{{#Wiki_filter:,
{{#Wiki_filter:PDR 6
PDR 6
August 7, 1985 For:
August 7, 1985 For:       The Commissioners From:     'T. A. Rehm, Assistant for Operations, Office of the ED0
The Commissioners From:
'T. A. Rehm, Assistant for Operations, Office of the ED0


==Subject:==
==Subject:==
WEEKLY INFORMATION REPORT - WEEK ENDING AUGUST 2, 1985 A summary of key events is included as a convenience to those Commissioners who may prefer a condensed version of this report.
WEEKLY INFORMATION REPORT - WEEK ENDING AUGUST 2, 1985 A summary of key events is included as a convenience to those Commissioners who may prefer a condensed version of this report.
Contents                                                 Enclosure
Contents Enclosure Administration A
,      Administration                                                 A Nuclear Reactor Regulation                                     B Nuclear Material Safety and Safeguards                         C Inspection and Enforcement                                     D Nuclear Regulatory Research                                   E Executive Legal Director                                       F*
Nuclear Reactor Regulation B
International Programs                                         G State Programs                                                 H Resource Management                                             I*
Nuclear Material Safety and Safeguards C
Analysis and Evaluation of Operational Data                   J Small & Disadvantaged Business Utilization & Civil Rights       K Regional Offices                                               L*
Inspection and Enforcement D
CRGR Monthly Report                                           M*
Nuclear Regulatory Research E
Executive Director for Operations                               N*
Executive Legal Director F*
Items Addressed by the Commission                               0 Meeting Notices                                                 P Proprietary or Other Sensitive Information (Not for             Q externaldistribution)
International Programs G
  *No input this week.             '
State Programs H
d-Il
Resource Management I*
                                      /T. A. R hm,
Analysis and Evaluation of Operational Data J
* nt for Operations Office of the Executive Director for Operations
Small & Disadvantaged Business Utilization & Civil Rights K
Regional Offices L*
CRGR Monthly Report M*
Executive Director for Operations N*
Items Addressed by the Commission 0
Meeting Notices P
Proprietary or Other Sensitive Information (Not for Q
externaldistribution)
*No input this week.
I d-
/
l T. A. R hm, nt for Operations Office of the Executive Director for Operations 8508140187hggo7


==Contact:==
==Contact:==
8508140187hggo7 T. A. Rehm, ED0                 PDR  CO 492-7781                         WEEKLYIh0REPTPDR
WEEKLYIh0REPTPDR PDR CO T. A. Rehm, ED0 492-7781


HfGHLIGHTS OF WEEKLY fNFORMATION REPORT WEEK ENDING AUGUST 2, 1985
HfGHLIGHTS OF WEEKLY fNFORMATION REPORT WEEK ENDING AUGUST 2, 1985 i.
: i.           Oconee Nuclear Station, Units 1, 2 and 3 i'           Earlier, Duke Power Company (Duke) had called to say that a DC reactor trip breaker (AK-2-25) responded slowly during the monthly on-line surveillance test. The breaker tripped in 1738 milliseconds rather than under 80.
Oconee Nuclear Station, Units 1, 2 and 3 i'
Earlier, Duke Power Company (Duke) had called to say that a DC reactor trip breaker (AK-2-25) responded slowly during the monthly on-line surveillance test. The breaker tripped in 1738 milliseconds rather than under 80.
{
{
On July 29, 1985, Duke informed the staff that they believe the caus6 for the delayed trip could be a potential gineric problem and that :1t involves the undervoltage trip attachment (UVTA) of the reactor trip i           breaker. Duke is in the process of installing a new UVTA (this is the i           second) and they stated that the new devices have smaller tolerances i           between the armature and the rtounting nuts. Duke believes that with j             the new devices and the smaller tolerances, the armature would hit the 4
On July 29, 1985, Duke informed the staff that they believe the caus6 for the delayed trip could be a potential gineric problem and that :1t involves the undervoltage trip attachment (UVTA) of the reactor trip i
mounting nuts on top of the housing.
breaker. Duke is in the process of installing a new UVTA (this is the i
The staff is pursuing: (1) any potential generic concerns, (2) confirmation that Duke does its own benchtesting for nuclear-grade
second) and they stated that the new devices have smaller tolerances i
;              certification and (3) any similarities to a Rancho Seco event where the UVTA did not trip because the clearances between the roller-rivet and the armature were significantly greater than the specified range.
between the armature and the rtounting nuts. Duke believes that with j
l             The Oconee units continue to operate at power.
the new devices and the smaller tolerances, the armature would hit the mounting nuts on top of the housing.
New Method of Calculating Skin Dose
4 The staff is pursuing:
      -        NRC regulations establish a quarterly skin dose limit, but no NRC guidance has been issued on the technically difficult subject of determining the
(1) any potential generic concerns, (2) confirmation that Duke does its own benchtesting for nuclear-grade certification and (3) any similarities to a Rancho Seco event where the UVTA did not trip because the clearances between the roller-rivet and the armature were significantly greater than the specified range.
        ,      skin dose from the measured radioactive contamination deposited on the skin. Battelle's Pacific Northwest Laboratory, under contract to the NRC, has developed a new, improved method of calculating skin dose due to fission and radioactive corrosion products' skin contamination.
l The Oconee units continue to operate at power.
Battelle has also recomended skin contamination levels below which
New Method of Calculating Skin Dose NRC regulations establish a quarterly skin dose limit, but no NRC guidance has been issued on the technically difficult subject of determining the skin dose from the measured radioactive contamination deposited on the skin. Battelle's Pacific Northwest Laboratory, under contract to the NRC, has developed a new, improved method of calculating skin dose due to fission and radioactive corrosion products' skin contamination.
!              further decontamination should not be required. These levels are expressed in units that can be readily measured using comercially available instrumentation. The calculational method can be implemented using a computer code (VARSKIN) that can compute the radiation dose at a specified depth in the skin for radiation sources ranging in size from a point to a disk of 100-cm diameter. A com mter diskette containing VARSKIN, which is compatible with the IBM->C is on file with R. B. Neel, Project
Battelle has also recomended skin contamination levels below which further decontamination should not be required. These levels are expressed in units that can be readily measured using comercially available instrumentation. The calculational method can be implemented using a computer code (VARSKIN) that can compute the radiation dose at a specified depth in the skin for radiation sources ranging in size from a point to a disk of 100-cm diameter. A com mter diskette containing VARSKIN, which is compatible with the IBM->C is on file with R. B. Neel, Project Manager, Occupational Radiation Protection Branch, DRPES, RES.
.              Manager, Occupational Radiation Protection Branch, DRPES, RES. The
The results of this research will be published as a NUREG/CR document, " Dose Calculation for Contamination of the Skin " in the next few ronths and will be considered for use as the basis for developing an NRC Regulation Guide on this subject.
!              results of this research will be published as a NUREG/CR document, " Dose
I 1
;              Calculation for Contamination of the Skin " in the next few ronths and will be considered for use as the basis for developing an NRC Regulation Guide on this subject.
l Part 21 Notification NRC was notified on July 19, 1985 of a possible Substantial Safety.fazard in accordance with 10 CFR Part 21 by Technology for Energy Corporation (TEC). The report deals with i
I                                                                                                                 1 Part 21 Notification l
TEC model 914-1 Valve Flow Monitor Modules (Acoustic). These modules are ac The problem is a possible monitors used to indicate whether valves are open or closed.
i NRC was notified on July 19, 1985 of a possible Substantial Safety.fazard in accordance with 10 CFR Part 21 by Technology for Energy Corporation (TEC). The report deals with TEC model 914-1 Valve Flow Monitor Modules (Acoustic).                       These modules are ac monitors used to indicate whether valves are open or closed. The problem is a possible
" latch-up" of the module in which it fails to reset after indicating full flow through If it " latches up," the monitor will continue to show that the valve is open the valve.
                  " latch-up" of the module in which it fails to reset after indicating full flow through the valve. If it " latches up," the monitor will continue to show that the valve is open Purchases of the monitors will be notified by the vendor.
after it has been closed.
:                after it has been closed.                                  Bellefonte, Browns Ferry, Calvert Those plants mentioned in the vendor notification are:
Purchases of the monitors will be notified by the vendor.
Bellefonte, Browns Ferry, Calvert Those plants mentioned in the vendor notification are:
Cliffs, Catawba, Clinton, Davis-Besse, Diablo Canyon, Ft. Calhoun, Indian Point 2 & 3, McGuire, Oconee, Palo Verde, Pilgrim, Rancho Seco, San Onofre, Sequoyah, St. Lucie, Susquehanna, Tuckey Point, Trojan, Watts Bar, and WNP-2.
Cliffs, Catawba, Clinton, Davis-Besse, Diablo Canyon, Ft. Calhoun, Indian Point 2 & 3, McGuire, Oconee, Palo Verde, Pilgrim, Rancho Seco, San Onofre, Sequoyah, St. Lucie, Susquehanna, Tuckey Point, Trojan, Watts Bar, and WNP-2.
MG   0195
MG 0195


;.                                                                                                                                                                                                                    t
t 0FFICE OF ADMINISTRATION Week Ending August 2, 1985 i
        -                                                                                            0FFICE OF ADMINISTRATION
ADMINISTRATION OF THE FREEDOM 0F INFORMATION ACT
!                                                                                                  Week Ending August 2, 1985 i                                                                                   ADMINISTRATION OF THE FREEDOM 0F INFORMATION ACT
]
]                                                                                                       STATUS OF REQUESTS Initial                           Appeal of i                                                                                                   Request                       Initial Decision Carryovers, 1984         179                               23 Received, 1985           551                               31 Granted                 418                               24                                                                           '
STATUS OF REQUESTS Initial Appeal of i
Denied                   117                                 13 Pending                 195                                 17
Request Initial Decision Carryovers, 1984 179 23 Received, 1985 551 31 Granted 418 24 Denied 117 13 Pending 195 17 ACTIONS THIS WEEK l
:                                                                                                        ACTIONS THIS WEEK l
l Received John Wendell Beavers, Requests all records concerning shut downs of the Salem Attorney-At-Law Unit 1 plant which were necessitated by the Westinghouse (85-522) circuit breaker, NRC's subsequent fines, and related i
l                                           Received John Wendell Beavers, Requests all records concerning shut downs of the Salem
action applicable to Westinghouse.
:                                                  Attorney-At-Law                         Unit 1 plant which were necessitated by the Westinghouse
l Lyle Graber, Requests a copy of SECY-85-209.
!                                                          (85-522)                       circuit breaker, NRC's subsequent fines, and related i                                                                                         action applicable to Westinghouse.
NUS Corporation j
l                                         Lyle Graber,                                   Requests a copy of SECY-85-209.
(85-523)
:                                                  NUS Corporation j                                                         (85-523)
Jeanene C. Ondrik, Requests copies of the last two NRC inspection Nuclear Pharmacy reports for St. James Hospital in Chicago Heights, Incorporated Illinois.
!                                          Jeanene C. Ondrik,                             Requests copies of the last two NRC inspection Nuclear Pharmacy                       reports for St. James Hospital in Chicago Heights, Incorporated                           Illinois.
(85-524)
(85-524)
Clifford A. Beck                               Requests copies of 24 listed reports and supplements.
Clifford A. Beck Requests copies of 24 listed reports and supplements.
j                                                         (85-525)
j (85-525)
Steven C. Sholly,                             Requests copies of Oyster Creek Probabilistic Safety Union of Concerned Analysis reports dated August 1979 and December 1982.
Steven C. Sholly, Requests copies of Oyster Creek Probabilistic Safety Union of Concerned Analysis reports dated August 1979 and December 1982.
Scientists (85-526)                                                                                                                                                     '
Scientists (85-526) i Susan L. Hiatt, Requests a copy of two identified records and four OCRE Representative categories of records concerning research programs.
i Susan L. Hiatt,                                 Requests a copy of two identified records and four OCRE Representative categories of records concerning research programs.
(85-527)
(85-527)
Charles Barnes                                 Requests records in Docket files 40-1366, Gunnison
Charles Barnes Requests records in Docket files 40-1366, Gunnison (85-528)
,                                                        (85-528)                         Uranium Processing Plant; and 40-1668, Lakeview Uranium
Uranium Processing Plant; and 40-1668, Lakeview Uranium Processing Plant; and Inspection Report of Sequoyah l
,                                                                                        Processing Plant; and Inspection Report of Sequoyah l                                                                                         Uranium Hexafluoride Plant conducted October 21-23, 1970.
Uranium Hexafluoride Plant conducted October 21-23, 1970.
CONTACT:                           J. M. Felton i                                                                             492-7211                                                                                             ENCLOSURE A AUG                 2 1985
CONTACT:
  -~   ,.e   n _ -nww.,.7-sn,,c-,em,--~.-,-.,,-,v.wn,,.n,.,.n.,_,n,,n__.e,                                         - - . , . .g   -_  r,,,w.,,.     ..ww-,--,v,, ,, , -e,g_,y         v,.e,_,w-re.e_n-n
J. M. Felton i
492-7211 ENCLOSURE A AUG 2 1985
-~
,.e n _ -nww.,.7-sn,,c-,em,--~.-,-.,,-,v.wn,,.n,.,.n.,_,n,,n__.e,
.g r,,,w.,,.
..ww-,--,v,,
,,, -e,g_,y v,.e,_,w-re.e_n-n


2
2 Received, Cont'd Charles Barnes Requests records in Docket files 40-8006, Oklahoma (85-529)
Received, Cont'd Charles Barnes       Requests records in Docket files 40-8006, Oklahoma (85-529)         City Nuclear Laboratory; 40-2038, Shiprock Uranium Processing Plant; and 40-8027, Sequoyah Uranium Hexafluoride Production Plant.
City Nuclear Laboratory; 40-2038, Shiprock Uranium Processing Plant; and 40-8027, Sequoyah Uranium Hexafluoride Production Plant.
Richard A. McCormack, Requests a list of attendees at the Nuclear Reactor The Energy Daily   Deconsnissioning Planning Conference on July 16-18.
Richard A. McCormack, Requests a list of attendees at the Nuclear Reactor The Energy Daily Deconsnissioning Planning Conference on July 16-18.
(85-530)
(85-530)
Nan M. Seuffert,     Requests records regarding tests done in the vicinity Environmental       of the Oyster Creek plant for radiation in air, soil Task Force         or water.
Nan M. Seuffert, Requests records regarding tests done in the vicinity Environmental of the Oyster Creek plant for radiation in air, soil Task Force or water.
(85-531)
(85-531)
Nancy E. Pearson,     Requests a copy of SECY-85-129, " Maintenance and Stone & Webster     Surveillance Program Plan."
Nancy E. Pearson, Requests a copy of SECY-85-129, " Maintenance and Stone & Webster Surveillance Program Plan."
En ineering Corp.
En ineering Corp.
85-532)
85-532)
Jonathan L. Alpert,   Requests records concerning NRC's quality assurance /
Jonathan L. Alpert, Requests records concerning NRC's quality assurance /
Fowler, White,     quality control program regarding Rinker Materials Gillen, Boggs,     Corporation.
Fowler, White, quality control program regarding Rinker Materials Gillen, Boggs, Corporation.
Villareal & Banker, P.A.
Villareal & Banker, P.A.
(85-533)
(85-533)
Nina Bell,           Requests three categories of records regarding the Nuclear             threat to commercial and non-power reactors from truck Infonnation and     bombs.
Nina Bell, Requests three categories of records regarding the Nuclear threat to commercial and non-power reactors from truck Infonnation and bombs.
Resource Service (85-534)
Resource Service (85-534)
Nina Bell,           Requests three categories of records regarding seismic Nuclear             hazards.
Nina Bell, Requests three categories of records regarding seismic Nuclear hazards.
Information and Resource Service (85-535)
Information and Resource Service (85-535)
Nina Bell,           Requests two categories of records regarding NRC's Nuclear             recent proposed rule under the Government in the Information and     Sunshine Act.
Nina Bell, Requests two categories of records regarding NRC's Nuclear recent proposed rule under the Government in the Information and Sunshine Act.
Resource Service (85-536)
Resource Service (85-536)
Scott W. Morgan,     Requests records regarding the nuclear processing and Rawle & Henderson   waste disposal of NUMEC and/or Babcock and_Wilcox.
Scott W. Morgan, Requests records regarding the nuclear processing and Rawle & Henderson waste disposal of NUMEC and/or Babcock and_Wilcox.
(85-537)
(85-537)
W.S. Schum,           Requests three categories of records regarding 01 Quality Technology activities concerning licensee directed employee concern Company             prograns.
W.S. Schum, Requests three categories of records regarding 01 Quality Technology activities concerning licensee directed employee concern Company prograns.
(85-538)
(85-538)
ENCLOSURE A
ENCLOSURE A
      ,g
,g


3
3 Received, Cont'd John Morley, Requests four categories of records regarding high-Governor's Task level radioactive waste disposal.
;.            Received, Cont'd John Morley,             Requests four categories of records regarding high-Governor's Task         level radioactive waste disposal.
Force on High-Level Radioactive Waste (85-539)
Force on High-Level Radioactive Waste (85-539)
T.P. Bracke,             Requests a nonproprietary version of Exxon Nuclear Combustion             Report XN-NF-739 which was supposedly submitted on Engineering, Inc.       the D.C. Cook Unit 2 nuclear plant on or about (85-540)           November 11, 1983.
T.P. Bracke, Requests a nonproprietary version of Exxon Nuclear Combustion Report XN-NF-739 which was supposedly submitted on Engineering, Inc.
C.R. Jensen,             Requests 11 categories of records regarding NRC's Data Recovery           requirements on protection of utilities' computer Institute             and data information in the event of a disaster.
the D.C. Cook Unit 2 nuclear plant on or about (85-540)
November 11, 1983.
C.R. Jensen, Requests 11 categories of records regarding NRC's Data Recovery requirements on protection of utilities' computer Institute and data information in the event of a disaster.
(85-541)
(85-541)
Mozart G. Ratner,         Requests records of all communications on which the
Mozart G. Ratner, Requests records of all communications on which the Attorney-At-Law letter from E. Neil Jensen regarding allegations made (85-542) against the General Electric Company was based.
;                Attorney-At-Law         letter from E. Neil Jensen regarding allegations made (85-542)           against the General Electric Company was based.
W.F. Lawless, Referral from the DOE of one record regarding Paine College management of defense transuranic (TRU) wastes.
W.F. Lawless,             Referral from the DOE of one record regarding Paine College           management of defense transuranic (TRU) wastes.
(85-543)
(85-543)
Rod Buckles,             Requests two specified memoranda regarding the startup               ~
Rod Buckles, Requests two specified memoranda regarding the startup
NUS Corporation         testing at San Onofre Unit 3.
~
(85-544) 4              Steven C. Sholly,         Requests copies of Sandia's "ASEP Plant Survey and Union of Concerned Initial Plant Grouping Letter Report" dated August 1983 Scientists             and all other versions of the report.                                   ~
NUS Corporation testing at San Onofre Unit 3.
(85-544)
Steven C. Sholly, Requests copies of Sandia's "ASEP Plant Survey and 4
Union of Concerned Initial Plant Grouping Letter Report" dated August 1983 Scientists and all other versions of the report.
(85-545)
(85-545)
Billie P. Garde,         Requests all records regarding speeches made by John Government             Herington about nuclear power, specifically a copy of the Accountability         speech given to the Nuclear Power Assembly.
~
Billie P. Garde, Requests all records regarding speeches made by John Government Herington about nuclear power, specifically a copy of the Accountability speech given to the Nuclear Power Assembly.
Project (85-546)
Project (85-546)
Billie P. Garde,         Requests all fecords between William Dircks, Victor Government             Stello and Harold Denton regarding the Comanche Peak Accountability         plant.
Billie P. Garde, Requests all fecords between William Dircks, Victor Government Stello and Harold Denton regarding the Comanche Peak Accountability plant.
Project (85-547)
Project (85-547)
Ann Hunter,               Requests two categories of records regardiiig the Government             Farley nuclear power plant.
Ann Hunter, Requests two categories of records regardiiig the Government Farley nuclear power plant.
Accountability Project (85-548)
Accountability Project (85-548)
ENCLOSURE A
ENCLOSURE A AUG 2, be5 1
,          AUG   2, be5 1


4
4 Received, Cont'd (Anindividual Referral from the FBI of two records, requesting information about herself)
  . Received, Cont'd (Anindividual         Referral from the FBI of two records, requesting information about herself)
(85-549)
(85-549)
Jim Pedro,             Requests the draft Regulatory Guide regarding the NUS Corporation     implementation of the ECCS proposed rule mentioned on (85-550)         page 2 of Enclosure E of the Commissioners' Weekly Report dated April 26, 1985.
Jim Pedro, Requests the draft Regulatory Guide regarding the NUS Corporation implementation of the ECCS proposed rule mentioned on (85-550) page 2 of Enclosure E of the Commissioners' Weekly Report dated April 26, 1985.
John J. McCaffrey,     Requests copies of 11 specified records.
John J. McCaffrey, Requests copies of 11 specified records.
New York Public Interest Research Group (85-551)
New York Public Interest Research Group (85-551)
J. Patrick Hickey,     APFEAL TO THE EDO for the release of five denied Shaw, Pittman,       tecords regarding misadministration reports for the h,tts & Trowbridge second, third and fourth quarters of 1984 pertaining (85-A-31-85-372) to'specified hospitals.
J. Patrick Hickey, APFEAL TO THE EDO for the release of five denied Shaw, Pittman, tecords regarding misadministration reports for the h,tts & Trowbridge second, third and fourth quarters of 1984 pertaining (85-A-31-85-372) to'specified hospitals.
Granted Michael D. Berry       In response to a request for copies of six reports by (85-430)         various organizations regarding radioactive waste disposal, infomed the requester that five of the reports are available at the PDR and or.e report is available in a public library.
Granted Michael D. Berry In response to a request for copies of six reports by (85-430) various organizations regarding radioactive waste disposal, infomed the requester that five of the reports are available at the PDR and or.e report is available in a public library.
Billie P. Garde,       In response to a request for copies of all records Government           related to Inspection Reports 50-348/83-16 and 50-364/
Billie P. Garde, In response to a request for copies of all records Government related to Inspection Reports 50-348/83-16 and 50-364/
Accountability       83-14 on the Farley nuclear power plant, made available Project             three records. Informed the requester that she may (85-453)         obtain a copy of one record from the Electric Power ResearchInstitute(EPRI).
Accountability 83-14 on the Farley nuclear power plant, made available Project three records.
Informed the requester that she may (85-453) obtain a copy of one record from the Electric Power ResearchInstitute(EPRI).
^
^
Steven C. Sholly,     In response to a request for ten records referenced Union of Concerned in NUREG-1037, " Containment Perfomance Working Group Scientists           Report," made available eight records. Infomed the (85-457)         requester that two additional records subject to this request may be purchased from the NTIS and the GPO.
Steven C. Sholly, In response to a request for ten records referenced Union of Concerned in NUREG-1037, " Containment Perfomance Working Group Scientists Report," made available eight records. Infomed the (85-457) requester that two additional records subject to this request may be purchased from the NTIS and the GPO.
R.J. Weigel,           In response to a request for four categories of mailing EQES Inc.           labels, made available the requested labels.
R.J. Weigel, In response to a request for four categories of mailing EQES Inc.
(85-489)                                                     _
labels, made available the requested labels.
ENCLOSURE A AUG   2 1985
(85-489)
ENCLOSURE A AUG 2 1985


