Line 16: Line 16:
| event date = 06/13/2009 09:45 EDT
| event date = 06/13/2009 09:45 EDT
| last update date = 06/19/2009
| last update date = 06/19/2009
| title = Technical Support Center Ventilation System Out Of Service
| title = Technical Support Center Ventilation System Out of Service
| event text = Planned maintenance activities are being performed today (June 13, 2009) on the Vogtle Nuclear Plant's Technical Support Center (TSC) power sources. This work activity is planned to be performed and completed expeditiously within approximately 3 days (78 hours). This maintenance activity is to perform a transformer replacement, perform preventative maintenance on several circuit breakers, perform preventative maintenance on the TSC HVAC unit, repair a leak on the Back-Up D/G [diesel generator] which provides a back-up power supply to the TSC HVAC, and other minor maintenance activities.
| event text = Planned maintenance activities are being performed today (June 13, 2009) on the Vogtle Nuclear Plant's Technical Support Center (TSC) power sources. This work activity is planned to be performed and completed expeditiously within approximately 3 days (78 hours). This maintenance activity is to perform a transformer replacement, perform preventative maintenance on several circuit breakers, perform preventative maintenance on the TSC HVAC unit, repair a leak on the Back-Up D/G [diesel generator] which provides a back-up power supply to the TSC HVAC, and other minor maintenance activities.
If an emergency condition occurs that requires activation of the Technical Support Center during this work activity, contingency plans are in place to restore the TSC to fully functional status, with the time to restoration dependent on the stage of the work activity at the time the emergency occurs. Plans are to utilize the Shift Manager's Office in the Control Room as the Backup TSC for any declared emergency during the time the work activity is being performed.  Procedure 91201-C, Activation and Operation of the Technical Support Center, provides instructions to direct TSC management to the Control Room to continue TSC activities if it is necessary to relocate from the primary TSC. At the beginning of the TSC outage, the ENN [Emergency Notification Network] and ERDS [Emergency Response Data System] will not be available until temporary power is being provided. This outage for the communications equipment will last from 2-4 hours, at which time they will be available.
If an emergency condition occurs that requires activation of the Technical Support Center during this work activity, contingency plans are in place to restore the TSC to fully functional status, with the time to restoration dependent on the stage of the work activity at the time the emergency occurs. Plans are to utilize the Shift Manager's Office in the Control Room as the Backup TSC for any declared emergency during the time the work activity is being performed.  Procedure 91201-C, Activation and Operation of the Technical Support Center, provides instructions to direct TSC management to the Control Room to continue TSC activities if it is necessary to relocate from the primary TSC. At the beginning of the TSC outage, the ENN [Emergency Notification Network] and ERDS [Emergency Response Data System] will not be available until temporary power is being provided. This outage for the communications equipment will last from 2-4 hours, at which time they will be available.

Latest revision as of 21:11, 1 March 2018

ENS 45128 +/-
Where
Vogtle Southern Nuclear icon.png
Georgia (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-4.43 h-0.185 days <br />-0.0264 weeks <br />-0.00607 months <br />)
Opened: Mike Henry
09:19 Jun 13, 2009
NRC Officer: Ryan Alexander
Last Updated: Jun 19, 2009