ML20214P655: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 20: Line 20:
{{#Wiki_filter:.
{{#Wiki_filter:.
*
*
                                          NOV 2 81986
NOV 2 81986
  Docket No. 50-455
Docket No. 50-455
  Commonwealth Edison Company
Commonwealth Edison Company
  ATTN: Mr. Cordell Reed
ATTN: Mr. Cordell Reed
          Vice President
Vice President
  Post Office Box 767
Post Office Box 767
  Chicago, IL 60690
Chicago, IL 60690
  Gentlemen:
Gentlemen:
  This refers to the routine safety inspection conducted by Messrs. H. A. Walker
This refers to the routine safety inspection conducted by Messrs. H. A. Walker
  and R. N. Sutphin of this office on October 8-30, 1986, of activities at Byron
and R. N. Sutphin of this office on October 8-30, 1986, of activities at Byron
  Nuclear Plant, Unit 2, authorized by License No. CPPR-131. Mr. J. P. Donnelly
Nuclear Plant, Unit 2, authorized by License No. CPPR-131. Mr. J. P. Donnelly
  of our Washington office, also participated in portions of the inspection as an
of our Washington office, also participated in portions of the inspection as an
  observer. Our findings were discussed with Mr. R. E. Querto and others of your
observer. Our findings were discussed with Mr. R. E. Querto and others of your
  staff at the conclusion of the inspection.
staff at the conclusion of the inspection.
  The enclosed copy of our inspection report identifies areas examined during
The enclosed copy of our inspection report identifies areas examined during
  the inspection. Within these areas, the inspection consisted of a selective
the inspection. Within these areas, the inspection consisted of a selective
  examination of procedures and reprasentative records, observations, and
examination of procedures and reprasentative records, observations, and
  interviews with personnel.
interviews with personnel.
  No violations of NRC requirements were identified during the course of this
No violations of NRC requirements were identified during the course of this
  inspection.
inspection.
  In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
  of this letter and the enclosed inspection report will be placed in the
of this letter and the enclosed inspection report will be placed in the
  NRC Public Document Room.
NRC Public Document Room.
  We will gladly discuss any questions you have concerning this inspection.
We will gladly discuss any questions you have concerning this inspection.
                                            Sincerely,
Sincerely,
                                              - ...              - -
- -
                                                                          , -, . , ,
-
                                                  .
-
                                                    ,-   - ... 7,                 ,
.
                                            J. J. Harrison, Chief
,-
                                            Engineering. Branch
- ... 7,
  Enclosure: Inspection Report
- ...
    No. 50-455/86036(DRS)
, , . , ,
  See Attached Distribution
,
                                                    %d
J. J. Harrison, Chief
  RI '[           RIIIn           RI           e'   H             RJ
Engineering. Branch
      A           Ghtl
Enclosure:
                                                    '
Inspection Report
                                      -
No. 50-455/86036(DRS)
  W V4r/1ms       Sutphin       J   onski       or ey         Harrison
See Attached Distribution
                  Iljtclu
%d
                                      p                             fgb
RI '[
            8612040295 861128
RIIIn
            PDR   ADOCK 05000455
RI
              G                 PDR
e'
                                                                            (      TE O)
H
RJ
A
Ghtl
-
'
W V4r/1ms
Sutphin
J
onski
or ey
Harrison
Iljtclu
p
fgb
8612040295 861128
PDR
ADOCK 05000455
G
PDR
TE O)
(


                                            .           .
.
    .
.
  .
.
      Commonwealth Edison Company       2
.
      -Distribution
Commonwealth Edison Company
      cc w/ enclosure:
2
      D. L. Farrar, Director
-Distribution
        of Nuclear Licensing
cc w/ enclosure:
      V. I. Schlosser, Project. Manager
D. L. Farrar, Director
      Gunner Sorensen, Site Project
of Nuclear Licensing
        Superintendent
V. I. Schlosser, Project. Manager
      R. E. Querto, Plant Manager
Gunner Sorensen, Site Project
      DCS/RSB(RIDS)
Superintendent
      Licensing Fee Management Branch
R. E. Querto, Plant Manager
      . Resident Inspector, RIII Byron
DCS/RSB(RIDS)
      Resident Inspector, RIII
Licensing Fee Management Branch
        Braidwood
. Resident Inspector, RIII Byron
      Phyllis Dunton, Attorney
Resident Inspector, RIII
        General's Office, Environmental
Braidwood
        Control Division
Phyllis Dunton, Attorney
      D. W. Cassel, Jr. , Esq.
General's Office, Environmental
      Diane Chavez, DAARE/ SAFE
Control Division
      Steve Lewis, 0GC
D. W. Cassel, Jr. , Esq.
      L.~01shan, NRR LPM
Diane Chavez, DAARE/ SAFE
      H. S. Taylor, Quality Assurance
Steve Lewis, 0GC
        Division
L.~01shan, NRR LPM
H. S. Taylor, Quality Assurance
Division
1
1
l
l
Line 104: Line 127:
l
l
l
l
                            ._.       . --   _
.
                                                .-- ---   .
..
. .
.
--
_
.--
---
.
}}
}}

Latest revision as of 01:08, 4 December 2024

Forwards Safety Insp Rept 50-455/86-36 on 861008-30.No Violations Noted
ML20214P655
Person / Time
Site: Byron Constellation icon.png
Issue date: 11/28/1986
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20214P658 List:
References
NUDOCS 8612040295
Download: ML20214P655 (2)


See also: IR 05000455/1986036

Text

.

NOV 2 81986

Docket No. 50-455

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. H. A. Walker

and R. N. Sutphin of this office on October 8-30, 1986, of activities at Byron

Nuclear Plant, Unit 2, authorized by License No. CPPR-131. Mr. J. P. Donnelly

of our Washington office, also participated in portions of the inspection as an

observer. Our findings were discussed with Mr. R. E. Querto and others of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and reprasentative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

- -

-

-

.

,-

- ... 7,

- ...

, , . , ,

,

J. J. Harrison, Chief

Engineering. Branch

Enclosure:

Inspection Report

No. 50-455/86036(DRS)

See Attached Distribution

%d

RI '[

RIIIn

RI

e'

H

RJ

A

Ghtl

-

'

W V4r/1ms

Sutphin

J

onski

or ey

Harrison

Iljtclu

p

fgb

8612040295 861128

PDR

ADOCK 05000455

G

PDR

TE O)

(

.

.

.

.

Commonwealth Edison Company

2

-Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project. Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querto, Plant Manager

DCS/RSB(RIDS)

Licensing Fee Management Branch

. Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr. , Esq.

Diane Chavez, DAARE/ SAFE

Steve Lewis, 0GC

L.~01shan, NRR LPM

H. S. Taylor, Quality Assurance

Division

1

l

l

l

l

l

l

l

!

l

l

.

..

. .

.

--

_

.--

---

.