ML20153C849: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
                ..._ ._                  .-              ..                            -m_,        , ,,
-m_,
e
e
                    >****%                              UNITED STATES
#o UNITED STATES NUCLEAR REGULATORY COMMISSION y
                            #o
g W ASHIN GTON, D.C. 20Sf 5
* y                g NUCLEAR REGULATORY COMMISSION g                     W ASHIN GTON, D.C. 20Sf 5
{
{
              %,...../                               November 12, 1981 OPFCEOPTHE COMMISSIONER l
g
Ms. Susan Stanners 2722 Honolulu #11 Montrose, CA 91020 l
%,...../
November 12, 1981 OPFCEOPTHE COMMISSIONER l
Ms. Susan Stanners 2722 Honolulu #11 l
Montrose, CA 91020


==Dear Ms. Stanners:==
==Dear Ms. Stanners:==
 
Tnank you very much for your. letter regarding Diablo Canyon. The recent Cont,sion decision authorizing low-power testing and fuel loading i
  ;                          Tnank you very much for your. letter regarding Diablo Canyon. The
is only the first step in Comission review of this plant. Specifically, i
  ,                    recent Cont ,sion decision authorizing low-power testing and fuel loading             '
the earthquake-related issues that distinguish Diablo Canyon from most I
i                    is only the first step in Comission review of this plant. Specifically, i                     the earthquake-related issues that distinguish Diablo Canyon from most I                   other nuclear units have not yet been addressed in detail by the Commission.
other nuclear units have not yet been addressed in detail by the Commission.
1 They will be reviewed before operation above five percent power is authorized.
1 They will be reviewed before operation above five percent power is authorized.
i
i While it may have some symbolic importance, a decision to authorize low-power testing poses very little danger to the public. The power level is so low that the operators have more than ample time to react to 4
  !                          While it may have some symbolic importance, a decision to authorize
any problems in the plant, and the amount of radioactivity existing in the core does not begin to build up until the plant has operated for l
  ,                    low-power testing poses very little danger to the public. The power                   l 4
i quite a while, i
level is so low that the operators have more than ample time to react to
j Sincerely, h/
  .                    any problems in the plant, and the amount of radioactivity existing in the core does not begin to build up until the plant has operated for                 l i                   quite a while,                                                                         i j                                                               Sincerely, h/
Peter A. Bradford Comissioner 0
Peter A. Bradford Comissioner l
8805090004 000418 PDR FOIA HAMLIN87-444 PDR I
0 8805090004 000418 PDR         FOIA HAMLIN87-444                 PDR                                                               I
(
(
                                                                                                  ~}}
~}}

Latest revision as of 03:00, 11 December 2024

Ack Receipt of Ltr Re Plant.Coomission Decision Authorizing Low Power Testing & Fuel Loading First Step in Review. Earthquake-related Issues Will Be Addressed in Detail by Commission
ML20153C849
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 11/12/1981
From: Bradford P
NRC COMMISSION (OCM)
To: Stanners S
AFFILIATION NOT ASSIGNED
Shared Package
ML20151Y970 List: ... further results
References
FOIA-87-444 NUDOCS 8805090004
Download: ML20153C849 (1)


Text

.

-m_,

e

  1. o UNITED STATES NUCLEAR REGULATORY COMMISSION y

g W ASHIN GTON, D.C. 20Sf 5

{

g

%,...../

November 12, 1981 OPFCEOPTHE COMMISSIONER l

Ms. Susan Stanners 2722 Honolulu #11 l

Montrose, CA 91020

Dear Ms. Stanners:

Tnank you very much for your. letter regarding Diablo Canyon. The recent Cont,sion decision authorizing low-power testing and fuel loading i

is only the first step in Comission review of this plant. Specifically, i

the earthquake-related issues that distinguish Diablo Canyon from most I

other nuclear units have not yet been addressed in detail by the Commission.

1 They will be reviewed before operation above five percent power is authorized.

i While it may have some symbolic importance, a decision to authorize low-power testing poses very little danger to the public. The power level is so low that the operators have more than ample time to react to 4

any problems in the plant, and the amount of radioactivity existing in the core does not begin to build up until the plant has operated for l

i quite a while, i

j Sincerely, h/

Peter A. Bradford Comissioner 0

8805090004 000418 PDR FOIA HAMLIN87-444 PDR I

(

~