ML20140G898: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20140G898 | | number = ML20140G898 | ||
| issue date = 05/01/1997 | | issue date = 05/01/1997 | ||
| title = Responds to | | title = Responds to Re Concerns of Several Oswego County Residents Re Vertical Cracks in Welds of Core Shroud at Nine Mile Point Unit 1.NRC Conducting Very Careful Independent Review of Licensee 970408 Submittal | ||
| author name = Jackson S, The Chairman | | author name = Jackson S, The Chairman | ||
| author affiliation = NRC COMMISSION (OCM) | | author affiliation = NRC COMMISSION (OCM) | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 9705120237 | | document report number = NUDOCS 9705120237 | ||
| title reference date = 04-10-1997 | |||
| package number = ML20140C487 | | package number = ML20140C487 | ||
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE | ||
| Line 18: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
/ | |||
~PDPs UNn1D STATES | |||
[.M l | |||
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2065/A001 e%.....[ | |||
May 1, 1997 CHAIRMAN j | |||
The Honorable John M. McHugh i | |||
CHAIRMAN | United States House of Representatives Washington, D.C. | ||
20515-3224 | |||
==Dear Congressman McHugh:== | ==Dear Congressman McHugh:== | ||
~ | |||
I am responding to your letter of April 10, 1997, in which you expressed the i | |||
regarding vertical cracks in the welds of the core shroud at Niagara Mohawk Power Corporation's Nine Mile Point Unit I reactor in Scriba, New York. The Commission recognizes that safety of the core shroud is important to the people of the Oswego area. On April 8,1997, the licensee submitted to the U.S. Nuclear Regulatory Commission (NRC) its inspection findings and evaluation of the core shroud issue. The licensee presented this information for discussion at the meeting on April 14, 1997, with the NRC and the public at the. Joint News Center in Fulton, New York. I assure you that the NRC is | concerns of several Oswego County residents, including a county legislator, regarding vertical cracks in the welds of the core shroud at Niagara Mohawk Power Corporation's Nine Mile Point Unit I reactor in Scriba, New York. The Commission recognizes that safety of the core shroud is important to the people of the Oswego area. On April 8,1997, the licensee submitted to the U.S. Nuclear Regulatory Commission (NRC) its inspection findings and evaluation of the core shroud issue. | ||
The licensee presented this information for discussion at the meeting on April 14, 1997, with the NRC and the public at the. Joint News Center in Fulton, New York. | |||
The NRC staff is reviewing the licensee's evaluation and root cause | I assure you that the NRC is conducting a very careful independent review of the licensee's April 8 submittal to determine whether or not the shroud is acceptable for continued use at Nine Mile Point Unit 1. | ||
determination regarding the observed degradation of the core shroud (e.g., the | The NRC staff is reviewing the licensee's evaluation and root cause determination regarding the observed degradation of the core shroud (e.g., the l | ||
cracks found in the vertical welds) and the tie rods of Nine Mile Point Unit 1. It is Niagara Mohawk's responsibility as a licensee to demonstrate to | cracks found in the vertical welds) and the tie rods of Nine Mile Point Unit 1. | ||
standards of the American Society of Mechanical Engineers) to ensure safe operation of the shroud. After completing its technical review, the NRC staff will issue a safety evaluation report to the licensee that accepts or rejects the licensee's conclusions regarding the safe operation of the plant with the | It is Niagara Mohawk's responsibility as a licensee to demonstrate to l | ||
With regard to your concern about the absence of an independent technical review, Niagara Mohawk has engaged several consultants and vendors in | the NRC staff that the existing shroud and the repaired tie rods meet the l | ||
Electric Company, which designed the shroud when the plant was constructed; Structural Integrity Associates; MPM Technologies; and the Altran Corporation | requirements set forth in NRC regulations (which endorse the code and standards of the American Society of Mechanical Engineers) to ensure safe operation of the shroud. After completing its technical review, the NRC staff will issue a safety evaluation report to the licensee that accepts or rejects the licensee's conclusions regarding the safe operation of the plant with the i | ||
In addition, the NRC staff is conducting an engineering review of the licensee's evaluations (which include their consultants' analyses) to ensure that the design bases for the shroud are met. Furthermore, the NRC technical staff is following this issue closely and is assessing the shroud tie rod 9705120237 970501 | current shroud. The staff will inform you of its technical review and send you a copy of this report. This report also will be made available to the M | ||
public through the local public document room in the Oswego area. | |||
With regard to your concern about the absence of an independent technical review, Niagara Mohawk has engaged several consultants and vendors in g | |||