5 Granted, Cont'd Billie P. Garde,     In response to a request for all records relevant Government         to and/or generated in connection with all Accountability     comunications between Harold Denton, William Dircks, Project           and Victor Stello regarding Comanche Peak, made (85-491)       available three records.
5 Granted, Cont'd Billie P. Garde, In response to a request for all records relevant Government to and/or generated in connection with all Accountability comunications between Harold Denton, William Dircks, Project and Victor Stello regarding Comanche Peak, made (85-491) available three records.
Steven C. Sholly,     In response to a request for a copy of " Analysis of Union of Concerned Thrust on a Pressure Vessel After Core Melt Through at Scientists         Elevated Pressure," Battelle Columbus Labaratories, 1979, (85-498)       made available a copy of the requested report.
Steven C. Sholly, In response to a request for a copy of " Analysis of Union of Concerned Thrust on a Pressure Vessel After Core Melt Through at Scientists Elevated Pressure," Battelle Columbus Labaratories, 1979, (85-498) made available a copy of the requested report.
Steven C. Sholly,     In response to a request for a copy of " Analysis of a Union of Concerned Station Blackout Transient for the Bellefonte Scientists         Pressurized Water Reactor," EG8G, April 1984, and (85-503)       " Analysis of a Station Blackout Transient at the Seabrook Nuclear Power Plant," EG&G, September 1984, made available copies of the requested reports.
Steven C. Sholly, In response to a request for a copy of " Analysis of a Union of Concerned Station Blackout Transient for the Bellefonte Scientists Pressurized Water Reactor," EG8G, April 1984, and (85-503)
William R. Gates,     In response to a request for a list of names and NUMANC0           addresses of all companies which are licensed by the NRC (85-512)       to store, handle, or process radioactive materials, made available a copy of the requested list.
" Analysis of a Station Blackout Transient at the Seabrook Nuclear Power Plant," EG&G, September 1984, made available copies of the requested reports.
        'S David R. Ennis,       In response to a request for a copy of " Financial NUS Corporation   Implications of Retrospective Premium Assessments," by (85-518)       Ron Melicher, informed the requester that he may obtain a copy of the requested report from the NTIS.
William R. Gates, In response to a request for a list of names and NUMANC0 addresses of all companies which are licensed by the NRC (85-512) to store, handle, or process radioactive materials, made available a copy of the requested list.
Charles Barnes       In response to a request for all records in Docket files (85-528)       40-1366; 40-1668; and the Inspection Report of the Sequoyah Uranium Hexafluoride Plant conducted October 21-23, 1970, made available 37 records. Infonned the requester that additional records subject to this request are already available at the PDR in a previous FOIA request file.
'S David R. Ennis, In response to a request for a copy of " Financial NUS Corporation Implications of Retrospective Premium Assessments," by (85-518)
Denied Nina Bell,           In response to a request for two categories of records Nuclear           regarding the Grand Gulf nuclear power plant, made Information and   available 300 documents. Informed the requester that Resource Service   additional records subject to this request are already (84-459)       available at the PDR. Denied six records in their entirety, release of which would tend to inhibit the open and frank exchange of ideas and other information essential to the deliberative process.     _
Ron Melicher, informed the requester that he may obtain a copy of the requested report from the NTIS.
Billie P. Garde.     In response to a request for records relevant to and/or Government         generated in connection with the responses of Mr. Robert Accountability     Martin, Regional Administrator, NRC Region IV, or his Project           predecessor Mr. John Collins, or any other NRC personnel, (85-152)       regarding drug abuse at the Comanche Peak site, made available three records. Denied one record in its     ENCLOSURE A AUG   2 1985           entirety, release of which would tend to inhibit the open and frank exchange of ideas essential to the deliberative process. Denied portions of two records, release of which would constitute a clearly unwarranted invasion of personal privacy.
Charles Barnes In response to a request for all records in Docket files (85-528) 40-1366; 40-1668; and the Inspection Report of the Sequoyah Uranium Hexafluoride Plant conducted October 21-23, 1970, made available 37 records. Infonned the requester that additional records subject to this request are already available at the PDR in a previous FOIA request file.
Denied Nina Bell, In response to a request for two categories of records Nuclear regarding the Grand Gulf nuclear power plant, made Information and available 300 documents.
Informed the requester that Resource Service additional records subject to this request are already (84-459) available at the PDR. Denied six records in their entirety, release of which would tend to inhibit the open and frank exchange of ideas and other information essential to the deliberative process.
Billie P. Garde.
In response to a request for records relevant to and/or Government generated in connection with the responses of Mr. Robert Accountability Martin, Regional Administrator, NRC Region IV, or his Project predecessor Mr. John Collins, or any other NRC personnel, (85-152) regarding drug abuse at the Comanche Peak site, made available three records. Denied one record in its ENCLOSURE A AUG 2 1985 entirety, release of which would tend to inhibit the open and frank exchange of ideas essential to the deliberative process. Denied portions of two records, release of which would constitute a clearly unwarranted invasion of personal privacy.


6
6 Denied, Cont'd John W. Flora, In response to a request for copies of Coninission Nuclear Consultant staff explanations of intent in setting, or (85-243) interpreting or clarifying Technical Specifications, made available 108 records. Denied in its entirety, one record containing predecisional advice, opinions, and recommendations of the staff.
  -    Denied, Cont'd John W. Flora,     In response to a request for copies of Coninission Nuclear Consultant staff explanations of intent in setting, or (85-243)     interpreting or clarifying Technical Specifications, made available 108 records. Denied in its entirety, one record containing predecisional advice, opinions, and recommendations of the staff.
Jerry S. McDevitt, In respon:;e to requests for records regarding alleged Kirkpatrick 8 deficiencies with Ruskin dampers, made available 70 Lockhart records.
Jerry S. McDevitt, In respon:;e to requests for records regarding alleged Kirkpatrick 8     deficiencies with Ruskin dampers, made available 70 Lockhart         records. Informed the requester that additional (85-264/265)   records subject to this request are already available at the PDR. Denied one record in its entirety, release of which would tend to inhibit the candid exchange of ideas that is essential during the agency's deliberative process.
Informed the requester that additional (85-264/265) records subject to this request are already available at the PDR. Denied one record in its entirety, release of which would tend to inhibit the candid exchange of ideas that is essential during the agency's deliberative process.
Nina Bell,         In response to a request for records produced by or for Nuclear           the NRC regarding an article published in the New Orleans Information and   newspaper Gambit concerning the Department of Energy's Resource Service Task Force on Commercial Nuclear Power and its (85-357)       involvement in NRC's licensing of nuclear plants, made available four records. Informed the requester that additional records subject to this request are already cvailable at the PDR. Denied five records in their entirety, release of which would inhibit the open and frank exchange of ideas essential to the deliberative process.
Nina Bell, In response to a request for records produced by or for Nuclear the NRC regarding an article published in the New Orleans Information and newspaper Gambit concerning the Department of Energy's Resource Service Task Force on Commercial Nuclear Power and its (85-357) involvement in NRC's licensing of nuclear plants, made available four records.
Frank S. Hamblett, In response to a request for a copy of SECY-85-80, denied Newman &         portions of the paper, release of which would tend to Holtzinger, P.C. inhibit the open and frank exchange of ideas essential to (85-460)       the deliberative process.
Informed the requester that additional records subject to this request are already cvailable at the PDR. Denied five records in their entirety, release of which would inhibit the open and frank exchange of ideas essential to the deliberative process.
Anthony C. Dicola   In response to a request for all surveys conducted by the (85-467)       NRC since January 1984, and all correspondence between Dollar Savings and the NRC from January 1984 to the present concerning METCOA, Inc., of Pulaski, Pennsylvania, made available two records. Denied two records in their entirety containing confidential business (proprietary)information.
Frank S. Hamblett, In response to a request for a copy of SECY-85-80, denied Newman &
Billie P. Garde. In response to a request for records related to the Government       presentation given by Commissioner Frederick Bernthal Accountability   to the Atomic Industrial Forum in Dallas, Texas, on Project           May 20, 1985, made available one record. Denied three (85-487)       records in their entirety, release of whic!Lwould tend to inhibit the open and frank exchange of ideas essential to the deliberative process.
portions of the paper, release of which would tend to Holtzinger, P.C.
ENCLOSURE A AUG 2 1985
inhibit the open and frank exchange of ideas essential to (85-460) the deliberative process.
Anthony C. Dicola In response to a request for all surveys conducted by the (85-467)
NRC since January 1984, and all correspondence between Dollar Savings and the NRC from January 1984 to the present concerning METCOA, Inc., of Pulaski, Pennsylvania, made available two records. Denied two records in their entirety containing confidential business (proprietary)information.
Billie P. Garde.
In response to a request for records related to the Government presentation given by Commissioner Frederick Bernthal Accountability to the Atomic Industrial Forum in Dallas, Texas, on Project May 20, 1985, made available one record. Denied three (85-487) records in their entirety, release of whic!Lwould tend to inhibit the open and frank exchange of ideas essential to the deliberative process.
ENCLOSURE A AUG 2 1985


7 Denied, Cont'd Jay E. Silberg,       In response to a request for copies of SECY-85-80; Shaw, Pittman,     SECY-85-208 and transcripts of any Commission meetings Potts & Trowbridge at which these two SECY papers were discussed, informed (85-493)         the requester that the disclosed portions of SECY-85-80 are already available at the PDR. Denied SECY-85-208 in its entirety, release of which would tend to inhibit the open and frank exchange of ideas essential to the deliberative process. Informed the requester that both SECY-85-80 and SECY-85-208 are " Notation Vote" papers and, therefore, were not discussed at a Commission meeting.
7 Denied, Cont'd Jay E. Silberg, In response to a request for copies of SECY-85-80; Shaw, Pittman, SECY-85-208 and transcripts of any Commission meetings Potts & Trowbridge at which these two SECY papers were discussed, informed (85-493) the requester that the disclosed portions of SECY-85-80 are already available at the PDR. Denied SECY-85-208 in its entirety, release of which would tend to inhibit the open and frank exchange of ideas essential to the deliberative process.
(NRCemployee)         In response to a request for copies of all records (85-499)         regarding a July 19, 1985, memorandum written by Mr. James G. Keppler, Regional Administrator, RIII, made available one record. Denied portions of one record, disclosure of which would constitute a clearly unwarranted invasion of personal privacy.
Informed the requester that both SECY-85-80 and SECY-85-208 are " Notation Vote" papers and, therefore, were not discussed at a Commission meeting.
(NRCemployee)         In response to a request, on behalf of an NRC employee, (85-506)         for three categories of records regarding Vacancy Announcement No. 85-2103-8, made available one record.
(NRCemployee)
In response to a request for copies of all records (85-499) regarding a July 19, 1985, memorandum written by Mr. James G. Keppler, Regional Administrator, RIII, made available one record. Denied portions of one record, disclosure of which would constitute a clearly unwarranted invasion of personal privacy.
(NRCemployee)
In response to a request, on behalf of an NRC employee, (85-506) for three categories of records regarding Vacancy Announcement No. 85-2103-8, made available one record.
Denied portions of four records, release of which would constitute a clearly unwarranted invasion of personal privacy.
Denied portions of four records, release of which would constitute a clearly unwarranted invasion of personal privacy.
Peter C. Hearn,       In response to an APPEAL TO THE COMMISSION for the NTEU Vice-President release of 28 denied records concerning NRC
Peter C. Hearn, In response to an APPEAL TO THE COMMISSION for the NTEU Vice-President release of 28 denied records concerning NRC (85-A-23-84-168) consolidation proposals, continued to deny these records, release of which would stifle honest and i
    .    (85-A-23-84-168) consolidation proposals, continued to deny these records, release of which would stifle honest and i                           frank communication among the participants to the detriment of the quality of the agency's decisions and communications with Congress.
frank communication among the participants to the detriment of the quality of the agency's decisions and communications with Congress.
1 l
1 l
l eme> +
l eme> +
Line 184: Line 218:
" Description of an NRC Simulation Facility Evaluation Program"
" Description of an NRC Simulation Facility Evaluation Program"


== Description:==
==
The contract objectives are to develop, refine and validate criteria and methodology for the review of nuclear power plant simulation facilities; recommend size and make-up of a review team; and develop a schedule for conduct of a l
Description:==
review. Work will include a review of applicable literature; development of a methodology; testing this methodology through conduct of actual simulation facility reviews and preparation of detailed recommendations.
The contract objectives are to develop, refine and validate criteria and methodology for the review of nuclear power plant simulation facilities; recommend size and make-up of a review team; and develop a schedule for conduct of a review. Work will include a review of applicable literature; l
development of a methodology; testing this methodology through conduct of actual simulation facility reviews and preparation of detailed recommendations.
Period of Performance: Basic - 14 months (option, additional 6 months).
Period of Performance: Basic - 14 months (option, additional 6 months).
Sponsor: Office of Nuclear Reactor Regulation Status: The competitive range has been established and negotiations are scheduled for the week of August 12, 1985.
Sponsor: Office of Nuclear Reactor Regulation Status: The competitive range has been established and negotiations are scheduled for the week of August 12, 1985.
RFP No.:   RS-NMS-85-009
RFP No.:
RS-NMS-85-009


==Title:==
==Title:==
" Technical Assistance in Hydrogeology - Project B - Analysis"
" Technical Assistance in Hydrogeology - Project B - Analysis"


== Description:==
==
The contractor shall provide technical assistance to the p                         NRC in its review of DOE site investigations to a potential High Level Waste (HLW) geologic repository.
Description:==
The contractor shall provide technical assistance to the p
NRC in its review of DOE site investigations to a potential High Level Waste (HLW) geologic repository.
Period of Performance: 2 years with 3 one-year options.
Period of Performance: 2 years with 3 one-year options.
Sponsor: Office of Nuclear Material Safety and Safeguards
Sponsor: Office of Nuclear Material Safety and Safeguards Status: The competitive range has been established and negotiations
!      ~
~
Status: The competitive range has been established and negotiations are scheduled for the week of August 26, 1985.
are scheduled for the week of August 26, 1985.
RFP No. : RS-NMS-85-002
RFP No. : RS-NMS-85-002


Line 205: Line 243:
" Technical Assistance for Design Reviews of High Level Nuclear Waste Geologic Repositories"
" Technical Assistance for Design Reviews of High Level Nuclear Waste Geologic Repositories"


== Description:==
==
Description:==
The contractor shall be required to provide support services, including analyses, computations, engineering evaluations, citations to literature, and documentation thereof to assist the NRC to review, evaluate, and comment on the design of a genlogic repository contained in the U.S. Department of Energy's (DOE) site characterization plans (SCP).
The contractor shall be required to provide support services, including analyses, computations, engineering evaluations, citations to literature, and documentation thereof to assist the NRC to review, evaluate, and comment on the design of a genlogic repository contained in the U.S. Department of Energy's (DOE) site characterization plans (SCP).
Period of Performance: Three years Sponsor: Office of Nuclear Material Safety and Safeguards Status: Best and Final offers received on August 1,1985, and forwarded to Source Evaluation Panel for review on August 2,1985.
Period of Performance: Three years Sponsor: Office of Nuclear Material Safety and Safeguards Status: Best and Final offers received on August 1,1985, and forwarded to Source Evaluation Panel for review on August 2,1985.
ENCLOSURE A AUG   2 1985
ENCLOSURE A AUG 2 1985


l Division of Contracts Weekly Information Report                           ADMINISTRATIVE MATTERS l
l Division of Contracts Weekly Information Report l ADMINISTRATIVE MATTERS I
I On July 31,1985, Division of Contracts received a protest filed with the                               ,
On July 31,1985, Division of Contracts received a protest filed with the Ceneral Acccunting Office (GA0) by Engineers International Inc. (EI) l under Solicitation No. RS-NMS-85-002 for " Technical Assistance for Design Reviews of High Level Nuclear Waste Geologic Repositories." Based on a review of all proposals received under this RFP, EI had been eliminated from further consideration for contract award.
Ceneral Acccunting Office (GA0) by Engineers International Inc. (EI)                                   l under Solicitation No. RS-NMS-85-002 for " Technical Assistance for Design Reviews of High Level Nuclear Waste Geologic Repositories." Based on a review of all proposals received under this RFP, EI had been eliminated from further consideration for contract award. EI alleges that its proposal was not given fair and equitable consideration by the NRC. In addition, EI requests that they be included in the competitive range and be given the opportunity to submit a revision to their proposal.
EI alleges that its proposal was not given fair and equitable consideration by the NRC.
1 On July 17, 1985, Software AG of North America filed a protest with the                               l General Services Board of Contract Appeals against award of Contract                                   l NRC-33-85-312 to Cullinet Software, Inc. The contract for a Data Base Management System and supporting integrated software to support the NRC Corporate Data Network was awarded June 27, 1985. Software AG l         contends that their Best and Final Offer was not evaluated properly and f         that the solicitation evaluation criteria were improperly applied in
In addition, EI requests that they be included in the competitive range and be given the opportunity to submit a revision to their proposal.
[         selection of the successful contractor.                                                               l f
1 On July 17, 1985, Software AG of North America filed a protest with the l
l ENCLOSURE A AUG     2 1985
General Services Board of Contract Appeals against award of Contract l
NRC-33-85-312 to Cullinet Software, Inc. The contract for a Data Base Management System and supporting integrated software to support the NRC Corporate Data Network was awarded June 27, 1985. Software AG l
contends that their Best and Final Offer was not evaluated properly and f
that the solicitation evaluation criteria were improperly applied in
[
selection of the successful contractor.
l f
l ENCLOSURE A AUG 2 1985


(-
(-
0FFICE OF NUCLEAR REACTOR REGULATION ITEMS OF INTEREST Week Ending August 2, 1985 North Anna Power Station, Unit No. 2 At 0700 hours (7/25/85), undetermined RCS leakage of 3.1 GPM was observed (TS limit is 1 GPH). At 0740 hours, NA-2 began a ramp down and was in hot stancby at 1704 hours. Leakage was determined to be coming from manual isolation
0FFICE OF NUCLEAR REACTOR REGULATION ITEMS OF INTEREST Week Ending August 2, 1985 North Anna Power Station, Unit No. 2 At 0700 hours (7/25/85), undetermined RCS leakage of 3.1 GPM was observed (TS limit is 1 GPH). At 0740 hours, NA-2 began a ramp down and was in hot stancby at 1704 hours.
valve (2RC6) which is off the "A" loop cold leg to the RID bypass lines. The l   problem appears to be a packing leak but operators have been unable to get l   close enough to observe due to steam. During the early morning of 7/26/85,                           l two operators made containment entry but heat stress required attempted                               I repairs to be terminated. Per this daily highlight at 1500 hours (7/26/85),
Leakage was determined to be coming from manual isolation valve (2RC6) which is off the "A" loop cold leg to the RID bypass lines.
The l
problem appears to be a packing leak but operators have been unable to get l
close enough to observe due to steam. During the early morning of 7/26/85, l
two operators made containment entry but heat stress required attempted I
repairs to be terminated. Per this daily highlight at 1500 hours (7/26/85),
leak is now at 10 gpm and the unit will be in cold shutdown by 2300 hours (7/26/85). Size of the affected line is 2 inches.
leak is now at 10 gpm and the unit will be in cold shutdown by 2300 hours (7/26/85). Size of the affected line is 2 inches.
River Bend On July 25, 1985, Gulf States Utilities, the applicant for an operating license for River Bend Station Unit 1, informed the staff that "the design, construction and pre-operational testing work required for fuel load has been completed."
River Bend On July 25, 1985, Gulf States Utilities, the applicant for an operating license for River Bend Station Unit 1, informed the staff that "the design, construction and pre-operational testing work required for fuel load has been completed."
l   The staff has on this date forwarded the final draft of the River Bend Technical Specifications to the applicant for certification.
l The staff has on this date forwarded the final draft of the River Bend Technical Specifications to the applicant for certification.
l   Termination of Operating License for Columbia University t
l Termination of Operating License for Columbia University t
On .1 Ay 25,1985, the Nuclear Regulatory Commission issued an order te:1ainating Operating License No. R-128 for the TRIGA reactor at l   columbia University in New York City.
On.1 Ay 25,1985, the Nuclear Regulatory Commission issued an order te:1ainating Operating License No. R-128 for the TRIGA reactor at l
columbia University in New York City.
i The Operating License was issued on April 14, 1977. The reactor was never fueled nor operated.
i The Operating License was issued on April 14, 1977. The reactor was never fueled nor operated.
Oconee Nuclear Station, Units 1, 2 and 3 Earlier, Duke Power Company (Duke) had called to say that a DC reactor trip breaker (AK-2-25) responded slowly during the monthly on-line surveillance test. The breaker tripped in 1738 milliseconds rather l   than under 80.                                                                 -
Oconee Nuclear Station, Units 1, 2 and 3 Earlier, Duke Power Company (Duke) had called to say that a DC reactor trip breaker (AK-2-25) responded slowly during the monthly on-line surveillance test. The breaker tripped in 1738 milliseconds rather l
ENCLOSURE B AUG     2 1985
than under 80.
ENCLOSURE B AUG 2 1985


