ML20205S821: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:l
{{#Wiki_filter:'
  '  .                                                                                  Yk p un,
Yk p un, UNITED STATES NUCLEAR REGULATORY COMMISSION l
          #                                        UNITED STATES NUCLEAR REGULATORY COMMISSION                         l
WASHINGTON, D. C. 20665
        $            *:                          WASHINGTON, D. C. 20665                     '
(*.DT o*
(*.DTo*                                       DEC 2 41984 MEMORANDUM FOR:         Those on Attached List FROM:                   William J. Dircks
DEC 2 41984 MEMORANDUM FOR:
;                                  Executive Director for Operations
Those on Attached List FROM:
William J. Dircks Executive Director for Operations


==SUBJECT:==
==SUBJECT:==
FORMATION OF PANEL TO PREPARE NRC STAFF F051 TION ON INTIMIDATION AT COMANCHE PEAK i
FORMATION OF PANEL TO PREPARE NRC STAFF F051 TION ON INTIMIDATION AT COMANCHE PEAK i
$          As the work of the Comanche Peak Technical Review Team (TRT) is nearing completion. the staff must evaluate all issues involving intimidation and harassment at Comanche Peak. The ASLB hearings, which have been in progress
As the work of the Comanche Peak Technical Review Team (TRT) is nearing completion. the staff must evaluate all issues involving intimidation and harassment at Comanche Peak. The ASLB hearings, which have been in progress for three years and are expected to resume in February 1985, have resolved all cententions except Contention No. 5.
:          for three years and are expected to resume in February 1985, have resolved all cententions except Contention No. 5. This contention concerns the Applicant's adherence to QA/QC requirements. As part of developing the staff
This contention concerns the Applicant's adherence to QA/QC requirements. As part of developing the staff position en this Contention, the staff must evaluate whether intimidation or harassment against employees or contractors occurred in the past or is now occurring, and make a detemination concerning the effects of any such intimidation on the overall QA/QC Program at Comanche Peak.
'        position en this Contention, the staff must evaluate whether intimidation or harassment against employees or contractors occurred in the past or is now occurring, and make a detemination concerning the effects of any such intimidation on the overall QA/QC Program at Comanche Peak.
To properly evaluate the intimidation issue and to prepare a comprehensive staff position I am directing the fonnation of a panel, composed of senior managers drawn from yoar offices. This panel is to be composed of the following individuals:
To properly evaluate the intimidation issue and to prepare a comprehensive staff position I am directing the fonnation of a panel, composed of senior managers drawn from yoar offices. This panel is to be composed of the following individuals:
JariesGagliardo.IE(Chairperson)
JariesGagliardo.IE(Chairperson)
Jane Axelrad. IE James Lieberman OELD Dorwin Hunter, Region IV Because of their previous association with Comanche Peak regulatory activities, I am appointing the following individuals as advisors to the panel:
Jane Axelrad. IE James Lieberman OELD Dorwin Hunter, Region IV Because of their previous association with Comanche Peak regulatory activities, I am appointing the following individuals as advisors to the panel:
1 Broolrs Criffin. 01 Thomas Ippolito. AEOD Joseph Scinto, OELD Vincent Noonan, NRR Bruce Kaplan, EG&G l       The advisors may be asked to assist the panel when issues involving their specific area of expertise are being considered, and I request your support in l       making them available on an "as-needed" basis.
1 Broolrs Criffin. 01 Thomas Ippolito. AEOD Joseph Scinto, OELD Vincent Noonan, NRR Bruce Kaplan, EG&G l
l       The product of the Panel's effort will be a report similar to a SSER, that l       states clear staff conclusions regarding the occurrence of intimida-tion and harassment at Comanche Peak. The Charter for this Panel is provided I       as Enclosure 1. The Charter provides the scope and objectives of the Panel l       but allows sufficient flexibility to enable the Panel to expand its scope, if l                                         e606120930 860602                       f0/d'IA'63 ARDE     -17     PDR                       8
The advisors may be asked to assist the panel when issues involving their specific area of expertise are being considered, and I request your support in l
making them available on an "as-needed" basis.
l The product of the Panel's effort will be a report similar to a SSER, that l
states clear staff conclusions regarding the occurrence of intimida-tion and harassment at Comanche Peak. The Charter for this Panel is provided I
as Enclosure 1.
The Charter provides the scope and objectives of the Panel l
but allows sufficient flexibility to enable the Panel to expand its scope, if l
e606120930 860602 f0/d'IA'63 ARDE
-17 PDR 8


s Those on Attached List                                                     The scheduled completion of the Panel's action is January 31, 1985. I expect the Panel to meet at least once per week and more frequently, if necessary.
s Those on Attached List The scheduled completion of the Panel's action is January 31, 1985.
Enclosure 3 provides a proposed milestone schedule.
I expect the Panel to meet at least once per week and more frequently, if necessary. provides a proposed milestone schedule.
The Panel will work under the direction of Vincent S. Noonan, Director of Comanche Peak Project, and should provide periodic status briefings to the Director of Licensing.
The Panel will work under the direction of Vincent S. Noonan, Director of Comanche Peak Project, and should provide periodic status briefings to the Director of Licensing.
CD2E"3 L C.h William J. Dircks Executive Director for Operations
CD2E"3 L C.h William J. Dircks Executive Director for Operations


==Enclosures:==
==Enclosures:==
As stated cc:     B. Hayes. OI DISTRIBUTION:
As stated cc:
Panel Members Advisors Docket File 50 445/446 EDO Reading S. Treby B. Youngblood
B. Hayes. OI DISTRIBUTION:
              ~
Panel Members Advisors Docket File 50 445/446 EDO Reading S. Treby B. Youngblood T. Novak
T. Novak S. Burwell CPTRT JGagliardo 12/ /84                 *See attached concurrence sheet
~
                                                            ** Nonconcurrence per Axelrad and Lieberman               J OFC ITRT                     :PD:TRT                 :DIR:DL       :0 ELD       :DEPDIR:NRR :DIR:NRR   :EDO MME :RWessman:pf*:VNoonan *                           :DGEisenhut* :JLieberna#*:ECase*         :HRDento# :WJDircks LATE :12/13/84               :12/ 1784               :12/17/84     :12/ /84     :12/17/84   :12/18/84 :12////84 0FFICIAL RECORD COPY
S. Burwell CPTRT JGagliardo 12/ /84
*See attached concurrence sheet
** Nonconcurrence per Axelrad and Lieberman J
OFC ITRT
:PD:TRT
:DIR:DL
:0 ELD
:DEPDIR:NRR :DIR:NRR
:EDO MME :RWessman:pf*:VNoonan *
:DGEisenhut* :JLieberna#*:ECase*
:HRDento#
:WJDircks LATE :12/13/84
:12/ 1784
:12/17/84
:12/ /84
:12/17/84
:12/18/84
:12////84 0FFICIAL RECORD COPY


s I
s Addressees List:
1 l
Harold R. Denton, Director Office of Nuclear Reactor Regulation Richard C. DeYoung, Director Office of Inspection and Enforcement Guy H. Cunningham, III.
Addressees List:                                 '
Executive Legal Director Jack Heltemes Director Office of the Analysis and Evaluation of Operational Data James Keppler, Regional Administrator
Harold R. Denton, Director Office of Nuclear Reactor Regulation             '
. Regio,n III Robert Martin, Regional Administrator Region IV l
Richard C. DeYoung, Director Office of Inspection and Enforcement Guy H. Cunningham, III.
Executive Legal Director Jack Heltemes Director Office of the Analysis and Evaluation of Operational Data James Keppler, Regional Administrator             .
        . Regio,n III                                       -
Robert Martin, Regional Administrator Region IV l
4 i
4 i
l
l


