ML20247G557: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 4
| page count = 4
| project = TAC:66508
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:--                _            _    . _ _ - _ _            -
{{#Wiki_filter:--
          .?o.
.?o.
c          ,-                              May,18, 1989 N   1           ,
May,18, 1989 c
Docket No. S0-267
N 1
!                Mr. R. O. Williams, Jr.
Docket No. S0-267 Mr. R. O. Williams, Jr.
Senior Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840
Senior Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840


==Dear Mr. Williams:==
==Dear Mr. Williams:==
==SUBJECT:==
==SUBJECT:==
APPROVAL OF FORT ST. VPAIN FIRE PROTECTION PROGRAM PLAN This letter is our Safety Evaluation of the Fort St. Vrain Fire Protection Program Plan., Revision 1 dated Jul 22, 1988. Our review is based on the
APPROVAL OF FORT ST. VPAIN FIRE PROTECTION PROGRAM PLAN This letter is our Safety Evaluation of the Fort St. Vrain Fire Protection Program Plan., Revision 1 dated Jul 22, 1988. Our review is based on the
                ' Technical Evaluation Report (TER) ydone by our contractor, Science Applications InternationalCorporation(SAIC). SAIC's TER is enclosed.
' Technical Evaluation Report (TER) ydone by our contractor, Science Applications InternationalCorporation(SAIC). SAIC's TER is enclosed.
This review was conducted against the applicable regulatory criteria and guidance. These include:-
This review was conducted against the applicable regulatory criteria and guidance. These include:-
Appendix A to BTP APPCSB 9.5-1,
Appendix A to BTP APPCSB 9.5-1,
                        -      ' Appendix R to 10 CFR Part'50,
' Appendix R to 10 CFR Part'50, Generic Letter 86-10 and Generic Letter 88-12 The staff 'sent a draft of this TER to you by {{letter dated|date=January 30, 1989|text=letter dated January 30, 1989}}, and received you comments by {{letter dated|date=March 16, 1989|text=letter dated March 16, 1989}}.
                        --      Generic Letter 86-10 and Generic Letter 88-12 The staff 'sent a draft of this TER to you by letter dated January 30, 1989, and received you comments by letter dated March 16, 1989. Based or. this evaluation and your other written commitments, we conclude that your Fire Protection Program Plan is acceptable.
Based or. this evaluation and your other written commitments, we conclude that your Fire Protection Program Plan is acceptable.
The approve:I Fire Protection Program Plan should be incorporated in your updated Final Safety Analysis Report (FSAR) as per Generic Letter 86-10. This approval may also serve as a basis for deleting appropriate portions of your Fire Protection Technical Specifications, and substituting tne general license
The approve:I Fire Protection Program Plan should be incorporated in your updated Final Safety Analysis Report (FSAR) as per Generic Letter 86-10. This approval may also serve as a basis for deleting appropriate portions of your Fire Protection Technical Specifications, and substituting tne general license
                ' condition discussed in~ Generic Letter 86-10.
' condition discussed in~ Generic Letter 86-10.
Sincerely,
Sincerely,
                                                                                      /s/
/s/
Kennetn L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects 6                                                                 Office of Nuclear Reactor Regulation
Kennetn L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects 6
Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==
 
