IR 05000324/1985003: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20127K075 | | number = ML20127K075 | ||
| issue date = 04/15/1985 | | issue date = 04/15/1985 | ||
| title = Ack Receipt of | | title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-324/85-03 & 50-325/85-03.Implementation of Corrective Actions Will Be Examined During Future Insps | ||
| author name = Verrelli D | | author name = Verrelli D | ||
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) | | author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8505220035 | | document report number = NUDOCS 8505220035 | ||
| title reference date = 04-03-1985 | |||
| package number = ML20127K079 | | package number = ML20127K079 | ||
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE | ||
| Line 19: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter: , | {{#Wiki_filter:_._ | ||
q. | |||
, | |||
. | |||
. | |||
APR 151985 Carolina' Power and Light Company | APR 151985 Carolina' Power and Light Company | ||
' ATTN: Mr. E. E. Utley Executive Vice President Power Supply and Engineering and Construction 411 Fayetteville Street Raleigh, NC 27602 Gentlemen: | |||
SUBJECT: REPORT NOS. 50-324/85-03 AND 50-325/85-03 Thank you for your response of April 3,1985, to our Notice of Violation issued on March 6, 1985, concerning activities conducted at your Brunswick facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2. | SUBJECT: REPORT NOS. 50-324/85-03 AND 50-325/85-03 Thank you for your response of April 3,1985, to our Notice of Violation issued on March 6, 1985, concerning activities conducted at your Brunswick facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. | ||
We will examine the implementation of your corrective actions during future inspections. | |||
Sincerely, David M. Verre111, Chief Reactor Projects Branch 1 Division of Reactor Projects cc: P. W. Howe, Vice President Brunswick Nuclear Project C. R. Dietz, Plant General Manager bec: NRC Resident Inspector Document Control Desk State of North Carolina | We appreciate your cooperation in this matter. | ||
Sincerely, David M. Verre111, Chief Reactor Projects Branch 1 Division of Reactor Projects cc: | |||
P. W. Howe, Vice President Brunswick Nuclear Project C. R. Dietz, Plant General Manager bec: NRC Resident Inspector Document Control Desk State of North Carolina | |||
. | . | ||
0 PDR RII R | |||
in:Jw PEFre rickson 4/d /85 4/ p/85 IJ ffot | |||
-- | |||
-- | |||
- | |||
- | |||
- | |||
-- - | |||
-- | |||
- - | |||
}} | }} | ||
Latest revision as of 16:11, 12 December 2024
| ML20127K075 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 04/15/1985 |
| From: | Verrelli D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20127K079 | List: |
| References | |
| NUDOCS 8505220035 | |
| Download: ML20127K075 (1) | |
Text
_._
q.
,
.
.
APR 151985 Carolina' Power and Light Company
' ATTN: Mr. E. E. Utley Executive Vice President Power Supply and Engineering and Construction 411 Fayetteville Street Raleigh, NC 27602 Gentlemen:
SUBJECT: REPORT NOS. 50-324/85-03 AND 50-325/85-03 Thank you for your response of April 3,1985, to our Notice of Violation issued on March 6, 1985, concerning activities conducted at your Brunswick facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, David M. Verre111, Chief Reactor Projects Branch 1 Division of Reactor Projects cc:
P. W. Howe, Vice President Brunswick Nuclear Project C. R. Dietz, Plant General Manager bec: NRC Resident Inspector Document Control Desk State of North Carolina
.
0 PDR RII R
in:Jw PEFre rickson 4/d /85 4/ p/85 IJ ffot
--
--
-
-
-
-- -
--
- -