and Surveillance Proaram The surveillance of fire barrier penetration seals is performed in accordance with PTI P54-P0056 which provides a visual inspection of 10 percent of the penetration seals every 18 months, or every refueling outage. An inspection schedule is maintained to ensure every penetration is inspected at least once every 15 years.
Eyaluation and imolementation of Aoolicable NRC I&E Notices The FIVE methodology identifies three NRC I&E Information Notices (IEN) which have specific applicability to fire barrier penetration seals:
        . IEN 88-04, " Inadequate Qualification and Documentation of Fire Barrier Penetration Seals."
        . IEN 88-04 Supplement 1, " Inadequate Qualification and Documentation of Fire Barrier Penetration Seals."
        . IEN 88-56 Supplement 1, " Potential Problems with Silicon Foam Fire Barrier Penetration Seals."
Evaluations were made of the specifications and the procedures for fire banier penetrations related to IEN 88-04. These evaluations created concems related to weaknesses in the implementation of USNRC requirements and guidelines. In response to these concems, a penetration seal design and installation program is being implemented at PNPP including:
        . A definition of design documents showing the function of the seal e  a defmition of seal design criteria e  a review of present seal installations e  a definition of the installer qualification requirements l This is considered to adequately address the concems regarding qualification of fire barrier fenetration seals at PNPP.
4-51
 
PNPP Individu:1 PI:nt Ex min:tiin - Ext rnil Ev:nts 4.9.3.4 Fire Dampers Fire Damoer Insoection and Maintenance Prooram  ~
l Fire dampers are visually inspected in accordance with Periodic Test Instructions PTI P54-P0053A through R once every 18 months, or every refueling outage.
I
                                                                                                              \
l In addition, following repair or maintenance of an HVAC system fire damper, both a static and dynanne l
functional test are performed on the damper to verify operability in accordance with PTI P54-P0022.
Failed damper testing is a violation of the Approved Fire Protection Program as described in PAP-1914, l
and must either be reported or declared inoperable and formally impaired with approved compensatory        I actions per PAP-1914, Attachment 4, Section 6.D.
?
Evaluation and imolementation of Annliembla NRC l&E Notices The FIVE methodology identifies two NRC I&E Information Notices which have specific applicability to l fire dampers:
e IEN 89-52, " Potential Fire Damper Operational Problems" l
        . IEN 83-69, " Improperly Installed Fire Dampers at Nuclear Power Plants" With respect to IEN 89-52 deficient dampers were identified affecting PNPP Unit 1. Worst case samples were tested and modifications were made to ensure closure of all required dampers under system operating conditions. PNPP documentation states that "This issue was an NRC open item                      ,
(50-440/85002 EE) and was satisfactorily closed by the NRC in their Inspection Report 50-440/85090."        I By PNPP intemal memoranda, a review of the IEN 83-69 issues were documented. These reviews                  l concluded that many of the PNPP fire dampers were not in confonnance with NFPA-90A at the time of          {
l the review. In response to these reviews, the fire damper non-conformities were resolved and the issue closed.
4.9.4 Manual Fire Fighting Effectiveness This issue is focused on the adequacy of training and preparedness of the plant fire brigade, and on the general orientation of appropriate plant personnel to fire response requirements. The objective of this issue is to determine the adequacy of the plant's manual fire suppression capability, and thereby determine i the degree to which this capability should be credited in the IPEEE Fire PRA.                              I 1
i 4-52
 
i PNPP Individu:1 PI:nt Ex:minition - Ext: mil Ev:nts                                I P
4.9.4.1 Reporting Fires J
Orientation of Plant Personnel to the Use of Portable Fire Extinguishers                                        1 As described in the Fire Protection Training Program, PAP-1917, a program is in place to train selected plant personnel in the use of portable fire extinguishers. Personnel formally trained include the Fire l
Brigade members, First Responders and Fire Watches.                                                            1 In accordance with PAP-1911, individuals discovering a fire are allowed to attempt to extinguish an              l incipient fire only if trained to do so, and if the attempt will not jeopardize their own safety or the safety ofothers.
1 Availability of Portable Extinguishers Throuahout the Plant Portable fire extinguishers are located in all fire zones except where radiological concerns exist, e.g.,
under condenser. For fire areas where radiological concems exist, extinguishers are staged outside the l area for fire brigade use. The location of fire extinguishers for every fire zone is shown in the FPI l Procedure, i.e., Pre-Fire Plan Instructions, for that zone. Operability of the fire extinguishers is ensured by l periodic testing and maintenance as described in PAP-1914.
1 Plant Procedure for Reoorting Fires j The initial reporting of fires and subsequent notification and dispatching of a First Responder and the Fire l Br.:gr.de, is addressed by Plant Administrative Procedure PAP-1911. Fmthermore, the reporting of fires          ,
l by assigned Fire Watches is addressed in PAP-1916. Lastly, as part of the PNPP General Employees                !
l Training Prograra, the Fire Protection Training for General Employees trains all personnel with unescorted access the proper procedures for reporting a fire.
Communication System to Allow Contact Wrth the Control Room As specified in PAP-1911, any individual discovering a fire is required to promptly notify the Secondary Alarm Station (SAS) or Control Room by the nearest communication system. PNPP contains an intemal phone system with extensions located throughout the plant.
4.9.4.2 Fire Brigade Size of Fire Brigade l As stipulated in PAP-In10, a fire brigade of at least five members, including the fire brigade leader, is maintained on site at all times.
4-53
 
PNPP Individu11 Pl:nt Eximinition - Ext; mil Ev:nts Brigade Members Knowledaeable in Plant Systems and Ooerations The plant Fire Brigade will consist of a Fire Brigade Leader with either a reactor operators license, or equivalent knowledge of plant safety related systems, i.e., simulator certification with plant systems familiarity, and four individuals from the Operations Section on all shifts. One of these individuals shall be the Fire Attack Leader assigned prior to the start of the shift.
Annual Physical Examinations for Brigade Members in accordance with PAP-1917, brigade members must satisfactorily complete a medical physical examination, including an electrocardiogram and a respiratory examination, and a sub-maximal stress test prior to participation in the Initial Fire Brigade Training Course, and thereafter, on an annual basis as part of the Fire Brigade requalification requirements.
Minimum Eauioment Providad/Avahbla to Fire Briande In accordance with Safety / Fire Instruction SFI-0060, all fire equipment in place in the Equipment Storage Areas and Fire Brigade Stations is visually and functionally inspected in full on a monthly basis, and in part when equipment is used for drills, practices, or emergencies to verify the equipment is in satisfactory condition for emergency use.
The tumout gear includes helmets, hoods, coats, pants, boots and gloves as described in PAP-1919, and flashlights. Portable ventilation equipment is provided in the Vent Paks which include smoke ejection equipment and accessories mounted on a portable cart. Portable fire extinguishers available to the Fire Brigade include the foam cart, as well as local portable fire extinguishers. Although not stated in SFI-0060, PAP-1911 states that the Fire Brigade Leader should have access to two portable radios.
Therefore, emergency communications equipment available to the Fire Brigade should include both the PNPP intemai communications system, and portable radios. In accordance with PAP-1922, the type and location of communication equipment within and nearby each fire zone, including an indication of any possible communication problem such as high noise levels, or poor radio communication, is listed in each Pre-Fire Plan Instructions. Therefore, the equipment available to the fire brigade is consistent with the FRSS criteria.
1 i
4-54
 
PNPP Individuil Pirnt Eximin: tion - Ext:m:I Evsnts 4.9.4.3 - Fire Brigade Training Initial Cl=== room instrw*ian Pronram The fire brigade classroom training program, as described in PAP-1917, provides the following elements, consistent with the FIVE evaluation methodology:
e ~ Indoctrination in the plant fire fighting plan and identification ofindividual responsibilities of the brigade members.
* Identification of the fire hazards and associated types of fires that may occur in the plant.
r e  Identification of the location of fire fighting equipment for each fire area, and familiarization with the layout of the plant, including access and egress routes.
* The proper use of available fire fighting equipment, and the correct method of fighting each type of fire. The types of fires covered should include electrical fires, fires in cable trays, hydrogen fires, flammable liquids, waste / debris fires, and reconi file fires.
* The proper use ofcommunication, lighting, ventilation, and emergency breathing equipment.
* The proper method for fighting fires inside buildings and confmed spaces.
* Detailed review of fire fighting strategies and procedures, Pre-Fire Plans.
1 In summary, the PNPP fire brigade classroom training program is in compliance with the FIVE/FRSS criteria.
Practice As described in PAP-1917, Fire Brigade requalification requirements include an annual practice session which must meet the following criteria:
i e  Practice sessions are held on the proper methods used for fighting the various types of fires          I that could occur at a nuclear power plant.
        . Practice sessions to provide members with first hand experience in actual fire extinguishment.
I e  Practice sessions to provide the members with first hand experience in the use of emergency l
l            breathing apparatus under strenuous conditions encountered in fire fighting.
: f. In summary, the PNPP fire brigade hands-on training program is in compliance with the FIVE/FRSS l  criteria.
4-55                                                  ,
 
[                                                                                                                  :
PNPP Individu;l Ptnt Ex mination - Ext 2rnil Ev nts                              '
Dnlis PNPP Fire Brigade drills provide the following elements consistent with the FIVE evaluation methodology:
i        e    In accordance with PAP-1918, fire drills are performed in the plant so that the brigade can          ,
practice as a team.                                                                                '
e    These fire drills are held at regular intervals (quarterly), per shift, with intervening intervals L
no more than five months nor less than one month for any shift.
          . Each brigade shift participates in at least one unannounced drill per year as prescrib-d in l              PAP-1918.
          . At least one drill per year is performed on a backshift for each shift fire brigade as prescribed    1 in PAP-1918.                                                                                        I i
!        e    As prescribed in PAP-1912, drills are pre-planned to establish training objectives, and drills      I are critiqued to determine how well the training objectives have been met.
i e    On a triennial basis, drills am critiqued by qualified individuals independent of the utility's    !
stafTas pmscribed in PAP-1918.
I I
i e : Pre-fire plans have been developed in accordance with PAP-1922 for areas containing safety-related equipment and areas presenting a hazard to safety-related equipment. In addition, PAP-1922 can be used to develop Pre-Fire Plan Instructions for other plant areas.                  I e    Pre-fire plans are updated in accordance with PAP-1922, and used as part of fim brigade            !
training activities as presenbed in PAP-1917.                                                      j
\
l e    As prescribed in PAP-1919, the Fire Brigade equipment is inventoried, inspected and                I
!-            maintained in accordance with SF1-0060.
t In summary, the PNPP fire brigade drills and drill schedules are in compliance with the FIVE/FRSS l    criteria.
l Records l    In accordance with PAP-1917, all fire protection training records documenting successful completion of each qualification requirement are maintained in accordance with TMG-1008 and TMA-4201.
Qualifications are tracked through the use of the Perry Training Section Records and Retrieval System.
I 1
'                                                                                                                  i r
4-56
 
PNPP Individuil PI:nt Ex; min: tion - Ext:rnil Ev;nts l
4.9.5 Total Environment Equipment Survival 4.9.5.1 Potential Adverse Effects on Plant Equipment by Combustion Products The FIVE/FRSS methodology does not provide criteria for assessment of the potential effects of non-thermal products of combustion on safety / safe-shutdown related equipment. However, for the relatively short duration of the fire event and early recovery period, these effects are considered to be insignificant by FIVE.
!      4.9.5.2 Spurious / inadvertent Fire Suppression Activity The potential effects of spurious / inadvertent suppression system actuation are enveloped by Section 4.9.2.2 of this document.
4.9.5.3 Operator Action Effectivoness Post-Fire Safe-Shutdown Procedures l
Off-Normal Instruction ONI-P54 describes the actions required by Control Room personnel to mitigate.
the effects of a fire. The actions taken by the Secondary Alarm Station personnel, the first responder, support personnel, and the Fire Brigade personnel are outlined in PAP-1911. In the event of a required Control Room evacuation, ONI-P54 directs the operators to enter ONI-C61 which describes the operator l      actions related to control room evacuation. Furthermore, ONI-C61 directs entry to 101-11 which provides    ,
l      the detailed instructions necessary to achieve and maintain a stable reactor shutdown condition from l
outside the Control Room with a possible loss of offsite power.
Ooerator Training in Post-Fire Safe-Shutdown Procedures Periodic operator training in post-fire shutdown procedures is conducted as part of regular operator refresher training for both licensed and non-licensed plant operators. Additional operator training in the use of the shutdown procedures may be indirectly given during fire drills.
Doerator Reentrv Into Affected Fire Area: Resoiratorv Protection l      The PNPP procedures do not specifically address operator reentry in smoke filled areas, but the following apply:
l
            . Self contained breathing apparatus (SCBA) equipment is provided in the control room and in i              the Fire Brigade Stations.
,          e  Fixed, battery-backed emergency lighting units are installed along post-fire shutdown access / egress routes and at equipment operating stations.
i 4-57
 
i PNPP Individu:1 Pl:nt Exrminition - Ext:m:I Ev2nts                            i 4.9.6 Control Systems lateractions                                                                        l The Control Room contains components and circuits for both Method A and B systems. Redundant components and circuits cannot be' protected in accordance with SectionIII.G.2 of Appendix R.            ,
Therefore, alternative shutdown capability in accordance with Section III.G.3 of Appendix R is provided. j For a fire in the Control Room, safe shutdown Method A is relied upon for shutdown. A review of all      !
components required for Method A was performed to determine the ability to safely shut down the plant    l given a fire in the Contml Room. The results of this review show:                                        '
                                                                                                            \
e  All necessaiy components can be electrically isolated from the Control Room                      ,
or                                                  !
there is sufficient time to operate the component manually.                                        j i
e  No spurious failure will prohibit safe shutdown.                                                  l l                                                                                                            !
Plant procedures reflect the actions necessary to isolate components from the control room, or manually    i operate components to safely shutdown the plant. Shutdown will be monitored and controlled from the Division 1 Remote Shutdown Panel located in Fire Area ICC3d.                                              i Circuits necessary to scram the reactor from the control room have not been protected. However, if        i reactor scram can not be achieved fmm inside the Control Room, plant procedures address how to l' accomplish the scram from outside the control room.
In conclusion, the PNPP remote shutdown features provide independent remote, or manual, control and        l monitoring features. Therefore, the design of the PNPP remote shutdown capabilities is generally immune    l to the efTects of" control systems interactions" as defined within the scope of the FIVE methodology.      !
4.9.7 Conclusions The results of the topical assessments performed under the FIVE Fire Risk Scoping Study indicate that all of the FRSS issues have been adequately addressed by PNPP, and the applicable aspects of the PNPP Fire Protection Program therefore are in conformance with the intent of the FRSS guidelines, as tabulated in Attachment 10.5 of the FIVE methodology.
4.10 USI A 45 and Other Safety issues As discussed in Section 4.s, the frequency of core damage scenarios involving loss of containment heat 4
removal systems is estimated to be 1.2x10 /yr. This estimate is dominated by the Unit 1 Division 2        l Switchgear Room fire scenarios, which have certain inherent conservatisms particularly when considering
;  the potential for recovery in the time frame for initiation oflong term containment heat removal (on the  l l  order of 15 to 20 hours). Further discussion of the conservatisms is provided in Section 4.7.3.2.
5 4-58
 
PNPP Individual Pl:nt Eximination - ExtImil Events 4.11 References 4-1    NUREG-1407, " Procedural and Submittal Guidance for the Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities," Final Report, June 1991.
4-2a    EPRI TR-100370s," Fire-Induced Vulnerability Evaluation (FIVE)," Final Report, April 1992.
4-2b    " Revision I to EPRI Final Report, dated April 1992, TR-100370, Fire-Induced Vulnerability Evaluation Methodology," Letter fmm William H. Rasin, NUMARC, Nuclear Management and Resource Council, September 29th 1993.
4-3    EPRI RP-3385-01, " Fire PRA Implementation Guide," January 1994 (Draft).
4-4    NSAC-181," Fire PRA Requantification Studies," Final Repor:, March 1993.
4-5    NUREG/CR-5088," Fire Risk Scoping Study," January 1989.
4-6    NSAC-178L, " Fire Events Database for U.S. Nuclear Power Plants," Final Report, June 1992.
4-7    " Individual Plant Examination for Perry Nuclear Power Plant," Cleveland Electric Illuminating Company, July 1992.
        '4-8    " Appendix R Safe Shutdown Capability Report."
4-9    Updated Safety Analysis Report (USAR) for Unit 1, Perry Nuclear Power Plant, Appendix 9A, Rev 2.
4-10a NUREG/CR-4527, "An Experimental Investigation ofInternally Ignited Fires in Nuclear Power Plant Control Cabinets: Part I: Cabinet Effects," April 1987.
4-10b NUREG/CR-4527, "An Experimental Investigation ofInternally Ignited Fires in Nuclear Power Plant Control Cabinets: Part II: Room Effects Tests," November 1988.
4-11    101-11, " Integrated Operating Instruction, Shutdown from Outside the Control Room," Rev 6.
4-12    NEDO-10466, " Power Generation Control Complex - Design Criteria and Safety Evaluation,"
R.:v 1, General Electric Company,1977.
4-59
 
1 l                          PNPP Individual Pirnt Ex min tiin - Ext 2rnal Ev nts l
l                    Table 4 PNPP Fire Areas and Associated Compartments Fire            Fire Area        Compartment                Description                                      j i                                                                                            i I ABla          I ABla            AX 568 Unit i LPCS Pump Room
(  IABld          I ABld            AX568 Unit i RilR C Pump Room                          i i Allt f        IAlltf            AX 568 Unit i IIPCS Pump Room                          1 1 ABig          l ABig            AX 568 Unit I Corridor lAll2          IAB2              AX $68/599 Unit i RCIC (Fire Zones I ABlc & 1 AB2)      4 l  IABE            lABE              AX 568/620 Unit i RilR A (Fire Zones l ABib & I AB3a)  l l  IABW            IABW              AX 568/620 Unit i RilR B (Fire Zones l ABle & I AB3b) l  IABSTWN        IABSTWN          AX 574/652 Unit i North Stairwell
!  I ABSTWS        IABSTWS          AX 574/652 Unit i South Stairwell ICC3a          ICC3a            CC 620 Unit i Division 2 Switchgear Room 1CC3b          ICC3b            CC 620 Unit i Division 3 Switchgear Room l  ICC3c          ICC3e            CC 620 Unit i Division 1 Switchgear Room ICC3d          ICC3d            CC 620 Unit i Remote Shutdown Room l  ICC3e          ICC3e            CC 620 Unit 1 Switchgear Room Corridor ICC4 638/654    ICC4 638/654      CC 638 Unit i Elevator Corridor 1CC4a          lCC4a            CC 638 Unit i Division 2 Cable Spreading Room ICC4b          ICC4b            CC 638 Unit i Division 2 Cable Chase ICC4c          ICC4c            CC 638 Unit 1 Division 2 DC Switchgear Room iCC4d          1CC4d            CC 638 Unit i I bision 2 Battery Room ICC4e          ICC4e            CC 638 Unit IIhvision I Cable Spreading Room l  lCC4f          ICC4f            CC 638 Unit 1 Division 1 Cable Chase
(  ICC4g          ICC4g            CC 638 Unit I Division i DC Switchgear Room
;  ICC4h          ICC4h            CC 638 Unit i Division i Battery Room I
ICC4i          ICC4i            CC 638 Computer Room ICC5a          ICC5a            CC 654 Unit I Control Room ICC5b          ICC5b            CC 654 Unit 1 Control Room Office ICC5c          ICC5c            CC 654 Unit 1 Control Room Corridor j  ICC6            ICC6              CC 679 Unit 1/2 Division 2 IIVAC Room iCCSIW          ICCSTW            CC 574/679 North Stairwell 2CC3a          2CC3a            CC 620 Unit 2 Division 2 Switchgear Room 2CC3h          2CC3b            CC 620 Unit 2 Division 3 Switchgear Room 2CC3e          2CC3c            CC 620 Unit 2 Division i Switchgear Room 2CC3d          2CC3d            CC 620 Unit 2 Remote Shutdown Room 2CC3e          2CC3e            CC 620 Unit 2 Switchgear Room Corridor 2CC4 638/654    2CC4 638/654      CC 638 Unit i Elevator Corridor 2CC4a          2CC4a            CC 638 Unit 2 Division 2 Cable Spreading Room 2CC4b          2CC4b            CC 638 Unit 2 Division 2 Cable Chase 2CC4c          2CC4c            CC 638 Unit 2 Division 2 DC SwitchFear Room 2CC4d          2CC4d            CC 638 Unit 2 Division 2 Battery Room 2CC4e          2CC4e            CC 638 Unit 2 Division I Cable Spreading Room 2CC4f          2CC4f            CC 638 Unit 2 Division I Cable Chase 2CC4g          2CC4g            CC 638 Unit 2 Division i IX' Switchgear Room l  2CC4h          2CC4h            CC 638 Unit 2 Division i Battery Room l  2CC4i          2CC4i            CC 638 Unit 2 Computer Room l  2CC5a          2CC5a            CC 654 Unit 2 Control Room l  2CC5b          2CC5b            CC 654 Unit 2 Control Room Corridor j  2CC6            2CC6              CC 679 Unit 1/2 Division i ilVAC Room
,  2CCSTW          2CCSTW            CC 574/679 South Stairwell CCI            CCI              CC 574 (Fire Zones CCIa. CCIb & CCic)
CC2            CC2/1            CC 599 Northwest portion of CC 599 (Equivalent to CC2b)
CC2/2            CC 599 Corridor (Corridor through CC2c & CC2a)
CC2/3            CC 599 Chemistry Lab (Equivalent to CC2c) 4-60
 
PNPP Individu11 Plint Ex minition - Ext: mil Ev:nts
, Fire          Fire Area        Compartment                    Description CC2/4              CC 599 NCC Pump Room (Southern portion of CC2a)
CC2/5              CC 599 NCC lleat Exchanger Room (Northern portion of CC2a)
CC6            CC6                CC 679 Unit 1/2 liVAC Chase IDGla          IDGla              IX} 620 Unit i Division 2 Diesel Generator Room IDG1b          IDGIb              DG 620 Unit 1 Division 3 Diesel Generator Room j IDGlc          IDGIc            DG 620 Unit i Division i Diesel Generator Room l 2DG1a -        2DGla              DG 620 Unit 2 Division 2 Diesel Generator Room 2D01b          2DGIb              DG 620 Unit 2 Division 3 Diesel Generator Room 2D01c          2DGIc              DG 620 Unit 2 Division 1 Diesel Generator Room DOId          DGId              DG 620 Diesel Generator Building Corridor DGle          LX}le              IX) 620 Low Level Radwaste Room DGDill        DGDBl              Diesel Generator Duct Bank I (Division 1)
DGDB2          DGDil2            Diesel Generator Duct Bank 2 (Division 2)
ESWIa          ESWia              Emergency Service Water Pumphouse ESW Pump Room ESWIb          ESWIb              Emergency Service Water Pumphouse - Diesel Fire lismp Room ESDBl          ESDBI              ESW Duct Bank I (Division 1) l ESDB2          ESDB2              ESW Duct Bank 2 (Division 2)
Fil            Fill              Fuelllandling Building 574 Fil2a              Fuelllandling Building 599 - Unit i Fil2b              Fuel liandling Building 599 - Unit 2
                                                                                        '  ^
Fil3              Fuelllandling Building 620 113            lill              intermediate Building 574 182                Intermediate fluilding 599 l
1B3                Intermediate lluilding 620 1114              Intermediate Building 654/665 IB5                Intermediate Building 682 ITil            ITB              Unit i Turbine lluilding ITPC            ITPC/l            Unit i Turbine Power Complex - Switchgear Rooms & Amertap iTPC/2            Unit i Turbine Power Complex - Sub-basemert l RWil          RWB                Radwaste lluildmg Yard (LOOP)  Yard                Yard Transformers UNIT 2        UNIT 2            Unit 2 Aux Bldg. Turb Bldg & Stm Tnl. & Turb Power Complex i
l 4-61                                      ;
 
PNPP Individu:1 Pl:nt Ex min ti:n - Ext: mil Ev:nts Table 4 2 - Fire Induced System Loss and initiating Event Matrix Plant Fire    Fire          Trip Area  Compt        initiator        Safe Shutdown System                                  Method I ABla  I ABla                Low Pressure Core Spray                                          A2 1ABid  IA111d                Residual lleat Removal C - Low Press Coolant injection Mode      B RiiR C Pump Room Cooler                                          B 1Allif I AB1f            X    Residual lleat Removal A - Shutdown Cooling Mode                  A Residual llent Removal B - Shutdown Cooling Mode                  B I ABig lABig                  Residual lleat Removal A - Steam Condensing Mode                  A Residual lleat Removal A . Shutdown Cooling Mode                  A Residuallleat Removal B Shutdown Cooling Mode                    B Residual liest Removal B - Suppression Pool Coolmg Mode          il Residual licat Removal C . lew Press Coolant injection Mode      11 law Pressure Core Spray                                          A2 Reactor Core Isolation Cooling                                    AI ,
Emergency Service Water A                                        A Electric Power for Method A                                      A Instrumentation for Method A                                      A Instrumentation for Method B                                      B 1AB2    1AB2            X    Rx Press Vessel Pressure Control (MSIVs & ADS)                    A Residual llent Removal A . Steam Condensing Mode                  A Residual lleat Removal A - Shutdown Cooling Mode                  A Residual lleat Removal A . Suppression Pool Coohng Mode          A Residual lleat Removal C - Low Press Coolant injection Mode      B
                                                                                            ~
Low Pressure Core Spray                                          A2 Reactor Core Isolation Cooling                                    A1 Rx Water Clean-Up liigh/ Low Press interface                      A RilR A Pump Room Cooler                                          A RIIR B Pump Room Cooler                                          B RilR C Pump Room Cooler                                          B RCIC Pump Room Cooler                                            Al Emergency Service Water A                                        A Safety Related instrument Air A                                  A Safety Related instrument Air B                                  B Electric Powe.for Method A                                        A instrumentation for Method A                                      A lABE    IABE            X    Rx Press Vessel Pressure Control (MSIVs & ADS)                    A Residual lleat Removal A - Steam Condensing Mode                  A Residualllent Removal A Shutdown Cooling Mode                    A Residual Ileat Removal A - Suppression Pool Cooling Mode        A  1 Residual licat Removal B . Shutdown Cooling Mode                  B
                ]                Low Pressure Core Spray                                          A2 Reactor Core isolation Coolmg                                    Al Rx Water Clean-Up liigh/ Low Press interface                    A RilR A Pump Room Cooler                                          A RCIC Pump Room Cooler                                            AI Emergency Service Water A                                        A Safety Related Instrument Air A                                  A Instrumentation for Method A                                    A 4-62
 