        .                                                                                              i 5
i 5
l ENCLOSURE 1 l
l ENCLOSURE 1 Comanche Peak Intimidation Panel Charter OBJECTIVES:
l Comanche Peak Intimidation Panel Charter OBJECTIVES:
1 The objectives of the panel are:
1 The objectives of the panel are:                                                             i
i 1)
: 1) To determine whether intimidation or harassment against empicyees or contractors occurred in the past or is now occurring at Comanche Peak;                   ;
To determine whether intimidation or harassment against empicyees or contractors occurred in the past or is now occurring at Comanche Peak; 2)
: 2)   To determine the extent of the above conditions if they exist (ed) and to identify the circunctances surrounding the events including the personnel involved, the duration, the reasons for its occurrence and the applicant's management corrective actions or recomendations for correc-tive actions.                                                                           ,
To determine the extent of the above conditions if they exist (ed) and to identify the circunctances surrounding the events including the personnel involved, the duration, the reasons for its occurrence and the applicant's management corrective actions or recomendations for correc-tive actions.
: 3)   To evaluate any other indicators of poor management practices or                         -
3)
attitude toward the identification and correction of quality problems.
To evaluate any other indicators of poor management practices or attitude toward the identification and correction of quality problems.
PURPOSE:
PURPOSE:
The panel will provide as products:
The panel will provide as products:
: 1)   A position on the intimidation question to NRC upper management;
1)
: 2)   Input to the Comanche Peak Contention 5 Panel. The Contention 5 Panel will determine the effects of any intimidation on the overall QA/QC Program at Comanche Peak.
A position on the intimidation question to NRC upper management; 2)
Input to the Comanche Peak Contention 5 Panel. The Contention 5 Panel will determine the effects of any intimidation on the overall QA/QC Program at Comanche Peak.
(
(
j         MEMBERSHIP:
j MEMBERSHIP:
                      + James Gagliardo. IE (Chairperson)
+ James Gagliardo. IE (Chairperson)
                      ., lane Axelrad, IE James Liebeman, DELD Dorwin Hunter, Region IV BruceKaplan,EG8G(Advisor)
., lane Axelrad, IE James Liebeman, DELD Dorwin Hunter, Region IV BruceKaplan,EG8G(Advisor)
Brooks Griffin, O! (Advisor)
Brooks Griffin, O! (Advisor)
ThomasIppolito,AE00(Advisor)
ThomasIppolito,AE00(Advisor)
Joseph Scinto, DELD Advisor)
Joseph Scinto, DELD Advisor)
* Vincent Noonan, NRR Advisor)
Vincent Noonan, NRR Advisor)
                  ~ _ - _ _ _ _      __. _                  ___  .  .    .-_ _ . .        _.
~


i 4
i 4
ACTION ITEMS                               '
ACTION ITEMS I.
I. Define criteria for determining whether intimidation or harassment occurred.
Define criteria for determining whether intimidation or harassment occurred.
: 2. Conduct as appropriate a review of relevant data bases:
2.
: a. EG8G report on intimidation (9/84)
Conduct as appropriate a review of relevant data bases:
: b. Transcript of EG&G Intimidation Study Team briefing of NRC, applicant's, and intervenor's lawyers
a.
: c. Enforcement packages related to intimidation.
EG8G report on intimidation (9/84) b.
: d. Depositions related to intimidation and harassment.   (A summary will be sought or prepared as required)
Transcript of EG&G Intimidation Study Team briefing of NRC, applicant's, and intervenor's lawyers c.
: e. Proposed Findings on intimidation (staff, applicants and intervenors).
Enforcement packages related to intimidation.
l             f. Transcripts of current ASLB hearings related to intimidation.
d.
: g. Office of Investigations reports on intimidation and status of outstanding allegations. (B. Griffin should provide briefing on theabove)
Depositions related to intimidation and harassment.
: h. Information on Department of Labor Hearings related to the subjects of concern.
(A summary will be sought or prepared as required) e.
: 3. Interface with CP Contention 5 Panel routinely.
Proposed Findings on intimidation (staff, applicants and intervenors).
: 4. Based on the above data and any other relevant data reviewed by the panel, develop a position which meets the stated objectives.
l f.
: 5. Prepare an SSER on intimidation, and provide testimony as required at ASLB hearings.
Transcripts of current ASLB hearings related to intimidation.
g.
Office of Investigations reports on intimidation and status of outstanding allegations.
(B. Griffin should provide briefing on theabove) h.
Information on Department of Labor Hearings related to the subjects of concern.
3.
Interface with CP Contention 5 Panel routinely.
4.
Based on the above data and any other relevant data reviewed by the panel, develop a position which meets the stated objectives.
5.
Prepare an SSER on intimidation, and provide testimony as required at ASLB hearings.
l l
l l


v.
v.
ENCLOSURE 2 Intimidation Panel Schedule December                 January Initial Panel Meeting Obtain relevant documents Document Reviews Consolidate Individual                                                 (Developed by Panel, consistent views, Develop Fare?                                         with resumption of hearings at consensus                                                     the end of January 1985)
ENCLOSURE 2 Intimidation Panel Schedule December January Initial Panel Meeting Obtain relevant documents Document Reviews Consolidate Individual (Developed by Panel, consistent views, Develop Fare?
with resumption of hearings at consensus the end of January 1985)
Prepare Panel Input to QA/QC Panel Prepare Panel Report on Staff's Position I
Prepare Panel Input to QA/QC Panel Prepare Panel Report on Staff's Position I
I
I
_ - - - - - - - - - -          --    ---            --  ~~--------   '
~~--------


4 p,a as;g'o,
4 p,a as;g'o, UNITED STATES NUCL EAR REGULATORY COMMISSION
                  ',                            UNITED STATES s  !            c              NUCL EAR REGULATORY COMMISSION
{T
{T .. )
.. )
            \                               WASHINGTON, D. C. 20555
s c
        \*****/                                       DEC 2 41984 g _ ggg5 a       _ .._._..
\\
MEMORANDUM FOR:     Those on Attached List                     .            - ~ _ .
WASHINGTON, D. C. 20555
FROM:               William J. Dircks Executive Director for Operations
\\*****/
DEC 2 41984 g _ ggg5 a
MEMORANDUM FOR:
Those on Attached List
- ~ _.
FROM:
William J. Dircks Executive Director for Operations


