ML20133D441: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:'
{{#Wiki_filter:'
                                        t
  ; -
          :  .  .
                    -
                                .
      .
          .            . .
              -
                        .
                  .
        ,
                                              December 24, 1984
          Mississippi Power and Light Company
          ATTN: Mr. J. B. Richard
                        Senior Vice President, Nuclear
          P. O. Box 23054
          Jackson, MS 39205
t
t
          Gentlemen:
;
                                                                                            .
:
          SUBJECT:        REPORT N05. 50-416/84-48 AND 50-417/84-07
-
          On November 5 - 9, 1984, NRC inspected activities authorized by NRC License
-
          No. NPF-29 and NRC Construction Permit No. CPPR-119 for your Grand Gulf facility.
.
          At the conclusion of the inspection, the findings were discussed with those
.
          members of your staff identified in the enclosed inspection report.
.
          Areas examined during the inspection are identified in the report. Within these
.
          areas, the inspection consisted of selective examinations of procedures and
. .
            representative records, interviews with personnel, and observation of activities
.
            in progress.
-
          The inspection findings indicate that certain activities violated NRC require-
.
          ments. The violations, references to pertinent requirements, and elements to be
.
December 24, 1984
,
,
            included in your response are presented in the enclosed Notice of Violation.
Mississippi Power and Light Company
            In addition to the need for corrective action regarding the specific matters
ATTN: Mr. J. B. Richard
            identified in the enclosed Notice, we are concerned about the implementation of
Senior Vice President, Nuclear
,        your management control systems that permitted this situation to develop.
P. O. Box 23054
          Consequently, your response should describe those particular actions taken or
Jackson, MS 39205
          planned to improve the effectiveness of your program.
t
'
Gentlemen:
            In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosures, and
.
          your reply will be placed in NRC's Public Document Room upon completion of our
SUBJECT:
          evaluation of the reply. If you wish to withhold information contained therein,
REPORT N05. 50-416/84-48 AND 50-417/84-07
          please notify this office by telephone and include a written application to
On November 5 - 9,
          withhold information in your response. Such application must be consistent with
1984, NRC inspected activities authorized by NRC License
          the requirements of 2.790(b)(1).
No. NPF-29 and NRC Construction Permit No. CPPR-119 for your Grand Gulf facility.
          The responses directed by this letter and the enclosures are not subject to the
At the conclusion of the inspection, the findings were discussed with those
          clearance procedures of the Office of Management and Budget issued under the
members of your staff identified in the enclosed inspection report.
          Paperwork Reduction Act of 1980, PL 96-511.
Areas examined during the inspection are identified in the report. Within these
          Should you have any questions concerning this letter, please contact us.
areas, the inspection consisted of selective examinations of procedures and
                                                        Sincerely,
representative records, interviews with personnel, and observation of activities
      8507220207 841224
in progress.
      PDR                                                 Original Signed by
The inspection findings indicate that certain activities violated NRC require-
      0           ADOCK 05000416
ments. The violations, references to pertinent requirements, and elements to be
                                  PINT.                   John A. Olshinski
included in your response are presented in the enclosed Notice of Violation.
                                                        John A. Olshinski, Director
,
                                                        Division of Reactor Projects
In addition to the need for corrective action regarding the specific matters
          Enclosures: -(See Page 2)
identified in the enclosed Notice, we are concerned about the implementation of
                                                                                        \\
your management control systems that permitted this situation to develop.
                                                                                      rEol
,
Consequently, your response should describe those particular actions taken or
planned to improve the effectiveness of your program.
In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosures, and
'
your reply will be placed in NRC's Public Document Room upon completion of our
evaluation of the reply. If you wish to withhold information contained therein,
please notify this office by telephone and include a written application to
withhold information in your response. Such application must be consistent with
the requirements of 2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
8507220207 841224
PDR
ADOCK 05000416
Original Signed by
0
PINT.
John A. Olshinski
John A. Olshinski, Director
Division of Reactor Projects
Enclosures: -(See Page 2)
\\\\
rEol


