ML20140B648: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20140B648
| number = ML20140B648
| issue date = 06/04/1997
| issue date = 06/04/1997
| title = Forwards Insp Rept 99901321/97-01 on 970515.No Violations Noted.Insp Evaluated Program That Abb Svc Established to Implement Provision of 10CFR21 for Reporting Defects & Noncompliance & 10CFR50
| title = Forwards Insp Rept 99901321/97-01 on 970515.No Violations Noted.Insp Evaluated Program That ABB Svc Established to Implement Provision of 10CFR21 for Reporting Defects & Noncompliance & 10CFR50
| author name = Gallo R
| author name = Gallo R
| author affiliation = NRC (Affiliation Not Assigned)
| author affiliation = NRC (Affiliation Not Assigned)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:_    . _          _.      _ _ _ _            _ _ _ _ _ .  . _ . . _      . _ . _ . _ _ _ . _ . _ _ . _ _ _ _ _
{{#Wiki_filter:_
    't                                                           June 4, 1997 ABB Service Company Regional Service Center                                                                                                                 l 400 Biltmore, Suite 520 Od Fenton, MO 63026                                                                                                                         i
't June 4, 1997 ABB Service Company l
Regional Service Center 400 Biltmore, Suite 520 Fenton, MO 63026 Od i


==SUBJECT:==
==SUBJECT:==
Line 25: Line 26:


==Dear Mr. Polizzi:==
==Dear Mr. Polizzi:==
1 1
1 This letter refers to the inspection conducted by Mr. K. R. Naidu and Mr. V.
This letter refers to the inspection conducted by Mr. K. R. Naidu and Mr. V.                                                             1 L. Beaston of this office on May 15, 1997. The inspection included a review                                                             .
1 L. Beaston of this office on May 15, 1997.
of activities conducted at your facility in Fenton, Missouri. The enclosed                                                               !
The inspection included a review of activities conducted at your facility in Fenton, Missouri.
report presents the results of that inspection.                                                                                         I The inspectors evaluated the program that ABB Service Inc. (ABB) established                                                           l to implement the provisions of Part 21 of Title 10 of the Code of Federal                                                                 '
The enclosed report presents the results of that inspection.
l              Reaulations (10 CFR Part 21) for reporting defects and noncompliances, and                                                               l Appendix B to 10 CFR Part 50. The inspectors reviewed the documentation on J
The inspectors evaluated the program that ABB Service Inc. (ABB) established l
selected metal-clad K-line circuit breakers th:t Illinois Power Company's                                                               i Clinton Power Station sent to your Fenton shop for refurbishing. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspectors. The inspectors identified one unresolved item relative to the availability of breaker specific drawings to verify the correct contact configuration and propose to obtain additional information on this item during a future inspection at your Houston Service Center.
to implement the provisions of Part 21 of Title 10 of the Code of Federal l
!              In accordance with 10 CFR 2.790 of the NPC's " Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
Reaulations (10 CFR Part 21) for reporting defects and noncompliances, and Appendix B to 10 CFR Part 50. The inspectors reviewed the documentation on J
selected metal-clad K-line circuit breakers th:t Illinois Power Company's i
Clinton Power Station sent to your Fenton shop for refurbishing. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspectors. The inspectors identified one unresolved item relative to the availability of breaker specific drawings to verify the correct contact configuration and propose to obtain additional information on this item during a future inspection at your Houston Service Center.
In accordance with 10 CFR 2.790 of the NPC's " Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
Sincerely, ORIGINA. SIGNED BY:
Sincerely, ORIGINA. SIGNED BY:
Robert M. Gallo, Chief                                                               !
Robert M. Gallo, Chief Special Inspettion Branch Division of Inspection and Support Programs t
Special Inspettion Branch Division of Inspection and Support Programs t
Docket No.: 99901321 i
Docket No.: 99901321                                                                                                                     i


