tiarch 14, 1997 MEMORANDUM T0: Theodore R. Quay, Director Standardization Project Directorate Division of Reactor Program Management, NRR FROM:                   William C. Huffman, Project Manager                                             original signed by:
.=-
Standardization Project Directorate
tiarch 14, 1997 MEMORANDUM T0: Theodore R. Quay, Director Standardization Project Directorate Division of Reactor Program Management, NRR FROM:
.                                              Division of Reactor Program Management, NRR
William C. Huffman, Project Manager original signed by:
Standardization Project Directorate Division of Reactor Program Management, NRR


==SUBJECT:==
==SUBJECT:==
NOTICE OF MEETING WITH WESTINGHOUSE TO DISCUSS POSSIBLE WATER 1                                             HAMMER EVENTS OBSERVED DURING AP600 TESTING AND APPLICABILITY TO AP600 DATE AND TIME: March 24, 1997 - 10:30 a.m. - 3:30                                       p.m.
NOTICE OF MEETING WITH WESTINGHOUSE TO DISCUSS POSSIBLE WATER 1
LOCATION:               U.S. Nuclear Regulatory Commission Two White Flint North 11555 Rockville Pike Rockville, MD 20852 Room T-9 F5 PURPOSE:                 Westinghouse and NRC-(Research)-to discuss potential water hammer' events observed during AP600 OSU testing, explore possible-occurrences at other testing facilities, and evaluate                                                     !
HAMMER EVENTS OBSERVED DURING AP600 TESTING AND APPLICABILITY TO AP600 DATE AND TIME: March 24, 1997 - 10:30 a.m. - 3:30 p.m.
significance to AP600.                   See attached agenda.
LOCATION:
PARTICIPANTS *i         ILR_q;     ,
U.S. Nuclear Regulatory Commission Two White Flint North 11555 Rockville Pike Rockville, MD 20852 Room T-9 F5 PURPOSE:
                                                                                                      ' WESTINGHOUSE M. D.Marzo (UMCP)                                 ,    G. Piplica                                                 l S. Hou           .                                    D. VanDyne (Contractor)                                   '
Westinghouse and NRC-(Research)-to discuss potential water hammer' events observed during AP600 OSU testing, explore possible-occurrences at other testing facilities, and evaluate significance to AP600.
D. Bessette F. Eltawila -                                 ,
See attached agenda.
PARTICIPANTS *i ILR_q;
' WESTINGHOUSE M. D.Marzo (UMCP)
G. Piplica S. Hou D. VanDyne (Contractor)
D. Bessette F. Eltawila -
P. Griffith (MIT).
P. Griffith (MIT).
B. Huffman,'et al.
B. Huffman,'et al.
Line 33: Line 38:


