ML20155F080: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 15: | Line 15: | ||
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE | ||
| page count = 3 | | page count = 3 | ||
| project = TAC:MA0863 | |||
| stage = Other | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:! | ||
l l | l l | ||
@ MQ t | |||
UNITED STATES s | |||
j NUCLEAR REGULATORY COMMISSION e | |||
WASHINGTON, D.C. 20665-0001 | |||
%,.....,d November 3, 1998 i | |||
l l | |||
Mr. Lou Liberatori, Chairman i | |||
Westinghouse Owners Group Steering Committee Indian Point Unit 2 Broadway & Bleakley Ave. | |||
Buchanan, NY 10511 l | |||
l | |||
==SUBJECT:== | ==SUBJECT:== | ||
REVISED PAGE 9 OF THE SAFETY EVALUATION RELATED TO TOPICAL | REVISED PAGE 9 OF THE SAFETY EVALUATION RELATED TO TOPICAL i | ||
topical report, submitted by the Westinghouse Owners Group (WOG) by letter dated January | REPORT WCAP-14036, REVISION 1, " ELIMINATION OF PERIODIC PROTECTION CHANNEL RESPONSE TIME TESTS"(TAC NO. MA0863) | ||
report concerning the components covered by the Solid State Protection Syatem in the topical report. | The NRC staff forwarded to you, on October 5,1998, the safety evaluation report on the subject I | ||
i | topical report, submitted by the Westinghouse Owners Group (WOG) by {{letter dated|date=January 22, 1998|text=letter dated January 22,1998}}. After a telephone conversation with members of the WOG, the staff prepared the attached modified page 9 of the report, correcting typographical errors made in the original report concerning the components covered by the Solid State Protection Syatem in the topical report. | ||
i This modification does not change the conclusion reached in the SER, nor does it change the logic used to reach those conclusions. The only change is to the list of components within the i | |||
Solid State Protection System. | |||
Please replace the current page 9 in the SER with the modified page 9. | Please replace the current page 9 in the SER with the modified page 9. | ||
1 Should you have any questions or wish further clarification, please call r,1e at (301) 415 2919, or Paul Loeser at (301) 415-2825. | 1 Should you have any questions or wish further clarification, please call r,1e at (301) 415 2919, or Paul Loeser at (301) 415-2825. | ||
I Sincyely, l& S Thomas H. Essig, Actin | I | ||
: Sincyely, l& S Thomas H. Essig, Actin hief e | |||
ssues ad EnWonantal &and 9811050293 981103 PDR TOPRP EUTOQWE D.ivision of Reactor Program Management C | |||
PDR Office of Nuclear Reactor Regulation d | |||
Project No. 694 3 | |||
==Enclosure:== | ==Enclosure:== | ||
Page 9 of SER | Page 9 of SER D<r0 cc w/ enc: See next page I | ||
i 0] (99 | i 0] (99 fhD3 b 9 h l | ||
O November 3, 1998 The NRC staff forwarded to you, on October 5,1998, the safety evaluation report on the subject | O November 3, 1998 The NRC staff forwarded to you, on October 5,1998, the safety evaluation report on the subject topical report, submitted by the Westinghouse Owners Group (WOG) by {{letter dated|date=January 22, 1998|text=letter dated January 22,1998}}. After a telephone conversation with members of the WOG, the staff prepared the attached modified page 9 of the report, correcting typographical errors made in the original report concerning the components covered by the Solid State Protection System in the topical report. | ||
topical report, submitted by the Westinghouse Owners Group (WOG) by letter dated January 22,1998. After a telephone conversation with members of the WOG, the staff prepared the attached modified page 9 of the report, correcting typographical errors made in the original report concerning the components covered by the Solid State Protection System in the topical report. | |||