==SUBJECT:==
==SUBJECT:==
FORMATION OF PANEL TO PREPARE NRC STAFF POSITION ON INTIMIDATION AT COMANCHE PEAK As the work of the Comanche Peak Technical Review Team (TRT) is nearing completion, the staff must evaluate all issues involving intimidation and harassment at Comanche Peak. The ASLB hearings, which have been in progress for three years and are expected to resume in February 1985, have resolved all contentions except Contention No. 5. This contention concerns the Applicant's adherence to QA/QC requirements. As part of developing the staff position on this Contention, the staff must evaluate whether intimidation or harassment against employees or contractors occurred in the past or is now occurring, and make a detennination concerning the effects of any such intimidation on the overall QA/QC Program at Comanche Peak.
FORMATION OF PANEL TO PREPARE NRC STAFF POSITION ON INTIMIDATION AT COMANCHE PEAK As the work of the Comanche Peak Technical Review Team (TRT) is nearing completion, the staff must evaluate all issues involving intimidation and harassment at Comanche Peak.
The ASLB hearings, which have been in progress for three years and are expected to resume in February 1985, have resolved all contentions except Contention No. 5.
This contention concerns the Applicant's adherence to QA/QC requirements. As part of developing the staff position on this Contention, the staff must evaluate whether intimidation or harassment against employees or contractors occurred in the past or is now occurring, and make a detennination concerning the effects of any such intimidation on the overall QA/QC Program at Comanche Peak.
To properly evaluate the intimidation issue and to prepare a comprehensive staff position, I am directing the formation of a panel, composed of senior managers drawn from your offices. This panel is to be composed of the following
To properly evaluate the intimidation issue and to prepare a comprehensive staff position, I am directing the formation of a panel, composed of senior managers drawn from your offices. This panel is to be composed of the following
(       individuals:
(
James Gagliardo IE (Chairperson) l Jane Axelrad, IE James Lieberman, OELD Dorwin Hunter, Region I M       O Because of their previous association with Comanche Peak regulatory activities, I am appointing the following individuals as advisors to the panel:
individuals:
(                   Brooks Griffin, OI Thomas Ippolito, AE0D Joseph Scinto, OELD Vincent Noonan, NRR Bruce Kaplan, EG&G
James Gagliardo IE (Chairperson) l Jane Axelrad, IE James Lieberman, OELD Dorwin Hunter, Region I M O
!        The advisors may be asked to assist the panel when issues involving their specific area of expertise are being considered, and I request your support in making them available on an "as-needed" basis.
Because of their previous association with Comanche Peak regulatory activities, I am appointing the following individuals as advisors to the panel:
The product of the Panel's effort will be a report similar to a SSER, that s
(
states clear staff conclusions regarding the occurrence of intimida-l       tion and harassment at Comanche Peak. The Charter for this Panel is provided l
Brooks Griffin, OI Thomas Ippolito, AE0D Joseph Scinto, OELD Vincent Noonan, NRR Bruce Kaplan, EG&G The advisors may be asked to assist the panel when issues involving their specific area of expertise are being considered, and I request your support in making them available on an "as-needed" basis.
as Enclosure 1. The Charter provides the scope and objectives of the Panel but allows sufficient flexibility to enable the Panel to expand its scope, if necessary.
The product of the Panel's effort will be a report similar to a SSER, that states clear staff conclusions regarding the occurrence of intimida-s l
tion and harassment at Comanche Peak.
The Charter for this Panel is provided l
as Enclosure 1.
The Charter provides the scope and objectives of the Panel but allows sufficient flexibility to enable the Panel to expand its scope, if necessary.
g pf jg Al7
g pf jg Al7


eO
e O
  .s Those on Attached List                                                                                       ~
.s Those on Attached List ~
The scheduled completion of the Panel's action is January 31, 1985. I expect the Panel to meet at least once per week and more frequently, if necessary.
The scheduled completion of the Panel's action is January 31, 1985.
I expect the Panel to meet at least once per week and more frequently, if necessary.
Enclosurc 2 provides a proposed milestone schedule.
Enclosurc 2 provides a proposed milestone schedule.
The Panel will work under the direction of Vincent S. Noonan, Director of Comanche Peak Project, and should provide periodic status briefings to the Director of Licensing.
The Panel will work under the direction of Vincent S. Noonan, Director of Comanche Peak Project, and should provide periodic status briefings to the Director of Licensing.
                                            /       f fl
/
                                                )%%
f fl William (J. DircksV%
William (J. DircksV%
)%%
Executive Director for Operations
Executive Director for Operations


==Enclosures:==
==Enclosures:==
As stated oc: B. Hayes, OI Panel Members Panel Advisors i
As stated oc:
B. Hayes, OI Panel Members Panel Advisors i
i i
i i


1 Addressees List:       ;
1 Addressees List:
Harold R. Denton, Director Office of Nuclear Reactor Regulation Richard C. DeYoung, Director Office of Inspection and Enforcement Guy H. Cunningham, III, Executive Legal Director Jack Heltemes, Director Office of the Analysis and                         '
Harold R. Denton, Director Office of Nuclear Reactor Regulation Richard C. DeYoung, Director Office of Inspection and Enforcement Guy H. Cunningham, III, Executive Legal Director Jack Heltemes, Director Office of the Analysis and Evaluation of Operational Data s
Evaluation of Operational Data           s James Keppler, Regional Administrator                 _
James Keppler, Regional Administrator Region III Robert Martin, Regional Administrator Region IV i
Region III Robert Martin, Regional Administrator               ,.
Region IV i
s 8
s 8
l
l
Line 150: Line 195:
ENCLOSURE 1 Comanche Peak Intimidation Panel Charter OBJECTIVES:
ENCLOSURE 1 Comanche Peak Intimidation Panel Charter OBJECTIVES:
The objectives of the panel are:
The objectives of the panel are:
: 1)   To determine whether intimidation or harassment against employees or contractors occurred in the past or is now occurring at Comanche Peak;
1)
: 2)   To determine the extent of the above conditions if they exist (ed) and to identify the circumstances surrounding the events including the personnel involved, the duration, the reasons for its occurrence and the applicant's management corrective actions or recommendations for correc-tive actions.
To determine whether intimidation or harassment against employees or contractors occurred in the past or is now occurring at Comanche Peak; 2)
: 3)   To evaluate any other indicators of poor management practices or attitude toward the identification and correction of quality problems.
To determine the extent of the above conditions if they exist (ed) and to identify the circumstances surrounding the events including the personnel involved, the duration, the reasons for its occurrence and the applicant's management corrective actions or recommendations for correc-tive actions.
3)
To evaluate any other indicators of poor management practices or attitude toward the identification and correction of quality problems.
PURPOSE:
PURPOSE:
The panel will provide as products:
The panel will provide as products:
: 1)   A position on the intimidation question to NRC upper management;
1)
: 2)   Input to the Comanche Peak Contention 5 Panel. The Contention 5 Panel will determine the effects of any intimidation on the overall QA/QC Program at Comanche Peak.
A position on the intimidation question to NRC upper management; 2)
Input to the Comanche Peak Contention 5 Panel. The Contention 5 Panel will determine the effects of any intimidation on the overall QA/QC Program at Comanche Peak.
MEMBERSHIP:
MEMBERSHIP:
JamesGagliardo,IE(Chairperson)
JamesGagliardo,IE(Chairperson)
Line 165: Line 213:
Vincent Noonan, NRR (Advisor)
Vincent Noonan, NRR (Advisor)


