IR 05000324/1986025: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:& IE k d
{{#Wiki_filter:IE k
/arolina C Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:
d
SUBJECT: REPORT N05. 50-325/86-24 AND 50-324/86-25 Thank you for your response of November 26, 1986, to our notice of Violation, issued on October- 31, 1986, concerning activities conducted at your Brunswick facilit We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the -implementation of your corrective actions during future inspection We appreciate your cooperation in this matte
&
/arolina Power and Light Company C
ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
REPORT N05. 50-325/86-24 AND 50-324/86-25 Thank you for your response of November 26, 1986, to our notice of Violation, issued on October-31, 1986, concerning activities conducted at your Brunswick facility.


Sincerely, ORIGtNAL SMEU "Y DAVID M. VERRELLI David M. Verrelli, Chief Reactor Projects Branch 2 cc: . W. Howe, Vice President Brunswick Nuclear Project
We have evaluated your response and found that it meets the requirements of 10 CFR 2.201.
/.R.Dietz,PlantGeneralManager bcc:VNRC Resident Inspector Document Control Desk State of South Carolina 8612290258 861222 DR ADOCK0500g4
 
%
We will examine the -implementation of your corrective actions during future inspections.
(ASMelTen:jd k
 
g Pfredrickson DVerrelli 12/15/86 12/(f/86 12/5/86
We appreciate your cooperation in this matter.
 
Sincerely, ORIGtNAL SMEU "Y DAVID M. VERRELLI David M. Verrelli, Chief Reactor Projects Branch 2 cc:
. W. Howe, Vice President Brunswick Nuclear Project
/.R.Dietz,PlantGeneralManager bcc:VNRC Resident Inspector Document Control Desk State of South Carolina 8612290258 861222 ADOCK0500g4 DR
%
k (ASMelTen:jd g Pfredrickson DVerrelli 12/5/86 12/15/86 12/(f/86


10 ZEO/
10 ZEO/
}}
}}

Revision as of 20:40, 5 December 2024

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-325/86-24 & 50-324/86-25
ML20212B473
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/22/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
References
NUDOCS 8612290258
Download: ML20212B473 (1)


Text

IE k

d

&

/arolina Power and Light Company C

ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

REPORT N05. 50-325/86-24 AND 50-324/86-25 Thank you for your response of November 26, 1986, to our notice of Violation, issued on October-31, 1986, concerning activities conducted at your Brunswick facility.

We have evaluated your response and found that it meets the requirements of 10 CFR 2.201.

We will examine the -implementation of your corrective actions during future inspections.

We appreciate your cooperation in this matter.

Sincerely, ORIGtNAL SMEU "Y DAVID M. VERRELLI David M. Verrelli, Chief Reactor Projects Branch 2 cc:

. W. Howe, Vice President Brunswick Nuclear Project

/.R.Dietz,PlantGeneralManager bcc:VNRC Resident Inspector Document Control Desk State of South Carolina 8612290258 861222 ADOCK0500g4 DR

%

k (ASMelTen:jd g Pfredrickson DVerrelli 12/5/86 12/15/86 12/(f/86

10 ZEO/