This modification does not change the conclusion reached in the SER, nor does it change the logic used to reach those conclusions. The only change is to the list of components within the Solid State Protection System. | This modification does not change the conclusion reached in the SER, nor does it change the logic used to reach those conclusions. The only change is to the list of components within the Solid State Protection System. | ||
Please replace the current page 9 in the SER with the modified page 9. | Please replace the current page 9 in the SER with the modified page 9. | ||
Should you have any questions or wish further clarification, please call me at (301) 415-2919, or Paul Loeser at (301) 415 2825. | Should you have any questions or wish further clarification, please call me at (301) 415-2919, or Paul Loeser at (301) 415 2825. | ||
Sincerely, Original Signed By: | Sincerely, Original Signed By: | ||
Thomas H. Essig, Acting Chief Generic issues and Environmental Dranch | Thomas H. Essig, Acting Chief Generic issues and Environmental Dranch Division of Reactor Program Management Office of Nuclear Reactor Regulation Project No. 694 | ||
Division of Reactor Program Management | |||
Office of Nuclear Reactor Regulation | |||
==Enclosure:== | ==Enclosure:== | ||
Page 9 of SER cc w/ enc: See next page DISTRIBUTION: | Page 9 of SER cc w/ enc: See next page DISTRIBUTION: | ||
Central File PUBLIC | Central File PUBLIC RL Spessard JWermlel JMauck HICB r/f PLoeser PWen PGEB r/f OGC ACRS To receive a copy of this document, indicate in the box C= Copy w/o attachment / enclosure E= Copy withattachment/ enclosure N = No copy SC:bf (A) BC:PGEB OFFICE PM:PGEB E. | ||
DATE | HlCB NAME PWen N PLoeser$ | ||
FAkstulewfcz TEssig hb DATE 11Q /98 11/ 2/98 11/c4 /98 y/ 3 /98 OFFICIAL RECORD COPY g, r; 00 080019 NRC Ptlf EEN $bb | |||
O i | O i | ||
1 Westinghouse Owners Group Project No. 694 | 1 Westinghouse Owners Group Project No. 694 | ||
- cc: | |||
- Mr. Nicholas Liparulo, Manager | |||
- Equipmm. % sign and Regulatory Engineering | |||
- Westinghouse Electric Corporation-Mail Stop ECE 4-15 P.O. Box 355 | |||
~ | |||
Pittsburgh, PA 15230-0355 Mr. Andrew Drake, Project Manager Westinghouse Owners Group Westinghouse Electric Corporation - | Pittsburgh, PA 15230-0355 Mr. Andrew Drake, Project Manager Westinghouse Owners Group Westinghouse Electric Corporation - | ||
Mail Stop ECE 516 | Mail Stop ECE 516 | ||
' P.O. Box 355 | |||
~ Pittc, burgh, PA 15230-0355 Mr. Jack Bastin, Director Regulatory Affairs Westinghouse Electric Corporation | |||
' 11921 Rockville Pike | |||
- Suite 107 Rockville, MD 20852 Mr.' Hank Sepp, Manager Regulatory and Licencing Engineering Westinghouse Electric Corporation PO Box 355 | |||
- Pittsburgh, PA 15230-0355 b | |||
4 1 | 4 1 | ||
4 P 4 | |||
!l;[ | |||
A~- | |||
p | |||
,Ar, e | |||
n a | |||
.,v,, | |||
w- | |||
~w, p | |||
4}} | |||
Latest revision as of 21:33, 10 December 2024
| ML20155F080 | |
| Person / Time | |
|---|---|
| Issue date: | 11/03/1998 |
| From: | Essig T NRC (Affiliation Not Assigned) |
| To: | Liberatori L WESTINGHOUSE OPERATING PLANTS OWNERS GROUP |
| Shared Package | |
| ML20155F084 | List: |
| References | |
| PROJECT-694 TAC-MA0863, TAC-MA863, NUDOCS 9811050293 | |
| Download: ML20155F080 (3) | |
Text
!
l l
@ MQ t
UNITED STATES s
j NUCLEAR REGULATORY COMMISSION e
WASHINGTON, D.C. 20665-0001
%,.....,d November 3, 1998 i
l l
Mr. Lou Liberatori, Chairman i
Westinghouse Owners Group Steering Committee Indian Point Unit 2 Broadway & Bleakley Ave.