l l
l
1
~
        ~
ACTION ITEMS 1.
ACTION ITEMS                                           1. Define criteria for determining whether intimidation or harassment occurred.
Define criteria for determining whether intimidation or harassment occurred.
: 2. Conduct as appropriate a review of relevant data bases:
2.
: a. EG8G report on intimidation (9/84) t
Conduct as appropriate a review of relevant data bases:
: b. Transcript of EG&G Intimidation Study Team briefing of NRC, applicant's, and intervenor's lawyers
a.
: c. Enforcement packages related to intimidation.
EG8G report on intimidation (9/84) t b.
: d. Depositions related to irtimidation and harassment.
Transcript of EG&G Intimidation Study Team briefing of NRC, applicant's, and intervenor's lawyers c.
e (A
Enforcement packages related to intimidation.
summary will be sought or prepared as required)
d.
: e. Proposed Findings on intimidation (staff, applicants and intervenors).                                                      .
Depositions related to irtimidation and harassment.
: f. Transcripts of current ASLB hearings related to intimidation.
(A e
9     Office of Investigations reports on intimidation and status of outstanding allegations. (B. Griffin should provide briefing on theabove) i
summary will be sought or prepared as required) e.
: h. Infonnation on Department of Labor Hearings related to the subjects
Proposed Findings on intimidation (staff, applicants and intervenors).
!                    of Concern.
f.
: 3. Interface with CP Contention 5 Panel routinely.
Transcripts of current ASLB hearings related to intimidation.
: 4. Based on the above data and any other relevant data reviewed by the panel, develop a position which meets the stated objectives.
9 Office of Investigations reports on intimidation and status of outstanding allegations.
: 5. Prepare an SSER on intimidation, and provide testimony as required at ASLB hearings.
(B. Griffin should provide briefing on theabove) h.
Infonnation on Department of Labor Hearings related to the subjects i
of Concern.
3.
Interface with CP Contention 5 Panel routinely.
4.
Based on the above data and any other relevant data reviewed by the panel, develop a position which meets the stated objectives.
5.
Prepare an SSER on intimidation, and provide testimony as required at ASLB hearings.
l l
l l
l l
l l
1
1


  .~
. ~
t ENCLOSURE 2 Intimidation Panel Schedule December                       January Initial Panel Meeting Obtain relevant documents Document Reviews Consolidate Individual                                   (Developed by Panel, consistent views, Develop Fare?                                     with resumption of hearings at consensus                                                 the end of January 1985)
t ENCLOSURE 2 Intimidation Panel Schedule December January Initial Panel Meeting Obtain relevant documents Document Reviews Consolidate Individual (Developed by Panel, consistent views, Develop Fare?
with resumption of hearings at consensus the end of January 1985)
Prepare Panel Input to QA/QC Panel Prepare Panel Report on Staff's Position i
Prepare Panel Input to QA/QC Panel Prepare Panel Report on Staff's Position i


                                                                                                                                                      .f
er-cu Y
                    #, ...,'o,,                                                       UNITED STATES er- curY                              :
.f r
l 8                              o                NUCLEAR REGULATORY COMMISSION                                                         <
#,...,'o,,
5                           -E                               WASHINGTON, D. C. 20555                                     *
UNITED STATES 8
      'g, q,      % . . . . . .o l
NUCLEAR REGULATORY COMMISSION o
MEMORANDUM FOR:                         Those on Attached List                                     .
5
FROM:                                 William J. Dircks Executive Director for Operations
-E WASHINGTON, D. C. 20555
%......o
'g, q, l
MEMORANDUM FOR:
Those on Attached List FROM:
William J. Dircks Executive Director for Operations


==SUBJECT:==
==SUBJECT:==
FORMATION OF PANEL TO PREPARE NRC STAFF POSITION ON INTIMIDATION AT COMANCHE PEAX
FORMATION OF PANEL TO PREPARE NRC STAFF POSITION ON INTIMIDATION AT COMANCHE PEAX
                    .As the work of the Comanche Peak Technical Review Team (TRT) is nearing completion, the staff must evaluate all issues involving intimidation and harassment at Comanche Peak. The ASLB hearings, which have been in progress for three years and are expected to resume in February 1985, have resolved all contentions except Contentien No. 5. This contention concerns the App 1tcant's adherence to QA/QC requirements. As part of developing the staff position on this Contention, the staff must evaluate whether intimidation or harassment against employees or contractors occurred in the past or is now occurring, and make a detemination concerning the effects of any such intimidation on the overall QA/QC Program at Comanche Peak.                                                                         '
.As the work of the Comanche Peak Technical Review Team (TRT) is nearing completion, the staff must evaluate all issues involving intimidation and harassment at Comanche Peak. The ASLB hearings, which have been in progress for three years and are expected to resume in February 1985, have resolved all contentions except Contentien No. 5.
This contention concerns the App 1tcant's adherence to QA/QC requirements. As part of developing the staff position on this Contention, the staff must evaluate whether intimidation or harassment against employees or contractors occurred in the past or is now occurring, and make a detemination concerning the effects of any such intimidation on the overall QA/QC Program at Comanche Peak.
To properly evaluate the intimidation issue and to prepare a comprehensive staff position, I am directing the formation of a panel, composed of senior managers drawn from your offices. This panel is to be composed of the following individuals:
To properly evaluate the intimidation issue and to prepare a comprehensive staff position, I am directing the formation of a panel, composed of senior managers drawn from your offices. This panel is to be composed of the following individuals:
[.. .l
[...l
    ~
~
        -    .*                                  JamesGagliardo,IE(Chairperson)
JamesGagliardo,IE(Chairperson)
Jane Axelrad, IE James Liebeman, OELD
Jane Axelrad, IE James Liebeman, OELD
                                        - Bruce Kaplan, EG8G Dorwin Hunter, Region IV Because of their previous association with Comanche Peak regulatory activities, I am appointing the following individuals as advisors to the
- Bruce Kaplan, EG8G Dorwin Hunter, Region IV Because of their previous association with Comanche Peak regulatory activities, I am appointing the following individuals as advisors to the
          \ panel:4 Brooks Griffin, 01 Thomas Ippolito, AE00 Joseph Scinto, OELD Vincent Noonan, NRR t
\\ panel:4 Brooks Griffin, 01 Thomas Ippolito, AE00 Joseph Scinto, OELD Vincent Noonan, NRR t
The advisors may be asked to assist the panel when issues involving their specific area of expertise are being considered, and I request your support in making them available on an "as-needed" basis.
The advisors may be asked to assist the panel when issues involving their specific area of expertise are being considered, and I request your support in making them available on an "as-needed" basis.
The product of the Panel's effort will be a report similar to a SSER, that states clear staff conclusions regarding the occurrence of intimida-tion and harassment at Comanche Peak. The Charter for this Panel is provided as Enclosure 1. The Charter provides the scope and objectives of the Panel but allows sufficient flexibility to enable the Panel to expand its scope, if necessary.
The product of the Panel's effort will be a report similar to a SSER, that states clear staff conclusions regarding the occurrence of intimida-tion and harassment at Comanche Peak. The Charter for this Panel is provided as Enclosure 1.
The Charter provides the scope and objectives of the Panel but allows sufficient flexibility to enable the Panel to expand its scope, if necessary.
(~
(~
Po/A 45'-tKb A/7l   . .-
Po/A 45'-tKb A/7l


          +
-- l
                                                                                                                            -- l
+
.                                                                                                                                j i
j i
:Ek')
:Ek')
T4" ' Those on Attached List                                           The scheduled completion of the Panel's action is January 31, 1985. I expect the Panel to meet at least once per week and more frequently, if necessary.
T4" '
Enclosure 2 provides a proposed milestone schedule.
Those on Attached List The scheduled completion of the Panel's action is January 31, 1985. I expect the Panel to meet at least once per week and more frequently, if necessary. provides a proposed milestone schedule.
William J. Dircks Executive Director for perations
William J. Dircks Executive Director for perations