==Enclosure:==
==Enclosure:==
Inspection Report 99901321/97-01                                                                                             l' I
Inspection Report 99901321/97-01 I
i               Distribution:                                                                                                                           l PSIB R/F                                                               /   's                           gfg(
i Distribution:
                                                                                              /' h l                                                                                                                                                        j Central Files / RIDS IE:09                                                                                                               l Docket File 99901321                                                   /     '
/' h gfg(
                                                                                                                    #                        /   t PUBLIC                                                                                                ,3/\/W                   id f DVPickett l              TTirupathaisah l               ZFalevitz C[ /fg / ~W, DOCUMENT NAME: G:\ABB. LOU                                                                                                                   1 To receive e copy of this document. Indicate in the box: 'C' = Copy without enclosures *E" = Copy with enclosures "ND copy 0FFICE       PSIB: DISP                     PSIlf:MSP lE             DE:EELB       l           DE:EELB                     l PSI,$1@ QP l       )
j l
NAME         KNaidu E nJ M r GC/aliha                                 ASGill d.'                 VLBeaston r                   RMGallo j   DATE         06/3 /97                       06/3 /97                 06/ /97                   06/ /97                       06/ 7 /97 0FFICIAL RECORD COPY 7
PSIB R/F
cae a,wua'."ya 6 " " #
/
ek 9706060281 970604                                               (l b 'I O I PM PDR       GA999 ENVC-E 99901321                   PDR i
's Central Files / RIDS IE:09 Docket File 99901321
/
/
,3/\\/W id f t
PUBLIC DVPickett TTirupathaisah l
C[ fg / ~W, l
ZFalevitz
/
DOCUMENT NAME: G:\\ABB. LOU To receive e copy of this document. Indicate in the box:
'C' = Copy without enclosures *E" = Copy with enclosures "ND copy 0FFICE PSIB: DISP PSIlf:MSP lE DE:EELB l
DE:EELB l
PSI,$1@ QP l
)
NAME KNaidu E nJ M r GC/aliha ASGill d.'
VLBeaston r RMGallo j
DATE 06/3 /97 06/3 /97 06/ /97 06/ /97 06/ 7 /97 0FFICIAL RECORD COPY cae a,wua'."ya 6 " " #
7 ek 9706060281 970604 (l b 'I O I PM PDR GA999 ENVC-E 99901321 PDR i


Mr. D.P. Polizzi Manager, Regional Service ABB Service Company Regional Service Center 400 Biltmore, Suite 520                                                                                             /
Mr. D.P. Polizzi Manager, Regional Service ABB Service Company Regional Service Center 400 Biltmore, Suite 520
/
Fenton, MO 63026
Fenton, MO 63026
/


==SUBJECT:==
==SUBJECT:==
NRC INSPECTION REPORT N0. 99901281/97-01                                                               /
NRC INSPECTION REPORT N0. 99901281/97-01
                                                                                                                                /
/


==Dear Mr. Polizzi:==
==Dear Mr. Polizzi:==
This letter refers to the inspection conducted by Mr. K. R. Naidu and Mr. V.
This letter refers to the inspection conducted by Mr. K. R. Naidu and Mr. V.
L. Beaston of this office on May 15, 1997. The inspection includedja review of activities conducted at your facility in Fenton, Missouri. At the conclusion of the inspection, the inspectors discussed the findings that are identified in the enclosed report.
L. Beaston of this office on May 15, 1997. The inspection includedja review of activities conducted at your facility in Fenton, Missouri. At the conclusion of the inspection, the inspectors discussed the findings that are identified in the enclosed report.
Areas examined during this inspection and our findings are discussed in the
/
                                                                                                            /
Areas examined during this inspection and our findings are discussed in the enclosed report. The inspectors evaluated the program that,'ABB Service Inc.
enclosed report. The inspectors evaluated the program that,'ABB Service Inc.
(ABB) established to implement the provisions of Part 21 of Title 10 of the Code of Federal Reaulationi (10 CFR Part 21) for reportins defects and noncompliances, and Appendix B to 10 CFR Part 50.
(ABB) established to implement the provisions of Part 21 of Title 10 of the Code of Federal Reaulationi (10 CFR Part 21) for reportins defects and noncompliances, and Appendix B to 10 CFR Part 50.                             The, inspectors reviewed the documentation on selected metal-clad K-line circuit br,eakers that Illinois Power Company's Clinton Power Station sent to your Fenton shop for refurbishing. Within these areas, the inspection co'nsisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspectors.                                           /
The, inspectors reviewed the documentation on selected metal-clad K-line circuit br,eakers that Illinois Power Company's Clinton Power Station sent to your Fenton shop for refurbishing. Within these areas, the inspection co'nsisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspectors.
Withinthescopeofthisinspection,wefounddoinstancewhereyoufailedto     j meet NRC requirements.
/
                                                                                /
Withinthescopeofthisinspection,wefounddoinstancewhereyoufailedto j
meet NRC requirements.
/
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosures will be laced in the NRC Public Document Room.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosures will be laced in the NRC Public Document Room.
Sincerpl'y,
Sincerpl'y,
                                                                    /
/
                                                                  /                                                                 .
/
Ro'bert M. Gallo, Chief j pecial S      Inspection F, ranch Division of Inspection and Support Programs Docket No.: 99901321
Ro'bert M. Gallo, Chief j pecial Inspection F, ranch S
Division of Inspection and Support Programs Docket No.:
99901321


