ML20199K991: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:I
{{#Wiki_filter:I$l %
$l %
.
  .
JUL 0 31986
                                          JUL 0 31986
Docket No. 50-271
      Docket No. 50-271
Vermont Yankee Nuclear Power Corporation
    Vermont Yankee Nuclear Power Corporation
ATTN:
    ATTN:   Mr. Warren P. Murphy
Mr. Warren P. Murphy
              Vice President and Manager of Operations
Vice President and Manager of Operations
      RD 5, Box 169
RD 5, Box 169
    Ferry Road
Ferry Road
    Brattleboro, Vermont 05301
Brattleboro, Vermont 05301
    Gentlemen:
Gentlemen:
    Subject:     Inspection Report No. 50-271/86-08
Subject:
    This refers to the routine resident safety inspection conducted by Mr. W. J. Raymond
Inspection Report No. 50-271/86-08
    of this office on March 18 - May 5, 1986, at the Vermont Yankee Nuclear Power Sta-
This refers to the routine resident safety inspection conducted by Mr. W. J. Raymond
    tion, Vernon, Vermont. The inspection findings were based on observation of acti-
of this office on March 18 - May 5, 1986, at the Vermont Yankee Nuclear Power Sta-
    vities, interviews with personnel and document reviews. The results of the in-
tion, Vernon, Vermont.
    spection are described in the NRC Region I Inspection Report enclosed with this
The inspection findings were based on observation of acti-
    letter and were discussed with Mr. J. P. Pelletier of your staff at the conclusion
vities, interviews with personnel and document reviews.
    of the inspection.
The results of the in-
    Based on the results of this inspection, it appears that one of your activities
spection are described in the NRC Region I Inspection Report enclosed with this
    was not conducted in full compliance with NRC requirements, as set f)rth in the
letter and were discussed with Mr. J. P. Pelletier of your staff at the conclusion
    Notice of Violation, enclosed herewith as Appendix A. The violation concerns the
of the inspection.
    failure to complete adequate corrective actions to identify and control defective
Based on the results of this inspection, it appears that one of your activities
    NAMCO contact blocks to prevent inadvertent use or installation, following the
was not conducted in full compliance with NRC requirements, as set f)rth in the
    discovery of defects in the blocks that were reported by your letter dated 3/28/86
Notice of Violation, enclosed herewith as Appendix A.
    under 10 CFR 21 as a matter that constituted a potential safety hazard. This
The violation concerns the
    violation has been categorized by severity level in accordance with the revised
failure to complete adequate corrective actions to identify and control defective
    NRC Enforcement Policy (10 CFR 2, Appendix C), published in the Federal Register
NAMCO contact blocks to prevent inadvertent use or installation, following the
    on March 8, 1984 (FR 8583). You are required to respond to this letter and in
discovery of defects in the blocks that were reported by your letter dated 3/28/86
    preparing your response, you should follow the instructions in Appendix A.
under 10 CFR 21 as a matter that constituted a potential safety hazard.
    An additional item discussed in Section 7 of the enclosed inspection report con-
This
    cerns the adequacy of escort control provided by your recirculation piping con-
violation has been categorized by severity level in accordance with the revised
    tractor on February 13, 1986 for an ironmaker, when the individual was brought on-
NRC Enforcement Policy (10 CFR 2, Appendix C), published in the Federal Register
    site under a visitor status for a weldiig test. At the request of our resident
on March 8, 1984 (FR 8583). You are required to respond to this letter and in
    inspector, site security reviewed this matter and determined that the individual
preparing your response, you should follow the instructions in Appendix A.
    was most likely either under direct escort control or under surveillance by badged
An additional item discussed in Section 7 of the enclosed inspection report con-
    personnel while on site. We have no further questions regarding this matter at
cerns the adequacy of escort control provided by your recirculation piping con-
    the present time.     However, we encourage you to ensure that plant and contractor
tractor on February 13, 1986 for an ironmaker, when the individual was brought on-
    personnel responsible for escorting visitors follow security procedures diligently.
site under a visitor status for a weldiig test. At the request of our resident
    In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", a copy of this
inspector, site security reviewed this matter and determined that the individual
    letter and the enclosures will be placed in the NRC Public Document Room.
was most likely either under direct escort control or under surveillance by badged
              8607090289 860703
personnel while on site. We have no further questions regarding this matter at
              PDR   ADOCK 05000271
the present time.
              G                 PDR
However, we encourage you to ensure that plant and contractor
                                                                                  2c o l
personnel responsible for escorting visitors follow security procedures diligently.
                                                      '
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", a copy of this
letter and the enclosures will be placed in the NRC Public Document Room.
8607090289 860703
PDR
ADOCK 05000271
G
PDR
o
'
2c
l