==Enclosures:==
==Enclosures:==
As stated cc:         B. Hayes. OI Panel Members Panel Advisors
As stated cc:
  .c a                                                                         -
B. Hayes. OI Panel Members Panel Advisors
.c
**a
: c. c n*
: c. c n*


1
1
          .i j LJ Those on Attached List                                         The scheduled completion of the Panel's action is January 31,1955. I expect the Panel to meet at least once per week and more frequently, if necessary.
.i LJ j
Enclosure 3 provides a proposed milestone schedule.
Those on Attached List The scheduled completion of the Panel's action is January 31,1955. I expect the Panel to meet at least once per week and more frequently, if necessary. provides a proposed milestone schedule.
William J. Dircks Executive Director for Operations
William J. Dircks Executive Director for Operations


==Enclosures:==
==Enclosures:==
As stated cc:   B. Hayes, OI DISTRIBUTION:
As stated cc:
                . Panel Members Advisors Docket File 50445/466                                       -
B. Hayes, OI DISTRIBUTION:
EDO Reading S. Treby
. Panel Members Advisors Docket File 50445/466 EDO Reading S. Treby
(,         B. Youngblood T. Novak S. Burwell i
(,
B. Youngblood T. Novak S. Burwell i
i l
i l
l   FC :TRT                 :PD:TRT       :DIR:DL     :0 ELD       :DEPDIR:NRR : DIE:NRR         :EDD l   ....:.....__....:............:............:_...__......:........____:...__.......:......____.
l FC :TRT
AME :RWessman:pf :VNoonan l                                          :DEEisenhut :JLieberman :ECase           :HRDenton       :WJDircks j   ATE :12/ /84             :12/ /84     :12/ /84     :12/ /84     :12/ /84     :12/ /84         :12/ /84 0FFICIAL RECORD , COPY
:PD:TRT
      %me '
:DIR:DL
:0 ELD
:DEPDIR:NRR : DIE:NRR
:EDD l
l AME :RWessman:pf :VNoonan
:DEEisenhut :JLieberman :ECase
:HRDenton
:WJDircks j
ATE :12/ /84
:12/ /84
:12/ /84
:12/ /84
:12/ /84
:12/ /84
:12/ /84 0FFICIAL RECORD, COPY
%me '


b2i 3 Addressees List:                                                                           ,
b2i 3 Addressees List:
Harold R. Denton, Director Office of Nuclear Reactor Regulation Richard C. DeYoung, Director Office of Inspection and Enforcement Guy H. Cunningham, III, Executive Legal Director Jack Heltemes, Director                                                                                 ,
Harold R. Denton, Director Office of Nuclear Reactor Regulation Richard C. DeYoung, Director Office of Inspection and Enforcement Guy H. Cunningham, III, Executive Legal Director Jack Heltemes, Director Office of the Analysis and Evaluation of Operational Data James Keppler, Regional Administrator Region III Robert Martin, Regional Administrator Region IV.
Office of the Analysis and Evaluation of Operational Data James Keppler, Regional Administrator Region III Robert Martin, Regional Administrator Region IV.
(h?.6.5 9
(h?.6.5 9
M er
M er


ENCLOSURE 1
ENCLOSURE 1
        .r..,
.r..,
Comanche Peak Intimidation Panel Charter                               .
Comanche Peak Intimidation Panel Charter OBJECTIVES:
OBJECTIVES:
The objectives of the panel are:
The objectives of the panel are:                                           ,
1)
: 1) To determine whether intimidation or harassment against employees or contractors occurred in the past or is now occurring at Comanche Peak;
To determine whether intimidation or harassment against employees or contractors occurred in the past or is now occurring at Comanche Peak; 2)
: 2)   To determine the extent of the above conditions if they exist (ed) and to identify the circumstances surrounding the events including the personnel involved, the duration, the reasons for its occurrence and the applicant's management corrective actions or recommendations for correc-tive actions.
To determine the extent of the above conditions if they exist (ed) and to identify the circumstances surrounding the events including the personnel involved, the duration, the reasons for its occurrence and the applicant's management corrective actions or recommendations for correc-tive actions.
                                                ~
3)
: 3)   To evaluate any other indicators of poor management practices or attitude toward the identification and correction of quality problems.
To evaluate any other indicators of poor management practices or
~
attitude toward the identification and correction of quality problems.
PURPOSE:
PURPOSE:
The panel will provide as products:
The panel will provide as products:
    . , , ,    1)   A position on the intimidation question to NRC upper management; t       .e~   2)   Input'to the Comanche Peak Contention 5 Panel. The Contention 5 Panel                                                                     .
1)
l will determine the effects of any intimidation on the overall QA/QC l                   Program at Comanche Peak.
A position on the intimidation question to NRC upper management; t
.e~
2)
Input'to the Comanche Peak Contention 5 Panel. The Contention 5 Panel will determine the effects of any intimidation on the overall QA/QC l
l Program at Comanche Peak.
MEMBERSHIP:
MEMBERSHIP:
James Gagliardo, IE (Chairperson)
James Gagliardo, IE (Chairperson)
Jane Axelrad, IE James Lieberman, OELD Bruce Kaplan, EG8G l                         Dorwin Hunter, Region IV l                         BrooksGriffin,01(Advisor) i                         ThomasIppolito,AE00(Advisor) l                         JosephScinto,OELD(Advisor)
Jane Axelrad, IE James Lieberman, OELD Bruce Kaplan, EG8G l
Dorwin Hunter, Region IV l
BrooksGriffin,01(Advisor) i ThomasIppolito,AE00(Advisor) l JosephScinto,OELD(Advisor)
Vincent Noonan, NRR (Advisor)
Vincent Noonan, NRR (Advisor)
I 1
I 1
y.
y.
                                . ~ . - - - - *         .-      ------*r=~
. ~. - - - - *
* _ ~ ~ _ _ _ _ _
------*r=~
* _______G=-~~***'**________~_  ,
~ ~
* G=-~~***'**
~
_____,,__.L_*'..
_____,,__.L_*'..