On July 29, 1985, Duke informed the staff that they believe the cause for the delayed trip could be a potential generic problem and that it involves the undervoltage trip attachment (UVTA) of the reactor trip breaker. Duke is in the process of installing a new UVTA (this is the second) and they stated that the new devices have smaller tolerances between the armature and the mounting nuts. Duke believes that with the new devices and the smaller tolerances, the armature would hit the mounting nuts on top of the housing.
On July 29, 1985, Duke informed the staff that they believe the cause for the delayed trip could be a potential generic problem and that it involves the undervoltage trip attachment (UVTA) of the reactor trip breaker. Duke is in the process of installing a new UVTA (this is the second) and they stated that the new devices have smaller tolerances between the armature and the mounting nuts. Duke believes that with the new devices and the smaller tolerances, the armature would hit the mounting nuts on top of the housing.
The staff is pursuing: (1) any potential generic concerns, (2) confirmation that Duke does its own benchtesting for nuclear-grade certification and (3) any similarities to a Rancho Seco event where the UVTA did not trip because the clearances between the roller-rivet and the armature were significantly greater than the specified range.
The staff is pursuing:
(1) any potential generic concerns, (2) confirmation that Duke does its own benchtesting for nuclear-grade certification and (3) any similarities to a Rancho Seco event where the UVTA did not trip because the clearances between the roller-rivet and the armature were significantly greater than the specified range.
The Oconee units continue to operate at power.
The Oconee units continue to operate at power.
Millstone Nuclear Power Station Unit-1 BWR The Millstone-1 plant exceeded, about two weeks ago, the old USA BWR rectFd for the longest continuous operation at rated power level and continues on at 361 days towards a scheduled refueling outage in the fall of 1985.
Millstone Nuclear Power Station Unit-1 BWR The Millstone-1 plant exceeded, about two weeks ago, the old USA BWR rectFd for the longest continuous operation at rated power level and continues on at 361 days towards a scheduled refueling outage in the fall of 1985.
Limerick On July 29, 1985 a Director's Decision was issued in response to a 2.206 Petition from R. L. Anthony / Friends of the Earth. The Petition sought to have the low power operating license revoked on the basis that certain exemptions were improperly granted, that licensed activities were being conducted in an unsafe manner on the basis of the reportable events since issuance of the low power license and certain correspondence between the staff and the licensee. The response to the Petition concluded that none of the issues warranted the action sought by the Petition.
Limerick On July 29, 1985 a Director's Decision was issued in response to a 2.206 Petition from R. L. Anthony / Friends of the Earth. The Petition sought to have the low power operating license revoked on the basis that certain exemptions were improperly granted, that licensed activities were being conducted in an unsafe manner on the basis of the reportable events since issuance of the low power license and certain correspondence between the staff and the licensee. The response to the Petition concluded that none of the issues warranted the action sought by the Petition.
Grand Gulf Unit 1 Shift advisors having substantive BWR operating experience were released today from their assignments on operating shifts at Grand Gulf
Grand Gulf Unit 1 Shift advisors having substantive BWR operating experience were released today from their assignments on operating shifts at Grand Gulf 1.
: 1. The licensee had previously advised the NRC staff of its plan to release the advisors and the staff had approved this plan by its {{letter dated|date=July 23, 1985|text=letter dated July 23, 1985}}.
The licensee had previously advised the NRC staff of its plan to release the advisors and the staff had approved this plan by its {{letter dated|date=July 23, 1985|text=letter dated July 23, 1985}}.
ENCLOSURE B gG     21985
ENCLOSURE B gG 21985


  .                                            A license condition required these experienced shift advisors until the plant achieved and demonstrated full power operation. This condition has now been fulfilled. The plant first achieved full power on May 12, 1985 and since then the plant has operated in the 90-100% power range for more than 20 cumulative days. Each of the operating shift crews have accumulated about 15 months of hot operating experience with more than 6 weeks above 20% power, which is substantially more than that recommended in Generic Letter 84-16.
A license condition required these experienced shift advisors until the plant achieved and demonstrated full power operation. This condition has now been fulfilled. The plant first achieved full power on May 12, 1985 and since then the plant has operated in the 90-100% power range for more than 20 cumulative days. Each of the operating shift crews have accumulated about 15 months of hot operating experience with more than 6 weeks above 20% power, which is substantially more than that recommended in Generic Letter 84-16.
Brunswick Steam Electric Plant, Unit 1 On July 31, 1985, while in the refueling mode with the vessel defueled, the Unit 1 core s                                     Three diesel generators (DGs)started pray system   had an1auto and a Group           start.occurred (the fourth isolation DG was out for repair). The reactor vessel cavity overflowed and damaged the ventilation system; however, the standby-gas treatment system was started. The building drain backed u gallons of water were emitted through the spray)p   . The(approximately event was        22,000 terminated on the morning of August 1, 1985. The cause is preliminarily attributed to a triple lo level signal received during the venting of the variable leg on a le:cl transmitter as a part of a plant modification.
Brunswick Steam Electric Plant, Unit 1 On July 31, 1985, while in the refueling mode with the vessel defueled, the Unit 1 core s Three diesel generators (DGs) pray system had an auto start.
started and a Group 1 isolation occurred (the fourth DG was out for repair). The reactor vessel cavity overflowed and damaged the ventilation system; however, the standby-gas treatment gallons of water were emitted through the spray)p (approximately 22,000 system was started. The building drain backed u The event was terminated on the morning of August 1, 1985. The cause is preliminarily attributed to a triple lo level signal received during the venting of the variable leg on a le:cl transmitter as a part of a plant modification.
Cleanup is in progress and the event cause is being investigated by the licensee and the Resident Inspector.
Cleanup is in progress and the event cause is being investigated by the licensee and the Resident Inspector.
ENCLOSURE B AUG   B 1983
ENCLOSURE B AUG B 1983


S NRC TMI PROGRAM 0FFICE WEEKLY STATUS REPORT WEEK ENDING AUGUST 2, 1985
S NRC TMI PROGRAM 0FFICE WEEKLY STATUS REPORT WEEK ENDING AUGUST 2, 1985 1.
: 1.               PLANT STATUS
PLANT STATUS The facility remains in long term cold shutdown with the Reactor CoolantSystem(RCS)ventedtothereactorbuildingatmosphereand the reactor vessel head and plenum assembly removed from the reactor vessel.
                            -    The facility remains in long term cold shutdown with the Reactor CoolantSystem(RCS)ventedtothereactorbuildingatmosphereand the reactor vessel head and plenum assembly removed from the reactor vessel.
The plenum is on its storage stand in the deep end of the fuel transfer canal. A dam has been installed between the deep and shallow ends of the fuel transfer canal. The deep end is filled with water to a depth of about 20 feet (about 5 feet above the top of the plenum).
The plenum is on its storage stand in the deep end of the fuel transfer canal. A dam has been installed between the deep and shallow ends of the fuel transfer canal. The deep end is filled with water to a depth of about 20 feet (about 5 feet above the top of the plenum).
The modified internals indexing fixture is installed on the reactor vessel flange and is flooded to elevation 327 feet 6 inches (151 feet above the top of the core region).
The modified internals indexing fixture is installed on the reactor vessel flange and is flooded to elevation 327 feet 6 inches (151 feet above the top of the core region).
Calculated reactor decay heat is less than 12 kilowatts.
Calculated reactor decay heat is less than 12 kilowatts.
RCS cooling is by natural heat loss to the reactor building ambient atmosphere. Incore thermocouple readings range from 71*F to 90 F
RCS cooling is by natural heat loss to the reactor building ambient atmosphere.
  .-                              with an average of 80*F. Average cold leg temperature is 57 F.
Incore thermocouple readings range from 71*F to 90 F with an average of 80*F.
The average reactor building temperature is 59 F. The reactor building airborne activity is 2.6 E-9 uCi/cc Tritium and 3.4 E-10 uCi/cc particulate, predominantly Cesium 137.
Average cold leg temperature is 57 F.
: 2.               WASTE MANAGEMENT The Submerged Demineralizer System (SDS) and EPICOR II were shutdown this period.
The average reactor building temperature is 59 F.
The reactor building airborne activity is 2.6 E-9 uCi/cc Tritium and 3.4 E-10 uCi/cc particulate, predominantly Cesium 137.
2.
WASTE MANAGEMENT The Submerged Demineralizer System (SDS) and EPICOR II were shutdown this period.
Total volume processed through SDS to date is 2,963,375 gallons, and the total volume processed through EPICOR II is 2,547,671 gallons.
Total volume processed through SDS to date is 2,963,375 gallons, and the total volume processed through EPICOR II is 2,547,671 gallons.
ENCLOSURE B AUG               2 1985
ENCLOSURE B AUG 2 1985
      . - _ _ _ _ - . _ . .                            . ~ , . . _ _ _ _ _ _ _ _ - . _ _ _ . - _ _ . _ _ _ _ _ . _ . . _ _ _ . _ _ _ _ _ _ _ _ _ _    _ _
. ~,.. _ _ _ _ _ _ _ _ -. _ _ _. - _


2
2 3.
: 3. DOSE REDUCTION / DECONTAMINATION ACTIVITIES
DOSE REDUCTION / DECONTAMINATION ACTIVITIES Decontamination activities are continuing on the 281' level of the Auxiliary Building.
            -    Decontamination activities are continuing on the 281' level of the Auxiliary Building.
Aierage general area radiation dose rate is 40 mrem per hour on the 347' level of the reactor building and is 67 mrem per hour on the 305' level of the reactor building. The change in radiation levels from previous reports is the result of a change in the manner in which the average radiation level is determined. The averages are new based on occupancy time-weighting of tasks accomplished in the reactor building as opposed to the previous method of averaging survey meter readings. The new values are based on an attempt to report radiation levels representative of those to which workers are actually exposed.
            -    Aierage general area radiation dose rate is 40 mrem per hour on the 347' level of the reactor building and is 67 mrem per hour on the 305' level of the reactor building. The change in radiation levels from previous reports is the result of a change in the manner in which the average radiation level is determined. The averages are new based on occupancy time-weighting of tasks accomplished in the reactor building as opposed to the previous method of averaging survey meter readings. The new values are based on an attempt to report radiation levels representative of those to which workers are actually exposed.
4.
: 4. ENVIRONMENTAL MONITORING
ENVIRONMENTAL MONITORING EPA sample analysis results show TMI site liquid effluents to be in accordance with regulatory limits, NRC requirements, and the City of Lancaster Agreement.
            -    EPA sample analysis results show TMI site liquid effluents to be in accordance with regulatory limits, NRC requirements, and the City of Lancaster Agreement.
TMI water samples taken by the US Environmental Protection Agency at the plant discharge to the river consisted of seven daily composite samples taken from July 13, to July 20, 1985.
            -    TMI water samples taken by the US Environmental Protection Agency at the plant discharge to the river consisted of seven daily composite samples taken from July 13, to July 20, 1985. Gamma scans detected no reactor related radioactivity.
Gamma scans detected no reactor related radioactivity.
            -    The Lancaster water sample taken at the water works intake and analyzed by the US Environmental Protection Agency consists of a seven day composite sample taken from July 21 to July 28, 1985. A gamma scan detected no reactor related radioactivity.
The Lancaster water sample taken at the water works intake and analyzed by the US Environmental Protection Agency consists of a seven day composite sample taken from July 21 to July 28, 1985. A gamma scan detected no reactor related radioactivity.
  -          -    The NRC outdoor airborne particulate sampler at the TMI Site collected a sample between July 25, and July 31, 1985. No reactor related radioactivity was detected. Analysis showed I-131 and Cs-137 concentrations to be less than the lower limits of               .
The NRC outdoor airborne particulate sampler at the TMI Site collected a sample between July 25, and July 31, 1985. No reactor related radioactivity was detected. Analysis showed I-131 and Cs-137 concentrations to be less than the lower limits of detectability.
detectability.
5.
: 5. REACTOR BUILDING ACTIVITIES
REACTOR BUILDING ACTIVITIES Installation of the rotating work platform and service platform continued over the reactor vessel.
              -    Installation of the rotating work platform and service platform continued over the reactor vessel.
Equipment was staged into the reactor building and installation began on the cable management system.
              -    Equipment was staged into the reactor building and installation began on the cable management system.
Work continued in support of installation of the reactor building service platfonn jib cranes.
              -    Work continued in support of installation of the reactor building service platfonn jib cranes.
Loop calibration of DWCS instrumentation and final preparations for system preoperational testing continued this week.
              -    Loop calibration of DWCS instrumentation and final preparations for system preoperational testing continued this week.
6.
: 6. AUXILIARY AND FUEL HANDLING BUILDING ACTIVITIES             -
AUXILIARY AND FUEL HANDLING BUILDING ACTIVITIES Installation of the DWCS continued.
Installation of the DWCS continued. Partial DWCS turnover for processing RCS during early defueling is scheduled to be completed in late August.
Partial DWCS turnover for processing RCS during early defueling is scheduled to be completed in late August.
The first of four fuel canister racks are on site with further celiverier schedcled thrcuch Aucest.                       ENCLOSURE B AUG   21985                                   .
The first of four fuel canister racks are on site with further celiverier schedcled thrcuch Aucest.
ENCLOSURE B AUG 21985


          .                                                                                  r __ _
r __ _
3
3 7.
: 7. TMI-2 OCCUPATIONAL DOSE
TMI-2 OCCUPATIONAL DOSE Total person-rem for January through June 1985 is 398. Total for March 1979 through June 1985 is 2,417 person-rem.
                -      Total person-rem for January through June 1985 is 398. Total for March 1979 through June 1985 is 2,417 person-rem.
8.
: 8. SHIPMENTS DURING JULY 1985
SHIPMENTS DURING JULY 1985 Shipments of contaminated laundry were made to Royersford, PA on:
                -      Shipments of contaminated laundry were made to Royersford, PA on:
66 drums, 2 boxes July 3 112 drums, 2 boxes July 16 63 drums, 3 boxes July 24 68 boxes July 31 July 2 - Liquid samples (Unit 1) to San Jose, California.
July 3    -    66 drums, 2 boxes July 16    -  112 drums, 2 boxes July 24 -      63 drums, 3 boxes July 31  -    68 boxes
July 2 - Liquid samples (Unit 1) to Rockville, Maryland.
                -      July 2 - Liquid samples (Unit 1) to San Jose, California.
July 3 - Electrical equipment samples (Unit 2) to Richland, Washington.
                -      July 2 - Liquid samples (Unit 1) to Rockville, Maryland.
July 3 - Electrical equipment samples (Unit 2) to Scoville, Idaho.
                -      July 3 - Electrical equipment samples (Unit 2) to Richland, Washington.
July S - Liquid samples (Unit 1) to Rockville, Maryland.
>                -    July 3 - Electrical equipment samples (Unit 2) to Scoville, Idaho.
July 18 - Three solidified resin liners (Unit 1) to Hanford, Washington.
                  -    July S - Liquid samples (Unit 1) to Rockville, Maryland.
July 18 - 104 drums (Unit 1 and 2) compacted and non-compacted waste to Hanford, Washington.
                  -    July 18 - Three solidified resin liners (Unit 1) to Hanford, Washington.
July 26 - 28 Boxes of uncompacted shield blocks to Hanford, Washington.
                  -    July 18 - 104 drums (Unit 1 and 2) compacted and non-compacted waste to Hanford, Washington.
9.
                  -    July 26 - 28 Boxes of uncompacted shield blocks to Hanford, Washington.
NRC EVALUATIONS IN PROGRESS Defueling W)ater Cleanup System Technical Evaluation (including Revision 6.
: 9.     NRC EVALUATIONS IN PROGRESS
Technical Specification Change Requests numbers 46, 48, 49, and 50.
    -                  Defueling Revision 6 .W)ater Cleanup System Technical Evaluation (including
Recovery Operations Plan Change numbers 27, 29, 31, and 32.
                  -    Technical Specification Change Requests numbers 46, 48, 49, and 50.
Fuel Canister Technical Evaluation.
                  -    Recovery Operations Plan Change numbers 27, 29, 31, and 32.
Fuel Handling Senior Reactor Operator Training Program.
                  -    Fuel Canister Technical Evaluation.                                           -
Defueling Safety Evaluation.
                  -    Fuel Handling Senior Reactor Operator Training Program .
Application for seismic exemption.
                  -    Defueling Safety Evaluation.
The NRC Vendor Programs Branch performed an inspection at the Nuclear Energy Services (NES) facility in Greensboro, North Carolina, where the fuel storage canisters, fuel storage racks, and fuel canister transfer shields are being fabricated. The inspection examined construction activities and included a review of the implementation of the quality assurance program at NES. The inspection report, issued July 26, 1985, indicates that NES failed to meet certain NRC requirements related to implementation of its quality assurance program.
                  -    Application for seismic exemption.
NESisrequiredtosubmit(1)a description of steps that have been or will be taken to correct those items identified in the report; (2) a descriptiortof the steps that have been or will be taken to prevent recurrence; and (3) the dates that the corrective actions and preventive measures were or will be completed.
                  -    The NRC Vendor Programs Branch performed an inspection at the Nuclear Energy Services (NES) facility in Greensboro, North Carolina, where the fuel storage canisters, fuel storage racks, and fuel canister transfer shields are being fabricated. The inspection examined construction activities and included a review of the implementation of the quality assurance program at NES. The inspection report, issued July 26, 1985, indicates that NES failed to meet certain NRC requirements related to implementation of its quality assurance program. NESisrequiredtosubmit(1)a description of steps that have been or will be taken to correct those items identified in the report; (2) a descriptiortof the steps that have been or will be taken to prevent recurrence; and (3) the dates that the corrective actions and preventive measures were or will be completed.
10.
: 10. PROJECTED SCHEDULE OF FUTURE EVENTS ENCLOSURE B U"         US "*I N
PROJECTED SCHEDULE OF FUTURE EVENTS ENCLOSURE B U"
US "*I N
* DS' 2
* DS' 2
* AUG 2 1985 ~
* AUG 2 1985 ~
Line 306: Line 365:
4
4
: 11. PUBLIC MEETING The next meeting of the Advisory Panel for the Decontamination of Three Mile Island Unit 2 is scheduled for September 1985 at a location in Annapolis, Maryland, the specific date and location will be identified later.
: 11. PUBLIC MEETING The next meeting of the Advisory Panel for the Decontamination of Three Mile Island Unit 2 is scheduled for September 1985 at a location in Annapolis, Maryland, the specific date and location will be identified later.
ENCLOSURE B AUG   2 1985
ENCLOSURE B AUG 2 1985


OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS Items of Interest Week Ending August 2, 1985 Near Term NRC Actions Under the Nuclear Waste Policy Act (NWPA)
OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS Items of Interest Week Ending August 2, 1985 Near Term NRC Actions Under the Nuclear Waste Policy Act (NWPA)
Section:     301 of NWPA Action:       The Final Mission Plan was submitted to Congress by DOE on July 9, 1985. As required by NWPA, DOE published a notice in the Federal Register on July 12, 1985 (50 FR 28446) concerning their response to NRC objections on the draft Mission Plan.
Section:
Status:       Although there is no PNPA requirement for NRC action on the Final Mission Plan, NRC staif is currently preparing comments for the Commission for their information, in light of the tremendous impact the Final Mission Plan has on NRC programs.
301 of NWPA Action:
SeUlion:     114(e) of NWPA Action:       The NRC received DOE Draft Project Decision Schedule on July 18, 1985.
The Final Mission Plan was submitted to Congress by DOE on July 9, 1985.
Status:       Comments are due to DOE on September 13, 1985.         NRC staff are cur-rently preparing comments, which will be provided to the Commission in mid-August.
As required by NWPA, DOE published a notice in the Federal Register on July 12, 1985 (50 FR 28446) concerning their response to NRC objections on the draft Mission Plan.
Status:
Although there is no PNPA requirement for NRC action on the Final Mission Plan, NRC staif is currently preparing comments for the Commission for their information, in light of the tremendous impact the Final Mission Plan has on NRC programs.
SeUlion:
114(e) of NWPA Action:
The NRC received DOE Draft Project Decision Schedule on July 18, 1985.
Status:
Comments are due to DOE on September 13, 1985.
NRC staff are cur-rently preparing comments, which will be provided to the Commission in mid-August.
Merger of Nuclear Pharmacy Inc. (NPI) and Syncor International Corporation (Syncor)
Merger of Nuclear Pharmacy Inc. (NPI) and Syncor International Corporation (Syncor)
On July 25, 1985 NRC gave its for.4.al approval to the merger of NPI and Syncor, which operate commercial nuclear pharmacies throughout the United States. The two companies hold more than 30 licenses issued by NRC and about 50 licenses issued by Agreement States.
On July 25, 1985 NRC gave its for.4.al approval to the merger of NPI and Syncor, which operate commercial nuclear pharmacies throughout the United States.
ENCLOSURE C AUG   2 1985
The two companies hold more than 30 licenses issued by NRC and about 50 licenses issued by Agreement States.
ENCLOSURE C AUG 2 1985


OFFICE OF INSPECTION AND ENFORCEMENT Items of Interest Week Ending August 2, 1985
OFFICE OF INSPECTION AND ENFORCEMENT Items of Interest Week Ending August 2, 1985 1.
: 1. The following Significant Enforcement Actions were taken during the past week:
The following Significant Enforcement Actions were taken during the past week:
: a. EN 85-01A, Imposition of Civil Penalty in the amount of $50,000 was issued July 29, 1985 to Florida Power Corporation (Crystal River Unit 3). The licensee responsed to the Notice of Violation and Proposed Imposition of Civil Penalty (EA 85-01) in a {{letter dated|date=March 1, 1985|text=letter dated March 1, 1985}}. After consideration of the licensee's response, the staf concludes that the violations did occur and that mitigation of the proposed Civil Penalty is not appropriate. This action involved two violations where the licensee failed to fully implement and maintain in effect the provisions of the Commission approved physical security plan. These violations were the result of the licensee's failure to take adequate corrective actions when the problems were previously identified.
a.
: b. EN 85-06A, Imposition of Civil Penalty in the amount of $21,425 was issued July 30, 1985 to Omaha Public Power District (Fort Calhoun).
EN 85-01A, Imposition of Civil Penalty in the amount of $50,000 was issued July 29, 1985 to Florida Power Corporation (Crystal River Unit 3). The licensee responsed to the Notice of Violation and Proposed Imposition of Civil Penalty (EA 85-01) in a {{letter dated|date=March 1, 1985|text=letter dated March 1, 1985}}. After consideration of the licensee's response, the staf concludes that the violations did occur and that mitigation of the proposed Civil Penalty is not appropriate. This action involved two violations where the licensee failed to fully implement and maintain in effect the provisions of the Commission approved physical security plan. These violations were the result of the licensee's failure to take adequate corrective actions when the problems were previously identified.
The licensee responded to the Notice of Violation and Proposed Imposition of Civil Penalty (EN 85-06) in a {{letter dated|date=March 15, 1985|text=letter dated March 15, 1985}}. After consideration of the licensee's response, the staff concludes that one of the violations should be withdrawn because of ambiguity in the planning documents. Because the staff feels this area to be important, the matter will be addressed as a licensing issue. This action involved multiple violations concerning the failure to maintain site security as specified in the licensee's Physical Security Plan. In addition, two violations were identifed which concerned physical aspects of the facility which did not meet the requirements of 10 CFR Part 73.
b.
: 2. The following IE Preliminary Notifications were issued during the past week:
EN 85-06A, Imposition of Civil Penalty in the amount of $21,425 was issued July 30, 1985 to Omaha Public Power District (Fort Calhoun).
: a. PNO-I-85-51A, Duquense Light Company (Beaver Valley Unit 1),
The licensee responded to the Notice of Violation and Proposed Imposition of Civil Penalty (EN 85-06) in a {{letter dated|date=March 15, 1985|text=letter dated March 15, 1985}}. After consideration of the licensee's response, the staff concludes that one of the violations should be withdrawn because of ambiguity in the planning documents. Because the staff feels this area to be important, the matter will be addressed as a licensing issue. This action involved multiple violations concerning the failure to maintain site security as specified in the licensee's Physical Security Plan.
In addition, two violations were identifed which concerned physical aspects of the facility which did not meet the requirements of 10 CFR Part 73.
2.
The following IE Preliminary Notifications were issued during the past week:
a.
PNO-I-85-51A, Duquense Light Company (Beaver Valley Unit 1),
Potential Tampering with Diesel Generator (Update)_.
Potential Tampering with Diesel Generator (Update)_.
: b. PN0-I-85-53, Long Island Lighting Company (Shoreham), Reactor Scram Signal Due to Low-Water Level.
b.
: c. PNS-I-85-11, Niagara Mohawk Power Corporation (Nine Mile Point Unit 1),
PN0-I-85-53, Long Island Lighting Company (Shoreham), Reactor Scram Signal Due to Low-Water Level.
PNS-I-85-11, Niagara Mohawk Power Corporation (Nine Mile Point Unit 1),
c.
Security Guard Terminated for Suspected Drug Use.
Security Guard Terminated for Suspected Drug Use.
: d. PN0-II-85-70B, Florida Power and Light (St. Lucie Units 1 & 2);
d.
Georgia Power Company (Hatch Units 1 & 2); Carolina Power and Light Company (Brunswick Units 1 & 2); and General Electric Company (Wilmington, NC), Actions in Response to Tropical Storm " Bob" (Update).                                                   ENCLOSURE D AUG 2 1985
PN0-II-85-70B, Florida Power and Light (St. Lucie Units 1 & 2);
: e. PN0-II-85-71A, Georgia Power Company (Hatch Unit 1), Unscheduled Shutdown Greater Than 48 Hours (Update).
Georgia Power Company (Hatch Units 1 & 2); Carolina Power and Light Company (Brunswick Units 1 & 2); and General Electric Company (Wilmington, NC), Actions in Response to Tropical Storm " Bob" (Update).
: f. PN0-II-85-72, University of North Carolina (Chapel Hill, NC), Stolen Refrigerator with Low-Level Contamination.
ENCLOSURE D AUG 2 1985
: g. PN0-II-85-73, Tennessee Valley Authority (Browns Ferry Unit 3), Media Interest in Minor Transofrmer Fire.
 
