IR 05000324/1987010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
Line 21: Line 21:
=Text=
=Text=
{{#Wiki_filter:l
{{#Wiki_filter:l
.
.
,.
,.
JUN O 31987 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 .
JUN O 31987 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602
.
Gentlemen:
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-325/87-10 AND 50-324/87-10 Thank you for your response of May 26, 1987, to our Notice of Violation issued on April 27, 1987, concerning activities conducted at your Brunswick facilit We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte
SUBJECT: NRC INSPECTION REPORT NOS. 50-325/87-10 AND 50-324/87-10 Thank you for your response of May 26, 1987, to our Notice of Violation issued on April 27, 1987, concerning activities conducted at your Brunswick facility.


Sincerely, J. Philip Stohr, Director Division of Radiation Safety and Safeguards cc: P. W. Howe, Vice President Brunswick Nuclear Project C. R. Dietz, Plant General Manager bec: NRR/DRIS/SB Document Control Desk (RIDS IE04), 016 NRC Resident Inspector State of North Carolina l
We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspections.


l
We appreciate your cooperation in this matter.
&
 
ATillman
Sincerely, J. Philip Stohr, Director Division of Radiation Safety and Safeguards cc:
P. W. Howe, Vice President Brunswick Nuclear Project C. R. Dietz, Plant General Manager bec: NRR/DRIS/SB Document Control Desk (RIDS IE04), 016 NRC Resident Inspector State of North Carolina
&
_
_
1re f//
f//
  ~ A011 e
.Y ATillman 1re
    .Y 1 Fredrickson 06/fd87 06/ /87 06/ 87 06/) /87 8706100323 870603 4    -
~ A011 e Fredrickson
 
06/fd87 06/ /87 06/
87 06/) /87 8706100323 870603
-
DR ADOCK 0500
DR ADOCK 0500
      -
 
      { g I)
{
      ,
g
_     J
,
I)
-
_
J
}}
}}

Revision as of 00:25, 4 December 2024

Ack Receipt of Util Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-324/87-10 & 50-325/87-10
ML20214T570
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 06/03/1987
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20214T573 List:
References
NUDOCS 8706100323
Download: ML20214T570 (1)


Text

l

.

,.

JUN O 31987 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602

.

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-325/87-10 AND 50-324/87-10 Thank you for your response of May 26, 1987, to our Notice of Violation issued on April 27, 1987, concerning activities conducted at your Brunswick facility.

We have evaluated your response and found that it meets the requirements of 10 CFR 2.201. We will examine the implementation of your corrective actions during future inspections.

We appreciate your cooperation in this matter.

Sincerely, J. Philip Stohr, Director Division of Radiation Safety and Safeguards cc:

P. W. Howe, Vice President Brunswick Nuclear Project C. R. Dietz, Plant General Manager bec: NRR/DRIS/SB Document Control Desk (RIDS IE04), 016 NRC Resident Inspector State of North Carolina

&