As stated s
s        As stated cc w/ enclosure:                                                           /fol
cc w/ enclosure:
  '88           See next page                                                                   j So
/fol
* DISTRIBUTION                                                                 l/l
'88 See next page j
              ! Docket File "7                 NRC PDR                     Local PDR           ' PD4 Reading Sd         G. Holahan '                   L. Rubenstein               J. Calvo               F. Hebdon
So DISTRIBUTION l/l
    '00         P. Noonan                     K. Heitner                 OGC-Rockville         E. Jordan N           B. Grimes                     C. McCracken               ACRS (10)             PD4 Plant File 2
! Docket File "7
g          DOCUMENT NAME:
NRC PDR Local PDR
' PD4 Reading Sd G. Holahan '
L. Rubenstein J. Calvo F. Hebdon
'00 P. Noonan K. Heitner OGC-Rockville E. Jordan N
B. Grimes C. McCracken ACRS (10)
PD4 Plant File 2g DOCUMENT NAME:
FSV 8956 m a.u.
FSV 8956 m a.u.
PD4/L                         PD4/PM N                     CE   .              PD4/D KHeitner:bj                @c    cken
PD4/L PD4/PM N CE PD4/D h.J:
            ,    PNoon    -
h F. A @bdo,+%
os'"~'8S                h.J:                       h F. A os'$'8'  @bdo,+%
@c cken PNoon KHeitner:bj os!F8' os'"~'8S os'n'8' os'$'8'
_                os!F8'                                                     os'n'8'


w .
w.
g                                                                May 18, 1989 Docket No. 50-267-Mr. R. O. Williams, Jr.
May 18, 1989 g
Docket No. 50-267-Mr. R. O. Williams, Jr.
Senior Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 60201-0840
Senior Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 60201-0840


==Dear Mr. Williams:==
==Dear Mr. Williams:==
==SUBJECT:==
==SUBJECT:==
APPROVAL OF FORT ST. VRAIN FIRE PROTECT!DN PROGRAM PLAN This letter is our Safety Evaluation of the Fort St. Vrain Fire Protection Program Plan, Revision 1 dated July 22, 1988. Our review is based on the Technical Evaluation Report (TER) done by our contractor, Science Applications InternationalCorporation(SAIC). SAIC's TER is enclosed.
APPROVAL OF FORT ST. VRAIN FIRE PROTECT!DN PROGRAM PLAN This letter is our Safety Evaluation of the Fort St. Vrain Fire Protection Program Plan, Revision 1 dated July 22, 1988. Our review is based on the Technical Evaluation Report (TER) done by our contractor, Science Applications InternationalCorporation(SAIC). SAIC's TER is enclosed.
This review was conducted against the applicable regulatory criteria and guidance. These include:
This review was conducted against the applicable regulatory criteria and guidance. These include:
Appendist A to 9TP APPCSB 9.5-1, Appendix R to 1D CFR Part 50, Generic Letter 86-10 and Generic Letter 88-12 The staff sent a draft of this TER to you by letter dated January 30, 1989, and received you comments by letter dated March 16, 1989. Based on this evaluation and your other written consnitments, we conclude that your Fire Protection Program Plan is acceptable.
Appendist A to 9TP APPCSB 9.5-1, Appendix R to 1D CFR Part 50, Generic Letter 86-10 and Generic Letter 88-12 The staff sent a draft of this TER to you by {{letter dated|date=January 30, 1989|text=letter dated January 30, 1989}}, and received you comments by {{letter dated|date=March 16, 1989|text=letter dated March 16, 1989}}. Based on this evaluation and your other written consnitments, we conclude that your Fire Protection Program Plan is acceptable.
The approved Fire Protection Program Plan should be incorporated in your updated Final Safety Analysis Report (FSAR) as per Generic Letter 86-10. This approval may also serve as a basis for deleting appropriate portions of your Fire Protection Technical Specifications, and substituting the gencral license condition discussed in Generic Letter 86-10.
The approved Fire Protection Program Plan should be incorporated in your updated Final Safety Analysis Report (FSAR) as per Generic Letter 86-10. This approval may also serve as a basis for deleting appropriate portions of your Fire Protection Technical Specifications, and substituting the gencral license condition discussed in Generic Letter 86-10.
Sincerely,
Sincerely,
                                                                                          /s/
/s/
                                    ,                                    Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==
As stated cc w/ enclosure:
As stated cc w/ enclosure:
See next page DISTRIBUTION Docket File                     NRC PDR             Local POR           PD4 Reading l
See next page DISTRIBUTION Docket File NRC PDR Local POR PD4 Reading l
G. Holahan                     L. Rubenstein       J. Calvo           F. Hebdon P. Noonan                       K. Heitner           OGC-Rockville       E. Jordan B. Grimes                     C. McCracken         ACRS (10)           PD4 Plant File DOCUMENT NAME: FSV 8956 PD4/L                         PD4/PM N               E                 PD4/D PNoon                           KHeitner:bj             c   cken         JGalvo F. Hude 05/k/89                       05/ir/89             05/[)/89           05/lg/89   ( f.h
G. Holahan L. Rubenstein J. Calvo F. Hebdon P. Noonan K. Heitner OGC-Rockville E. Jordan B. Grimes C. McCracken ACRS (10)
_ -__      _ - _ .                                                                                            n)
PD4 Plant File DOCUMENT NAME: FSV 8956 PD4/L PD4/PM N E
PD4/D PNoon KHeitner:bj c
cken JGalvo F. Hude 05/k/89 05/ir/89 05/[)/89 05/lg/89 (
f.h n)