==Attachment:==
==Attachment:==
As stated cc w/ attachment:                                                                                                                           I See next page
As stated cc w/ attachment:
* Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Reaister 48344, 9/20/94.                                                                       i However, portions of this meeting may be closed to protect Westinghouse                                                                     I proprietary information. Members of the public who wish to attend should                                                                   '
See next page
contact me at (301) 415-1141.
* Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Reaister 48344, 9/20/94.
DISTRIBUTION:
However, portions of this meeting may be closed to protect Westinghouse proprietary information. Members of the public who wish to attend should contact me at (301) 415-1141.
See next page g{ g(hh h j
g{ g(hh h DISTRIBUTION:
DOCUMENT NAME: A:WATR-HMR.N0T T2,eceive e copy of thle document,Indcate in the boa: "C" = Copy without attachment / enclosure   "E* = Copy with attachment / enclosure   "N* = No copy 0FFICE           PM:PDST:DRPM                   BC:RPSB: DST:RES               D:PDST:DRPM                                       l NAME             WCHufRna h F E i tRH a         CN:0 TRQuay 4 f4
See next page j
                                    \
DOCUMENT NAME: A:WATR-HMR.N0T T2,eceive e copy of thle document,Indcate in the boa: "C" = Copy without attachment / enclosure "E* = Copy with attachment / enclosure "N* = No copy 0FFICE PM:PDST:DRPM BC:RPSB: DST:RES D:PDST:DRPM l
DATE             03/)'t /97                     03//4/97                         03/W/97 0FFICIAL RECORD COPY f''' 9703170191 970314 PDR       ADOCK 05200003 u         A                             [PFM
NAME WCHufRna h F E i tRH a CN:0 TRQuay 4 f4
: c. ., .
\\
DATE 03/)'t /97 03//4/97 03/W/97 0FFICIAL RECORD COPY f'''
9703170191 970314 PDR ADOCK 05200003 u
A
[PFM
: c..,
l
l
}     .        Westinghouse Electric Corporation                           Docket No. 52-003 i
}
cc: Mr. Nicholas J. Liparulo, Manager           .
Westinghouse Electric Corporation Docket No. 52-003 i
Mr. Frank A. Ross Nuclear Safety and Regulatory Analysis               U.S. Department of Energy, NE-42 Nuclear and Advanced Technology Division             Office of LWR Safety and Technology Westinghouse Electric Corporation                   19901 Germantown Road P.O. Box 355                                         Germantown, MD. 20874 Pittsburgh, PA 15230
cc: Mr. Nicholas J. Liparulo, Manager Mr. Frank A. Ross Nuclear Safety and Regulatory Analysis U.S. Department of Energy, NE-42 Nuclear and Advanced Technology Division Office of LWR Safety and Technology Westinghouse Electric Corporation 19901 Germantown Road P.O. Box 355 Germantown, MD. 20874 Pittsburgh, PA 15230 Mr. Ronald Simard, Director Mr. B. A. McIntyre Advanced Reactor Program i
;                                                                          Mr. Ronald Simard, Director i
Advanced Plant Safety & Licensing Nuclear Energy Institute Westinghouse Electric Corporation 1776 Eye Street, N.W.
Mr. B. A. McIntyre                                   Advanced Reactor Program
Energy Systems Business Unit Suite 300 i-Box 355 Washington, DC 20006-3706 j
;                      Advanced Plant Safety & Licensing                   Nuclear Energy Institute Westinghouse Electric Corporation                   1776 Eye Street, N.W.
Pittsburgh, PA 15230 Ms. Lynn Connor Ms. Cindy L. Haag Doc-Search Associates Advanced Plant Safety & Licensing Post Office Box 34 j
Energy Systems Business Unit                         Suite 300 i-                     Box 355                                             Washington, DC 20006-3706 j                     Pittsburgh, PA 15230 Ms. Lynn Connor Ms. Cindy L. Haag                                   Doc-Search Associates
Westinghouse Electric Corporation Cabin John, MD 20818 Energy Systems Business Unit l
,                      Advanced Plant Safety & Licensing                   Post Office Box 34 j
Box 355 Mr. James E. Quinn, Projects Manager i
Westinghouse Electric Corporation                   Cabin John, MD 20818 Energy Systems Business Unit l                     Box 355                                             Mr. James E. Quinn, Projects Manager i                     Pittsburgh, PA 15230                                 LMR and SBWR Pr.ograms GE Nuclear Energy
Pittsburgh, PA 15230 LMR and SBWR Pr.ograms GE Nuclear Energy Mr. M. D. Beaumont 175 Curtner Avenue, M/C 165 Nuclear and Advanced Technology Division San Jose, CA 95125 i
!.                    Mr. M. D. Beaumont                                   175 Curtner Avenue, M/C 165 Nuclear and Advanced Technology Division             San Jose, CA 95125 i                     Westinghouse Electric Corporation One Montrose Metro                                   Mr. Robert H. Buchholz
Westinghouse Electric Corporation One Montrose Metro Mr. Robert H. Buchholz 11921 Rockville Pike GE Nuclear Energy
:                      11921 Rockville Pike                                 GE Nuclear Energy
?
?
Suite 350                                           175 Curtner Avenue, MC-781 j                     Rockville, MD 20852                                 San Jose, CA 95125
Suite 350 175 Curtner Avenue, MC-781 j
;                      Mr. Sterling Franks                                 Barton Z. Cowan, Esq.
Rockville, MD 20852 San Jose, CA 95125 Mr. Sterling Franks Barton Z. Cowan, Esq.
:                      U.S. Department of Energy                           Eckert Seamans Cherin & Mellott NE-50                                               600 Grant Street 42nd Floor
U.S. Department of Energy Eckert Seamans Cherin & Mellott NE-50 600 Grant Street 42nd Floor l
:                      19901 Germantown Road                               Pittsburgh, PA 15219 Germantown, MD 20874 Mr. Ed Rodwell, Manager Mr. S. M. Modro                                     PWR Design Certification Nuclear Systems Analysis Technologies               Electric Power Rese. arch Institute Lockheed Idaho Technologies Company                 3412 Hillview Avenue Post Office Box 1625                                 Palo Alto, CA 94303 Idaho Falls, ID 83415 Mr.- Charles Thompson, Nuclear Engineer AP600 Certification NE-50 19901 Germantown Road Germantown, MD 20874
19901 Germantown Road Pittsburgh, PA 15219 Germantown, MD 20874 Mr. Ed Rodwell, Manager Mr. S. M. Modro PWR Design Certification Nuclear Systems Analysis Technologies Electric Power Rese. arch Institute Lockheed Idaho Technologies Company 3412 Hillview Avenue Post Office Box 1625 Palo Alto, CA 94303 Idaho Falls, ID 83415 Mr.- Charles Thompson, Nuclear Engineer AP600 Certification NE-50 19901 Germantown Road Germantown, MD 20874


