                                                                        APPENDIX A
- - _ - .. _ _ .
                                                          NOTICE-OF. VIOLATION.                                            1
-.
                                  TU Electric                                        Dockets:              50-445/87-30
t.y
                                                                                                            50-446/87-22
                                  Comanche' Peak Steam Electric Station              Permits:              CPPR-126
                                  Units l'and 2,1 Glen' Rose, Texas                                        CPPR-127
                                .During an NRC inspection conducted on' November 4 through-
                                  December 1, 1987," violations of NRC requirements were identified.
                                  In accordance with the'" General Statement of Policy and Procedure                        i
                                  for'NRC' Enforcement Actions," 10 CFR Part.'2, Appendix C.(1987), the'                    i
                                . violations are listed-below:
                                  A.:  Criterion III of Appendix B to 10 CFR Part 50- as implemented    ,
                                      by Section 3.0, Revision 3, dated July 31, 1984, of the                              j
                                      TU' Electric Quality Assurance Plan (QAP), requires in part,                          i
                                        that measures must be established to assure.that applicable                        j
                                        regulatory requirements and design bases, as defined in                              I
                                        Part 50i2.and as specified in the license application, for
                                        those structures, systems and components to which this
                                        appendix applies, are. correctly translated into specifica-
                                        tions, drawings, procedures, and instructions. The design
                                        control measures must provide for verifying or checking the
                                        adequacy of design, such as by the performance of design
                                        reviews, by:the use of alternate or simplified calculational
                                        methods, or by the. performance of a suitable testing program.
                                        In addition, design changes, including field changes, must be                        ,
                                        subject to design control measures commensurate with those                          l
                                        applied'to the original design.
                                        Contrary to the above, the NRC inspector identified two
                                        capacitors' connected in parallel with a relay coil located in
                                        both Unit 1 emergency diesel generator control panels that
                                        were not shown on facility electrical drawings nor described
                                        in any associated documents.
                                                                                                                            i
                                        This is a Severity Level IV violation (Supplement II)
                                        (445/8730-V-06).
                                  B..  Criterion V of Appendix B to 10 CFR Part 50, as implemented by
                                        Section 5.0, Revision.3 of the TU Electric QAP dated July 31,
l-                                      1984, requires that activities affecting quality shall-be
'
'
                                        prescribed by and accomplished in accordance with documented
.
                                        instructions, procedures, or drawings of a type appropriate to
APPENDIX A
                                        the circumstances.
NOTICE-OF. VIOLATION.
                                                                                          8712240061 871216
1
                                                                                          PDR             ADDCK 05000445
TU Electric
                                                                                          Q                         POR
Dockets:
50-445/87-30
50-446/87-22
Comanche' Peak Steam Electric Station
Permits:
CPPR-126
Units l'and 2,1 Glen' Rose, Texas
CPPR-127
.During an NRC inspection conducted on' November 4 through-
December 1, 1987," violations of NRC requirements were identified.
In accordance with the'" General Statement of Policy and Procedure
i
for'NRC' Enforcement Actions," 10 CFR Part.'2, Appendix C.(1987), the'
i
. violations are listed-below:
A.:
Criterion III of Appendix B to 10 CFR Part 50- as implemented
,
by Section 3.0, Revision 3, dated July 31, 1984, of the
j
TU' Electric Quality Assurance Plan (QAP), requires in part,
i
that measures must be established to assure.that applicable
j
regulatory requirements and design bases, as defined in
I
Part 50i2.and as specified in the license application, for
those structures, systems and components to which this
appendix applies, are. correctly translated into specifica-
tions, drawings, procedures, and instructions.
The design
control measures must provide for verifying or checking the
adequacy of design, such as by the performance of design
reviews, by:the use of alternate or simplified calculational
methods, or by the. performance of a suitable testing program.
In addition, design changes, including field changes, must be
,
l
subject to design control measures commensurate with those
applied'to the original design.
Contrary to the above, the NRC inspector identified two
capacitors' connected in parallel with a relay coil located in
both Unit 1 emergency diesel generator control panels that
were not shown on facility electrical drawings nor described
in any associated documents.
i
This is a Severity Level IV violation (Supplement II)
(445/8730-V-06).
B..
Criterion V of Appendix B to 10 CFR Part 50, as implemented by
Section 5.0, Revision.3 of the TU Electric QAP dated July 31,
l-
1984, requires that activities affecting quality shall-be
'
prescribed by and accomplished in accordance with documented
instructions, procedures, or drawings of a type appropriate to
the circumstances.
8712240061 871216
PDR
ADDCK 05000445
Q
POR
b___ _ _ __ _
b___ _ _ __ _