                        ~ ,feKai             a
~,feKai a
:(, - .
:(, -
3- .             [S,                           UNITED STATES y                           g.             NUCLEAR REGULATORY COMMISSION 5                           'j                       WASHINGTON, D C. 20655
3-.
              %, ...-                                                    May 18, 1989 Docket No. 50-267 Mr. R. O. Williams, Jr.
[S, UNITED STATES NUCLEAR REGULATORY COMMISSION y
g.
5
'j WASHINGTON, D C. 20655 May 18, 1989 Docket No. 50-267 Mr. R. O. Williams, Jr.
Senior Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840
Senior Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840


==Dear Mr. Williams:==
==Dear Mr. Williams:==
==SUBJECT:==
==SUBJECT:==
APPROVAL OF FORT ST. VRAIN FIRE PROTECTION PROGRAM PLAN This letter is our Safety Evaluation of the Fort St. Vrain Fire Protection Program Plan, Revision 1 dated July 22, 1988. Our review is based on the Technical Evaluation Report (TER) done by our contractor, Science Applications InternationalCorporation(SAIC). SAIC's TER is enclosed.
APPROVAL OF FORT ST. VRAIN FIRE PROTECTION PROGRAM PLAN This letter is our Safety Evaluation of the Fort St. Vrain Fire Protection Program Plan, Revision 1 dated July 22, 1988. Our review is based on the Technical Evaluation Report (TER) done by our contractor, Science Applications InternationalCorporation(SAIC). SAIC's TER is enclosed.
This review was conducted against the applicable regulatory criteria and guidance. These include:
This review was conducted against the applicable regulatory criteria and guidance. These include:
Appendix A to 8TP APPCSB 9.5-1, Appendix R to 10 CFR Part 50, Generic Letter 86-10 and Generic Letter 88-12.
Appendix A to 8TP APPCSB 9.5-1, Appendix R to 10 CFR Part 50, Generic Letter 86-10 and Generic Letter 88-12.
The staff ser.t a draft of this TER to you by letter dated January 30, 1989, and received you comments by letter dated March 16, 1989. Based on this evaluation and your other written ccmitments, we conclude that your Fire Protection Program Plan is acceptable.
The staff ser.t a draft of this TER to you by {{letter dated|date=January 30, 1989|text=letter dated January 30, 1989}}, and received you comments by {{letter dated|date=March 16, 1989|text=letter dated March 16, 1989}}. Based on this evaluation and your other written ccmitments, we conclude that your Fire Protection Program Plan is acceptable.
The approved Fire Protection Drogram Plan should be incorporated in your updated Final Safety Analysis Report {FSAR) as per Generic Letter 86-10. This approval may also serve as a basis for deleting appropriate portions of your Fire Protection Technical Specifications, and substituting the general license condition discussed in Generic Letter 86-10.
The approved Fire Protection Drogram Plan should be incorporated in your updated Final Safety Analysis Report {FSAR) as per Generic Letter 86-10. This approval may also serve as a basis for deleting appropriate portions of your Fire Protection Technical Specifications, and substituting the general license condition discussed in Generic Letter 86-10.
Sincerely,
Sincerely,
                                                                              % B 91 L .' h Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Rear; tor Projects - III,.
% B 9 L.' h 1
Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Rear; tor Projects - III,.
IV, Y and Special Projects Office of Nuclear Reactor Regulation
IV, Y and Special Projects Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==
As stated i
cc w/ enclosure:
l See next page