PNPP Individuil PI:nt Eximin: tion - Ext:rnri Ev:nts                            ,
Plant                                                                          i Fire        Fire          Trip Area      Compt        initiator        Safe Shutdown System                                  Method IABW      IA11W            X    Rx Press Vessel Press Control (MSIVs & ADS) for Method A        A Rx Press Vessel Press Control (MSIVs & ADS) for Method B        B Residuallleat Removal A Shutdown Cooling Mode                  A Residual llent Removal B - Shutdown Cooling Mode                B Residual llent Removal B - Suppression Pool Cooling Mode        B  i Residual lleat Removal C - Low Press Coolant injection Mode      B  !
Reactor Core isolation Cooling                                  AI R1(R B Pump Room Cooler                                          B RHR C Pump Room Cooler                                          11 Emergency Service Water B                                        B Safety Related Instnament Air B                                  11 Electnc Power for Method A                                      A Instrumentation for Method B                                    11 l Alls'lWN  lAliSTWN              None 1ABSTWS    lABSTWS              None ICC3a      ICC3a            X    Cntri Cmpix Chilled Water A                                      A Cntrl Cmplx Chilled Water B                                      B ESW Screen Wash 11                                              B Rx Press Vessel Press Control (MSIVs & ADS) for Method A        A Rx Press Vessel Press Control (MSIVs & ADS) for Method B        B Rx Recirculation liigh/ Low Press interface                      B    '
Reactivity Control for Method A -                                A  I Reactivity Control for Method B                                  B Rx Protection System for Method A                                A Rx Protection System for Method B                                B Residual lleat Removal A - Shutdown Cooling Mode                A    l Residuallleat Removal 11 Shutdown Cooling Mode                  B    l Residual licat Removal B - Suppression Pool Cooling Mode        B    l Residual IIcat Rernoval C - Low Press Coolant injection Mode    B    '
Reactor Core Isolation Cooling                                  Al  !
Rx Water Clean-Up liigh/ Low PresIFrface                        11 MCC Swtchgr & Misc Elec !!VAC B                                  B Battery Rooms Exhaust B                                          B Control Room liVAC A                                            A Control Room IIVAC B                                            B Control Room Emergency Recirculation B                          B    ;
ECC Pump Area Cooling 13                                        B    I ESW Pumphouse Ventilation 11                                    B RiiR B Pump Room Cooler                                          B RiiR C Pump Room Cooler                                          B D/G Bldg Ventilation B                                          B Emergency Closed Cooling B                                      B Emergency Service Water B                                        B Safety Related Instrumcnt Air B                                  B    '
Electnc Power for Method A                                      A Electnc Power for Method B                                      B Division 2 Diesel Generator                                    13 iCC3b      ICC3b                None ICC3c      1CC3c          X    Cntrl Cmpix Chilled Water A                                      A 4-63
 
1 1
I i
PNPP Individu:1 Ptnt Ex min:ti:n - Ext::rn:1 EvInts                        :
Plant Fire  Fire      Trip Area  Compt    initiator      Safe Shutdown System                                Method Rx Press Vessel Press Control (MSIVs & ADS) for Method A      A Rx Press Vessel Press Control (MSIVs & ADS) for Method A2    A2 Rx Press Vessel Press Control (MSIVs & ADS) for Method 11    B Rx Recirculation fligh/ Low Press interface                  A  )
Rx Recirculation fligh/ Low Press Interface                  B Reactivity Control for Method A                              A  +
Reactivity Control for Method B                              B Rx Protection System for Method A                            A
              ,            Rx Protection System for Method B                            B Residual Heat Removal A . Steam Condensing Mode              A Residual Heat Removal A . Shutdown Cooling Mode              A Residual lleat Removal A . Suppression Pool Cooling Mode      A Residual llent Removal B . Shutdown Cooling Mode              B  [
Low Pressure Core Spray                                      A2 i Reactor Core isolation Cooling                                Al Rx Water Clean-Up liigh/ Low Press Interface                  A MCC Swtchgr & Misc Elec flVAC A                              A Battery Rooms Exhaust A                                      A  I Control Room ilVAC A                                          A Control Room Emergency Recirculation A                        A ECC Pump Area Cooling A                                      A  l ESW Pumphouse Ventilation A                                  A  l RiiR A Pump Room Cooler                                      A  ]
RCIC Pump Room Cooler                                        AI EmerFency Closed Coohng A                                    A Emergency Service Water A                                    A Safety Related Instrument Air A                              A Electne Power for Method A                                    A Electne Power for Method B                                    B Division I Diesel Generator                                  A Instrumentation for Method A                                  A 1CC3d  ICC3d            Rx Press Vessel Press Control (MSIVs & ADS) for Method B      B Reactivity Control for Method A                              A Residuallleat Removal A Steam Condensing Mode                A ResidualIIcat Removal A Shutdown Cooling Mode                A Residual lleat Removal A - Suppression Pool Cooling Mode      A Residual llent Removal B . Shutdown Coolmg Mode              B Reactor Core isolation Cooling                                AI Rx Water Clean-Up liigh/ Low Press Interface                  A D/G Bldg Ventilation A                                        A Emergency Closed Cooling A                                    A Emergency Service Water A                                    A Electric Power for Method A                                  A Electric Power for Method B                                  B Division i Diesel Generator                                  A Instrumentation for Method A                                  A ICC3e  ICC3e            ESW Screen Wash B                                            B i
Control Room ilVAC B                                          B D/G Bldg Ventilation A                                        A D/G Bldg Ventilation 11                                      B ECC Pump Area Coolmg A                                        A ECC Pump Area Cooling B                                      B 4 64
 
_ _  _ _        = . -                -- -
PNPP Individuil Pirnt Eximinition - Exttmil Ev;nts Plant l Fire        Fire            Trip Area        Compt          initiator        Safe Shutdown Gystem                                Method Electric Power for Method A                                    A Division I Diesel Generator                                    A Division 2 Diesel Generator                                    B ICC4        iCC4                    Electric Power for Method A                                    A 635/654    638/654                  Electric Power for Method 11                                    B 1CC4a      ICC4a              X    Cntrl Cmpix Chilled Water B                                    B ESW Screen Wash B                                              B Rx Press Vessel Press Control (MSIVs & ADS) for Method A        A i                                      Rx Press Vessel Press Control (MSIVs & ADS) for Method B        B l                                      Rx Recirculation liigh/ Low Press Interface                    B Reactivity Control for Method A                                A Reactivity Control for Method B                                B Rx Protection System for Method A                              A Rx lYotection System for Method B                              B Residual licat Removal A - Shutdown Cooling Mode                A
(                                      Residual lleat Removal A - Suppression Pool Cooling Mode        A Residual lleat Removal B - Shutdown Cooling Mode                B l                                      Residual lleat Removal B - Suppression Pool Cooling Mode        B Residual lient Removal C - Low Press Coolant injection Mode    B Reactor Core Isolation Cooling                                  AI Rx Water Clean-Up liigh/ Low Press interface                    B
(                                      MCC Swtchgr & Misc Elec IIVAC D                                B i                                      Battery Rooms Exhaust B                                        11 l                                      Control Room IIVAC A                                            A l                                      Control Room ilVAC 13                                          B Control Room Emergency Recirculation A                          A l
Control Room Emergency Recirculation B                          B ECC Pump Area Cooling B                                        B
;                                      ESW Pumphouse Ventilation B                                    B RilR B Pump Room Cooler                                        B RilR C Pump Room Cooler                                        B l                                      D/G Bldg Ventilation B                                          B l                                      Emergency Closed Cooling B                                      B i                                      Emergency Service Water B                                      B Safety Related instrument Air B                                B Electric Power for Method A                                    A Electric Power for Method B                                    11 Division 2 Diesel Generator                                    B instrumentation for Method 11                                  B ICC4b        ICC4b              X    Cntri Cmpix Chilled Water A                                    A Cntrl Cmplx Chilled Water B                                    B ESW Screen Wash B                                              B  i Rx Press Vessel Press Control (MSIVs & ADS) for Method A        A Rx Press Vessel Press Control (MSIVs & ADS) for Method il      B Rx Recirculation liigh/ Low Press Interface                    A l                                      Rx Recirculation liigh/ Low Press interface                    B Reactivity Control for Method il                                B Rx Protection System for Method A                              A Rx Protection System for Method B                              11 i                                      Residual licat Removal A - Shutdown Cooling Mode                A Residual IIcat Removal A - Suppression Pool Cooling Mode        A l                                      Residual lleat Removal B - Shutdown Cooling Mode                il 4-65
 
PNPP Individual Pl:nt Ex minsti:n - Ext:m:I EvInts Plant Fire      Fire                  Trip Area      Compt                initiator          Safe Shutdown System                                Method Residual lleat Removal B - Suppression Pool Cooling Mode        B l                                            Residual lleat Removal C - Low Press Coolant injection Mode    B l
Reactor Core isolation Cooling                                  Al Rx Water Clean-Up liigh/ Low Press Interface                    A Rx Water Clean-Up liigh/ Low Press Interface                    B MCC Swtchgr & Misc Elec flVAC B                                B
;                                            Battery Rooms Exhaust B                                        B Control Room IIVAC B                                            B Control Room Emergency Recirculation B                          B ECC Pump Area Cooling B                                        B RilR B Pump Room Cooler                                        B RilR C Pump Room Cooler                                        B Emergency Closed Cooling B                                      B Emergency Service Water B                                      B Safety Related Instrument Air B                                B Electric Power for Method A                                    A Electric Power for Method B                                    B Instrumentation for Method B                                    B ICC4c    ICC4c                            Reactor Core Isolation Cooling                                  AI Electric Power for Method A                                    A l                                            Electric Power for Method B                                    B ICC4d    ICC4d                            Electric Power for Method B                                    B l
ICC4e    ICC4e                    X      Cntri Cmpix Chilled Water A                                    A Cntrl Cmpix Chilled Water il                                    B ESW Screen Wash A                                              A Rx Press Vessel Press Control (MSIVs & ADS) for Method A        A
,                                            Rx Press Vessel Press Control (MSIVs & ADS) for Method A2      A2 Rx Press Vessel Press Control (MSIVs & ADS) for Method B        B l                                            Rx Recirculation liigtvlow Press interface                      A Rx Recirculation liigh/Imw Press interface                      B Reactivity Control for Method A                                A Rx Protection System for Method A                              A Rx Protection System for Method B                              B Residual lleat Removal A - Steam Condensing Mode                A Residual lleat Removal A - Shutdown Cooling Mode                A l                                            Residual lleat Removal A - Suppression Pool Coolmg Mode        A Residual lleat Removal B - Shutdown Cooling Mode                B Low Pressure Core Spray                                        A2 Reactor Core Isolation Coolmg                                  Al Rx Water Clean-Up liigh/ Low Press Interface                    A Rx Water Clean-Up liigh/ Low Press interface                    B MCC Swtchgr & Misc Elec flVAC A                                A Battery Rooms Exhaust A                                        A l                                            Control Room IIVAC A                                            A l                                            Control Room flVAC B                                            B
[                                            Control Room Emergency Recirculation A                          A Control Room Emergency Recirculation B                          11 a                                            ECC Pump Area Cooling A                                        A ESW Pumphouse Ventilation A                                    A RilR A Pump Room Cooler                                        A RCIC Pump Room Cooler                                          Al j                                            DKi Bldg Ventilation A                                          A l                                                            4-66 l
 
PNPP Individuil Plint Extminition - Ext:rnil Ev:nts Plant                                                                        -
Fire    Fire      Trip Area    Compt  initiator        Safe Shutdown System                                Method Emergency Closed Cooling A                                      A Emergency Closed Cooling B                                      B Emergency Service Water A                                        A  ,
Emergency Service Water B                                        B Safety Related instrument Air A                                  A  ,
Electric Power for Method A                                      A Electric Power for Method B                                      B D.C. Power for Method A                                          A D.C. Power for Method B                                          B  i instrumentation for Method A                                    A ICC4f  ICC4f        X    Cntrl Cmplx Chilled Water A                                      A Reactivity Control for Method A                                  A Rx Protection System for Method A                                A  i Residuallleat Removal A - Shutdown Cooling Mode                  A Residual lleat Removal A - Suppression Pool Coolmg Mode          A Residual Ileat Remova B - Shutdown Cooling Mode                  B Reactor Core isolation Cooling                                  Ai Rx Water Clean-Up fligh/ Low Press Interface                    A
,                                    MCC Swtchgr & Misc Elec IIVAC A                                  A Battery Rooms Exhaust A                                          A
!                                    Controt Room ilVAC A                                            A Contml Room EmerFency Recirculation A                            A ESW Pumphouse Ventilation A                                      A Emergency Closed Cooling A                                      A  l Emergency Service Water A                                        A l
Safety Related Instrument Air A                                  A Instrumentation for Method A                                    A i
j          1CC4g  iCC4g            Rx iYess Vessel Press Control (MSIVs & ADS) for Method A2        A2 Reactivity Control for Method A                                  A Electnc Power for Method A                                      A l
l          ICC4h  ICC4h            Electric Power for Method A                                      A l
1CC4i  iCC4i            None l
ICC5a  ICC5a      X    Rx Press Vessel Press Contml(MSIVs & ADS) for Method A          A Rx Press Vessel Press Control (MSIVs & ADS) for Method B        B Rx Protection System for Method A                                A Rx Protection System for Method A1                              Al Rx Protection System for Method B                                B Instrumentation for Method A                                    A Instrumentation for Met!ad B                                    B ICC5b  ICC5b            Control Room liVAC B                                            B ICC5c  ICC5c            Control Room ilVAC B                                            B I
Electric Power for Method B                                    11 j          lCC6  1CC6              Cntrl Cmpix Chilled Water A                                    A MCC Swtchgr & Misc Elec ilVAC A                                A MCC Swtchgr & Misc Elec ilVAC B                                B
.                                                      4-67 l
 
PNPP ladividuil Plint Ex: min: tion - Ext; mil Ev;nts Plant Fire    Fire      Trip Area    Compt    initiator        Safe Shutdown System              Method llattery Rooms Exhaust A                      A  j Battery Rooms Exhaust B                        B
;                            Control Room IIVAC A                          A  j Control Room liVAC B                          B  ;
l                            Control Room Emergency Recirculation A        A  l Control Room Emergency Recirculation 11        B  I Electric Power for Method A                    A
( ICCSTW  ICCSTW            Electric Power for Method A                    A 2CC3a  2CC3a              None                                              I 2CC3b  2CC3b              None 2CC3c  2CC3e              None i
2CC3d  2CC3d              None 2CC3e  2CC3e              None 2CC4    2CC4              None 638/654 638/654 2CC4a  2CC4a              Electric Power for Method A                    A Electric Power for Method B                    B 2CC4b  2CC4b              Cntrl Cmplx Chilled Water B                    B ECC Pump Area Cooling B                        B Emergency Closed Cooling B                    B Emergency Service Water B                      11 2CC4c  2CC4c              Electric Power for Method B                    B 2CC4d  2CC4d              Electric Power for Method B                    B 2CC4e  2CC4e              Electric Power for Method A                    A 2CC4f  2CC4f              None 2CC4g  2CC4g              Electne Power for Method A                    A 2CC4h  2CC4h              Electric Power for Method A                    A 2CC4i  2CC4i              None 2CC5a  2CC5a              None 2CC5b  2CC5b              Control Room llVAC B f                                                                          11 2CC6    2CC6              Cntri Cmplx Chilled Water A                    A
;                            MCC Swtchgr & Misc Elec llVAC A                A MCC Swtchgr & Misc Elec ilVAC 11              11 llattery Rooms Exhaust A                      A Ilattery Rooms Exhaust B                      B Control Room lIVAC A                          A 4-68
 
PNPP Individuil Plant Ex min tion - Ext 2rn l Ev:nts Plant Fire        Fire    Trip Area        Compt  initiator          Safe Shutdown System                                Method Contml Room llVAC B                                            B Control Room Emergency Recirculation B                        B Electric Power for Method B                                    B 2CCSTW      2CCSTW              Nonc                                                              !
CCI        CCI          X    Cntrl Cmp!x Chilled Water A                                    A Cntrl Cmplx Chilled Water B                                    B ECC Pump Area Cooling A                                        A ECC Pump Area Cooling B                                        B Emergency Closed Cooling A                                    A Emergency Closed Cooling B                                    B Emergency Service Water A                                      A Emergency Service Water B                                      B CC2        CC2/1        X    Cntri Cmplx Chilled Water A                                    A Cntrl Cmplx Chilled Water B                                    B ECC Pump Area Cooling A                                        A ECC Pump Area Cooling B                                        B Emergency Closed Cooling A                                    A Emergency Closed Cooling B                                    B Emergency Service Water A                                      A Emergency Service Water B                                      B Flectric Power for Method A                                    A CC2        CC2/2        X    Cntrl Cmpix Chilled Water A                                    A Cntri Cmpix Chilled Water B                                    B Rx Press Vessel Press Control (MSIVs & ADS) for Method A      A Rx lYess Vessel Press Control (MSIVs & ADS) for Method B      B Residual Ileat Removal A - Steam Condensing Mode              A Residual lleat Removal A - bhutdown Coohng Mode                A Residual licat Removal A - Suppression Pool Cooling Mode      A Residual llent Removal B - Shutdown Cooling Mode              B Low Pressure Core Spray                                        A2 Reactor Core isolation Cooling                                Al Rx Water Clean-Up High/ Low Press interface                    A ECC Pump Area Cooling A                                        A ECC Pump Area Coohng B                                        B RilR A Pump Room Cooler                                        A RCIC Pump Room Cooler                                          AI Emergency Closed Cooling A                                    A  I Emergency Closed Cooling B                                    B Emergency Service Water A                                      A Emergency Service Water B                                      B Electric Power for Method A                                    A Electric Power for Method B                                    B instrumentation for Method A                                  A CC2        CC2/3              None CC2        CC2/4        X    Cntrl Cmplx Chilled Water A                                    A Cntrl Cmplx Chilled Water B                                    B Rx Press Vessel Press Control (MSIVs & ADS) for Method A      A Rx Press Vesselitess Control (MSIVs & ADS) for Method B        B Residual lleat Removal A - Steam Condensing Mode              A 4-69
 
PNPP Individu11 Plint Ex min tion - Ext:Imil EvInts l
l Plant Fire    Fire        Trip Area  Compt      initiator        Safe Shutdown System                                    Method  i Residuallleat Removal A - Shutdown Cooling Mode                    A Residual lleat Removal A - Suppression Pool Cooling Mode          A    i Residual liest Removal B - Shutdown Cooling Mode                  B Low Pressure Core Spray                                            A2 Reactor Core Isolation Cooling                                    Al Rx Water Clean-Up liigh/ Low Press interface                      A ECC Pump Area Coolmg A                                            A ECC Pump Area Cooling B                                            B RilR A Pump Room Cooler                                            A RCIC Pump Room Cooler                                              AI Emergency Closed Cooling A                                        A Emergency Closed Cooling B                                        B
!        e                              Emergency Service Water A                                          A l                                        Emergency Service Water B                                          B l                                        Safety Related Instrument Air A                                    A Electric Power for Method A                                        A Electric Power for Method B                                        B
;                                        instrumentation for Method A 1
A l            CC2    CC2/5          X    Cntrl Cmpix Chilled Water A                                        A
(                                        Cntrl Cmplx Chilled Water B                                        B
!                                        Rx Press Vessel Press Contml(MSIVs & ADS) for Method A            A
!                                        Rx Press Vessel Press Control (MSIVs & ADS) for Method B          B Residual llcat Removal A - Steam Condensing Mode                  A Residuallleat Removal A Shutdown Cooling Mode                      A Residual Ileat Removal A - Suppression Pool Cooling Mode          A Residual lleat Removal B - Shutdown Cooling Mode                  B
                                                                                                                  )
I
!                                        Low Pressure Core Spray                                            A2 Reactor Core Isolation Cooling                                    Al Rx Water Clean-Up liigh/ Low Press Interface                      A ECC Pump Area Coolmg A                                            A ECC Pump Area Cooling B                                            B RilR A Pump Room Cooler                                            A RCIC Pump Room Cooler                                              AI l                                        Emergency Closed Cooling A                                        A l                                        EmerFency Closed Cooling B                                        B Emergency Service Water A                                          A Emergency Service Water B                                          B Safety Related Instrument Air A                                    A Electric Power for Method A                                        A Electric Power for Method B                                        B l
Instrumentation for Method A                                      A CC6    CC6                  MCC Swichgr & Misc Elec IIVAC 13                                  B Battery Rooms Exhaust B                                            B Control Room IIVAC B                                              B Control Room Emergency Recirculation B                            B Electric Power for Method B                                        B
;            IDGla  IDGla              D/G Bldg Ventilation B                                            B Emergency Sersice Water B                                          B Electnc Power for Method B                                        B 1                                        Division 2 Diesel Generator                                        B IDGib  IDGib              None 4-70 1                                                                                                .____        _
 
I l
i PNPP Individu11 Pl:nt Extminition - Ext::rnil Ev;nts                ;
Plant Fire    Fire      Trip Area    Compt    Initiator        Safe Shutdown System                      Method IDGlc  IDGlc              D/G Bldg Ventilation A                              A EmerFency Service Water A                            A Electric Power for Method A                          A Division i Diesel Generator                          A 2LX.ila 2DGla              None 2DGib  2DGib              None 2DGIc  2DGIc              None DGid    IXild              D/G Bldg Ventilation A                              A D/G Bldg Ventilation B                              B Emergency Service Water A                            A Emergency Service Water B                          B Electric Power for Method B                          11 Division i Diesel Generator                        A Division 2 Diesel Generator                          B DGle    DGle                Residual llent Removal B - Shutdown Cooling Mode    B    i D/G Bldg Ventilation B                              11  I Emergency Service Water B                            B i
DGDill  DGDBl              Electric Power for Method A                          A l
DGDB2  DGDB2              Electric Power for Method il                        13 l
l ESWla  ESWla              ESW Screen Wash A                                    A l                            ESW Screen Wash B                                    B    l l                            ESW Pumphouse Ventilation A                        A ESW Pumphouse Ventilation B                        B Emergency Service Water A                          A Emergency Service Water B                            B
!                            Electric Power for Method A                        A    J
!                            Electric Power for Method il                        B      l l
ESWlb  ESWib              None                                                      l ESWDBl  ESWI)lli            ESW Screen Wash A                                    A t
E',G Pumphouse Ventilation A                        A Emergency Service Water A                            A Electric Power for Method A                          A ESWDB2  ESWDB2              ESW Screen Wash B                                    B ESW Pumphouse Ventilation 11                        B Emergency Service Water B                            B Electnc Power for Method B                          B l'il    l'Ill          X    None 1
l'Il    l'Il2a              ESW Screen Wash A                                    A ESW Pumphouse Ventilation A                          A Emergency Service Water A                            A i                            Electric Power for Method A                          A 4-71 l
1
 
r                                                                                        1 PNPP Individu11 Plint Eximinition - Ext:: mil Ev;nts l              Plant                                                                      i
                                                                                          \
Fire  Fire    Trip                                                                    i Area Compt  initiator      Safe Shutdown System                                Method
( Fil  l'Il2b            None I'll Fil3              ESW Screen Wash A                                            A ESW Pumphouse Ventilation A                                  A Emergency Service Water A                                    A Electne Power for Method A                                    A til  1111        X    None 111  1112        X    Rx Press Vessel lYess Control (MSIVs & ADS) for Method A      A l
Residual licat Removal A - Steam Condensing Mode              A-Residual lleat Removal A - Shutdown Cooling Mode              A Residual 11 eat Removal A - Suppression Pool Cooling Mode    A Residual liest Removal B - Shutdown Cooling Mode              B Low Pressure Core Spray                                      A2 Reactor Core Isolation Cooling                                Ai Rx Water Clean-Up liigh/ Low Press interface                  A RilR A Pump Room Cooler                                      A l                        RCIC Pump Room Cooler                                        A1 Emergency Service Water A                                    A Safety Related instrument Air A                              A Instrumentation for Method A                                  A I
; lit  1113        X    ESW Screen Wash A                                            A
!                        Rx Pr ss Vessel Press Control (MSIVs & ADS) for Method A      A Rx Press Vessel itess Control (MSIVs & ADS) for Method B      B Reactivity Control for Method A                              A  ;
Residual lleat Removal A - Shutdown Cooling Mode            A  j Residual llent Removal B - Shutdown Cooling Mode              B  j Residual licat Removal B - Suppression Pool Coolmg Mode      B Residual lleat Removal C - Low Pressure Coolant injection    B Reactor Core Isolation Cooling                                AI
.                        RilR B Pump Room Cooler                                      B  i I
RiiR C Pump Room Cooler                                      B  l Emergency Service Water A                                    A l                        Emergency Service Water B                                    B Safety Related Instrument Air B                              B Electnc Power for Method A                                    A Instrumentation for Method A                                  A Instrumentation for Method B                                  B IB  1114        X    Residual llent Removal A - Shutdown Coolmg Mode              A til  1B5              None i ITil IIB          X    Rx Press Vessel Press Control (MSIVs & ADS) for Method A      A l
.                        Rx Press Vessel lYess Control (MSIVs & ADS) for Method B      11 l                        Residuallleat Removal A - Shutdown Cooling Mode              A Residual licat Removal B - Shutdown Cooling Mode              il Reactor Core Isolation Coolmg                                AI Rx Water Clean-Up iligh/ Low Press Interlace                  A ITPC ITPC/I      X    Rx Press VesselIYess Control (MSIVs & ADS) for Method A      A l                        Rx Press Vessel Press Control (MSIVs & ADS) for Method il    B l                                        4-72
 
PNPP Individuil PI:_nt Ex min: tion - Ext: mal Ev:nts Plant Fire        Fire    Trip Area        Compt  initiator      Safe Shutdown System                  Method Reactivity Control for Method A                A 1TPC        1TPC/2            None RWI)        RWil              None Yard (LOOP) Yard        X    None UN112      UNIT 2            None l
i l
i 4-73
 