==Enclosure:==
==Enclosure:==
Inspection Re' ort 99901321/97-01
Inspection Re' ort 99901321/97-01
                                                  /
/
Distribution:                     /
Distribution:
PSIB R/F                     /
/
Central Files / RIDS /IE:09
PSIB R/F
,              Docket File 9990)-321   '
/
PUBLIC l
Central Files / RIDS /IE:09 Docket File 9990)-321 PUBLIC l
l DVPickett TTirupathaisah
DVPickett
                                  /
/
TTirupathaisah l
ZFalevitz /
ZFalevitz /
                              /
/
DOCUMENT NAME: G:\ABB. LOU To receive a copy of thd document, indicate in the box: 'C' = Copy without enclosures *E" = Copy with enclosures *N" = No copy 0FFICE       PSIB': DISP     lr       PSIB: DISP l             DE:EELB         .lE     DE:EELB         l E-   PSIB: DISP l NAME         KNaidu M 4 wf W           GCwalina                 ASGill W       ~
DOCUMENT NAME: G:\\ABB. LOU To receive a copy of thd document, indicate in the box: 'C' = Copy without enclosures *E" = Copy with enclosures *N" = No copy 0FFICE PSIB': DISP lr PSIB: DISP l DE:EELB
VLBeaston 4)G           RMGallo DATE         05/4/97                   05/ /97                   05/24/97                 05/?i/97               05/ /97 l                                     OFFICIAL RECORD COPY l
.lE DE:EELB l E-PSIB: DISP l NAME KNaidu M 4 wf W GCwalina ASGill W VLBeaston 4)G RMGallo
~
DATE 05/4/97 05/ /97 05/24/97 05/?i/97 05/ /97 l
OFFICIAL RECORD COPY l
!}}
!}}

Latest revision as of 17:20, 11 December 2024

Forwards Insp Rept 99901321/97-01 on 970515.No Violations Noted.Insp Evaluated Program That ABB Svc Established to Implement Provision of 10CFR21 for Reporting Defects & Noncompliance & 10CFR50
ML20140B648
Person / Time
Issue date: 06/04/1997
From: Gallo R
NRC (Affiliation Not Assigned)
To: Polizzi
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML20140B653 List:
References
REF-QA-99901321 99901321-97-01, 99901321-97-1, NUDOCS 9706060281
Download: ML20140B648 (2)


Text

_

't June 4, 1997 ABB Service Company l

Regional Service Center 400 Biltmore, Suite 520 Fenton, MO 63026 Od i

SUBJECT:

NRC INSPECTION REPORT NO. 99901/8f/97-01

Dear Mr. Polizzi:

1 This letter refers to the inspection conducted by Mr. K. R. Naidu and Mr. V.

1 L. Beaston of this office on May 15, 1997.

The inspection included a review of activities conducted at your facility in Fenton, Missouri.

The enclosed report presents the results of that inspection.