As stated i                              cc w/ enclosure:
6 t
l                            See next page
, Mr. R. 0. Williams, Jr.
 
l Public Service Company of Colorado Fort St. Vrain l
6 t       *
CC:
          , Mr. R. 0. Williams, Jr.
Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division-Radiation Control Division Public Service Company Department of Health-of Colt'rado 4210 East,11th Avenue P. O. '; x 840 Denoer, Colorado 80220 Denvet,' Colorado 80201-0840 Mr. David Alberstein, Manager Mr. Charles H. Fuller Fort St. Vrain Services Manager, Nuclear Production GA International Services Corporation and Station Manager Post Office Box 85608 Public Service Company of Colorado
l               Public Service Company of Colorado                 Fort St. Vrain l               CC:
. San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651-Mr. H. L. Brey, Manager Nuclear Licensing and Resource Mr. P. F. Tomlinson, Manager Management Division Quality Assurance Division Public Service Company cf Colorado Public Service Company of Colorado P. O. Box 840 16805 Weld County Road 19-1/2 Denver, Colorado 80201-0840 Platteville, Colorado 80651 Senior Resident Inspector Mr. D. D. Hock U.S. Nuclear Regulatory Comission President and Chief Executive Officer P. O. Box 640 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80201-0840 Kelley, Standfield & 0'Donnell ATTN: Mr. J. K. Tarpey Commitment Control Program Public Service Company Building Coordinator Room 900 Public Service Company of Colorado 550 15th Street 2420 P. 26th Ave. Suite 100-0 Denver, Colorado 80202 Denver, Colorado 80211 Regional Administrator, Region IV U.S. Nuclear Regulatory Comission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado j
!              Mr. D. W. Warembourg, Manager                       Albert J. Hazle, Director Nuclear Engineering Division-                     Radiation Control Division Public Service Company                             Department of Health-of Colt'rado                                 4210 East ,11th Avenue P. O. '; x 840                                     Denoer, Colorado 80220 Denvet,' Colorado 80201-0840 Mr. David Alberstein, Manager                       Mr. Charles H. Fuller Fort St. Vrain Services                           Manager, Nuclear Production GA International Services Corporation                 and Station Manager Post Office Box 85608                             Public Service Company of Colorado
Greeley, Colorado 80631
          . San Diego, California 92138                           16805 Weld County Road 19-1/2 Platteville, Colorado 80651-Mr. H. L. Brey, Manager Nuclear Licensing and Resource                     Mr. P. F. Tomlinson, Manager             -
\\
Management Division                         Quality Assurance Division Public Service Company cf Colorado                 Public Service Company of Colorado P. O. Box 840                                       16805 Weld County Road 19-1/2 Denver, Colorado 80201-0840                         Platteville, Colorado 80651 Senior Resident Inspector                         Mr. D. D. Hock U.S. Nuclear Regulatory Comission                   President and Chief Executive Officer P. O. Box 640                                     Public Service Company of Colorado Platteville, Colorado 80651                         Post Office Box 840 Denver, Colorado 80201-0840 Kelley, Standfield & 0'Donnell ATTN: Mr. J. K. Tarpey                               Commitment Control Program Public Service Company Building                     Coordinator Room 900                                           Public Service Company of Colorado 550 15th Street                                   2420 P. 26th Ave. Suite 100-0 Denver, Colorado 80202                             Denver, Colorado 80211 Regional Administrator, Region IV U.S. Nuclear Regulatory Comission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631                                                                                             j
Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place L
                                                                                                                                    \
l 999 18th Street, Suite 1300 I
Regional Representative                                                                                             !
Denver, Colorado 80202-2413
Radiation Programs Environmental Protection Agency 1 Denver Place                                                                                                     L 999 18th Street, Suite 1300                                                                                         l Denver, Colorado 80202-2413                                                                                         I l
.}}
  .}}

