ML20199B190: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:_ _ - _ _ - _
{{#Wiki_filter:_ _ - _ _ - _
November 6, 1997 v         Mr. George A. Hunger, Jr.
November 6, 1997 v
    '/-                   Director-Licensing, MC 62A-1 PECO Energy Comnany Nuclear Group lieadquarters Correspondence Control Desk
Mr. George A. Hunger, Jr.
                          -P.O. Box No. 195
'/-
        '          t    l Wayne, PA 19087-0195
Director-Licensing, MC 62A-1 PECO Energy Comnany Nuclear Group lieadquarters Correspondence Control Desk
                    ~
-P.O. Box No. 195 l Wayne, PA 19087-0195 t


==SUBJECT:==
==SUBJECT:==
EMERGENCY RESPONSE DATA SYSTEM " DATA POINT LIBRARY CHANGES, PEdCHI BOTTOM ATOMIC POWER STATION, UNIT NOS. 2 AND 3
EMERGENCY RESPONSE DATA SYSTEM " DATA POINT LIBRARY CHANGES, PEdCHI
~
BOTTOM ATOMIC POWER STATION, UNIT NOS. 2 AND 3


==Dear Mr. Hunger:==
==Dear Mr. Hunger:==
Your {{letter dated|date=October 6, 1997|text=October 6, 1997, letter}} forwarded updated Emergency Response Data System Data Point Library (DPL) information to us in accordance with Title ~ 10 of the
Your {{letter dated|date=October 6, 1997|text=October 6, 1997, letter}} forwarded updated Emergency Response Data System Data Point Library (DPL) information to us in accordance with Title ~ 10 of the Code'of Fede 11 Reoulations, Part SQ, Appendix E, Section VI.3.a.
* Code'of Fede 11 Reoulations, Part SQ, Appendix E, Section VI.3.a. You indicated t , .t you implemented data point changes, but failed to submit the
You indicated t,.t you implemented data point changes, but failed to submit the
                          . changes to us on the docket within 30 days as Appendix E requires.                                                                                             <
. changes to us on the docket within 30 days as Appendix E requires.
                          ,We have reviewed your data point changes and find that the information you provided is incomplete, and is not in the format required for full use in the Emergency Response Data System. The information required for DPL changes is outlined in NUREG-1394, Rev. 1. Appendices C through I provide the necessary format and background information for submitting DPL information. Also, you did not indicate whether the data points identified in the enclosure to your letter are points to L,e added to the original DPLs, or if these points are to replace currently existing points in your DPLs. Please send us a corrected data point listing. You can contact me at (301) 415-1423, if you have any questions.
,We have reviewed your data point changes and find that the information you provided is incomplete, and is not in the format required for full use in the Emergency Response Data System. The information required for DPL changes is outlined in NUREG-1394, Rev. 1.
Appendices C through I provide the necessary format and background information for submitting DPL information. Also, you did not indicate whether the data points identified in the enclosure to your letter are points to L,e added to the original DPLs, or if these points are to replace currently existing points in your DPLs.
Please send us a corrected data point listing.
You can contact me at (301) 415-1423, if you have any questions.
Sincerely,
Sincerely,
                                                                                                                          /s/
/s/
L. Mark Padovan, Project Manager Project Directorate 1-2 Division of Reactor Projects - I/II Office cf Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc: See next page                                                                                                                                                           j DISTRIBUTION:                                                                                                                                                    #
L. Mark Padovan, Project Manager Project Directorate 1-2 Division of Reactor Projects - I/II Office cf Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc: See next page j
Docket File PUBLIC M0'Brien LPadovan JJolicoeur                                                                      h i
h
{
{
i
DISTRIBUTION:
                                                                                                                                                                                                          , D PDI-2 Reading                                           CAnderson, RGN-1 BBoger                                                 JStolz 0FFICE                                          PDI-2/PM  ,y    PDI-2/LA[h         PD N IO NAME                                             LPadovan:ch     M0'Brien '   Id JSth DATE                                            d / 4 /97       0 / b /97                             /$/97                                                   *          '
, D Docket File M0'Brien JJolicoeur i
0FFICIAL RECORD COPY DOCUMENT NAME: ERDS.LTR 9711180240 971106 PDR     ADOCK 05000277 l ,                    , ,
i PUBLIC LPadovan PDI-2 Reading CAnderson, RGN-1 BBoger JStolz PDI-2/LA[h PD N IO 0FFICE PDI-2/PM
,y NAME LPadovan:ch M0'Brien ' Id JSth 4 97 0 / b /97
/$/97 DATE d /
/
0FFICIAL RECORD COPY DOCUMENT NAME: ERDS.LTR 9711180240 971106 PDR ADOCK 05000277 l