Buchanan, NY 10511 l
l
SUBJECT:
REVISED PAGE 9 OF THE SAFETY EVALUATION RELATED TO TOPICAL i
REPORT WCAP-14036, REVISION 1, " ELIMINATION OF PERIODIC PROTECTION CHANNEL RESPONSE TIME TESTS"(TAC NO. MA0863)
The NRC staff forwarded to you, on October 5,1998, the safety evaluation report on the subject I
topical report, submitted by the Westinghouse Owners Group (WOG) by letter dated January 22,1998. After a telephone conversation with members of the WOG, the staff prepared the attached modified page 9 of the report, correcting typographical errors made in the original report concerning the components covered by the Solid State Protection Syatem in the topical report.
i This modification does not change the conclusion reached in the SER, nor does it change the logic used to reach those conclusions. The only change is to the list of components within the i
Solid State Protection System.
Please replace the current page 9 in the SER with the modified page 9.
1 Should you have any questions or wish further clarification, please call r,1e at (301) 415 2919, or Paul Loeser at (301) 415-2825.
I
- Sincyely, l& S Thomas H. Essig, Actin hief e
ssues ad EnWonantal &and 9811050293 981103 PDR TOPRP EUTOQWE D.ivision of Reactor Program Management C
PDR Office of Nuclear Reactor Regulation d
Project No. 694 3
Enclosure:
Page 9 of SER D<r0 cc w/ enc: See next page I
i 0] (99 fhD3 b 9 h l
O November 3, 1998 The NRC staff forwarded to you, on October 5,1998, the safety evaluation report on the subject topical report, submitted by the Westinghouse Owners Group (WOG) by letter dated January 22,1998. After a telephone conversation with members of the WOG, the staff prepared the attached modified page 9 of the report, correcting typographical errors made in the original report concerning the components covered by the Solid State Protection System in the topical report.
This modification does not change the conclusion reached in the SER, nor does it change the logic used to reach those conclusions. The only change is to the list of components within the Solid State Protection System.
Please replace the current page 9 in the SER with the modified page 9.
Should you have any questions or wish further clarification, please call me at (301) 415-2919, or Paul Loeser at (301) 415 2825.
Sincerely, Original Signed By:
Thomas H. Essig, Acting Chief Generic issues and Environmental Dranch Division of Reactor Program Management Office of Nuclear Reactor Regulation Project No. 694
Enclosure:
Page 9 of SER cc w/ enc: See next page DISTRIBUTION:
Central File PUBLIC RL Spessard JWermlel JMauck HICB r/f PLoeser PWen PGEB r/f OGC ACRS To receive a copy of this document, indicate in the box C= Copy w/o attachment / enclosure E= Copy withattachment/ enclosure N = No copy SC:bf (A) BC:PGEB OFFICE PM:PGEB E.
HlCB NAME PWen N PLoeser$
FAkstulewfcz TEssig hb DATE 11Q /98 11/ 2/98 11/c4 /98 y/ 3 /98 OFFICIAL RECORD COPY g, r; 00 080019 NRC Ptlf EEN $bb
O i
1 Westinghouse Owners Group Project No. 694
- cc:
- Mr. Nicholas Liparulo, Manager
- Equipmm. % sign and Regulatory Engineering
- Westinghouse Electric Corporation-Mail Stop ECE 4-15 P.O. Box 355
~
Pittsburgh, PA 15230-0355 Mr. Andrew Drake, Project Manager Westinghouse Owners Group Westinghouse Electric Corporation -
Mail Stop ECE 516
' P.O. Box 355
~ Pittc, burgh, PA 15230-0355 Mr. Jack Bastin, Director Regulatory Affairs Westinghouse Electric Corporation
' 11921 Rockville Pike
- Suite 107 Rockville, MD 20852 Mr.' Hank Sepp, Manager Regulatory and Licencing Engineering Westinghouse Electric Corporation PO Box 355
- Pittsburgh, PA 15230-0355 b
4 1
4 P 4
!l;[
A~-
p
,Ar, e
n a
.,v,,
w-
~w, p
4