I PNPP Individurl PI:nt Eximin: tion - Ext rnil Evints Table 4 Fire Area / Compartment Screening Results through Phase 11 Step 2 Fire        Safe            Fire    Conditional        F2 l                      Induced      Shutdown    Frequency i    Fire    Fire                                                    CDP            ,
Screened i                        Plant    Equipment          (F1)
Area    Comp                                                              F1 x P2 initiator                                    (P2)
IAB1a                              X          2.312E-03        1.83E-05  4.231E-08  Phaseil Step 2 IAbid                              X          2.311 5 03      1.75E-05  *.044 E-08 Phase !I Step 2 1 ABlf                X            X          2.751E-03      5.19E-04    1.428E-06        No IABig                              X          5.349E-03      5.39E-05    2.883E-07  Phase ll Step 2 l    IAB2                  X            X          8.255E-03      7.49E-04    6.183E-06        No j    lABE                  X            X          3.802E 03      4.87E-04    1.852E-M        No IABSTWN                                                -              -          -
Phase 1 IABSTWS                                                -              -          -
Phasei lABW                  X            X          5.439E-03      4.44D05    2.415b-07  Phase II Step 2 1CC3a                  X            X          7.994E-03      7.01E-03    5.604E-05      - No l
1CC3b                                                -              -          -
Phasei l
ICC3c                  X            X          7.670E-03      4.94E-04    3.789E-06        No ICC3d                              X          9.906E-04      4.87E-04    4.824E-07  Phasell Step 2 1CC3e                              X          1.089E-03      2.61E-04    2.842E-07  Phase 11 Step 2 ICC4                              X          6.910E-04      8.28E-05    5.721E-08  PhaseII Step 2 638/654 l
ICC4a                  X            X          3.131E-03      2.92E-04    9.143E-07  Phasell Step 2 1CC4b                  X            X          2.375E-04      8.55E 03    2.031E-05        No 1CC4c                              X          3.126E-03      2.52E-04    7.878E-07  Phase 11 Step 2 1CC4d                              X          2.247E-03      2.52E-04    5.662E-07  Phase 11 Step 2 ICC4e                  X            X          2.498E-03      5.28E-05    1.319E-07  Phasell Step 2 ICC4f                  X            X          3.058E-03        1.21E-04  3.700 5 07 Phase ll Step 2 ICC4g                              X          2.482E-03      2.63E-04    6.528E-07  Phase II Step 2 1CC4h                              X          2.247E-03      2.638-04    5.910E-07  Phase 11 Step 2 l    1CC4i                                              -              -            -      Phase 1 ICC$a                  X            X          1.033E-02      1.21D02    1.250E-04        No 1CC5b                              X          9.480E-04        8.28E-05  7.849E-08  Phase 11 Step 2
',  ICC5c                              X          l.814E-03      8.28E-05    1.502E-07 Phase ll Step 2 ICC6                              X          5.810D03        8.28E-05  4.811E-07  Phase ll Step 2 1CCSTW                              X          6.468E-04        5.86E-04  3.790E-07  Phase 11 Step 2 IDGla                              X          3.021E-02        4.56E-06    1.378E-07 Phase !I Step 2 4-74
 
1 1
PNPP Individuil Plint Examiniti:n - Ext rnal Ev;nts i
Table 4 Fire Area / Compartment Screening Results through Phase 11 Step 2 Fire        Safe                Fire    Conditional    F2 Induced      Shutdown        Frequency Fire    F. ire                                                  CDP Screened Plant    Equipment              (F1)                F1 x P2 Area    Comp initiator                                      (P2)
IDGib                                                  -          -          -
Phase i IDGlc                              X              3.021E-02    1.27E-06  3.837E-08  Phase ll Step 2 ITB                  X            X              1.391E-01  7.44E-04  1.035E-04      No ITPC                  X            X              7.446E-03    4.38E-04  3.261E-06      No 2CC3a                                                  -          -          -
Phase I      )
2CC3b                                                  -          -          -
Phase I 2CC3d                                                  -          -          -
Phase 1
                                                                                                        )
2CC3e                                                  -          -          -
Phase 1 2CC4                                                  -          -          -
Phase 1 638/654 2CC4a                              X              2.509E-03    8.28E-05  2.077E-07  Phase 11 Step 2 2CC4b                              X              8.792E-04    5.39E-04  4.739E-07  Phase 11 Step 2 2CC4c                              X              4.803E-03    8.28E-05  3.977E-07  Phase 11 Step 2 2CC4d                              X              2.289E-03    8.28E-05  1.895E-07  Phase 11 Step 2 2CC4e                              X              2.735E-03    8.28E-05  2.265E-07  Phase 11 Step 2 2CC4f                                                  -          -          -
Phase 1 2CC4g                              X              4.803E-03    8.28E-05  3.977E-07  Phase 11 Step 2 2CC4h                              X              1.489E-03  8.28E-05  1.233E-07  Phase 11 step 2 2CC4i                                                  -          .          -      Phase 1 2CC5a                                                  -          -          -
Phase 1 2CC5b                              X              6.710E-03    8.28E-05  5.556E-07  Phase 11 Step 2 2CC6                              X              5.274E-03    8.28E-05  4.367E 07  Phase 11 Step 2 2CCSTW                                                  -          -          -
Phase 1 2DGla                                                  -          -          -        Phase 1 2DGIb                                                  -          -          -
Phase 1 2DG1c                                                  -          -          -
Phase 1 CCI                              X              8.698E 03    1.35E-02  1.174E-04      No l  CC2z    CC2/1        X            X              7.755E-04    3.51E-03  2.722E-06        No CC2/2          X          X              1.017E-03  3.51E-03  3.570E-06        No CC2/3                                          -          -            -
Phase I CC2/4          X          X              2.912E-03    3.62E-01  1.054E-03      No l
l                                                  4-75
 
PNPP Individu;l Plint Ex: min:ti:n - Ext: mil Ev;nts Table 4 Fire Area / Compartment Screening Results through Phase il Step 2 Fire          Safe            Fire  Conditional        F2 Induced        Shutdown  Frequency Fire                                              Fire                                                          CDP            ,
Screened Plant        Equipment          (F1)
Area                                    Comp                                                                              F1 x P2 initiator                                        (P2)
CC2/5                X                X        1.897E-03    5.28E-03    1.002E-05                                    No CC6                                                                                  X          1.186E 03    8.28E-05    9.820E-08                              Phase II Step 2 DG1d                                                                                  X          l.604E-03    6.20E-05    9.945E-08                              Phase 11 Step 2 DGle                                                                                  X        7.002E-04      7.26E-03    5.083E-06                              Phase ll Step 2 DGDB1                                                                                  X          l.995E-06    3.66E-06    7.302E-12                              Phase II Step 2 DGDB2                                                                                  X          1.995E-06    4.56E-06    9.097E-12                              PhaseII Step 2 ESWI                                      ESWla                                      X        6.381E-03      2.61E-04    1.791E-06                                  No ESWib                                                          -            -          -
Phasel ESWDBI                                                                                  X        1.995E-06      1.22E-06  2.434E-12                              Phase II Step 2 ESWDB2                                                                                  X        1.995E-06    2.76E-06    5.5%E-12                              Phase 11 Step 2 FIIz                                              F1II              X                        5.151E-03      8.28E-05  4.265E-07                              Phase II S'ep 2 Fil2a                                X        1.321E-03    6.46E-04    8.534E-07                              Phase II Step 2 FII2b                                                    -          -          -
Phase 1 F113                              X        2.529E-03    6.46E-04    1.634E-06                                    No IDz                                                IBl            X                          8.356E-03    8.28E-05    7.333E-07                              Phase 11 Step 2 IB2              X                X      7.028E-03      3.63E-02    2.551E-04                                    No 183              X                X      9.802E-03      8.66E-05    8.489E-07                              Phase 11 Step 2 IB4              X                X      4.268E-03      8.59E-05    3.666E-07                              Phase 11 Step 2 IB5                                                  -          -          -
PhaseI RWB                                                                                                    -          -          -
Phase i Yard                                                                X                        1.600E-03      4.38E-04    7.000E-07                              Phase 11 Step 2 I
(LOOP)
UNIT 2                                                                                                  -            -          -
Phase 1 4-76
 
T                                                                                                                                                      \
P PNPP Individual Plant ExEmination - External Events                                                !
Table 4 F2 Calculations for Fire Compartment 1CC3a Fire Scenarios Fire Compartment 1CCJa Fire Damage Scenarios Scen Source                Source identification              Supp      Safe Shutdown          SSD Trays and/or      F1'          P2'      F3'
    #  Type      (Section if SWGR, Bus or MCC) (Y!N) Equipment Damaged                            Conduit  Damaged I  4.16 kV  Any                                              N        All in Fire Compartment          All      8.434E-05      FDS0    5.91E-07 SWGR                                                                                                                      7.0IE-03 2  4.16 kV  1) 4,160/480 V XFMR XFil-1-A                    Y              4.16 kV SWGR          Tray 2607271  4.217E-05      FDS0    2.%E-07 SWGR                                                                                          Tray 1316/1321              7.01E-03 Tray 1320 3  4.16 kV  2) SW Pump B P41 C001B                          Y              4.16 kV SWGR              Tray 260    8.434-05      FDS0    5.91E-07 SWGR                                                                                            Tray 1316                7.01E-03 3)NCC Pump B P43-C001B 4  4.16 kV  4)CRD Pump B ClI-C001B                          Y              4.16 kV SWGR              Tray 260    2.952E-04      FDS0    2.07E47 SWGR    5) Supply to Bus XII12                                                                  Tray 1316                7.0lE-03
: 6) Alt. Pref. Source-LII-2-A                                                          IR33D30B
: 7) Pref. Source - LII-I-A                                                              1R33D54B
: 8) Spare
: 9) RIIR Pump C E12-C002C
: 10) 4160/480 V XFMR ElIF-1-D 5  4.16 kV  II) RilR Pump B E12-C002B                        Y              4.16 kV SWGR              Tray 260  4.217E-05      FDS0    2.%E-07 SWGR                                                                                            Tray I316                7.01E-03 IR33D54B 6  4.16 kV  12) Spare                                        Y              4.16 kV SWGR            Tray 260    2.109E-05      FDS0    1.48E-06 SWGR    13)CCCW Chiller B P47-B001B                                                              Tray 1316                7.01E-03
: 14) ESW Pump B P45-C001B                                                                IR33D29B                                      '
: 15) 4160/480 V XFMR EXIF-I-C
: 16) Spare 7  4.16 kV  17) Aux. Compt. Ell-1202                        Y              4.16 kV SWGR            Tray 260    8.434E-05      FDS0    5.91E-07 SWGR    18) From D/G R43-5001B                                                                  Tray 1316                7.01E 03 8  480 V Bus Any                                              N        Allin Fire CwwLe.t              All      3.300E-05      FDS0    2.31E-07 7.01E-03 9  480 V Bus 1) Inst. Compt. EFICI, Main supply breaker from  Y            480 V Bus EF-l-C          Tray 272    8.434E-05      FDS2    3.1IE-08 Ell-12, and Inst. Compt. EFIC2                                                      Trey 1317                3.69E-04
: 2) FPCC Pump B G41-C003B, M23 Fan B M23-                                                1 ray I379 C001B, Reserve Battery ChargerEFD-12-B (R42-                                        Tray 1608                                    ,
S009). and MCC EFIC07(R24-S023)                                                                                                    l 10  480 V Bus 3) MCC EFIC08 (R24-5024) MCC EFIC09 (R24-        Y            480 V Bus EF-l-C          Tray 272    4.217E-05      1-DS 0  2.%E-07 S025)                                                    480 V Bus EF-1-D          Tray 1317                7.01E-03 Tray 1379 Tray 1608 II  480 V Bus 4) MCC EFICl2 (R24-S032), EF-l-C to EF-1-D X-    Y                480 V Bus              Tray 272    8.434E-05    7.01E-03  5.91E-07 tie Breaker, and 112 Recombiner M51-D001B                                            Tray 1317 Tray 1381 4-77
 
PNPP Individual Plant Ex;mination - Extemal Events Fire Compar^ ment 1CC3a Fire Damage Scenarios Scen    Source                            Source Identification                    Supp                            Safe Shutdown                                                                      SSD Trays and/or                                                                                    F1'      P2'      F3'
#        Type                  (Section if SWGR, Bus or MCC) (Y/N) Equipment Damaged Conduit Damaged 5)MCC EFID08(R24-S028) MCC EFID09                                                                                                                                                                    Tray 1608 (R24-S036),and AttematePowerSupplyto EF2DII (R24-SO48) 12      480 V Bus            6) ECC Pump B P42-C001B, CCCW Pump B                  Y                                            480 V Bus EF-1-D                                                                                    Tray 272                                              4.217E-05              FDS0    2.96E-07 P47-C001 B, Normal Battery Charger EFD-I-B                                                                                                                                                        Tray 1317                                                                    7.0lE-03 (R42-S008), and MCC EF1D07 (R24-S026)                                                                                                                                                            Tray I381 Tray 1608 13      480 V Bus            7) Instr. Compt. EFI D01, Main supply breaker from    Y                                            480 V Bus EF-t-D                                                                                    Tray 272                                              4.217E-05              FDS0    2 96E-07 Ell-12, and Instr. Compt. EFID02                                                                                                                                                                  Tray 1317                                                                    7.01E-03 Tray 1608 14      480 V MCC              EFIC07 (R24-S023)                                    N                                                EFIC07                                                                                              None                                                6.53E-04            FDS3      NEG NEG 15      480 V MCC              EFIC08 (R24-S024)                                    N                                                EFIC08                                                                                              None                                              1.875E-04            FDS3      NEG NEG 16      480 V MCC              EFID09(R24-5036)                                      N                                                EFID09                                                                                              None                                            2.363E-05              FVS3      NEG NEG 17      480 V MCC              EFIC09(R24-S025)                                      N                                                EFAC09                                                                                          Tray 273                                                  3.3E-05          FDS0    2.31E-07 Tray 1356                                                                      7.01E-03 18      480 V MCC              EFID07 (R24-5026)                                    N                                                EFID07                                                                                        Tray 271                                                2.97E-04              FDSI    7.69608 Tray 1321                                                                      2.59E-04 Tray 1320 Tray 1371 Tray 1372 Tray 1373 Tray 1374 Tray 1375 Tray 1376 Tray 1377 Tray 1378 19      480 V MCC              EFID08 (R24-S028)                                    N                                                EFID08                                                                                        Tray 271                                                8.032-04            FDSI    5.49508 Tray 1321                                                                      2.59E-04 Tray 1320 Tray 1384 Tray 1385 20      Post LOCA M51-S002                                                          N                                                M51-S002                                                                                    Tray l317                                              4.875E05                FDSO    3.42607 Power Supply                                                                                                                                                                                                                Tray 272                                                                      7.01E-03 IR33C5423B 21    Junct. Boxes            N/A                                                  N                                                  None                                                                                              None                                          0.000D00                  N/A    0.000E-00 4-78
 
PNPP Individual Plant Examination - Extemal Events Fire Compartment 1CC3a Fire Damage Scenarios Scen        Source                                          Source identification              Supp        Safe Shutdown                        SSD Trays and/or    F1'        P2'                          F3'  [
      #            Type                                  (Section if SWGR, Bus or MCC) (YlN) Equipment Damaged Conduit Damaged 22      RPS MG Set                              N/A                                            N                  None                                  None  2.753E-03 FDS 3 NEG                        NEG 23              XFMR                            R25-5034                                        N                  None                                  None  9.753E-05    FDS3                          NEG NEG 24              XFMR                            R25-S5002                                      N                  None                                  None  9.753E-05    FDS3                          NEG NEG 25              XI MR                          EliF-1-C (R23-50l l)                            N                    All                                  All  9.753E-06    FUS0                        6.82E-08 l
7.01E-03
,    26              XFMR                            EliF-l-C (R23-Soll)                            Y            480 V Bus EF-1-C                          Tray 272 8.777E-05    FDS0                        6.15E 07 l
Tray 1317            7.01E-03 Tray 1608 27              XFMR                            EliF-1-D(R23-S012)                              N                    All                                  All  9.753E-06    FDSO                        6.82E-08 7.01E-03 28              XFMR                            EllF-1-D(R23-S012)                              Y            480 V Bus EF-1-D                          Tray 272 8.777E-05    FDS0                        6.15E-07 Tray 597            7.01E-03 Tray 1317 t
Tray 1608                                                  i Tray 1649 29              XFMR                            R25-S027                                        N                  None                                  None  9.753E-05    FDS3                          NEG NEG 30              XFMR                            R25-S035                                        N                  None                                None    9.753E-05    FDS3                          NEG NEG 31              XFMR                            R25-S128                                        N                  None                                None    9.753E-05    FDS 3                          NEG NEG 32              XFMR                            R71-S076                                        N                  None                                None    9.753E-05    FDS3                          NEG NEG 1 g 33                    -                        l'ransient and Weldmg/ Cutting                  N                    All                                  All  6.876E-07  7.01 E-03                4.829E-09    t 4-79
 
PNPP Individuil Plint Ex mination - Ext mil Ev:nts Table 4 Grouping of Control Room Cabinets Fire Damage (Loss of Control from Control Room)
Division Cabinet                    RCIC        SRVs            FPCC      MSlV      HPCS                Offsite Group      Y' **                                                                                Power except                                    Vent Path    Vent RCIC, p,g FPCC Vent and ADS Valves la    Division I    Group la      Division I      Group la No damage  Group la                      4 No damage 1b                    No damage                    No damage          No damage yg                    Group lb                      Group lb            Group Ib No damage                    No damage            Damaged Id Group Ic                      Group Ic            Group Ic Divi                          Div I            No damage Group Id                    Group Id            Group Id Damaged                    No damage          No damage 2a      Division 11  No damage      Division 11    Group 2a  No damage No damage              Group 2a No damage                              No dansge 2b Group 2b                                  Group 2b 2c                                                    Div 11                                  Damaged Croup 2e                                  Group 2c Div 11                              No damage 3a      Division i    Group 3a      Group 3a      Group 3a  Group 3a  Group 3a          No damage
                &      No damage    No damage      No damage            No damage 3                                                            No damage Division ll    Group 3b      Group 3b      Group 3b            Group 3b 3c                    Damaged      Damaged        Damaged  Group 3b  Damaged Group 3e      Group 3c      Group 3e  No damage Group 3c No damage    No damage      No damage            No damage Group 3c Damaged 4a      No damage    No damage    No damage      No damage            No damage            Group 4a 4b                                                                                        No damage Group 4b Damaged 4-80
 
PNPP IndividuEl Plcnt Examination - Extemal Events Table 4 Cabinet Equipment Status and Fire Frequency Evaluation Cabinet              Function                Cabinet Division RCIC HPCS FPCC Vent MSIV ADSISRV Offsite            Cabinet  Cabinet ID        (based on walkdown)                (GEZ-7132)                        Path      Vent CR Cntrl Power  Floor      Fire D1/D3    D2/D4                    CR Cntrl    Path          Status  Area      Freq CABINET GROUP 1 A P628                ADSI                    Div 1                                                  Div i            2    1.04E-04 P632            Leak Detection              Div i                                                                    1    5.19E-05 P651      Control Rod Position Panel          Div i                                                                    1    5.19E-05 P655            Aux Relay Div 1              Div 1                                                                    2    1.04E-04 P669          Neutron Monitoring              Div i                                                                  3    1.56E-04 P881  Div 1 Cont. and DW Isolation Valve    Div1,3                                                                        5.19E-05 1              l P884      Post Accident Monitoring          Div i                                                                    1    5.19E-05 Total  5.71E-04  .
CABINET GROUP 1B P625          Division 3 Aux Relays            Div 3                    Failed                                          1  5.19E-05 P873          Division 3 Aux Relays            Div 3                    Failed                                          1  5.19E-05 Total  1.04E-04 CABINET GROUP 1C P872          Aux Relays Division 1            Divi                                Div1                              3    1.56E-04 Total  1.56E-04 CABINET GROUP 1D P621        Div 1 Aux Relays /RCIC            Div 1            Failed                              Divi              1    5.19E-05 P629    Div i Aux Relay LPCS, RilR A          Div1            Failed                              Div1            4    2.08E-04 Total  2.60E-04 CABINET GROUP 2A P610                  Test                            Div 2                                                          1    5.19E-05 P618      Div 2 Aux Relay- RIIR B&C                      Div 2                                        Div 2            4    2.08E-04 P622            Div 2 Aux Relays                        Div 2                                                        2    1.04E-04 P631                  ADS 11                            Div 2                                        Div 2            1    5.19E-05 P640                    Test                            Div 2                                                        2    1.04E-04 P642              Leak Detection                        Div 2                                                        2    1.04E-04 4-81
 
PNPP Individuil Plint Eximination - Extem I Events CEbinet                              Function                          Cabinet Division                                  RCIC                            HPCS                FPCC Vent                                  MSIV          ADSISRV  Offsite                  Cabinet  Cabinet ID                        (based on walkdown)                            (GEZ-7132)                                                                                                Path                                  Vent          CR Cntrl Power                      Floor              Fire D1/D3            D2/D4                                                                                  CR Cntrl                                  Path                    Status                    Area            Freq P652                              11113-P0652                                            Div 2                                                                                                                                                                                  1    5.19E-05 P653                      CRD Control Instrumentation                                    Div 2                                                                                                                                                                                  1    5.19E-05 P654                          Aux Relay Div 2                                          Div 2                                                                                                                                                                                  1    5.19E-05 P670      Process Rad Monitor SRM & IRM Chnl                                            Div 2                                                                                                                                                                                  3    1.56E-04 B/F P882                        Containment Isolation                                        Div 2                                                                                                                                                                                  1    5.19E-05 P885                      Post Accident Monitoring                                      Div 2                                                                                                                                                                                  1    5.19E-05 Total  1.04 E-03 CABINET GROUP 2B P870                          Offsite Power / BOP                                        Div 2                                                                                Div 2 Failed                                                        Failed                      9    4 o7E-04 Total  4.67E-04 CABINET GROUP 2C P871                          B Relay Division 2                                        Div 2                                                                                  Div 2 Failed                                                                                    3    1.56E-04 Total  1.56E-04 CABINET GROUP 3A P623                          Auxiliary Relay                          Div1          Div 4                                                                                                                                                                                  1    5.19E-05 P671                        Neutron Monitoring                        Div 3          Div 2                                                                                                                                                                                  3      1.56E-04 P672                          Rad Monitoring                          'Div 1        Div 4                                                                                                                                                                                  3      1.56E-04 P680                        Unit I control Console                    Div 1,3  Div 2,4                                                                                                                                                                                        8    4.15E-04 P691        Div 1 RPS and Inst & Auxiliary Relay                      Div 1,3  Div 2,4                                                                                                                                                                                        2    1.04E-04
.                                                  Panel P692        Div 2 RPS and Inst & Auxiliary Relay                      Div1,3  Div 2,4                                                                                                                                                                                        2    1.04E-04 Panel P693        Div 3 RPS and Inst & Auxiliary Relay                      Div 1,3  Div 2,4                                                                                                                                                                                        2    1.04E-04 Panel P694        Div 4 RPS and Inst & Auxiliary Relay                      Div1,3  Div 2,4                                                                                                                                                                                        2    1.04E-04 Panel P800                        ilVAC Control Panel                        Div 1,3      Div 2                                                                                                                                                                                    5    2.60E-04 P868  Analog Loop Division 2 Instrumentation                          Div 1,3      Div 2                                                                                                                                                                                    3    1.56E-04 Panel.
4-82
 
i PNPP Individual PI:nt Ex:minition - Ext; mil Events Ccbinet                                                        Function        Cabinet Division                      RCIC      HPCS    FPCC Vent                                        MSIV  ADS /SRV Offsite  Cabinet        Cabinet ID          (based on walkdown)                                                        (GEZ-7132)                                      Path                                          Vent  CR Cntrl Power      Floor          Fire D1/D3                          D2/D4                    CR Cntrl                                        Path            Status    Area          Freq P869  Analog Loop Division i Instrumentation                                  Div 1                        Div 2,4                                                                                                      3    1.56E-04 Panel.
P877      Diesel Generator Bench Board                                        Div 1                        Div 2                                                                                                        2    1.04E-04 P883          Post Accident Monitoring                                          Div1                          Div 2                                                                                                          1 5.19E-05 P904                                  Common llVAC                              Div1                          Div 2                                                                                                      3    1.56E-04 P969  Common Long Response Control Panel                                      Div 1                        Div 2                                                                                                        3    1.56E-04 P970    Common Analog Loop Instr.and Aux                                        Div 1                        Div 2                                                                                                      2    1.04E-04 Relay Panel Total        2.34E-03 CABINET GROUP 3B                                                                                                              ,
P601    Emergency Core Cooling Bench Board                                    Div 1,3                      Div 2,4 Failed Failed      Div 1/2 l                                              Div 1/2                    7    3.63E-04 Total        3.63E-04 CABINET GROUP 3C C22-        Redundant Reactivity Control                                        Divi                          Div 2                                                                    Failed                            3    1.56E-04 P001 C22-      Redundant Reactivity Control                                        Div 1,3                      Div 2,4                                                                    Failed                            3    1.56E-04 P002 Total        3.11 E-04 CABINET GROUP 4A P5001  Control Room Communications Panel                                                                                                                                                                                  1  5.19E-05 P600                                    Rad Monitoring                                                                                                                                                                  2    1.04E-04 P604                                    Rad Monitoring                                                                                                                                                                    1  5.19E-05 P612                            FW/ Recirculation                                                                                                                                                                        3      1.56E-04 P613                                                        NSSS Inst.                                                                                                                                                    1    5.19E-05 P614                                          NSS Recorder                                                                                                                                                              2      1.04E-04 P619                                                            Jet Pump                                                                                                                                                  1    5.19E-05 P630          Annunciator Logic Panel                                                                                                                                                                                    8      4.15E-04 P634                                  Recirc/ Flow Cti.                                                                                                                                                                2      1.04E-04 P637                                            Steam Bypass                                                                                                                                                            2      1.04E-04 4-83
 
