{{#Wiki_filter:1 P
{{#Wiki_filter:1 P
February 7, 1997 i
February 7, 1997 i
l 1
Mr. S. A. Patuiski Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241
Mr. S. A. Patuiski                                                                           (
Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241


==Dear Mr. Patuiski:==
==Dear Mr. Patuiski:==
In a telephone conversation between Mr. D. McNeil, and Mr. P. Smith, arrangements were made for the administration of licensing re-examinations at the Point Beach Nuclear Plant.
In a telephone conversation between Mr. D. McNeil, and Mr. P. Smith, arrangements were made for the administration of licensing re-examinations at the Point Beach Nuclear Plant.
The operating re-examinations are scheduled for the week of May 12,1997. Your staff will be given an opportunity to review the licensing re-examinations in accordance with the guidelines in Revision 7 of NUREG-1021, " Operator Licensing Examiner Standards,"
The operating re-examinations are scheduled for the week of May 12,1997. Your staff will be given an opportunity to review the licensing re-examinations in accordance with the guidelines in Revision 7 of NUREG-1021, " Operator Licensing Examiner Standards,"
Line 32: Line 29:
If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires April 30,1997. The estimated average burden is 7.7 hours per response, including gathering, copying and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Mail Stop T-6 F33, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and Budget, Washington, D.C. 20503.
This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires April 30,1997. The estimated average burden is 7.7 hours per response, including gathering, copying and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Mail Stop T-6 F33, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and Budget, Washington, D.C. 20503.
9702140306 970207 PDR   ADOCK 05000266 V                     PDR
9702140306 970207 PDR ADOCK 05000266 V
PDR


i l
i l
l
S. A. Patulski 2
  .                                                                                                                                  l S. A. Patulski                                             2                             February 7, 1997                       l l
February 7, 1997 Thank you for your consideration in this matter. Mr. Smith has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and requirements, please contact R. Max Bailey at (630) 829-9750.
Thank you for your consideration in this matter. Mr. Smith has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and requirements, please contact R. Max Bailey at (630) 829-9750.
Sincerely, Q.
Sincerely,                                                                   l Q.
ay. Lennartz, Actin C ief 1
ay . Lennartz, Actin C ief                                                 1 Operator Licensing Bra Docket No. 50-266 Docket No. 50-301 cc:     R. R. Grigg, President and                                                                                             l Chief Operating Officer, WEPCo                                                                                       !
Operator Licensing Bra Docket No. 50-266 Docket No. 50-301 cc:
A. J. Cayia, Plant Manager                                                                                             l R. D. Seizert, Training Manager                                                                                         l Virgil Kanable, Chief, Boiler Section Cheryl L. Parrino, Chairman, Wisconsin Public Service Commission State Liaison Officer Distribution:
R. R. Grigg, President and Chief Operating Officer, WEPCo A. J. Cayia, Plant Manager R. D. Seizert, Training Manager Virgil Kanable, Chief, Boiler Section Cheryl L. Parrino, Chairman, Wisconsin Public Service Commission State Liaison Officer Distribution:
Docket File                           Rlli PRR w/enci PUBLIC IE-42                         SRI, Pt. Beach OC/LFDCB                             L. Gundrum, LPM, NRR J. Mc-Barger, DRP                     S. A. Richards, NRR/HOLB DRS l
Docket File Rlli PRR w/enci PUBLIC IE-42 SRI, Pt. Beach OC/LFDCB L. Gundrum, LPM, NRR J. Mc-Barger, DRP S. A. Richards, NRR/HOLB DRS l
t                                                                                                                                   1 140023                                                                                                                   O 1 DOCUMENT NAME: G:\ pol 020]7.0L To receive a copy of this document, indicate in the box *C" = Copy w/o attach / encl *E" = Copy w/ attach /enci"N" = No copy
t 140023 O
;    0FFICE         RIII:DRS .lM               Rill:DRS . l/v                                 l                         l NAME           DMcNeil       A           JLennartz24--                                                                       l DATE           02/ D7 /97                 02/ -) /97                                                                           1 0FFICIAL RECORD COPY}}
DOCUMENT NAME: G:\\ pol 020]7.0L To receive a copy of this document, indicate in the box *C" = Copy w/o attach / encl *E" = Copy w/ attach /enci"N" = No copy 0FFICE RIII:DRS.lM Rill:DRS
. l/v l
l NAME DMcNeil A
JLennartz24--
DATE 02/ D7 /97 02/ -) /97 1
0FFICIAL RECORD COPY}}

Latest revision as of 03:57, 12 December 2024

Confirms Arrangements Made During Telcon Between D Mcneil & P Smith Re Operating re-examinations.Examinations Scheduled for Wk of 970512
ML20134K926
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/07/1997
From: Lennartz J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Patulski S
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 9702140306
Download: ML20134K926 (2)


Text

1 P

February 7, 1997 i

Mr. S. A. Patuiski Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WI 54241

Dear Mr. Patuiski:

In a telephone conversation between Mr. D. McNeil, and Mr. P. Smith, arrangements were made for the administration of licensing re-examinations at the Point Beach Nuclear Plant.

The operating re-examinations are scheduled for the week of May 12,1997. Your staff will be given an opportunity to review the licensing re-examinations in accordance with the guidelines in Revision 7 of NUREG-1021, " Operator Licensing Examiner Standards,"

(ES-201, Attachment 4) during the week of May 12,1997.

The NRC will prepare and administer the operating tests in accordance with ES-301 and ES-302 of NUREG-1021. In order to conduct the requested operating tests,it may be necessary for your staff to make the simulation facility available on the dates noted above.

ES-302, Attachment 1, contains a number of NRC policies and guidelines that will be in effect while the operating tests are being administered.

Your staff should submit preliminary reactor operator license applications and waiver requests at least 30 days before the first examination date so that the NRC will be able to review the applications and the medical certifications and evaluate any requested waivers.

If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Final, signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires April 30,1997. The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, copying and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, Mail Stop T-6 F33, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NEOB-10202, Office of Management and Budget, Washington, D.C. 20503.

9702140306 970207 PDR ADOCK 05000266 V

PDR

i l

S. A. Patulski 2

February 7, 1997 Thank you for your consideration in this matter. Mr. Smith has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and requirements, please contact R. Max Bailey at (630) 829-9750.

Sincerely, Q.

ay. Lennartz, Actin C ief 1

Operator Licensing Bra Docket No. 50-266 Docket No. 50-301 cc:

R. R. Grigg, President and Chief Operating Officer, WEPCo A. J. Cayia, Plant Manager R. D. Seizert, Training Manager Virgil Kanable, Chief, Boiler Section Cheryl L. Parrino, Chairman, Wisconsin Public Service Commission State Liaison Officer Distribution:

Docket File Rlli PRR w/enci PUBLIC IE-42 SRI, Pt. Beach OC/LFDCB L. Gundrum, LPM, NRR J. Mc-Barger, DRP S. A. Richards, NRR/HOLB DRS l

t 140023 O

DOCUMENT NAME: G:\\ pol 020]7.0L To receive a copy of this document, indicate in the box *C" = Copy w/o attach / encl *E" = Copy w/ attach /enci"N" = No copy 0FFICE RIII:DRS.lM Rill:DRS

. l/v l

l NAME DMcNeil A

JLennartz24--

DATE 02/ D7 /97 02/ -) /97 1

0FFICIAL RECORD COPY