              -      - . . - . . . .-          _ . ~ . --... - -. - . ..- ----- .                     _.-.. -.        -- . . - -    .-
_. ~. --... - -. -...- -----.
i 1
i 1
1 1               PROPOSED AGENDA POR NRC/ WESTINGHOUSE MEETING ON AP600 WA111R HAMMER.
1 1
PROPOSED AGENDA POR NRC/ WESTINGHOUSE MEETING ON AP600 WA111R HAMMER.
I Westinghouse Presentations:
I Westinghouse Presentations:
!                I.       Overview of the Westinghouse approach to the weser hammer issue.
I.
j                         Water hammer potential exist, AP600 will be reviewed against screening criteria.
Overview of the Westinghouse approach to the weser hammer issue.
II.       Evaluation of OSU noise events.
j Water hammer potential exist, AP600 will be reviewed against screening criteria.
3                          Evaluation of the design transient SB18 data. Detailed evaluation of the processes seen during the poise event. Discussion of facility test data taken at 0.5 HZ, aad fast response pressure
II.
;                          probes at 8 kHZ.
Evaluation of OSU noise events.
I Discussion of condensation events observed during OSU testing. Discussion of event types y
Evaluation of the design transient SB18 data. Detailed evaluation of the processes seen during 3
versus type of transant being tested i
the poise event. Discussion of facility test data taken at 0.5 HZ, aad fast response pressure probes at 8 kHZ.
1
I Discussion of condensation events observed during OSU testing. Discussion of event types versus type of transant being tested y
;              NRC Presentations:
i 1
i i             III.       Discussion of observations from the OSU test facility.
NRC Presentations:
Discusion should be specific to the abservation of condensation events (or noise events) i                         supported by data.
i i
l             W.         Discussion of observations from other test facilities, i
III.
Discussion should be specific to observation of condensation events, supported by data which 2                        describes the physical processes in the facility at the time of the events, j
Discussion of observations from the OSU test facility.
i Joint Discussion Issues:
Discusion should be specific to the abservation of condensation events (or noise events) i supported by data.
f V.         Freeflowing discussion of NRC and Westinghouse personnel. The objectives should be to try                   ,
l W.
to shed light on the observations, and determme if possible if these events are specific to the l
Discussion of observations from other test facilities, Discussion should be specific to observation of condensation events, supported by data which i
describes the physical processes in the facility at the time of the events, 2
j i
Joint Discussion Issues:
f V.
Freeflowing discussion of NRC and Westinghouse personnel. The objectives should be to try to shed light on the observations, and determme if possible if these events are specific to the l
test facility or are they possible in the AP600.
test facility or are they possible in the AP600.
VI.       Derme the water hammer issue (s) for AP600.
VI.
5 VII.       Develop a consensus on the approach to be followed in the resolution of the water hammer 4
Derme the water hammer issue (s) for AP600.
issue.
5.
l Attachment w,      --,
VII.
r        -----,-
Develop a consensus on the approach to be followed in the resolution of the water hammer issue.
4 l
Attachment m
-w nww v
w ar-x-
w, r
w


4                   ,
4
* t +
* t +
Memorandum to Theodore R. Quay. Dated: March 14 1997 E)lSTRIBUTION:
E)lSTRIBUTION:
bcket .F,ile 3""1
Memorandum to Theodore R. Quay. Dated: March 14 1997 bcket.F,ile 3""1
:    -PUBLIC                                                                                                                                     1 1
-PUBLIC PDST R/F 1
PDST R/F SCollinsjFMiraglia, 0 -12 G18 AThadani, 0-12 G18 RZimmerman, 0-12 G18 TMartin MLSlosson TJKenyon DTJackson WCHuffman JMSebrosky-l WDean, 0-17 G21 JMoore, 0-15 B18 ACRS (11)
SCollinsjFMiraglia, 0 -12 G18 AThadani, 0-12 G18 RZimmerman, 0-12 G18 TMartin MLSlosson TJKenyon DTJackson WCHuffman JMSebrosky-WDean, 0-17 G21 JMoore, 0-15 B18 ACRS (11)
GBagchi, 0-7 HIS Shou, 0-7 H15                                                                                                                             l FEltawila, T-10 E46                                                                                                                       l DBessette, T-10 E46 PMNS (e-mail)
GBagchi, 0-7 HIS Shou, 0-7 H15 FEltawila, T-10 E46 DBessette, T-10 E46 PMNS (e-mail)
OPA-(e-mail)                                                                                                                               1 I
OPA-(e-mail)
l l
A 9'
A 9'
k 5
k 5
I y                                             g           I V 5         y
y g
                        $                        1' t
I V
                                        .                                            ,s'             ,
5 y
                                        -+                                                                         c
1' t
                                                                                                              ., s f'     g  Fp k           ?                         f
,s'
                                                    ,r             t               ,
-+
                                +                                                                         n
c
                                            ~44-"                               j k
., s f'
p                        ?
F k f
s r-
?
                                                                ,    ,.       i}}
g p
,r t
+
n
~44-"
j k
?
p s
r-i
,.}}

Latest revision as of 01:55, 12 December 2024

Notification of 970324 Meeting W/Westinghouse in Rockville,Md to Discuss Potential Water Hammer Events Observed During AP600 Osu Testing & Applicability to AP600
ML20135F933
Person / Time
Site: 05200003
Issue date: 03/14/1997
From: Huffman W
NRC (Affiliation Not Assigned)
To: Quay T
NRC (Affiliation Not Assigned)
References
NUDOCS 9703170191
Download: ML20135F933 (4)


Text

. -

.=-

tiarch 14, 1997 MEMORANDUM T0: Theodore R. Quay, Director Standardization Project Directorate Division of Reactor Program Management, NRR FROM:

William C. Huffman, Project Manager original signed by:

Standardization Project Directorate Division of Reactor Program Management, NRR

SUBJECT:

NOTICE OF MEETING WITH WESTINGHOUSE TO DISCUSS POSSIBLE WATER 1

HAMMER EVENTS OBSERVED DURING AP600 TESTING AND APPLICABILITY TO AP600 DATE AND TIME: March 24, 1997 - 10:30 a.m. - 3:30 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission Two White Flint North 11555 Rockville Pike Rockville, MD 20852 Room T-9 F5 PURPOSE:

Westinghouse and NRC-(Research)-to discuss potential water hammer' events observed during AP600 OSU testing, explore possible-occurrences at other testing facilities, and evaluate significance to AP600.

See attached agenda.

PARTICIPANTS *i ILR_q;

' WESTINGHOUSE M. D.Marzo (UMCP)

G. Piplica S. Hou D. VanDyne (Contractor)

D. Bessette F. Eltawila -

P. Griffith (MIT).

B. Huffman,'et al.

Docket No.52-003

Attachment:

As stated cc w/ attachment:

See next page

  • Meetings between the NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meeting Open to the Public," 59 Federal Reaister 48344, 9/20/94.

However, portions of this meeting may be closed to protect Westinghouse proprietary information. Members of the public who wish to attend should contact me at (301) 415-1141.

g{ g(hh h DISTRIBUTION:

See next page j

DOCUMENT NAME: A:WATR-HMR.N0T T2,eceive e copy of thle document,Indcate in the boa: "C" = Copy without attachment / enclosure "E* = Copy with attachment / enclosure "N* = No copy 0FFICE PM:PDST:DRPM BC:RPSB: DST:RES D:PDST:DRPM l

NAME WCHufRna h F E i tRH a CN:0 TRQuay 4 f4

\\

DATE 03/)'t /97 03//4/97 03/W/97 0FFICIAL RECORD COPY f

9703170191 970314 PDR ADOCK 05200003 u

A

[PFM

c..,

l

}

Westinghouse Electric Corporation Docket No.52-003 i

cc: Mr. Nicholas J. Liparulo, Manager Mr. Frank A. Ross Nuclear Safety and Regulatory Analysis U.S. Department of Energy, NE-42 Nuclear and Advanced Technology Division Office of LWR Safety and Technology Westinghouse Electric Corporation 19901 Germantown Road P.O. Box 355 Germantown, MD. 20874 Pittsburgh, PA 15230 Mr. Ronald Simard, Director Mr. B. A. McIntyre Advanced Reactor Program i

Advanced Plant Safety & Licensing Nuclear Energy Institute Westinghouse Electric Corporation 1776 Eye Street, N.W.

Energy Systems Business Unit Suite 300 i-Box 355 Washington, DC 20006-3706 j

Pittsburgh, PA 15230 Ms. Lynn Connor Ms. Cindy L. Haag Doc-Search Associates Advanced Plant Safety & Licensing Post Office Box 34 j

Westinghouse Electric Corporation Cabin John, MD 20818 Energy Systems Business Unit l

Box 355 Mr. James E. Quinn, Projects Manager i

Pittsburgh, PA 15230 LMR and SBWR Pr.ograms GE Nuclear Energy Mr. M. D. Beaumont 175 Curtner Avenue, M/C 165 Nuclear and Advanced Technology Division San Jose, CA 95125 i

Westinghouse Electric Corporation One Montrose Metro Mr. Robert H. Buchholz 11921 Rockville Pike GE Nuclear Energy

?

Suite 350 175 Curtner Avenue, MC-781 j

Rockville, MD 20852 San Jose, CA 95125 Mr. Sterling Franks Barton Z. Cowan, Esq.

U.S. Department of Energy Eckert Seamans Cherin & Mellott NE-50 600 Grant Street 42nd Floor l

19901 Germantown Road Pittsburgh, PA 15219 Germantown, MD 20874 Mr. Ed Rodwell, Manager Mr. S. M. Modro PWR Design Certification Nuclear Systems Analysis Technologies Electric Power Rese. arch Institute Lockheed Idaho Technologies Company 3412 Hillview Avenue Post Office Box 1625 Palo Alto, CA 94303 Idaho Falls, ID 83415 Mr.- Charles Thompson, Nuclear Engineer AP600 Certification NE-50 19901 Germantown Road Germantown, MD 20874

_. ~. --... - -. -...- -----.

i 1

1 1

PROPOSED AGENDA POR NRC/ WESTINGHOUSE MEETING ON AP600 WA111R HAMMER.

I Westinghouse Presentations:

I.

Overview of the Westinghouse approach to the weser hammer issue.

j Water hammer potential exist, AP600 will be reviewed against screening criteria.

II.

Evaluation of OSU noise events.

Evaluation of the design transient SB18 data. Detailed evaluation of the processes seen during 3

the poise event. Discussion of facility test data taken at 0.5 HZ, aad fast response pressure probes at 8 kHZ.

I Discussion of condensation events observed during OSU testing. Discussion of event types versus type of transant being tested y

i 1

NRC Presentations:

i i

III.

Discussion of observations from the OSU test facility.

Discusion should be specific to the abservation of condensation events (or noise events) i supported by data.

l W.

Discussion of observations from other test facilities, Discussion should be specific to observation of condensation events, supported by data which i

describes the physical processes in the facility at the time of the events, 2

j i

Joint Discussion Issues:

f V.

Freeflowing discussion of NRC and Westinghouse personnel. The objectives should be to try to shed light on the observations, and determme if possible if these events are specific to the l

test facility or are they possible in the AP600.

VI.

Derme the water hammer issue (s) for AP600.

5.

VII.

Develop a consensus on the approach to be followed in the resolution of the water hammer issue.

4 l

Attachment m

-w nww v

w ar-x-

w, r

w

4

  • t +

E)lSTRIBUTION:

Memorandum to Theodore R. Quay. Dated: March 14 1997 bcket.F,ile 3""1

-PUBLIC PDST R/F 1

SCollinsjFMiraglia, 0 -12 G18 AThadani, 0-12 G18 RZimmerman, 0-12 G18 TMartin MLSlosson TJKenyon DTJackson WCHuffman JMSebrosky-WDean, 0-17 G21 JMoore, 0-15 B18 ACRS (11)

GBagchi, 0-7 HIS Shou, 0-7 H15 FEltawila, T-10 E46 DBessette, T-10 E46 PMNS (e-mail)