{{#Wiki_filter:.          . _ .    ,-                    .            .-        - - - - . -                -. ..
{{#Wiki_filter:.
        .    <                                                                                                      i i
i i
NOTICE OF VIOLATION                                                   l
NOTICE OF VIOLATION l
    .      Southern Nuclear Operating                             Docket Nos. 50-321, 50 366 Company.Inc                                       License Nos. DPR-57. NPF-5 Hatch Units 1 and 2 During the NRC inspection conducted on August 17. 1997, through October 4.-                           1 1997, a violation of NRC requirements was identified. In accordance with the
Southern Nuclear Operating Docket Nos. 50-321, 50 366 Company.Inc License Nos. DPR-57. NPF-5 Hatch Units 1 and 2 During the NRC inspection conducted on August 17. 1997, through October 4.-
          " General Statement of Policy and Procedure for NRC Enforcement Actions." MIREG                         !
1 1997, a violation of NRC requirements was identified.
.          1600, the violation is listed below:
In accordance with the
Unit 1~ and Unit 2 Technical Specificatiet         ) 5.4 re                                             l 4          written procedures shall be established, uglemented,               quired, coverin and maintained      in part, that       i
" General Statement of Policy and Procedure for NRC Enforcement Actions." MIREG 1600, the violation is listed below:
-          the activities in the applicable procedures recommended in Regulatory Guide'g (RG) 1.33. Revision 2. Appendix A. February 1978.
Unit 1~ and Unit 2 Technical Specificatiet
Appendix A of RG 1.33. Typical Procedures for Pressurized Water Reactors and                           f Boiling Water Reactors, paragraph 9. Procedure for performing maintenance.                             *
) 5.4 re l
          - part (e), recommends procedures for the control of maintenance, repair,
written procedures shall be established, uglemented, quired, in part, that and maintained coverin i
          = replacement, and modification work.                                                                   :
the activities in the applicable procedures recommended in Regulatory Guide'g 4
(RG) 1.33. Revision 2. Appendix A. February 1978.
Appendix A of RG 1.33. Typical Procedures for Pressurized Water Reactors and f
Boiling Water Reactors, paragraph 9. Procedure for performing maintenance.
- part (e), recommends procedures for the control of maintenance, repair,
= replacement, and modification work.
Administrative Control procedure 50AC MNT-001-05. Maintenance Program.
Administrative Control procedure 50AC MNT-001-05. Maintenance Program.
* Revision 25. Step 4.2.5. requires. in part, that plant maintenance be performed and contro11 d within the boundaries of work instructions of
Revision 25. Step 4.2.5. requires. in part, that plant maintenance be performed and contro11 d within the boundaries of work instructions of
          - Maintenance Work Ordrs. Step 8.2.2 and sub step 8.2.1.2 require. in part,                             i that non-safety and safety-related work instructions, block 23 of the                                 :
- Maintenance Work Ordrs. Step 8.2.2 and sub step 8.2.1.2 require. in part, i
Maintenance Work Order, state a specific scope of work using referenced                                 i miterial, at applicable. Step 8.5.1 require, in part, that prior to the start of-plant maintenance, the responsible personnel will perform a cursory review of the Maintenance Work Order package to ensure that the contents are                                 ,
that non-safety and safety-related work instructions, block 23 of the Maintenance Work Order, state a specific scope of work using referenced i
adequate.
miterial, at applicable.
i          Administrative Control Procedure 40AC-0CX-001-05. Quality Control Inspection                           ,
Step 8.5.1 require, in part, that prior to the start of-plant maintenance, the responsible personnel will perform a cursory review of the Maintenance Work Order package to ensure that the contents are adequate.
Program. Revision 7. Step 8.6.5 requires, in part, that the qualified Quality Control inspectors Jerform inspections in accordance with the approved Quality
Administrative Control Procedure 40AC-0CX-001-05. Quality Control Inspection i
          - Control Inspection )oint Assignment' Sheet.                                                           l Administrative Control Procedure 10AC MGR 019-0S " Procedure Use and                                   ,
Program. Revision 7. Step 8.6.5 requires, in part, that the qualified Quality Control inspectors Jerform inspections in accordance with the approved Quality l
Adherence." Revision 0. Step 8.2.1 requires, in part, that " Continuous Use"                           ,
- Control Inspection )oint Assignment' Sheet.
of a procedure is required when work being performed could affect the                                 i operability of a safety system.
Administrative Control Procedure 10AC MGR 019-0S " Procedure Use and Adherence." Revision 0. Step 8.2.1 requires, in part, that " Continuous Use" of a procedure is required when work being performed could affect the i
operability of a safety system.
Contrary to the above, writun procedures were not implemented in that:
Contrary to the above, writun procedures were not implemented in that:
: 1.       On August 15, 1997. Administrative Control procedure 50AC-MNT-001-OS.
1.
                  ~ Maintenance Program. Revision 25. Steps 4.2.5. 8.2.2. 8.~2.1.2. and 8.5.1                   -
On August 15, 1997. Administrative Control procedure 50AC-MNT-001-OS.
were not correctly performed. Unit 1 operations personnel developed a                       -
~ Maintenance Program. Revision 25. Steps 4.2.5. 8.2.2. 8.~2.1.2. and 8.5.1 were not correctly performed.
Maintenance Work Order and authorized maintenance work activities using-                     ;
Unit 1 operations personnel developed a Maintenance Work Order and authorized maintenance work activities using-a Maintenance Work Order with no work instructions, referenced material, or specific work scope identified. Maintenance work was completed using a Maintenance Work Order with inadequate instructions following a cursory review by responsible personnel.
.                    a Maintenance Work Order with no work instructions, referenced material, or specific work scope identified. Maintenance work was completed using a Maintenance Work Order with inadequate instructions following a                           ;
Moqi
cursory review by responsible personnel.
~
Enclosure 1 Moqi
~
      ~   ~       -          -        -        _                            -                      . .