                    -               ___     _ ___ _ ___ _____     _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ . _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ - _
-
        .
___
                                                                                                                                                                '
_ ___ _ ___ _____
                                                                    2
_ _ - _ _ _ _ _ - _ _ _ _ _ _ _ . _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ -
                                Paragraph 2.1.3 of TNE Procedure TNE-DC-7, Revision 16,-dated
_
                                February 14, 1986, " Preparation and Review of Design
-
                                Drawings," requires that completed drawings shall be checked
_
                                for accuracy and compliance. Paragraph 2.1.4 also requires an
.
                                engineering review for technical accuracy upon completion of
'
                                the drafting / design check.
2
                                                                                                                                                                        '
Paragraph 2.1.3 of TNE Procedure TNE-DC-7, Revision 16,-dated
                                Contrary to the above, drawings were not appropriately
February 14, 1986, " Preparation and Review of Design
                                reviewed / checked for accuracy as evidenced by the differences
Drawings," requires that completed drawings shall be checked
                                which existed between the two sets of electrical sc'aematic
for accuracy and compliance.
                                drawings for the emergency diesel generator control panels.
Paragraph 2.1.4 also requires an
                                Examples of these differences were most evident in the
engineering review for technical accuracy upon completion of
                                circuitry for solenoids 6A and 6B and relay contact numbers
the drafting / design check.
                                and arrangements (i.e., RX/1B and 10X) on Drawings
'
                                09-500-76001, Sheet 3 and TNE-El-0067, Sheet 96.
Contrary to the above, drawings were not appropriately
                                This is a Severity Level IV violation (Supplement II)
reviewed / checked for accuracy as evidenced by the differences
                                (445-8730-V-07).
which existed between the two sets of electrical sc'aematic
                      Pursuant to the provisions of 10 CFR 2.201, TU Electric is hereby                                                                       s
drawings for the emergency diesel generator control panels.
                        required to submit a written statement or explanation to the U. S.                                                                       g
Examples of these differences were most evident in the
                      Nuclear Regulatory Commission, ATTN: Document Control Desk,
circuitry for solenoids 6A and 6B and relay contact numbers
                      Washington, DC 20555 with a copy to the Assistant Director for
and arrangements (i.e., RX/1B and 10X) on Drawings
                        Inspection Programs, Comanche Peak Project Division, Office of                                                                               ;
09-500-76001, Sheet 3 and TNE-El-0067, Sheet 96.
                        Special Projects, within 30 days of the date of the letter
This is a Severity Level IV violation (Supplement II)
                                                                                                                                                                  I
(445-8730-V-07).
                        transmitting this Notice. This reply should be clearly marked as a                                                                             *
Pursuant to the provisions of 10 CFR 2.201, TU Electric is hereby
                        " Reply to a Notice of Violation" and should include for each
s
                        violation:       (1) the reason for the violation if admitted, (2) the
required to submit a written statement or explanation to the U.
                        corrective steps that have been taken and the results achieved,
S.
                        (3) the corrective steps that will be taken to avoid further
g
                        violations, and (4) the date when full compliance will be achieved.
Nuclear Regulatory Commission, ATTN: Document Control Desk,
                        If an adequate reply is not received within the time specified in
Washington, DC
                        this Notice, an order may be issued to show cause why the license
20555 with a copy to the Assistant Director for
                        should not be modified, suspended, or revoked or why such other
Inspection Programs, Comanche Peak Project Division, Office of
                        action as may be proper should not be taken. Consideration may be
;
                        given to extending the response time for good cause shown.
Special Projects, within 30 days of the date of the letter
                                                                FOR THE NUCLEAR REGULATORY COMMISSION
I
                                                                  SYf OdAnt4$k',
transmitting this Notice.
                        Dated at Comanche Peak Site
This reply should be clearly marked as a
                        this 16th day of Dectnber, 1987
*
" Reply to a Notice of Violation" and should include for each
violation:
(1) the reason for the violation if admitted, (2) the
corrective steps that have been taken and the results achieved,
(3) the corrective steps that will be taken to avoid further
violations, and (4) the date when full compliance will be achieved.
If an adequate reply is not received within the time specified in
this Notice, an order may be issued to show cause why the license
should not be modified, suspended, or revoked or why such other
action as may be proper should not be taken.
Consideration may be
given to extending the response time for good cause shown.
FOR THE NUCLEAR REGULATORY COMMISSION
SYf OdAnt4$k',
Dated at Comanche Peak Site
this 16th day of Dectnber, 1987
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
}}
}}

Latest revision as of 07:58, 2 December 2024

Notice of Violation from Insp on 871104-1201.Violation Noted:Capacitors Connected in Parallel W/Relay Coil Located in Both Unit 1 Emergency Diesel Generator Control Panels & Not Shown on Facility Electrical Drawings
ML20237D591
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/16/1987
From: Warnick R
NRC OFFICE OF SPECIAL PROJECTS
To:
Shared Package
ML20237D587 List:
References
50-445-87-30, 50-446-87-22, NUDOCS 8712240061
Download: ML20237D591 (2)


See also: IR 07100104/2012001

Text

_ _ _ _ _ _ _ _ - _ _ _ ___

-

- _ - --_

-

__

- - _ - .. _ _ .