1 l
(".
(".-#      1 ACTION ITEMS
1 ACTION ITEMS 1.
: 1.       Define criteria for determining whether intimidation or harassment occurred.
Define criteria for determining whether intimidation or harassment occurred.
: 2.       Conduct as appropriate a review of relevant data bases:
2.
: a.           EG8Greportonintimidation(9/84)
Conduct as appropriate a review of relevant data bases:
: b.           Transcript of EG&G Intimidation Study Team briefing of NRC, applicant's, and intervenor's lawyers
a.
: c.           Enforcement packages related to. intimidation.
EG8Greportonintimidation(9/84) b.
: d.           Depositions related to intimidation and harassment.       (A summary will be sought or prepared as required)
Transcript of EG&G Intimidation Study Team briefing of NRC, applicant's, and intervenor's lawyers c.
: e.           Proposed Findings on intimidation (staff, applicants and intervenors).
Enforcement packages related to. intimidation.
: f.           Transcripts of current ASLB hearings related to intimidation,
d.
: g.           Office of I'nvestigations reports on intimidation and status of
Depositions related to intimidation and harassment.
              .. c ,                               outstanding allegations. (B. Griffin should provide briefing on
(A summary will be sought or prepared as required) e.
            '~ ~ ? F.*                             the above)
Proposed Findings on intimidation (staff, applicants and intervenors).
                      .n                                     :
f.
: h.           Information on Department of Labor Hearings related to the subjects of concern.
Transcripts of current ASLB hearings related to intimidation, g.
: 3.       Interface with CP Contention 5 Panel routinely.
Office of I'nvestigations reports on intimidation and status of
: 4.       Based on the above data and any other relevant data reviewed by the panel, develop a position which meets the stated objectives.
.. c,
: 5.       Prepare an SSER on intimidation, and provide testimony as required at ASLB hearings.
outstanding allegations.
(B. Griffin should provide briefing on
'~ ~ ? F.*
the above)
.n h.
Information on Department of Labor Hearings related to the subjects of concern.
3.
Interface with CP Contention 5 Panel routinely.
4.
Based on the above data and any other relevant data reviewed by the panel, develop a position which meets the stated objectives.
5.
Prepare an SSER on intimidation, and provide testimony as required at ASLB hearings.
9
9
    . , _ _ . . _ _ _ _            ,  , . _ . ,                ?       -.          -
?
                                                                                                                            ' ' ' ' ~ ' ' ~ ~ ~
r
~
~ - - - - - - - '
' ' ' ' ~ ' ' ~ ~ ~


  .            ~
~
: i. ~~ ' n*
: i. ~~ ' n I
I * ~ .--
ENCLOSURE 2
ENCLOSURE 2 Intimidation Panel Schedule December                         January Initial Panel Meeting Obtain relevant documents Document Reviews Consolidate Individual                                     (Developed by Panel, consistent views, Develop Panel                                         with resumption of hearings at consensus                                                   the end of January 1985)
* ~ -
Prepare Panel Input to r.$:'
Intimidation Panel Schedule December January Initial Panel Meeting Obtain relevant documents Document Reviews Consolidate Individual (Developed by Panel, consistent views, Develop Panel with resumption of hearings at consensus the end of January 1985)
s....,
Prepare Panel Input to r.$:' ;.
            ;.      QA/QC Panel Prepare Panel Report on Staff's Position l
QA/QC Panel s....,
Prepare Panel Report on Staff's Position l
s i
s i
I
I
        ~...
~...
                                        ..w4+                 ..e--             ....e e.. g   ....p .e--       .--,em-.     ._-}}
..w4+
..e--
e..
g
....p
.e--
.--,em-.
....e}}

Latest revision as of 02:51, 7 December 2024

Discusses Formation of Panel to Prepare NRC Position on ASLB Hearing Contention 5 Re Effects of Alleged Intimidation & Harassment on Overall Qa/Qc Program.Completion of Panel Action Scheduled for 850131
ML20205S821
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/24/1984
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Cunningham G, Harold Denton, Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation, NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
Shared Package
ML20204J043 List:
References
FOIA-85-153, FOIA-86-A-17 NUDOCS 8606120930
Download: ML20205S821 (19)


Text

'

Yk p un, UNITED STATES NUCLEAR REGULATORY COMMISSION l

WASHINGTON, D. C. 20665

(*.DT o*

DEC 2 41984 MEMORANDUM FOR:

Those on Attached List FROM:

William J. Dircks Executive Director for Operations

SUBJECT:

FORMATION OF PANEL TO PREPARE NRC STAFF F051 TION ON INTIMIDATION AT COMANCHE PEAK i

As the work of the Comanche Peak Technical Review Team (TRT) is nearing completion. the staff must evaluate all issues involving intimidation and harassment at Comanche Peak. The ASLB hearings, which have been in progress for three years and are expected to resume in February 1985, have resolved all cententions except Contention No. 5.

This contention concerns the Applicant's adherence to QA/QC requirements. As part of developing the staff position en this Contention, the staff must evaluate whether intimidation or harassment against employees or contractors occurred in the past or is now occurring, and make a detemination concerning the effects of any such intimidation on the overall QA/QC Program at Comanche Peak.

To properly evaluate the intimidation issue and to prepare a comprehensive staff position I am directing the fonnation of a panel, composed of senior managers drawn from yoar offices. This panel is to be composed of the following individuals:

JariesGagliardo.IE(Chairperson)

Jane Axelrad. IE James Lieberman OELD Dorwin Hunter, Region IV Because of their previous association with Comanche Peak regulatory activities, I am appointing the following individuals as advisors to the panel:

1 Broolrs Criffin. 01 Thomas Ippolito. AEOD Joseph Scinto, OELD Vincent Noonan, NRR Bruce Kaplan, EG&G l

The advisors may be asked to assist the panel when issues involving their specific area of expertise are being considered, and I request your support in l

making them available on an "as-needed" basis.

l The product of the Panel's effort will be a report similar to a SSER, that l

states clear staff conclusions regarding the occurrence of intimida-tion and harassment at Comanche Peak. The Charter for this Panel is provided I

as Enclosure 1.

The Charter provides the scope and objectives of the Panel l

but allows sufficient flexibility to enable the Panel to expand its scope, if l

e606120930 860602 f0/d'IA'63 ARDE

-17 PDR 8

s Those on Attached List The scheduled completion of the Panel's action is January 31, 1985.

I expect the Panel to meet at least once per week and more frequently, if necessary. provides a proposed milestone schedule.

The Panel will work under the direction of Vincent S. Noonan, Director of Comanche Peak Project, and should provide periodic status briefings to the Director of Licensing.

CD2E"3 L C.h William J. Dircks Executive Director for Operations

Enclosures:

As stated cc:

B. Hayes. OI DISTRIBUTION:

Panel Members Advisors Docket File 50 445/446 EDO Reading S. Treby B. Youngblood T. Novak

~

S. Burwell CPTRT JGagliardo 12/ /84

  • See attached concurrence sheet
    • Nonconcurrence per Axelrad and Lieberman J

OFC ITRT

PD:TRT
DIR:DL
0 ELD
DEPDIR:NRR :DIR:NRR
EDO MME :RWessman:pf*:VNoonan *
DGEisenhut* :JLieberna#*:ECase*
HRDento#
WJDircks LATE :12/13/84
12/ 1784
12/17/84
12/ /84
12/17/84
12/18/84
12////84 0FFICIAL RECORD COPY

s Addressees List:

Harold R. Denton, Director Office of Nuclear Reactor Regulation Richard C. DeYoung, Director Office of Inspection and Enforcement Guy H. Cunningham, III.

Executive Legal Director Jack Heltemes Director Office of the Analysis and Evaluation of Operational Data James Keppler, Regional Administrator

. Regio,n III Robert Martin, Regional Administrator Region IV l

4 i

l

i 5

l ENCLOSURE 1 Comanche Peak Intimidation Panel Charter OBJECTIVES:

1 The objectives of the panel are:

i 1)

To determine whether intimidation or harassment against empicyees or contractors occurred in the past or is now occurring at Comanche Peak; 2)

To determine the extent of the above conditions if they exist (ed) and to identify the circunctances surrounding the events including the personnel involved, the duration, the reasons for its occurrence and the applicant's management corrective actions or recomendations for correc-tive actions.

