ML20138M100: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:- | {{#Wiki_filter:- | ||
-: | |||
w | |||
DEC 171985 | |||
'% | |||
Docket No. 50-309 | |||
License No: DPR-36 | |||
Maine Yankee Atomic Power Company | |||
ATTN: Mr. J. B. Randazza | |||
Vice President | |||
Nuclear Operations | |||
83 Edison Drive | |||
Augusta, Maine 04336 | |||
Gentlemen: | |||
Subject: | |||
Inspection No. 50-309/85-33 | |||
This refers to the routine safety inspection conducted by Mr. H. Zibulsky of | |||
this office on November 19-21, 1985 of activities authorized by NRC at the | |||
Maine Yankee Nuclear Power Company, Wiscasset, Maine and to the discussions of | |||
. | . | ||
our findings held by Mr. Zibulsky with Mr. E. Thomas Boulette and other members | |||
! | ! | ||
of your staff at the conclusion of the inspection. | |||
Areas examined during this inspection are described in the NRC Region I | |||
Inspection Report which is enclosed with this letter. Within these areas, the | |||
inspection consisted of selective examinations of procedures and representative | |||
records, interviews with personnel, and observations by the inspector. | |||
Within the scope of this inspection, no violations were observed. | |||
N | |||
No reply to this letter is required. Your cooperation with us in this matter | |||
is appreciated. | |||
Sincerelv | |||
Orir;inal Sitmeo Wt | |||
h/L .) | |||
.. | |||
. | |||
l | |||
.. | |||
homas T. Martin, Director | |||
l | |||
Division of Radiation Safety | |||
and Safeguards | |||
l | l | ||
Enclosure: NRC Region I Inspection Report No. 50-309/85-33 | |||
l | l | ||
l | l | ||
b | |||
0FFICIAL RECORD COPY | |||
IR MY 85-33 - 0001.0.0 | |||
; | |||
12/16/85 | |||
' | |||
8512200229 851217 | |||
)\\ | |||
PDR | |||
ADOCK 0500 | |||
9 | |||
i | |||
o | |||
.. | .. | ||
' | |||
t | |||
i | |||
. | |||
' | |||
Maine Yankee Atomic Power Co. | |||
2 | |||
cc w/ enc 1: | |||
C. E. Monty, President | |||
C. D. Frizzle, Assistant Vice President / Manager of Operations | |||
J. H. Garrity, Plant Manager | |||
P. L. Anderson, Project Manager | |||
G. D. Whittier, Licensing Section Head | |||
J. A. Ritsher, Attorney (Ropes and Gray) | |||
Public Document Room (PDR) | |||
Local Public Document Room (LPDR) | |||
Nuclear Safety Information Center (NSIC) | |||
NRC Resident Inspector | |||
State of Maine | |||
bcc w/ enc 1: | |||
Region I Docket Room (with concurrences) | |||
Management Assistant, DRMA (w/o enc 1) | |||
DPRP Section Chief | |||
M. McBride, RI, Pilgrim | |||
H. Eichenholz, SRI, Yankee | |||
K. Heitner, LPM, NRR | |||
L. J. Cunningham, IE | |||
I | |||
i | i | ||
RI:DRSSk | |||
R | |||
S | |||
S | |||
S | |||
/ | |||
tin | |||
Zubulsky | |||
Pasciak | |||
Be lamy | |||
12/13 /85 | |||
12/f/85 | |||
1247/85 | |||
12/ 7 85 | |||
0FFICIAL RECORD COPY | |||
IR MY 85-33 - 0002.0.0 | |||
12/10/85 | |||
}} | }} | ||
Latest revision as of 18:46, 11 December 2024
| ML20138M100 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 12/17/1985 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Randazza J Maine Yankee |
| Shared Package | |
| ML20138M103 | List: |
| References | |
| NUDOCS 8512200229 | |
| Download: ML20138M100 (2) | |
See also: IR 05000309/1985033
Text
-
-:
w
DEC 171985
'%
Docket No. 50-309
License No: DPR-36
Maine Yankee Atomic Power Company
ATTN: Mr. J. B. Randazza
Vice President
Nuclear Operations
83 Edison Drive
Augusta, Maine 04336
Gentlemen:
Subject:
Inspection No. 50-309/85-33
This refers to the routine safety inspection conducted by Mr. H. Zibulsky of
this office on November 19-21, 1985 of activities authorized by NRC at the
Maine Yankee Nuclear Power Company, Wiscasset, Maine and to the discussions of
.
our findings held by Mr. Zibulsky with Mr. E. Thomas Boulette and other members
!
of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed.
N
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerelv
Orir;inal Sitmeo Wt
h/L .)
..
.
l
..
homas T. Martin, Director
l
Division of Radiation Safety
and Safeguards
l
Enclosure: NRC Region I Inspection Report No. 50-309/85-33
l
l
b
0FFICIAL RECORD COPY
IR MY 85-33 - 0001.0.0
12/16/85
'
8512200229 851217
)\\
ADOCK 0500
9
i
o
..
'
t
i
.
'
Maine Yankee Atomic Power Co.
2
cc w/ enc 1:
C. E. Monty, President
C. D. Frizzle, Assistant Vice President / Manager of Operations
J. H. Garrity, Plant Manager
P. L. Anderson, Project Manager
G. D. Whittier, Licensing Section Head
J. A. Ritsher, Attorney (Ropes and Gray)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Maine
bcc w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
DPRP Section Chief
M. McBride, RI, Pilgrim
H. Eichenholz, SRI, Yankee
K. Heitner, LPM, NRR
L. J. Cunningham, IE
I
i
RI:DRSSk
R
S
S
S
/
Zubulsky
Pasciak
Be lamy
12/13 /85
12/f/85
1247/85
12/ 7 85
0FFICIAL RECORD COPY
IR MY 85-33 - 0002.0.0
12/10/85