ML20137Z045: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_ _.
{{#Wiki_filter:_
    .
_.
.
1
1
  ~.
~.
    .
.
4
4
4
4
                                                    DEC 8       Ess
DEC 8
Ess
Docket No. 50-412
,
,
          Docket No. 50-412
Duquesne Light Company
          Duquesne Light Company
I
I         ATTN: Mr. J. J. Carey
ATTN: Mr. J. J. Carey
                  Vice President
Vice President
                  Nuclear Group
Nuclear Group
;         Robinson Plaza Building No. 2
;
          Suite #210, PA Route 60
Robinson Plaza Building No. 2
'
'
Suite #210, PA Route 60
.
.
          Pittsburgh, Pennsylvania 15205
Pittsburgh, Pennsylvania 15205
:
:
          Gentlemen:
Gentlemen:
Subject:
Inspection Report Number 50-412/85-23
,
,
          Subject:    Inspection Report Number 50-412/85-23
This refers to the routine safety inspection conducted by M. J. Schaeffer of
          This refers to the routine safety inspection conducted by M. J. Schaeffer of
this office on October 28 - November 1,1985 at Beaver Valley Power Station,
          this office on October 28 - November 1,1985 at Beaver Valley Power Station,
j
j         Unit 2, Shippingport, Pennsylvania of activities authorized by NRC License Num-
Unit 2, Shippingport, Pennsylvania of activities authorized by NRC License Num-
'
'
          ber CPPR-105 and to the discussions of our findings held by Mr. M. J. Schaeffer
ber CPPR-105 and to the discussions of our findings held by Mr. M. J. Schaeffer
i       with Mr. D. Denning at the conclusion of the inspection.
i
with Mr. D. Denning at the conclusion of the inspection.
,
,
;         Areas examined during this inspection are described in the NRC Region I
;
          Inspection Report which is enclosed with this letter. Within these areas, the
Areas examined during this inspection are described in the NRC Region I
'
'
          inspection consisted of selective examinations of procedures and representative
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
,
,
          records, interviews with personnel, and observations by the inspector.
,
,
          Based on the results of this inspection, it appears that one of your activities
Based on the results of this inspection, it appears that one of your activities
          was not conducted in full compliance with NRC requirements, as set forth in the
was not conducted in full compliance with NRC requirements, as set forth in the
          Notice of Violation, enclosed herewith as Appendix A. This violation has been
Notice of Violation, enclosed herewith as Appendix A.
          categorized by severity level in accordance with the revised NRC Enforcement
This violation has been
categorized by severity level in accordance with the revised NRC Enforcement
.
.
          Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR
Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR
8533) dated March 8, 1984. You are required to respond to this letter and in
>
>
          8533) dated March 8, 1984. You are required to respond to this letter and in
preparing your response, you should follow the instructions in Appendix A.
          preparing your response, you should follow the instructions in Appendix A.
The responses directed by this letter and the accompanying Notice are not
          The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
          subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
          required by the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in thic matter is appreciated.
          Your cooperation with us in thic matter is appreciated.
1
1
                                                    Sincerely,
Sincerely,
                                                            Origia.: .: vs EYs
Origia.: .: vs EYs
>                                                          JacqueP.Darr
JacqueP.Darr
>
!
!
                                                    Stewart D. Ebneter, Director
Stewart D. Ebneter, Director
        gpqg $$p
gpqg $$p
        O
''''' " ' ""^'' " S*'" "
                                                      ''''' " ' ""^'' "       S*'" "
O
!
!
                                    0FFICIAL RECORD COPY         IR BV2 85-23 - 0001.0.0 h
0FFICIAL RECORD COPY
;                                                                 12/02/85                 '\\
IR BV2 85-23 - 0001.0.0
h
;
12/02/85
'\\\\
j
j
                                                                                        ZE0$
ZE0$
      _                                       - - . -.. __                _     - - .. -     . -
_
. .
- - .
-..
_
- - .. -
. -


    .   . .                                 ._                           _ . _ . .         _     ._                 _ _ . -__-_                   .- .                 .
.
      -
. .
._
_ . _ . .
_
._
_ _ . -__-_
.-
.
.
1
1
t
-
      -
t
            Duquesne Light. Company                                     2
-
Duquesne Light. Company
2
<
<
.           . Enclosures:
.
j           1.   Appendix A, Notice of Violation
. Enclosures:
j
1.
Appendix A, Notice of Violation
2.
NRC Region I Inspection Report Number 50-412/85-23
<
<
            2.    NRC Region I Inspection Report Number 50-412/85-23
i
i            cc w/encls:
cc w/encls:
,            E. J. Woolever, Vice President, Nuclear Construction Division
E. J. Woolever, Vice President, Nuclear Construction Division
i           E. Ewing, Quality Assurance Manager
,
i
E. Ewing, Quality Assurance Manager
R. J. Swiderski, Manager, Startup Group
1
1
'
'
            R. J. Swiderski, Manager, Startup Group
R. E. Martin, Manager, Engineering
            R. E. Martin, Manager, Engineering
;
;
E. F. Kurtz, Jr. , Manager, Regulatory Affairs
'
'
            E. F. Kurtz, Jr. , Manager, Regulatory Affairs
P. RayStrcar, Stone and Webster Engineering Corporation
            P. RayStrcar, Stone and Webster Engineering Corporation
Public Document Room (PDR)
*
*
            Public Document Room (PDR)
Local Public Document Room (LPDR)
            Local Public Document Room (LPDR)
1
1           Nuclear Safety Information Center (NSIC)
Nuclear Safety Information Center (NSIC)
7
NRC Resident Inspector
            NRC Resident Inspector
7
l           Commonwealth of Pennsylvania
l
f
Commonwealth of Pennsylvania
'
f
            bec w/encls:
'
;           Region I Docket Room (with concurrences)
bec w/encls:
            Management Assistant, DRMA (w/o encl) DRP Section Chief
;
            T. Rebelowski, SRI, Millstone 3
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl) DRP Section Chief
T. Rebelowski, SRI, Millstone 3
W. Troskoski, SRI, BV-1
:.
:.
            W. Troskoski, SRI, BV-1
i
i            B. Singh, LPM, NRR
B. Singh, LPM, NRR
i
i
k
k
4
4
Line 128: Line 169:
i
i
1
1
:                                                                                                                                                                                   I
:
I
;
;
i
i
l
l
1                                                                                                                                                                                   .
1
.
a
a
                                                                              c4
c4
  1
RI:DRS9mj/-
            RI:DRS9mj/-             RI:DRf                 RI:DRS                                   RI:DRS
Cheune([/
                                      Cheune([/ Anderson
RI:DRf
'
RI:DRS
            Schaeffer/mjh                                                                             Durr
RI:DRS
            12/3 /85                                         12/jp/85                                 12/3'785
1'
                                      12/3/85
Schaeffer/mjh
                                          0FFICIAL RECORD COPY                                       IR BV2 85-23 - 0002.0.0
Anderson
Durr
12/3 /85
12/3/85
12/jp/85
12/3'785
0FFICIAL RECORD COPY
IR BV2 85-23 - 0002.0.0
12/02/85
+
+
                                                                                                      12/02/85
:
:
:
:
              .,       _   --   __.           _ _ . . _ . . _ . . . . _ . . - _ . . _ _ . . _ . .     . . , _ _ , _ . . . . . . - . - _ . _ . _ _ _
.,
                                                                                                          .                                                . . _ , _ - , . - . . - -
_
--
__.
_ _ . . _ . .
. . . .
. . -
. .
. .
. .
. . , _ _ , _ . . . . . . - . - _ . _ . _ _ _
. . _ ,
_ - , . - . . - -
.
}}
}}

Latest revision as of 20:28, 11 December 2024

Forwards Safety Insp Rept 50-412/85-23 on 851028-1101 & Notice of Violation
ML20137Z045
Person / Time
Site: Beaver Valley
Issue date: 12/06/1985
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20137Z051 List:
References
NUDOCS 8512110210
Download: ML20137Z045 (2)


See also: IR 05000412/1985023

Text

_

_.

.

1

~.

.

4

4

DEC 8

Ess

Docket No. 50-412

,

Duquesne Light Company

I

ATTN: Mr. J. J. Carey

Vice President

Nuclear Group

Robinson Plaza Building No. 2

'

Suite #210, PA Route 60

.

Pittsburgh, Pennsylvania 15205

Gentlemen:

Subject:

Inspection Report Number 50-412/85-23

,

This refers to the routine safety inspection conducted by M. J. Schaeffer of

this office on October 28 - November 1,1985 at Beaver Valley Power Station,

j

Unit 2, Shippingport, Pennsylvania of activities authorized by NRC License Num-

'

ber CPPR-105 and to the discussions of our findings held by Mr. M. J. Schaeffer

i

with Mr. D. Denning at the conclusion of the inspection.

,

Areas examined during this inspection are described in the NRC Region I

'

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

,

,

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This violation has been

categorized by severity level in accordance with the revised NRC Enforcement

.

Policy (10 CFR 2, Appendix C) published in the Federal Register Notice (49 FR 8533) dated March 8, 1984. You are required to respond to this letter and in

>

preparing your response, you should follow the instructions in Appendix A.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation with us in thic matter is appreciated.

1

Sincerely,

Origia.: .: vs EYs

JacqueP.Darr

>

!

Stewart D. Ebneter, Director

gpqg $$p

" ' ""^ " S*'" "

O

!

0FFICIAL RECORD COPY

IR BV2 85-23 - 0001.0.0

h

12/02/85

'\\\\

j

ZE0$

_

. .

- - .

-..

_

- - .. -

. -

.

. .

._

_ . _ . .

_

._

_ _ . -__-_

.-

.

.

1

-

t

-

Duquesne Light. Company

2

<

.

. Enclosures:

j

1.

Appendix A, Notice of Violation

2.

NRC Region I Inspection Report Number 50-412/85-23

<

i

cc w/encls:

E. J. Woolever, Vice President, Nuclear Construction Division

,

i

E. Ewing, Quality Assurance Manager

R. J. Swiderski, Manager, Startup Group

1

'

R. E. Martin, Manager, Engineering

E. F. Kurtz, Jr. , Manager, Regulatory Affairs

'

P. RayStrcar, Stone and Webster Engineering Corporation

Public Document Room (PDR)

Local Public Document Room (LPDR)

1

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

7

l

Commonwealth of Pennsylvania

f

'

bec w/encls:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl) DRP Section Chief

T. Rebelowski, SRI, Millstone 3

W. Troskoski, SRI, BV-1

.

i

B. Singh, LPM, NRR

i

k

4

i

i

1

I

i

l

1

.

a

c4

RI:DRS9mj/-

Cheune([/

RI:DRf

RI:DRS

RI:DRS

1'

Schaeffer/mjh

Anderson

Durr

12/3 /85

12/3/85

12/jp/85

12/3'785

0FFICIAL RECORD COPY

IR BV2 85-23 - 0002.0.0

12/02/85

+

.,

_

--

__.

_ _ . . _ . .

. . . .

. . -

. .

. .

. .

. . , _ _ , _ . . . . . . - . - _ . _ . _ _ _

. . _ ,

_ - , . - . . - -

.