                                                                May 7, 1998
May 7, 1998
              Mr. W. L. Berg
Mr. W. L. Berg
              General Manager
General Manager
              Dairyland Power Cooperative
Dairyland Power Cooperative
              3200 East Avenue S.
3200 East Avenue S.
              P. O. Box 817
P. O. Box 817
              La Crosse, WI 54602-0817
La Crosse, WI 54602-0817
              SUBJECT:                 ROUTINE SAFETY INSPECTION AT THE LA CROSSE BOILING WATER
SUBJECT:
                                        REACTOR (INSPECTION REPORT 50-409/98001(DNMS))
ROUTINE SAFETY INSPECTION AT THE LA CROSSE BOILING WATER
              Dear Mr. Berg:
REACTOR (INSPECTION REPORT 50-409/98001(DNMS))
              On April 20,1998, the NRC conducted an inspection at your permanently shutdown La Crosse
Dear Mr. Berg:
              Boiling Water Reactor nuclear plant which examined SAFSTOR activities. The enclosed report
On April 20,1998, the NRC conducted an inspection at your permanently shutdown La Crosse
              presents the results of that inspection.
Boiling Water Reactor nuclear plant which examined SAFSTOR activities. The enclosed report
              During this inspection, activities in the areas of facility management and control, spent fuel
presents the results of that inspection.
                                                                  _
During this inspection, activities in the areas of facility management and control, spent fuel
              safety, and radiological safety were examined.
_
              Overall performance during decommissioning activities was very good. Focus and effort in some
safety, and radiological safety were examined.
              areas were limited, which was consistent with the limited activities being performed while the
Overall performance during decommissioning activities was very good. Focus and effort in some
              plant is in SAFSTOR. All activities inspected were conducted in compliance with the
areas were limited, which was consistent with the limited activities being performed while the
              Decommissioning Plan, the Quality Assurance Program and the Technical Specifications.
plant is in SAFSTOR. All activities inspected were conducted in compliance with the
              In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the
Decommissioning Plan, the Quality Assurance Program and the Technical Specifications.
              enclosed inspection report will be placed in the NRC Public Document Room.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the
              We will gladly discuss any questions you have concerning this inspection.
enclosed inspection report will be placed in the NRC Public Document Room.
                                                                      Sincerely,
We will gladly discuss any questions you have concerning this inspection.
                                                                    Original Signed by
Sincerely,
!                                                                     Bruce L. Jorgensen, Chief
Original Signed by
                                                                      Decommissioning Branch
!
              Docket No. 50-409
Bruce L. Jorgensen, Chief
              License No. DPR-45
Decommissioning Branch
            Enclosure:               Inspection Repor150-409/98001(DNMS)
Docket No. 50-409
            See Attached Distribution
License No. DPR-45
  DOCUMENT NAME: G:\SEC\ LAC 98001.DNM
Enclosure:
  To tredve a copy of this doeurnent, indicate in the box:"C" = Copy without enclosure "E" = Copy with enclosure"N" = No copy
Inspection Repor150-409/98001(DNMS)
  OFFICE           Rlli                       l   Rlil_                     C. Rlli   m                   EE
See Attached Distribution
  NAME             Nelson:ibl4M                 @!Ee7
DOCUMENT NAME: G:\\SEC\\ LAC 98001.DNM
                                                  '
To tredve a copy of this doeurnent, indicate in the box:"C" = Copy without enclosure "E" = Copy with enclosure"N" = No copy
                                                                                  Jorger1SEri
OFFICE
  DATE            05/o7/98                       05/07/98                     05/07/93
Rlli
                                                          OFFICIAL RECORD COPY                                                 ,
l
                                                                                                                                  '
Rlil_
                                                                                                                              \
C. Rlli
          9905190016 990507
m
          PDR       ADOCK 05000409
EE
          G                                 PDR                                                                                     l
NAME
                          _ - - _ - _
Nelson:ibl4M
@!Ee7
Jorger1SEri
'
DATE
05/o7/98
05/07/98
05/07/93
OFFICIAL RECORD COPY
,
'
\\
9905190016 990507
PDR
ADOCK 05000409
G
PDR
l
_ - - _ - _