Notice of Violation                         2
Notice of Violation 2
: 2.       On or before March 28. Step 8.6.5 of procedure 40AC-QCX-001-0S was not fully im)1emented. A VT1 inspection for re)lacement work activities on Reactor  r eedwater Inboard check valve 2B21 ;010B was not performed as required by the Quality Control Inspection Point Assignment Sheet.
2.
: 3.       On September 11, 1997. Step 8.2.1 of procedure li"C-MGR-019-OS was not implemented. Operations Jersonnel transferred Erc 'gency Diesel Generator (EDG) 125 Volt 31 rect Current (VDC) battery chargers without the use of procedures. This resulted in improper battery charger alignmene that rendared the 125 VDC subsystems for the 2A and 2C EDGs inoperabh.
On or before March 28. Step 8.6.5 of procedure 40AC-QCX-001-0S was not fully im)1emented. A VT1 inspection for re)lacement work activities on eedwater Inboard check valve 2B21 ;010B was not performed as Reactor r
required by the Quality Control Inspection Point Assignment Sheet.
3.
On September 11, 1997. Step 8.2.1 of procedure li"C-MGR-019-OS was not implemented.
Operations Jersonnel transferred Erc 'gency Diesel Generator (EDG) 125 Volt 31 rect Current (VDC) battery chargers without the use of procedures. This resulted in improper battery charger alignmene that rendared the 125 VDC subsystems for the 2A and 2C EDGs inoperabh.
This is a Severity Level IV Violation (Supplement 1).
This is a Severity Level IV Violation (Supplement 1).
Pursuant to the provisions of 10 CFR 2.201 Southern Nuclear Operating Company. Inc. is hereby requited to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission. ATTN: Document Control Desk.
Pursuant to the provisions of 10 CFR 2.201 Southern Nuclear Operating Company. Inc. is hereby requited to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission. ATTN:
Washington. D.C. 20555. with a copy to the Regional Administrator. Region II, and a copy to the NRC Resident inspector. Hatch Nuclear Plant. within 30 days of the date of the letter transmitting this Notice of Violat'.on (Notice).
Document Control Desk.
This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation: (1) the reason for the violation, or, if contested the basis for disputing the violation. (2) the corrective steps that have been taken and the results achieved. (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full comaliance will be ach'eved. Your response may rererence or include 3revious docceted correspondence, if the correspondence adequately addresses t1e required response. If an adequate reply is not received within the time specified in this Notice, an order or Demand for Information may be issued as to why the license should not be modified, sus) ended, or revoked or why such other action as ty be proper should not be tacen. Where good cause is shown.
Washington. D.C.
20555. with a copy to the Regional Administrator. Region II, and a copy to the NRC Resident inspector. Hatch Nuclear Plant. within 30 days of the date of the letter transmitting this Notice of Violat'.on (Notice).
This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation:
(1) the reason for the violation, or, if contested the basis for disputing the violation. (2) the corrective steps that have been taken and the results achieved. (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full comaliance will be ach'eved.
Your response may rererence or include 3revious docceted correspondence, if the correspondence adequately addresses t1e required response.
If an adequate reply is not received within the time specified in this Notice, an order or Demand for Information may be issued as to why the license should not be modified, sus) ended, or revoked or why such other action as ty be proper should not be tacen.
Where good cause is shown.
consideration wili in given to extending the response time.
consideration wili in given to extending the response time.
i Becau w your response will be placed in the NRC Public Document Room (PDR), to the extent no w ale. it should not include any personal privacy. 3roprietary.
i Becau w your response will be placed in the NRC Public Document Room (PDR), to the extent no w ale. it should not include any personal privacy. 3roprietary.
or safegu 4 t a 'ormation so that it can be placed in the PDR witlout redaction. H .:vs ' if you find it necessary to include such information you should cleary indicate the specific information that you desire not to be placed in the PDR. ana provide the legal basis to support your request for g
or safegu 4 t a 'ormation so that it can be placed in the PDR witlout redaction. H.:vs ' if you find it necessary to include such information you should cleary indicate the specific information that you desire not to be placed in the PDR. ana provide the legal basis to support your request for withholding the information from the public.
withholding the information from the public.
g I
I                             Dat;d at Atlanta, Georgia this 3rd day of November 1997 Enclosure 1
Dat;d at Atlanta, Georgia this 3rd day of November 1997  
                                                                                                                    -}}
-}}