7    ge' "8!ug j p=         *,                        UNITED STATES
g ' "8!ug 7
,1 g j
e j
2 NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. ma =1 November 6, 1997
p=
      % ..... [
UNITED STATES
Mr. George A. Hunger, Jr.
,1 g
j NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. ma =1
%..... [
November 6, 1997 Mr. George A. Hunger, Jr.
Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19087-0195
Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19087-0195


==SUBJECT:==
==SUBJECT:==
EMERGENCY RESPONSE DATA SYSTEM                                         DATA POINT LIBRARY CHANCES, PEACH BOTTOM ATOMIC POWER STATION, UNIT NOS. 2 AND 3
EMERGENCY RESPONSE DATA SYSTEM DATA POINT LIBRARY CHANCES, PEACH BOTTOM ATOMIC POWER STATION, UNIT NOS. 2 AND 3


==Dear Mr. Hunger:==
==Dear Mr. Hunger:==
Your {{letter dated|date=October 6, 1997|text=October 6, 1997, letter}} forwarded updated Emerger.cy Ressonse Data System Data Point Library (DPL) information to us in accordance wit 1 Title 10 of the Code of Federal Reaulations, Part 50, Appendix E, Section VI.3.a. You indicated that you implemented data point changes, but failed to submit the changes to us on the docket within 30 days as Appendix E requires.
Your {{letter dated|date=October 6, 1997|text=October 6, 1997, letter}} forwarded updated Emerger.cy Ressonse Data System Data Point Library (DPL) information to us in accordance wit 1 Title 10 of the Code of Federal Reaulations, Part 50, Appendix E, Section VI.3.a.
We have reviewed your data point changes and find that the infonnation you provided is incomplete, and is not in the format required for full use in the Emergency Response Data System. The information required for DPL changes is outlined in NUREG-1394, Rev. 1. Appendices C through I provide the necessary format and background information for submitting DPL information. Also, you did not indicate whether the data points identified in the enclosure to your letter are points to be added to the original DPLs, or if these points are to replace currently existing points in your DPLs. Please send us a corrected data point listing. You can contact me at (301) 415-1423, if you have any questions.
You indicated that you implemented data point changes, but failed to submit the changes to us on the docket within 30 days as Appendix E requires.
Sincerely, N.                                                                               cd-L. Mark Padovan, Project Manager Project Directorate I-2 Division of Reactor Prc,jects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc: See next page l
We have reviewed your data point changes and find that the infonnation you provided is incomplete, and is not in the format required for full use in the Emergency Response Data System. The information required for DPL changes is outlined in NUREG-1394, Rev. 1.
Appendices C through I provide the necessary format and background information for submitting DPL information. Also, you did not indicate whether the data points identified in the enclosure to your letter are points to be added to the original DPLs, or if these points are to replace currently existing points in your DPLs. Please send us a corrected data point listing. You can contact me at (301) 415-1423, if you have any questions.
Sincerely, N.
cd-L. Mark Padovan, Project Manager Project Directorate I-2 Division of Reactor Prc,jects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc: See next page l
l
l
__ _ _ . _                  . . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _-__________._____. .__.__-___________- -    - ~
~