PNPP Individual Pl;nt Eximination - Externct Events Cr. binet                          Function          Cabinet Division                                                                RCIC                                                HPCS                                                  FPCC Vent              MSIV ADSISRV  Offsite Cabinet  Cabinet ID        (based on walkdown)                        (GEZ-7132)                                                                                                                                                                                              Path Vent CR Cntrl Power    Floor      Fire D1/D3                D2/D4                                                                                                                                                                        CR Cntrl      Path          Status  Area      Freq P643                                  SAS                                                                                                                                                                                                                                                      1    5.19E-05 P703        Not shown on GEZ 7132                                                                                                                                                                                                                                                                  0.00E+00 P802                              Fire / Security                                                                                                                                                                                                                                              3    1.56E-04 P803                  Rad Monitoring                                                                                                                                                                                                                                                          1    5.19E-05 P804                  Rad Monitoring                                                                                                                                                                                                                                                          3    1.56E-04 P805      Cabinet at center of horseshoe                                                                                                                                                                                                                                                        1    5.19E-05 P807        Main Transformer Relay                                                                                                                                                                                                                                                            1    5.19E-05 P821                                  EllC                                                                                                                                                                                                                                                    4    2.08E-04 P822                                Turbine                                                                                                                                                                                                                                                    1    5.19E-05 P823                Balance of Plant                                                                                                                                                                                                                                                          1    5.19E-05 P840                  RFPT Governor                                                                                                                                                                                                                                                            1    5.19E-05 P842                Balance of Plant                                                                                                                                                                                                                                                          1    5.19E-05
                                                                      ~
P845                                OITGas                                                                                                                                                                                                                                                  3      1.56E-04 P864    Analog Loop B Intrument Panel                                                                                                                                                                                                                                                        2      1.04E-04 P865    Analog Loop A Instrument Panel                                                                                                                                                                                                                                                      4    2.08E-04 P866            Auxiliary Relay A                                                                                                                                                                                                                                                            5    2.60E-04 P867            Auxiliary Relay B                                                                                                                                                                                                                                                            5    2.60E-04 P874                                  SAS                                                                                                                                                                                                                                                    3      1.56E-04 P902                  Rad Monitoring                                                                                                                                                                                                                                                          1    5.19E-05 P906                Rad Monitoring                                                                                                                                                                                                                                                          1    5.19E-05 P907                Rad Monitoring                                                                                                                                                                                                                                                          1    5.19E-05 Total  3.43E-03 CABINET GROUP 4B P808              Generator Relay                                                                                                                                                                                                                                                  Failed    3    1.56E-04 P809      Startup Transformer Relay                                                                                                                                                                                                                                                Failed    1    5.19E-05 P810      Auxiliary Transformer Relay                                                                                                                                                                                                                                              Failed    1    5.19E-05 P811            Electrical System                                                                                                                                                                                                                                                  Failed    1    5.19E-05 Total  3.llE-04 4-84
 
PNPP Individual Pl:nt Ex mination - Extemal Events Cabinet                            Function  Cabinet Division    RCIC  HPCS    FPCC Vent    MSIV  ADSISRV  Offsite Cabinet Cabinet ID          (based on walkdown)              (GEZ-7132)                          Path      Vent CR Cntrl  Power          Floor  Fire D1/D3    D2/D4                      CR Cntrl    Path          Status          Area - Freq GRAND TOTAL 9.50E-03        ,
4-85
 
PNPP Individual PI:nt Ex min tion - Ext:m;l Ev:nts Table 4 Screening of Internal Cabinet Fires Cabinet Summary of CR          Frequency        Conditional      Core    Fire Damage Group        Controls          of fire in    Core Damage      Damage        State Damaged              Cabinet        Frequency    Frequency (see Table 4-9)
Group (F1')          (P2')        (F3)'
Ia        MFW/PCS            5.71E-04        1.08E-04      6.17E-08    FDS 12 t
Division I "
ADS Valve Div I Ib        MFW/PCS              1.04E-04        4.47E-03      4.65E-07    FDS 13 DivisionI(D HPCS le        MFW/PCS              1.56E-04        1.08E-04      1.68E-08    FDS 12 Division 1(D FPCC Vent Div I 1d        MFW/PCS            2.60E-04        5.26E-04      1.36E-07      FDS8 Division 1(D RCIC 2a        MFW/PCS              1.04E-03        4.89E-04      5.09E-07    FDS 14 Division II(D ADS Valve Div II 2b        MFW/PCS            4.67E-04        7.59E-02      3.54E-05    FDS 16 Division II(D Offsite Power FPCC Vent DivII 2c        MFW/PCS              1.56E-04        3.00E-03      4.68E-07    FDS 15 Division IllD FPCC Vent Div II 3a        MFW/PCS            2.65E-03        5.33E-04      1.25E-06    FDS11 Division I & II(D 3b        MFW/PCS            3.63E-04        1.91E-02      6.93E-05      FDS7 Division I & 11(D ADS Vivs Div I &
II FPCC Vent Div I&II                                                                    ,
RCIC                                                                    l 3c        MFW/PCS            3.12E-04        2.79E-05      8.70E-09    FDS 19 Division I & IIm MSIV vent path 4-86
 
PNPP Individuil Pl:nt Examiniti:n - Ext: mil Ev:nts Cabinet    Summary of CR      Frequency        Conditional                              Core    Fire Damage Group          Controls        of fire in    Core Damage                              Damage        State Damaged          Cabinet        Frequency                        Frequency      (see Table 4-9)
Group (F1')        (P ')                                  (F3)'                  _
4a      MFW /PCS          3.43E-03        2.75E-05                              9.43E-08      FDS5 4b      MFW/PCS          3.11E-04        1.03E-03                              3.20E-07      FDS1 Offsite Power (1) Excludes RCIC, ADS and FPCC and MSIV containment vent paths. These are identified separately.
I 4-87
 
PNPP Individu;l PI:nt Exrmin tion - Ext; mil Ev:nts Table 4 Control Room Fies Damage States Fire Damage State Definition                              Fire Damage Designation Loss of Offsite Power FDS1 Loss of Offsite Power and Div 11 (including FPCC/ ADS), w/ no RCIC damage            FDS 16  i Loss of Offsite Power and Div II (including FPCC/ ADS), w/ RCIC damage FDS2-CR evacuation w/ LOOP, w/ Div 11 damage                                              FDS 17 CR evacuation w/ LOOP, w/ no Div 11 damage                                            FDS3 Loss of Div 11 (including FPCC / ADS) w/ no RCIC damage FDS 15 Loss of Div 11 (including FPCC / ADS) w/ RCIC damage FDS4 None                                                                                  FDS5 Loss of MSIV vent path                                                              FDS 19 CR evacuation w/ no Div 11 damage                                                    FDS 18 CR evacuation w/ Div11 damage                                                        FDS6 Loss of Div 1/11 (including FPCC/ ADS) w/ RCIC damage FDS7 Loss of Div i (including FPCC/ ADS) w/ RCIC damage                                    FDS8 Loss of Div i and liPCS (including FPCC/ ADS) w/ no RCIC damage                      FDS 13 Loss of Div 1 and liPCS (including FPCC/ ADS) w/ RCIC damage                          FDS9 Loss Div 11 (including ADS) w/ no RCIC damage                                        FDS 14 Loss Div II (including ADS) w/ RCIC damage                                          FDS 10 Loss of Div !/11 (not FPCC/ ADS) w/ no damage to RCIC                                FDS11 Loss of Div i (: neluding FPCC/ ADS) w/ no damage to RCIC FDS 12 l
l 4-88
 
PNPP Individutl Plant Examination - Extemal Events Table 4 Results of Control Room Analysis CtInnet                                                              FIRE DAMAGE STATE CONTRIBUTIONS                                                                        Ignition Groep    F D51          I D52 FD53 iD54  iD55      FDS6    IDS 7  FD58    &DS9    iDSIO  FDSII  ED511jED513      FD514 4 iDSIS  FD516    FDSl7      FDSI8      &D519    Freq Group i A
  -All                                              1.14c-6                                        5.70e-4                                                                    5.7 t e-4 Cabinets Group IB
  -All                                              2.08e-7                                                  1.03e-4                                                          1.03c-4 Cabinets Group IC                                                                                                                                                                                  I
  -All                                              3.12e-7                                          1.56e-4                                                                  1.56e-4 Cabinets Group ID
  -All                                              5.20e-7        2.59e-4                                                                                                    2.60e-4 Cabinets Group 2A
  -All                                                                                                                1.04e-3                              2.08e-6            1.04c-3 Cabinets Group 2B
  -P870  4.95c-5                          3.6 t e-4                                                                          5.19e-5 4.88c-6  1.04c-7    7.27e-7            4.68c-4 Group 2C
-P871                                                                                                                        1.56e-4                      3.12c-7            1.56e-4 Group 3A                                                                                                                                                                                  !
-P680                                    4.I4e-4                                                                                                          8.15e-7            4.15c-4
-P691                                                                                      1.03c-4                                                        2.08e-7            1.03c-4
-P692                                                                                      1.03c-4                                                        2.08e-7            1.03c-4
-P693                                                                                      1.03c-4                                                        2.08c-7            1.03e-4
-P644                                                                                      1.03e-4                                                        2.08c-7            1.03c-4
-P800                                    9.90e-5                                          5.99c-5 4.95c-5          5.19e-5                              5.20e-7            2.6 t e-4
-P868                                                                                      1.06c-4                  4.95c-5                              3.12e-7            1.56c-4
-P877                                                                                      4.88c-6 4.95e-5          4.95e-5                              2.08e-7            1.04c-4
-P904                                    4.95c-5                                          4.88e-6 5.19e-5          4.95e-5                              3.12e-7            1.56e-4 4-89
 
PNPP Individu;l Plant Eximination - Extemal Events G innet                                                                                                                    FIRE DAhlAGE STATE CONTRIBUTIONS                                                                                                                                      Ignition Croup      & D51                FD52      > D53  ID54            FD55    t D56                                ID57 I FD58    FDS9    iD510    FD511    iD512    FD513          FD514      FD515  tDSI6                                                >D517          >D518    i D5 19    Freq
  -P623                                                                                                                                              5.18e-5                                                                                                                      1.04e-7          5.19e-5
  -P869                                                                                                                                              I .06e-4 4.95c-5                                                                                                          3.12e-7            1.56e-4
  -All                                              6.25e-4      1.25c-6                                                                                                                                                                                                                          6.26e4 Other Cbnts Group 3B
  -P601                                              9.90e-5      4.95e-5                                    6.16e-5    9.90e-5                                        5.44c-5                                                                                                7.28e-7            3.64c-4 Group 3C All                                                                      6.24e-7                                                                                                                                                                                                      3.12c-4  3.13e-4 cabinets Group 4A
  -All                                                            3.42c-3  6.84c-6                                                                                                                                                                                                                3.43c-3 Cabinets Group 413
  -Alt      3. loc-4                        6.20e-7                                                                                                                                                                                                                                              3.IIc-4 Cabinets Total      3.60e-4        0.00E+00        6_20e-7 9.90e-5      5.02c 3  1.09e-5                          6.16e-5    3.58e-4 0.00E+00 0.00E+00  7.45e-4  9.26c-4  1.57e-4        1.24e-3    2.08e-4 4.88e-6                                              1.04c-7      7.26e-6  3.12e-4  9.20e-3 FDS Freq FD5      1.03c-3            7.62e-2      3.83e-I 3.06c-3      2.75c-5  2.79e-1                          1.91e-2    5.26e-4  2.04c-2  6.18c-4  533c-4    1.08c-4  4.47e-3        4.89e-4    3.00e-3 7.59e-2                                              3.83e-I      3.23e-I    2.79e-5          >
CCDP Total      3.70c-7        0.00E+00        237c-7  3.03c-7      1.38e-7  3.04c-6                          1.18e-6    1.88c-7 0.00E+00 0.00E+00  3.97e-7  1.00e-7  7.04c-7        6.07c-7    6.24e-7 3.70e-7                                            3.98c-8      235c-6    8.70e-9  1.06e-5 Fire CDF 4-90
 
PNPP Individuil Plint Ex!minition - ExtImil EvInts Table 4 Summary of Overall Fire Analysis Results for Areas which Did Not Initially Screen                        1 l
Fire induced          Final Compartment                              Description Ba    on CDF Screening AB1f                    HPCS Pump Room                                1.43E-06        8.56E-07                  !
1AB2            Unit 1 RCIC and HVAC Room                            6.18E-06        2.40E-07 1 CC-3a    Unit 1, Division 2 Switchgear Room                        5.60E-05        1.05E-05 1 CC-3c    Unit 1, Division 1 Switchgear Room                        3.79E-06        1.98E-06                  ;
1 CC-4b            Unit 1 Div 2 Cable Chase                            2.03E-05        8.55E-07                  ,
CC1            Control Complex El. 574'-0"                          1.17E-04        2.03E-06 CC2/1 Northwest Cnti. Cmplx El. 599'-0"                        2.71 E-04        3.92E-07 CC2/2      Corridor Control Cmpix. El. 599'-O"                        3.57E-04        1.64E-07 CC2/4      Cntrl Cmplx El. 599'-0" - NCC Pump                          1.05E-03        5.82E-07 Room                                                                  ;
CC2/5        Cntrl Cmpix El. 599'-0" - NCC HX                        1.00E-05        3.27E-07 Room DGle      D/G Bldg Low Level Rad Waste Room                          5.08E-06        2.79E-07 ESW1 a    ESW Pumphouse - ESW Pump Room                              1.67E-05        7.92E-07 IB-2        Intermediate Building, El. 599'-0"                      2.55E-04        8.04E-07 1TB                Unit 1 Turbine Building                          7.87E-05        1.30E-06 1 CC-Sa              Unit 1 Control Room                              9.97E-05        1.06E-05                  l 1TPC/1          Unit 1 Turbine Power Complex                          3.28E-06        3.28E-06 Switchgear Room                                                                        l FH3            Fuel Handling Building El. 620'                    1.634E-06          1.63E-06 4-91
 
i l                                                                                PNPP Individual Plant Excmination - Extemal Events                                                                                                            "
i
                                                                          - Figure 4 Layout of Unit 1, Division 2 Switchgear Room I                                                                                                                                                                                                                                              r l
l I                                                                                                                                                                                                                                              i L                                    i
'                                                                                                                                                                                            Arte                                            ['
1CCad Area 1CC3e t
1 Area 1CC4f                                                                                                                                                                                                                      i
                                                                    /                                                                                                                                    Ares j
                                                                  /                                                                                                                                      1CCao Arom 1CC31s 1R25-8034                                                                  1H51-P871 0                                                                                                                                                              ;
I 1C71-8001A                                                                                              1R22-8008 i
Aree                                  1IIIII IIIIIIIIIIIIIIIIIIII 1CC41s                                                                                                                                                                                                                    f 1R23-8028                        1R24-8028                                                                              1C81-P002 Area 1CC3e                          C          i1iiIIi                    IiIIIIII                                                    *
* Ii 1R25-8027          1R24-8038                  1R24-8025 1H51-P085                                                ,
1R24-8024 1R25-8035                      1R24-8023                                                                1M51-8002 0
IIIII                    IIIIIIIIIIIIIII                                  O R71-807s                R71-a02: O              O                                            t i
* t b
t, unn1 cm complexa e20                                                                                                                      - :
r i
                                                                                                                                                                                                                                            +
I 4                                                                                                                    4-92 t
    --n-, - , - - , -  --,,e - , ---n --s-----...----,-e--        <,--av      ww  -,.,r-  .-  v,-  -w -s ,    .-o  ,.w-s<--. . - - - - - ---e--  . - .- , - - - -      ., ,        - --        w,+---      --  . - - - - - , - - -
 
PNPP Individual Plant Examination - Extemal Events Figure 4 Layout of Control Room                                        .
l I
I P909        P866        P840                      P612        P864          P868 P872            P806                                P867              P871 l
l                P821              P637                                  P630 l
\                  -
P823  P842      P800      P083                    P908  P807    Pete pese    P811 l
l I
l                      pges                                                P881 P877 P882
;                      P904        P870                                                              i l                                                                          C22                        -
i-P901        P001A                  ORice P970                                                C22                l P001B I                                                                                                      '
i--
l      l
              ~                                                                  ~
P900 i
P634    P619    P845  pees pees                    P900    peospoos peos    P614 r
P672    P994    P053    P051                    P613  pers reas pees      P671 l
P089      P991    P623    P632                    P652  Pe42 Pe22  Poe2    P670 PS29        PS21 PS28 P056                    P640    P610    Pos4  resi  P618        )
i Unit 1 Control Room                                  North I
4-93
 
i PNPP Individu 1 Plant Examination - Extemal Events -
Figure 4 Example of Control Room Cabinet Fire Growth Event Tree t
Fire in Cabinet                                                                        Fire Location                                  Fire Extinguished      Fire Extinguished              F                          Frequency 870                                                                    Probability                              Prior to Inter-Bay      Prior to MCR                D Propagation            Evacuation                S 1                    4.95E-05 Bay A                                                                                                      16                  2.44E-06 0.111 4.9E-02                2.OE-03/4.9E-02            17                  1.04E-07 4.1 E-02                    15                  4.95E-05 Bay B                                                                                                      16                  2.44E-06 0.111 4.9E-02                2.OE-G3/4.9E-02            17                  1.04E-07                                                                        i 4.1 E-02                    5                    4.95E-05 4.67E-04/yr                                                                          Bay C                                                l                                                    15                  2.44E-06 0.111                                                                                                                                                                                                          .
4.9E-02                2.0E-03/4.9E-02            18                  1.04E-07                                                                        j 4.1 E-02                  5                    3.11E-04                                                                        ;
Bays D-J                                                                                                                                                                                                          !
0.667                                                                                                        18                  6.23E-07 2.0E-03 FDS = Fire Damage State (See Table 3-1 for definitions)
Fire Growth Event Tree For Cabinet 1H13-P870 4-94
_-        --      ___-----.___-~______---_----+-e                -o- s.-,_              __, , _ _ _ _ .- . _ - - - - . _ _ _ _
 
7 PNPP Individu11 PI:nt Ex minition - Ext mil Evznts 5 HIGH WINDS, FLOODS, AND OTHERS The individual plant examination of extemal events (IPEEE) requires an evaluation of the impact on the plant of hazards that are external to it. The hazards are classified into seismic, fire, and other. In NUREG-1407,15-il the conclusion was reached that, of the other extemal events, only the following need          .
be considered on a plant specific basis; high winds, external floods, and transportation and nearby facility accidents. However, there is also a requirement that there be a review performed to confirm that there are      !
no extemal hazards unique to the site, that would invalidate the conclusions of NUREG-1407. This                )
section of the report documents the analysis of other external hazards for the Perry Nuclear Power Plant.      :
i i                                                                                                                    l l  The approach used follows the method described in NUREG/CR-4839p-2) by performing an initial screening analysis, followed by bounding or detailed analyses as necessary.                                      :
Section 5.1 provides a brief description of PNPP, and Section 5.2 describes the initial screening analysis approach, and presents - the conclusions of that screening, which confirms the conclusions of i  NUREG-1407. Sections 5.3, 5.4, and 5.5 discuss high winds, floods, and transportation and nearby facility accidents respectively. Conclusions are given in Section 5.6, and references in Section 5.7.
5.1 Generic Plant Description 5.1.1 Site Description The Perry Nuclear Power Plant (PNPP) consists of a single operating unit located in Lake County Ohio approximately 7 miles northeast of Painesville and 35 miles northeast of Cleveland. The plant site is located along the southeastem shoreline of Lake Erie on an ancient lake plain approximately 50 feet above the lake low water elevation. The site and its environs consist mainly of woodland and former nursery lands. The total area of the site is approximately 1,100 acres and is relatively flat. The land has a gentle slope toward the lake and is crossed by small streams which drain into the lake. The main plant building are located about 800 feet from the toe of a 45 foot high steep bluff that forms the shoreline.
PNPP is a 3,579 MWm General Electric BWR/6 with a MarkIII containment. The balance of plant systems were engineered by Gilbert Commonwealth, Inc. The unit started commercial operation in November 1987.
5-1
 
  . - - . . . - _                _      - . -              .        - ~ . -  - - . -            -      .      -                .
t PNPP Individu11 Pirnt Eximin: tion - Ext:rnil Evcnts 5.1.2 Identification of Structures, Systems and Components Potentially Susceptible to                            6 External Events T
l                  The objective of performing an external events analysis is the identification of structures, systems or l
l-                components which are susceptible to damage, and which, if damaged, could lead to a loss of capability to          ;
safely shut down the reactor. The majority of the safety related equipment is protected by being enclosed        l in the safety-related Class I structures which are:
i e    Reactor Building e    Auxiliary Building                                                                                    i e    Control Complex e    Fuel Handling and Intermediate Buildings e    Emergency Service Water Pumphouse e    Diesel Generator Building
                        . ' Intake Structure
                        . Radwaste Building e    Off-Gas Building 5.2 Screening or External hazards 5.2.1 Description of Approach The objective of the screening analysis is to provide confirmation of the NUREG-1407 conclusion that there are no hazards unique to the site that require evaluation, other than those posed by high winds,
,                  extemal floods, and transportation and nearby facility accidents.
l l
The PRA Procedures GuidelM provides an exhaustive list of potential external hazards which provides the starting point for the analysis. The screening is performed by reviewing the information on the site region and plant design to identify extemal events that are applicable using the screening criteria below.
The data in the Updated Safety Analysis Report (USAR) on the geologic, seismologic, hydrologic, and meteorological characteristics of the site region as well as present and projected industrial activities, i.e.,    l l                  the building of a reservoir, increases in the number of flights at an airport, construction of a road that l                  carries explosive materials, etc., in the vicinity of the plant are reviewed for this purpose. The set of
;                  screening criteria has been formulated to minimize the possibility of omitting significant risk contributors      '
l                  while reducing the amount of detailed analyses to manageable proportions. The following screening i'                criteria have been adopted from those given in the PRA Procedures Guide.
5-2 i
i
 
l PNPP Individu 1 Pl nt Eximination - Extemil Ev:nts l
An external event is excluded if:
* The event is of equal or lesser damage potential than the events for which the plant has been designed. This requires an evaluation of plant design bases in order to estimate the resistance i
of plant stmetures and systems to a particular extemal event. For example, it is shown by
          ' Kennedy, Blejwas, and BennettlM that safety-related structures designed for earthquake and L
tomado loadings in Uniform Building Code Zone 1 can safety withstand a 3.0 psi static i
pressure from explosions. Hence, ifit is demonstrated that the overpressure resulting from explosions at a source (e.g., railroad, highway or industrial facility) cannot exceed 3 psi, these postulated explosions need not be considered.
* The event has a significantly lower mean frequency of occurrence than other events with
            -similar uncertainties and could not result in worse consequences than those events. For example, an event may be excluded whose mean frequency of occurrence is less than some small fraction of those for other events. In this case, the uncertainty in the frequency estimate for the excluded event isjudged as not significantly influencing the total risk.
* The event cannot occur close enough to the plant to affect it. This is also a function of the magnitude of the event. Examples of such events are landslides, volcanic eruptions and earthquake fault ruptures.
* The event is included in the definition of another event. For example, storm surges and seiches are included in extemal flooding; the release of toxic gases from sources extemal to the plant is included in the effects of either pipeline accidents, industrial or military facility accidents, or transportation accidents.
In addition to these, another criterion is added.
* The event is slow in developing and there is sufficient time to eliminate the source of the threat, or to take precautionary measures to minimize the consequences.
Each of the potential other extemal hazards listed in the PRA Procedures Guide was reviewed with respect to the above criteria and determined to meet one or more of these screening criteria as summarized in Table 5-1.
In accordance with the recommendation of NUREG-1407, a plant walkdown was performed to confinn the conclusions of the paper study, i.e., that only high winds, external floods, and nearby facility and transportation accidents need be investigated in detail. Some of the general observations made during the'-
walkdown include: the plant site is generally very clean with no significant accumulation of objects that could become airborne during the occurrence of a tomado or other extreme wind such as construction steel, pipes, etc.; there are large open areas with no possibility for ponding during heavy downpours; plant structures containing safety related structures have relatively few openings and penetrations that would be j  susceptible to external hazards; the majority of penetrations, such as doors, air intakes and exhaust vents, of safety related structures are protected by concrete shields which prevent a direct hit from an airbome missile, or by gratings; sandbags are provided outside doorways into safety related structures for use in 4  the event that severe flooding occurs. Therefore, the plant is generally well protected against the external
  . events anal yzed in detail.
f-3
 
l PNPP Individu;l Plint Eximin: tion - Ext:rnal Ev::nts 5.2.2 Results of Screening Analysis Each of the external hazards listed in the PRA Procedures Guide was reviewed. Based on information in the USAR, and on the basis of the walkdown, it was determined that the conclusions of NUREG-1407 were valid for PNPP, namely that there are no known plant-unique other external events that pose a significant threat of severe accidents within the context of the NUREG-1407 screening approach. The          4 next three sections discuss the potential for significant impact of the three hazards identified by          '
NUREG-1407 for plant-specific evaluation, namely, high winds, extemal floods, and transportation and nearby facility accidents.
5.3 High Winds 5.3.1 Straight Winds The evaluation of high wind loading for the PNPP was performed by comparing the PNPP design basis, obtained from Section 3.3.1 of the USAR against the acceptance criteria of the USNRC Standard Review Plan (SRP)l"1 Section 3.3.1," Wind Loadings.
The first acceptance criteria requires that the wind used in the design should be the most severe wind that  l has been historically reponed for the site and surrounding area with sufficient margin for the limited accuracy, quantity, and period of time in which historical data has been accumulated. The basic wind speed used in the design of safety class structures is 90 mph at 30 feet above grade, and is in agreement with Figure 2 of ANSI A58.1. Increased wind velocities were considered in the case of wind being channeled through the cooling towers and impinging on safety class structures.
Based on the USAR l"3 information (see Section 2.3.1.2.3), the annual fastest mile wind (defined as the i one-mile passage of wind with the fastest speed including all meteorological phenomena except tomadoes) data at Cleveland for the 30 year period from 1948 to 1977 were used to determine predicted extreme wind speeds for the PNPP site for recurrence intervals of 50 (70 mph) and 100 (74 mph) years.
These wind speeds are in excess of any winds actually observed in Cleveland or in the Perry region, as
{
noted in the Nineteenth Annual Report of the Meteorological Program at the Perry Nuclear Power                !
Plant,I"I which concludes that the 90 mph wind is still valid as a design basis.
l The second acceptance criteria states that the approved parameter values must be in accordance with the SRP Sections 2.3.1 and 2.3.2. The specific criteria necessary to meet the requirements are:
SRP Section 2.3.1 a) The description of the general climate of the region should be based on standard climatic
.        summaries compiled by NOAA. Consideration of the relationships between regional synoptic-scale atmospheric processes and local meteorological conditions should be based on appropriate meteorological data.
The values provided in USAR Section 2.3.1.2.3 for 50 and 100 year recurrence maximum wind speeds are consistent with those published by the U.S. Department of Commerce and the NOAA for the Perry region.
5-4
 