Latest revision as of 08:30, 10 December 2024

Notice of Violation from Insp on 970817-1004.Violation Noted:Written Procedures Were Not Implemented on 970815 & Maintenance Work Was Completed Using Maintenance Work Order W/Inadequate Instructions
ML20199B812
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/03/1997
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20199B804 List:
References
50-321-97-09, 50-321-97-9, 50-366-97-09, 50-366-97-9, NUDOCS 9711190105
Download: ML20199B812 (2)


Text

.

i i

NOTICE OF VIOLATION l

Southern Nuclear Operating Docket Nos. 50-321, 50 366 Company.Inc License Nos. DPR-57. NPF-5 Hatch Units 1 and 2 During the NRC inspection conducted on August 17. 1997, through October 4.-

1 1997, a violation of NRC requirements was identified.

In accordance with the

" General Statement of Policy and Procedure for NRC Enforcement Actions." MIREG 1600, the violation is listed below:

Unit 1~ and Unit 2 Technical Specificatiet

) 5.4 re l

written procedures shall be established, uglemented, quired, in part, that and maintained coverin i

the activities in the applicable procedures recommended in Regulatory Guide'g 4

(RG) 1.33. Revision 2. Appendix A. February 1978.

Appendix A of RG 1.33. Typical Procedures for Pressurized Water Reactors and f

Boiling Water Reactors, paragraph 9. Procedure for performing maintenance.

- part (e), recommends procedures for the control of maintenance, repair,

= replacement, and modification work.

Administrative Control procedure 50AC MNT-001-05. Maintenance Program.