                                  a
a
  '
-;
  -; ,.',   .
, . ' ,
                -
'
                          .
-
      ..
.
          ~
.
              ..   .
.
                      *
..
                  .         .
..
        Mississippi Power and Light Company       2         December 24, 1984
~
        Enclosures:
*
        1.     Notice of Violation
.
        2.     Inspection Report Nos. 50-416/84-48
.
                  and 50-417/84-07
Mississippi Power and Light Company
        cc w/encls:
2
        J. E. Cross, General Manager
December 24, 1984
.       R. T. Lally, Manager of Quality
Enclosures:
          Middle South Services, Inc.
1.
        R. B. McGehee, Esquire
Notice of Violation
          Wise, Carter, Child, Steen and Caraway
2.
        N. S. Reynolds, Esquire
Inspection Report Nos. 50-416/84-48
          Bishop, Liberman, Cook, Purcell
and 50-417/84-07
          & Reynolds
cc w/encls:
        R. W. Jackson, Project Engineer
J. E. Cross, General Manager
        bec w/encls:
.
        NRC Resident Inspector
R. T. Lally, Manager of Quality
      ~ Document Control Desk
Middle South Services, Inc.
        State of. Mississippi
R. B. McGehee, Esquire
Wise, Carter, Child, Steen and Caraway
N. S. Reynolds, Esquire
Bishop, Liberman, Cook, Purcell
& Reynolds
R. W. Jackson, Project Engineer
bec w/encls:
NRC Resident Inspector
~ Document Control Desk
State of. Mississippi
,
,
      ~RII                     RII               RII         RII
~RII
    #
RII
        CMUpright:sa         * AFGibson-         PBe             iera         /
RII
        12/ /84                 12/ ./84         12/is/84-   VPa484
RII
                                                                12/         g
# CMUpright:sa
                                                                              6#4,q/d
* AFGibson-
                                                                                    -
PBe
/
VPa484
iera
g 6# ,q/d
12/ /84
12/ ./84
12/is/84-
12/
4
-


                                                                              . - _ . . _ . _ . - _ _
.-
    .-
. - _ .
                                            #
. _ . _ . - _ _
                                    '"
#
      h . ~.'.,
h . ~.'
            ..
'"
                      .
-
                        -
.
                                  .
.,
                    '
.
                        ..    .
..
                                *
.
                          .           .
..
                  Mississippi Power and Light-Company     2
'
                .
*
.
.
Mississippi Power and Light-Company
2
.
i
i
                  cc w/encls:
cc w/encls:
                  J. E. Cross, General Manager
J. E. Cross, General Manager
                  R. T. Lally, Manager of Quality
R. T. Lally, Manager of Quality
                    Middle South Services, Inc.
Middle South Services, Inc.
                  R. B. McGehee, Esquire
R. B. McGehee, Esquire
                    Wise, Carter, Child, Steen and Caraway
Wise, Carter, Child, Steen and Caraway
                  N. S. Reynolds,- Esquire
N. S. Reynolds,- Esquire
                    Bishop, ~ Liberman, Cook, Purcell
Bishop, ~ Liberman, Cook, Purcell
                    & Reynolds
& Reynolds
                  R. W.~ Jackson, Project Engineer
R. W.~ Jackson, Project Engineer
                  bcc w/encls:
bcc w/encls:
                'NRC Resident Inspector
'NRC Resident Inspector
                  Document Control-Desk
Document Control-Desk
                  State of Mississippi.
State of Mississippi.
              '
'
                  RII       p
RII
                                          -RII             RII:     RII
-RII
            ;CMUpright:sa               .AFGibson-       PBemis   VPanciera
RII:
                  12/;L/84'               -12/gv/84         12/ "/84 12/ /84
RII
          :-.
p
;CMUpright:sa
.AFGibson-
PBemis
VPanciera
12/;L/84'
-12/gv/84
12/ "/84
12/ /84
:-.
L:l
L:l
}}
}}