-i                         .>
-i 0
0                              Mr. George A. Hunger, Jr.                 Peach Bottom Atomic Powe? Station, i                               PECO Energy Company                         Units 2 and 3 cc:
Mr. George A. Hunger, Jr.
J. W. Durham, Sr., Esquire                 Chief-Division of Nuclear Safety Sr. V.P. & General Counsel               PA Dept. of PECO Energy Company                         Environwntal Resources 2301 Market Street, S26-1                 P.O. Box 8469 Philadelphia, PA 19101                   Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Botton Atomic Power Station         Peach Bottum Township 1848 Lay Road                           R. D. #1 Delta, PA 17314                           Delta, PA 17314 PECO Energy Cc'npany                     Public Service Commission of Maryland ATTN:     Regulatory Engineer, A4-5S     Engineering Division Peach Bottom Atomic Power Station       Chief Engineer 1848 Lay Road                           6 St. Paul Centre Delta, PA 17314                         Baltimore, MD 21202-6806 Resident Inspector                       Mr. Richard McLean U.S. Nuclear Regulatory Commission       Power Plant and Environmental Peach Bottom Atomic Power Station         Review Division P.O. Box 399                           Department of Natural Resources Delta, PA 17314                         B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission     Dr. Judith Johnsrud 475 Allendale Road                     National Energy Committee King of Prussia, PA 19406               Sierra Club 433 Orlando Avenue Mr. Roland Fletcher                     State College, PA 16803                                                                                                 g Department of Environment 201 West Preston Street                 Manager-Business & Co-owner Affairs Baltimore, MD 21201                     Public Service E'ectric and Gas Company A. F. Kirby, TII                       D.O. Box 236 External Operations - Nuclear         Hancocks Bridge, NJ 08038-0236 Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899                   Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company                   Nuclear Group Headquarters Plant Manager                         Correspondence Control Desk Peach Bottom Atomic Power Station     P.O. Box No. 195 1848 Lay Road                         Wayne, PA 19087-0195 Delta, PA -17314 i
Peach Bottom Atomic Powe? Station, i
                              . . . . . .    ..                                  _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ -}}
PECO Energy Company Units 2 and 3 cc:
J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of PECO Energy Company Environwntal Resources 2301 Market Street, S26-1 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Botton Atomic Power Station Peach Bottum Township 1848 Lay Road R. D. #1 Delta, PA 17314 Delta, PA 17314 PECO Energy Cc'npany Public Service Commission of Maryland ATTN:
Regulatory Engineer, A4-5S Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA 17314 Baltimore, MD 21202-6806 Resident Inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 g
Department of Environment 201 West Preston Street Manager-Business & Co-owner Affairs Baltimore, MD 21201 Public Service E'ectric and Gas Company A. F. Kirby, TII D.O. Box 236 External Operations - Nuclear Hancocks Bridge, NJ 08038-0236 Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company Nuclear Group Headquarters Plant Manager Correspondence Control Desk Peach Bottom Atomic Power Station P.O. Box No. 195 1848 Lay Road Wayne, PA 19087-0195 Delta, PA -17314 i
_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ -}}

Latest revision as of 08:42, 10 December 2024

Requests Corrected Data Point Listing Re 971006 Updated Emergency Response Data Sys,Data Point Library Changes for Peach Bottom Atomic Power Station,Units 2 & 3
ML20199B190
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/06/1997
From: Padovan L
NRC (Affiliation Not Assigned)
To: Hunger G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 9711180240
Download: ML20199B190 (3)


Text

_ _ - _ _ - _

November 6, 1997 v

Mr. George A. Hunger, Jr.

'/-

Director-Licensing, MC 62A-1 PECO Energy Comnany Nuclear Group lieadquarters Correspondence Control Desk

-P.O. Box No. 195 l Wayne, PA 19087-0195 t

SUBJECT:

EMERGENCY RESPONSE DATA SYSTEM " DATA POINT LIBRARY CHANGES, PEdCHI

~

BOTTOM ATOMIC POWER STATION, UNIT NOS. 2 AND 3

Dear Mr. Hunger:

Your October 6, 1997, letter forwarded updated Emergency Response Data System Data Point Library (DPL) information to us in accordance with Title ~ 10 of the Code'of Fede 11 Reoulations, Part SQ, Appendix E,Section VI.3.a.