Latest revision as of 20:36, 1 December 2024

Advises That 880722 Rev 1 to Fire Protection Program Plan Acceptable.Approved Plan Should Be Incorporated in Updated FSAR Per Generic Ltr 86-10
ML20247G557
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/18/1989
From: Heitner K
Office of Nuclear Reactor Regulation
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20245E659 List:
References
GL-86-10, GL-86-12, TAC-66508, NUDOCS 8905310009
Download: ML20247G557 (4)


Text

--

.?o.

May,18, 1989 c

N 1

Docket No. S0-267 Mr. R. O. Williams, Jr.

Senior Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

APPROVAL OF FORT ST. VPAIN FIRE PROTECTION PROGRAM PLAN This letter is our Safety Evaluation of the Fort St. Vrain Fire Protection Program Plan., Revision 1 dated Jul 22, 1988. Our review is based on the

' Technical Evaluation Report (TER) ydone by our contractor, Science Applications InternationalCorporation(SAIC). SAIC's TER is enclosed.

This review was conducted against the applicable regulatory criteria and guidance. These include:-

Appendix A to BTP APPCSB 9.5-1,

' Appendix R to 10 CFR Part'50, Generic Letter 86-10 and Generic Letter 88-12 The staff 'sent a draft of this TER to you by letter dated January 30, 1989, and received you comments by letter dated March 16, 1989.

Based or. this evaluation and your other written commitments, we conclude that your Fire Protection Program Plan is acceptable.

The approve:I Fire Protection Program Plan should be incorporated in your updated Final Safety Analysis Report (FSAR) as per Generic Letter 86-10. This approval may also serve as a basis for deleting appropriate portions of your Fire Protection Technical Specifications, and substituting tne general license

' condition discussed in~ Generic Letter 86-10.

Sincerely,

/s/

Kennetn L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects 6

Office of Nuclear Reactor Regulation

Enclosure:

As stated s

cc w/ enclosure:

/fol

'88 See next page j

So DISTRIBUTION l/l

! Docket File "7

NRC PDR Local PDR

' PD4 Reading Sd G. Holahan '

L. Rubenstein J. Calvo F. Hebdon

'00 P. Noonan K. Heitner OGC-Rockville E. Jordan N

B. Grimes C. McCracken ACRS (10)

PD4 Plant File 2g DOCUMENT NAME:

FSV 8956 m a.u.

PD4/L PD4/PM N CE PD4/D h.J:

h F. A @bdo,+%

@c cken PNoon KHeitner:bj os!F8' os'"~'8S os'n'8' os'$'8'

w.

May 18, 1989 g

Docket No. 50-267-Mr. R. O. Williams, Jr.

Senior Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 60201-0840

Dear Mr. Williams:

SUBJECT:

APPROVAL OF FORT ST. VRAIN FIRE PROTECT!DN PROGRAM PLAN This letter is our Safety Evaluation of the Fort St. Vrain Fire Protection Program Plan, Revision 1 dated July 22, 1988. Our review is based on the Technical Evaluation Report (TER) done by our contractor, Science Applications InternationalCorporation(SAIC). SAIC's TER is enclosed.

This review was conducted against the applicable regulatory criteria and guidance. These include:

Appendist A to 9TP APPCSB 9.5-1, Appendix R to 1D CFR Part 50, Generic Letter 86-10 and Generic Letter 88-12 The staff sent a draft of this TER to you by letter dated January 30, 1989, and received you comments by letter dated March 16, 1989. Based on this evaluation and your other written consnitments, we conclude that your Fire Protection Program Plan is acceptable.

The approved Fire Protection Program Plan should be incorporated in your updated Final Safety Analysis Report (FSAR) as per Generic Letter 86-10. This approval may also serve as a basis for deleting appropriate portions of your Fire Protection Technical Specifications, and substituting the gencral license condition discussed in Generic Letter 86-10.

Sincerely,

/s/

Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION Docket File NRC PDR Local POR PD4 Reading l

G. Holahan L. Rubenstein J. Calvo F. Hebdon P. Noonan K. Heitner OGC-Rockville E. Jordan B. Grimes C. McCracken ACRS (10)

PD4 Plant File DOCUMENT NAME: FSV 8956 PD4/L PD4/PM N E

PD4/D PNoon KHeitner:bj c

cken JGalvo F. Hude 05/k/89 05/ir/89 05/[)/89 05/lg/89 (

f.h n)

~,feKai a

(, -

3-.

[S, UNITED STATES NUCLEAR REGULATORY COMMISSION y

g.

5

'j WASHINGTON, D C. 20655 May 18, 1989 Docket No. 50-267 Mr. R. O. Williams, Jr.

Senior Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

APPROVAL OF FORT ST. VRAIN FIRE PROTECTION PROGRAM PLAN This letter is our Safety Evaluation of the Fort St. Vrain Fire Protection Program Plan, Revision 1 dated July 22, 1988. Our review is based on the Technical Evaluation Report (TER) done by our contractor, Science Applications InternationalCorporation(SAIC). SAIC's TER is enclosed.

This review was conducted against the applicable regulatory criteria and guidance. These include:

Appendix A to 8TP APPCSB 9.5-1, Appendix R to 10 CFR Part 50, Generic Letter 86-10 and Generic Letter 88-12.

The staff ser.t a draft of this TER to you by letter dated January 30, 1989, and received you comments by letter dated March 16, 1989. Based on this evaluation and your other written ccmitments, we conclude that your Fire Protection Program Plan is acceptable.

The approved Fire Protection Drogram Plan should be incorporated in your updated Final Safety Analysis Report {FSAR) as per Generic Letter 86-10. This approval may also serve as a basis for deleting appropriate portions of your Fire Protection Technical Specifications, and substituting the general license condition discussed in Generic Letter 86-10.

Sincerely,

% B 9 L.' h 1

Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Rear; tor Projects - III,.

IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated i

cc w/ enclosure:

l See next page

6 t

, Mr. R. 0. Williams, Jr.

l Public Service Company of Colorado Fort St. Vrain l

CC:

Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division-Radiation Control Division Public Service Company Department of Health-of Colt'rado 4210 East,11th Avenue P. O. '; x 840 Denoer, Colorado 80220 Denvet,' Colorado 80201-0840 Mr. David Alberstein, Manager Mr. Charles H. Fuller Fort St. Vrain Services Manager, Nuclear Production GA International Services Corporation and Station Manager Post Office Box 85608 Public Service Company of Colorado

. San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651-Mr. H. L. Brey, Manager Nuclear Licensing and Resource Mr. P. F. Tomlinson, Manager Management Division Quality Assurance Division Public Service Company cf Colorado Public Service Company of Colorado P. O. Box 840 16805 Weld County Road 19-1/2 Denver, Colorado 80201-0840 Platteville, Colorado 80651 Senior Resident Inspector Mr. D. D. Hock U.S. Nuclear Regulatory Comission President and Chief Executive Officer P. O. Box 640 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80201-0840 Kelley, Standfield & 0'Donnell ATTN: Mr. J. K. Tarpey Commitment Control Program Public Service Company Building Coordinator Room 900 Public Service Company of Colorado 550 15th Street 2420 P. 26th Ave. Suite 100-0 Denver, Colorado 80202 Denver, Colorado 80211 Regional Administrator, Region IV U.S. Nuclear Regulatory Comission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado j

Greeley, Colorado 80631

\\

Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place L

l 999 18th Street, Suite 1300 I

Denver, Colorado 80202-2413

.