: h. PNO-II-85-74, Tennessee Valley Authority (Sequoyah Unit 2), Minor Contamination of Employees From Leaking Primary Coolant Sample Line.
' e.
: 1. PNO-III-85-65, Union Electric Company (Callaway), Possible Tampering.
PN0-II-85-71A, Georgia Power Company (Hatch Unit 1), Unscheduled Shutdown Greater Than 48 Hours (Update).
: j. PN0-III-85-65A, Union Electric Company (Callaway), Possible Tampering (FirstUpdate).
f.
: k. PNO-III-85-66, Detroit Edison Company (Fermi Unit 2), Both Diesel Generators Inoperable.
PN0-II-85-72, University of North Carolina (Chapel Hill, NC), Stolen Refrigerator with Low-Level Contamination.
: 1. PN0-III-85-67, Detroit Edison Company (Fermi Unit 2), Temporary Halt to Low Power Testing,
g.
: m. PN0-V-85-49, Southern California Edison Company (San Onofre),
PN0-II-85-73, Tennessee Valley Authority (Browns Ferry Unit 3), Media Interest in Minor Transofrmer Fire.
h.
PNO-II-85-74, Tennessee Valley Authority (Sequoyah Unit 2), Minor Contamination of Employees From Leaking Primary Coolant Sample Line.
1.
PNO-III-85-65, Union Electric Company (Callaway), Possible Tampering.
j.
PN0-III-85-65A, Union Electric Company (Callaway), Possible Tampering (FirstUpdate).
k.
PNO-III-85-66, Detroit Edison Company (Fermi Unit 2), Both Diesel Generators Inoperable.
1.
PN0-III-85-67, Detroit Edison Company (Fermi Unit 2), Temporary Halt to Low Power Testing, PN0-V-85-49, Southern California Edison Company (San Onofre),
m.
Greenpeace Blockade of Waste Shipment.
Greenpeace Blockade of Waste Shipment.
: n. PNO-V-85-50, Arizona Nuclear Power Project (Palo Verde Unit 2),
n.
PNO-V-85-50, Arizona Nuclear Power Project (Palo Verde Unit 2),
Potential Unauthorized Operation of Equipment.
Potential Unauthorized Operation of Equipment.
: 3. The following IE Information Notices were issued during the past week:
3.
: a. IE Information Notice 85-64, BBC Brown Boveri Low Voltage K-Line Circuit Breakers, with Deficient Over Current Trip Devices Models 00-4 and 5 was issued July 26, 1985 to all nuclear power reactor facilities holding an operating license or construction permit,
The following IE Information Notices were issued during the past week:
: b. IE Information Notice 85-65, Crack Growth in Steam Generator Girth Welds was issued July 31, 1985 to all nuclear power pressurized water reactor facilities holding an operating license or a construction permit.
a.
IE Information Notice 85-64, BBC Brown Boveri Low Voltage K-Line Circuit Breakers, with Deficient Over Current Trip Devices Models 00-4 and 5 was issued July 26, 1985 to all nuclear power reactor facilities holding an operating license or construction permit, b.
IE Information Notice 85-65, Crack Growth in Steam Generator Girth Welds was issued July 31, 1985 to all nuclear power pressurized water reactor facilities holding an operating license or a construction permit.
ENCLOSURE D AUG 2 1985
ENCLOSURE D AUG 2 1985
: 4. Other Items
 
: a.     Senior Management Meeting Director, IE was in Region IV July 31, 1985 to discuss Houston Lighting and Power Company's (HL&P) proposed program for review of the law suit record of HL&F vs. Brown & Root.
. 4.
: b.     Technical Training Center Director, Division of Quality Assurance, Vendor, and Technical Training Programs, was at the Technical Training Center (TTC),
Other Items a.
Senior Management Meeting Director, IE was in Region IV July 31, 1985 to discuss Houston Lighting and Power Company's (HL&P) proposed program for review of the law suit record of HL&F vs. Brown & Root.
b.
Technical Training Center Director, Division of Quality Assurance, Vendor, and Technical Training Programs, was at the Technical Training Center (TTC),
Chattanooga, TN August 1-2, 1985 for meetings with the TTC staff and Commissioner Bernthal.
Chattanooga, TN August 1-2, 1985 for meetings with the TTC staff and Commissioner Bernthal.
: c.     Vendor Program The following vendor inspection was conducted this week:
c.
Vendor Program The following vendor inspection was conducted this week:
Research Dynamics, Cincinnati, OH. To observe LOCA testing on PORV leak detector manufactured by NTD International for South Texas project and to review associated data and followup on corrective action from previous inspection.
Research Dynamics, Cincinnati, OH. To observe LOCA testing on PORV leak detector manufactured by NTD International for South Texas project and to review associated data and followup on corrective action from previous inspection.
: d.     Construction Appraisal Team (CAT) Inspection The CAT inspection for Byron Unit 2 is scheduled for August 19-30, and September 9-20, 1985.
d.
: e.     Seismic Qualification of Equipment A representative of the Engineering and Generic Communications Branch, Division of Emergency Preparedness and Engineering Response attended a meeting on proposed requirements for seismic qualifica-tion of equipment in operating nuclear power plants in Williamsburg, VA August 1-2, 1985.
Construction Appraisal Team (CAT) Inspection The CAT inspection for Byron Unit 2 is scheduled for August 19-30, and September 9-20, 1985.
: f.     Civil Penalty Paid On July 26, 1985 payment in the amount of $500 was received from Geo-Mechanics (Elizabeth, PA) for enforcement action (EA-85-62) relating to violations involving inadequate control and oversight of the radiation safety program.                         _
e.
ENCLOSURE D MG 2 1985
Seismic Qualification of Equipment A representative of the Engineering and Generic Communications Branch, Division of Emergency Preparedness and Engineering Response attended a meeting on proposed requirements for seismic qualifica-tion of equipment in operating nuclear power plants in Williamsburg, VA August 1-2, 1985.
: g. Part 21 Notification NRC was notified on July 19, 1985 of a possible Substantial Safety Hazard in accordance with 10 CFR Part 21 by Technology for Energy Corporation (TEC). The report deals with TEC model 914-1 Valve Flow Monitor Modules (Acoustic). These modules are acoustic monitors used to indicate whether valves are open or closed. The problem is a possible " latch-up" of the module in which it fails to reset after indicating full flow through the valve. If it " latches up," the monitor will continue to show that the valve is open after it has been closed. Purchasers of the monitors will be notified by the vendor. Those plants mentioned in the vendor notification are:
f.
Civil Penalty Paid On July 26, 1985 payment in the amount of $500 was received from Geo-Mechanics (Elizabeth, PA) for enforcement action (EA-85-62) relating to violations involving inadequate control and oversight of the radiation safety program.
ENCLOSURE D MG 2 1985
 
. g.
Part 21 Notification NRC was notified on July 19, 1985 of a possible Substantial Safety Hazard in accordance with 10 CFR Part 21 by Technology for Energy Corporation (TEC). The report deals with TEC model 914-1 Valve Flow Monitor Modules (Acoustic). These modules are acoustic monitors used to indicate whether valves are open or closed. The problem is a possible " latch-up" of the module in which it fails to reset after indicating full flow through the valve.
If it " latches up," the monitor will continue to show that the valve is open after it has been closed.
Purchasers of the monitors will be notified by the vendor. Those plants mentioned in the vendor notification are:
Bellefonte, Browns Ferry, Calvert Cliffs, Catawba, Clinton, Davis-Besse, Diablo Canyon, Ft. Calhoun, Indian Point 2 & 3, McGuire, Oconee, Palo Verde, Pilgrim, Rancho Seco, San Onofre, Sequoyah, St. Lucie, Susquehanna, Turkey Point, Trojan, Watts Bar, and WNP-2.
Bellefonte, Browns Ferry, Calvert Cliffs, Catawba, Clinton, Davis-Besse, Diablo Canyon, Ft. Calhoun, Indian Point 2 & 3, McGuire, Oconee, Palo Verde, Pilgrim, Rancho Seco, San Onofre, Sequoyah, St. Lucie, Susquehanna, Turkey Point, Trojan, Watts Bar, and WNP-2.
: h. Intergranular Stress Corrosion Cracking (IGSCC) Detection Representative of the Engineering and Generic Communications Branch, Division of Emergency Preparedness and Engineering Response was at the EPRI-NDE Center, Charlotte, NC from July 25-26 for qualifica-tion of NDE personnel from Cymar Company in IGSCC detection utilizing automated systems.
h.
: 1. Emergency Preparedness Two representatives of the Emergency Preparedness Branch, Division of Emergency Preparedness and Engineering Response participated in a meeting in Region I this week with Millstone 3 personnel to discuss licensing issues and the results of a recent onsite emer-gency preparedness inspection.
Intergranular Stress Corrosion Cracking (IGSCC) Detection Representative of the Engineering and Generic Communications Branch, Division of Emergency Preparedness and Engineering Response was at the EPRI-NDE Center, Charlotte, NC from July 25-26 for qualifica-tion of NDE personnel from Cymar Company in IGSCC detection utilizing automated systems.
: j. Quality Assurance (1) Representatives of the Quality Assurance Branch, Division of Quality Assurance, Vendor, and Technical Training Programs conducted an inspection of implementation of design aspects of the Vogtle Readiness Review Program July 29-August 2, 1985 at Bechtel Power corporation offices in Los Angeles, CA.
1.
ENCLOSURE D AUG 21985
Emergency Preparedness Two representatives of the Emergency Preparedness Branch, Division of Emergency Preparedness and Engineering Response participated in a meeting in Region I this week with Millstone 3 personnel to discuss licensing issues and the results of a recent onsite emer-gency preparedness inspection.
j.
Quality Assurance (1) Representatives of the Quality Assurance Branch, Division of Quality Assurance, Vendor, and Technical Training Programs conducted an inspection of implementation of design aspects of the Vogtle Readiness Review Program July 29-August 2, 1985 at Bechtel Power corporation offices in Los Angeles, CA.
ENCLOSURE D AUG 21985


                                                                          . - = .
. - =.
(2) Representatives of the Quality Assurance Branch, Division of Quality Assurance, Vendor, and Technical Center Training Programs participated in a public meeting on July 31, 1985 in Bethesda, MD with Public Service Electric and Gas Company and Sargent & Lundy concerning completion of the Hope Creek IDVP.
. (2) Representatives of the Quality Assurance Branch, Division of Quality Assurance, Vendor, and Technical Center Training Programs participated in a public meeting on July 31, 1985 in Bethesda, MD with Public Service Electric and Gas Company and Sargent & Lundy concerning completion of the Hope Creek IDVP.
(3) Representatives of the Quality Assurance Branch visited the Millstone 3 Nuclear Pcwer Plant site on July 30, 1985 in conjunction with inspection activities associated with the Millstone 3 Engineering Assurance Plan.
(3) Representatives of the Quality Assurance Branch visited the Millstone 3 Nuclear Pcwer Plant site on July 30, 1985 in conjunction with inspection activities associated with the Millstone 3 Engineering Assurance Plan.
: k. Comanche Peak Reinspection Chief and representatives of the Reactor Construction Branch, Division of Inspection Programs were in Region IV July 30-August 1, 1985 planning for NRC inspection of the Comanche Peak site reinspec-tion programs.
k.
: 1. Outage Inspection Program Representatives of the Reactor Construction Branch were at Ft. Calhoun July 29-30, 1985 to obtain work package information for the outage l           inspection program.
Comanche Peak Reinspection Chief and representatives of the Reactor Construction Branch, Division of Inspection Programs were in Region IV July 30-August 1, 1985 planning for NRC inspection of the Comanche Peak site reinspec-tion programs.
: m. Training Course- " Medical Uses of Isotopes" Representative of the Safeguards Materials Program Branch, Division of Inspection Programs was a lecturer at the training course on
1.
;            " Medical Uses of Isotopes" held in San Antonio, TX this week.
Outage Inspection Program Representatives of the Reactor Construction Branch were at Ft. Calhoun July 29-30, 1985 to obtain work package information for the outage l
: n. Program Assessment Representative of the Safeguards Materials Program Branch accom-panied Region III staff on an inspection of the construction engineering facility in Hematite, M0.
inspection program.
: o. Spent Fuel Transportation Seminar Representative of the Safeguards Materials Program Branch attended and was a lecturer for several sessions of the NRC/ DOT Spent Fuel Transportation Seminar in Chicago, IL.
m.
: p. Dry Storage of Spent Fuel Representatives of the Safeguards Materials Program Branch parti-cipated in a preliminary walk-through review with NMSS' planned operations for dry storage of spent nuclear fuel at the Surry Nuclear Power Plant site, VA on July 30, 1985.
Training Course- " Medical Uses of Isotopes" Representative of the Safeguards Materials Program Branch, Division of Inspection Programs was a lecturer at the training course on
ENCLOSURE D AUG 21985 l
" Medical Uses of Isotopes" held in San Antonio, TX this week.
n.
Program Assessment Representative of the Safeguards Materials Program Branch accom-panied Region III staff on an inspection of the construction engineering facility in Hematite, M0.
o.
Spent Fuel Transportation Seminar Representative of the Safeguards Materials Program Branch attended and was a lecturer for several sessions of the NRC/ DOT Spent Fuel Transportation Seminar in Chicago, IL.
p.
Dry Storage of Spent Fuel Representatives of the Safeguards Materials Program Branch parti-cipated in a preliminary walk-through review with NMSS' planned operations for dry storage of spent nuclear fuel at the Surry Nuclear Power Plant site, VA on July 30, 1985.
ENCLOSURE D AUG 21985


        ~
~
crr: :   c , . q :: :r-             ,: - :. :::3 9 l
crr: :
{.                                                                                           Items of :nteres:
c,. q :: :r-, - :. :::3 9 l
{.
Items of :nteres:
Week Ending August 2, 1985
Week Ending August 2, 1985
}
}
i J
i J
  )                                       20/30 4               4 Construction of the Upper Plenum Test Facility (UPTF) in Maanheim, FRG, has now been completed four years after the detailed plans were fonnu-                                                           !
)
i                                       lated. It is a full-scale test facility containing the reactor vessel                                                           l l                                       and 4 loops with steam-water separators (simulating steam generators),
20/30 4
J i                                       pump simulators, and extensive instrumentation. Much of this instrumentation has been supplied by the U.S. The reactor vessel has all of the components, except the core, which is simulated by injecting steam and water into the vessel.
4 Construction of the Upper Plenum Test Facility (UPTF) in Maanheim, FRG, has now been completed four years after the detailed plans were fonnu-i lated.
The UPTF is now undergoing shake-down testing to verify its operation and the performance of the extensive instrumentation. The shakedown testing will be completed by the end of this calendar year, and the first main i                                         test will be run early next calendar year.
It is a full-scale test facility containing the reactor vessel l
l and 4 loops with steam-water separators (simulating steam generators),
i pump simulators, and extensive instrumentation.
Much of this J
instrumentation has been supplied by the U.S.
The reactor vessel has all of the components, except the core, which is simulated by injecting steam and water into the vessel.
The UPTF is now undergoing shake-down testing to verify its operation and the performance of the extensive instrumentation.
The shakedown testing will be completed by the end of this calendar year, and the first main i
test will be run early next calendar year.
?
?
j                                         The UPTF will be operated in parallel with the Japanese Slab Core Test                                                           !
j The UPTF will be operated in parallel with the Japanese Slab Core Test
Facility
.# mergency(Core Cooling System (ECCS) rule, as well as to assess bes Facility E
                                        .#E mergency(Core Cooling System (ECCS) rule, as well as to assess bes estimate computer codes which will be used to fulfill the requirements i                                        of the proposed ECCS rule revision.
estimate computer codes which will be used to fulfill the requirements of the proposed ECCS rule revision.
i Multi-Loop Integral System Test (MIST)
i i
The MIST testing program is designed to provide thermal hydraulic data 1
Multi-Loop Integral System Test (MIST)
related to small-break loss-of-coolant accident (LOCA) transients to i                                         benchmark Babcock and Wilcox Company (B&W) analysis models.                                   Installation and brazing of the core heaters for the MIST program was successfully completed. The complete core simulator consists of 45 heater rods, with only 35 of them being required to provide the needed power for testing.
The MIST testing program is designed to provide thermal hydraulic data related to small-break loss-of-coolant accident (LOCA) transients to 1
:                                        Lehigh University The purpose of the Lehigh University Post-Critical Heat Flux (CHF) Heat Transfer experiment is to provide data to assess post-CHF correlations used in nuclear reactor systems codes. A report entitled " Assessment of i                                         Post-Critical Heat Flux Models with Lehigh Nonequilibrium Data" is being published by the NRC (NUREG/CR-4353). This report presents a comparison of convective film boiling model predictions to the Lehigh single tube
i benchmark Babcock and Wilcox Company (B&W) analysis models.
  ;                                      post-CHF experimental data.
Installation and brazing of the core heaters for the MIST program was successfully completed. The complete core simulator consists of 45 heater rods, with only 35 of them being required to provide the needed power for testing.
I
Lehigh University The purpose of the Lehigh University Post-Critical Heat Flux (CHF) Heat Transfer experiment is to provide data to assess post-CHF correlations used in nuclear reactor systems codes. A report entitled " Assessment of i
;                                                                                                                                          ENCLOSURE E l                                   AUG   2 1985 1
Post-Critical Heat Flux Models with Lehigh Nonequilibrium Data" is being published by the NRC (NUREG/CR-4353).
This report presents a comparison of convective film boiling model predictions to the Lehigh single tube post-CHF experimental data.
I ENCLOSURE E l
AUG 2 1985 1


        -      - - .      -        _ _ .                  - = - - --
- = - -
CIRRPC Subpanel Meeting on VA Use of Radioepidemiological Tables On July 25 a subpanel of the Comittee on Interagency Radiation Research
CIRRPC Subpanel Meeting on VA Use of Radioepidemiological Tables On July 25 a subpanel of the Comittee on Interagency Radiation Research and Policy Coordination (CIRRPC) met to discuss the possible use of the recently published NIH Radioepidemiological Tables by the Veteran's Administration as a guide on compensation for claimed radiogenic cancers.
* and Policy Coordination (CIRRPC) met to discuss the possible use of the recently published NIH Radioepidemiological Tables by the Veteran's Administration as a guide on compensation for claimed radiogenic cancers.                                           l The VA has received many such claims and requested advice from CIRRPC in connection with a proposed rule which outlines procedures for dealing with these claims. Based on the information in the Tables, the subpanel l                     is attempting to derive quantitative criteria for the VA which will allow them to reject clearly nonmeritorious claims. It was determined that additional study of the uncertainties inherent in the Tables was necessary before a reply to the VA can be finalized. Dr. Jerome S.
The VA has received many such claims and requested advice from CIRRPC in connection with a proposed rule which outlines procedures for dealing with these claims.
Based on the information in the Tables, the subpanel l
is attempting to derive quantitative criteria for the VA which will allow them to reject clearly nonmeritorious claims.
It was determined that additional study of the uncertainties inherent in the Tables was necessary before a reply to the VA can be finalized.
Dr. Jerome S.
Puskin, RES, represented NRC at the subpanel meeting.
Puskin, RES, represented NRC at the subpanel meeting.
New Method of Calculating Skin Dose i
New Method of Calculating Skin Dose i
NRC regulations establish a quarterly skin dose limit, but no NRC guidance has been issued on the technically difficult subject of determining the skin dose from the measured radioactive contamination deposited on the skin. Battelle's Pacific Northwest Laboratory, under contract to the NRC, has developed a new, improved method of calculating skin dose due to fission and radioactive corrosion products' skin contamination.
NRC regulations establish a quarterly skin dose limit, but no NRC guidance has been issued on the technically difficult subject of determining the skin dose from the measured radioactive contamination deposited on the skin. Battelle's Pacific Northwest Laboratory, under contract to the NRC, has developed a new, improved method of calculating skin dose due to fission and radioactive corrosion products' skin contamination.
Battelle has also recomended skin contamination levels below which                                                 !
Battelle has also recomended skin contamination levels below which further decontamination should not be required.
further decontamination should not be required. These levels are expressed
These levels are expressed in units that can be readily measured using comercially available instrumentation.
,                      in units that can be readily measured using comercially available
The calculational method can be implemented using a computer code (VARSKIN) that can compute the radiation dose at a specified depth in the skin for radiation sources ranging in size from a point to
;                      instrumentation. The calculational method can be implemented using a
~
~
computer code (VARSKIN) that can compute the radiation dose at a specified i
i a disk of 100-cm diameter. A com) uter diskette containing VARSKIH, which is compatible with the IBM-PC, is on file with R. B. Neei, Project i
depth in the skin for radiation sources ranging in size from a point to a disk of 100-cm diameter. A com) uter diskette containing VARSKIH, i
Manager, Occupational Radiation Protection Branch, DRPES, RES.
which is compatible with the IBM-PC, is on file with R. B. Neei, Project Manager, Occupational Radiation Protection Branch, DRPES, RES. The results of this research will be published as a NUREG/CR document, " Dose Calculation for Contamination of the Skin," in the next few months and will be considered for use as the basis for developing an NRC Regulation Guide on this subject.
The results of this research will be published as a NUREG/CR document, " Dose Calculation for Contamination of the Skin," in the next few months and will be considered for use as the basis for developing an NRC Regulation Guide on this subject.
Recently Issued Publication Draft Regulatory Guide and Value/ Impact Statement: Proposed Revision 1 to Regulatory Guide 3.52, " Standard Fomat and Content for the Health and Safety i                      Sections of License Renewal Applications for Uranium ProcessiHg and Fuel Fabrication" Task CE 308-4. Comments requested by September 27,1985.
Recently Issued Publication Draft Regulatory Guide and Value/ Impact Statement: Proposed Revision 1 to Regulatory Guide 3.52, " Standard Fomat and Content for the Health and Safety Sections of License Renewal Applications for Uranium ProcessiHg and Fuel i
)
Fabrication" Task CE 308-4. Comments requested by September 27,1985.