Revision 25. Step 4.2.5. requires. in part, that plant maintenance be performed and contro11 d within the boundaries of work instructions of

- Maintenance Work Ordrs. Step 8.2.2 and sub step 8.2.1.2 require. in part, i

that non-safety and safety-related work instructions, block 23 of the Maintenance Work Order, state a specific scope of work using referenced i

miterial, at applicable.

Step 8.5.1 require, in part, that prior to the start of-plant maintenance, the responsible personnel will perform a cursory review of the Maintenance Work Order package to ensure that the contents are adequate.

Administrative Control Procedure 40AC-0CX-001-05. Quality Control Inspection i

Program. Revision 7. Step 8.6.5 requires, in part, that the qualified Quality Control inspectors Jerform inspections in accordance with the approved Quality l

- Control Inspection )oint Assignment' Sheet.

Administrative Control Procedure 10AC MGR 019-0S " Procedure Use and Adherence." Revision 0. Step 8.2.1 requires, in part, that " Continuous Use" of a procedure is required when work being performed could affect the i

operability of a safety system.

Contrary to the above, writun procedures were not implemented in that:

1.

On August 15, 1997. Administrative Control procedure 50AC-MNT-001-OS.

~ Maintenance Program. Revision 25. Steps 4.2.5. 8.2.2. 8.~2.1.2. and 8.5.1 were not correctly performed.

Unit 1 operations personnel developed a Maintenance Work Order and authorized maintenance work activities using-a Maintenance Work Order with no work instructions, referenced material, or specific work scope identified. Maintenance work was completed using a Maintenance Work Order with inadequate instructions following a cursory review by responsible personnel.

Moqi

~

~

Notice of Violation 2

2.

On or before March 28. Step 8.6.5 of procedure 40AC-QCX-001-0S was not fully im)1emented. A VT1 inspection for re)lacement work activities on eedwater Inboard check valve 2B21 ;010B was not performed as Reactor r

required by the Quality Control Inspection Point Assignment Sheet.

3.

On September 11, 1997. Step 8.2.1 of procedure li"C-MGR-019-OS was not implemented.

Operations Jersonnel transferred Erc 'gency Diesel Generator (EDG) 125 Volt 31 rect Current (VDC) battery chargers without the use of procedures. This resulted in improper battery charger alignmene that rendared the 125 VDC subsystems for the 2A and 2C EDGs inoperabh.

This is a Severity Level IV Violation (Supplement 1).

Pursuant to the provisions of 10 CFR 2.201 Southern Nuclear Operating Company. Inc. is hereby requited to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission. ATTN:

Document Control Desk.

Washington. D.C.

20555. with a copy to the Regional Administrator. Region II, and a copy to the NRC Resident inspector. Hatch Nuclear Plant. within 30 days of the date of the letter transmitting this Notice of Violat'.on (Notice).

This reply should be clearly marked as a " Reply to a Notice of Violation" and should include for each violation:

(1) the reason for the violation, or, if contested the basis for disputing the violation. (2) the corrective steps that have been taken and the results achieved. (3) the corrective steps that will be taken to avoid further violations, and (4) the date when full comaliance will be ach'eved.

Your response may rererence or include 3revious docceted correspondence, if the correspondence adequately addresses t1e required response.

If an adequate reply is not received within the time specified in this Notice, an order or Demand for Information may be issued as to why the license should not be modified, sus) ended, or revoked or why such other action as ty be proper should not be tacen.

Where good cause is shown.

consideration wili in given to extending the response time.

i Becau w your response will be placed in the NRC Public Document Room (PDR), to the extent no w ale. it should not include any personal privacy. 3roprietary.

or safegu 4 t a 'ormation so that it can be placed in the PDR witlout redaction. H.:vs ' if you find it necessary to include such information you should cleary indicate the specific information that you desire not to be placed in the PDR. ana provide the legal basis to support your request for withholding the information from the public.

g I

Dat;d at Atlanta, Georgia this 3rd day of November 1997

-