The inspectors evaluated the program that ABB Service Inc. (ABB) established l

to implement the provisions of Part 21 of Title 10 of the Code of Federal l

Reaulations (10 CFR Part 21) for reporting defects and noncompliances, and Appendix B to 10 CFR Part 50. The inspectors reviewed the documentation on J

selected metal-clad K-line circuit breakers th:t Illinois Power Company's i

Clinton Power Station sent to your Fenton shop for refurbishing. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspectors. The inspectors identified one unresolved item relative to the availability of breaker specific drawings to verify the correct contact configuration and propose to obtain additional information on this item during a future inspection at your Houston Service Center.

In accordance with 10 CFR 2.790 of the NPC's " Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

Sincerely, ORIGINA. SIGNED BY:

Robert M. Gallo, Chief Special Inspettion Branch Division of Inspection and Support Programs t

Docket No.: 99901321 i

Enclosure:

Inspection Report 99901321/97-01 I

i Distribution:

/' h gfg(

j l

PSIB R/F

/

's Central Files / RIDS IE:09 Docket File 99901321

/

/

,3/\\/W id f t

PUBLIC DVPickett TTirupathaisah l

C[ fg / ~W, l

ZFalevitz

/

DOCUMENT NAME: G:\\ABB. LOU To receive e copy of this document. Indicate in the box:

'C' = Copy without enclosures *E" = Copy with enclosures "ND copy 0FFICE PSIB: DISP PSIlf:MSP lE DE:EELB l

DE:EELB l

PSI,$1@ QP l

)

NAME KNaidu E nJ M r GC/aliha ASGill d.'

VLBeaston r RMGallo j

DATE 06/3 /97 06/3 /97 06/ /97 06/ /97 06/ 7 /97 0FFICIAL RECORD COPY cae a,wua'."ya 6 " " #

7 ek 9706060281 970604 (l b 'I O I PM PDR GA999 ENVC-E 99901321 PDR i

Mr. D.P. Polizzi Manager, Regional Service ABB Service Company Regional Service Center 400 Biltmore, Suite 520

/

Fenton, MO 63026

/

SUBJECT:

NRC INSPECTION REPORT N0. 99901281/97-01

/

Dear Mr. Polizzi:

This letter refers to the inspection conducted by Mr. K. R. Naidu and Mr. V.

L. Beaston of this office on May 15, 1997. The inspection includedja review of activities conducted at your facility in Fenton, Missouri. At the conclusion of the inspection, the inspectors discussed the findings that are identified in the enclosed report.

/

Areas examined during this inspection and our findings are discussed in the enclosed report. The inspectors evaluated the program that,'ABB Service Inc.

(ABB) established to implement the provisions of Part 21 of Title 10 of the Code of Federal Reaulationi (10 CFR Part 21) for reportins defects and noncompliances, and Appendix B to 10 CFR Part 50.

The, inspectors reviewed the documentation on selected metal-clad K-line circuit br,eakers that Illinois Power Company's Clinton Power Station sent to your Fenton shop for refurbishing. Within these areas, the inspection co'nsisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspectors.

/

Withinthescopeofthisinspection,wefounddoinstancewhereyoufailedto j

meet NRC requirements.

/

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosures will be laced in the NRC Public Document Room.

Sincerpl'y,

/

/

Ro'bert M. Gallo, Chief j pecial Inspection F, ranch S

Division of Inspection and Support Programs Docket No.:

99901321

Enclosure:

Inspection Re' ort 99901321/97-01

/

Distribution:

/

PSIB R/F

/

Central Files / RIDS /IE:09 Docket File 9990)-321 PUBLIC l

DVPickett

/

TTirupathaisah l

ZFalevitz /

/

DOCUMENT NAME: G:\\ABB. LOU To receive a copy of thd document, indicate in the box: 'C' = Copy without enclosures *E" = Copy with enclosures *N" = No copy 0FFICE PSIB': DISP lr PSIB: DISP l DE:EELB

.lE DE:EELB l E-PSIB: DISP l NAME KNaidu M 4 wf W GCwalina ASGill W VLBeaston 4)G RMGallo

~

DATE 05/4/97 05/ /97 05/24/97 05/?i/97 05/ /97 l

OFFICIAL RECORD COPY l

!