PNPP Individuil Plant Eximination - Ext m:I EvInts b) Data on severe weather phenomena should be based on standard mr.teoro.ogical records from nearby representative National Weather Service (NWS), military or other stations recognized as standard installations which have long periods on record. The applicability of_ these data to represent site conditioos during the expected period ofreactor operation must be substantiated.
As noted in USAR Sectien 2.3.1.2.3, the data on peak wind gust at various heights are based on the NWS station at Cleveland and other recognized stations.
c) Operating basis velocity (fastest mile of wind) should be based on the standard published by the ANSI with suitable corrections for local conditions.
The basic wind speed of 90 mph at 30 feet above grade used in the design of safety class structures is in agreement with Figure 2 of ANSI A58.1 which gives 80-90 mph as the fastest mile wind speed expected in a 100 year interval. The 90 mph is higher than the piedicted fastest mile wind from meteorological data.
SRP Section 2.3.2 The acceptance criteria require the information regarding meteorological conditions and phenomena meet the requirement of the 10 CFR Part 50, Appendix A, General Design Criterion 2 and 10 CFR Part 100,100,10(c).
The information provided in USAR meets the requirement of GDC 2 and 10 CFR Part 100.
The third acceptance criterion indicates that the use of procedures delineated in ANSI A58.1, " Building Code Requirements for Minimum Design Loads in Buildings and Other Structures" to transform the wind velocity into an effective pressure are acceptable.
The USAR Section 3.3.1.2 provides a discussion on the determination of applied forces. According to the USAR information, the wind pressures corresponding to the basic wind speed were based on Tables 5 and 6 of ANSI A58.1. The pressure values indicated consider the effects of height, terrain and gusts. In particular, the following observations can be made:
          . The maximum velocity pressure, based upon the maximum wind velocity, was determined to be consistent with the formula provided in the SRP Section 3.3.1 (USAR Section 3.3.1.2).
          . The velocity pressure, in accordance with the SRP acceptance criteria was determined at various heights based on Table 5 and Table 6 of ANSI A58.1 (USAR 3.3.1.2).
          . The effective pressures for structures depending on geometry and physical configuration were determined based on Sections 6.4,6.5 and 6.6 of ANSI A58.1 in accordance with SRP Section 3.3.1.
Since the SRP acceptance criteria are satisfied, the Perry Nuclear Power Plant has been designed in accordance with the intent of the Standard Review Plan with respect to the impact ofhigh winds.
5-5 i
 
l PNPP Individuil Plint Ex mination - Ext::m:I Evints                                ;
i 5.3.2 Tornadoes                                                                                                  !
The plant site lies within RegionI for determining design basis tornadoes according to Regulatory                i Guide 1.76. Region I has the following tornado characteristics:
I Maximum wind speed                                  360 mph Rotational wind speed                              290 mph Translational speed                                70 mph max.,5 mph min.
Radius ofmaximum rotational speed                  150 ft                                                  l Pressure drop                                      3.0 psi Rate ofpressure drop                                2.0 psi /sec                                            ;
The tomado strike probability is 0.00106/ year (USAR Section 2.3.1.2.1). Structures, systems, and components whose failure, due to design wind loading, tornado wind loading, or associated missiles,              ,
could prevent safe shutdown of the reactor are protected from such failure by one of the following              j methods:                                                                                                        ,
          . The structure or the component is designed to withstand design wind, tomado wind and                      !
tornado generated missiles.                                                                            l or
          . The system or components are housed within a structure which is designed to withstand design wind, tomado wind and tornado generated missiles. (USAR Section 3.3)
The plant design conforms with the standard review plan criteria and hence tomadoes are not considered a significant hazard. The most likely damage by a tornado would be a loss of offsite power with a long recovery time. This is already included in the PRA model.
1 l'
5.3.3 Walkdown
!    A walkdown was performed to identify if there was any potential for missiles to be generated that could impact safety elated equipment. The principal structures are designed against tomado missile impact, but there are doorways and penetrations that could provide weak points in the barriers. Generally for the safety related structures, the doorways are recessed so that a direct missile impact is highly improbable.
Similarly, the air intakes and exhausts are protected, either by concrete shields, or gratings. The doorways into the auxiliary building and the fuel handling building are, however, not protected against missile j    strike. In both structures there is.an instrument sir tank located within the stmetums and in the vicinity of i    a personnel door. However, the simultaneous loss of both air tanks would require a simultaneous missile strike in two locations on small targets, and this is considered to be an event of extremely low probability.
Thus it was concluded that the likelihood of missiles penetrating safety related structures, and damaging        !
safety related equipment such that there could be significant consequences, is low enough to be                  i insignificant. 'Ihe walkdown also confirmed that the potential concems raised in IEN 93-53,
:    Supplement I M about the potential for failures of non-safety equipment leading to failures of safety-related equipment, were not an issue at PNPP.
5-6
 
PNPP IndividuCl Plant Ex0mination - Extemal Events 5.4 External Floods 5.4.1 General Plant Description The plant site is located along the southeastem shoreline of Lake Erie approximately 50 feet above lake low water datum. The site is approximately 1,100 acres in size and relatively flat. The land has a very gentle slope toward the lake and is incised by small streams which drain into the lake.
The loss of switchyard and/or transformers by flooding would cause a loss of offsite power to the plant.
The loss of offsite power is covered by the Perry PRA. Therefore, the effects ofexternal floeding on the switchyard and various transformer sites is not considered here.
5.4.2 Sources of External Flooding There are four potential flooding sources at the Perry site: Lake Erie, intense local precipitation, and two small streams which border the site to the east and south. In addition, the impact of flooding due to Service Water System (SWS) or Circulating Water System (CWS) fiberglass pipe rupture is also investigated.
Lake Erie is located to the north of the plant site. There are no safety-related structures within 380 feet of the lake shoreline. The lake will not influence the surface water characteristics of the site since the mean lake level is in excess of 40 feet below plant grade.
Flooding from Lake Erie is extremely improbable. No records of flooding in the plant area of the site from Lake Erie exist. Final grade elevations in the immediate plant area vary from 617 to 620 feet (USGS). His is about 45 feet above the maximum monthly mean lake level of 575.4 6t (USGS). Runup occurring coincidentally with the probable maximum setup would extend to about Elevation 607.9 feet on the bluff at the lake shore. This runup would still be about 12 feet below the nominal 620 foot (USGS) plant grade elevation.
He site soil is relatively permeable and contains sand layers in the upper reaches of the drainage area.
The ground surface in much of the catchment area is forested with a heavy mulch ground cover. Due to the flat terrain, permeable upper soil layers, and the small catchment areas, it is unlikely that this location has ever been subjected to flooding or is likely to experience severe flooding from lake water in the future.
Two nameless, parallel steams run close to the plant area. The larger has a drainage basin of 7.16 square miles and mas northwestward within 1,000 feet of the southwest comer of the plant." The smaller stream, which as a drainage area of only 0.76 square mile, borders the plant area to the east and northeast.
The safety-related structures of the plant are located within the drainage basin of the small stream.
No records of flooding in the plant area of the site exist from the two streams draining the coastal watershed. However, as a result of probable maximum flooding (PMF) the level in the two streams can increase and if not contained can cause flooding hazard to the plant.
5-7
 
PNPP Individu:1 PI:nt Ex mination - Ext; mil Evznts A new PMF value has been estimated using the latest probable maximum precipitation (PMP) estimates!"I where a 30.5% increase in rainfall over one square mile was calculated to correspond to about 4.26% increase in PMF. The calculation furthc showed that for the case of major and minor streams, the flood flow caused by PMF will be contaL.sd.
Therefore, it can be concluded that the two streams adjacent to the plant site would not cause flooding hazard to the plant. The potential for extreme precipitation to result in standing water is discussed in the next section.
5.4.3 Flooding Caused by Probable Maximum Precipitation (PMP)
There are two concerns associated with extreme precipitation: water ingress into critical structures as a result of standing water on the site, and increased loading due to roofponding.
The PMP is defined as "the theoretically greatest depth of precipitation for a given duration that is physically possible over a particular drainage area." Thus, ifit can be demonstrated that the PMP will not cause problems, it can be assumed that extreme precipitation is not a cause for concern. The evaluation includes an assessment of the National Weather Service's (NWS) new PMP criteria.I"I The revised NWS PMP criteria result in higher precipitation intensities over shorter time intervals and smaller areas. As a result of this PMP, greater roof ponding loads and higher site flooding levels may be expected.
Based on Reference 5-9, Figure 24, the 1-hour,1-square mile PMP for the Perry site is about 17.1 inches.
From Figure 23, Reference 5-9, the I to 6 hour ratio of precipitation for the Perry site is about 0.68. This ratio corresponds to 68 percent of grecipitation occurring during the first hour and the remaining 32 percent occurring during the 2"d,3 up to the 6* hour. The total 6 hour PMP rate for the Perry site is about 25.1 inches.
Evaluations of safety related structures' roof ponding and plant surface flooding are provided in Sections 5.4.3.1 and 5.4.3.2 respectively.
5.4.3.1 Roof Ponding All of the roofs of the critical plant stmetures are enclosed by parapets that are generally on the order of 3'-6" in height. The exception is the ESW Pumphouse which is the only safety-related structure with a parapet height of only 9". To prevent ponding, reliance is made on roof drains and scupper overflows.
The design live load of safety related structures is about 84.5 psf, which corresponds to about 16.4 inches (84.5 psf / 62 psf x 12 in) of water. The roof drainage capacity for these structures is about 4.1 in/hr.l*
Thus, even if the scuppers are not taken into consideration the load caused by the water on the roofs is considerably less than the designed roof live load. In the event that the roof drains are blocked completely, the roof scuppers (4" by 8"), the lower edges of which are located about 9" above the surface of the roofs, will be suflicient to prevent the overloading of the roofs.
5-8
 
PNPP Individuil Pl:nt Eximin; tion - Ext::rnil Evrnts
! The only section of roof which was been identified as a potential outlier is that between the diesel l
l generator building and the control complex. This section of roofis boxe i in with no scuppers. Drainage is l via two large drains. In addition to direct precipitation, two scupperr ,  5 e diesel generator building roof i
over the ventilation rooms, drain onto this enclosed section. If water accumulates on the enclosed section of roof to a height of 2 ft, it will begin to enter the three diesel generator building ventilation rooms via    )
! the air intakes. In addition, water could also enter the ventilation rooms through the gap under the 3 ft wide access doors. Within the ventilation rooms, if the flood depth reaches about 18", water will get into      l l the horizontal dampers which would allow the water to drop into the diesel generator rooms at the 620 ft l
elevation below. There are no floor drains in the three rooms above the diesel generator rooms. The water        '
from the ventilation ducts would fall onto control panels which can be assumed to fail the diesel generators. If the PMP is also assumed to fail the offsite power, this could lead to loss of all a.c. power increasing the potential for core damage.
However, ; the design rating of the roof drains in the enclosed section of roof, the flooding through the ventilation rooms' air intakes will not occur even with the PMP profile. Although some flooding could occur through the door gaps, this would be limited, and is unlikely to result in sufficient depth to cause a significant amount of water intrusion into the diesel generator rooms.
l 5.4.3.2 Surface Flooding i
The major concern is the potential for water ingress into critical structures due to flooding above grade level caused by PMP. However, since the site is generally flat (the exception is the eastem side of the plant site, where it dips to lower elevation toward the site boundary), water level would be controlled by the runoffinto this lower area.
The water level on the site was modeled as a flow over a weir, and is believed to be conservative. A conservative estimate of the standing water level caused by the PMP was determined by equating the discharge over the " weirs" equal to the rate of water falling onto the catchment area, and assuming the worst case scenario of complete blockage of the site storm drainage system and using peak discharge from the most intense hour of the PMP. This was used to determine the rate of water intrusion into the safety-related buildings through openings to the yard area. It is assumed that the water intrusion into the safety-related buildings can occur only through personnel /rollup doors and no water can be leaked in through the electrical or mechanical conduits (see Section 5.4.3.3). It should be noted that the buildings have a 6 inch curb at the entrances. For conservatism, the PMP was assumed to fall on fully saturated tenain, with 100 percent runofT. The head of water was calculated as being on the order of 3" during the first hour ofintense precipitation, but falls off considerably in subsequent hours.
i 5-9
 
PNPP Individuil Plant Ex min: tion - Ext; mil Events                                !
In order to examine the impact of the PMP on safety related structures, water ingress into the Auxiliary Building, Control Complex, Intermediate Building, and Diesel Generator Building was evaluated, using the above head of water. The Containment, Intake Structure, Radwaste Building, Fuel Handling Building and Off-Gas Building were not analyzed further since no critical equipment susceptible to extemal flooding are included in these buildings. The ESW structure was not evaluated since flooding of the building can not happen because the open floor in that structure prevents accumulation (floor gratings to the ESW forebay). In addition, the Intermediate Building was alsa screened out from further evaluation since, according to the internal flood r.nalysis, no significant equipment at the gre le level or at the lower i level susceptible to the flooding was identified. Flooding is also not a concern in the Unit 1 Diesel Generator Rooms. An 8" barrier, for the purpose of containing fuel oil spills within the room, is installed in each of these rooms just inside the door leading to the corridor adjacent to the Control Complex and just inside the door to the outside.
The analysis of the flow into the stmetures, given the estimated head of water showed that the time to reach the critical flood height in each of the structums would be well in excess of an hour, by which time the precipitation rate is considerably reduced. The time required to reach the critical flood heights, coupled with the fact that there are provisions for sandbagging entry ways into the critical structures during periods of extreme precipitation, leads to the conclusion that this source of flooding is not a concem at PNPP.
C.4.3.3 Flooding Caused By Inleakage Through Conduits Since Peny went into operation in 1987, there have been several instances in which water migration from outside the plant through electrical manholes has caused varying degrees ofintemal flooding. In response to these events, automatic sump pumps were provided in several manholes. In addition, conduits were sealed at the inboard end using Bisco SF60 rubberized sealant. Testing was performed to establish the          ,
water tight effectiveness of the seals. Similarly, water intrusion through the annular space between yard      )
piping and embedded pipe sleeves in plant building walls situated below grade has been prevented by the use oflink seals and Bisco rubberized sealant.                                                                1 Thus, it can be concluded that the water leakage through conduits into buildings would not be a safety concem at Perry.
5.4.3.4 Flooding Caused By inleakage Through Underdrains The Perry plant site is situated in an area where the ground water table is within a few feet of finished grade for the plant. The plant underdrain system was designed and installed in a manner which alleviates significant hydrostatic head from building up on the plant structure walls that are situated below grade.
The main objective of the pressure relief underdrain system is to ensure that the groundwater level around the primary plant structures do not exceed elevation 590.0 feet. Lfety-related structures serviced by the underdrain system are designed to withstand all loading ccnditions at this maximum level.
5-10
 
PNPP Individuct Plant Examinition - Extcrnil Ev:nts The underdrain system consists of a porous concrete blanket, one foot thick, which underlies all of the      ;
structures of the nuclear island. The blanket is increased in thickness in some areas to incorporate a one    I foot diameter, porous concrete pipe. The pipe canies the collected water to nine individual pumps located in manholes. The pumps discharge into pipelines that vary from three to six inches in diameter, connect to the gravity discharge system, and drain to Lake Erie via the emergency service water pumphouse.
The system includes two discharge systems (pumping and gravity drain) which are designed to operate independently of each other. The seven underdrain pumps are set to maintain a water surface elevation between 566.0' and 568.0'. If the pumps fail to start or cannot keep up with the rising water level, then when the level reaches 568.5', a high water level alarm will sound in the control room and the two backup pumps will start to provide enough additional pumping discharge capacity. In the event both the underdrain service pumps and the backup pumps fail, the ground water level would rise until it reaches the gravity discharge system which is provided to ensure that the groundwater level around the nuclear island never exceeds elevation 590.0'. 'Ihe gravity discharge system is designed to provide a redundant discharge system which incorporates a gravity outfall, having no active components and enough discharge capacity to prevent flooding caused by rising groundwater of main plant buildings. Therefore, it    ;
can be concluded that the flooding hazard due to rising groundwater level at the Perry plant site is insignificant.
5.4.4 Flooding Caused by Fiberglass Pipe Rupture i
The Service Water System (P41) and the Circulating Water System (N71) underground piping at PNPP is fabricated from fiberglass reinforced plastic (FRP). Since Perry has experienced two failures of fiberglass piping in the yard area, the potential impact of these pipe failures to the safety of the plant while in operation is analyzed in this section. The fiberglass pipe breaks at PNPP occurred in the Senice Water System (P41) and in the Circulating Water System (N71). In order to provide background on each system, the history of each system is briefly summarized below.
5.4.4.1 Background Information 5.4.4.1.1 Service Water System (P41)
The Senice Water System is constructed of various sizes of hoop wound FRP pipe, ranging frum 6 inches in diameter to 54 inches in diameter, fabricated by Owens-Corning Fiberglass Corporation.
Although the plant went on-line in 1985, the Service Water System went into senice in 1981 and operated almost continuously until the failure of a pipe on the supply side piping in March of 1993. The P41 piping failure occurred underground. The flooding emanated from a 30" pipe approximately 50 feet south of the Water Treatment Building. However, no area of the plant at or below the grade level adjacent to the flood containing safety related equipment was significantly affected by the flooding. Flood levels in these areas and were well within the existing USAR limits. Areas adjacent to the flood point with lwge access doors (rollup doors) received more water than other areas, however, these are areas with no major equipment needed for plant operation.
5-11
 
PNPP Individu 1 Pl:nt Ex: min: tion - Ext:rn:1 Ev:nts 5.4.4.1.2 Circulating Water System (N71)
The circulating water system was fabricated of helically wound FRP pipe made by CorBan Industries.
The line break occurred above ground. A 36" diameter pipe elbow on the supply line leading to the Unit I auxiliary condenser ruptured north of the lleater Bay in December 1991. Water flooded the ground surface and also entered manhole #20 of the plant underdrain system which had been left open. In addition, some water also entered the electrical manholes in the flood area and small amounts of water entered buildings in the vicinity of the break through doorways and hatch plugs in the Heater Bay. Some flooding occurred in the basements of the Intermediate Building and the Unit 1 Auxiliary Building.
Discharge from the break ceased when the three Circulating Water pumps were shutoff within 34 minutes of the break.
Both circulating and service water pipe failures were determined to have been caused by manufacturing and installation defects.
As a result of these two events, administrative controls were strengthened, improvements in regard to leak tightness of the electrical manholes were performed as explained in the following section, and measures were taken for improved inspection of the FRP piping in each of the systems.
5.4.4.2 The Likelihood of Fiberglass Pipe Rupture at PNPP A practical method to determine the likelihood of fiberglass pipe ruptures during the plant operation is to use past CEl failures and experiences as carefully as possible to confirm plausibility. In addition, the industry's experience with these type of failures would also help in bracketing the issue. The probabilistic assessment approach can not be used, because a statistically sound database does not exist across the industry.
An industrial survey on FRP piping, a review of the historical service performance of the FRP piping in both the Service Water System and the Circulating Water System was performed for CEI. This undertaking was originally proposed as a means e# collecting the data to establish a database and to conduct statistically-based estimate of the future reliability of the FRP piping systems at the Perry Plant.
However, after it became evident that the FRP piping systems would not likely last for the remaining life span of the plant, the focus was shifted from numerically determining the future reliability of the piping systems to defining the actions regmred to enhance the piping so that it would achieve the desired life.
The industrial survey identified 12 CorBan Industries and 7 Owens-Corning Fiberglass Corporation FRP piping systems located in 8 states, with an average age of 16 years. Nine of the 19 systems have been repaired. One of these 9 systems was subsequently completely replaced with an above-ground steel piping system. Based on the survey, those systems that were correctly installed with proper backfill and in firm native soil had only minor problems. The majority of problems have occurred in systems with marginal soil and high water tables. Few of the plants had inspection programs dating from installation and the majority began at least intermittent inspections only after some type of failure had occurred. This is probably because FRP is a very good corrosion resisting material in very benign service and, therefore, should be almost trouble-free. Most of the problems reported were addressed during planned shutdowns.
The comparison of extent of cracking and other defects in earlier outages with the RFO-4 and RFO-5 inspection results at PNPP indicates that at least some degradation is occurring.
5-12
 
_ _ . _ _ _ _                  _ _ _ . . ~      ___.- _ _ _ _ _ ._ _ _ _                                      -_ _.        _ _ _ . _
PNPP Individuil Pl:nt Extmination - Ext: mil Events -                                        f 1
It is generally believed that the fracture in the circulating water pipes will only have helical orientation in l
the same angle as the glass windings. These fractures / failures would be most likely to occur in unrepaired              j areas of past observed damage or cracking. It is further believed that the initial fracture mechanics would                i probably take years to slowly develop to a helical crack that would extend through the pipe wall.
l The fracture type in the service water piping generally will have circumferential orientation, which would                i be most likely to occur in unrepaired areas of the past observed damage or cracking. 'Ihe fracture                        !
propagation rate would increase exponentially. The initial fracture mechanics would probably take years                    j to slowly develop to a circular crack that would extend through the pipe wall.                                            j i
While the potential for the FRP pipe cracks cannot be absolutely excluded, their likelihood is minimized                  j by the aggressive inspection and repair program carried out at each refueling outage for the piping in the                i P41 and N71 systems. When all relevant defects are repaired, it is the opinion of CEl's contracted                        !
fiberglass specialist, Fiberglass Structural Engineering, Inc., that the rapid catastrophic failure of either              i FRP piping system is unlikely to occur between refueling outages. Ultimately, hardware changes will be                    i made to eliminate this potential in the Service Water system. All of the Service Water FRP pipe will be                    l replaced with steel or refurbished with a cured-in-place-pipe (CIPP) in RFO-6. Inspection, trending and                    i monitoring of the Circulating Water system will continue throughout plant life to detect any structural                    !
defects prior to a failure condition.
j 1
In addition, it should be noted that the impact of any pipe break leading to a large over ground flood                    !
should be bounded by the PMP considerations discussed in Section 5.4.3.
{
5.4.5 Flooding Caused by Miscellaneous Events l
The only other event during which water intrusion has occurred at the plant was due to melting of snow                    ;
piled on one side of the emergency service water pump house structure. However, since this instance the                  -l snow cleaning practice at the plant site has been changed, and currently no more snow piling close to the                  i plant building structures takes place. Therefore, it is concluded that the flooding hazard due to sources other than those discussed in the previous sections is insignificant.                                                      !
l l
t L
5-13
 
1 PNPP Individu:1 Plant Examin tion - Ext:rn:1 Ev:nts                                              ,
I 5.4.6 Conclusion and Results in this analysis, an evaluation of the impact on the Perry Nuclear Power Plant of external flooding was performed in response to Generic Letter 88-20, Supplement 4. The following are summaries of the analysis results.
      . The "new" PMP criteria will not cause any significant roof overloading of the safety-related structures at the Perry Plant. The 84.5 psf roof design live load for these structures, which corresponds to about 16.4 inches of water, is suflicient to handle the PMP rate of 17.1 in/ hour less the capacity of the scupper overflows (5 to 9 in/hr). Additionally, the plant structure roofs are designed for an extra 25 psf ofloads for a total design load of 109.5 psf.
      . The "new" PMP criteria will not lead to a serious surface flooding and thus will not render the critical equipment / systems inside the safety-related structures from performing their intended operation. The runoff depth has been estimated not to exceed a depth of more than 2.9 inches over the plant entry elevation of 620'-6". The time duration to fail critical equipment inside the safety-related structures, such as the Auxiliary Building and Control Complex, is between 5 to 7 hours. This a very conservative estimate since this is well in excess of the I hour period of most intense precipitation. The PMP rate during the 2"d, 3'd and the subsequent hours drops down significantly, with a subsequent lowering of the site water level below the plant entry elevation.
In addition, the exterior doors have 6 inch curbs and are controlled by a sevem weather conditions instruction, where all doors are required to be sandbagged during an intense precipitation condition. This would further reduce the likelihood of a serious flooding of the safety-related structums during a PMP situation.
      . The water leakage through conduits into the safety-related structures should not be a safety concem at Perry. Automatic sump pumps are provided to prevent flooding of manholes. In addition, conduits were sealed at the inboard end using Bisco SF60 rubberized sealant.
Similarly, water intrusion through the annular space between yard piping and embedded pipe sleeves in plant building walls situated below grade has been protected against by the use of link seals and Bisco mbberized sealant.
    . Flooding hazard due to rising groundwater level at the Perry plant site is insignificant to risk.
        'Ihe gravity discharge system is designed to provide a redundant discharge system which incorporates a gravity outfall, having no active components and enough discharge capacity to prevent flooding caused by rising groundwater ofmain plant buildings.
    . Even though the potential for FRP pipe cracks exist, the likelihood of a failure between refueling outages is considered to be low given that the pipes are inspected and defects repaired at each outage, and will be until such time that the pipes are replaced or othenvise enhanced.
5-14
 
PNPP Individual Plant Exrminatbn - Extem-l E%nts 5.5 Transportation and Nearby Facility Accidents 5.5.1 Aircraftimpact Regulatory Guide 1.70 (Rev 3, Section 3.5.1.6, Aircraft Hazards),"'") provides the following guidelines and criteria for aircraft hazard analyses:
    "An aircraft hazard analysis should be provided for each of the following:
PFA    -
Federal airways or airport approaches passing within 2 miles of the nuclear facility.
PA      -  All airports located within 5 miles of the site.
2 4        Po      -
Airports with projected operations greater than 500 d movements per year located 2
within 10 miles of the site and greater than 1,000 d outside 10 miles, where d is the distance in miles from the site.
Pu    -
Military installations or any airspace usage that might present a hazard to the site.
For some uses such as practice bombing ranges, it may be necessary to evaluate uses as far as 20 miles from the site."
The total probability of an aircraft crash therefore is the sum:
PFA + PA + Po + Pu A calculation was performed to establish the probability of an aircraft crash onto the Perry Nuclear Power Plant. The me+ hods used were those outlined in Standard Review Plan 3.5.1.6, Revision 2.lM 5-15
 