Latest revision as of 08:47, 12 December 2024

Forwards Insp Repts 50-416/84-48 & 50-417/84-07 on 841105-09 & Notice of Violation.Plans to Improve Effectiveness of Mgt Control Sys Program Requested
ML20133D441
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 12/24/1984
From: Olshinski J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Richard J
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20133D444 List:
References
NUDOCS 8507220207
Download: ML20133D441 (3)


See also: IR 05000416/1984048

Text

'

t

-

-

.

.

.

.

. .

.

-

.

.

December 24, 1984

,

Mississippi Power and Light Company

ATTN: Mr. J. B. Richard

Senior Vice President, Nuclear

P. O. Box 23054

Jackson, MS 39205

t

Gentlemen:

.

SUBJECT:

REPORT N05. 50-416/84-48 AND 50-417/84-07

On November 5 - 9,

1984, NRC inspected activities authorized by NRC License

No. NPF-29 and NRC Construction Permit No. CPPR-119 for your Grand Gulf facility.

At the conclusion of the inspection, the findings were discussed with those

members of your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC require-

ments. The violations, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

,

In addition to the need for corrective action regarding the specific matters

identified in the enclosed Notice, we are concerned about the implementation of

your management control systems that permitted this situation to develop.

,

Consequently, your response should describe those particular actions taken or

planned to improve the effectiveness of your program.

In accordance with 10 CFR 2.790(a), a copy of this letter, its enclosures, and

'

your reply will be placed in NRC's Public Document Room upon completion of our

evaluation of the reply. If you wish to withhold information contained therein,

please notify this office by telephone and include a written application to

withhold information in your response. Such application must be consistent with

the requirements of 2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

8507220207 841224

PDR

ADOCK 05000416

Original Signed by

0

PINT.

John A. Olshinski

John A. Olshinski, Director

Division of Reactor Projects

Enclosures: -(See Page 2)

\\\\

rEol

a

-;

, . ' ,

'

-

.

.

.

..

..

~

.

.

Mississippi Power and Light Company

2

December 24, 1984

Enclosures:

1.

Notice of Violation

2.

Inspection Report Nos. 50-416/84-48

and 50-417/84-07

cc w/encls:

J. E. Cross, General Manager

.

R. T. Lally, Manager of Quality

Middle South Services, Inc.

R. B. McGehee, Esquire

Wise, Carter, Child, Steen and Caraway

N. S. Reynolds, Esquire

Bishop, Liberman, Cook, Purcell

& Reynolds

R. W. Jackson, Project Engineer

bec w/encls:

NRC Resident Inspector

~ Document Control Desk

State of. Mississippi

,

~RII

RII

RII

RII

  1. CMUpright:sa
  • AFGibson-

PBe

/

VPa484

iera

g 6# ,q/d

12/ /84

12/ ./84

12/is/84-

12/

4

-

.-

. - _ .

. _ . _ . - _ _

h . ~.'

'"

-

.

.,

.

..

.

..

'

.

.

Mississippi Power and Light-Company

2

.

i

cc w/encls:

J. E. Cross, General Manager

R. T. Lally, Manager of Quality

Middle South Services, Inc.

R. B. McGehee, Esquire

Wise, Carter, Child, Steen and Caraway

N. S. Reynolds,- Esquire

Bishop, ~ Liberman, Cook, Purcell

& Reynolds

R. W.~ Jackson, Project Engineer

bcc w/encls:

'NRC Resident Inspector

Document Control-Desk

State of Mississippi.

'

RII

-RII

RII:

RII

p

CMUpright
sa

.AFGibson-

PBemis

VPanciera

12/;L/84'

-12/gv/84

12/ "/84

12/ /84

-.

L:l