==Contact:==
==Contact:==
W. R. Pearson (301) 443-7663.
W. R. Pearson (301) 443-7663.
)
t
t
]
]
ENCLOSURE E AUG           2 1985 i
ENCLOSURE E AUG 2 1985 i


I l
ITEMS OF INTEREST OFFICE OF INTERNATIONAL PROGRAMS WEEK ENDING AUGUST 2, 1985 International Meetings The following international meeting notices supplement those previously announced:
ITEMS OF INTEREST OFFICE OF INTERNATIONAL PROGRAMS WEEK ENDING AUGUST 2, 1985 International Meetings The following international meeting notices supplement those previously announced:
October 21-25, 1985, Vienna, Austria - IAEA Technical Committee on the Assessment of the Radiological Impact from the Transport of Radioactive Materials October 21-25, 1985, Vienna, Austria - IAEA, OECD, WHO and ILO Advisory Group Meeting on General Principles for Exemption from the Basic Safety Standards for Radiation Protection November 18-22, 1985, Mexico - IAEA Advisory Group Meeting to Prepare a Safety Series Document on the Safe Use of Industrial Radiation Sources November 18-22, 1985, Vienna, Austria - IAEA Technical Committee on the Siting of Research Reactors April 14-18, 1986, Tokyo, Japan - NEA Symposium on Reducing Reactor Scram Frequency April 15-17,1986, Tokyo, Japan - 2nd International Topical Meeting on Nuclear Power Plant Thermal Hydraulics and Operations Foreign Visitors On Tuesday Mr. Masamitsu Kumada, the Washington Representative of the Kansai Electric Power Company of Japan, had a brief courtesy call with NRR Director H. Denton and NRR Deputy Director D. Eisenhut on the occasion of his departure and to introduce his successor Mr. Tetsuji Kishida.
October 21-25, 1985, Vienna, Austria - IAEA Technical Committee on the Assessment of the Radiological Impact from the Transport of Radioactive Materials October 21-25, 1985, Vienna, Austria - IAEA, OECD, WHO and ILO Advisory Group Meeting on General Principles for Exemption from the Basic Safety Standards for Radiation Protection November 18-22, 1985, Mexico - IAEA Advisory Group Meeting to Prepare a Safety Series Document on the Safe Use of Industrial Radiation Sources November 18-22, 1985, Vienna, Austria - IAEA Technical Committee on the Siting of Research Reactors April 14-18, 1986, Tokyo, Japan - NEA Symposium on Reducing Reactor Scram Frequency April 15-17,1986, Tokyo, Japan - 2nd International Topical Meeting on Nuclear Power Plant Thermal Hydraulics and Operations Foreign Visitors On Tuesday Mr. Masamitsu Kumada, the Washington Representative of the Kansai Electric Power Company of Japan, had a brief courtesy call with NRR Director H. Denton and NRR Deputy Director D. Eisenhut on the occasion of his departure and to introduce his successor Mr. Tetsuji Kishida.
Line 432: Line 558:
Mr. Jones participated in the Halden Program Meeting on Computerized Man-Machine Communication and in the Halden Program Group Meeting. The nuclear industry is implementing computer applications in process control, procedures, plant protection nonitoring, and control room operations. The Halden Program Group met on June 7 to review the status of 1985 programs.
Mr. Jones participated in the Halden Program Meeting on Computerized Man-Machine Communication and in the Halden Program Group Meeting. The nuclear industry is implementing computer applications in process control, procedures, plant protection nonitoring, and control room operations. The Halden Program Group met on June 7 to review the status of 1985 programs.
H. Brent Clayton, Section Leader, Division of Human Factors Safety, NRR June 10-21, 1985; Visited Yugoslavia:
H. Brent Clayton, Section Leader, Division of Human Factors Safety, NRR June 10-21, 1985; Visited Yugoslavia:
As a follow up to the mission in February of this year, Mr. Clayton
As a follow up to the mission in February of this year, Mr. Clayton undertook a second mission to Yugoslavia, as an IAEA expert, to assist the J. Stefan Institute in upgrading the abnormal and emergency procedures for the Krsko plant.
    . undertook a second mission to Yugoslavia, as an IAEA expert, to assist the J. Stefan Institute in upgrading the abnormal and emergency procedures for the Krsko plant.
l i
l i
AUG   2 1985                                                     ENCLOSURE G
AUG 2 1985 ENCLOSURE G


.                                  OFFICE OF STATE PROGRAMS ITEMS OF INTEREST WEEK ENDING AUGUST 2, 1985 Florida Review A review of the Florida radiation control program will begin August 12, 1985.
OFFICE OF STATE PROGRAMS ITEMS OF INTEREST WEEK ENDING AUGUST 2, 1985 Florida Review A review of the Florida radiation control program will begin August 12, 1985.
California's Low-Level Radioactive Waste Disposal On July 19, 1985, the Superior Court of California issued its final decision in the case of Chem-Nuclear Systems, Inc. vs. the California State Department of Health Services regarding California's selection process for a licensee     -
California's Low-Level Radioactive Waste Disposal On July 19, 1985, the Superior Court of California issued its final decision in the case of Chem-Nuclear Systems, Inc. vs. the California State Department of Health Services regarding California's selection process for a licensee designee to develop and operate a low-level radioactive waste disposal site.
designee to develop and operate a low-level radioactive waste disposal site.
This decision reaffirms the tentative decision that was reported in the weekly report for the Week Ending April 19, 1985. The main provisions of the Court decision are:
This decision reaffirms the tentative decision that was reported in the weekly report for the Week Ending April 19, 1985. The main provisions of the Court decision are:
: 1. The Department of Health Services cease all activity with regard to the second round of proposals for licensee designee.
1.
1
The Department of Health Services cease all activity with regard to the second round of proposals for licensee designee.
: 2. The determinations by the former director DHS, that Chem-Nuclear, US Ecology and Pacific Nuclear - Morrison Knudsen were not likely to satisfy California's requirements due to technical deficiency are set aside as void.
1 2.
: 3. The present Director shall determine as to whether each of the applicants named in Item 2 above is likely to file an application satisfying California's requirements.                      .
The determinations by the former director DHS, that Chem-Nuclear, US Ecology and Pacific Nuclear - Morrison Knudsen were not likely to satisfy California's requirements due to technical deficiency are set aside as void.
  ~
3.
: 4. If one or any of the applicants in Item 2 above are satisfactory, the Director is to rank the applicants.
The present Director shall determine as to whether each of the applicants named in Item 2 above is likely to file an application satisfying California's requirements.
~
4.
If one or any of the applicants in Item 2 above are satisfactory, the Director is to rank the applicants.
The Director is then to notify the highest ranked applicant of the selection and follow the procedures for selection.
The Director is then to notify the highest ranked applicant of the selection and follow the procedures for selection.
AUG   2 1985                                                       ENCLOSURE H
AUG 2 1985 ENCLOSURE H


- -                        0FFICE FOR ANALYSIS AND EVALUATION OF OPERATIONAL DATA ITEM 0F INTEREST WEEK ENDING AUGUST 2, 1985 Ernie Rossi, NRC Team Leader for the investigation of the June 9 loss of feedwater event at Davis-Besse, briefed the ACRS on Wednesday, July 31, 1985.
0FFICE FOR ANALYSIS AND EVALUATION OF OPERATIONAL DATA ITEM 0F INTEREST WEEK ENDING AUGUST 2, 1985 Ernie Rossi, NRC Team Leader for the investigation of the June 9 loss of feedwater event at Davis-Besse, briefed the ACRS on Wednesday, July 31, 1985.
The briefing covered the Team's report, including the Team's activities, event description, equipment malfunctions, operator actions, human factor considera-tions, and findings and conclusions.
The briefing covered the Team's report, including the Team's activities, event description, equipment malfunctions, operator actions, human factor considera-tions, and findings and conclusions.
The Davis-Besse Team has now disbanded, and the individuals have returned to d
The Davis-Besse Team has now disbanded, and the individuals have returned to their normal duties.
their normal duties.
d 6>=
6>=
AUG 2 1985 ENCLOSURE J
AUG     2 1985                                                                                   ENCLOSURE J


OFFICE OF SMALL AND DISADVANTAGED BUSINESS UTILIZATION / CIVIL RIGHTS Item of Iterest Week Ending August 2, 1985 Small and Disadvantaged Business Utilization Program The House Subcommittee on Small Business conducted a 3-day hearing on a bill to legislatively establish size standard eligibility for small business set-aside contracts. The major thrust of the legislation would require that all size
OFFICE OF SMALL AND DISADVANTAGED BUSINESS UTILIZATION / CIVIL RIGHTS Item of Iterest Week Ending August 2, 1985 Small and Disadvantaged Business Utilization Program The House Subcommittee on Small Business conducted a 3-day hearing on a bill to legislatively establish size standard eligibility for small business set-aside contracts. The major thrust of the legislation would require that all size standards shall be designed to promote maximum competition and inhibit government contracts with few or limited sources. Testimony was received from industry, SBA, and the Department of Defense on July 30, 31, and August 1,1985.
  - standards shall be designed to promote maximum competition and inhibit government contracts with few or limited sources. Testimony was received from industry, SBA, and the Department of Defense on July 30, 31, and August 1,1985.
Civil Rights Program At the request of the Region II Administrator, the Director, Office of Small and Disadvantaged Business Utilization and Civil Rights, and two of his senior staff participated in a 2-day work session on management /EE0 matters. The work sessions, held on July 24-25, 1985, focused on the overall Agency's Civil Rights Program and the specific objectives of EE0/ personnel initiatives of regional managenent.
Civil Rights Program At the request of the Region II Administrator, the Director, Office of Small and Disadvantaged Business Utilization and Civil Rights, and two of his senior staff participated in a 2-day work session on management /EE0 matters. The work sessions, held on July 24-25, 1985, focused on the overall Agency's Civil Rights Program and the specific objectives of EE0/ personnel initiatives of regional managenent.
ENCLOSURE K AUG   2 E65
ENCLOSURE K AUG 2 E65
                - ~ - - - - -                 - - . . . , , . - . - - - -      . - . .
- ~ - - - - -


r .
r.
4
4 ITEMS ADDRESSED BY THE COMMISSION - WEEK ENDING AUGUST 2, 1985 i
        -      ITEMS ADDRESSED BY THE COMMISSION - WEEK ENDING AUGUST 2, 1985 i
A.
A. SECY-85-245 - PROPOSED LICENSE TO EXPORT NUCLEAR GRADE GRAPHITE TO TO JAPAN (XMAT0319) - SECY Hemo to W. J. Dircks dated 7/30/85 i                   This is to advise you that the Commission (with all Commis-sioners agreeing) has approved the proposed license to export 6,360 pounds (2,890 kilograms) of nuclear grade graphite to Japan, t
SECY-85-245 - PROPOSED LICENSE TO EXPORT NUCLEAR GRADE GRAPHITE TO TO JAPAN (XMAT0319) - SECY Hemo to W. J. Dircks dated 7/30/85 i
i B. SECY-85-230 - PROPOSED LICENSE TO EXPORT COMP 0NENTS TO THE MONJU FAST BREEDER REACTOR IN JAPAN (XCOM0988) Memo SECY to W. J. Dircks dated 7/30/85 This is to advise you that the Commission (with all Commis-sioners agreeing) has approved the proposed license to export components for use in the MONJU fast breeder reactor in Japan.
This is to advise you that the Commission (with all Commis-sioners agreeing) has approved the proposed license to export 6,360 pounds (2,890 kilograms) of nuclear grade graphite to
C. STAFF REQUIREMENTS - AFFIRMATION / DISCUSSION AND VOTE, 3:30 P.M., WEDNESDAY, JULY 24, 1985, COPHISSIONERS' CONFERENCE ROOM, D.C. OFFICE (OPEN TO PUBLIC ATTENDANCE) Memo SECY to H. H. E. Plaine dated 7/31/85 4
: Japan, t
I.                 SECY-85-139/139C - Disposition of Hearing Requests Regarding
i B.
;                                        Materials License Amendments a
SECY-85-230 - PROPOSED LICENSE TO EXPORT COMP 0NENTS TO THE MONJU FAST BREEDER REACTOR IN JAPAN (XCOM0988) Memo SECY to W. J. Dircks dated 7/30/85 This is to advise you that the Commission (with all Commis-sioners agreeing) has approved the proposed license to export components for use in the MONJU fast breeder reactor in Japan.
C.
STAFF REQUIREMENTS - AFFIRMATION / DISCUSSION AND VOTE, 3:30 P.M., WEDNESDAY, JULY 24, 1985, COPHISSIONERS' CONFERENCE ROOM, D.C. OFFICE (OPEN TO PUBLIC ATTENDANCE) Memo SECY to H. H. E. Plaine dated 7/31/85 4
I.
SECY-85-139/139C - Disposition of Hearing Requests Regarding Materials License Amendments a
The Commission, by a 4-1 vote (Commissioner Roberts disapproving),
The Commission, by a 4-1 vote (Commissioner Roberts disapproving),
approved issuing orders responding to requests for hearings in three materials licensing cases as follows:
approved issuing orders responding to requests for hearings in three materials licensing cases as follows:
: 1.                         Amendment of B&W license to allow operation of special nuclear material volume reduction services at its Parks Township, Pennsylvania Facility.
1.
: 2.                         Application of Precision Materials Corp. for new license to operate irradiator facility at Mine Hill, New Jersey.
Amendment of B&W license to allow operation of special nuclear material volume reduction services at its Parks Township, Pennsylvania Facility.
s
2.
: 3.                         Amendment of Sequoyah Fuels Corporation license to add facilities at its existing Sequoyah plant in Gore, Oklahoma, to allow conversion of depleted uranium hexafluoride to depleted uranium tetrafluoride.
Application of Precision Materials Corp. for new license to operate irradiator facility at Mine Hill, New Jersey.
The orders refer the hearing requests to the Licensing Board for disposition by a single Administrative Judge. Commissioner Roberts had dissenting views which were attached to-the orders.
s 3.
Amendment of Sequoyah Fuels Corporation license to add facilities at its existing Sequoyah plant in Gore, Oklahoma, to allow conversion of depleted uranium hexafluoride to depleted uranium tetrafluoride.
The orders refer the hearing requests to the Licensing Board for disposition by a single Administrative Judge.
Commissioner Roberts had dissenting views which were attached to-the orders.
(Subsequently, on July 24, 1985 the Secretary signed the orders.)
(Subsequently, on July 24, 1985 the Secretary signed the orders.)
i
i
)
)
ENCLOSURE 0 q'             ,,,
ENCLOSURE 0 q'
                                  *m
*m


i i .
. i C.
C. CONTINUED II. SECY-85-228 - Limerick Generating Station, Units 1 and 2,               l Immediate Effectiveness Review                                             l The Commission, by a 5-0 vote, approved an order indicating that the Commission has reviewed the comments by Limerick Ecology Action and the ASLAB partial initial decisions, LBP-84-31 and LBP-85-14 and found that there is nothing which warrants staying               ,
CONTINUED II.
the effectiveness of LBP-84-31 and LBP-85-14.
SECY-85-228 - Limerick Generating Station, Units 1 and 2, Immediate Effectiveness Review The Commission, by a 5-0 vote, approved an order indicating that the Commission has reviewed the comments by Limerick Ecology Action and the ASLAB partial initial decisions, LBP-84-31 and LBP-85-14 and found that there is nothing which warrants staying the effectiveness of LBP-84-31 and LBP-85-14.
(Subsequently, on July 24, 1985 the Secretary signed the order.)
(Subsequently, on July 24, 1985 the Secretary signed the order.)
III. SECY-85-253 - Applicant's Request for Exemption from 10 CFR Part 50, Appendix E (IV) (F) (1)
III.
SECY-85-253 - Applicant's Request for Exemption from 10 CFR Part 50, Appendix E (IV) (F) (1)
The Commission, by a 5-0 vote, approved an order referring a request from Philadelphia Electric Company for an exemption from 10 CFR Part 50, Appendix E (IV) (F) (1) (which requires a full participation emergency exercise within the one year period prior to the issuance of a full-power operating license) to the Director of Nuclear-Reactor Regulation for a decision. (NRR)
The Commission, by a 5-0 vote, approved an order referring a request from Philadelphia Electric Company for an exemption from 10 CFR Part 50, Appendix E (IV) (F) (1) (which requires a full participation emergency exercise within the one year period prior to the issuance of a full-power operating license) to the Director of Nuclear-Reactor Regulation for a decision. (NRR)
(Subsequently, on July 24, 1965 the Secretary signed the order.)
(Subsequently, on July 24, 1965 the Secretary signed the order.)
D. STAFF REQUIREMENTS - BRIEFING ON ACCIDENT SOURCE TERM REASSESSMENT, 10:00 A.M., WEDNESDAY, JULY 24, 1985, COMMISSIONERS' CONFERENCE ROOM, D.C. 0FFICE (OPEN TO PUBLIC ATTENDANCE) Memo SECY to RECORD dated 8/1/85 The Commission met with the staff to discuss staff's program on source term reassessment including staff's progress in source i
D.
term research, advances in the source term computer model and
STAFF REQUIREMENTS - BRIEFING ON ACCIDENT SOURCE TERM REASSESSMENT, 10:00 A.M., WEDNESDAY, JULY 24, 1985, COMMISSIONERS' CONFERENCE ROOM, D.C. 0FFICE (OPEN TO PUBLIC ATTENDANCE) Memo SECY to RECORD dated 8/1/85 The Commission met with the staff to discuss staff's program on source term reassessment including staff's progress in source term research, advances in the source term computer model and i
!          staff's progress on completion of NUREG-0956 and NUREG-1150.
staff's progress on completion of NUREG-0956 and NUREG-1150.
The staff advised the Commission that NUREG-0956 would be issued for public comment and available to the Commission in early August 1985, and that NUREG-1150 would be available by March or April 1986.
The staff advised the Commission that NUREG-0956 would be issued for public comment and available to the Commission in early August 1985, and that NUREG-1150 would be available by March or April 1986.
The Commission requested quarterly briefings by the staff on source term developments.
The Commission requested quarterly briefings by the staff on source term developments.
ENCLOSURE 0 AUG   21985
ENCLOSURE 0 AUG 21985


E.           STAFF REQUIREMENTS - BRIEFING BY GEORGIA POWER (V0GTLE) ON OPERATIONAL READINESS REVIEW PILOT PROGRAM, 10:00 A.M., FRIDAY, JULY 26, 1985, COPNISSIONERS' CONFERENCE ROOM, D.C. OFFICE (OPEN TO PUBLIC ATTENDANCE)
E.
STAFF REQUIREMENTS - BRIEFING BY GEORGIA POWER (V0GTLE) ON OPERATIONAL READINESS REVIEW PILOT PROGRAM, 10:00 A.M., FRIDAY, JULY 26, 1985, COPNISSIONERS' CONFERENCE ROOM, D.C. OFFICE (OPEN TO PUBLIC ATTENDANCE)
Fiemo SECY to RECORD dated 8/2/85 The Commission met to be briefed by representatives of the Georgia Power Company on their Readiness Review Pilot Program.
Fiemo SECY to RECORD dated 8/2/85 The Commission met to be briefed by representatives of the Georgia Power Company on their Readiness Review Pilot Program.
The following persons participated in the briefing:
The following persons participated in the briefing:
Robert W. Scherer, Chairman and CEO Georgia Power Company Paul D. Rice, Vice President, Quality Assurance Georgia Power Company                                                           I f
Robert W. Scherer, Chairman and CEO Georgia Power Company Paul D. Rice, Vice President, Quality Assurance Georgia Power Company I
James H. Miller, Jr., President                                                 ,
f James H. Miller, Jr., President Georgia Power Company Richard J. Kelly, Executive Vice President, Power Supply Georgia Power Company William C. Ramsey, Readiness Review Program Manager Vogtle Project The Commission also heard a statement made by Billie Garde of the Government Accountability Project in behalf of intervenors in the Vogtle proceeding.
Georgia Power Company                                                           '
There were no requirements at this meeting.
Richard J. Kelly, Executive Vice President, Power Supply Georgia Power Company William C. Ramsey, Readiness Review Program Manager Vogtle Project The Commission also heard a statement made by Billie Garde of the Government Accountability Project in behalf of intervenors in the Vogtle proceeding.
f ENCLOSURE 0 AUG
There were no requirements at this meeting.                                             ,
' ivoo 4
f ENCLOSURE 0 AUG               ' ivoo 4


Ecn na                                           NRR MEETING NOTICES
E cn na NRR MEETING NOTICES
* gg                                                                                         AUGUST 2, 1985 u,
* gg AUGUST 2, 1985 u,
DOCKET                                                       APPLICANT /
DOCKET APPLICANT /
DATE/ TIME       NUMBER   LOCATION                     PURPOSE               ATTENDEES             NRR CONTACT 8/5/85           50-302   P-114             To discuss licensee's pro-       Florida Power Corp. H. Silver 1:00 pm                   Bethesda           posed exemption to GDC-4 for RCP supports                   ,
DATE/ TIME NUMBER LOCATION PURPOSE ATTENDEES NRR CONTACT 8/5/85 50-302 P-114 To discuss licensee's pro-Florida Power Corp.
8/5/85           50-410   Nine Mile 2 Site Discussion of NMP-2 First         Niagara Mohawk Power   M. Haughey 12:00 Noon               Scriba, NY         Technical Specifications 8/7/85                   Room 144           To discuss status of licensing Niagara Mohawk Power   M. Haughey 10:00 am                 Phillips Bldg.     issues for Nine Mile Point 2 Bethesda 8/8/85       50-387/388   P-114             To discuss development of       Pennsylvania Power     M. Campagnone 10:30 am                 Bethesda           transient analysis and core       & Light Co.
H. Silver 1:00 pm Bethesda posed exemption to GDC-4 for RCP supports 8/5/85 50-410 Nine Mile 2 Site Discussion of NMP-2 First Niagara Mohawk Power M. Haughey 12:00 Noon Scriba, NY Technical Specifications 8/7/85 Room 144 To discuss status of licensing Niagara Mohawk Power M. Haughey 10:00 am Phillips Bldg.
8/8/85           50-354   Hope Creek Site   Electrical audit of Hope Creek Public Serv. Elec.     D. Wagner 3:00 pm                   Lower A110 ways Creek Township, NJ 8/12/85         50-309   P-110             To discuss generic fuel loads   Maine Yankee Atomic     P. Sears 1:00 pm                   Bethesda           for Maine Yankee PLEASE BE ADVISED THAT DAILY RECORDING CAN BE HEARD ON 492-7166
issues for Nine Mile Point 2 Bethesda 8/8/85 50-387/388 P-114 To discuss development of Pennsylvania Power M. Campagnone 10:30 am Bethesda transient analysis and core
& Light Co.
8/8/85 50-354 Hope Creek Site Electrical audit of Hope Creek Public Serv. Elec.
D. Wagner 3:00 pm Lower A110 ways Creek Township, NJ 8/12/85 50-309 P-110 To discuss generic fuel loads Maine Yankee Atomic P. Sears 1:00 pm Bethesda for Maine Yankee PLEASE BE ADVISED THAT DAILY RECORDING CAN BE HEARD ON 492-7166
* Copies of summaries of these meetings will be made publicly available and placed in the respective docket fite(s) in the NRC and local public document rooms.
* Copies of summaries of these meetings will be made publicly available and placed in the respective docket fite(s) in the NRC and local public document rooms.
E P
E P8 C
8 C
m v
m v
e
e


Ec>
E c>
c:                                              NRR MEETING NOTICES
NRR MEETING NOTICES
* O US DOCKET                                                       APPLICANT /
* c:
DATE/ TIME           NUMBER   LOCATION                           PURPOSE         ATTENDEES           NRR CONTACT 8/13/85         50-387/388     MNBB-6507         To discuss possible NRC review     Pennsylvania Power & M. J. Campagnone 10:30 am                       Bethesda         of Susquehann's completed PRA ,
O US DOCKET APPLICANT /
Light
DATE/ TIME NUMBER LOCATION PURPOSE ATTENDEES NRR CONTACT 8/13/85 50-387/388 MNBB-6507 To discuss possible NRC review Pennsylvania Power &
M. J. Campagnone 10:30 am Bethesda of Susquehann's completed PRA Light l
}
}
l I
l I
Line 531: Line 667:
PLEASE BE ADVISED THAT DAILY RECORDING CAN BE HEARD ON 492-7166
PLEASE BE ADVISED THAT DAILY RECORDING CAN BE HEARD ON 492-7166
* Copies of summaries of these meetings will be made publicly available and placed in the respective docket file (s) in the NRC and local public document rooms.
* Copies of summaries of these meetings will be made publicly available and placed in the respective docket file (s) in the NRC and local public document rooms.
9 P
9 P8
8
!5, n
              !5, n
t 7
7 I
I t
t


E MSS EETING NOTICES w                                  DIVISION OF WASTE Mall 4GEMENT                     Week Ending August 2, 1985 m                                                                                                                     ~
E MSS EETING NOTICES DIVISION OF WASTE Mall 4GEMENT Week Ending August 2, 1985 w
8?
m 8?
DOCKET DATE/ TIE     NUfBER     LOCATION                                           ATTENDE'ES/                                    '
~
PURPOSE               APPLICATION             NRC CONTACT 8/20-21/85               Willste Bldg           To discuss with the DOE     NRC staff             PElackford, WMGT Room 106-110           their document " Rationale   DOE staff for Seismic / Tectonic Investigations for Licensing a Nuclear Waste Repos itory DIVISION OF FUEL CYCLE AND MATERIAL SAFETY 8/6/85     Project     Willste     DOE briefing on MRS.                   Reps of NMSS, 10:30 am   it-38                                                                                     Rouse 9th floor                                             IE, RES, conf room                     ,
DOCKET ATTENDE'ES/
ELD, DOE 8/14-16/85             Lake Geneva, Working Group participant in         Reps of Battelle Wisconsin                                                                     Roberts ANS-57.7 Reconfirmation                 Pacific Northwest lieeting.                               Labs.                                   ~
DATE/ TIE NUfBER LOCATION PURPOSE APPLICATION NRC CONTACT 8/20-21/85 Willste Bldg To discuss with the DOE NRC staff PElackford, WMGT Room 106-110 their document " Rationale DOE staff for Seismic / Tectonic Investigations for Licensing a Nuclear Waste Repos itory DIVISION OF FUEL CYCLE AND MATERIAL SAFETY 8/6/85 Project Willste DOE briefing on MRS.
Reps of NMSS, Rouse 10:30 am it-38 9th floor IE, RES, conf room ELD, DOE 8/14-16/85 Lake Geneva, Working Group participant in Reps of Battelle Roberts Wisconsin ANS-57.7 Reconfirmation Pacific Northwest lieeting.
Labs.
~
J. Roberts (FC)
J. Roberts (FC)
DIVISION OF SAFEGUARDS j   fione.                                                                                                                .
DIVISION OF SAFEGUARDS j
i ..
fione.
I           g                                                             '-
i..
!            n                                                                                           .
I g
un C
n un C


E c'                                 RES MEETING NOTICES                                               August 2,1985
E c'
[                   DOCKET                                                           ATTENDEES /
RES MEETING NOTICES August 2,1985
g   DATE/ TIME     NUPBER LOCATION                     PURPOSE                     APPLICANT                   NR_C IONTN 8/19                 NL-5650       To conduct program review on status Blackman,INEL                     Au 9:00 AM                             of FIN No. A6394 and A6826 - Plant Norberg,RES Procedure Research at INEL                 Au, RES 8/20                 GPC           To review draft report of                   Schroeder,GPC             Au 9:00 AM               Colunbia,MD   Procedures Interface Issues                 Couley, GPC Au, RES Bongarra ,NRR Blackman.INEL 3/22                 Wills te       Review statistical analysis of             Emeigh,NMSS               Abramson 9:00 AM                             recurririg loss                             Picard,LASL Tingey Abramson l
[
t                                                                                     . ..
DOCKET ATTENDEES /
    =
g DATE/ TIME NUPBER LOCATION PURPOSE APPLICANT NR_C IONTN 8/19 NL-5650 To conduct program review on status Blackman,INEL Au 9:00 AM of FIN No. A6394 and A6826 - Plant Norberg,RES Procedure Research at INEL Au, RES 8/20 GPC To review draft report of Schroeder,GPC Au 9:00 AM Colunbia,MD Procedures Interface Issues Couley, GPC Au, RES Bongarra,NRR Blackman.INEL 3/22 Wills te Review statistical analysis of Emeigh,NMSS Abramson 9:00 AM recurririg loss Picard,LASL Tingey Abramson l
t
=
P S
P S
5 I
5 I
_ _ _ _ _ _ _ _ _ . _ _ _  _ _ _ _ _ _ _}}
_ _ _ _ _ _ _}}

Latest revision as of 07:16, 12 December 2024

Weekly Info Rept for Wk Ending 850802
ML20133P166
Person / Time
Issue date: 08/07/1985
From: Rehm T
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To:
References
WIR-850802, NUDOCS 8508140187
Download: ML20133P166 (38)


Text

PDR 6

August 7, 1985 For:

The Commissioners From:

'T. A. Rehm, Assistant for Operations, Office of the ED0

Subject:

WEEKLY INFORMATION REPORT - WEEK ENDING AUGUST 2, 1985 A summary of key events is included as a convenience to those Commissioners who may prefer a condensed version of this report.

Contents Enclosure Administration A

Nuclear Reactor Regulation B

Nuclear Material Safety and Safeguards C

Inspection and Enforcement D

Nuclear Regulatory Research E

Executive Legal Director F*

International Programs G

State Programs H

Resource Management I*

Analysis and Evaluation of Operational Data J

Small & Disadvantaged Business Utilization & Civil Rights K

Regional Offices L*

CRGR Monthly Report M*

Executive Director for Operations N*

Items Addressed by the Commission 0

Meeting Notices P

Proprietary or Other Sensitive Information (Not for Q

externaldistribution)

  • No input this week.

I d-

/

l T. A. R hm, nt for Operations Office of the Executive Director for Operations 8508140187hggo7

Contact:

WEEKLYIh0REPTPDR PDR CO T. A. Rehm, ED0 492-7781

HfGHLIGHTS OF WEEKLY fNFORMATION REPORT WEEK ENDING AUGUST 2, 1985 i.

Oconee Nuclear Station, Units 1, 2 and 3 i'

Earlier, Duke Power Company (Duke) had called to say that a DC reactor trip breaker (AK-2-25) responded slowly during the monthly on-line surveillance test. The breaker tripped in 1738 milliseconds rather than under 80.

{

On July 29, 1985, Duke informed the staff that they believe the caus6 for the delayed trip could be a potential gineric problem and that :1t involves the undervoltage trip attachment (UVTA) of the reactor trip i

breaker. Duke is in the process of installing a new UVTA (this is the i

second) and they stated that the new devices have smaller tolerances i

between the armature and the rtounting nuts. Duke believes that with j

the new devices and the smaller tolerances, the armature would hit the mounting nuts on top of the housing.

4 The staff is pursuing:

(1) any potential generic concerns, (2) confirmation that Duke does its own benchtesting for nuclear-grade certification and (3) any similarities to a Rancho Seco event where the UVTA did not trip because the clearances between the roller-rivet and the armature were significantly greater than the specified range.

l The Oconee units continue to operate at power.

New Method of Calculating Skin Dose NRC regulations establish a quarterly skin dose limit, but no NRC guidance has been issued on the technically difficult subject of determining the skin dose from the measured radioactive contamination deposited on the skin. Battelle's Pacific Northwest Laboratory, under contract to the NRC, has developed a new, improved method of calculating skin dose due to fission and radioactive corrosion products' skin contamination.

Battelle has also recomended skin contamination levels below which further decontamination should not be required. These levels are expressed in units that can be readily measured using comercially available instrumentation. The calculational method can be implemented using a computer code (VARSKIN) that can compute the radiation dose at a specified depth in the skin for radiation sources ranging in size from a point to a disk of 100-cm diameter. A com mter diskette containing VARSKIN, which is compatible with the IBM->C is on file with R. B. Neel, Project Manager, Occupational Radiation Protection Branch, DRPES, RES.

The results of this research will be published as a NUREG/CR document, " Dose Calculation for Contamination of the Skin " in the next few ronths and will be considered for use as the basis for developing an NRC Regulation Guide on this subject.

I 1

l Part 21 Notification NRC was notified on July 19, 1985 of a possible Substantial Safety.fazard in accordance with 10 CFR Part 21 by Technology for Energy Corporation (TEC). The report deals with i

TEC model 914-1 Valve Flow Monitor Modules (Acoustic). These modules are ac The problem is a possible monitors used to indicate whether valves are open or closed.

" latch-up" of the module in which it fails to reset after indicating full flow through If it " latches up," the monitor will continue to show that the valve is open the valve.

after it has been closed.

Purchases of the monitors will be notified by the vendor.

Bellefonte, Browns Ferry, Calvert Those plants mentioned in the vendor notification are:

Cliffs, Catawba, Clinton, Davis-Besse, Diablo Canyon, Ft. Calhoun, Indian Point 2 & 3, McGuire, Oconee, Palo Verde, Pilgrim, Rancho Seco, San Onofre, Sequoyah, St. Lucie, Susquehanna, Tuckey Point, Trojan, Watts Bar, and WNP-2.

MG 0195

t 0FFICE OF ADMINISTRATION Week Ending August 2, 1985 i

ADMINISTRATION OF THE FREEDOM 0F INFORMATION ACT

]

STATUS OF REQUESTS Initial Appeal of i

Request Initial Decision Carryovers, 1984 179 23 Received, 1985 551 31 Granted 418 24 Denied 117 13 Pending 195 17 ACTIONS THIS WEEK l

l Received John Wendell Beavers, Requests all records concerning shut downs of the Salem Attorney-At-Law Unit 1 plant which were necessitated by the Westinghouse (85-522) circuit breaker, NRC's subsequent fines, and related i

action applicable to Westinghouse.

l Lyle Graber, Requests a copy of SECY-85-209.

NUS Corporation j

(85-523)

Jeanene C. Ondrik, Requests copies of the last two NRC inspection Nuclear Pharmacy reports for St. James Hospital in Chicago Heights, Incorporated Illinois.

(85-524)

Clifford A. Beck Requests copies of 24 listed reports and supplements.

j (85-525)

Steven C. Sholly, Requests copies of Oyster Creek Probabilistic Safety Union of Concerned Analysis reports dated August 1979 and December 1982.

Scientists (85-526) i Susan L. Hiatt, Requests a copy of two identified records and four OCRE Representative categories of records concerning research programs.

(85-527)

Charles Barnes Requests records in Docket files 40-1366, Gunnison (85-528)

Uranium Processing Plant; and 40-1668, Lakeview Uranium Processing Plant; and Inspection Report of Sequoyah l

Uranium Hexafluoride Plant conducted October 21-23, 1970.

CONTACT:

J. M. Felton i

492-7211 ENCLOSURE A AUG 2 1985

-~

,.e n _ -nww.,.7-sn,,c-,em,--~.-,-.,,-,v.wn,,.n,.,.n.,_,n,,n__.e,

.g r,,,w.,,.

..ww-,--,v,,

,,, -e,g_,y v,.e,_,w-re.e_n-n

2 Received, Cont'd Charles Barnes Requests records in Docket files 40-8006, Oklahoma (85-529)

City Nuclear Laboratory; 40-2038, Shiprock Uranium Processing Plant; and 40-8027, Sequoyah Uranium Hexafluoride Production Plant.

Richard A. McCormack, Requests a list of attendees at the Nuclear Reactor The Energy Daily Deconsnissioning Planning Conference on July 16-18.

(85-530)

Nan M. Seuffert, Requests records regarding tests done in the vicinity Environmental of the Oyster Creek plant for radiation in air, soil Task Force or water.

(85-531)

Nancy E. Pearson, Requests a copy of SECY-85-129, " Maintenance and Stone & Webster Surveillance Program Plan."

En ineering Corp.85-532)

Jonathan L. Alpert, Requests records concerning NRC's quality assurance /

Fowler, White, quality control program regarding Rinker Materials Gillen, Boggs, Corporation.

Villareal & Banker, P.A.

(85-533)

Nina Bell, Requests three categories of records regarding the Nuclear threat to commercial and non-power reactors from truck Infonnation and bombs.

Resource Service (85-534)

Nina Bell, Requests three categories of records regarding seismic Nuclear hazards.

Information and Resource Service (85-535)

Nina Bell, Requests two categories of records regarding NRC's Nuclear recent proposed rule under the Government in the Information and Sunshine Act.

Resource Service (85-536)

Scott W. Morgan, Requests records regarding the nuclear processing and Rawle & Henderson waste disposal of NUMEC and/or Babcock and_Wilcox.

(85-537)

W.S. Schum, Requests three categories of records regarding 01 Quality Technology activities concerning licensee directed employee concern Company prograns.

(85-538)

ENCLOSURE A

,g

3 Received, Cont'd John Morley, Requests four categories of records regarding high-Governor's Task level radioactive waste disposal.

Force on High-Level Radioactive Waste (85-539)

T.P. Bracke, Requests a nonproprietary version of Exxon Nuclear Combustion Report XN-NF-739 which was supposedly submitted on Engineering, Inc.

the D.C. Cook Unit 2 nuclear plant on or about (85-540)

November 11, 1983.

C.R. Jensen, Requests 11 categories of records regarding NRC's Data Recovery requirements on protection of utilities' computer Institute and data information in the event of a disaster.

(85-541)

Mozart G. Ratner, Requests records of all communications on which the Attorney-At-Law letter from E. Neil Jensen regarding allegations made (85-542) against the General Electric Company was based.

W.F. Lawless, Referral from the DOE of one record regarding Paine College management of defense transuranic (TRU) wastes.

(85-543)

Rod Buckles, Requests two specified memoranda regarding the startup

~

NUS Corporation testing at San Onofre Unit 3.

(85-544)

Steven C. Sholly, Requests copies of Sandia's "ASEP Plant Survey and 4

Union of Concerned Initial Plant Grouping Letter Report" dated August 1983 Scientists and all other versions of the report.

(85-545)

~

Billie P. Garde, Requests all records regarding speeches made by John Government Herington about nuclear power, specifically a copy of the Accountability speech given to the Nuclear Power Assembly.

Project (85-546)

Billie P. Garde, Requests all fecords between William Dircks, Victor Government Stello and Harold Denton regarding the Comanche Peak Accountability plant.

Project (85-547)

Ann Hunter, Requests two categories of records regardiiig the Government Farley nuclear power plant.

Accountability Project (85-548)

ENCLOSURE A AUG 2, be5 1

4 Received, Cont'd (Anindividual Referral from the FBI of two records, requesting information about herself)

(85-549)

Jim Pedro, Requests the draft Regulatory Guide regarding the NUS Corporation implementation of the ECCS proposed rule mentioned on (85-550) page 2 of Enclosure E of the Commissioners' Weekly Report dated April 26, 1985.

John J. McCaffrey, Requests copies of 11 specified records.

New York Public Interest Research Group (85-551)

J. Patrick Hickey, APFEAL TO THE EDO for the release of five denied Shaw, Pittman, tecords regarding misadministration reports for the h,tts & Trowbridge second, third and fourth quarters of 1984 pertaining (85-A-31-85-372) to'specified hospitals.

Granted Michael D. Berry In response to a request for copies of six reports by (85-430) various organizations regarding radioactive waste disposal, infomed the requester that five of the reports are available at the PDR and or.e report is available in a public library.

Billie P. Garde, In response to a request for copies of all records Government related to Inspection Reports 50-348/83-16 and 50-364/

Accountability 83-14 on the Farley nuclear power plant, made available Project three records.

Informed the requester that she may (85-453) obtain a copy of one record from the Electric Power ResearchInstitute(EPRI).

^

Steven C. Sholly, In response to a request for ten records referenced Union of Concerned in NUREG-1037, " Containment Perfomance Working Group Scientists Report," made available eight records. Infomed the (85-457) requester that two additional records subject to this request may be purchased from the NTIS and the GPO.

R.J. Weigel, In response to a request for four categories of mailing EQES Inc.

labels, made available the requested labels.

(85-489)

ENCLOSURE A AUG 2 1985

5 Granted, Cont'd Billie P. Garde, In response to a request for all records relevant Government to and/or generated in connection with all Accountability comunications between Harold Denton, William Dircks, Project and Victor Stello regarding Comanche Peak, made (85-491) available three records.

Steven C. Sholly, In response to a request for a copy of " Analysis of Union of Concerned Thrust on a Pressure Vessel After Core Melt Through at Scientists Elevated Pressure," Battelle Columbus Labaratories, 1979, (85-498) made available a copy of the requested report.

Steven C. Sholly, In response to a request for a copy of " Analysis of a Union of Concerned Station Blackout Transient for the Bellefonte Scientists Pressurized Water Reactor," EG8G, April 1984, and (85-503)

" Analysis of a Station Blackout Transient at the Seabrook Nuclear Power Plant," EG&G, September 1984, made available copies of the requested reports.

William R. Gates, In response to a request for a list of names and NUMANC0 addresses of all companies which are licensed by the NRC (85-512) to store, handle, or process radioactive materials, made available a copy of the requested list.

'S David R. Ennis, In response to a request for a copy of " Financial NUS Corporation Implications of Retrospective Premium Assessments," by (85-518)

Ron Melicher, informed the requester that he may obtain a copy of the requested report from the NTIS.

Charles Barnes In response to a request for all records in Docket files (85-528) 40-1366; 40-1668; and the Inspection Report of the Sequoyah Uranium Hexafluoride Plant conducted October 21-23, 1970, made available 37 records. Infonned the requester that additional records subject to this request are already available at the PDR in a previous FOIA request file.

Denied Nina Bell, In response to a request for two categories of records Nuclear regarding the Grand Gulf nuclear power plant, made Information and available 300 documents.

Informed the requester that Resource Service additional records subject to this request are already (84-459) available at the PDR. Denied six records in their entirety, release of which would tend to inhibit the open and frank exchange of ideas and other information essential to the deliberative process.

Billie P. Garde.

In response to a request for records relevant to and/or Government generated in connection with the responses of Mr. Robert Accountability Martin, Regional Administrator, NRC Region IV, or his Project predecessor Mr. John Collins, or any other NRC personnel, (85-152) regarding drug abuse at the Comanche Peak site, made available three records. Denied one record in its ENCLOSURE A AUG 2 1985 entirety, release of which would tend to inhibit the open and frank exchange of ideas essential to the deliberative process. Denied portions of two records, release of which would constitute a clearly unwarranted invasion of personal privacy.

6 Denied, Cont'd John W. Flora, In response to a request for copies of Coninission Nuclear Consultant staff explanations of intent in setting, or (85-243) interpreting or clarifying Technical Specifications, made available 108 records. Denied in its entirety, one record containing predecisional advice, opinions, and recommendations of the staff.

Jerry S. McDevitt, In respon:;e to requests for records regarding alleged Kirkpatrick 8 deficiencies with Ruskin dampers, made available 70 Lockhart records.

Informed the requester that additional (85-264/265) records subject to this request are already available at the PDR. Denied one record in its entirety, release of which would tend to inhibit the candid exchange of ideas that is essential during the agency's deliberative process.

Nina Bell, In response to a request for records produced by or for Nuclear the NRC regarding an article published in the New Orleans Information and newspaper Gambit concerning the Department of Energy's Resource Service Task Force on Commercial Nuclear Power and its (85-357) involvement in NRC's licensing of nuclear plants, made available four records.

Informed the requester that additional records subject to this request are already cvailable at the PDR. Denied five records in their entirety, release of which would inhibit the open and frank exchange of ideas essential to the deliberative process.

Frank S. Hamblett, In response to a request for a copy of SECY-85-80, denied Newman &

portions of the paper, release of which would tend to Holtzinger, P.C.

inhibit the open and frank exchange of ideas essential to (85-460) the deliberative process.

Anthony C. Dicola In response to a request for all surveys conducted by the (85-467)

NRC since January 1984, and all correspondence between Dollar Savings and the NRC from January 1984 to the present concerning METCOA, Inc., of Pulaski, Pennsylvania, made available two records. Denied two records in their entirety containing confidential business (proprietary)information.

Billie P. Garde.

In response to a request for records related to the Government presentation given by Commissioner Frederick Bernthal Accountability to the Atomic Industrial Forum in Dallas, Texas, on Project May 20, 1985, made available one record. Denied three (85-487) records in their entirety, release of whic!Lwould tend to inhibit the open and frank exchange of ideas essential to the deliberative process.

ENCLOSURE A AUG 2 1985

7 Denied, Cont'd Jay E. Silberg, In response to a request for copies of SECY-85-80; Shaw, Pittman, SECY-85-208 and transcripts of any Commission meetings Potts & Trowbridge at which these two SECY papers were discussed, informed (85-493) the requester that the disclosed portions of SECY-85-80 are already available at the PDR. Denied SECY-85-208 in its entirety, release of which would tend to inhibit the open and frank exchange of ideas essential to the deliberative process.

Informed the requester that both SECY-85-80 and SECY-85-208 are " Notation Vote" papers and, therefore, were not discussed at a Commission meeting.

(NRCemployee)

In response to a request for copies of all records (85-499) regarding a July 19, 1985, memorandum written by Mr. James G. Keppler, Regional Administrator, RIII, made available one record. Denied portions of one record, disclosure of which would constitute a clearly unwarranted invasion of personal privacy.

(NRCemployee)

In response to a request, on behalf of an NRC employee, (85-506) for three categories of records regarding Vacancy Announcement No. 85-2103-8, made available one record.

Denied portions of four records, release of which would constitute a clearly unwarranted invasion of personal privacy.

Peter C. Hearn, In response to an APPEAL TO THE COMMISSION for the NTEU Vice-President release of 28 denied records concerning NRC (85-A-23-84-168) consolidation proposals, continued to deny these records, release of which would stifle honest and i

frank communication among the participants to the detriment of the quality of the agency's decisions and communications with Congress.

1 l

l eme> +

EhCLOSURE A

WEEKLY INFORMATION REPORT DIVISION OF CONTRACTS WEEK ENDING AUGUST 2, 1985 t

PROPOSALS UNDER EVALUATION RFP No.: RS-NRR-85-054

Title:

" Description of an NRC Simulation Facility Evaluation Program"

==

Description:==

The contract objectives are to develop, refine and validate criteria and methodology for the review of nuclear power plant simulation facilities; recommend size and make-up of a review team; and develop a schedule for conduct of a review. Work will include a review of applicable literature; l

development of a methodology; testing this methodology through conduct of actual simulation facility reviews and preparation of detailed recommendations.

Period of Performance: Basic - 14 months (option, additional 6 months).

Sponsor: Office of Nuclear Reactor Regulation Status: The competitive range has been established and negotiations are scheduled for the week of August 12, 1985.

RFP No.:

RS-NMS-85-009

Title:

" Technical Assistance in Hydrogeology - Project B - Analysis"

==

Description:==

The contractor shall provide technical assistance to the p

NRC in its review of DOE site investigations to a potential High Level Waste (HLW) geologic repository.

Period of Performance: 2 years with 3 one-year options.

Sponsor: Office of Nuclear Material Safety and Safeguards Status: The competitive range has been established and negotiations

~

are scheduled for the week of August 26, 1985.

RFP No. : RS-NMS-85-002

Title:

" Technical Assistance for Design Reviews of High Level Nuclear Waste Geologic Repositories"

==

Description:==

The contractor shall be required to provide support services, including analyses, computations, engineering evaluations, citations to literature, and documentation thereof to assist the NRC to review, evaluate, and comment on the design of a genlogic repository contained in the U.S. Department of Energy's (DOE) site characterization plans (SCP).

Period of Performance: Three years Sponsor: Office of Nuclear Material Safety and Safeguards Status: Best and Final offers received on August 1,1985, and forwarded to Source Evaluation Panel for review on August 2,1985.

ENCLOSURE A AUG 2 1985

l Division of Contracts Weekly Information Report l ADMINISTRATIVE MATTERS I

On July 31,1985, Division of Contracts received a protest filed with the Ceneral Acccunting Office (GA0) by Engineers International Inc. (EI) l under Solicitation No. RS-NMS-85-002 for " Technical Assistance for Design Reviews of High Level Nuclear Waste Geologic Repositories." Based on a review of all proposals received under this RFP, EI had been eliminated from further consideration for contract award.

EI alleges that its proposal was not given fair and equitable consideration by the NRC.

In addition, EI requests that they be included in the competitive range and be given the opportunity to submit a revision to their proposal.

1 On July 17, 1985, Software AG of North America filed a protest with the l

General Services Board of Contract Appeals against award of Contract l

NRC-33-85-312 to Cullinet Software, Inc. The contract for a Data Base Management System and supporting integrated software to support the NRC Corporate Data Network was awarded June 27, 1985. Software AG l

contends that their Best and Final Offer was not evaluated properly and f

that the solicitation evaluation criteria were improperly applied in

[

selection of the successful contractor.

l f

l ENCLOSURE A AUG 2 1985

(-

0FFICE OF NUCLEAR REACTOR REGULATION ITEMS OF INTEREST Week Ending August 2, 1985 North Anna Power Station, Unit No. 2 At 0700 hours0.0081 days <br />0.194 hours <br />0.00116 weeks <br />2.6635e-4 months <br /> (7/25/85), undetermined RCS leakage of 3.1 GPM was observed (TS limit is 1 GPH). At 0740 hours0.00856 days <br />0.206 hours <br />0.00122 weeks <br />2.8157e-4 months <br />, NA-2 began a ramp down and was in hot stancby at 1704 hours0.0197 days <br />0.473 hours <br />0.00282 weeks <br />6.48372e-4 months <br />.

Leakage was determined to be coming from manual isolation valve (2RC6) which is off the "A" loop cold leg to the RID bypass lines.

The l

problem appears to be a packing leak but operators have been unable to get l

close enough to observe due to steam. During the early morning of 7/26/85, l

two operators made containment entry but heat stress required attempted I

repairs to be terminated. Per this daily highlight at 1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br /> (7/26/85),

leak is now at 10 gpm and the unit will be in cold shutdown by 2300 hours0.0266 days <br />0.639 hours <br />0.0038 weeks <br />8.7515e-4 months <br /> (7/26/85). Size of the affected line is 2 inches.

River Bend On July 25, 1985, Gulf States Utilities, the applicant for an operating license for River Bend Station Unit 1, informed the staff that "the design, construction and pre-operational testing work required for fuel load has been completed."

l The staff has on this date forwarded the final draft of the River Bend Technical Specifications to the applicant for certification.

l Termination of Operating License for Columbia University t

On.1 Ay 25,1985, the Nuclear Regulatory Commission issued an order te:1ainating Operating License No. R-128 for the TRIGA reactor at l

columbia University in New York City.

i The Operating License was issued on April 14, 1977. The reactor was never fueled nor operated.

Oconee Nuclear Station, Units 1, 2 and 3 Earlier, Duke Power Company (Duke) had called to say that a DC reactor trip breaker (AK-2-25) responded slowly during the monthly on-line surveillance test. The breaker tripped in 1738 milliseconds rather l

than under 80.

ENCLOSURE B AUG 2 1985

On July 29, 1985, Duke informed the staff that they believe the cause for the delayed trip could be a potential generic problem and that it involves the undervoltage trip attachment (UVTA) of the reactor trip breaker. Duke is in the process of installing a new UVTA (this is the second) and they stated that the new devices have smaller tolerances between the armature and the mounting nuts. Duke believes that with the new devices and the smaller tolerances, the armature would hit the mounting nuts on top of the housing.

The staff is pursuing:

(1) any potential generic concerns, (2) confirmation that Duke does its own benchtesting for nuclear-grade certification and (3) any similarities to a Rancho Seco event where the UVTA did not trip because the clearances between the roller-rivet and the armature were significantly greater than the specified range.

The Oconee units continue to operate at power.

Millstone Nuclear Power Station Unit-1 BWR The Millstone-1 plant exceeded, about two weeks ago, the old USA BWR rectFd for the longest continuous operation at rated power level and continues on at 361 days towards a scheduled refueling outage in the fall of 1985.

Limerick On July 29, 1985 a Director's Decision was issued in response to a 2.206 Petition from R. L. Anthony / Friends of the Earth. The Petition sought to have the low power operating license revoked on the basis that certain exemptions were improperly granted, that licensed activities were being conducted in an unsafe manner on the basis of the reportable events since issuance of the low power license and certain correspondence between the staff and the licensee. The response to the Petition concluded that none of the issues warranted the action sought by the Petition.

Grand Gulf Unit 1 Shift advisors having substantive BWR operating experience were released today from their assignments on operating shifts at Grand Gulf 1.

The licensee had previously advised the NRC staff of its plan to release the advisors and the staff had approved this plan by its letter dated July 23, 1985.

ENCLOSURE B gG 21985

A license condition required these experienced shift advisors until the plant achieved and demonstrated full power operation. This condition has now been fulfilled. The plant first achieved full power on May 12, 1985 and since then the plant has operated in the 90-100% power range for more than 20 cumulative days. Each of the operating shift crews have accumulated about 15 months of hot operating experience with more than 6 weeks above 20% power, which is substantially more than that recommended in Generic Letter 84-16.

Brunswick Steam Electric Plant, Unit 1 On July 31, 1985, while in the refueling mode with the vessel defueled, the Unit 1 core s Three diesel generators (DGs) pray system had an auto start.

started and a Group 1 isolation occurred (the fourth DG was out for repair). The reactor vessel cavity overflowed and damaged the ventilation system; however, the standby-gas treatment gallons of water were emitted through the spray)p (approximately 22,000 system was started. The building drain backed u The event was terminated on the morning of August 1, 1985. The cause is preliminarily attributed to a triple lo level signal received during the venting of the variable leg on a le:cl transmitter as a part of a plant modification.

Cleanup is in progress and the event cause is being investigated by the licensee and the Resident Inspector.

ENCLOSURE B AUG B 1983

S NRC TMI PROGRAM 0FFICE WEEKLY STATUS REPORT WEEK ENDING AUGUST 2, 1985 1.

PLANT STATUS The facility remains in long term cold shutdown with the Reactor CoolantSystem(RCS)ventedtothereactorbuildingatmosphereand the reactor vessel head and plenum assembly removed from the reactor vessel.

The plenum is on its storage stand in the deep end of the fuel transfer canal. A dam has been installed between the deep and shallow ends of the fuel transfer canal. The deep end is filled with water to a depth of about 20 feet (about 5 feet above the top of the plenum).

The modified internals indexing fixture is installed on the reactor vessel flange and is flooded to elevation 327 feet 6 inches (151 feet above the top of the core region).

Calculated reactor decay heat is less than 12 kilowatts.

RCS cooling is by natural heat loss to the reactor building ambient atmosphere.

Incore thermocouple readings range from 71*F to 90 F with an average of 80*F.

Average cold leg temperature is 57 F.

The average reactor building temperature is 59 F.

The reactor building airborne activity is 2.6 E-9 uCi/cc Tritium and 3.4 E-10 uCi/cc particulate, predominantly Cesium 137.

2.

WASTE MANAGEMENT The Submerged Demineralizer System (SDS) and EPICOR II were shutdown this period.

Total volume processed through SDS to date is 2,963,375 gallons, and the total volume processed through EPICOR II is 2,547,671 gallons.

ENCLOSURE B AUG 2 1985

. ~,.. _ _ _ _ _ _ _ _ -. _ _ _. - _

2 3.

DOSE REDUCTION / DECONTAMINATION ACTIVITIES Decontamination activities are continuing on the 281' level of the Auxiliary Building.

Aierage general area radiation dose rate is 40 mrem per hour on the 347' level of the reactor building and is 67 mrem per hour on the 305' level of the reactor building. The change in radiation levels from previous reports is the result of a change in the manner in which the average radiation level is determined. The averages are new based on occupancy time-weighting of tasks accomplished in the reactor building as opposed to the previous method of averaging survey meter readings. The new values are based on an attempt to report radiation levels representative of those to which workers are actually exposed.

4.

ENVIRONMENTAL MONITORING EPA sample analysis results show TMI site liquid effluents to be in accordance with regulatory limits, NRC requirements, and the City of Lancaster Agreement.

TMI water samples taken by the US Environmental Protection Agency at the plant discharge to the river consisted of seven daily composite samples taken from July 13, to July 20, 1985.

Gamma scans detected no reactor related radioactivity.

The Lancaster water sample taken at the water works intake and analyzed by the US Environmental Protection Agency consists of a seven day composite sample taken from July 21 to July 28, 1985. A gamma scan detected no reactor related radioactivity.

The NRC outdoor airborne particulate sampler at the TMI Site collected a sample between July 25, and July 31, 1985. No reactor related radioactivity was detected. Analysis showed I-131 and Cs-137 concentrations to be less than the lower limits of detectability.

5.

REACTOR BUILDING ACTIVITIES Installation of the rotating work platform and service platform continued over the reactor vessel.

Equipment was staged into the reactor building and installation began on the cable management system.

Work continued in support of installation of the reactor building service platfonn jib cranes.

Loop calibration of DWCS instrumentation and final preparations for system preoperational testing continued this week.

6.

AUXILIARY AND FUEL HANDLING BUILDING ACTIVITIES Installation of the DWCS continued.

Partial DWCS turnover for processing RCS during early defueling is scheduled to be completed in late August.

The first of four fuel canister racks are on site with further celiverier schedcled thrcuch Aucest.

ENCLOSURE B AUG 21985

r __ _

3 7.

TMI-2 OCCUPATIONAL DOSE Total person-rem for January through June 1985 is 398. Total for March 1979 through June 1985 is 2,417 person-rem.

8.

SHIPMENTS DURING JULY 1985 Shipments of contaminated laundry were made to Royersford, PA on:

66 drums, 2 boxes July 3 112 drums, 2 boxes July 16 63 drums, 3 boxes July 24 68 boxes July 31 July 2 - Liquid samples (Unit 1) to San Jose, California.

July 2 - Liquid samples (Unit 1) to Rockville, Maryland.

July 3 - Electrical equipment samples (Unit 2) to Richland, Washington.

July 3 - Electrical equipment samples (Unit 2) to Scoville, Idaho.

July S - Liquid samples (Unit 1) to Rockville, Maryland.

July 18 - Three solidified resin liners (Unit 1) to Hanford, Washington.

July 18 - 104 drums (Unit 1 and 2) compacted and non-compacted waste to Hanford, Washington.

July 26 - 28 Boxes of uncompacted shield blocks to Hanford, Washington.

9.

NRC EVALUATIONS IN PROGRESS Defueling W)ater Cleanup System Technical Evaluation (including Revision 6.

Technical Specification Change Requests numbers 46, 48, 49, and 50.

Recovery Operations Plan Change numbers 27, 29, 31, and 32.

Fuel Canister Technical Evaluation.

Fuel Handling Senior Reactor Operator Training Program.

Defueling Safety Evaluation.

Application for seismic exemption.

The NRC Vendor Programs Branch performed an inspection at the Nuclear Energy Services (NES) facility in Greensboro, North Carolina, where the fuel storage canisters, fuel storage racks, and fuel canister transfer shields are being fabricated. The inspection examined construction activities and included a review of the implementation of the quality assurance program at NES. The inspection report, issued July 26, 1985, indicates that NES failed to meet certain NRC requirements related to implementation of its quality assurance program.

NESisrequiredtosubmit(1)a description of steps that have been or will be taken to correct those items identified in the report; (2) a descriptiortof the steps that have been or will be taken to prevent recurrence; and (3) the dates that the corrective actions and preventive measures were or will be completed.

10.

PROJECTED SCHEDULE OF FUTURE EVENTS ENCLOSURE B U"

US "*I N

  • DS' 2
  • AUG 2 1985 ~

4

11. PUBLIC MEETING The next meeting of the Advisory Panel for the Decontamination of Three Mile Island Unit 2 is scheduled for September 1985 at a location in Annapolis, Maryland, the specific date and location will be identified later.

ENCLOSURE B AUG 2 1985

OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS Items of Interest Week Ending August 2, 1985 Near Term NRC Actions Under the Nuclear Waste Policy Act (NWPA)

Section:

301 of NWPA Action:

The Final Mission Plan was submitted to Congress by DOE on July 9, 1985.

As required by NWPA, DOE published a notice in the Federal Register on July 12, 1985 (50 FR 28446) concerning their response to NRC objections on the draft Mission Plan.

Status:

Although there is no PNPA requirement for NRC action on the Final Mission Plan, NRC staif is currently preparing comments for the Commission for their information, in light of the tremendous impact the Final Mission Plan has on NRC programs.

SeUlion:

114(e) of NWPA Action:

The NRC received DOE Draft Project Decision Schedule on July 18, 1985.

Status:

Comments are due to DOE on September 13, 1985.

NRC staff are cur-rently preparing comments, which will be provided to the Commission in mid-August.

Merger of Nuclear Pharmacy Inc. (NPI) and Syncor International Corporation (Syncor)

On July 25, 1985 NRC gave its for.4.al approval to the merger of NPI and Syncor, which operate commercial nuclear pharmacies throughout the United States.

The two companies hold more than 30 licenses issued by NRC and about 50 licenses issued by Agreement States.

ENCLOSURE C AUG 2 1985

OFFICE OF INSPECTION AND ENFORCEMENT Items of Interest Week Ending August 2, 1985 1.

The following Significant Enforcement Actions were taken during the past week:

a.

EN 85-01A, Imposition of Civil Penalty in the amount of $50,000 was issued July 29, 1985 to Florida Power Corporation (Crystal River Unit 3). The licensee responsed to the Notice of Violation and Proposed Imposition of Civil Penalty (EA 85-01) in a letter dated March 1, 1985. After consideration of the licensee's response, the staf concludes that the violations did occur and that mitigation of the proposed Civil Penalty is not appropriate. This action involved two violations where the licensee failed to fully implement and maintain in effect the provisions of the Commission approved physical security plan. These violations were the result of the licensee's failure to take adequate corrective actions when the problems were previously identified.

b.

EN 85-06A, Imposition of Civil Penalty in the amount of $21,425 was issued July 30, 1985 to Omaha Public Power District (Fort Calhoun).

The licensee responded to the Notice of Violation and Proposed Imposition of Civil Penalty (EN 85-06) in a letter dated March 15, 1985. After consideration of the licensee's response, the staff concludes that one of the violations should be withdrawn because of ambiguity in the planning documents. Because the staff feels this area to be important, the matter will be addressed as a licensing issue. This action involved multiple violations concerning the failure to maintain site security as specified in the licensee's Physical Security Plan.

In addition, two violations were identifed which concerned physical aspects of the facility which did not meet the requirements of 10 CFR Part 73.

2.

The following IE Preliminary Notifications were issued during the past week:

a.

PNO-I-85-51A, Duquense Light Company (Beaver Valley Unit 1),

Potential Tampering with Diesel Generator (Update)_.

b.

PN0-I-85-53, Long Island Lighting Company (Shoreham), Reactor Scram Signal Due to Low-Water Level.

PNS-I-85-11, Niagara Mohawk Power Corporation (Nine Mile Point Unit 1),

c.

Security Guard Terminated for Suspected Drug Use.

d.

PN0-II-85-70B, Florida Power and Light (St. Lucie Units 1 & 2);

Georgia Power Company (Hatch Units 1 & 2); Carolina Power and Light Company (Brunswick Units 1 & 2); and General Electric Company (Wilmington, NC), Actions in Response to Tropical Storm " Bob" (Update).

ENCLOSURE D AUG 2 1985

' e.

PN0-II-85-71A, Georgia Power Company (Hatch Unit 1), Unscheduled Shutdown Greater Than 48 Hours (Update).

f.

PN0-II-85-72, University of North Carolina (Chapel Hill, NC), Stolen Refrigerator with Low-Level Contamination.

g.

PN0-II-85-73, Tennessee Valley Authority (Browns Ferry Unit 3), Media Interest in Minor Transofrmer Fire.

h.

PNO-II-85-74, Tennessee Valley Authority (Sequoyah Unit 2), Minor Contamination of Employees From Leaking Primary Coolant Sample Line.

1.

PNO-III-85-65, Union Electric Company (Callaway), Possible Tampering.

j.

PN0-III-85-65A, Union Electric Company (Callaway), Possible Tampering (FirstUpdate).

k.

PNO-III-85-66, Detroit Edison Company (Fermi Unit 2), Both Diesel Generators Inoperable.

1.

PN0-III-85-67, Detroit Edison Company (Fermi Unit 2), Temporary Halt to Low Power Testing, PN0-V-85-49, Southern California Edison Company (San Onofre),

m.

Greenpeace Blockade of Waste Shipment.

n.

PNO-V-85-50, Arizona Nuclear Power Project (Palo Verde Unit 2),

Potential Unauthorized Operation of Equipment.

3.

The following IE Information Notices were issued during the past week:

a.

IE Information Notice 85-64, BBC Brown Boveri Low Voltage K-Line Circuit Breakers, with Deficient Over Current Trip Devices Models 00-4 and 5 was issued July 26, 1985 to all nuclear power reactor facilities holding an operating license or construction permit, b.

IE Information Notice 85-65, Crack Growth in Steam Generator Girth Welds was issued July 31, 1985 to all nuclear power pressurized water reactor facilities holding an operating license or a construction permit.

ENCLOSURE D AUG 2 1985

. 4.

Other Items a.

Senior Management Meeting Director, IE was in Region IV July 31, 1985 to discuss Houston Lighting and Power Company's (HL&P) proposed program for review of the law suit record of HL&F vs. Brown & Root.

b.

Technical Training Center Director, Division of Quality Assurance, Vendor, and Technical Training Programs, was at the Technical Training Center (TTC),

Chattanooga, TN August 1-2, 1985 for meetings with the TTC staff and Commissioner Bernthal.

c.

Vendor Program The following vendor inspection was conducted this week:

Research Dynamics, Cincinnati, OH. To observe LOCA testing on PORV leak detector manufactured by NTD International for South Texas project and to review associated data and followup on corrective action from previous inspection.

d.

Construction Appraisal Team (CAT) Inspection The CAT inspection for Byron Unit 2 is scheduled for August 19-30, and September 9-20, 1985.

e.

Seismic Qualification of Equipment A representative of the Engineering and Generic Communications Branch, Division of Emergency Preparedness and Engineering Response attended a meeting on proposed requirements for seismic qualifica-tion of equipment in operating nuclear power plants in Williamsburg, VA August 1-2, 1985.

f.

Civil Penalty Paid On July 26, 1985 payment in the amount of $500 was received from Geo-Mechanics (Elizabeth, PA) for enforcement action (EA-85-62) relating to violations involving inadequate control and oversight of the radiation safety program.

ENCLOSURE D MG 2 1985

. g.

Part 21 Notification NRC was notified on July 19, 1985 of a possible Substantial Safety Hazard in accordance with 10 CFR Part 21 by Technology for Energy Corporation (TEC). The report deals with TEC model 914-1 Valve Flow Monitor Modules (Acoustic). These modules are acoustic monitors used to indicate whether valves are open or closed. The problem is a possible " latch-up" of the module in which it fails to reset after indicating full flow through the valve.

If it " latches up," the monitor will continue to show that the valve is open after it has been closed.

Purchasers of the monitors will be notified by the vendor. Those plants mentioned in the vendor notification are:

Bellefonte, Browns Ferry, Calvert Cliffs, Catawba, Clinton, Davis-Besse, Diablo Canyon, Ft. Calhoun, Indian Point 2 & 3, McGuire, Oconee, Palo Verde, Pilgrim, Rancho Seco, San Onofre, Sequoyah, St. Lucie, Susquehanna, Turkey Point, Trojan, Watts Bar, and WNP-2.

h.

Intergranular Stress Corrosion Cracking (IGSCC) Detection Representative of the Engineering and Generic Communications Branch, Division of Emergency Preparedness and Engineering Response was at the EPRI-NDE Center, Charlotte, NC from July 25-26 for qualifica-tion of NDE personnel from Cymar Company in IGSCC detection utilizing automated systems.

1.

Emergency Preparedness Two representatives of the Emergency Preparedness Branch, Division of Emergency Preparedness and Engineering Response participated in a meeting in Region I this week with Millstone 3 personnel to discuss licensing issues and the results of a recent onsite emer-gency preparedness inspection.

j.

Quality Assurance (1) Representatives of the Quality Assurance Branch, Division of Quality Assurance, Vendor, and Technical Training Programs conducted an inspection of implementation of design aspects of the Vogtle Readiness Review Program July 29-August 2, 1985 at Bechtel Power corporation offices in Los Angeles, CA.

ENCLOSURE D AUG 21985

. - =.

. (2) Representatives of the Quality Assurance Branch, Division of Quality Assurance, Vendor, and Technical Center Training Programs participated in a public meeting on July 31, 1985 in Bethesda, MD with Public Service Electric and Gas Company and Sargent & Lundy concerning completion of the Hope Creek IDVP.

(3) Representatives of the Quality Assurance Branch visited the Millstone 3 Nuclear Pcwer Plant site on July 30, 1985 in conjunction with inspection activities associated with the Millstone 3 Engineering Assurance Plan.

k.

Comanche Peak Reinspection Chief and representatives of the Reactor Construction Branch, Division of Inspection Programs were in Region IV July 30-August 1, 1985 planning for NRC inspection of the Comanche Peak site reinspec-tion programs.

1.

Outage Inspection Program Representatives of the Reactor Construction Branch were at Ft. Calhoun July 29-30, 1985 to obtain work package information for the outage l

inspection program.

m.

Training Course- " Medical Uses of Isotopes" Representative of the Safeguards Materials Program Branch, Division of Inspection Programs was a lecturer at the training course on

" Medical Uses of Isotopes" held in San Antonio, TX this week.

n.

Program Assessment Representative of the Safeguards Materials Program Branch accom-panied Region III staff on an inspection of the construction engineering facility in Hematite, M0.

o.

Spent Fuel Transportation Seminar Representative of the Safeguards Materials Program Branch attended and was a lecturer for several sessions of the NRC/ DOT Spent Fuel Transportation Seminar in Chicago, IL.

p.

Dry Storage of Spent Fuel Representatives of the Safeguards Materials Program Branch parti-cipated in a preliminary walk-through review with NMSS' planned operations for dry storage of spent nuclear fuel at the Surry Nuclear Power Plant site, VA on July 30, 1985.

ENCLOSURE D AUG 21985

~

crr: :

c,. q :: :r-, - :. :::3 9 l

{.

Items of :nteres:

Week Ending August 2, 1985

}

i J

)

20/30 4

4 Construction of the Upper Plenum Test Facility (UPTF) in Maanheim, FRG, has now been completed four years after the detailed plans were fonnu-i lated.

It is a full-scale test facility containing the reactor vessel l

l and 4 loops with steam-water separators (simulating steam generators),

i pump simulators, and extensive instrumentation.

Much of this J

instrumentation has been supplied by the U.S.

The reactor vessel has all of the components, except the core, which is simulated by injecting steam and water into the vessel.

The UPTF is now undergoing shake-down testing to verify its operation and the performance of the extensive instrumentation.

The shakedown testing will be completed by the end of this calendar year, and the first main i

test will be run early next calendar year.

?

j The UPTF will be operated in parallel with the Japanese Slab Core Test

.# mergency(Core Cooling System (ECCS) rule, as well as to assess bes Facility E

estimate computer codes which will be used to fulfill the requirements of the proposed ECCS rule revision.

i i

Multi-Loop Integral System Test (MIST)

The MIST testing program is designed to provide thermal hydraulic data related to small-break loss-of-coolant accident (LOCA) transients to 1

i benchmark Babcock and Wilcox Company (B&W) analysis models.

Installation and brazing of the core heaters for the MIST program was successfully completed. The complete core simulator consists of 45 heater rods, with only 35 of them being required to provide the needed power for testing.

Lehigh University The purpose of the Lehigh University Post-Critical Heat Flux (CHF) Heat Transfer experiment is to provide data to assess post-CHF correlations used in nuclear reactor systems codes. A report entitled " Assessment of i

Post-Critical Heat Flux Models with Lehigh Nonequilibrium Data" is being published by the NRC (NUREG/CR-4353).

This report presents a comparison of convective film boiling model predictions to the Lehigh single tube post-CHF experimental data.

I ENCLOSURE E l

AUG 2 1985 1

- = - -

CIRRPC Subpanel Meeting on VA Use of Radioepidemiological Tables On July 25 a subpanel of the Comittee on Interagency Radiation Research and Policy Coordination (CIRRPC) met to discuss the possible use of the recently published NIH Radioepidemiological Tables by the Veteran's Administration as a guide on compensation for claimed radiogenic cancers.

The VA has received many such claims and requested advice from CIRRPC in connection with a proposed rule which outlines procedures for dealing with these claims.

Based on the information in the Tables, the subpanel l

is attempting to derive quantitative criteria for the VA which will allow them to reject clearly nonmeritorious claims.

It was determined that additional study of the uncertainties inherent in the Tables was necessary before a reply to the VA can be finalized.

Dr. Jerome S.

Puskin, RES, represented NRC at the subpanel meeting.

New Method of Calculating Skin Dose i

NRC regulations establish a quarterly skin dose limit, but no NRC guidance has been issued on the technically difficult subject of determining the skin dose from the measured radioactive contamination deposited on the skin. Battelle's Pacific Northwest Laboratory, under contract to the NRC, has developed a new, improved method of calculating skin dose due to fission and radioactive corrosion products' skin contamination.

Battelle has also recomended skin contamination levels below which further decontamination should not be required.

These levels are expressed in units that can be readily measured using comercially available instrumentation.

The calculational method can be implemented using a computer code (VARSKIN) that can compute the radiation dose at a specified depth in the skin for radiation sources ranging in size from a point to

~

i a disk of 100-cm diameter. A com) uter diskette containing VARSKIH, which is compatible with the IBM-PC, is on file with R. B. Neei, Project i

Manager, Occupational Radiation Protection Branch, DRPES, RES.

The results of this research will be published as a NUREG/CR document, " Dose Calculation for Contamination of the Skin," in the next few months and will be considered for use as the basis for developing an NRC Regulation Guide on this subject.

Recently Issued Publication Draft Regulatory Guide and Value/ Impact Statement: Proposed Revision 1 to Regulatory Guide 3.52, " Standard Fomat and Content for the Health and Safety Sections of License Renewal Applications for Uranium ProcessiHg and Fuel i

Fabrication" Task CE 308-4. Comments requested by September 27,1985.

Contact:

W. R. Pearson (301) 443-7663.

)

t

]

ENCLOSURE E AUG 2 1985 i

ITEMS OF INTEREST OFFICE OF INTERNATIONAL PROGRAMS WEEK ENDING AUGUST 2, 1985 International Meetings The following international meeting notices supplement those previously announced:

October 21-25, 1985, Vienna, Austria - IAEA Technical Committee on the Assessment of the Radiological Impact from the Transport of Radioactive Materials October 21-25, 1985, Vienna, Austria - IAEA, OECD, WHO and ILO Advisory Group Meeting on General Principles for Exemption from the Basic Safety Standards for Radiation Protection November 18-22, 1985, Mexico - IAEA Advisory Group Meeting to Prepare a Safety Series Document on the Safe Use of Industrial Radiation Sources November 18-22, 1985, Vienna, Austria - IAEA Technical Committee on the Siting of Research Reactors April 14-18, 1986, Tokyo, Japan - NEA Symposium on Reducing Reactor Scram Frequency April 15-17,1986, Tokyo, Japan - 2nd International Topical Meeting on Nuclear Power Plant Thermal Hydraulics and Operations Foreign Visitors On Tuesday Mr. Masamitsu Kumada, the Washington Representative of the Kansai Electric Power Company of Japan, had a brief courtesy call with NRR Director H. Denton and NRR Deputy Director D. Eisenhut on the occasion of his departure and to introduce his successor Mr. Tetsuji Kishida.

Foreign Trip Reports L. G. Hulman, Chief, Accident Evaluation Branch, DSI/NRR April 19-26, 1985; Visited the People's Republic of China:

Mr. Hulman participated in an IAEA-sponsored training course in reactor safety in Beijing, PRC. He gave three lectures and participated in several others.

ENCLOSURE G AUG 2 1985

2 Foreign Trip Reports continued M. Wayne Hodges, Section Leader, Reactor Systems Branch, NRR May 9-15, 19E5; Visited the People's Republic of China:

Mr. Hodges participated in the IAEA course on Safety Analysis of Nuclear Power Plants in Beijing, PRC. He gave two lectures--one on accident analysis and one on computer codes. A number of the questions from the students pertained to the philosophy for design and operation as well as analysis.

Daniel B. Jones, Division of Human Factors Safety, NRR June 3-7, 1985; Visited Sweden:

Mr. Jones participated in the Halden Program Meeting on Computerized Man-Machine Communication and in the Halden Program Group Meeting. The nuclear industry is implementing computer applications in process control, procedures, plant protection nonitoring, and control room operations. The Halden Program Group met on June 7 to review the status of 1985 programs.

H. Brent Clayton, Section Leader, Division of Human Factors Safety, NRR June 10-21, 1985; Visited Yugoslavia:

As a follow up to the mission in February of this year, Mr. Clayton undertook a second mission to Yugoslavia, as an IAEA expert, to assist the J. Stefan Institute in upgrading the abnormal and emergency procedures for the Krsko plant.

l i

AUG 2 1985 ENCLOSURE G

OFFICE OF STATE PROGRAMS ITEMS OF INTEREST WEEK ENDING AUGUST 2, 1985 Florida Review A review of the Florida radiation control program will begin August 12, 1985.

California's Low-Level Radioactive Waste Disposal On July 19, 1985, the Superior Court of California issued its final decision in the case of Chem-Nuclear Systems, Inc. vs. the California State Department of Health Services regarding California's selection process for a licensee designee to develop and operate a low-level radioactive waste disposal site.

This decision reaffirms the tentative decision that was reported in the weekly report for the Week Ending April 19, 1985. The main provisions of the Court decision are:

1.

The Department of Health Services cease all activity with regard to the second round of proposals for licensee designee.

1 2.

The determinations by the former director DHS, that Chem-Nuclear, US Ecology and Pacific Nuclear - Morrison Knudsen were not likely to satisfy California's requirements due to technical deficiency are set aside as void.

3.

The present Director shall determine as to whether each of the applicants named in Item 2 above is likely to file an application satisfying California's requirements.

~

4.

If one or any of the applicants in Item 2 above are satisfactory, the Director is to rank the applicants.

The Director is then to notify the highest ranked applicant of the selection and follow the procedures for selection.

AUG 2 1985 ENCLOSURE H

0FFICE FOR ANALYSIS AND EVALUATION OF OPERATIONAL DATA ITEM 0F INTEREST WEEK ENDING AUGUST 2, 1985 Ernie Rossi, NRC Team Leader for the investigation of the June 9 loss of feedwater event at Davis-Besse, briefed the ACRS on Wednesday, July 31, 1985.

The briefing covered the Team's report, including the Team's activities, event description, equipment malfunctions, operator actions, human factor considera-tions, and findings and conclusions.

The Davis-Besse Team has now disbanded, and the individuals have returned to their normal duties.

d 6>=

AUG 2 1985 ENCLOSURE J

OFFICE OF SMALL AND DISADVANTAGED BUSINESS UTILIZATION / CIVIL RIGHTS Item of Iterest Week Ending August 2, 1985 Small and Disadvantaged Business Utilization Program The House Subcommittee on Small Business conducted a 3-day hearing on a bill to legislatively establish size standard eligibility for small business set-aside contracts. The major thrust of the legislation would require that all size standards shall be designed to promote maximum competition and inhibit government contracts with few or limited sources. Testimony was received from industry, SBA, and the Department of Defense on July 30, 31, and August 1,1985.

Civil Rights Program At the request of the Region II Administrator, the Director, Office of Small and Disadvantaged Business Utilization and Civil Rights, and two of his senior staff participated in a 2-day work session on management /EE0 matters. The work sessions, held on July 24-25, 1985, focused on the overall Agency's Civil Rights Program and the specific objectives of EE0/ personnel initiatives of regional managenent.

ENCLOSURE K AUG 2 E65

- ~ - - - - -

r.

4 ITEMS ADDRESSED BY THE COMMISSION - WEEK ENDING AUGUST 2, 1985 i

A.

SECY-85-245 - PROPOSED LICENSE TO EXPORT NUCLEAR GRADE GRAPHITE TO TO JAPAN (XMAT0319) - SECY Hemo to W. J. Dircks dated 7/30/85 i

This is to advise you that the Commission (with all Commis-sioners agreeing) has approved the proposed license to export 6,360 pounds (2,890 kilograms) of nuclear grade graphite to

Japan, t

i B.

SECY-85-230 - PROPOSED LICENSE TO EXPORT COMP 0NENTS TO THE MONJU FAST BREEDER REACTOR IN JAPAN (XCOM0988) Memo SECY to W. J. Dircks dated 7/30/85 This is to advise you that the Commission (with all Commis-sioners agreeing) has approved the proposed license to export components for use in the MONJU fast breeder reactor in Japan.

C.

STAFF REQUIREMENTS - AFFIRMATION / DISCUSSION AND VOTE, 3:30 P.M., WEDNESDAY, JULY 24, 1985, COPHISSIONERS' CONFERENCE ROOM, D.C. OFFICE (OPEN TO PUBLIC ATTENDANCE) Memo SECY to H. H. E. Plaine dated 7/31/85 4

I.

SECY-85-139/139C - Disposition of Hearing Requests Regarding Materials License Amendments a

The Commission, by a 4-1 vote (Commissioner Roberts disapproving),

approved issuing orders responding to requests for hearings in three materials licensing cases as follows:

1.

Amendment of B&W license to allow operation of special nuclear material volume reduction services at its Parks Township, Pennsylvania Facility.

2.

Application of Precision Materials Corp. for new license to operate irradiator facility at Mine Hill, New Jersey.

s 3.

Amendment of Sequoyah Fuels Corporation license to add facilities at its existing Sequoyah plant in Gore, Oklahoma, to allow conversion of depleted uranium hexafluoride to depleted uranium tetrafluoride.

The orders refer the hearing requests to the Licensing Board for disposition by a single Administrative Judge.

Commissioner Roberts had dissenting views which were attached to-the orders.

(Subsequently, on July 24, 1985 the Secretary signed the orders.)

i

)

ENCLOSURE 0 q'

  • m

. i C.

CONTINUED II.

SECY-85-228 - Limerick Generating Station, Units 1 and 2, Immediate Effectiveness Review The Commission, by a 5-0 vote, approved an order indicating that the Commission has reviewed the comments by Limerick Ecology Action and the ASLAB partial initial decisions, LBP-84-31 and LBP-85-14 and found that there is nothing which warrants staying the effectiveness of LBP-84-31 and LBP-85-14.

(Subsequently, on July 24, 1985 the Secretary signed the order.)

III.

SECY-85-253 - Applicant's Request for Exemption from 10 CFR Part 50, Appendix E (IV) (F) (1)

The Commission, by a 5-0 vote, approved an order referring a request from Philadelphia Electric Company for an exemption from 10 CFR Part 50, Appendix E (IV) (F) (1) (which requires a full participation emergency exercise within the one year period prior to the issuance of a full-power operating license) to the Director of Nuclear-Reactor Regulation for a decision. (NRR)

(Subsequently, on July 24, 1965 the Secretary signed the order.)

D.

STAFF REQUIREMENTS - BRIEFING ON ACCIDENT SOURCE TERM REASSESSMENT, 10:00 A.M., WEDNESDAY, JULY 24, 1985, COMMISSIONERS' CONFERENCE ROOM, D.C. 0FFICE (OPEN TO PUBLIC ATTENDANCE) Memo SECY to RECORD dated 8/1/85 The Commission met with the staff to discuss staff's program on source term reassessment including staff's progress in source term research, advances in the source term computer model and i

staff's progress on completion of NUREG-0956 and NUREG-1150.

The staff advised the Commission that NUREG-0956 would be issued for public comment and available to the Commission in early August 1985, and that NUREG-1150 would be available by March or April 1986.

The Commission requested quarterly briefings by the staff on source term developments.

ENCLOSURE 0 AUG 21985

E.

STAFF REQUIREMENTS - BRIEFING BY GEORGIA POWER (V0GTLE) ON OPERATIONAL READINESS REVIEW PILOT PROGRAM, 10:00 A.M., FRIDAY, JULY 26, 1985, COPNISSIONERS' CONFERENCE ROOM, D.C. OFFICE (OPEN TO PUBLIC ATTENDANCE)

Fiemo SECY to RECORD dated 8/2/85 The Commission met to be briefed by representatives of the Georgia Power Company on their Readiness Review Pilot Program.

The following persons participated in the briefing:

Robert W. Scherer, Chairman and CEO Georgia Power Company Paul D. Rice, Vice President, Quality Assurance Georgia Power Company I

f James H. Miller, Jr., President Georgia Power Company Richard J. Kelly, Executive Vice President, Power Supply Georgia Power Company William C. Ramsey, Readiness Review Program Manager Vogtle Project The Commission also heard a statement made by Billie Garde of the Government Accountability Project in behalf of intervenors in the Vogtle proceeding.

There were no requirements at this meeting.

f ENCLOSURE 0 AUG

' ivoo 4

E cn na NRR MEETING NOTICES

  • gg AUGUST 2, 1985 u,

DOCKET APPLICANT /

DATE/ TIME NUMBER LOCATION PURPOSE ATTENDEES NRR CONTACT 8/5/85 50-302 P-114 To discuss licensee's pro-Florida Power Corp.

H. Silver 1:00 pm Bethesda posed exemption to GDC-4 for RCP supports 8/5/85 50-410 Nine Mile 2 Site Discussion of NMP-2 First Niagara Mohawk Power M. Haughey 12:00 Noon Scriba, NY Technical Specifications 8/7/85 Room 144 To discuss status of licensing Niagara Mohawk Power M. Haughey 10:00 am Phillips Bldg.

issues for Nine Mile Point 2 Bethesda 8/8/85 50-387/388 P-114 To discuss development of Pennsylvania Power M. Campagnone 10:30 am Bethesda transient analysis and core

& Light Co.

8/8/85 50-354 Hope Creek Site Electrical audit of Hope Creek Public Serv. Elec.

D. Wagner 3:00 pm Lower A110 ways Creek Township, NJ 8/12/85 50-309 P-110 To discuss generic fuel loads Maine Yankee Atomic P. Sears 1:00 pm Bethesda for Maine Yankee PLEASE BE ADVISED THAT DAILY RECORDING CAN BE HEARD ON 492-7166

  • Copies of summaries of these meetings will be made publicly available and placed in the respective docket fite(s) in the NRC and local public document rooms.

E P8 C

m v

e

E c>

NRR MEETING NOTICES

  • c:

O US DOCKET APPLICANT /

DATE/ TIME NUMBER LOCATION PURPOSE ATTENDEES NRR CONTACT 8/13/85 50-387/388 MNBB-6507 To discuss possible NRC review Pennsylvania Power &

M. J. Campagnone 10:30 am Bethesda of Susquehann's completed PRA Light l

}

l I

i

)

PLEASE BE ADVISED THAT DAILY RECORDING CAN BE HEARD ON 492-7166

  • Copies of summaries of these meetings will be made publicly available and placed in the respective docket file (s) in the NRC and local public document rooms.

9 P8

!5, n

t 7

I t

E MSS EETING NOTICES DIVISION OF WASTE Mall 4GEMENT Week Ending August 2, 1985 w

m 8?

~

DOCKET ATTENDE'ES/

DATE/ TIE NUfBER LOCATION PURPOSE APPLICATION NRC CONTACT 8/20-21/85 Willste Bldg To discuss with the DOE NRC staff PElackford, WMGT Room 106-110 their document " Rationale DOE staff for Seismic / Tectonic Investigations for Licensing a Nuclear Waste Repos itory DIVISION OF FUEL CYCLE AND MATERIAL SAFETY 8/6/85 Project Willste DOE briefing on MRS.

Reps of NMSS, Rouse 10:30 am it-38 9th floor IE, RES, conf room ELD, DOE 8/14-16/85 Lake Geneva, Working Group participant in Reps of Battelle Roberts Wisconsin ANS-57.7 Reconfirmation Pacific Northwest lieeting.

Labs.

~

J. Roberts (FC)

DIVISION OF SAFEGUARDS j

fione.

i..

I g

n un C

E c'

RES MEETING NOTICES August 2,1985

[

DOCKET ATTENDEES /

g DATE/ TIME NUPBER LOCATION PURPOSE APPLICANT NR_C IONTN 8/19 NL-5650 To conduct program review on status Blackman,INEL Au 9:00 AM of FIN No. A6394 and A6826 - Plant Norberg,RES Procedure Research at INEL Au, RES 8/20 GPC To review draft report of Schroeder,GPC Au 9:00 AM Colunbia,MD Procedures Interface Issues Couley, GPC Au, RES Bongarra,NRR Blackman.INEL 3/22 Wills te Review statistical analysis of Emeigh,NMSS Abramson 9:00 AM recurririg loss Picard,LASL Tingey Abramson l

t

=

P S

5 I

_ _ _ _ _ _ _