PNPP Individu 1 Pl nt Eximin tion - Exttmil Evrnts 5.5.1.1 Federal Aisways/ Airport Approaches l
l The calculation of the probability of an aircraft crashing onto the plant (P      FA) of situations where federal  l l airways or aviation corridors pass thmugh the vicinity of the plant (vicinity = 2 mi, from Regulatory                !
l Guide 1.70, Rev 3), ves made using the guidelines of SRP 3.5.1.6, III.2. For each airway or corridor, this          l l probability is:
t l
PFA = C x N x A / W                                                  !
where:  C=        in-flight crash rate per mile for aircraft using the airway W = width of airway (plus twice the distance fmm the airway edge to the site when                    l the site is outside the airway) in miles 1
l N = number of flights per year along the airway                                                      l l
l                A = effective area of plant in square miles                                                          ;
i L Thus, for the set of T corridors meeting the analysis criteria in the vicinity of the plant, the total              !
l probability is given by:
T Pr4 = [CiNiA/W,                                                        ;
l                                                      J=I 5.5.1.1.1 Federal Airways I
Five airways are situated such that the plant site either lies within the airway or is located less than two        j miles from one of the airway's outer borders (Figure 5-1). The five cases corresponding to these air traffic routes were investigated. They are V10, V10-188, V522, J190-584 and J29-82 (Ref. I1). V10, V10-188 l and V522 are low altitude airways used by general and commercial aviation. Ji90-584 and J29-82 are high altitude airways designed for use by commercial aviation. All of the airways except V10 are oriented i most closely to an east-west direction with respect to the plant axis. Airway V10 is oriented more closely to north-south with respect to the plant axis.
l i
f i
1 5-16
 
l i
PNPP Individu 1 PIInt Ex: min: tion - ExtImil Evrnts                              j i
5.5.1.1.2 in-Flight Crash Rates In-flight crash rates (C i) were needed for commercial and general aviation aircraft. Summaries of aircraft 4
accident rates are published yearly in a press release from the National Transportation Safety Board          i (NTSB); the most recent summary available is SB 95-03, which includes data from the years 1982 -              !
1994.15_121 More detailed breakdowns of this data are provided in the NTSB's " Annual Review of Aircraft      l Accident Data," the most recent available version of which is NTSB/ARG-94/02, covering data for                !
calendar years 1983-1992?'31 Note that both documents use the same data set for years covered by both          l surveys, i.e., 1983-1992.                                                                                      l
                                                                                                                )
Commereini Avi=*ian Accidant Pa*a (ng)                                                                        l l
It was assumed for this analysis that fatal accidents conelate to crashes that could impact the plant site,    j resulting in a value of C. of 1.97x10* crash /na-mi.                                                          i General Avim*ian Accidant R=*= (nj l
Again it was assumed that fatal accidents correlate to crashes that could impact the plant site. For general  l 4                                                                                :
aviation, a rate of 1.76x10 crash /hr is obtained, and assuming a flight speed of 100 nautical miles per hour (it is conservative to assume a slow flight speed to determine C,), C, can be determined by multiplying the accident rate (crashes /hr) by the percent of in-flight accidents and dividing by the air speed as follows:                                                                                              ;
4 C, = 1.76x10 cr/hr/100 na-mi/hr                                  [
                                                  =1.76x10^7cr/na-mi i
Fraction of Aircraft Crashes That neenr Durina Flioht Ooer=*ians For airway operations, only in-flight crashes need be considered,' i.e., takeoff, taxiing, landing can be excluded. Table 21, page 22 of Reference 5-13 provides the percentage based on phase of operation. The cruise, climb, and descent phases result in about 23 percent of accidents. Both C        and C, need to be adjusted by this ratio to properly reflect the nature of crashes that are postulated for the Perry site. Thus, the rates effective for these calculations will be:
C    = 1.97x10* cr/na-mi x 0.23
                                              = 4.53x10''' cr/na-mi and                                                I C, = 1.76x10'' cr/na-mi x 0.23 4
                                                = 4.05x10 cr/na-mi 5-17
 
PNPP Individu:1 PI:nt Ex: min:ti:n - Ext:m:I EvInts 5.5.1.1.3 Effective Plant Areas The following areas were combined in the calculation of effective plant areas per aircraft type.
      . Shadow area (Ashadow) is the area of the vital building elevations projected on the horizontal.        t
      . Skid area (Asud) is the area in the direction of approach to the plant through which an aircraft could skid into vital buildings e  Roof top area (Anoor) is the simple roof top area of the vital buildings minus the area shadowed by other vital buildings.                                                                    1 Vital buildings and structures are those housing equipment or systems vital to safe shutdown or susceptible to allowing radiological release in excess of 10 CFR 100 limits. Effective plant areas for both I
general aviation crashes and commercial aircraft crashes were developed for this analysis using worst case assumptions for each.                                                                                      I i
A,cn and Acom, the effective crash target areas for general aviation and commercial aircraft, respectively,    )
were developed using an assumed crash angle of 10* with the ground. For each of the east-west airways,        )
an approach direction of 90* to the plant axis was used because it presents the largest area seen by aircraft traveling in this general direction. An approach direction parallel to the plant axis was used for the one      ;
north-south oriented airway (V10); this will present the largest representative target area for travel in this  i direction.
5.5.1.1.4 Shadow Effect of Cooling Towers For all westbound flight paths in east-west airways, two large concrete cooling towers (approximately 500 feet in height and 300 feet in diameter) provide a significant barrier to impact from crashing or skidding planes on vital structures. Conservatively, only these barriers are considered; no credit is taken for shielding from other structures as would be present on any other approach angle. Each cooling tower (assuming a crash angle of 10*) provides a shadow oflength sufTicient to protect all vital structures lying    ;
directly a the west of the towers. There is, however, a gap in the barrier (the area between the two            l cooling towers) which leaves some vulnerability to incoming aircraft. The protective effect of these            l towers, then, is incorporated by modifying the crash rate on East-West airways by a factor P,, which was computed to be equal to 0.667.
1 1
I l
f f
i 5-18 l
 
PNPP Individu:1 Pirnt Ex mination - Ext; mil Ev:nts 5.5.1.1.5 Numbers of Flights l
! The number of flights assumed is given below:
l              Airway              Flights per year        Flights per year        Flights per year Commercial'          General Aviation              Total 2
V10-188                    7,300                  10,950                  18,250 V10                    1,460                  2,1902                  3,650 2
V522                    13,870                  20,805                  34,675 l            Ji90-584                  19,345                    0'                  19,345 J29-82                  56,210                    0'                  56,210 Notes:
l) From FAA estimates
: 2) General Aviation flights are assumed to represent 60% of total flights
: 3) All flights assumed to be commercial for high altitude airways.
5.5.1.1.6, ."esults The total frequency of aircraft crash into the site from the airways is 8.8x10''. The main contributions l are from airway V10-188 at 3.0x10'', V522 at 4.1x10'', and V10 at 1.1x10''.
5.5.1.2 Airports /Hel! ports Three airports and one airstrip are located close to the plant site (Figure 5-1):
Lost Nation Airport Concord Air Park Casement Airport Woodworth (sod airstrip)
There is also a heliport at the site operated by CEI .
The first three airports can be screened on the basis of Criterion 3 of Regulatory Guide 1.70,
! Revision 3.M                                                                                              i i
1 i
I t
5-19
 
PNPP Individuil Plant Examin tion - Ext: mil Ev:nts MVordworth Airstrio Woodworth is a private sod airstrip located at the Woodworth Farm approximately 4.5 miles east-southeast of the site. Operational airplanes are no longer based there. The approach pattern is 3.5 miles east of the plant center. There is one 2,300 fl runway oriented 90* to 270 . The annual operations are estimated at less than one flight per week; conservatively,52 flights per year will be assumed.
The annual aircraft crash frequency contribution from the Woodworth Airstrip can be developed as follows.
PA Zi Z i CiN 9A3 where:    C) = probability per square mile of a crash per aircraft movement for the j* aircraft N ij= number (per year) of movements by thej* aircraft along the i* flight path A; = effective plant area (in square miles) for thej* aircraft The distance from the plant to end of runway is 4 mi + 1,490 ft. From the table on page 3.5.1.6-4 of 4
SRP 3.5.1.6, C = 1.2x10 crashes /na-mi2-fl. Nautical miles are assumed.                                I N = 52 f1/yr A y = effective area for general aviation aircraft or 3.5x10'3mi2 PAlv=CxNx A
              = 4.05x10*cr/na-mi2 -fl x 52 f1/yr x 3.5x103 mi 2 /1.32mi/na-mi 2
              = 5.58x10*cr/yr Perry Heliport CEI has a private heliport located on the Perry site. This heliport is located approximately 2,000 feet l
(0.38 mi) southwest of the reactor building and 170 feet southeast of the Emergency Operations Facility (EOF). An analysis was previously developed to calculate the predicted frequency with which a helicopter taking off from or terminating at this heliport might impact vital structures at the Perry site. This analysis was developed in support of revisions made to the USAR that included consideration of the heliport and its impact on plant safety. The use of the heliport has not changed i  appreciably since the time of that analysis. This prior analysis demonstrated that the predicted annual 5-20 l
 
PNPP Individu-J Pl:nt Ex:minition - Extemil Ev:nts frequency of helicopter crashes which impact vital structures is 4.0x10''. Improvements in helicopter safety over the past ten to twenty years render this figure conserva6ve; however, it will be used as the figure ofmerit for this analysis.
Combined Alrnort/Helloort Cases P4has contributions only from the Woodworth airstrip and the heliport, totaling 4.56x10'8cr/yr.
5.5.1.3 Military /Other Airspace Usage There are no military airpons or usage in the site vicinity. There is only one holding pattem near the plant site. It is associated with airway Ji90-584 and is located approximately 17 miles east-nonheast of the plant over the shore of Lake Eric. No edge of the holding pattem approaches closer than 10 miles to the site.
Because the holding pattem lies outside the criteria specified by the SRP, it is not considered further.
5.5.1.4 Summary The total frequency of an aircraft crash from the cases described above is:                                l P = 8.84x104 + 4.56x10-s 4
            = 9.3x10 cr/yr 4
This frequency does not comply with the acceptance criteria 10 /yr on page 3.5.1.6-2 of Ref.5-6.            I However, Section 2.2.3 of Ref. 5-5 states that "..., the expected rate of occurrence of potential 4
exposures in excess of 10 CFR Part 100 guidelines of approximately 10 per year is acceptable if, when combined with reasonable qualitative arguments, the realistic probability can be shown to be lower." The situation represented in this analysis can easily be shown to meet this criterion.
There are several factors which would lower the calculated probability substantially if accounted for, but were not included in the above calculation because sufficient quantitative information was not available. These factors include:
* The probability referred to in the SRP is for the occurrences of exposures in excess of 10 CFR 100 guidelines. A significant portion of the probability value determined in the above calculation is due to general aviation. The type of aircraft included in the general aviation category is not likely te be able to damage a vital structure to the extent that would cause exposures in excess of 10 CFR 100. Table 6.4.2 of NUREG/CR-5042M estimates the probability of penetration of concrete structures by incoming aircraft as a function of plane size and distance from the airport at which the plane originated or will terminate.
This table shows that, for concrete thickness of two feet or more (as is the case with the vital structures of concem for the Perry plant), there is a probability approaching zero of structure penetration by planes under 12,500 pounds (which bounds the vast majority of general aviation ~ craft, though the FAA could not provide an exact percentage of general aviation craft bounded by this weight).
5-21
 
f-PNPP Individu:1 Pirnt Exrmination - Extsmil Ev:nts 1
l                                                                                                              l l            Thus, if this were accounted for, the above probability would be substantially lower.            l Assuming, very conservatively, that only half of the general aviation planes in the three        !
low altitude airways of interest weigh less than 12,500 pounds (effectively eliminating          !
[            their contribution to C,, and thus halving the overall C,, used in the calculations), the        l l            overall frequency of exposure in excess of 10 CFR 100 guidelines would drop below                j 8x10^7 .                                                                                          .
,        i Turbine buildings 95 feet in height and over 450 feet in length lie to the north and the south      j l
of the auxiliary / reactor / control / diesel building complex. These buildings provide barriers  t that would, in reality, prevent a significant amount of air crashes from impacting vital          :
structures. Because they are not concrete structures, they are conservatively not credited.      l l-          110 wever, keeping in mind the first qualifying statement above regarding general aviation crafl, it would be very likely that such a plane would be fully stopped by such'a barrier building.
l l'
l            At an approach angle of 10', the shadow of each Turbine Building is approximately 550 feet. This would provide adequate protection from northbound or southbound planes for all        !
vital structures except the Emergency Service Water Pump House. This would reduce the -
overall P for aircraft accidents as stated above by about 12 percent.
;.  - While the lack of specific data on general aviation aircraft size precludes quantification of these two I
!    factors, it is clear that even a conservative accounting of their effects on the probability of aircraft I accidents resulting in offsite exposures in excess of 10 CFR 100 guidelines will result in a frequency    j below - 10'7. Thus, the frequency of aircraft accidents which could result in offsite exposure level      :
exceeding 10 CFR 100 limits is considered to be below the level of acceptability for conservative analyses, and no additional design or procedural protection to mitigate their consequences are required.
5.5.2 Transportation Accidents                                                                            !
There are two aspects of concem for transportation accidents; explosions that could lead to damage to plant structures, and the release of hazardous chemicals which could lead to the incapacitation of the control room operators. Either of these occurrences could initiate a series of events that could lead to core damage. Hazardous materials and explosions will be dealt with separately. The proximity of transportation corridors to the Perry site requires that three modes of transportation be investigated; lake traffic, road, and rail.
I i
[
5-22
 
PNPP Individuil Plint Ex min tion - Ext;rnil Ev;nts 1
5.5.3 Hazardous Materials 5.5.3.1.1 Methodology for the Assessment of Risk from Hazardous Materials The analysis was composed of a number of steps. First, any chemicals which could be qualitatively judged as of no concern to the control room operators at Perry were excluded from further evaluation.
Then, adjusted allowable weights were calculated for each chemical not screened by any of the above factors, using the methodology of Regulatory Guide 1.78.tml Those transported (or stored) in quantities less than the adjusted allowable weight were eliminated from further consideration. The toxic effects of those not screened in either of these ways must be evaluated. This was done using the DOT Emergency Response Guidebook (ERG).D*l Chemicals for which the control room is within the ERG impact zone for toxicity of that material were evaluated probabilistically, as it was assumed that these chemicals are capable ofincapacitating the control room operators.
Qualitative Screenino Criteria The criteria used to qualitatively screen the lists of hazardous commodities shipped in the vicinity of PNPP to exclude those that pose no threat to the Control Room are described below.
      . Section C. . of Regulatory Guide 1.78 states that "[I]f hazardous chemicals... are known or projected to be frequently shipped by rail, water, or road routes within o Tive-mile radius of a nuclear power plant, estimates of these shipments should be considered in the evaluation of control room habitability... Shipments are defined as being frequent if there are.. 30 per year for rail traffic..." Thus, all chemicals that are shipped in quantities ofless than 30 cars per year will be eliminated from further consideration.
      . Certain gases, such as argon and nitrogen, have no specific toxicity effect, but act by excluding 02 from the lungs. Asphyxiants 3 or more miles from the plant are not                ;
considered to be a threat to the Control Room.
      . Per Ref. 5-16, "when an explosive or flammable material is accidentally released, it is highly likely to      *de or burn before its vapor reaches the control room. For this reason, only those subt w wo se toxicity limits are less than their lower limits of explosion and flammability were considered for control room habitability here." The effects of explosions are addressed in Section 5.5.3.2 of this document.
      . Solid and liquid hazardous materials are local hazards and will be assumed to be incapable of traveling distances of three miles or more in sufficient quantities to be of concern (unless they can form a vapor after spillage that can be transported to the plant).
      . Liquids with vapor pressures less than 10 torr @ 100*F (38 C) and normal atmospheric            l pressure are excluded per Regulatory Guide 1.78.
5-23
 
1 i
l PNPP Individu:1 PI:nt Extminiti:n - ExtImil Ev2nts                        J l
j Adiusted Allowable Weichk                                                                                ;
Regulatory Guide 1.78 introduces the concept of maximum adjusted allowable weight. It is noted that this weight is for that quantity of the chemical which is released immediately in vapor form upon release. This would be the total contents of a gas tank or that portion of a liquefied gas that flashes upon release. Commodities were immediately excluded if the adjusted allowable weight exceeded the        ,
capacity of the container in which the chemical was stored or transported. Further consideration        j (evaporation or flashing) was not given here to those commodities which are not transported as gases    l to determine whether or not they may be excluded; they were assumed to convert directly and              l immediately to vapor, i.e., the most conservative assumption of 100% flashing is used.                  [
l To perform the required calculations, the distance between the source of the chemical release and the
{
plant must be known. The adjusted allowable weight per Appendix A of Ref. 5-21 was determined for chemicals not screened qualitatively using parameters developed in the following manner i
Reference distance = X miles                                                        I Control Room Type = C Unacu asted allowable weight = 33,000 lb = 16.5 tons Adjusted allowable weight = 16.5 tons (toxicity limit (mg/m'] / 50) x 0.44 Adjusted allowable weights, as defined in Regulatory Guide 1.78, were calculated for each chemical      I not screerad by any of the above factors. Those with a shipment or container size less than the adjusted allowab' seight were eliminated from further consideration.
Conservatism Evaporation (boiloff) and flashing models for spilled liquid hazardous chemicals that can be used to calculate concentration at the Control Room based on the evaporative release rate and atmospheric dispersion were not included at this time. There are insufficient data readily available for some of ths l  chemicals in this analysis to properly use the models provided in, for example, NUREG-0570.M Instead, the entire spilled quantity was assumed to convert directly and immediately into vapor form and was assumed to be transported to the control room intake with " instantaneous puff release" l  characteristics. This introduced a large factor of conservatism in the analysis.
i                                                                                                            !
!  5.5.3.1.2 Railroads                                                                                      I There are two railroads that carry hazardous chemicals in the vicinity of PNPP; Conrail, and the          l Norfolk Southern Railway Company (NSRC), see Figure 5-2. Because of the great distance (3 miles or        i more) between the rail lines and the plant site, only those hazardous materials capable of being transported by air are considered a hazard to control room operators. Both Conrail and Norfolk Southern provided their most recent annual summaries of their hazardous materials shipments for use in this analysis. A simplified screening process was used to eliminate all chemicals that can be l  specifically identified as non-s teatening to the plant and its operators. All other chemicals were      :
!  included in a calculation of the frequency of a transportation accident involving release of toxic l  chemicals which could result in offsite exposure levels exceeding 10 CFR 100 limits. In this
!  calculation, unscreened chemicals were not assessed individually; the probabilities derived were based on the aggregate shipment by rail of all commodities whose release as a result of an accident have the 5-24 m      - - - -                                    ,- .-
 
PNPP Individu;l Plint Eximiniti:n - Ext; mil Events potential to impact control room habitability. This is consistent with the USNRC position described in  ,
Reference 5-17.
Method for Estimation of Frecuency The frequency of exceeding 10 CFR 100 limits due to the transport of hazardous materials via rail in the vicinity of the plant is calculated using the methodology of NUREG/CR-2650.D''83 Fi m = Pi mi x Foi F i m = Pi mi x F, x Pg x L x Pa xPi                              .
where:
Fw=
i    probability of exceeding 10 CFR 100 limits per year Pi mi = probability of exceeding 10 CFR 100 limits given incapacitation of the operators Foi = probability ofincapacitation of the operators as result of hazardous materials accident F, =  frequency of shipments per year Pg =    probability of accident per km traveled L=    km rail within 5 miles of the plant i
Pa =    probability of a large release to occur from a given accident P= i    probability of operator incapacitation given that a large release occurs along a specified stretch of track (Pov,,i  )
Inout Parameters Probability of exceeding 10 CFR 100 limits given incapacitation of the operators:
Pi mfoi = 0.1 (NUREG/CR-2650, page 6)
Frequency of hazardous shipments per year:
F, = 5,945 Probability of accident resulting in release per km traveled:
Pg = 4.18x10 8 This number was calculated using actual U.S. railroad hazardous materials accident and traffic data for the years 1985-1989 (the latest years for which complete data was available).
I l
l 5-25
 
PNPP Individuil Plant Ex!miniti:n - Ext: mil Ev:nts Rail length exposed per shipment (L):
The approximate rail length exposed per shipment in each 22.5* sector within 5 miles of PNPP is obtained by scaling track lengths from USAR Fig. 2.2-2. The Conrail routing was used as being representative of NSRC routing. Although NSRC tracks are slightly longer in the southern sector, the overall Conrail length within 5 miles is longer. This is acceptable given the conservatism in determining F,.
Probability of a large release to occur from a given accident:
Pa = 0.45 The Pa provided above gives a probability of a rail accident which results in any release of toxic chemicals. Pa here, then, is the fraction of all accidents which result in a release that result in large releases, and is derived from Department of Transportation statistics.
Probability of operator incapacitation given that a large release occurs along a specified rail stretch:
P=P i      m This probability is the percent of time which meteorological conditions are such that the release of hazardous materials would impact the Control Room. It is assumed that stability classes A, B, C, D, and E sufficiently disperse the cloud that the toxicity level is not reached at the Control Room (Regulatory Guide 1.78 Appendix 'A). Thus, Pi is the probability that the meteorological condition of stability class F or G is present with the wind blowing in the direction of the Control Room air intake. A distribution of wind direction (hours) versus stability was generated utilizing the PNPP 10-m wind and delta-T (60m-10m) joint frequency
    ' distribution reports for the last 5 years.
5-26
 
PNPP Individu:1 Plant Ex:mination - Ext: mil Ev;nts i The probability factors are constant except for L and P i. Thus, the total probability is given as:
Pi oo = Pei x F, x Pa x Pa x E (L x P i )
where the summation is over the sectors which have rail tracks within 5 miles. This computation is          ;
shown below:                                                                                                l Summation of Probability Factors: Rail Sector            L              L          Pi          Pioo/ sector (miles)          (km)                                                    !
I SW              0.5          0.80      0.00392        3.51e-08 SSW              l.8          2.90      0.00999        3.22e-07 S            1.3          2.09      0.01513        3.52e-07                    i SSE            1.3          2.09      0.01886        4.39e-07                    i SE            1.5          2.41      0.02042        5.48e-07 l
ESE            1.0            1.61      0.02532        4.53e-07                    )
Total            7.4          11.91                      2.15e-06 5.5.3.1.3 Road Transportation Unlike the case of railroads, specific information on road shipment sizes and frequencies for specific hazardous chemicals is neither required by state or federal agencies nor generally kept by facilities.      l Information regarding shipment frequency and sizes can only be estimated from information on actual shipments to and from the local facilities hazardous materials.
Three classes of roadway are ofinterest in this analysis. The first consists of roadways that handle local traffic that lie within five miles of the plant site. The two major roads in the vicinity of Perry that meet this categorization are U.S. Route 20 (1 mile SSE of the plant), and State Route 84 (3.5 mi SSE)
(Figure 5-2). There are several facilities within a five mile radius of the Perry site which have some road transport of hazardous materials affiliated with their operations; these will be considered the source of local roadway hazardous materials traffic. Five facilities handle significant quantities of hazardous materials and are within the five-mile radial area of the plant site. Four (Zeneca Chemicals, PET Processors, the Lake County Water East facility, and the Madison Village Sewer Plant) lie more than three miles from the plant site; only the Neff-Perkins facility lies within one mile of the plant site.
The list of chemicals assumed transported is based on data received from the Lake County Emergency Planning Committee. Chemicals that are not required to be reported to county officials for emergency planning purposes are assumed to be exempt from further evaluation.
l 5-27
 
_ m . _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . . _ _ _                                                    _  _  _  __
PNPP IndividuIl Pirnt Eximinition - Extimil EvInts i
The hazardous materials assumed to be transported on local roads within five miles of the plant site were screened to exclude those commodities that do not pose a threat to the Control Room. A probabilistic evaluation was performed considering the probability of a hazardous materials truck                  i accident that could impact the Cetrol Room and wind direction and stability class joint distribution frequencies to estimate the probabi!!!y that the offsite exposure levels would exceed 10 CFR 100                  ;
limits.
l The second class evaluated consists of one stretch of road - the small portion ofInterstate 90 that lies within a five-mile radius of the plant. Unlike the local roadways, it is impossible to speculate on the nature of shipments over this section of roadway due to the widely varying composition of the shipments and the lack of available data. Local emergency response procedures become the element in assessing the level of the risk to the plant from accidents on this small stretch of road.                        >
Finally, those roadways lying more than five miles from the plant site were handled using the                    l' guidelines of Regulatory Guide 1.78. Several major limited access highway routes (including the rest of Interstate 90, State Route 44, State Route 2 west of Painesville, and the highway extension into                '
Fairport Harbor) and one major local roadway (State Route 528) are outside this radius. The limited i
access highway routes are the preferred route for hazardous materials traffic into the industrial facilities      :
in the Painesville and Fairport Harbor areas to and from the east. Also, it is likely that Route 528 will j    carry some local hazardous materials traffic. However, per the instructions of Regulatory Guide 1.78,            i L
the traffic on these roads will be excluded from this calculation. To wit, Section C states that i
    "[c]hemicals stored or situated at distances greater than five miles from the facility need not be                i considered because, if a release occurs at such a distance, atmospheric dispersion will dilute and disperse the incoming plume to such a degree that there should be sufficient time for control room operators to take appropriate action. In addition, the probability of a plume remaining within a given            i sector for a long period of time is quite small."
Screening of I-90 i
    'Most ofI-90 lies outside the five-mile radius of the plant. One small section less than two miles in length does, however, lie within the radius, according to the most recent surveys of the area                      j surrounding the plant (Figure 5-2). Interstate routes cannot easily be treated quantitatively, as federal,          '
state, and local governmental agencies do not track hazardous materials shipment frequencies on
,    roadways. The only realistic means of counting truck traffic would be a long-term traffic survey, which l    is extremely difficult and time-consuming. For that reason, it was desirable to first attempt to i
determine qualitatively if there is any reason to believe truck traffic on this stretch of roadway presents l    a realistic risk to plant operators.
l l    Emeroency Resoonse to a Truck Ama t ninvolvino                    Havardous Materials                            i In the event of an accident, the Lake County Emergency Planning Committee (LEPC) for Lake County
,    would direct response operations. A representative of the LEPC with extensive emergency response                  l i
procedure experience provided the following information relevant to an accident situation involving                l
:    hazardous materials accidents on I-90 south of the plant site.                                                    1 f    If the first responders determined that the accident posed a toxic threat to the local citizenry, one of the l
first formal actions that would be taken would be to initiate pluming projections using a computer i                                                                      5-28 L,                                                                              -
 
r r
l PNPP Individuil Pl nt Eximinatinn - Extimil Ennts l
program set known as CAMEO / ALOHA to determine the characteristics of the potential spread of the          l chemical phune. This program projects plume travel and concentrations, given material properties, spill quantities, and weather conditions. Should these projections indicate that evacuation or sheltering in the local area is necessary, an existing county Emergency Operations Center (EOC) facility will be activated to centralize the communications for emergency response.
i
    ' From this point, the response is very dynamic and situation-driven. Updating the CAMEO / ALOHA runs with shifting weather conditions, the EOC can track the plume and its projected concentrations (or
      " dose curves"), and determine what actions (evacuation, shelter-in-place, etc.) are required. In most      l situations, field verifications of the computer projections are made; any discrepancies between the        l projected and actual concentration / location information are entered into the program, which is          :
constantly updated and rerun. Since the first projections are usually available within 30-40 minutes,      ,
this gives the EOC a time window of sufficient size to notify Perry before toxic concentrations will be seen at the plant.
The fact that a highway accident centralizes communications at an EOC significantly enhances communication with the plant control room. To handle nuclear emergency situations, direct telephone lines between the LEPC and the Perry control room are maintained. While these are intended to serve .
as a resource in the event of a nuclear accident, these direct lines also give the EOC an immediate, direct line that can be used to notify Perry operators of any impending chemical hazard.
As a practical matter, the existence of populated areas between I-90 and the plant narrows the time
* window in which the EOC must act to one smaller than that required for timely plant notification.          ;
Since an evacuate / shelter-in-place /no action decision will have to be made based on populations much closer to the roadway than the plant, a decision on the direction and toxicity of the cloud will be made in time to use the direct communication lines with the plant to notify them to take action. Emergency responders will act very conservatively based on their instincts and experience rather than wait for the results of computer runs and projections, and, in the event of an accident involving an extremely toxic    ;
chemical, they will begin appropriate action in all areas surrounding the accident immediately, using the computer projections to confirm the need for such actions. However, in the event of an accident of    ;
the level of severity that would be a hazard to the plant, immediate and general action will be taken to ensure public safety. These actions would include notifying the Perry control room, since the Perry plant, because ofits concentration of workers and its operational nature and public safety significance, is one of the first priorities for notification in case of a significant accident, according to the LEPC.  ,
Physical Considerations l
l There are also certain physical realities that would likely result in such an accident being basically a local concem (within a radius of I-2 miles), and thus have no significant impact on the plant. First, unlike rail or fixed facility accidents, the quantities involved are quite limited (under 9,500 gallons). >
Thus, for all but extremely toxic chemicals, dispersion would, in most cases, reduce concentrations      ,
effectively. More importantly, there are very significant geologic features of the area that would serve j      to almost completely contain a heavier-than-air plume. (This would include nearly all severely toxic l      chemicals that would be transported by truck; lighter-than-air , Semicals would likely rise well above j      the control room intake by the time they had traveled five miles.) Specifically, the Grand River runs in
;      a deep ravine basically parallel to I-90 along that stretch of road. There are dramatic elevation changes and small Grand River tributaries associated with that ravine both north and south ofI-90. A cloud of    ;
5-29
 
PNPP Individuil Pl:nt Ex minatian - Exttmal Ev:nts toxic, heavier-than-air vapor would collect in the tributaries and Grand River basin, and, particularly for the limited quantities associated with truck transport, remain there. This makes it extremely unlikely that any of the vapor would reach the plant.
Disoosition of Truck Accisci.nts on I-90 Based on these factors, the event of a release from a truck accident on I-90 incapacitating control room operators at Perry appears highly unrealistic. The precautions in place and the physical features of the accident development and the surrounding terrain all act to strongly counter that possibility.
Screening Criteria The procedure used to screen chemicals transported on local roadways is essentially the same as that for railroads. The major differences between the cases of transportation by road and rail are:
          . The closest roadway, U.S. Route 20, is one mile away at its closest approach point to the plant (as opposed to three miles for rail travel, as discussed in the previous section). This forces more restrictive criteria on the chemical screening in terms of air transport after an l              accident; specifically, the unadjusted allowable weight is reduced to 2,500 pounds for all l              chemicals transported by truck except perchloromethyl mercaptan (PMM), which is not transported on Route 20.
l          e  The maximum truck tank size assumed is 9,500 gallons. While no formal guidelines dictating tank size for trucks exists, informal discussions with USDOT personnel and            l review of past hazardous materials truck incidents reported to DOT and the National            l l              Transportation Safety Board demonstrate that this is an acceptable upper limit for tank l              size. Maximum cargo quantities usually run no greater than 90-95% of this capacity; I
however, in this analysis, a full 9,500 gallon capacity will be assumed.
A 3
l                                                            5-30 I
l
 
PNPP Individu 1 PIInt Eximination - Ext; mil Ev:nts Method for Estimation of Freauency The frequency of exceeding 10 CFR 100 limits due to truck transport of hazardous materials within a five-mile radius of the plant is calculated using the methodology ofNUREG/CR 265015-isj Fi m = Pi mi x Foi Fi w = Pi mi x F, x Pg x L x Pg x P where:
Fw= i        frequency of exceeding 10 CFR 100 limits per year Pi mi < probability of exceeding 10 CFR 100 limits given incapacitation of the operators Foi= frequency of incapacitation of the operators as result of hazardous materials accident F, = frequencf ofshipments, year Pa =            probability of accident per km traveled L=          length of roadway used for hazardous materials transport lying within 5 miles of the plant Pa =            probability of a large release to occur from a given accident P=      i      probability of operator incapacitation given that a large release occurs along a specified stretch of roadway (Pour,i,,,,)
Input Parameters Probability of exceeding 10 CFR 100 limits given incapacitation of the operators:
Pi mi = 0.1 (NUREG/CR-2650 ts-isj, page 6)
Frequency of hazardous shipments per year:
There is assumed to be one ammonia shipment and three sulfur monochloride shipments per week on Route 20. All other chemicals have been screened from consideration. Therefore, on an annual basis, F = 4 x 52 = 208.
Probability of accident per km traveled:
4 Pg = 1.6x10 accidents / truck-km (NUREG/CR-2650tsis) page 9)                              ,
Road length exposed per shipment (L):
The approximate road length exposed per shipment in each 22.5* sector within 5 miles of PNPP is obtained by scaling road segment lengths from USAR Fig. 2.2-2.
5-31
 
i PNPP Individuil Pl:nt Ex mination - Ext:rn;l Events Probability of a large release to occur from a given accident:
Pg = 0.005 (NUREG/CR-2650,lb'81 page 10) l Probability of operator incapacitation given that a large release occurs along a specified stretch of roadway:
Pi = Pou,,ie,,,
This probability is the percent of time which meteorological conditions are such that the release of hazardous materials would impact the Control Room. It is assumed that stability classes A, B, C, D, and E sufficiently disperse the cloud that the toxicity level is not reached at the Control Room (Regulatory Guide 1.78 Appendix A). Thus, Pi is the probability that the meteorological condition of stability class F or G is present with the wind blowing in the        l direction of the Control Room air intake.
                                                                                                      )
The probability factors are constant except for L and Pi . Thus, the total probability is given as:
Pi oo = Pi oaci x F, x P,g x Pa x I(L x Pi )
where the summation is over the sectors which have road segments within 5 miles. This computation is shown below:
Summation of Probability Factors: Roadway Sector            L              L            P          P,oolsector (miles)          (km)                                              I SW            2.5            4.02        0.00392        2.62e-09 SSW              l.3          2.09        0.00999        3.48e-09              I l
S            0.8            1.29        0.01513        3.24e-09              j SSE            0.7                                                              l 1.13        0.01886        3.55e-09 SE            0.7            1.13        0.02042        3.83e-09 ESE              1.5          2.41        0.02532        1.02e-08 E            2.8            4.51        0.01705        1.28e-08 Total          10.3          16.58                        3.97e-08 5-32
 
PNPP Individurl Plint Extminition - Ext:rnil Ev2nts l
l 5.5.3.1.4 Waterway Traffic The Great Lakes Region Freight Traffic Tables for the most recent year available provide a                      J comprehensive review of the substances transported over the waterways near the plant. They                      j demonstrate that no hazardous materials capable of being transported great distances in the air are            i transported over these routes. Mineral and metal products (primarily iron ore, iron products, and              !
limestone) dominate the freight traffic in the area. For this reason, waterway traffic is judged to be          !
incapable of contributing to the toxic chemical hazard risk for the plant and will not be analyzed              ;
further.
5.5.3.1.5 Summary 1
The aggregate probability of a rail, road, or barge accident involving the release of toxic chemicals          l which could result in offsite exposure level exceeding 10 CFR 100 limits as derived in this calculation 4                                                          4 is 2.2x10 per year. This exceeds the SRP 2.2.3 criterion of lx10 per year. However, this figure must          j be viewed in light of the extraordinary conservatism inherent in the simplified analytical method used,        !
particularly for the rail accident analysis, which represents 99 percent of the value stated above. As          !
examples of the conservatism, the actual carload count may be exaggerated by a factor of two, and the          ;
probability of operator incapacitation by an order of magnitude. These primary factors, plus other less        ;
4 significant considerations would be expected to bring the actual probability to or below 10 , in line          j with SRP criteria. Thus, transportation accidents involving the release of toxic chemicals which could          !
result in offsite exposure level exceeding 10 CFR 100 limits are not considered credible and do not            i require additional design or procedural protection to mitigate their consequences.                              l 5.5.3.2 Explosions                                                                                              !
The potential impact of accidents involving explosives was analyzed by establishing whether the closest point to the plant at which an accident could occur is far enough that the overpressure at the plant created by such an explosion would be less than the design basis. In all cases, (i.e., road, rail, and ~  i lake traffic) this' was shown to be the case. No explosives, flammable gases, or other combustible              ;
materials have a credible potential to explode and cause design overpressures at the plant to be                .
exceeded, taking into account the quantities and specific materials transported.
5.5.4 Fixed Facility Accidents                                                                                  l 5.5.4.1 Industrial Facilities As is the case for transportation accidents, the potential for both the release of toxic chemicals and explosions is of concern. The installations of concern are indicated on Figure 5-2.
i l
l 5-33
 
l l                                                                                                        i PNPP Individu;l Plint Eximinition - ExtIm-l Ev;nts                        l 5.5.4.1.1 Toxic Chemicals The methodology used was the same as that for the case of transportation, discussed in Section 5.5.2. l Design input and major assumptions used in the analysis are provided below.
l
      . Data received from the LEPC is the basis for identifying offsite hazardous chemicals.            l Individual companies were contacted only if additional information was required.                j i
e  Only those hazardous materials capable of being transported by air, e.g., gases or vapors,      ;
will be considered a hazard to control room operators. Solid and liquid hazardous materials I
are assumed to be local hazards incapable of traveling distances of one mile or more in sufficient quantities to be of concem, unless they can form a vapor after spillage that can    i l
be transported to the plant.                                                                    !
e  Chemical and toxic properties of chemicals are obtained from standard references,-              .
typically References 5-19,5-20, or 5-21, and are noted where used.
* Ambient temperature is assumed to be 104*F e  If a toxicity limit is provided in Regulatory Guide 1.78m231 for the chemical under analysis,  i that value is used. However, only a limited number of chemicals are listed. Where other        '
chemicals are assessed, Ref. 5-19 and/or Ref 5-21 are used to determine the incapacitating level. These levels and their effects are described in this reference, and are reviewed to      ;
ensure conformity with the Regulatory Guide 1.78 definition and intent of" toxicity limit."    l e  Where no discussion is provided in Ref. 5-17 or Ref. 5-19 describing an incapacitating level, the OSHA Standard ' Air time-weighted-average concentration (TWA) value is              !
typically used. This value is extremely conservative, since it is a concentration of a substance to which most workers can be exposed for an eight hours per day, five days per        '
work week without adverse effect. In some instances, ceiling or peak concentrations or Sho-t Term Exposure Limit (STEL) values may alternately be used.
* It is assumed that container, i.e., rail car, tank, failures are independent, and that multiple container failures in one incident are not credible, i.e., are below the threshold probability of concern for this analysis, i
5-34
 
PNPP Individuil Plint Ex minition - Exttm;l Ev:nts Agusted Allowable Weights To perform the required calculations, the distance between the source of the chemical release and the plant must be known. In this analysis, a reference distance of 3 miles was used. Nearly all of the major chemical storage facilities in the area are more than three miles away from the control room intake, so assuming a 3 mile reference distance is conservative. Storage facilities located more than three miles will be bounded by these weights, as the adjusted allowable weights increase with distance between the source and site. If a facility is less than three miles from the plant, a separate calculation was done where necessary to determine the appropriate adjusted weight for that case.
Two chemicals were screened on the basis of adjusted allowable weights; carbon tetrachloride, and methyl ethyl ketone.
Isolation and Protective Action Distances Following the above screening, only chlorine, trichloromethane sulfenyl chloride or PMM, sulfur monochloride, and ammonia were left to be analyzed with the next screening approach. This evaluation was performed using the guidelines of the DOT Emergency Response Guidebook (ERG).* This guidebook was developed by the U.S. Department of Transportation for use by firefighters, police, and other emergency services personnel who may be the first to arrive at the scene of a serious incident involving a hazardous material. It is primarily a guide to aid first responders in quickly identifying the specific or generic classification of the material (s) involved in the incident, and protecting themselves and the general public during this initial response phase of the incident.
Initial isolation and protective action distances for this guidebook were determined for small and large spills occurring day or night. Analysis used state-of-the-art source term and vapor cloud dispersion modeling, probabilistic application of actual atmospheric data, and the latest toxicological exposure guidelines available for each material. Dispersion models calculated downwind vapor concentrations based on actual,24-hour, groundlevel and upper-air meteorological data from 61 cities (including one each in Alaska and Hawaii) over a 5 year period. Data showed nighttime atmospheric conditions transported vapor plumes much greater distances than daytime conditions, therefore, daytime and nighttime protective action guidance is provided to more accurately describe risk.
Source term modeling considered three factors; tank sizes, spill rates from damage to each tank, and release of vapors by evaporation from a liquid pool, direct release of gaseous vapors from a package into the atmosphere, or a combination of both.
Toxicological short-term exposure guidelines for the materials were applied to vapor concentrations to determine how far downwind the public is in danger. An independent panel of toxicological experts from industry and academia recommended that toxicological exposure guidelines be chosen from emergency response guidelines, occupational health guidelines, and lethal concentrations determined from animal studies. Specific means of application of these health criteria and adjustments based on time-of-exposure were made when recommended by the panel of experts.
The Protective Action Distance (PAD) assigned for each chemical assumes random changes in wind direction confines the vapor plume to an area with 30 degrees on either side of the predominant wind direction, resulting in a crosswind protective action distance equal to the downwind protective action 5-35
\                - - _ _ _ _
 
PNPP Individuil Pirnt Eximin: tion - Extsmil Evrnts distance. Within the protective action zone, vapor concentrations present may be capable of incapacitating nearly all unprotected persons. The Initial Isolation Zone is determined as an area, including upwind from the incident, within which a high probability of localized wind reversal may expose nearly all persons without appropriate protection to life threatening concentrations of the material. (The isolation zone represents a much smaller area than that of the PAD; thus, in this analysis the PAD was used exclusively.)                                                                                  l l
. Zeneca Chemicals, the only facility at which very large stores of chemicals are present within a five-mile radius of the plant, uses the ERG to plan and conduct much ofits accident response activity. Thus, this was deemed a suitable reference for Protective Action Distances for the chemicals not screened out earlier. To maintain an appropriate level of conservatism, the largest published PAD was used to l
determine whether or not the chemical in question can incapacitate plant operators. This will maximize the probability that the Perry Control Room falls within the protective action distance. A probabilistic        ,
evaluation must be conducted for any chemical for which the control room falls within these
{
boundaries, as it was assumed that the chemical is capable of incapacitating control room operators.            I Note that, due to the conservatism inherent in the DOT analyses used to derive these distances, these distances themselves are quite conservative. They are intended to provide a large margin of safety to-local facilities and citizens, and are thus adequate for this analysis.                                        -
i The Perry control room is outside the affected zone for three of the four chemicals. However, detailed          1 analysis must be performed for chlorine storage, since the Perry control room lies within its impact          i radius.                                                                                                        ;
                                                                                                                )
1 5-36
 
PNPP Individu 1 PIInt Ex:minition - Ext: mil Ev;nts Chlorine Storage Locations and Quantities The table below lists all of the stores of chlorine that are of concem in this analysis. The adjusted allowable weight of chlorine is 13,068 lb. Any storage tank containing less than this amount of      f chlorine can be excluded from further analysis per Regulatory Guide 1.78; any exceeding this must be  ,
included in the probabilistic evaluation.
Location                Maximum Tank                  Tank Type            Screened on Adj.
Quantity (Note 1)                                  Allowable Weight?
Madison Village Sewer                150 lb.                Small tanks                Yes Plant PET Processors                        150 lb.                Small tanks                Yes Lake County Water-                  2,000 lb.                  Tanks                    Yes East                                                                                    (Note 2)
Zeneca, Inc.                      999,999 lb.                Rail car                    No Zeneca,Inc                          9,999 lb.                Tank (inside)                Yes Zeneca, Inc.                        999 lb.                Tank (outside)                Yes l
Notes:
: 1) From LEPC/ SARA reports. Note that sizes are often reported as ranges, e.g.,10-99 lbs, 100-999 lbs, etc. For those cases, maximum inventory in range is shown and used as comparison point for adjusted allowable weights.
: 2) The Lake County Water - East facility, located four miles from the plant site, was            i contacted to determine the precise chlorine storage capabilities they have on their site. A representative of the facility stated that 14,000 pounds of chlorine are generally stored on site in seven 2,000 pound tanks. Since the facility is more than 3 miles away from the Perry plant, the adjusted allowable weight of 13,068 lb. can be used to disposition the chemical.
Since the maximum storage in any container of 2,000 pounds is well under the adjusted allowable weight of approximately 13,000 pounds and several coincident failures of chlorine tanks are considered not credible, this chemical will be excluded from further consideration.
i i
5-37 l
 
      .    . ~ - - . . . - . . . - - . -                                . . -        - . . . . _ . - . - -
PNPP Individuci Plont ECmination - Extemal Events Estimation of Frequency RAethodology The frequency of exceeding 10 CFR 100 limits due to failure of one of the Zeneca rail car chlorine                            j storage tanks is derived from the methodology of NUREG/CR-2650.*'0 l
Fn=Pma i      i      x Foi                                !
Pw=Pna i          i xCxPa x Pa xPi where:
F im = frequency of exceeding 10 CFR 100 limits per year Pi ma = probability of exceeding 10 CFR 100 limits given incapacitation of the operators Foi= frequency of incapacitation of the operators as result of hazardous materials accident C = number of cars in storage within five miles of the plant P,, = probability of hazardous materials release per car Pa = probability that a given car failure is catastrophic and results in a large release Pi = probability of operator incapacitation given that a catastrophic rail car failure with      j large release occurs                                                                    l Input Parameters                                                                                                              !
Probability of exceeding 10 CFR 100 limits given incapacitation of the operators:
Pi ma = 0.1 (NUREG/CR-2650,*'0 page 6)
Number of cars in storage within five miles of the plant:
Storage of chlorine at Zeneca cannot be screened; this represents ; ud c.                        : ars per year.
Probability of hazardous materials release per car:
                  - Hazardous materials release data for rail cars for non-accident incidents in the United States from 1986-1991 give a fmquency of hazardous materials release per car of 7.09x10".
5-38
-y-'r  9-  7
: w.  ---+ww,--    w  m-    -.-e -
                                                                                      ,          e          -p- --ay  e- p---v.    $ m
 
l PNPP Individu;l Plint Ex mination - Extem:I Ev:nts 1
Probability that a given car failure is catastrophic and results in a large release:                                  l l
U.S. Department of Transportation Hazardous Materials Information System recorts for 1993                        ;
and 1994 were reviewed to determine the fraction of all releases that could be discribed as                      i "large."- Since the lower of the two exclusion weights for the chemicals of inte.est here is                      l about 13,000 pounds (chlorine), and the liquid density for chlorine is about U pounds per                        ;
gallon, a "large release," for the purposes cf this analysis, will be one that exceeds 13,000                    -
pounds or 1,000 gallons. Of the 2,177 releases reported in the DOT data base,23 exceeded this criterion. Therefore, the probability of a large release given a non-accident rail car release
    .will be approximated as 23 / 2,177, or 1.05x10' .
Probability of operator incapacitation given that a catastroph:c rail car failure with large release occurs:          j Pi = Pom This probability is the percent of time which meteorological conditions are such that the release of hazardous materials would impact the Control Room. it was assumed that stability                      )
classes A, B, C, D, and E sufliciently disperse the cloud that the toxicity level is not reached at the Control Room (Regulatory Guide 1.78 Appendix A). Thus, Pi is the probability that the meteorological condition of stability class F or G is present with the wind blowing in the direction of the Control Room air intake. The factor that applies to the spatial relationship between the Zeneca and Perry facilities is 0.02512.
Therefore, the total probability of a rail car leak or rupture that results in a large chemical release capable ofincapacitating the control room operators and resulting in an offsite exposure exceeding 10 CFR 100 limits is:
Pi oo = Pi mi x C x Pg x Pa xPi
                                              = 3.74x10''
Summary The aggregate probability of a railcar or storage tank failure involving the release of toxic chemicals which could result in offsite exposure level exceeding 10 CFR 100 limits derived in this calculation is 8                                                                4 3.74x10 per year. This is well below the SRP 2.2.3 criterion of 1x10 per year. Thus, offsite chemical storage container failures involving the release of toxic chemicals which could result in offsite exposure level exceeding 10 CFR 100 limits are not considered credible and do not require additional design or piocedural protection to mitigate their consequences.
l l
5-39
 
PNPP Individu 1 Pl:nt Ex min tion - Exttmil EvInts 5.5.4.1.2 Explosives Only two chemicals that are potentially explosive were identified as being stored in nearby facilities.
These chemicals, butadiene and carbon bisulphide, are stored at the Zeneca facility, which is 3.5 miles from PNPP. As with the case of the transportation accidents involving explosives, it was demonstrated in two ways that the impact of explosions from these stored chemicals would not have significant consequences at PNPP. First, it was demonstrated that the plant is at a sufficient distance form the stored chemicals that the overpressure is less than 1 psi. Second, the overpressure expected at the plant was estimated, and shown to be considerably less than the design basis overpressure. Thus, chemical explosions are demonstrated to be of no concern.
5.5.4.2 Military Facilities There are no military facilities close enough to the plant to be of concem.
5.5.4.3 Pipeline Accidents There are natural gas pipelines that pass within 2,000 feet of the plant (Figure 5-3). Analyses of various effects of natural gas pipeline leaks in the vicinity of the plant conclude that natural gas leaks cannot cause concentrations in the control room intake high enough to result in explosive conditions. Since natural gas serves as an asphyxiant danger, the concentration must be even higher than the explosive limits to pose a toxic danger. Since explosions have been ruled out for natural gas pipeline leaks, toxic cazards can be eliminated also. Thus the pipelines do not cause a hazard to the plant.
5.5 Conclusions This review of the impact on PNPP of other external events leads to the conclusion that there are no significant events of concem. A comprehensive screening analysis of those other extemal hazards identified in the PRA Procedures Guide resulted in supporting the NUREG-1470 conclusion that only high winds, external floods, and transportation and nearby facility accidents required to be reviewed in detail. The plant as designed meets the intent of the criteria of the Standard Review Plan of 1975 and thus it is not surprising that these events do not pose a significant threat to the plant.
5-40 l
 
1 PNPP Individu:1 PI:nt Ex:mination - Ext mil Ev nts 5.7 References 5-1 NUREG-1470, " Procedural and Submittal Guidance for the Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities," June 1991.
5-2 Ravindra M.K., and Bannon, H., " Methods for External Event Screening Quantification: Risk Methods Integration and Evaluation Program (RMIEP) Methods Development,"
NUREG/CR-4839, July 1992.
5-3 NUREG/CR-2300,"PRA Procedures Guide," January 1983.
5-4 Kennedy, R.P., Blejwas, T.E., Bennett, D.E., " Capacity of Nuclear Power Plant Structures to Resist Blast Loadings," NUREG/CR- 2462, September 1983.
5-5 NUREG-0800," Standard Review Plan," USNRC, Rev.2, July 1981.
5-6 Perry Nuclear Power Plant, Units 1 and 2, USAR.
5-7 Nineteenth Annual Report of the Meteorological Program at the Perry Nuclear Power Plant, January 1,1994 through December 31,1994.
5-8 USNRC, Information Notice 93-53, Supplement 1: Effect of Hurricane Andrew on Turkey Point Nuclear Generating Station and Lessons Learned, April 29,1993.
5-9 NOAA HMR No. 52, Application of Probable Maximum Precipitation Estimates - United States East of the 105th Median, August 1982.
5-11 CEI Calc. No. CN-1.1, dated 1/8/74.
5-12 USNRC Regulatory Guide 1.70, Rev 3, November 1978.
5-13 SB 95-03, National Transportation Safety Board, January 19,1995 5-14 NTSB/ARG-94/02, Annual Review of Aircraft Accident Data U.S. General Aviation Calendar Year 1992, Government Accession No. PB94-181054 (Attachment 3).
5-15 NUREG/CR-5042, " Evaluation of External Hazards to Nuclear Power Plants in the United States," U.S. Nuclear Regulatory Commission,1987.
5-16 NUREG-0570, " Toxic Vapor Concentrations in the Control Room Following a Postulated Accidental Release," June,1979.
5-17 USNRC letter to TVA,"TVA backfit claim regarding the NRC's safety evaluation of the potential impact of hazardous chemicals transported by barge upon habitability of the control room at Brown's Ferry," 11/20/90.
5-41
 
                                                                                                    )
PNPP Individu;l Plant Ex:mination - Ext:m;l Events 5-18 NUREG/CR-2650 " Allowable Shipment Frequencies for the Transport of Toxic Gases near Nuclear Power Plants," October,1982.
5-19 Lewis, Richard J., Sax's Dangerous Pronerties of Industrial Materials, Eighth Edition, Von Nostrand Reinhold Co., New York,1992 5-20 CRC Handbook of Chemistry and Physics,61st Edition,1981.
5-21 American Conference of Governmental Industrial Hygienists, " Industrial Ventilation, A Manual of Recommended Practice," 19th Edition,1986.
5-22 Deleted.
5-23 USNRC Regulatory Guide 1.78, " Assumptions for Evaluating the Habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical Release," June,1974.
5-24 1993 Emergency Response Guidebook, U.S. Department of Transportation, Research and Special Programs Administration, RSPA 5800.6, October,1993.
5-42
 
PNPP Individuil PI:nt Eximination - Ext;rn:1 Ev:nts
!                      Table 5 Screening of External Events for PNPP i
Event                        Applicable Screening Criteria          '
i Avalanche                                                            3                      l Biological Events                                                    5                      l 1
l Coastal Erosion                                                      5 Drought                                                            2,5 Fire                                                                3 Fog                                            4 ( principal impact is on transportation )
Forest Fire                                                          3 Frost                                                                1 IIail                                                              1,4 liigh Tide,liigh Lake                                      4 (externalflooding) i liigh Summer Temperature                                            1,5 Ice Cover                                                          4, 5 Landslide                                                            3 l Lightning                                    4 (included in loss of offsite power events) i Low Lake or River Water Level                                      4, 5 1
Low Winter Temperature                                              1,5 Meteorite                                                            2                      l Pipeline Accident                                                  1, 4 l Intense Precipitation                              4 (treated under external flooding) l River Diversion                                                      3 l
l Sandstorm                                                            3 1
5-43
 
PNPP Individu;l PI:nt Ex: min:ti:n - Ext:rnil Ev:nts Table 5 Screening of External Events for PNPP (Continued) l Event                        Applicable Screening Criteria Seiche                                            4 (included in external flooding)
Snow                                                                1 Soil Shrink-Swell Consolidation                                      1 Storm Surge                                      4 (included in external flooding)  ;
Tsunami                                                            3                1 Toxic Gas                                      (included in transportation and nearby facility hazards)
Turbine Generated Missiles                                          2                i Volcanic Activity                                                  3 Waves                                                              3, 4 1
5-44
 
PNPP Individual Plant Examin; tion - Exttm:I Events Figure 5 Airways and Airports in the Vicinity of PNPP NW                      NN                                          N                            NE                                                                                          NE WNW                                                                                                                                            4,9                                                                                                          #
E13F
                                                                                                      .h, ,                                                                                                                                              slitab
                                                                                  %mr 2""&
W                                      2                      i zg w\ , _                        w glg??                                                                                                                                      .
y e, g ,                                                                                , v-;gg %                                                                                                                  .
: n. ay        .
                                                                                                                                                                                                                            -                                                                                                          w
                                                                                    /                                                  un "s"
ne V n ? y%.:-
w, ng rA-
                                                                                                                                                                                                                                    ,m~                                    %
O fx S=q qs c
                                                                                                                                  ,,, . p 7,,                                                                ..
g,          ake                                                                                                                                                                                                                          ;
                                                                                                                                                                                                                            '',em                                                                                                  hp WSW io.3 g .r.'"*                          '
                                                                                                                                                                                              ..        @O_-    u              W    sm                                                          ;4                                                                  p45]
ppm              .
p
                                                                                                                                            ,ey g -
                                                                                                                                                                                                                                                                                                                                              ~
* F -
Euchd                                                                                ~5                  ,      gme'                                                                                                                                    4 g                          ,g ',
* t"/        Chard ,                              f; " t (,,              - =
O' A
1-                      s.u neia    Sh; ,cs i            M                                  l' am .                                                                                                                . db \.inams                                      "
                                                                        ~
r                                      W                            NNAAN O w eea oris airstrin                                                                                            5        o                    5                    io '                                                                    is                                  20 mites Casement Airport                                                                                  i Concord Airport                                                                                Selected Air Facilitics and Airways in the Region Lost Nation Airport 5-45
 
PNPP Individu:I PI:nt Ex: min: tion - Extemal Events Figure 5 Nearby Industrial Facilities and Transportation Routes NfARBY FACILITIES Mg... -                                                                                ,                                    h i        v2            o                  i Mae 3        V - '-                    jQw q"swa          'Y
_ :;-;1/gs %S, m
_4 e                          g            N      ;'swS n            .
                                                                                                                      'N ' %            e 5_ /ip '
                                                                                                                                                                        ~
                                                                                                                                                                                  ~                  8
                                                                                                                                    <qap
                                                                                                                                    +                                              4
                  #> . ' ,_' ~                                      -#                                                                                                      Qrf
                                                                                                , ,            -  e4 s                          y -                                          - -
p              _- _                , 'ese. _
q    p;        W    .; s n.
K,                                                                                                                                                                        c          -
5 a
g[-
                                              .g
                                                - ,y
                                                          .--(
                                                                            .a
                                                                              'm          ,A r g=
se % $4                    .
: e.        ,
                                                                                                                                                                            . y r                                                        c
                                                .m                                                      gj'                      ;a, 4kp(? l3
                  'c                                                                  '. ^ %                    y      y+
                                                                                                          ' , y[~  & :. ;l                            ln[-:.r.}._        e ,. -Q 2                                                'B
                                                        ~
j    ,
l                  2                                                    g 4 , ;y .~  .-
                                                                                                    .y 20        r        a      ::
  . , 20                      4'i                        kRon'sg -[            i                                                    $.
                                                                                                                  ,e{}w f 4 (T f c ..
y-    --;;            'Ro          i sJ                                      =y            k.s
                                                                                                                                                    +: ~ ,:, -s$; 2o g
            *a            ~~~ -                                                & .in                    %        eq. .w_, g~ w= a; _
p
                                              ~~,'
y;$  1 -3, o my4            -e,x      w.          c+~      c    <:n                .x          :
e
        /        $            ]                                                                                                                                              4 O        #
3 yagrOtx__so 1?-            [~ ~ ~ .m.- - ~
                                                                                    # 1~~&lNy?moF?
ski:                      -.                      Yw$ q..0' f ~.
_                                                                                                              .m
                                                                                                              ~ ,p/cQ (;;y pf ., - ; '
yqc A
50 1RfDGE RDJ                                                    ~                1
      **                  e\                                      S.                                                                                                                    #
f                                  .-          ,#                Nl@
e ~      a f            'Q n+ . was    }i[y f .'5m&g$?      '                        a
* fr    .l'    3.-3 "          ;i{                  } Q;                                  Ol' SO&Q~ _
v                                                                                  '-
c.g z .y 1 ;p gu^
p g. & u!            c    s  ;M g
W. H . .              $,. h(:
pl[J1Tgkk'
                                                                                'y                          M
* m
      ,                            e            n;                                                ._          -
                                                                                                                                        ., ,                            ,          a
                                          ^
                                                                              - ddifffy g}f(              g ggytjy gy                                ^-X          .              ';
: 1. Alltell-Perry Exchange                  4. Madison Village Sewer Plant
: 2. Zeneca Chemicals                        S. PET Processors                                                          NEARBY FACILITIES MAP
: 3. Lake County Water East                  6. Neff-Perkins 5-46
 
PNPP Individual Plant Examination - Ext:rn:1 Ev:nts Figure 5 Gas Pipelines in the Vicinity of PNPP NW                              NNW      \      N            NNE                                NE A.  -
3g a                  g.:y-f'                        "khbd'Rd.
WNW                                                                                                  ..
                                                                                                #+            j.,NssIENE
                                                                                                                  .P
                                                                                                              ,e : . .
ERRY N                E                                f[kkj                  lt            E
;                                POWER P                                              NgM;              ,
h
                                                                                            -uf              - e la s 1 W                lMILE                                                                    ME!" (ke$y[.jE:'          If[
                                                                                                .2            Gok%11 +
iM yy-7*-
  /                                ..
                                      . . , ~
: g.            .
                        . m~jf                                                          a 9m ti    _
p- e,-        Ti c ./
m._
n.m
                                                                                          .m
: u.      A_c ew            <
3pj.        ?
N            ~
kh ' -
x  1
                                                                                        ?            u
                                                                                                        ,,    @.?"a.        '. m ES,E Spy                s "y;;
S      % 3(MEGDjAigs g .                                                  $;.
                                                                                        %  s y/n ,ig d
      ~._
:          i  p s.                                                                                                          ?
_' :                                                                :g;. '
20 A ' 5g ~
                              .,        ,          m ,. .  .
                                          .s..,wn_yy-
                                  .?                        - ,- ?.a ~ ~                            s
  ..-                n;;. v                          .a                                      a: a 7.    ; .n .r .
r.a,;;$Mi${SE?
                                                                                                                  ~
                                                                      ~
  'OSWus? U$G%i$$$'SSW$                                                          JSS 1                                            0                                  1 MILE N
Natural Gas Pipeline Map 5-47
 
l PNPP Individuil Pirnt Ex:minitian - Ext:rnr1 Evrnts                          !
l 6 LICENSEE PARTICIPATION AND INTERNAL REVIEW TEAM Cleveland Electric Illuminati ig (CEI) personnel were involved in both the development of the IPEEE and review of the output documents and submittal. Consultants were retained to pro"ide specialized            '
expertise and an overview of the IPEEE project.
6.1 IPEEE Program Organization                                                                                l l
l    The IPEEE team.was put together to optimize CEI resources while meeting the requirements in                  '
Generic Letter 88-20, Supplement 4. The organization structure for the IPEEE is shown in Figure 6-1.
Overall management of the IPEEE was provided by the CEI Project Engineer. Specific direction for each of the three broad areas ofinvestigation came from the CEI Seismic Engineer, CEI Other External i    Hazards Engineer and the CEI Fire Protection Engineer. The analyses performed for the IPEEE were l
generated by both CEI and consultant personnel.
The consultants were retained to provide assistance in the performance of the IPEEE and to provide additional technical expertise in the areas of the EPRI FIVE methodology and the EPRI Seismic                i Margins Methodology. In addition to the management role of CEI, CEI personnel also participated in
                                                                          ~
the analyses produced during the course of the IPEEE effort. All output documents were reviewed by CEI personnel.
This approach ensured that the level of both technical expertise and plant familiarity was high. The participation of CEI personnel in either the production of analyses or the review of completed products resulted in a good technical transfer in all areas.                                                          ,
6.2 Composition of Independent Review Team As noted above, CEI personnel performed an in depth review of all output documents to verify both the
,    technical adequacy of the analyses and the applicability to the Perry plant design. In addition to this
!    review, Vectra Technologies was retained to perform an overview of the analyses performed to ensure that all areas were adequately addressed and that the analyses met the requirements embodied in Generic Letter 88-20, Supplement 4 and NUREG-1407. For the seismic walkdown, Dr. Paul Smith of
    'the Readiness Operation and Mr. Harry Johnson of Programmatic Solutions were retained to provide "on the spot" review and advice on the walkdown results. These gentlemen are recognized industry experts in this area.
The organization structure for the IPEEE peer review is shown in Figure 6-2. Overall peer review for          I the seismic efTort was performed by Charbel Abou-Jaoude of Vectra Technologies. Mr. Abou-Jaoude j    has over 10 years experience in this field. Mr. Abou-Jaoude was also responsible for performing he
'    peer review of high winds, external floods and other external hazards with the assistance of Greg Ashley. The peer review for internal fires was performed by Debby de la Cruz and Staci Thompson of            ;
Vectra Technologies. Ms.de la Cruz has 9 years of experience in the field of fire protection.                  j Ms. Thompson has 5 years experience in external events analysis and fire protection.
i, .
i 6-1 l
 
PNPP Individual Plant Examinatian - Ext: mil Ev;:nts i
6.3 Areas of Review and Major Concerns                                                                    ;
6.3.1 Seismic Margins Assessment i
Each of the output documents such as development of the SSEL, Screening Evaluation Work Sheets            l (SEWS),11CLPF calculations, etc. were reviewed by Mr. Abou-Jaoude after they were developed.              l Comments were received from Mr. Abou-Jaoude and addressed by CEI personnel. The SEWS were also reviewed by either Dr. Smith or Mr. Johnson at the time the equipment was walked down. This          !
enabled their comments to be addressed while the walkdown teams were still intact and the equipment l                in the field was still accessible.                                                                        D l                In general, no major deficiencies were identified in the process used in the Perry seismic margins assessment. Additional detail was recommended for some of the SSEL calculations. The reviewer l                suggested that some refinement of the needed systems and equipment for a seismic event could reduce        I the number of components on the SSEL.
Additional detail was also recommended on the SEWS generated during the seismic walkdown by both the Vectra reviewer and Dr. Smith and Mr. Johnson.
The methodology used to determine the liCLPFs was deemed appropriate. One comment was received regarding the justification for screening out one of the components. An additional analysis was performed to verify that he component could be screened.
The remainder of the comments were minor.
6.3.2 Internal Fires The peer review for internal fires was perfonned by Ms. de la Cruz and Ms. Thompson. The EPRI FIVE results, the fire ignition frequency calculation, the conditional core damage probability (CCDP) calculation, and several detailed fire analyses were reviewed by the peer reviewers. A summary of the review concluded that, "In general, the documentation was found to be consistent with the FIVE guidelines and thorough, particularly in the area of Detailed Fire Analysis. The fault tree modeling approach utilized was effective in isolating fire scenarios and reducing fire frequency values.
Suggestions were made to include additional items which may eliminate potential questions and provide clarity. Additional discussion is recommended in the areas of plant trip initiators, manual suppression, and simplified fire modeling..."
The documentation was substantially improved by developing formal calculations. Minor technical issues and corrections were addressed during the development of the formal calculations. No major deficiencies were identified.
l 6-2
 
PNPP Individu 1 Plint Exrmination - Ext:rn l Ev;nts 6.3.3 High Winds, External Floods, and Other External Hazards The calculations developed for the other extemal hazards were reviewed by Mr. Abou-Jaoude and Greg Ashley. A summary of the review stated that, " Based on the review of the [ calculations], the Peer Reviewer finds that the "other" events portion of the PNPP IPEEE has been performed in a very thorough and conservative manner. The guidance provided by NUREG-1407 has been adopted for this evaluation and the objectives of the NUREG met."
Four observations were ofTered to clarify or strengthen the conclusions of the "Other" External Hazards i-portion of the IPEEE. The observations were incorporated into the calculations.
6.4 Resolution of Comments i
Resolution of the review comments is discussed above in Section 6.3.
6-3
 
PNPP Individual Plant Examination - Extemal Events Figure 6-1 -IPEEE Project Organization Chart I CEI            Pmpect SMohen  MeyerEnynew I                            i                                                                      i                                          i Sten Tomeezemski                                                        Stephen Meyer                                Mary Maker -
m Seeme Enynew                                                        : CEI Omer Extemel                              CEI Fue Hazards Enyneer                          Pmesmon Engmew i              l                i                                        i                              .            .                    i NUS Corp  GeaWCommonwoom            CEI                                  NUS Corp                    CEI            NUS Corp -                CEI
!      Ray Sacramo            Chen        Seeme                                Gareth Parry -          Other Extemel        Paul Guymer          intemel Fires Lead Enyneer    Lead                Analysts                            Lead Engineer          Hazards Analysts      Lead Enyneer              Analysts l              I                                                          I                                            I NUS Corp  GeorWConunonwoom                                              NUS Corp                                    NUS Corp -
SeemeAnasysts  Seeme Anesrets                                            Other Extemel                            Intemel Fees Analysts Hazards Analysts i
6-4
 
PNPP Individual Plant Examination - ExtemS1 Events                i Figure 6 Peer Review Organization CEI Project Engineer Stephen Meyer i                                I                              I Stan Tomaszewski                  Peer Review                      Peer Review    !
CEI Seismic Engineer        Other Extemal Hazards                  Intemal Fires Vectra Technologies              Vectra Technologies Charbel Abou-Jaoude                Debby de la Cruz Peer Review Seismic Margins Analysis Vectra Technologies Charbel Abou-Jaoude 6-5
 
1 l
l PNPP Individu:1 Pl;nt Ex mination - Ext;rnri Ev;nts                          '
l 7 PLANT IMPROVEMENTS AND UNIQUE SAFETY FEATURES                                                          ,
!                                                                                                            )
l  7.1 Unique Safety Features There are a number of unique features at Perry which help to safely shut the plant down from certain    !
I  initiating events.
1 The diesel generator which supplies the HPCS system is not the same size or design as the two standby diesel generators supplying the Division I and 2 cmergency buses so that a common cause failure of all three diesel generators is less likely to occur. Similarly the differences in design between the emergency service water train for HPCS and the other two emergency service water trains will lessen the probability of a common cause failure of all three trains.                                            '
The ability exists and is proceduralized to cross connect the electric supply from the HPCS diesel generator to the Division 2 emergency bus. This enables the inboard containment isolation valves (which include the valves used to vent the containment) to be powered in the event of a loss of offsite power from an external event and the failure of both the Division I and 2 diesel generators.
7.1.1 Seismic Analysis Sufficient diversity exists at Perry such that Success Path A is nearly completely separate from Success l  Path B, i.e., there are very few common components for the RPV level control systems and decay heat removal systems between Success Paths A and B. For Success Path A, RPV level control is accomplished with the HPCS system and decay heat removal by venting the containment via the FPCC system. Power may be supplied to the FPCC containment isolation valves by cross-tying the HPCS diesel generator to the Division 2 emergency bus. For Success Path B, low pressure ECCS using any        ,
one of the three LPCI trains or LPCS provides RPV level control. The bypass around the RHR heat          !
exchangers can be isolated to provide decay heat removal capability or the containment can be vented    ;
via the containment spray headers and the RHR system piping.                                              l l  The only common links between Success Paths A and B are some Division 2 emergency buses which may be used for containment venting, reactivity control and RPV overpressure protection.
7.1.2 Internal Fire Analysis The Perry design incorporates good physical separation of the different electrica! divisions. Existing housekeeping and hot work procedures minimize the risk from ignition sources. This provides the defense in depth desired for safe plant shutdown and decay heat removal.
i 7.1.3 High Winds, Floods, and Others The key to minimum risk from other external hazards is the structures housing the equipment needed to safely shutdown the plant and removal decay heat. In addition to meeting the intent of the Standard Review Plant, the design of the structures at Perry is robust. The ability to withstand the postulated external events was built into the plant to protect the operators and needed equipment.
7-1 l
l
 
T PNPP Individu11 Plint Eximination - Ext; mil Ev:nts 7.2 Plantimprovements There were no vulnerabilities identified during the performance of the IPEEE. However, as part of the seismic analysis, several items were identified which could increase the resistance to relay chatter from spatial interactions during a seismic event. No enhancements for internal fires or other external hazards were identified.
7.2.1 Seismic Analysis l The seismic margins analysis resulted in four outliers that did not screen out upon further analysis.        ;
These outliers and their resolutions were all from spatial interactions and are considered housekeeping      i items. No physical plant modifications were found to be needed.                                              i Maintenance Test Bench                                                                                        !
A maintenance test bench is located in the Unit 1, Division 2 Switchgear Room. The test bench is mounted on rollers so that it can be easily moved from one location to another for use during testing and maintenance activities. The potential exists that during a seismic event, the test bench could roll and impact motor control center MCC EFID08. The resolution to this issue is to provide locking              _
wheels for the test bench.                                                                                    I Operations Electncal Locker l
An operations electrical locker is located in the Unit 1, Division 2 Switchgear Room near the panel containing Bus EH12 (IR22-S0006). The locker is 84" in height and would come close to impacting IR22-S0006 ifit were to overturn during a seismic event. To provide assurance that there would be no possibility of striking IR22-S0006 upon overturning, the resolution is to replace the tall narrow locker with two shorter lockers. The shorter lockers would be less likely to overtum and even if they did, the distance to 1 R22-S0006 would preclude impact.
Switchgear Trolleys Trollers are mounted on top of the 480 VAC switchgear panels to support the hoists used in removal and installation of the breakers. The trolleys are not restrained from side to side movement and              ,
potential exists for the lifting hooks to swing and strike the panel face during a seismic event. Based on    I the evaluation conducted, the trolleys, if parked in the center of the panel, would provide sufficient        j margin from moving along the rails and impacting the stops. If the lifting hook is restrained by the          '
trolley frame, the potential for swinging into the panel face is eliminated. A caution on parking the trolleys and restraining the lifting hook are being placed in the appropriate instructions.
Control Room Fumiture l
l During the seismic walkdown of the control room numerous potential spatial interactions were identified. During the subsequent evaluation, the majority of these potential interactions were screened out leaving thirteen items. Relocation of these items is being explored to resolve this outlier. This l effort may involve relocation of some items by only a few inches while others may need to be relocated to less sensitive places in the control room.
7-2
 
                                                                                                        }
PNPP Individuil Plint ExImination - Extsmil Ev:nts                            '
7.2.2 Internal Fire Analysis 4
Seven fire area / compartments remained above the screening criteria of 10 /yr following the detailed  [
fire analyses. Five of the fire area / compartments have fire induced core damage frequencies close to the screening criteria. Fire areas ICC5a (Unit I control Room) and ICC3a (Unit 1 Division 2            l Switchgear Room) dominate the fire induced CDF. By its very nature a fire in the control room          l 4
(ICC5a) has the potential to result in a core damage frequency above 10 /yr. No additional actions      l were identified which would further reduce the contribution to the CDF of a control room fire. The fire -
induced CDF in the Unit 1 Division 2 switchgear room is dominated by the fires in the 4.16 kV          l switchgear and the 480 V bus sections which damage overhead cable. Conservatisms in the analysis        !
are discussed in Section 4.7.3.2 of this report. No additional actions were identified which would further reduce the contribution to the CDF of a fire in ICC3a.                                          r i
7.2.3 High Winds, Floods, and Others There were no open items at the end of the screening process and subsequent analyses. No plant improvements were made as a result of the high winds, floods, and other external hazards evaluations performed for Generic Letter 88-20, Supplement 4.                                                      l I
i 1
7-3
 
PNPP Individu:1 PI:nt Ex:mination - Ext; mil Ev;nts 8
 
==SUMMARY==
& CONCLUSIONS (including proposed resolution of USIs, Gls and other issues)
Cleveland Electric Illuminating Co. (CEI) performed an Individual Plant Examination of External Events (IPEEE) for the Perry Nuclear Power Plant (PNPP). The Perry IPEEE meets the intent of Generic Letter 88-20, Supplement 4 and NUREG-1407. Perry was found to be rugged with respect to seismic events, internal fires and high winds, floods and other external hazards. Management of the project was retained within CEI. The analyses themselves were performed by a combination of CEI and consultant personnel.
8.1 Seismic Analyses A seismic margins assessment was performed for Perry using the EPRI seismic margins methodology.
Perry was analyzed as focused scope plant per the guidance contained in Generic Letter 88-20, Supplement 4 and NUREG-1407. The review level earthquake was anchored at 0.3g.
Two safe shutdown paths (both of which can mitigate a small LOCA) were developed and found to have a high confidence of a low probability of failure (HCLPF) of 0.3g. In addition, the containment also was found to have a IICLPF of 0.3g.
Four enhancements to reduce the threat of spatial interactions were identified and are in the process of being implemented. No plant modifications were required.
8.2 Internal Fire Analyses The internal fire analysis was performed using the EPRI Fire-Induced Vulnerability Evaluation (FIVE).
The progressive screening used in the FIVE methodology left nine fire zones which required additional detailed evaluation. Based on the detailed evaluations performed each of the remaining fire zones were found to be acceptable with no enhancements or modifications required.
8.3 High Winds, Floods, and Other External Hazards The approach used for high winds, floods and other external hazards follows the method described in NUREG/CR-4839 by performing an initial screening analysis followed by bounding or more detailed analyses as necessary. A comprehensive review of external hazards based on those identified in the PRA Procedures Guide supported the NUREG-1407 conclusion that only high winds, external floods and transportation and nearby facility accidents needed a detailed evaluation. The plant as designed was found to meet the intent of the criteria of the Standard Review Plan of 1975. No enhancements or modifications were made as a result of the other external hazards analyses performed for Generic Letter 88-20, Supplement 4.
I l
8-1
 
_ _ _ . -    _ _ _    __      __ __        _  __    _    ~ _ _ _        _ _ - .        . _ _ _ _ _    _. _
PNPP Individuil Plant Eximinition - Exttrnil Ev:nts 8.4 Resolution of USIs, Gls and Other issues 1
8.4.1 USl A-1'T " System interactions in Nuclear Power Plants" The external events portion of USI A-17, " System Interactions in Nuclear Power Plants," was subsumed into the IPEEE. Seismic spatial interactions were evaluated as part of the seismic walkdown effort. The walkdowns were performed in accordance with the guidance contained in EPRI document            !
NP-6041-SL. No seismic vulnerabilities were identified due to spatial interactions. This issue is considered complete for Perry.
8.4.2 USl A-45 " Shutdown Decay Heat Removal Requirements"                                                  l l
The Perry Individual Plant Examination (IPE), submitted in June 1992, addressed the impact on shutdown decay heat removal requirements ofinternal events. The Perry IPEEE covers external events and their impact on decay heat removal. The safe shutdown equipment list (SSEL) generated for the          ,
seismic margins analysis contains the equipment necessary to safely shut the plant down and maintain        !
in a safe condition for 72 hours assuming no offsite a.c. power. The equipment needed to remove decay      1 heat is included in the SSEL. No potential vulnerabilities were identified that would prevent decay heat removal processes. This issue is considered complete for Perry.
8.4.3 The Eastern U.S. Seismicity issue (The Charleston Earthquake issue)
{
The Eastern Seismicity Issue, forraerly called the Charleston Earthquake Issue, was subsumed into the IPEEE. The performance of t'4e seismic margins assessment as part of the IPEEE provides the resolution to this issue. The work on the seismic hazard estimates by the USNRC, LLNL and EPRI played a key role in developing the review level earthquake bins which set the magnitude of the earthquakes each plant was assigned to evaluate. Perry performed the seismic analyses to a review level earthquake anchored at 0.3g. No vulnerabilities were identified. Based on this, The Eastem U.S.
Seismicity issue is considered complete for Perry.
8.4.4 January 31,1986 Leroy Earthq sake lasues Following the 1986 earthquake near Leroy, Ohio, PNPP committed to perfonn an evaluation to determine the level of available seismic margin. The review level earthquake for the PNPP seismic margin assessment performed as part of the IPEEE was anchored at 0.3g. This is exactly twice the safe shutdown earthquake of 0.15g utilized for the design of the plant. A HCLPF of 0.3g for the SSEL, shows that Perry has significant margin above design. This completes the Perry commitment made for the 1986 Leroy earthquake.
l 8-2}}