                      *
*
                    .
.
                        W. L. Berg                                       -2-
W. L. Berg
                                                                              )
-2-
                        cc w/ encl:     ' Roger Christians, Plant Manager '   j
)
                                        B. D. Burks, Director,                 '
cc w/ encl:
                                          Bureau of Field Operations
' Roger Christians, Plant Manager
                                        Cheryl L. Parrino, Chairman
j
                                          Wisconsin Public Service Commission l
'
                                        Spark Burmaster, Coulee Region       )
'
                                          Energy Coalition
B. D. Burks, Director,
                                        State Liaison Officer
Bureau of Field Operations
                                        Chief, Radiation Protection Section
Cheryl L. Parrino, Chairman
                                          WI Department of Health and         ,
Wisconsin Public Service Commission
                                          Social Services, Division of Health !
Spark Burmaster, Coulee Region
                        Distribution:
Energy Coalition
                        Docket File w/enci
State Liaison Officer
                        PUBLIC IE-01 w/ encl
Chief, Radiation Protection Section
                        Rlll PRR w/ encl
WI Department of Health and
                        A. B. Beach, Rlll w/enci
,
                        J. L. Caldwell, Rill w/ encl
Social Services, Division of Health
                        C. D. Pederson, Rlli w/enci
!
                        Rlli Enf. Coordinator w/enci
Distribution:
                        S. W. Brown, NMSS w/enci                             l
Docket File w/enci
                        TSS w/enci                                           !
PUBLIC IE-01 w/ encl
                        IEO w/enci (e-mail)
Rlll PRR w/ encl
                        DOCDESK w/enci (e-mail)
A. B. Beach, Rlll w/enci
                        Green w/o enci                                       ,
J. L. Caldwell, Rill w/ encl
_ _ _ _ _ _ _ _ _ _
C. D. Pederson, Rlli w/enci
Rlli Enf. Coordinator w/enci
S. W. Brown, NMSS w/enci
TSS w/enci
IEO w/enci (e-mail)
DOCDESK w/enci (e-mail)
Green w/o enci
,
}}
}}

Latest revision as of 20:59, 3 December 2024

Forwards Insp Rept 50-409/98-01 on 980420-0423.No Violations Noted
ML20216B931
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 05/07/1998
From: Jorgensen B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Berg W
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20216B935 List:
References
50-409-98-01, 50-409-98-1, NUDOCS 9805190016
Download: ML20216B931 (2)


See also: IR 05000409/1998001

Text

..

May 7, 1998

Mr. W. L. Berg

General Manager

Dairyland Power Cooperative

3200 East Avenue S.

P. O. Box 817

La Crosse, WI 54602-0817

SUBJECT:

ROUTINE SAFETY INSPECTION AT THE LA CROSSE BOILING WATER

REACTOR (INSPECTION REPORT 50-409/98001(DNMS))

Dear Mr. Berg:

On April 20,1998, the NRC conducted an inspection at your permanently shutdown La Crosse

Boiling Water Reactor nuclear plant which examined SAFSTOR activities. The enclosed report

presents the results of that inspection.

During this inspection, activities in the areas of facility management and control, spent fuel

_

safety, and radiological safety were examined.

Overall performance during decommissioning activities was very good. Focus and effort in some

areas were limited, which was consistent with the limited activities being performed while the

plant is in SAFSTOR. All activities inspected were conducted in compliance with the

Decommissioning Plan, the Quality Assurance Program and the Technical Specifications.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original Signed by

!

Bruce L. Jorgensen, Chief

Decommissioning Branch

Docket No. 50-409

License No. DPR-45

Enclosure:

Inspection Repor150-409/98001(DNMS)

See Attached Distribution

DOCUMENT NAME: G:\\SEC\\ LAC 98001.DNM

To tredve a copy of this doeurnent, indicate in the box:"C" = Copy without enclosure "E" = Copy with enclosure"N" = No copy

OFFICE

Rlli

l

Rlil_

C. Rlli

m

EE

NAME

Nelson:ibl4M

@!Ee7

Jorger1SEri

'

DATE

05/o7/98

05/07/98

05/07/93

OFFICIAL RECORD COPY

,

'

\\

9905190016 990507

PDR

ADOCK 05000409

G

PDR

l

_ - - _ - _

.

W. L. Berg

-2-

)

cc w/ encl:

' Roger Christians, Plant Manager

j

'

'

B. D. Burks, Director,

Bureau of Field Operations

Cheryl L. Parrino, Chairman

Wisconsin Public Service Commission

Spark Burmaster, Coulee Region

Energy Coalition

State Liaison Officer

Chief, Radiation Protection Section

WI Department of Health and

,

Social Services, Division of Health

!

Distribution:

Docket File w/enci

PUBLIC IE-01 w/ encl

Rlll PRR w/ encl

A. B. Beach, Rlll w/enci

J. L. Caldwell, Rill w/ encl

C. D. Pederson, Rlli w/enci

Rlli Enf. Coordinator w/enci

S. W. Brown, NMSS w/enci

TSS w/enci

IEO w/enci (e-mail)

DOCDESK w/enci (e-mail)

Green w/o enci

,