3)

To evaluate any other indicators of poor management practices or attitude toward the identification and correction of quality problems.

PURPOSE:

The panel will provide as products:

1)

A position on the intimidation question to NRC upper management; 2)

Input to the Comanche Peak Contention 5 Panel. The Contention 5 Panel will determine the effects of any intimidation on the overall QA/QC Program at Comanche Peak.

(

j MEMBERSHIP:

+ James Gagliardo. IE (Chairperson)

., lane Axelrad, IE James Liebeman, DELD Dorwin Hunter, Region IV BruceKaplan,EG8G(Advisor)

Brooks Griffin, O! (Advisor)

ThomasIppolito,AE00(Advisor)

Joseph Scinto, DELD Advisor)

Vincent Noonan, NRR Advisor)

~

i 4

ACTION ITEMS I.

Define criteria for determining whether intimidation or harassment occurred.

2.

Conduct as appropriate a review of relevant data bases:

a.

EG8G report on intimidation (9/84) b.

Transcript of EG&G Intimidation Study Team briefing of NRC, applicant's, and intervenor's lawyers c.

Enforcement packages related to intimidation.

d.

Depositions related to intimidation and harassment.

(A summary will be sought or prepared as required) e.

Proposed Findings on intimidation (staff, applicants and intervenors).

l f.

Transcripts of current ASLB hearings related to intimidation.

g.

Office of Investigations reports on intimidation and status of outstanding allegations.

(B. Griffin should provide briefing on theabove) h.

Information on Department of Labor Hearings related to the subjects of concern.

3.

Interface with CP Contention 5 Panel routinely.

4.

Based on the above data and any other relevant data reviewed by the panel, develop a position which meets the stated objectives.

5.

Prepare an SSER on intimidation, and provide testimony as required at ASLB hearings.

l l

v.

ENCLOSURE 2 Intimidation Panel Schedule December January Initial Panel Meeting Obtain relevant documents Document Reviews Consolidate Individual (Developed by Panel, consistent views, Develop Fare?

with resumption of hearings at consensus the end of January 1985)

Prepare Panel Input to QA/QC Panel Prepare Panel Report on Staff's Position I

I

~~--------

4 p,a as;g'o, UNITED STATES NUCL EAR REGULATORY COMMISSION

{T

.. )

s c

\\

WASHINGTON, D. C. 20555

\\*****/

DEC 2 41984 g _ ggg5 a

MEMORANDUM FOR:

Those on Attached List

- ~ _.

FROM:

William J. Dircks Executive Director for Operations

SUBJECT:

FORMATION OF PANEL TO PREPARE NRC STAFF POSITION ON INTIMIDATION AT COMANCHE PEAK As the work of the Comanche Peak Technical Review Team (TRT) is nearing completion, the staff must evaluate all issues involving intimidation and harassment at Comanche Peak.

The ASLB hearings, which have been in progress for three years and are expected to resume in February 1985, have resolved all contentions except Contention No. 5.

This contention concerns the Applicant's adherence to QA/QC requirements. As part of developing the staff position on this Contention, the staff must evaluate whether intimidation or harassment against employees or contractors occurred in the past or is now occurring, and make a detennination concerning the effects of any such intimidation on the overall QA/QC Program at Comanche Peak.

To properly evaluate the intimidation issue and to prepare a comprehensive staff position, I am directing the formation of a panel, composed of senior managers drawn from your offices. This panel is to be composed of the following

(

individuals:

James Gagliardo IE (Chairperson) l Jane Axelrad, IE James Lieberman, OELD Dorwin Hunter, Region I M O

Because of their previous association with Comanche Peak regulatory activities, I am appointing the following individuals as advisors to the panel:

(

Brooks Griffin, OI Thomas Ippolito, AE0D Joseph Scinto, OELD Vincent Noonan, NRR Bruce Kaplan, EG&G The advisors may be asked to assist the panel when issues involving their specific area of expertise are being considered, and I request your support in making them available on an "as-needed" basis.

The product of the Panel's effort will be a report similar to a SSER, that states clear staff conclusions regarding the occurrence of intimida-s l

tion and harassment at Comanche Peak.

The Charter for this Panel is provided l

as Enclosure 1.

The Charter provides the scope and objectives of the Panel but allows sufficient flexibility to enable the Panel to expand its scope, if necessary.

g pf jg Al7

e O

.s Those on Attached List ~

The scheduled completion of the Panel's action is January 31, 1985.

I expect the Panel to meet at least once per week and more frequently, if necessary.

Enclosurc 2 provides a proposed milestone schedule.

The Panel will work under the direction of Vincent S. Noonan, Director of Comanche Peak Project, and should provide periodic status briefings to the Director of Licensing.

/

f fl William (J. DircksV%

)%%

Executive Director for Operations

Enclosures:

As stated oc:

B. Hayes, OI Panel Members Panel Advisors i

i i

1 Addressees List:

Harold R. Denton, Director Office of Nuclear Reactor Regulation Richard C. DeYoung, Director Office of Inspection and Enforcement Guy H. Cunningham, III, Executive Legal Director Jack Heltemes, Director Office of the Analysis and Evaluation of Operational Data s

James Keppler, Regional Administrator Region III Robert Martin, Regional Administrator Region IV i

s 8

l

O

~

ENCLOSURE 1 Comanche Peak Intimidation Panel Charter OBJECTIVES:

The objectives of the panel are:

1)

To determine whether intimidation or harassment against employees or contractors occurred in the past or is now occurring at Comanche Peak; 2)

To determine the extent of the above conditions if they exist (ed) and to identify the circumstances surrounding the events including the personnel involved, the duration, the reasons for its occurrence and the applicant's management corrective actions or recommendations for correc-tive actions.

3)

To evaluate any other indicators of poor management practices or attitude toward the identification and correction of quality problems.

PURPOSE:

The panel will provide as products:

1)

A position on the intimidation question to NRC upper management; 2)

Input to the Comanche Peak Contention 5 Panel. The Contention 5 Panel will determine the effects of any intimidation on the overall QA/QC Program at Comanche Peak.

MEMBERSHIP:

JamesGagliardo,IE(Chairperson)

Jane Axelrad, IE James Lieberman, OELD Dorwin Hunter, Region IV Bruce Kaplan, EG&G (Advisor)

Brooks Griffin, 01 (Advisor)

Thomas Ippolito, AE0D (Advisor)

JosephScinto,OELD(Advisor)

Vincent Noonan, NRR (Advisor)

l

~

ACTION ITEMS 1.

Define criteria for determining whether intimidation or harassment occurred.

2.

Conduct as appropriate a review of relevant data bases:

a.

EG8G report on intimidation (9/84) t b.

Transcript of EG&G Intimidation Study Team briefing of NRC, applicant's, and intervenor's lawyers c.

Enforcement packages related to intimidation.

d.

Depositions related to irtimidation and harassment.

(A e

summary will be sought or prepared as required) e.

Proposed Findings on intimidation (staff, applicants and intervenors).

f.

Transcripts of current ASLB hearings related to intimidation.

9 Office of Investigations reports on intimidation and status of outstanding allegations.

(B. Griffin should provide briefing on theabove) h.

Infonnation on Department of Labor Hearings related to the subjects i

of Concern.

3.

Interface with CP Contention 5 Panel routinely.

4.

Based on the above data and any other relevant data reviewed by the panel, develop a position which meets the stated objectives.