-.

t.y

'

.

APPENDIX A

NOTICE-OF. VIOLATION.

1

TU Electric

Dockets:

50-445/87-30

50-446/87-22

Comanche' Peak Steam Electric Station

Permits:

CPPR-126

Units l'and 2,1 Glen' Rose, Texas

CPPR-127

.During an NRC inspection conducted on' November 4 through-

December 1, 1987," violations of NRC requirements were identified.

In accordance with the'" General Statement of Policy and Procedure

i

for'NRC' Enforcement Actions," 10 CFR Part.'2, Appendix C.(1987), the'

i

. violations are listed-below:

A.:

Criterion III of Appendix B to 10 CFR Part 50- as implemented

,

by Section 3.0, Revision 3, dated July 31, 1984, of the

j

TU' Electric Quality Assurance Plan (QAP), requires in part,

i

that measures must be established to assure.that applicable

j

regulatory requirements and design bases, as defined in

I

Part 50i2.and as specified in the license application, for

those structures, systems and components to which this

appendix applies, are. correctly translated into specifica-

tions, drawings, procedures, and instructions.

The design

control measures must provide for verifying or checking the

adequacy of design, such as by the performance of design

reviews, by:the use of alternate or simplified calculational

methods, or by the. performance of a suitable testing program.

In addition, design changes, including field changes, must be

,

l

subject to design control measures commensurate with those

applied'to the original design.

Contrary to the above, the NRC inspector identified two

capacitors' connected in parallel with a relay coil located in

both Unit 1 emergency diesel generator control panels that

were not shown on facility electrical drawings nor described

in any associated documents.

i

This is a Severity Level IV violation (Supplement II)

(445/8730-V-06).

B..

Criterion V of Appendix B to 10 CFR Part 50, as implemented by

Section 5.0, Revision.3 of the TU Electric QAP dated July 31,

l-

1984, requires that activities affecting quality shall-be

'

prescribed by and accomplished in accordance with documented

instructions, procedures, or drawings of a type appropriate to

the circumstances.

8712240061 871216

PDR

ADDCK 05000445

Q

POR

b___ _ _ __ _

-

___

_ ___ _ ___ _____

_ _ - _ _ _ _ _ - _ _ _ _ _ _ _ . _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ -

_

-

_

.

'

2

Paragraph 2.1.3 of TNE Procedure TNE-DC-7, Revision 16,-dated

February 14, 1986, " Preparation and Review of Design

Drawings," requires that completed drawings shall be checked

for accuracy and compliance.

Paragraph 2.1.4 also requires an

engineering review for technical accuracy upon completion of

the drafting / design check.

'

Contrary to the above, drawings were not appropriately

reviewed / checked for accuracy as evidenced by the differences

which existed between the two sets of electrical sc'aematic

drawings for the emergency diesel generator control panels.

Examples of these differences were most evident in the

circuitry for solenoids 6A and 6B and relay contact numbers

and arrangements (i.e., RX/1B and 10X) on Drawings

09-500-76001, Sheet 3 and TNE-El-0067, Sheet 96.

This is a Severity Level IV violation (Supplement II)

(445-8730-V-07).

Pursuant to the provisions of 10 CFR 2.201, TU Electric is hereby

s

required to submit a written statement or explanation to the U.

S.

g

Nuclear Regulatory Commission, ATTN: Document Control Desk,

Washington, DC

20555 with a copy to the Assistant Director for

Inspection Programs, Comanche Peak Project Division, Office of

Special Projects, within 30 days of the date of the letter

I

transmitting this Notice.

This reply should be clearly marked as a

" Reply to a Notice of Violation" and should include for each

violation:

(1) the reason for the violation if admitted, (2) the

corrective steps that have been taken and the results achieved,

(3) the corrective steps that will be taken to avoid further

violations, and (4) the date when full compliance will be achieved.

If an adequate reply is not received within the time specified in

this Notice, an order may be issued to show cause why the license

should not be modified, suspended, or revoked or why such other

action as may be proper should not be taken.

Consideration may be

given to extending the response time for good cause shown.

FOR THE NUCLEAR REGULATORY COMMISSION

SYf OdAnt4$k',

Dated at Comanche Peak Site

this 16th day of Dectnber, 1987