      *
*
  ., ,
.,
    -
,
            Vermont Yankee Nuclear Power             2           JUL 0 3 m
Vermont Yankee Nuclear Power
              Corporation
2
            Your cooperation with us is appreciated.
JUL 0 3 m
                                                    Sincerely,
-
                                                    criainal Signed Bya
Corporation
                                                    Edward C. Wenzinger, Chief
Your cooperation with us is appreciated.
                                                    Projects Branch No. 3
Sincerely,
                                                    Division of Reactor Projects
criainal Signed Bya
            Enclosures:
Edward C. Wenzinger, Chief
            1. Appendix A, Notice of Violation
Projects Branch No. 3
          2. NRC Region I Inspection Report No. 50-271/86-08
Division of Reactor Projects
          cc w/encls:
Enclosures:
          Mr. R. W. Capstick, Licensing Engineer
1. Appendix A, Notice of Violation
          Mr. J. Gary Weigand, President and' Chief Executive Officer
2. NRC Region I Inspection Report No. 50-271/86-08
          Mr. J. P. Pelletier, Plant Manager
cc w/encls:
          Mr. Donald Hunter, Vice President
Mr. R. W. Capstick, Licensing Engineer
          Mr. Cort Richardson, Vermont Public Interest Research Group, Inc.
Mr. J. Gary Weigand, President and' Chief Executive Officer
          Public Document Room (PDR)
Mr. J. P. Pelletier, Plant Manager
          Local Public Document Room (LPDR)
Mr. Donald Hunter, Vice President
          Nuclear Safety Information Center (NSIC)
Mr. Cort Richardson, Vermont Public Interest Research Group, Inc.
          State of New Hampshire
Public Document Room (PDR)
          State of Vermont
Local Public Document Room (LPDR)
          NRC Resident Inspector
Nuclear Safety Information Center (NSIC)
          bec w/encls:
State of New Hampshire
          Region I Docket Room (with concurrences)
State of Vermont
          Management Assistant, DRMA (w/o encls)
NRC Resident Inspector
          DRP Section Chief
bec w/encls:
          DRP Branch Chief
Region I Docket Room (with concurrences)
          M. McBride, SRI, Pilgrim
Management Assistant, DRMA (w/o encls)
DRP Section Chief
DRP Branch Chief
M. McBride, SRI, Pilgrim
H. Eichenholz, SRI, Yankee
i
i
          H. Eichenholz, SRI, Yankee
V. Rooney, LPM, NRR
          V. Rooney, LPM, NRR
J. Wiggins, RI
          J. Wiggins, RI
!
!
l
l
l
l
!
!
        I RI: - '
I RI: -
                          RI:           R
RI:
R
'
a - ,... a
W.
..,
<
I
6/12/86
1 l
'
'
'
            a - ,...
0FFICIAL RECORD COPY
        < 6/12/86        a  I
                            1 l
                                          W.    ..,
                                                                                    '
                                        0FFICIAL RECORD COPY
l
l
l
l
L                   -                                                             .
L
-
.
}}
}}

Latest revision as of 04:07, 8 December 2024

Forwards Safety Insp Rept 50-271/86-08 on 860318-0505 & Notice of Violation.Site Security Reviewed 860213 Incident Re Unescorted Ironmaker Visit for Welding Test.Security Procedures Should Be Followed When Escorting Visitors
ML20199K991
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/03/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20199K999 List:
References
NUDOCS 8607090289
Download: ML20199K991 (2)


See also: IR 05000271/1986008

Text

I$l %

.

JUL 0 31986

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN:

Mr. Warren P. Murphy

Vice President and Manager of Operations

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

Gentlemen:

Subject:

Inspection Report No. 50-271/86-08

This refers to the routine resident safety inspection conducted by Mr. W. J. Raymond

of this office on March 18 - May 5, 1986, at the Vermont Yankee Nuclear Power Sta-

tion, Vernon, Vermont.

The inspection findings were based on observation of acti-

vities, interviews with personnel and document reviews.

The results of the in-

spection are described in the NRC Region I Inspection Report enclosed with this

letter and were discussed with Mr. J. P. Pelletier of your staff at the conclusion

of the inspection.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set f)rth in the

Notice of Violation, enclosed herewith as Appendix A.

The violation concerns the

failure to complete adequate corrective actions to identify and control defective

NAMCO contact blocks to prevent inadvertent use or installation, following the

discovery of defects in the blocks that were reported by your letter dated 3/28/86

under 10 CFR 21 as a matter that constituted a potential safety hazard.

This

violation has been categorized by severity level in accordance with the revised

NRC Enforcement Policy (10 CFR 2, Appendix C), published in the Federal Register

on March 8, 1984 (FR 8583). You are required to respond to this letter and in

preparing your response, you should follow the instructions in Appendix A.

An additional item discussed in Section 7 of the enclosed inspection report con-

cerns the adequacy of escort control provided by your recirculation piping con-

tractor on February 13, 1986 for an ironmaker, when the individual was brought on-

site under a visitor status for a weldiig test. At the request of our resident

inspector, site security reviewed this matter and determined that the individual

was most likely either under direct escort control or under surveillance by badged

personnel while on site. We have no further questions regarding this matter at

the present time.

However, we encourage you to ensure that plant and contractor

personnel responsible for escorting visitors follow security procedures diligently.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", a copy of this

letter and the enclosures will be placed in the NRC Public Document Room.

8607090289 860703

PDR

ADOCK 05000271

G

PDR

o

'

2c

l

.,

,

Vermont Yankee Nuclear Power

2

JUL 0 3 m

-

Corporation

Your cooperation with us is appreciated.

Sincerely,

criainal Signed Bya

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Region I Inspection Report No. 50-271/86-08

cc w/encls:

Mr. R. W. Capstick, Licensing Engineer

Mr. J. Gary Weigand, President and' Chief Executive Officer

Mr. J. P. Pelletier, Plant Manager

Mr. Donald Hunter, Vice President

Mr. Cort Richardson, Vermont Public Interest Research Group, Inc.

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of New Hampshire

State of Vermont

NRC Resident Inspector

bec w/encls:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encls)

DRP Section Chief

DRP Branch Chief

M. McBride, SRI, Pilgrim

H. Eichenholz, SRI, Yankee

i

V. Rooney, LPM, NRR

J. Wiggins, RI

!

l

l

!

I RI: -

RI:

R

'

a - ,... a

W.

..,

<

I

6/12/86

1 l

'

'

0FFICIAL RECORD COPY

l

l

L

-

.