j performing the appropriate analyses of the current condition of the shroud and its safety for continued operation. These consultants include the General Electric Company, which designed the shroud when the plant was constructed; Structural Integrity Associates; MPM Technologies; and the Altran Corporation. | |||
In addition, the NRC staff is conducting an engineering review of the licensee's evaluations (which include their consultants' analyses) to ensure that the design bases for the shroud are met. | |||
Furthermore, the NRC technical staff is following this issue closely and is assessing the shroud tie rod | |||
.hhhlllllill 9705120237 970501 | |||
*e PDR COMMS NRCC CORRESPONDENCE PDR | |||
P O | P O | ||
repairs performed by the licensee. You can be assured that the plant will not | r 2 | ||
restart until the'NRC is satisfied that there will be no undue risk to the | repairs performed by the licensee. You can be assured that the plant will not restart until the'NRC is satisfied that there will be no undue risk to the health and safety of'the public in the Oswego area. | ||
health and safety of'the public in the Oswego area. | i I am enclosing a copy of a paper prepared by the NRC staff that gives l | ||
i I am enclosing a copy of a paper prepared by the NRC staff that gives | information related to' shroud activities nationwide. | ||
contact me. | I trust that you will find this information useful. | ||
If I can be of further assistance, please contact me. | |||
Sincerely, | Sincerely, | ||
)a L l | |||
L | 7 Shirley Ann Jackson | ||
==Enclosure:== | ==Enclosure:== | ||
As stated i | As stated i | ||
d i | d i | ||
8 | 8}} | ||
Latest revision as of 16:21, 11 December 2024
| ML20140G898 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 05/01/1997 |
| From: | Shirley Ann Jackson, The Chairman NRC COMMISSION (OCM) |
| To: | James Mchugh HOUSE OF REP. |
| Shared Package | |
| ML20140C487 | List: |
| References | |
| NUDOCS 9705120237 | |
| Download: ML20140G898 (2) | |
Text
.
/
~PDPs UNn1D STATES
[.M l
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2065/A001 e%.....[
May 1, 1997 CHAIRMAN j
The Honorable John M. McHugh i
United States House of Representatives Washington, D.C.
20515-3224
Dear Congressman McHugh:
~
I am responding to your letter of April 10, 1997, in which you expressed the i
concerns of several Oswego County residents, including a county legislator, regarding vertical cracks in the welds of the core shroud at Niagara Mohawk Power Corporation's Nine Mile Point Unit I reactor in Scriba, New York. The Commission recognizes that safety of the core shroud is important to the people of the Oswego area. On April 8,1997, the licensee submitted to the U.S. Nuclear Regulatory Commission (NRC) its inspection findings and evaluation of the core shroud issue.
The licensee presented this information for discussion at the meeting on April 14, 1997, with the NRC and the public at the. Joint News Center in Fulton, New York.
I assure you that the NRC is conducting a very careful independent review of the licensee's April 8 submittal to determine whether or not the shroud is acceptable for continued use at Nine Mile Point Unit 1.
The NRC staff is reviewing the licensee's evaluation and root cause determination regarding the observed degradation of the core shroud (e.g., the l
cracks found in the vertical welds) and the tie rods of Nine Mile Point Unit 1.
It is Niagara Mohawk's responsibility as a licensee to demonstrate to l
the NRC staff that the existing shroud and the repaired tie rods meet the l
requirements set forth in NRC regulations (which endorse the code and standards of the American Society of Mechanical Engineers) to ensure safe operation of the shroud. After completing its technical review, the NRC staff will issue a safety evaluation report to the licensee that accepts or rejects the licensee's conclusions regarding the safe operation of the plant with the i
current shroud. The staff will inform you of its technical review and send you a copy of this report. This report also will be made available to the M
public through the local public document room in the Oswego area.
With regard to your concern about the absence of an independent technical review, Niagara Mohawk has engaged several consultants and vendors in g
j performing the appropriate analyses of the current condition of the shroud and its safety for continued operation. These consultants include the General Electric Company, which designed the shroud when the plant was constructed; Structural Integrity Associates; MPM Technologies; and the Altran Corporation.
In addition, the NRC staff is conducting an engineering review of the licensee's evaluations (which include their consultants' analyses) to ensure that the design bases for the shroud are met.
Furthermore, the NRC technical staff is following this issue closely and is assessing the shroud tie rod
.hhhlllllill 9705120237 970501
P O
r 2
repairs performed by the licensee. You can be assured that the plant will not restart until the'NRC is satisfied that there will be no undue risk to the health and safety of'the public in the Oswego area.
i I am enclosing a copy of a paper prepared by the NRC staff that gives l
information related to' shroud activities nationwide.
I trust that you will find this information useful.
If I can be of further assistance, please contact me.
Sincerely,
)a L l
Enclosure:
As stated i
d i
8