ML20147C709: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:. | {{#Wiki_filter:. | ||
DUlm POWEIt COMPANY TttteHesti ant e e 802 "8 | |||
{/'l September 26, 1978 Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Catawba Nuclear Station IE:II:JJB Inspection Reports: 50-413/78-8 and 50-414/78-7 Duke File: CN-1412.ll-1 | OI:N1;IC A L OFFICICS y | ||
422 $00TH CHURCH $17tti g g [B CII Alt Lo'I'n:. N. C. O S2-12 g.// | |||
{/'l September 26, 1978 Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Catawba Nuclear Station IE:II:JJB Inspection Reports: | |||
50-413/78-8 and 50-414/78-7 Duke File: | |||
CN-1412.ll-1 | |||
==Dear Mr. O'Reilly:== | ==Dear Mr. O'Reilly:== | ||
In response to Mr. Murphy's letter of September 21, 1978 transmitting the subjcct IE Inspection Reports, Duke Power does not consider any of the information contained in those reports to be proprietary. | In response to Mr. Murphy's letter of September 21, 1978 transmitting the subjcct IE Inspection Reports, Duke Power does not consider any of the information contained in those reports to be proprietary. | ||
Very truly yours, k | Very truly yours, k | ||
| Line 28: | Line 31: | ||
Design Engineering JDW/tas l | Design Engineering JDW/tas l | ||
1 93 :lla 62d3S P.! | 1 93 :lla 62d3S P.! | ||
7 2//>/ W W | 7 2//>/ W W YlO8030 'Y1NY '" | ||
- >= u r T: | |||
1 | 1 | ||
_}} | |||
Latest revision as of 13:30, 11 December 2024
| ML20147C709 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 09/26/1978 |
| From: | Dail L DUKE POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20147C713 | List: |
| References | |
| NUDOCS 7810130096 | |
| Download: ML20147C709 (1) | |
Text
.
DUlm POWEIt COMPANY TttteHesti ant e e 802 "8
OI:N1;IC A L OFFICICS y
422 $00TH CHURCH $17tti g g [B CII Alt Lo'I'n:. N. C. O S2-12 g.//
{/'l September 26, 1978 Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Catawba Nuclear Station IE:II:JJB Inspection Reports:
50-413/78-8 and 50-414/78-7 Duke File:
CN-1412.ll-1
Dear Mr. O'Reilly:
In response to Mr. Murphy's letter of September 21, 1978 transmitting the subjcct IE Inspection Reports, Duke Power does not consider any of the information contained in those reports to be proprietary.
Very truly yours, k
L. C. Dail Vice President I
Design Engineering JDW/tas l
1 93 :lla 62d3S P.!
7 2//>/ W W YlO8030 'Y1NY '"
- >= u r T:
1
_