5.

Prepare an SSER on intimidation, and provide testimony as required at ASLB hearings.

l l

l l

1

. ~

t ENCLOSURE 2 Intimidation Panel Schedule December January Initial Panel Meeting Obtain relevant documents Document Reviews Consolidate Individual (Developed by Panel, consistent views, Develop Fare?

with resumption of hearings at consensus the end of January 1985)

Prepare Panel Input to QA/QC Panel Prepare Panel Report on Staff's Position i

er-cu Y

.f r

  1. ,...,'o,,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

5

-E WASHINGTON, D. C. 20555

%......o

'g, q, l

MEMORANDUM FOR:

Those on Attached List FROM:

William J. Dircks Executive Director for Operations

SUBJECT:

FORMATION OF PANEL TO PREPARE NRC STAFF POSITION ON INTIMIDATION AT COMANCHE PEAX

.As the work of the Comanche Peak Technical Review Team (TRT) is nearing completion, the staff must evaluate all issues involving intimidation and harassment at Comanche Peak. The ASLB hearings, which have been in progress for three years and are expected to resume in February 1985, have resolved all contentions except Contentien No. 5.

This contention concerns the App 1tcant's adherence to QA/QC requirements. As part of developing the staff position on this Contention, the staff must evaluate whether intimidation or harassment against employees or contractors occurred in the past or is now occurring, and make a detemination concerning the effects of any such intimidation on the overall QA/QC Program at Comanche Peak.

To properly evaluate the intimidation issue and to prepare a comprehensive staff position, I am directing the formation of a panel, composed of senior managers drawn from your offices. This panel is to be composed of the following individuals:

[...l

~

JamesGagliardo,IE(Chairperson)

Jane Axelrad, IE James Liebeman, OELD

- Bruce Kaplan, EG8G Dorwin Hunter, Region IV Because of their previous association with Comanche Peak regulatory activities, I am appointing the following individuals as advisors to the

\\ panel:4 Brooks Griffin, 01 Thomas Ippolito, AE00 Joseph Scinto, OELD Vincent Noonan, NRR t

The advisors may be asked to assist the panel when issues involving their specific area of expertise are being considered, and I request your support in making them available on an "as-needed" basis.

The product of the Panel's effort will be a report similar to a SSER, that states clear staff conclusions regarding the occurrence of intimida-tion and harassment at Comanche Peak. The Charter for this Panel is provided as Enclosure 1.

The Charter provides the scope and objectives of the Panel but allows sufficient flexibility to enable the Panel to expand its scope, if necessary.

(~

Po/A 45'-tKb A/7l

-- l

+

j i

Ek')

T4" '

Those on Attached List The scheduled completion of the Panel's action is January 31, 1985. I expect the Panel to meet at least once per week and more frequently, if necessary. provides a proposed milestone schedule.

William J. Dircks Executive Director for perations

Enclosures:

As stated cc:

B. Hayes. OI Panel Members Panel Advisors

.c

    • a
c. c n*

1

.i LJ j

Those on Attached List The scheduled completion of the Panel's action is January 31,1955. I expect the Panel to meet at least once per week and more frequently, if necessary. provides a proposed milestone schedule.

William J. Dircks Executive Director for Operations

Enclosures:

As stated cc:

B. Hayes, OI DISTRIBUTION:

. Panel Members Advisors Docket File 50445/466 EDO Reading S. Treby

(,

B. Youngblood T. Novak S. Burwell i

i l

l FC :TRT

PD:TRT
DIR:DL
0 ELD
DEPDIR:NRR : DIE:NRR
EDD l

l AME :RWessman:pf :VNoonan

DEEisenhut :JLieberman :ECase
HRDenton
WJDircks j

ATE :12/ /84

12/ /84
12/ /84
12/ /84
12/ /84
12/ /84
12/ /84 0FFICIAL RECORD, COPY

%me '

b2i 3 Addressees List:

Harold R. Denton, Director Office of Nuclear Reactor Regulation Richard C. DeYoung, Director Office of Inspection and Enforcement Guy H. Cunningham, III, Executive Legal Director Jack Heltemes, Director Office of the Analysis and Evaluation of Operational Data James Keppler, Regional Administrator Region III Robert Martin, Regional Administrator Region IV.

(h?.6.5 9

M er

ENCLOSURE 1

.r..,

Comanche Peak Intimidation Panel Charter OBJECTIVES:

The objectives of the panel are:

1)

To determine whether intimidation or harassment against employees or contractors occurred in the past or is now occurring at Comanche Peak; 2)

To determine the extent of the above conditions if they exist (ed) and to identify the circumstances surrounding the events including the personnel involved, the duration, the reasons for its occurrence and the applicant's management corrective actions or recommendations for correc-tive actions.

3)

To evaluate any other indicators of poor management practices or

~

attitude toward the identification and correction of quality problems.

PURPOSE:

The panel will provide as products:

1)

A position on the intimidation question to NRC upper management; t

.e~

2)

Input'to the Comanche Peak Contention 5 Panel. The Contention 5 Panel will determine the effects of any intimidation on the overall QA/QC l

l Program at Comanche Peak.

MEMBERSHIP:

James Gagliardo, IE (Chairperson)

Jane Axelrad, IE James Lieberman, OELD Bruce Kaplan, EG8G l

Dorwin Hunter, Region IV l

BrooksGriffin,01(Advisor) i ThomasIppolito,AE00(Advisor) l JosephScinto,OELD(Advisor)

Vincent Noonan, NRR (Advisor)

I 1

y.

. ~. - - - - *


*r=~

~ ~

  • G=-~~***'**

~

_____,,__.L_*'..

(".

1 ACTION ITEMS 1.

Define criteria for determining whether intimidation or harassment occurred.

2.

Conduct as appropriate a review of relevant data bases:

a.

EG8Greportonintimidation(9/84) b.

Transcript of EG&G Intimidation Study Team briefing of NRC, applicant's, and intervenor's lawyers c.

Enforcement packages related to. intimidation.

d.

Depositions related to intimidation and harassment.

(A summary will be sought or prepared as required) e.

Proposed Findings on intimidation (staff, applicants and intervenors).

f.

Transcripts of current ASLB hearings related to intimidation, g.

Office of I'nvestigations reports on intimidation and status of

.. c,

outstanding allegations.

(B. Griffin should provide briefing on

'~ ~ ? F.*

the above)

.n h.

Information on Department of Labor Hearings related to the subjects of concern.

3.

Interface with CP Contention 5 Panel routinely.

4.

Based on the above data and any other relevant data reviewed by the panel, develop a position which meets the stated objectives.

5.

Prepare an SSER on intimidation, and provide testimony as required at ASLB hearings.

9

?

r

~

~ - - - - - - - '

' ' ' ' ~ ' ' ~ ~ ~

~

i. ~~ ' n I

ENCLOSURE 2

  • ~ -

Intimidation Panel Schedule December January Initial Panel Meeting Obtain relevant documents Document Reviews Consolidate Individual (Developed by Panel, consistent views, Develop Panel with resumption of hearings at consensus the end of January 1985)

Prepare Panel Input to r.$:' ;.

QA/QC Panel s....,

Prepare Panel Report on Staff's Position l

s i

I

~...

..w4+

..e--

e..

g

....p

.e--

.--,em-.

....e