You indicated t,.t you implemented data point changes, but failed to submit the

. changes to us on the docket within 30 days as Appendix E requires.

,We have reviewed your data point changes and find that the information you provided is incomplete, and is not in the format required for full use in the Emergency Response Data System. The information required for DPL changes is outlined in NUREG-1394, Rev. 1.

Appendices C through I provide the necessary format and background information for submitting DPL information. Also, you did not indicate whether the data points identified in the enclosure to your letter are points to L,e added to the original DPLs, or if these points are to replace currently existing points in your DPLs.

Please send us a corrected data point listing.

You can contact me at (301) 415-1423, if you have any questions.

Sincerely,

/s/

L. Mark Padovan, Project Manager Project Directorate 1-2 Division of Reactor Projects - I/II Office cf Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc: See next page j

h

{

DISTRIBUTION:

, D Docket File M0'Brien JJolicoeur i

i PUBLIC LPadovan PDI-2 Reading CAnderson, RGN-1 BBoger JStolz PDI-2/LA[h PD N IO 0FFICE PDI-2/PM

,y NAME LPadovan:ch M0'Brien ' Id JSth 4 97 0 / b /97

/$/97 DATE d /

/

0FFICIAL RECORD COPY DOCUMENT NAME: ERDS.LTR 9711180240 971106 PDR ADOCK 05000277 l

g ' "8!ug 7

e j

p=

UNITED STATES

,1 g

j NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. ma =1

%..... [

November 6, 1997 Mr. George A. Hunger, Jr.

Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19087-0195

SUBJECT:

EMERGENCY RESPONSE DATA SYSTEM DATA POINT LIBRARY CHANCES, PEACH BOTTOM ATOMIC POWER STATION, UNIT NOS. 2 AND 3

Dear Mr. Hunger:

Your October 6, 1997, letter forwarded updated Emerger.cy Ressonse Data System Data Point Library (DPL) information to us in accordance wit 1 Title 10 of the Code of Federal Reaulations, Part 50, Appendix E,Section VI.3.a.

You indicated that you implemented data point changes, but failed to submit the changes to us on the docket within 30 days as Appendix E requires.

We have reviewed your data point changes and find that the infonnation you provided is incomplete, and is not in the format required for full use in the Emergency Response Data System. The information required for DPL changes is outlined in NUREG-1394, Rev. 1.

Appendices C through I provide the necessary format and background information for submitting DPL information. Also, you did not indicate whether the data points identified in the enclosure to your letter are points to be added to the original DPLs, or if these points are to replace currently existing points in your DPLs. Please send us a corrected data point listing. You can contact me at (301) 415-1423, if you have any questions.

Sincerely, N.

cd-L. Mark Padovan, Project Manager Project Directorate I-2 Division of Reactor Prc,jects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc: See next page l

l

~

-i 0

Mr. George A. Hunger, Jr.

Peach Bottom Atomic Powe? Station, i

PECO Energy Company Units 2 and 3 cc:

J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of PECO Energy Company Environwntal Resources 2301 Market Street, S26-1 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Botton Atomic Power Station Peach Bottum Township 1848 Lay Road R. D. #1 Delta, PA 17314 Delta, PA 17314 PECO Energy Cc'npany Public Service Commission of Maryland ATTN:

Regulatory Engineer, A4-5S Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA 17314 Baltimore, MD 21202-6806 Resident Inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region I U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 g

Department of Environment 201 West Preston Street Manager-Business & Co-owner Affairs Baltimore, MD 21201 Public Service E'ectric and Gas Company A. F. Kirby, TII D.O. Box 236 External Operations - Nuclear Hancocks Bridge, NJ 08038-0236 Delmarva Power & Light Company P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company Nuclear Group Headquarters Plant Manager Correspondence Control Desk Peach Bottom Atomic Power Station P.O. Box No. 195 1848 Lay Road Wayne, PA 19087-0195 Delta, PA -17314 i

_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ -