ML21048A057: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 21: Line 21:


==Title:==
==Title:==
Petition Review Board Meeting with the Petitioner - 10 CFR 2.206 Petition Regarding Hardened Containment Vents for Boiling Water Reactors with Mark I Containments Docket Number:     (n/a)
Petition Review Board Meeting with the Petitioner - 10 CFR 2.206 Petition Regarding Hardened Containment Vents for Boiling Water Reactors with Mark I Containments Docket Number:
Location:         teleconference Date:             Wednesday, February 3, 2021 Work Order No.:   NRC-1335                             Pages 1-42 NEAL R. GROSS AND CO., INC.
(n/a)
Location:
teleconference Date:
Wednesday, February 3, 2021 Work Order No.:
NRC-1335 Pages 1-42 NEAL R. GROSS AND CO., INC.
Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.
Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.
Washington, D.C. 20005
Washington, D.C. 20005  


(202) 234-4433 1
(202) 234-4433  
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
 
                                + + + + +
1 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION  
+ + + + +
10 CFR 2.206 PETITION REVIEW BOARD (PRB)
10 CFR 2.206 PETITION REVIEW BOARD (PRB)
CONFERENCE CALL RE HARDENED CONTAINMENT VENTS OF ALL BOILING-WATER REACTORS WITH MARK I CONTAINMENTS (EPID L-2020-CRS-0003)
CONFERENCE CALL RE HARDENED CONTAINMENT VENTS OF ALL BOILING-WATER REACTORS WITH MARK I CONTAINMENTS (EPID L-2020-CRS-0003)  
                                + + + + +
+ + + + +
WEDNESDAY FEBRUARY 3, 2021
WEDNESDAY FEBRUARY 3, 2021  
                                + + + + +
+ + + + +
The   conference         call       was held,   Perry Buckberg, Petition Manager, presiding.
The conference call was held, Perry Buckberg, Petition Manager, presiding.
PETITIONERS:       MARK LEYSE PAUL GUNTER, Beyond Nuclear PETITION REVIEW BOARD MEMBERS BRIAN SMITH, NRR/DANU BRIAN LEE, NRR/DSS/SCPB DON ALGAMA, RES/DSA/FSCB BOB BERNARDO, NRR/DORL/LPMB RAO KARIPINENI, NRR/DSS/SCPB NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
PETITIONERS: MARK LEYSE PAUL GUNTER, Beyond Nuclear PETITION REVIEW BOARD MEMBERS BRIAN SMITH, NRR/DANU BRIAN LEE, NRR/DSS/SCPB DON ALGAMA, RES/DSA/FSCB BOB BERNARDO, NRR/DORL/LPMB RAO KARIPINENI, NRR/DSS/SCPB  
(202) 234-4433          WASHINGTON, D.C. 20005-3701          (202) 234-4433


2 PETITION REVIEW BOARD CONTRIBUTORS HOSSEIN ESMAILI, RES/DSA/FSCB JOE SEBROSKY, NRR/DANU/UARP BRETT TITUS, NRR/DEX/EEEB OTHER NRC STAFF CAROLINE CARUSONE, NRR/DORL UNDINE SHOOP, NRR/DORL/LPL2-2 JENNY TOBIN, NRR/DORL/LPL1 TILDA LIU, NMSS/DFM/STLB LICENSEE STAFF LINDA DEWHIRST, Nebraska Public Power District TRACY ORF, Tennessee Valley Authority TIM ENFINGER, Southern Nuclear KIMBERLY HULVEY, Tennessee Valley Authority NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
2 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433        WASHINGTON, D.C. 20005-3701  (202) 234-4433
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 PETITION REVIEW BOARD CONTRIBUTORS HOSSEIN ESMAILI, RES/DSA/FSCB JOE SEBROSKY, NRR/DANU/UARP BRETT TITUS, NRR/DEX/EEEB OTHER NRC STAFF CAROLINE CARUSONE, NRR/DORL UNDINE SHOOP, NRR/DORL/LPL2-2 JENNY TOBIN, NRR/DORL/LPL1 TILDA LIU, NMSS/DFM/STLB LICENSEE STAFF LINDA DEWHIRST, Nebraska Public Power District TRACY ORF, Tennessee Valley Authority TIM ENFINGER, Southern Nuclear KIMBERLY HULVEY, Tennessee Valley Authority  


3 C-O-N-T-E-N-T-S Introductions and Logistics........................4 Petitioner Presentation...........................17 Question and Answer Phase.........................39 Adjourn.............................................
3 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 C-O-N-T-E-N-T-S Introductions and Logistics........................4 Petitioner Presentation...........................17 Question and Answer Phase.........................39 Adjourn.............................................  
(202) 234-4433    WASHINGTON, D.C. 20005-3701  (202) 234-4433


4 P R O C E E D I N G S 2:01 p.m.
4 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
MR. BUCKBERG: Good afternoon.                 I'd like to     thank     everybody       for     attending       this   Nuclear Regulatory Commission, or NRC, public meeting.                             The purpose       of   today's       meeting       is     to provide       the petitioner, Beyond Nuclear, an opportunity to address the Petition Review Board, or PRB, regarding their petition to require that the hardened containment vent system venting capacity be increased for boiling water reactors with Mark 1 containments.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 P R O C E E D I N G S 2:01 p.m.
My name is Perry Buckberg, and I'm the petition manager for this petition.                     I'm also a Senior Project Manager in the Division of Operating Reactor Licensing       in   the   NRC   Office       of   Nuclear   Reactor Regulations.         I'm also the NRC's Agency 2.206 Petition Coordinator.
MR. BUCKBERG: Good afternoon. I'd like to thank everybody for attending this Nuclear Regulatory Commission, or NRC, public meeting. The purpose of today's meeting is to provide the petitioner, Beyond Nuclear, an opportunity to address the Petition Review Board, or PRB, regarding their petition to require that the hardened containment vent system venting capacity be increased for boiling water reactors with Mark 1 containments.
A   Petition       Review       Board,   again       PRB, typically consists of a petition manager, a chairman at the Senior Executive Service level, an office or agency petition coordinator, and other Board Members who are determined based on the technical content of the petition.
My name is Perry Buckberg, and I'm the petition manager for this petition. I'm also a Senior Project Manager in the Division of Operating Reactor Licensing in the NRC Office of Nuclear Reactor Regulations. I'm also the NRC's Agency 2.206 Petition Coordinator.
The PRB Chairman is Brian Smith, Deputy Director of the Division of Advanced Reactors and NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
A Petition Review Board, again PRB, typically consists of a petition manager, a chairman at the Senior Executive Service level, an office or agency petition coordinator, and other Board Members who are determined based on the technical content of the petition.
(202) 234-4433            WASHINGTON, D.C. 20005-3701            (202) 234-4433
The PRB Chairman is Brian Smith, Deputy Director of the Division of Advanced Reactors and  


5 Non-Power Production and Utilization Facilities in the Office of Nuclear Reactor Regulation.
5 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
We will introduce the other PRB members later.         As part of the review of their petition Beyond Nuclear has requested this opportunity to address the PRB.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 Non-Power Production and Utilization Facilities in the Office of Nuclear Reactor Regulation.
This is a Category 1 meeting.             The public is invited to observe this meeting, and will have an opportunity to communicate with the NRC after the business portion, but before the meeting is adjourned.
We will introduce the other PRB members later. As part of the review of their petition Beyond Nuclear has requested this opportunity to address the PRB.
This is a Category 1 meeting. The public is invited to observe this meeting, and will have an opportunity to communicate with the NRC after the business portion, but before the meeting is adjourned.
Any licensee staff may respond to questions if they choose.
Any licensee staff may respond to questions if they choose.
There are three categories of NRC public meetings.         More detailed information of these meetings can be found on NRC public website, www.nrc.gov.
There are three categories of NRC public meetings. More detailed information of these meetings can be found on NRC public website, www.nrc.gov.
As this is a public meeting there will be no     safeguards,     nor     official     use     only information discussed. This meeting began at 2:00 p.m., and is scheduled to end at 3:00 p.m. Eastern Time.                         After introductory remarks, Beyond Nuclear will address the Board, and then there will be a brief question and answer phase.
As this is a public meeting there will be no safeguards, nor official use only information discussed. This meeting began at 2:00 p.m., and is scheduled to end at 3:00 p.m. Eastern Time. After introductory remarks, Beyond Nuclear will address the Board, and then there will be a brief question and answer phase.
The   meeting       is   being     moderated       and recorded by the NRC Operations Center, and will be transcribed by a court reporter.                   The transcript will NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
The meeting is being moderated and recorded by the NRC Operations Center, and will be transcribed by a court reporter. The transcript will  
(202) 234-4433          WASHINGTON, D.C. 20005-3701            (202) 234-4433


6 become a supplement to the petition, and will also be made       publicly available.           Is     the court reporter present and able to record the meeting?
6 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 become a supplement to the petition, and will also be made publicly available. Is the court reporter present and able to record the meeting?
(No audible response)
(No audible response)
MR. BUCKBERG:         Thank you. Now we'll do introductions.         I have at least a partial list of people attending the meeting. When I read each person's name, please acknowledge you're on the phone by clearly stating your name, your position, and the office or organization you work for, so we have the information for the record.
MR. BUCKBERG: Thank you. Now we'll do introductions. I have at least a partial list of people attending the meeting. When I read each person's name, please acknowledge you're on the phone by clearly stating your name, your position, and the office or organization you work for, so we have the information for the record.
Again, my name is Perry Buckberg. I'm a Senior Project Manager in the Division of Operating Reactor Licensing in the Office of Nuclear Reactor Regulation. That's DORL for short, for others that follow me.
Again, my name is Perry Buckberg. I'm a Senior Project Manager in the Division of Operating Reactor Licensing in the Office of Nuclear Reactor Regulation. That's DORL for short, for others that follow me.
For the PRB members first I have Brian Smith on the line.
For the PRB members first I have Brian Smith on the line.
MR. SMITH: Yes.         This is Brian Smith.       I'm here.
MR. SMITH: Yes. This is Brian Smith. I'm here.
MR. BUCKBERG:         Brian Lee.
MR. BUCKBERG: Brian Lee.
MR. LEE:     Yes, I'm on the line.         This is Brian Lee.       I'm a safety engineer.
MR. LEE: Yes, I'm on the line. This is Brian Lee. I'm a safety engineer.
MR. BUCKBERG:         Brian, are you dialed into the phone number?
MR. BUCKBERG: Brian, are you dialed into the phone number?  
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701        (202) 234-4433


7 MR. LEE:     Brian Lee or Brian Smith MR. BUCKBERG:         Brian Lee.
7 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
MR. LEE:     No, I'm not.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 MR. LEE: Brian Lee or Brian Smith MR. BUCKBERG: Brian Lee.
MR. BUCKBERG:         You're going to need to do that.         That's, I'll give it to you real quickly, 800-772-3842.         And pass code is 2206.
MR. LEE: No, I'm not.
MR. LEE:     One more time.
MR. BUCKBERG: You're going to need to do that. That's, I'll give it to you real quickly, 800-772-3842. And pass code is 2206.
MR. BUCKBERG:           Sure.         800-772-3842.
MR. LEE: One more time.
MR. BUCKBERG: Sure. 800-772-3842.
Pass code is 2206.
Pass code is 2206.
MR. LEE:     Okay.
MR. LEE: Okay.
MR. BUCKBERG:             Anybody       else     who's connected virtually through the NRC needs to call that same phone number, if you haven't already.                         Thanks.
MR.
Let me continue.           Don Algama.
BUCKBERG:
MR. ALGAMA:         Yes, sir, I'm here.               Don Algama, Reactor Systems Engineer in the Office of Research.
Anybody else who's connected virtually through the NRC needs to call that same phone number, if you haven't already. Thanks.
MR. BUCKBERG:         Thank       you,   Don.         Bob Bernardo.
Let me continue. Don Algama.
MR. BERNARDO:         Yes, I'm here.         It's Bob Bernardo         in NRR,     Division       of       Operator   Reactor Licensing.         And I'm a Project Manager.
MR. ALGAMA: Yes, sir, I'm here. Don Algama, Reactor Systems Engineer in the Office of Research.
MR. BUCKBERG: Thank you, Don. Bob Bernardo.
MR. BERNARDO: Yes, I'm here. It's Bob Bernardo in NRR, Division of Operator Reactor Licensing. And I'm a Project Manager.
MR. BUCKBERG: Thanks, Bob.
MR. BUCKBERG: Thanks, Bob.
Rao Karipineni.
Rao Karipineni.
MR. KARIPINENI: Yes.                 Rao Karipineni.
MR. KARIPINENI: Yes. Rao Karipineni.  
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433          WASHINGTON, D.C. 20005-3701              (202) 234-4433


8 I'm a Plant Systems Engineer, Safety and Plant Systems Engineer in the Division of Safety Systems of Nuclear Reactor Regulation.
8 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
MR. BUCKBERG:         Thank you.       For other PRB contributors, I have Hossein Esmaili.                   Are you on the line, Hossein?       Brett Titus.       Hossein or Brett, either one of you?       Rob Carpenter.           Please make sure you unmute your phones before you try to talk, in case I, in case you were trying.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 I'm a Plant Systems Engineer, Safety and Plant Systems Engineer in the Division of Safety Systems of Nuclear Reactor Regulation.
I'll   continue       with     other   NRC   staff       I believe are in attendance.             Caroline Carusone?
MR. BUCKBERG: Thank you. For other PRB contributors, I have Hossein Esmaili. Are you on the line, Hossein? Brett Titus. Hossein or Brett, either one of you? Rob Carpenter. Please make sure you unmute your phones before you try to talk, in case I, in case you were trying.
MS. CARUSONE:         Hey,       Perry,   this       is Caroline. Yes, I'm on the call. I'm the Deputy Division Director       for   the   Division       of     Operating     Reactor Licensing.
I'll continue with other NRC staff I believe are in attendance. Caroline Carusone?
MR. BUCKBERG:         Thank you.       Undine Shoop.
MS.
Nate Jordan.       BP Jain.       Jenny Tobin.
CARUSONE:
MS. TOBIN:         Hi.     This is Jenny Tobin, J-E-N-N-Y, T-O-B-I-N.           I am a Project Manager in DORL.
: Hey, Perry, this is Caroline. Yes, I'm on the call. I'm the Deputy Division Director for the Division of Operating Reactor Licensing.
And Peach Bottom is one of my plants.                   Thank you.
MR. BUCKBERG: Thank you. Undine Shoop.
MR. BUCKBERG:         Thanks, Jenny.         Andy Hon.
Nate Jordan. BP Jain. Jenny Tobin.
Zack Stone.       Any members of the NRC whose names I didn't call?
MS. TOBIN: Hi. This is Jenny Tobin, J-E-N-N-Y, T-O-B-I-N. I am a Project Manager in DORL.
MS. SHOOP:     This is Undine Shoop.           I'm the Branch Chief in DORL, with oversight of the 2.206 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
And Peach Bottom is one of my plants. Thank you.
(202) 234-4433          WASHINGTON, D.C. 20005-3701            (202) 234-4433
MR. BUCKBERG: Thanks, Jenny. Andy Hon.
Zack Stone. Any members of the NRC whose names I didn't call?
MS. SHOOP: This is Undine Shoop. I'm the Branch Chief in DORL, with oversight of the 2.206  


9 process.
9 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
MR. BUCKBERG:         Hi, Undine.       I'm sorry.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 process.
I called your name earlier.           I hope I didn't talk over you.
MR. BUCKBERG: Hi, Undine. I'm sorry.
MS. SHOOP:       I know.       No. Actually I was a little bit late.         I apologize for that.
I called your name earlier. I hope I didn't talk over you.
MR. BUCKBERG:         Not at all.       Anybody else from the NRC?
MS. SHOOP: I know. No. Actually I was a little bit late. I apologize for that.
MR. SEBROSKY:         This is Joe Sebrosky.           I'm late, Perry, sorry.
MR. BUCKBERG: Not at all. Anybody else from the NRC?
MR. BUCKBERG:         Thanks, Joe.       Any other NRC staff on the phone?
MR. SEBROSKY: This is Joe Sebrosky. I'm late, Perry, sorry.
MR. TITUS:       Perry, this is Brett Titus.
MR. BUCKBERG: Thanks, Joe. Any other NRC staff on the phone?
MR. TITUS: Perry, this is Brett Titus.
I don't know if you called my name earlier as well.
I don't know if you called my name earlier as well.
I was joining the phone call.
I was joining the phone call.
MR. BUCKBERG:         Thats good.       I've got Joe and Brett now.       Any other NRC staff want to identify themselves?
MR. BUCKBERG: Thats good. I've got Joe and Brett now. Any other NRC staff want to identify themselves?
MS. LIU:     Tilda Liu.         I'm from NMSS.
MS. LIU: Tilda Liu. I'm from NMSS.
MR. BUCKBERG:         Please mute your phones if you're not talking.         I'll get to it later but *6 is the way to mute.         You can probably mute your phones otherwise     the old     fashion       way.       Thanks,   Tilda.
MR. BUCKBERG: Please mute your phones if you're not talking. I'll get to it later but *6 is the way to mute. You can probably mute your phones otherwise the old fashion way. Thanks, Tilda.
Anybody else from the NRC?             Please speak up.
Anybody else from the NRC? Please speak up.
MR. ESMAILI:       Perry, did you get my name?
MR. ESMAILI: Perry, did you get my name?  
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433        WASHINGTON, D.C. 20005-3701            (202) 234-4433


10 This is Hossein.
10 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
MR. BUCKBERG: I did. At least, I called on you.       But thanks for verifying. I'll move on to the petitioners.         Mr. Gunter, Paul Gunter, are you on the line?
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 This is Hossein.
MR. GUNTER:       Yes. Can you hear me?
MR. BUCKBERG: I did. At least, I called on you. But thanks for verifying. I'll move on to the petitioners. Mr. Gunter, Paul Gunter, are you on the line?
MR. BUCKBERG:       I can hear you fine.         Thank you.       Mark Leyse.
MR. GUNTER: Yes. Can you hear me?
MR. LEYSE:       Yes, I'm on the line.
MR. BUCKBERG: I can hear you fine. Thank you. Mark Leyse.
MR. BUCKBERG:           Thank     you. Licensee staff.         Anybody   from     the     licensees?     BWR   Mark     1 licensees who would like to identify themselves?
MR. LEYSE: Yes, I'm on the line.
MR. ENFINGER:         Hey, Perry.       This is Tim Enfinger from Southern Nuclear.
MR. BUCKBERG: Thank you. Licensee staff. Anybody from the licensees? BWR Mark 1 licensees who would like to identify themselves?
MR. BUCKBERG:         Thank you.
MR. ENFINGER: Hey, Perry. This is Tim Enfinger from Southern Nuclear.
MS. HULVEY:       Kimberly Hulvey of Tennessee Valley Authority.
MR. BUCKBERG: Thank you.
MR. BUCKBERG:         Thank you, Kim.
MS. HULVEY: Kimberly Hulvey of Tennessee Valley Authority.
MS. DEWHIRST:         Linda Dewhirst, Nebraska Public Power District.
MR. BUCKBERG: Thank you, Kim.
MR. BUCKBERG:         Thank you.
MS. DEWHIRST: Linda Dewhirst, Nebraska Public Power District.
MR. ORF:       Tracy Orf, Tennessee Valley Authority.
MR. BUCKBERG: Thank you.
MR. BUCKBERG:           Good afternoon.           Thank you.       Any other licensee staff? I'll move on. It is NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
MR. ORF: Tracy Orf, Tennessee Valley Authority.
(202) 234-4433          WASHINGTON, D.C. 20005-3701            (202) 234-4433
MR. BUCKBERG: Good afternoon. Thank you. Any other licensee staff? I'll move on. It is  


11 not required for members of the public to introduce themselves for this call. However, if there are any members of the public on the phone that wish to do so at this time, please state your name for the record.
11 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Any     members of   the   public?       Hearing   none,     I'll continue.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 not required for members of the public to introduce themselves for this call. However, if there are any members of the public on the phone that wish to do so at this time, please state your name for the record.
I'd like to emphasize that we each need to speak clearly and loudly to make sure that the court reporter can accurately transcribe this meeting.                         If you do have something that you would like to say please first state your name for the record.
Any members of the public? Hearing none, I'll continue.
For those dialing into the meeting, please remember to mute your phone to minimize any background noise or distractions.         If you do not have a mute button this can be done by pressing the keys *6.                   To unmute, press the *6 keys again.             Thank you.
I'd like to emphasize that we each need to speak clearly and loudly to make sure that the court reporter can accurately transcribe this meeting. If you do have something that you would like to say please first state your name for the record.
The agenda for today's meeting, after this introduction, is for the petitioner to provide new information to the PRB, for the PRB to consider in the petition's       acceptability         for       review   or     final assessment.
For those dialing into the meeting, please remember to mute your phone to minimize any background noise or distractions. If you do not have a mute button this can be done by pressing the keys *6. To unmute, press the *6 keys again. Thank you.
After the petitioner's presentation we will enter a brief question and answer phase.                   At this time I'll turn it over to the PRB Chairman, Brian Smith.
The agenda for today's meeting, after this introduction, is for the petitioner to provide new information to the PRB, for the PRB to consider in the petition's acceptability for review or final assessment.
MR. SMITH:     All right.         Excuse me. Thank NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
After the petitioner's presentation we will enter a brief question and answer phase. At this time I'll turn it over to the PRB Chairman, Brian Smith.
(202) 234-4433        WASHINGTON, D.C. 20005-3701            (202) 234-4433
MR. SMITH: All right. Excuse me. Thank  


12 you,       Perry. Welcome,       everyone,       to this   meeting regarding       the   2.206     petition       submitted   by   Beyond Nuclear.       I'd like to first share some background on our process.
12 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 you, Perry. Welcome, everyone, to this meeting regarding the 2.206 petition submitted by Beyond Nuclear. I'd like to first share some background on our process.
Section 2.206 of Title 10 in the Code of Federal Regulations describes the petition process, which is the primary mechanism for the public to request enforcement action by the NRC in a public process.
Section 2.206 of Title 10 in the Code of Federal Regulations describes the petition process, which is the primary mechanism for the public to request enforcement action by the NRC in a public process.
This process permits anyone to petition NRC to take enforcement-type actions related to the NRC licensees or license activity.                   Depending on the results of its evaluation NRC could modify, suspend, or revoke an NRC-issued license, or take any other appropriate enforcement action.
This process permits anyone to petition NRC to take enforcement-type actions related to the NRC licensees or license activity. Depending on the results of its evaluation NRC could modify, suspend, or revoke an NRC-issued license, or take any other appropriate enforcement action.
The   NRC     staff's         guidance   for       the disposition of 2.206 petitions request is Management Directive 8.11, which is publicly available.
The NRC staff's guidance for the disposition of 2.206 petitions request is Management Directive 8.11, which is publicly available.
The purpose of today's meeting is to give the petitioner an opportunity to provide any relevant additional explanation in support for the petition, after having received the PRB's initial assessment.
The purpose of today's meeting is to give the petitioner an opportunity to provide any relevant additional explanation in support for the petition, after having received the PRB's initial assessment.
This meeting is not a hearing, nor is it an opportunity for the petitioner or other members of the public to question or examine the Petition Review Board on its merits or the issues presented in the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
This meeting is not a hearing, nor is it an opportunity for the petitioner or other members of the public to question or examine the Petition Review Board on its merits or the issues presented in the  
(202) 234-4433          WASHINGTON, D.C. 20005-3701            (202) 234-4433


13 petition request.
13 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
During the question and answer phase the NRC       staff may   ask     clarifying         questions   of     the petitioner and the licensee.             The licensee may ask the Petition Review Board questions related to the issues raised in the petition, and then the petitioner and the     licensee may   ask   the     Petition       Review   Board questions related to the 2.206 petition process in general.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 petition request.
No decisions regarding the merits of the petition will be made during this meeting. Following this meeting the Petition Review Board will conduct its internal deliberations.                 The outcome of this internal meeting will be provided to the petitioner in a letter.
During the question and answer phase the NRC staff may ask clarifying questions of the petitioner and the licensee. The licensee may ask the Petition Review Board questions related to the issues raised in the petition, and then the petitioner and the licensee may ask the Petition Review Board questions related to the 2.206 petition process in general.
No decisions regarding the merits of the petition will be made during this meeting. Following this meeting the Petition Review Board will conduct its internal deliberations. The outcome of this internal meeting will be provided to the petitioner in a letter.
I would like to summarize the scope of the petition under consideration, and the NRC activities to date.
I would like to summarize the scope of the petition under consideration, and the NRC activities to date.
Beyond Nuclear submitted a petition to the NRC on October 16th, 2020.           The petition requested that the       U.S. Nuclear       Regulatory           Commission     take enforcement action against licensees of all boiling water reactors with Mark 1 containment systems, in the form of a suspension of operating licenses until all hardened containment vent systems are replaced.
Beyond Nuclear submitted a petition to the NRC on October 16th, 2020. The petition requested that the U.S.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Nuclear Regulatory Commission take enforcement action against licensees of all boiling water reactors with Mark 1 containment systems, in the form of a suspension of operating licenses until all hardened containment vent systems are replaced.  
(202) 234-4433        WASHINGTON, D.C. 20005-3701            (202) 234-4433


14 The basis of your petition is that the hardened containment vent requirements in NRC Order EA-13-109       do not   account     for     the   thermal   energy produced by chemical reactions that would occur during a severe accident and therefore would not prevent a BWR Mark 1 primary containment from failing in a severe accident.
14 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
The   petition       includes       various   severe accident phenomena that could cause higher flow than what the hardened containment vent is designed to pass.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 The basis of your petition is that the hardened containment vent requirements in NRC Order EA-13-109 do not account for the thermal energy produced by chemical reactions that would occur during a severe accident and therefore would not prevent a BWR Mark 1 primary containment from failing in a severe accident.
To provide some background, the Petition Review         Board   first     evaluates           petitions     using Management Directive 8.11, Section 3(c)(1) as criteria for accepting petitions, to assess whether or not further review is warranted.
The petition includes various severe accident phenomena that could cause higher flow than what the hardened containment vent is designed to pass.
To provide some background, the Petition Review Board first evaluates petitions using Management Directive 8.11, Section 3(c)(1) as criteria for accepting petitions, to assess whether or not further review is warranted.
A petition must basically provide facts not previously reviewed and/or resolved by the NRC to warrant further review.
A petition must basically provide facts not previously reviewed and/or resolved by the NRC to warrant further review.
On   December       18th,     2020   the   petition manager contacted you to inform you of the Petition Review Board's initial assessment that your petition did not meet the criteria for accepting petitions.
On December 18th, 2020 the petition manager contacted you to inform you of the Petition Review Board's initial assessment that your petition did not meet the criteria for accepting petitions.
This   is   because     in     issuing   NRC   Order EA-13-109 the hardened containment vent system was not intended to be used by itself to prevent containment NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
This is because in issuing NRC Order EA-13-109 the hardened containment vent system was not intended to be used by itself to prevent containment  
(202) 234-4433          WASHINGTON, D.C. 20005-3701            (202) 234-4433


15 failure.       The hardened containment vent system is one of a range of tools, along with severe accident water addition and severe accident water management, that the operators could use to prevent or mitigate an environmental relief and containment failure.
15 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Also, a study documented in NUREG-2206 demonstrated that the hardened containment vent system was a beneficial part of strategy for preventing and mitigating       releases       under     many     severe accident scenarios, and concluded that additional regulatory requirements were not justified.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 failure. The hardened containment vent system is one of a range of tools, along with severe accident water addition and severe accident water management, that the operators could use to prevent or mitigate an environmental relief and containment failure.
Also, a study documented in NUREG-2206 demonstrated that the hardened containment vent system was a beneficial part of strategy for preventing and mitigating releases under many severe accident scenarios, and concluded that additional regulatory requirements were not justified.
NUREG-2206 documents the simulation of accident progression and source term for a range of severe accident scenarios.
NUREG-2206 documents the simulation of accident progression and source term for a range of severe accident scenarios.
Consistent       with     Management     Directive 8.11, Section III.C.1(b)(ii), because the issues that you raised in your petition have previously been subject of a facility-specific or generic NRC staff review, the Petition Review Board then concluded that none       of the   following         Section       III.C.1(b)(ii) additional circumstances apply.
Consistent with Management Directive 8.11, Section III.C.1(b)(ii), because the issues that you raised in your petition have previously been subject of a facility-specific or generic NRC staff review, the Petition Review Board then concluded that none of the following Section III.C.1(b)(ii) additional circumstances apply.
Those being, the prior review did not resolve the issues raised by the petitioner, or the resolution of the issues in the prior review does not apply to the facts provided by the petitioner to support NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Those being, the prior review did not resolve the issues raised by the petitioner, or the resolution of the issues in the prior review does not apply to the facts provided by the petitioner to support  
(202) 234-4433          WASHINGTON, D.C. 20005-3701          (202) 234-4433


16 the     requested   action,       and     the     petition provides significant new information that the staff did not consider in the prior review. Essentially, none of those circumstances apply.
16 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
The   petition       manager       offered you       an opportunity to address the Petition Review Board to clarify or supplement your petition in response to this assessment.     And you requested to address the Petition Review Board in this forum.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 the requested action, and the petition provides significant new information that the staff did not consider in the prior review. Essentially, none of those circumstances apply.
As a reminder for all participants, please identify yourself if you make any remarks, as this will help us in the preparation of the meeting transcript that will be made publicly available.                   Thank you.
The petition manager offered you an opportunity to address the Petition Review Board to clarify or supplement your petition in response to this assessment. And you requested to address the Petition Review Board in this forum.
As a reminder for all participants, please identify yourself if you make any remarks, as this will help us in the preparation of the meeting transcript that will be made publicly available. Thank you.
Beyond Nuclear, Mr. Paul Gunter, I will now turn it over to you to provide any information that you believe the Petition Review Board should consider as part of this petition.
Beyond Nuclear, Mr. Paul Gunter, I will now turn it over to you to provide any information that you believe the Petition Review Board should consider as part of this petition.
MR. GUNTER:         Good afternoon.       My name is Paul Gunter.       I'm on staff for the petitioner, Beyond Nuclear, which is based in Takoma Park, Maryland.
MR. GUNTER: Good afternoon. My name is Paul Gunter. I'm on staff for the petitioner, Beyond Nuclear, which is based in Takoma Park, Maryland.
The October 16, 2020 enforcement petition in today's supplemental information request to the NRC to suspend operations of 19 General Electric Mark 1 Boiling Water Reactors cited in Alabama, Georgia, Illinois,       Pennsylvania,             Michigan,       Minnesota, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
The October 16, 2020 enforcement petition in today's supplemental information request to the NRC to suspend operations of 19 General Electric Mark 1 Boiling Water Reactors cited in Alabama, Georgia,
(202) 234-4433        WASHINGTON, D.C. 20005-3701          (202) 234-4433
: Illinois, Pennsylvania,
: Michigan, Minnesota,  


17 Nebraska, New Jersey, and North Carolina, that are identified with the acknowledged design flaw, and severe         accident       vulnerability             involving       the volumetrically         undersized         GE   pressure       suppression containment system.
17 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
This       same       undersized           containment structure demonstrated a 100 percent failure rate for the three Tokyo Electric Power Company's Fukushima Daiichi units that were at full power on March 11, 2011, and     following     the   Tohoku     earthquake       and tsunami, experiencing multiple severe nuclear accidents, breach of     containments,       and     the     widespread       release       of radioactivity.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 Nebraska, New Jersey, and North Carolina, that are identified with the acknowledged design flaw, and severe accident vulnerability involving the volumetrically undersized GE pressure suppression containment system.
None of the actions to date by the Nuclear Regulatory Commission and the operators here in the United         States   have     corrected         the   GE   pressure suppression         system's     underlying           design   flaw     and operational vulnerability first identified and then suppressed by the Atomic Energy Commission in 1972.
This same undersized containment structure demonstrated a 100 percent failure rate for the three Tokyo Electric Power Company's Fukushima Daiichi units that were at full power on March 11, 2011, and following the Tohoku earthquake and tsunami, experiencing multiple severe nuclear accidents, breach of containments, and the widespread release of radioactivity.
None of the actions to date by the Nuclear Regulatory Commission and the operators here in the United States have corrected the GE pressure suppression system's underlying design flaw and operational vulnerability first identified and then suppressed by the Atomic Energy Commission in 1972.
The petitioners charge that the Agency and the industry's post-Fukushima compensatory actions as stipulated by NRC Order and Enforcement Action 2013-109 leave the public at unreasonable and undue risk.
The petitioners charge that the Agency and the industry's post-Fukushima compensatory actions as stipulated by NRC Order and Enforcement Action 2013-109 leave the public at unreasonable and undue risk.
Today's       supplemental           materials       and remarks are presented to the Petition Review Board by NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Today's supplemental materials and remarks are presented to the Petition Review Board by  
(202) 234-4433            WASHINGTON, D.C. 20005-3701            (202) 234-4433


18 our petition's principle researcher and author, and co-petitioner, Mr. Mark Leyse.               Mark.
18 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
MR. LEYSE:       Hi.     Thank you, Paul.         This is Mark Leyse.     And I first want to say that the way the petition was described is actually, it's not incorrect what you said.             It's just not really the primary point of the petition.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 our petition's principle researcher and author, and co-petitioner, Mr. Mark Leyse. Mark.
MR. LEYSE: Hi. Thank you, Paul. This is Mark Leyse. And I first want to say that the way the petition was described is actually, it's not incorrect what you said. It's just not really the primary point of the petition.
You said that, you know, because the NRC didn't account for the thermal energy produced by chemical reactions that, you know, that's basically the point of the petition.
You said that, you know, because the NRC didn't account for the thermal energy produced by chemical reactions that, you know, that's basically the point of the petition.
That's, like I say, that is not incorrect.
That's, like I say, that is not incorrect.
But the petition is very simple.                 The petition just says, basically, the vents required by Order EA-13-109 cannot be guaranteed to prevent failure of the primary containment because they do not have the capacity to discharge the total amount of thermal energy that would be generated over some periods of time in various severe accident scenarios.
But the petition is very simple. The petition just says, basically, the vents required by Order EA-13-109 cannot be guaranteed to prevent failure of the primary containment because they do not have the capacity to discharge the total amount of thermal energy that would be generated over some periods of time in various severe accident scenarios.
That is the essence of the petition.                 And then we also requested that the NRC revoke the licenses of any BWR Mark 1 units that are not modified to have a venting capacity that would guarantee prevention of containment failure under severe accident conditions.
That is the essence of the petition. And then we also requested that the NRC revoke the licenses of any BWR Mark 1 units that are not modified to have a venting capacity that would guarantee prevention of containment failure under severe accident conditions.
So, this total amount of thermal energy, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
So, this total amount of thermal energy,  
(202) 234-4433      WASHINGTON, D.C. 20005-3701            (202) 234-4433


19 yeah, it would include chemical energy, like from the zirconium-steam reaction.               It would also include decay heat.       But there are points in time where there's just so much more thermal energy generated by the chemical reactions.
19 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
So, that's the real point.           Anyway, I have sent       a   letter   responding       to   statements   that     the Petition Review Board made.               That's a letter that was sent December 18th, 2020.               So, what I discuss in this presentation         is   explained         in     more detail,       and referenced in the written response that I sent to the Petition Review Board.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 yeah, it would include chemical energy, like from the zirconium-steam reaction. It would also include decay heat. But there are points in time where there's just so much more thermal energy generated by the chemical reactions.
So, that's the real point. Anyway, I have sent a letter responding to statements that the Petition Review Board made. That's a letter that was sent December 18th, 2020. So, what I discuss in this presentation is explained in more detail, and referenced in the written response that I sent to the Petition Review Board.
So, I just want to start now basically.
So, I just want to start now basically.
We cited evidence showing that the vents required by Order EA-13-109 lack the capacity to perform reliably under severe accident conditions.
We cited evidence showing that the vents required by Order EA-13-109 lack the capacity to perform reliably under severe accident conditions.
Idaho   National       Engineering     Laboratory, now it's INL, reported that in order to successfully operate in a severe accident, a hardened containment vent needs to have the capacity that is seven times as great as that of the vents that are required by Order EA-13-109.
Idaho National Engineering Laboratory, now it's INL, reported that in order to successfully operate in a severe accident, a hardened containment vent needs to have the capacity that is seven times as great as that of the vents that are required by Order EA-13-109.
That is one of the items that we presented that I note that in the Petition Review Board's statement they did not acknowledge what Idaho National NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
That is one of the items that we presented that I note that in the Petition Review Board's statement they did not acknowledge what Idaho National  
(202) 234-4433          WASHINGTON, D.C. 20005-3701          (202) 234-4433


20 Labs had said, nor did they address that.
20 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 Labs had said, nor did they address that.
Anyway, so we presented that along with a lot of other evidence just showing that over some periods of time, they may be very brief, there can be tremendous amounts of thermal energy generated, which would overwhelm a vent.
Anyway, so we presented that along with a lot of other evidence just showing that over some periods of time, they may be very brief, there can be tremendous amounts of thermal energy generated, which would overwhelm a vent.
For example, you could have 25 percent of the entire thermal power level of the reactor that could be generated.       It would be a power level of over 25 percent.       And it would sustain for a period of, you know, say one minute.           And that would just blow the vents, and the containment wouldn't work.
For example, you could have 25 percent of the entire thermal power level of the reactor that could be generated. It would be a power level of over 25 percent. And it would sustain for a period of, you know, say one minute. And that would just blow the vents, and the containment wouldn't work.
Anyway, so that is, like I said, that's thoroughly documented in the petition.                       It's also documented in the letter that I sent as a reply.                       But anyway, the Petition Review Board, as you said, the initial recommendation is to not accept our petition for review.
Anyway, so that is, like I said, that's thoroughly documented in the petition. It's also documented in the letter that I sent as a reply. But anyway, the Petition Review Board, as you said, the initial recommendation is to not accept our petition for review.
And I just want to note that a number of petitioners, and I would be among them, allege that Petition Review Boards are biased.                   A report from 2017 by the NRC's Office of the Inspector General, on their audit of the Petition Review Board process states, quote, some petitioners said that 10 CFR 2.206 petition process is a conflict of interest.
And I just want to note that a number of petitioners, and I would be among them, allege that Petition Review Boards are biased. A report from 2017 by the NRC's Office of the Inspector General, on their audit of the Petition Review Board process states, quote, some petitioners said that 10 CFR 2.206 petition process is a conflict of interest.  
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433        WASHINGTON, D.C. 20005-3701            (202) 234-4433


21 Specifically, petitioners assert that NRC cannot objectively review petitions that appeal or challenge NRC decisions, because the staff performing the review are the same staff who made the original decision, end of quote.
21 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 Specifically, petitioners assert that NRC cannot objectively review petitions that appeal or challenge NRC decisions, because the staff performing the review are the same staff who made the original decision, end of quote.
So now, in the Fukushima accident, March 2011, hardened vents that were installed in Mark 1 primary containments failed to prevent hydrogen gas from leaking into reactor buildings, and exploding.
So now, in the Fukushima accident, March 2011, hardened vents that were installed in Mark 1 primary containments failed to prevent hydrogen gas from leaking into reactor buildings, and exploding.
And the NRC became very concerned that the vents that had been previously voluntarily installed in Mark 1 units in the United States were inadequate.
And the NRC became very concerned that the vents that had been previously voluntarily installed in Mark 1 units in the United States were inadequate.
So, after tens of BWR Mark 1 units had operated in the U.S. for roughly four decades, the NRC finally, prompted by the Fukushima accident, decided to impose legally binding requirements to finally solve the       problem   of     Mark     1     primary       containment overpressurization.
So, after tens of BWR Mark 1 units had operated in the U.S. for roughly four decades, the NRC finally, prompted by the Fukushima accident, decided to impose legally binding requirements to finally solve the problem of Mark 1
Among     other     things,       Order   EA-13-109 stipulated that the new BWR Mark 1 vents must have the capacity to handle a continuous thermal energy input at a rate equal to one percent of the reactor's rated maximum thermal power while maintaining the primary containment       at a   pressure       lower     than its   design pressure.
primary containment overpressurization.
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Among other things, Order EA-13-109 stipulated that the new BWR Mark 1 vents must have the capacity to handle a continuous thermal energy input at a rate equal to one percent of the reactor's rated maximum thermal power while maintaining the primary containment at a pressure lower than its design pressure.  
(202) 234-4433        WASHINGTON, D.C. 20005-3701            (202) 234-4433


22 The NRC has explained -- and also I just want to say, this was not acknowledged in the statement that the Petition Review Board sent on December 18th last year.       It was not addressed.
22 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 The NRC has explained -- and also I just want to say, this was not acknowledged in the statement that the Petition Review Board sent on December 18th last year. It was not addressed.
And also, anyway, basically in 2013 the NRC explained that the venting capacity stipulated by Order EA-13-109 is based on quantities of thermal power that are generated by decay heating.
And also, anyway, basically in 2013 the NRC explained that the venting capacity stipulated by Order EA-13-109 is based on quantities of thermal power that are generated by decay heating.
According to the NRC, after the reactor shuts down in an accident, the wet well suspension pool is typically capable of absorbing the nuclear fuel's decay heat for a period of three hours.                     After three hours the thermal power from continuous decay heat generation has typically decreased to less than one percent of the reactor's rated maximum thermal power.
According to the NRC, after the reactor shuts down in an accident, the wet well suspension pool is typically capable of absorbing the nuclear fuel's decay heat for a period of three hours. After three hours the thermal power from continuous decay heat generation has typically decreased to less than one percent of the reactor's rated maximum thermal power.
So, like I said, that's an explanation that the NRC had, 2013.           It's also in NEI documents.               And when       -- and that's     thoroughly         documented   in     our petition, and at the end of the Petition Review Board statement there is a different, a table where it says on one side petition information.                     On the other side it says NRC response.
So, like I said, that's an explanation that the NRC had, 2013. It's also in NEI documents. And when -- and that's thoroughly documented in our petition, and at the end of the Petition Review Board statement there is a different, a table where it says on one side petition information. On the other side it says NRC response.
And the reply to what I just said was basically that NUREG-2206, that all phases of severe accidents had been considered, and including thermal NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
And the reply to what I just said was basically that NUREG-2206, that all phases of severe accidents had been considered, and including thermal  
(202) 234-4433          WASHINGTON, D.C. 20005-3701            (202) 234-4433


23 energy         generated   by   the     metal-water     reaction,       et cetera.
23 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
But the problem is, you know, we just said how the NRC explained the venting capacity.                     And that was explained in 2013.               And NUREG-2206 was completed three years later, published five years later.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 energy generated by the metal-water reaction, et cetera.
But the problem is, you know, we just said how the NRC explained the venting capacity. And that was explained in 2013. And NUREG-2206 was completed three years later, published five years later.
So, I just, I was really bothered by that.
So, I just, I was really bothered by that.
It's like you're saying that a document that was completed in 2016 negates statements which again you did not acknowledge, that the NRC made in 2013.
It's like you're saying that a document that was completed in 2016 negates statements which again you did not acknowledge, that the NRC made in 2013.
And just as someone who put a lot of time into this petition, you know, I just would expect a more honest review, something that just acknowledges, yes, the NRC did say that back in 2013.                       Then maybe you could say, however, we subsequently realized, blah, blah, blah.
And just as someone who put a lot of time into this petition, you know, I just would expect a more honest review, something that just acknowledges, yes, the NRC did say that back in 2013. Then maybe you could say, however, we subsequently realized, blah, blah, blah.
But you don't even acknowledge that the NRC made that statement in 2013.                     And that's among a number of other problems with your statement regarding your initial decision.             And I'm going to now cover some of those.
But you don't even acknowledge that the NRC made that statement in 2013. And that's among a number of other problems with your statement regarding your initial decision. And I'm going to now cover some of those.
Anyway, the problem is that the vents that are required by Order EA-13-109, they're incapable of discharging the total amount of thermal energy that would       be   generated     under     the     harshest of   severe NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Anyway, the problem is that the vents that are required by Order EA-13-109, they're incapable of discharging the total amount of thermal energy that would be generated under the harshest of severe  
(202) 234-4433            WASHINGTON, D.C. 20005-3701            (202) 234-4433


24 accident conditions.
24 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 accident conditions.
As stated in our petition, there are some severe accident scenarios in which very large amounts of thermal energy are rapidly generated over short periods of time, far more than that which is solely generated by decay heating.
As stated in our petition, there are some severe accident scenarios in which very large amounts of thermal energy are rapidly generated over short periods of time, far more than that which is solely generated by decay heating.
So, you, your statement, the PRB statement says, quote, the PRB's initial assessment is that in issuing NRC Order EA-13-109, and since the NRC did not consider, I'm sorry, did, I'm sorry, the NRC did consider       and/or   analyze       any   document     that   severe accident         conditions       included         in your   petition, unquote.
So, you, your statement, the PRB statement says, quote, the PRB's initial assessment is that in issuing NRC Order EA-13-109, and since the NRC did not consider, I'm sorry, did, I'm sorry, the NRC did consider and/or analyze any document that severe accident conditions included in your petition, unquote.
In fact, I'm now going to talk about the MELCOR.       MELCOR is a computer program.             It simulates accidents.         So, I'm now going to discuss the MELCOR analyses, which are discussed in NUREG-2206.                   And they did not simulate the harshest conditions that may occur in a severe accident.
In fact, I'm now going to talk about the MELCOR. MELCOR is a computer program. It simulates accidents. So, I'm now going to discuss the MELCOR analyses, which are discussed in NUREG-2206. And they did not simulate the harshest conditions that may occur in a severe accident.
So for example, none of the MELCOR analyses in NUREG-2206 -- I'll now refer to it just as the NUREG
So for example, none of the MELCOR analyses in NUREG-2206 -- I'll now refer to it just as the NUREG  
-- stipulated any postulated severe accidents with scenarios similar to ones which in a period of time of one minute, about seven, 6800 kilograms of zirconium would react with about 2700 kilograms of steam, to yield NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
-- stipulated any postulated severe accidents with scenarios similar to ones which in a period of time of one minute, about seven, 6800 kilograms of zirconium would react with about 2700 kilograms of steam, to yield  
(202) 234-4433          WASHINGTON, D.C. 20005-3701            (202) 234-4433


25 300 kilograms of hydrogen, and about 44,000 megajoules of thermal energy.
25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
The   NUREG     does     not     disclose how     many megajoules of thermal energy were generated in its MELCOR simulations.           But we can actually see with some basic graphs how much hydrogen was generated, at what time.       And from that we can kind of discern that the rates of thermal energy were not what I'm describing as those moments of time where it can just be a real blast of thermal energy.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 300 kilograms of hydrogen, and about 44,000 megajoules of thermal energy.
The NUREG does not disclose how many megajoules of thermal energy were generated in its MELCOR simulations. But we can actually see with some basic graphs how much hydrogen was generated, at what time. And from that we can kind of discern that the rates of thermal energy were not what I'm describing as those moments of time where it can just be a real blast of thermal energy.
Now, according to the OECD nuclear energy agency, flooding the melting-down reactor core with coolant water may generate from five to ten kilograms of hydrogen per second.
Now, according to the OECD nuclear energy agency, flooding the melting-down reactor core with coolant water may generate from five to ten kilograms of hydrogen per second.
And now I'm going to refer to the letter I just sent you.           Section 1 of my response in the letter, it's titled, quote, A Case of Cherry Picking.
And now I'm going to refer to the letter I just sent you. Section 1 of my response in the letter, it's titled, quote, A Case of Cherry Picking.
The analyses of NUREG-2206 did not simulate phenomena as harsh as ones that occurred in the Fukushima Daiichi accident, unquote.
The analyses of NUREG-2206 did not simulate phenomena as harsh as ones that occurred in the Fukushima Daiichi accident, unquote.
I'm paraphrasing.             The PRB's statement discusses         the   MELCOR       computer       simulations       of NUREG-2206,         MELCOR-simulated             molten   materials relocating downward, and boiling off water located in the lower region of the reactor core, causing a pressure NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
I'm paraphrasing. The PRB's statement discusses the MELCOR computer simulations of NUREG-2206, MELCOR-simulated molten materials relocating downward, and boiling off water located in the lower region of the reactor core, causing a pressure  
(202) 234-4433          WASHINGTON, D.C. 20005-3701          (202) 234-4433


26 spike inside the reactor pressure vessel.
26 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
The PRB says that the primary containment is successfully vented at its pressure limit.                             And that's true.           I read the NUREG.               An example of the pressure spike is in Figure 3-10 of NUREG-2206.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 spike inside the reactor pressure vessel.
Now, Figure 3-10 concerns Case 9.                     The pressure spike of Case 9 reached nearly 500 pounds per square         inch   absolute.           Containment       failure       was prevented in Case 9 by employing water management and injection, as well as containment venting.
The PRB says that the primary containment is successfully vented at its pressure limit. And that's true. I read the NUREG. An example of the pressure spike is in Figure 3-10 of NUREG-2206.
Now, Case 10 of NUREG-2206 concerns a MELCOR simulation of a severe accident at a Mark 1 unit in which there was a combination of severe accident water addition and containment venting.                     And there was a failure of the, containment was prevented.
Now, Figure 3-10 concerns Case 9. The pressure spike of Case 9 reached nearly 500 pounds per square inch absolute. Containment failure was prevented in Case 9 by employing water management and injection, as well as containment venting.
And there was also a pressure spike in Case 10 from debris locating downward to the lower reactor pressure vessel.           And it reached nearly 400 pounds per square inch absolute.
Now, Case 10 of NUREG-2206 concerns a MELCOR simulation of a severe accident at a Mark 1 unit in which there was a combination of severe accident water addition and containment venting. And there was a failure of the, containment was prevented.
And there was also a pressure spike in Case 10 from debris locating downward to the lower reactor pressure vessel. And it reached nearly 400 pounds per square inch absolute.
And NUREG-2206 says that both Case 9 and Case 10 were selected to represent a number of MELCOR simulations that were of similar scenarios that were done in the same study.
And NUREG-2206 says that both Case 9 and Case 10 were selected to represent a number of MELCOR simulations that were of similar scenarios that were done in the same study.
So,   the     Case     9   and     Case 10   MELCOR simulations of severe accidents at BWR Mark 1 units NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
So, the Case 9 and Case 10 MELCOR simulations of severe accidents at BWR Mark 1 units  
(202) 234-4433            WASHINGTON, D.C. 20005-3701            (202) 234-4433


27 did not simulate conditions as harsh as ones that were observed in the Fukushima Daiichi accident.
27 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
A huge pressure spike was observed in the Fukushima Daiichi Unit 3 reactor pressure vessel.                         It was ten days after the tsunami struck on March 21st, 2010.       And they believe that it was after, there was a remelting of core contents.               And the highest recorded pressure was measured at nearly 1,700 pounds per square inch absolute.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 did not simulate conditions as harsh as ones that were observed in the Fukushima Daiichi accident.
According to a Journal of Nuclear Science and Technology paper, the huge pressure spike can be interpreted as a consequence of a large amount of steam generation due to interaction of melting core materials with water.         End of quote.
A huge pressure spike was observed in the Fukushima Daiichi Unit 3 reactor pressure vessel. It was ten days after the tsunami struck on March 21st, 2010. And they believe that it was after, there was a remelting of core contents. And the highest recorded pressure was measured at nearly 1,700 pounds per square inch absolute.
And   analysis       of   the     Unit 3 accident performed       by Japanese       experts       estimated that     the pressure spike that occurred on March 21st, 2010 actually reached a value greater than 1,900 pounds per square inch absolute.
According to a Journal of Nuclear Science and Technology paper, the huge pressure spike can be interpreted as a consequence of a large amount of steam generation due to interaction of melting core materials with water. End of quote.
And analysis of the Unit 3 accident performed by Japanese experts estimated that the pressure spike that occurred on March 21st, 2010 actually reached a value greater than 1,900 pounds per square inch absolute.
So, none of the MELCOR analyses, including what you referred to, Case 9, discussed in NUREG-2206 simulated any accidents with scenarios in which there was a pressure spike as great as one that was actually recorded at the Fukushima Unit 3 reactor.
So, none of the MELCOR analyses, including what you referred to, Case 9, discussed in NUREG-2206 simulated any accidents with scenarios in which there was a pressure spike as great as one that was actually recorded at the Fukushima Unit 3 reactor.
And so, like, again, this is documented NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
And so, like, again, this is documented  
(202) 234-4433          WASHINGTON, D.C. 20005-3701          (202) 234-4433


28 in my, the letter I sent to you, referenced everything.
28 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 in my, the letter I sent to you, referenced everything.
So, not analyzing conditions as harsh as what occurred at Fukushima, that's what is called cherry picking.
So, not analyzing conditions as harsh as what occurred at Fukushima, that's what is called cherry picking.
That's cherry picking.
That's cherry picking.
So, as covered in our petition, an analysis of the Fukushima Unit 3 accident found that on March 13, 2010 a large amount of materials relocated downward in the pressure vessel rapidly vaporized a large amount of water. And the vaporized water, the steam, reacted with       molten   materials,         rapidly       generating   large amounts of hydrogen and thermal energy, in a short time period of unspecified duration, but is quite short.
So, as covered in our petition, an analysis of the Fukushima Unit 3 accident found that on March 13, 2010 a large amount of materials relocated downward in the pressure vessel rapidly vaporized a large amount of water. And the vaporized water, the steam, reacted with molten materials, rapidly generating large amounts of hydrogen and thermal energy, in a short time period of unspecified duration, but is quite short.
And about 14 -- I'm sorry, about 4,200 kilograms of water vaporized and reacted with core materials, rapidly generating about 472, 475 kilograms of hydrogen and nearly 70,000 megajoules of thermal energy.
And about 14 -- I'm sorry, about 4,200 kilograms of water vaporized and reacted with core materials, rapidly generating about 472, 475 kilograms of hydrogen and nearly 70,000 megajoules of thermal energy.
So, none of the MELCOR analyses discussed in NUREG-2206 simulated any severe accident scenarios like that.       Nothing even close.             And by the way, one can look at the graphs in NUREG-2206 and see the hydrogen generation plot.
So, none of the MELCOR analyses discussed in NUREG-2206 simulated any severe accident scenarios like that. Nothing even close. And by the way, one can look at the graphs in NUREG-2206 and see the hydrogen generation plot.
And we see that in Case 9 of NUREG-2206 hydrogen generation was negligible at the time that the core relocated to the lower plenum.                     And if that NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
And we see that in Case 9 of NUREG-2206 hydrogen generation was negligible at the time that the core relocated to the lower plenum. And if that  
(202) 234-4433          WASHINGTON, D.C. 20005-3701            (202) 234-4433


29 means, that also means that the thermal energy was also negligible.
29 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 means, that also means that the thermal energy was also negligible.
So, how can one legitimately dismiss the safety issues that we raised in our petition based on the MELCOR analyses, and the analyses of NUREG-2206, which did not simulate conditions as harsh as ones that occurred in the Fukushima Unit 3 accident?
So, how can one legitimately dismiss the safety issues that we raised in our petition based on the MELCOR analyses, and the analyses of NUREG-2206, which did not simulate conditions as harsh as ones that occurred in the Fukushima Unit 3 accident?
Now, Section, another part of my response to the Petition Review Board is titled, Worse than Worthless.         Analyses       that     simulate     unrealistic circumstances yield unrealistic results.
Now, Section, another part of my response to the Petition Review Board is titled, Worse than Worthless. Analyses that simulate unrealistic circumstances yield unrealistic results.
In   a   draft     regulatory       analysis       for rulemaking activity the NRC did in May 2015, the NRC stated, operator actions to prevent or mitigate severe accidents     are contingent       on   the     availability     and functionality of equipment and diagnostic instruments under severe accident conditions.
In a draft regulatory analysis for rulemaking activity the NRC did in May 2015, the NRC stated, operator actions to prevent or mitigate severe accidents are contingent on the availability and functionality of equipment and diagnostic instruments under severe accident conditions.
The operator relies on instruments to know when to add water and/or take other severe accident management actions.
The operator relies on instruments to know when to add water and/or take other severe accident management actions.
So, in that same document the NRC also stated that the MELCOR analyses conducted for its regulatory analysis assumed that instruments measuring the reactor pressure vessel and containment water levels and pressures would be available and functional NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
So, in that same document the NRC also stated that the MELCOR analyses conducted for its regulatory analysis assumed that instruments measuring the reactor pressure vessel and containment water levels and pressures would be available and functional  
(202) 234-4433        WASHINGTON, D.C. 20005-3701          (202) 234-4433


30 under severe accident conditions.
30 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 under severe accident conditions.
NUREG-2206 states that the MELCOR analyses it discusses are the same as those of the draft regulatory analysis for a rulemaking activity dated May 2015.
NUREG-2206 states that the MELCOR analyses it discusses are the same as those of the draft regulatory analysis for a rulemaking activity dated May 2015.
So, the MELCOR analyses of NUREG-2206 simulated unrealistic circumstances.                     There is no guarantee that instruments measuring reactor pressure vessel and containment water levels and pressure would be functional under severe accident conditions.
So, the MELCOR analyses of NUREG-2206 simulated unrealistic circumstances. There is no guarantee that instruments measuring reactor pressure vessel and containment water levels and pressure would be functional under severe accident conditions.
In fact, it's highly likely they would be unavailable or malfunctional.               Analyses that simulate unrealistic circumstances yield unrealistic results.
In fact, it's highly likely they would be unavailable or malfunctional. Analyses that simulate unrealistic circumstances yield unrealistic results.
The MELCOR, the results of the MELCOR analyses of NUREG-2206, they demonstrate, yes, they demonstrate       a   false     narrative.           Because     plant operators, basically the false narrative is that plant operators will always have diagnostic instruments that are reliable under severe accident conditions.
The MELCOR, the results of the MELCOR analyses of NUREG-2206, they demonstrate, yes, they demonstrate a false narrative. Because plant operators, basically the false narrative is that plant operators will always have diagnostic instruments that are reliable under severe accident conditions.
And therefore, they will always save the primary containment by employing a combination of properly       executed       venting       and     severe accident management, and/or water addition strategies.
And therefore, they will always save the primary containment by employing a combination of properly executed venting and severe accident management, and/or water addition strategies.
To   say     that     the     MELCOR   analyses       of NUREG-2206 may be worse than worthless, it sounds like NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
To say that the MELCOR analyses of NUREG-2206 may be worse than worthless, it sounds like  
(202) 234-4433        WASHINGTON, D.C. 20005-3701            (202) 234-4433


31 an insult.       But I don't mean it that way.             I just mean it to actually describe the potential dangers of unrealistic analyses.
31 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Unrealistic           analyses         that         are nonconservative are dangerous, because they purvey a false sense of security.               Plant operators should not be led to believe that instruments will be available and functional under severe accident conditions if they,       well   actually,       if   they       may actually       be unavailable or malfunctional.               MELCOR analyses should be used to reduce risk, not increase risk.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 an insult. But I don't mean it that way. I just mean it to actually describe the potential dangers of unrealistic analyses.
An Oak Ridge, now an Oak Ridge National Laboratory report from 2015 says that in a severe accident there may be widespread instrument failure or         inaccurate     and/or         misleading         instrument indications.
Unrealistic analyses that are nonconservative are dangerous, because they purvey a false sense of security. Plant operators should not be led to believe that instruments will be available and functional under severe accident conditions if they, well actually, if they may actually be unavailable or malfunctional. MELCOR analyses should be used to reduce risk, not increase risk.
At Fukushima Daiichi workers were misled during the early hours of the accident by erroneous readings of the Unit 1 reactor's condition.                             The reactor's water level appeared to be above the top of the fuel rods, when in fact they were uncovered and melting down.         The water levels of all the stricken Fukushima reactors read erroneously high.
An Oak Ridge, now an Oak Ridge National Laboratory report from 2015 says that in a severe accident there may be widespread instrument failure or inaccurate and/or misleading instrument indications.
Now, that was in the petition that we submitted and documented.               So, I think maybe before NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
At Fukushima Daiichi workers were misled during the early hours of the accident by erroneous readings of the Unit 1 reactor's condition. The reactor's water level appeared to be above the top of the fuel rods, when in fact they were uncovered and melting down. The water levels of all the stricken Fukushima reactors read erroneously high.
(202) 234-4433          WASHINGTON, D.C. 20005-3701            (202) 234-4433
Now, that was in the petition that we submitted and documented. So, I think maybe before  


32 you started leaning on NUREG-2206 to just show us how wrong we were, maybe you should have actually reviewed NUREG-2206 to see that it had a premise where the instruments are supposed to always work.
32 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Now, back to the Oak Ridge Laboratory report. It said, during the Fukushima Daiichi accident numerous       instrumentation               measurements       were unavailable as a result of loss of power supplies.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 you started leaning on NUREG-2206 to just show us how wrong we were, maybe you should have actually reviewed NUREG-2206 to see that it had a premise where the instruments are supposed to always work.
Now, back to the Oak Ridge Laboratory report. It said, during the Fukushima Daiichi accident numerous instrumentation measurements were unavailable as a result of loss of power supplies.
Even after power was restored the instrumentation measurements were inaccurate, or differed in values, or trends across the instruments measuring the same parameters.
Even after power was restored the instrumentation measurements were inaccurate, or differed in values, or trends across the instruments measuring the same parameters.
Temperature and pressure conditions in containment     affected     reactor         level and   pressure instrumentation, and may have complicated accident management. End of quote.
Temperature and pressure conditions in containment affected reactor level and pressure instrumentation, and may have complicated accident management. End of quote.
The rosy picture depicted by the results of the MELCOR analyses of NUREG-2206, they depend on how the idealistic circumstances that are unlikely to occur in a natural accident.
The rosy picture depicted by the results of the MELCOR analyses of NUREG-2206, they depend on how the idealistic circumstances that are unlikely to occur in a natural accident.
Without available or functional, without available and functional instruments operators will not know when to add water or to take other accident management actions.
Without available or functional, without available and functional instruments operators will not know when to add water or to take other accident management actions.
In the aftermath of the Fukushima accident NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
In the aftermath of the Fukushima accident  
(202) 234-4433      WASHINGTON, D.C. 20005-3701          (202) 234-4433


33 the NRC actually imposed, imposing regulation that would require enhancements to reactor and containment instruments.
33 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Then in 2016, after evaluations the NRC announced that enhancements would, would not provide a substantial safety enhancement.                   And therefore, additional regulatory actions were not warranted.                   End of quote.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 the NRC actually imposed, imposing regulation that would require enhancements to reactor and containment instruments.
So, I have to say, you know, the degree of the NRC's cynicism is remarkable.                     Diagnostic instruments     weren't     available         in   the Fukushima accident.       Nonetheless,       the     NRC   decided against requiring that nuclear plants operate with instruments capable of providing reliable readings under severe accident conditions.
Then in 2016, after evaluations the NRC announced that enhancements would, would not provide a substantial safety enhancement. And therefore, additional regulatory actions were not warranted. End of quote.
So, I have to say, you know, the degree of the NRC's cynicism is remarkable. Diagnostic instruments weren't available in the Fukushima accident. Nonetheless, the NRC decided against requiring that nuclear plants operate with instruments capable of providing reliable readings under severe accident conditions.
There is no guarantee that there would be reliable instrumentation essential to mitigating the severe accident that will be developed any time soon, that is, instrumentation robust enough to provide accurate readings throughout the duration of the harsh conditions of a severe accident.
There is no guarantee that there would be reliable instrumentation essential to mitigating the severe accident that will be developed any time soon, that is, instrumentation robust enough to provide accurate readings throughout the duration of the harsh conditions of a severe accident.
So, I'll just say that the MELCOR analyses of 20, of NUREG-2206 found that the vents required by Order EA-13-109 are incapable of preventing the failure of a Mark 1 primary containment in the event of a severe NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
So, I'll just say that the MELCOR analyses of 20, of NUREG-2206 found that the vents required by Order EA-13-109 are incapable of preventing the failure of a Mark 1 primary containment in the event of a severe  
(202) 234-4433      WASHINGTON, D.C. 20005-3701          (202) 234-4433


34 accident.
34 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 accident.
According to the NUREG it, to successfully prevent containment failure the vents must be employed along with severe accident water management, or water addition strategies.
According to the NUREG it, to successfully prevent containment failure the vents must be employed along with severe accident water management, or water addition strategies.
So, if there is an accident here in the U.S. it's likely that, instruments would likely be about as reliable as they were at Fukushima.                     And so, lacking reliable readings plants, operators would not know when to add water to either the reactor pressure vessel or the primary containment.
So, if there is an accident here in the U.S. it's likely that, instruments would likely be about as reliable as they were at Fukushima. And so, lacking reliable readings plants, operators would not know when to add water to either the reactor pressure vessel or the primary containment.
So, venting the containment would not be complemented with properly executed severe accident water         management,       and/or       additions     strategies.
So, venting the containment would not be complemented with properly executed severe accident water management, and/or additions strategies.
Containment would fail, enabling hydrogen gas to leak into and explode in the reactor building.
Containment would fail, enabling hydrogen gas to leak into and explode in the reactor building.
So, the NRC undermines nuclear safety by refusing       to   require     enhancements         to reactor     and containment         instruments         that     would   ensure   their reliability under severe accident conditions.
So, the NRC undermines nuclear safety by refusing to require enhancements to reactor and containment instruments that would ensure their reliability under severe accident conditions.
Then, in a display of cynicism the NRC decided the MELCOR analyses NUREG-2206 would assume that instruments measuring the reactor pressure vessel and containment water levels and pressures would always be available and functional in the event of a severe NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Then, in a display of cynicism the NRC decided the MELCOR analyses NUREG-2206 would assume that instruments measuring the reactor pressure vessel and containment water levels and pressures would always be available and functional in the event of a severe  
(202) 234-4433          WASHINGTON, D.C. 20005-3701          (202) 234-4433


35 accident.
35 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
The MELCOR analyses of NUREG-2206 are also not     legally   binding,     like     some       for design   basis accidents.       There's no requirement that the most sever postulated       accident     scenarios         be   simulated.       So, that's also another thing.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 accident.
The MELCOR analyses of NUREG-2206 are also not legally binding, like some for design basis accidents. There's no requirement that the most sever postulated accident scenarios be simulated. So, that's also another thing.
So, you know, NUREG-2206, it can do these couple of very low kind of more simple, easy scenarios, not nearly as harsh as what even occurred at Fukushima.
So, you know, NUREG-2206, it can do these couple of very low kind of more simple, easy scenarios, not nearly as harsh as what even occurred at Fukushima.
And there's no problem because it's not legally binding.
And there's no problem because it's not legally binding.
Now, I realize we're coming to a close.
Now, I realize we're coming to a close.
And not so much time.           I request a little time to go over.       But I'm almost done.         So, I'd say, is the NRC really claiming that the problem of Mark 1 primary containment over pressurization in the event of a severe accident finally is solved?
And not so much time. I request a little time to go over. But I'm almost done. So, I'd say, is the NRC really claiming that the problem of Mark 1 primary containment over pressurization in the event of a severe accident finally is solved?
NUREG-2206 says, venting alone is not adequate, as it does not prevent other modes of containment failure, such as liner melt through, and over temperature failure of the upper dry well head, by pass of the suppression pole, and direct release of radioactivity to the environment.
NUREG-2206 says, venting alone is not adequate, as it does not prevent other modes of containment failure, such as liner melt through, and over temperature failure of the upper dry well head, by pass of the suppression pole, and direct release of radioactivity to the environment.
A   combination         of     venting   and     water injection is required to prevent such failures.                         And NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
A combination of venting and water injection is required to prevent such failures. And  
(202) 234-4433          WASHINGTON, D.C. 20005-3701            (202) 234-4433


36 the current work provides a sound technical basis that that effect thus, to that effect.                   Thus, supporting adequate protection of the containment.
36 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
And I'll just say, everything I quote, I'm going through it pretty quickly.                 It's all accurately quoted in the email I just sent to you.                   Anyway, Case 1 of NUREG-2206, it concerns a simulation where there was only containment, venting without the aid of water management or addition.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 the current work provides a sound technical basis that that effect thus, to that effect. Thus, supporting adequate protection of the containment.
And the containment fails in Case 1, even under severe accident conditions that are not as harsh as ones that occurred at Fukushima.                 In Case 1 the dry well head is pushed upward due to over pressure, enabling hydrogen gas to leak into and explode in the reactor building.         Destruction of the reactor building leads to a release of radioactive material into the environment.
And I'll just say, everything I quote, I'm going through it pretty quickly. It's all accurately quoted in the email I just sent to you. Anyway, Case 1 of NUREG-2206, it concerns a simulation where there was only containment, venting without the aid of water management or addition.
So, is, like I say, is the NRC really claiming       that   the     problem     with     Mark   1 primary containment over pressurization in the event of a severe accident is finally solved?
And the containment fails in Case 1, even under severe accident conditions that are not as harsh as ones that occurred at Fukushima. In Case 1 the dry well head is pushed upward due to over pressure, enabling hydrogen gas to leak into and explode in the reactor building. Destruction of the reactor building leads to a release of radioactive material into the environment.
Now,     it's     claiming         this   NUREG-2206 provides a sound technical basis that demonstrates that the problem is finally solved after tens of BWR Mark 1 units have operated in the U.S. for decades, after NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
So, is, like I say, is the NRC really claiming that the problem with Mark 1 primary containment over pressurization in the event of a severe accident is finally solved?
(202) 234-4433        WASHINGTON, D.C. 20005-3701            (202) 234-4433
: Now, it's claiming this NUREG-2206 provides a sound technical basis that demonstrates that the problem is finally solved after tens of BWR Mark 1 units have operated in the U.S. for decades, after  


37 decades of NRC coverups and false insurances regarding the safety, supposed safety of the Mark 1 primary containments, where now members of the public are supposed to believe this.
37 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
And, like I say, these are assurances that are based on analyses of, that cherry picked severe accident scenarios.         And I ask, why would the NRC intentionally     cherry     pick       the     severe   accident scenarios?     That is, to make sure the scenarios were too, not too harsh that were analyzed for NUREG-2206.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 decades of NRC coverups and false insurances regarding the safety, supposed safety of the Mark 1 primary containments, where now members of the public are supposed to believe this.
And there's a simple answer.               To provide results to define its decision to limit the capacity of the vents required by Order EA-13-109.               The results of the MELCOR analyses, they also provide a false demonstration that the problem of over pressurization has finally been solved now, after Fukushima. And that spares owners the expense of providing an actual solution.
And, like I say, these are assurances that are based on analyses of, that cherry picked severe accident scenarios. And I ask, why would the NRC intentionally cherry pick the severe accident scenarios? That is, to make sure the scenarios were too, not too harsh that were analyzed for NUREG-2206.
And there's a simple answer. To provide results to define its decision to limit the capacity of the vents required by Order EA-13-109. The results of the MELCOR analyses, they also provide a false demonstration that the problem of over pressurization has finally been solved now, after Fukushima. And that spares owners the expense of providing an actual solution.
And I have to say, it's characterized, it's commonplace to characterize the NRC as a captured regulator. Deceiving the public to spare industry the expense of improving safety is par for the course.
And I have to say, it's characterized, it's commonplace to characterize the NRC as a captured regulator. Deceiving the public to spare industry the expense of improving safety is par for the course.
And I also say that the NRC's decision that you just had in your petition to not consider it for review, it's based on those cherry picked results.
And I also say that the NRC's decision that you just had in your petition to not consider it for review, it's based on those cherry picked results.  
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433      WASHINGTON, D.C. 20005-3701            (202) 234-4433


38 And it's also based on the decision to assume that instruments are always reliable in the MELCOR analyses.
38 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
And   I   think     to   ignore     the fact     that instruments were often unreliable or malfunctional in the Fukushima accident is indefensible.                     So, like I say, I'm now concluding.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 And it's also based on the decision to assume that instruments are always reliable in the MELCOR analyses.
Basically     last     questions.         Just,     you know, how do plant operators perform all the water management and/or water addition strategies that you claim with, along with venting prevent the primary containment from failing in a severe accident, if their diagnostic         instruments           are         unavailable         or malfunctional?
And I think to ignore the fact that instruments were often unreliable or malfunctional in the Fukushima accident is indefensible. So, like I say, I'm now concluding.
Basically last questions. Just, you know, how do plant operators perform all the water management and/or water addition strategies that you claim with, along with venting prevent the primary containment from failing in a severe accident, if their diagnostic instruments are unavailable or malfunctional?
And so, I leave you with that question.
And so, I leave you with that question.
And thank you for your time.               And I appreciate your letting me go a little past 1:00 p.m.                   This is the end of Mark Leyse's presentation.
And thank you for your time. And I appreciate your letting me go a little past 1:00 p.m. This is the end of Mark Leyse's presentation.
(Off the record comments)
(Off the record comments)
MR. BUCKBERG:         Thank you, Mr. Leyse for the presentation.             Thanks for taking the time to provide the NRC staff with clarifying information on the petition you've submitted.
MR. BUCKBERG: Thank you, Mr. Leyse for the presentation. Thanks for taking the time to provide the NRC staff with clarifying information on the petition you've submitted.
As stated at the opening we'll now enter into a question and answer phase.                   At this time do the members       of the   PRB     have     any     questions   for     the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
As stated at the opening we'll now enter into a question and answer phase. At this time do the members of the PRB have any questions for the  
(202) 234-4433          WASHINGTON, D.C. 20005-3701          (202) 234-4433


39 petitioner?         Hearing       none,     do     the petitioner       or licensees have any questions about the 2.206 process in general?       Please speak up.
39 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
MR. GUNTER:       This is Paul Gunter, Beyond Nuclear.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 petitioner? Hearing none, do the petitioner or licensees have any questions about the 2.206 process in general? Please speak up.
MR. BUCKBERG:         We can hear you.       Please.
MR. GUNTER: This is Paul Gunter, Beyond Nuclear.
MR. GUNTER:       Okay.       My question is, will we see the draft director's decision before it's published in the Federal Register?
MR. BUCKBERG: We can hear you. Please.
MR. BUCKBERG:         If the process goes that far.       So, the initial assessment that I sent to you on December 18th was that we would not be accepting your petition for further review, which would mean that we would not be moving towards developing a director's decision.       We're now going to consider the information you submitted today, and see if that initial assessment changes.       If it does not we will end the petition's evaluation.       If our initial --
MR. GUNTER: Okay. My question is, will we see the draft director's decision before it's published in the Federal Register?
MR. GUNTER:       Okay.
MR. BUCKBERG: If the process goes that far. So, the initial assessment that I sent to you on December 18th was that we would not be accepting your petition for further review, which would mean that we would not be moving towards developing a director's decision. We're now going to consider the information you submitted today, and see if that initial assessment changes. If it does not we will end the petition's evaluation. If our initial --
MR. BUCKBERG:         -- assessment is changed we would do a director's decision.                       But normally proposed director's decision are publicly available, and you would see a copy.
MR. GUNTER: Okay.
MR. GUNTER:       Right.       So, that leads to the follow-up question.           Are you going to, is, will the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
MR. BUCKBERG: -- assessment is changed we would do a director's decision. But normally proposed director's decision are publicly available, and you would see a copy.
(202) 234-4433          WASHINGTON, D.C. 20005-3701            (202) 234-4433
MR. GUNTER: Right. So, that leads to the follow-up question. Are you going to, is, will the  


40 Petition Review Board provide the petitioners with answers       to   the     specific       questions       that     this supplemental session has asked?
40 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
MR. BUCKBERG:         We attempt to answer all of the petitioner's concerns.               So, without having the time to really review what was just discussed I'd say that that's our goal in general.                     But we'll, we try to be thorough in our response.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 Petition Review Board provide the petitioners with answers to the specific questions that this supplemental session has asked?
MR. GUNTER:           One       additional     final follow-up.         Will the answers to this, any of the responses from the PRB to this supplemental session, will they be docketed in ADAMS?                 Or what, are we just going to get an email?             But will that be docketed?
MR. BUCKBERG: We attempt to answer all of the petitioner's concerns. So, without having the time to really review what was just discussed I'd say that that's our goal in general. But we'll, we try to be thorough in our response.
MR. BUCKBERG:           Actually, the December 18th email is docketed in ADAMS.                         It's publicly available.       The next document we will provide you is a formal letter on whether we're accepting or not accepting       the   petition.           That     will   be publicly available in ADAMS as well.
MR.
MR. GUNTER:       Okay.     Thank you. I have no further questions.
GUNTER:
MR. LEYSE:           Mark     Leyse.     Just       to follow-up with what Paul said.                   Yes. I would really appreciate it in your, after this meeting that you would actually address the two primary points that I, well, NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
One additional final follow-up. Will the answers to this, any of the responses from the PRB to this supplemental session, will they be docketed in ADAMS? Or what, are we just going to get an email? But will that be docketed?
(202) 234-4433          WASHINGTON, D.C. 20005-3701            (202) 234-4433
MR. BUCKBERG: Actually, the December 18th email is docketed in ADAMS. It's publicly available. The next document we will provide you is a formal letter on whether we're accepting or not accepting the petition. That will be publicly available in ADAMS as well.
MR. GUNTER: Okay. Thank you. I have no further questions.
MR. LEYSE: Mark Leyse. Just to follow-up with what Paul said. Yes. I would really appreciate it in your, after this meeting that you would actually address the two primary points that I, well,  


41 more than two.
41 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
But, you know, the two main things about NUREG-2206 that I allege, that it did not simulate accidents as harsh as with, conditions as harsh as what occurred at Fukushima.         And then also its assumption that the diagnostic instrumentation would always be available.
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 more than two.
I see those as, the second one I just think is terrible, especially in view of the fact of the decision I referred to that NRC published in 2016 regarding to abandon any regulation that would require better instrumentation.           Anyway, if you would address that I would really appreciate it.                 Thank you.
But, you know, the two main things about NUREG-2206 that I allege, that it did not simulate accidents as harsh as with, conditions as harsh as what occurred at Fukushima. And then also its assumption that the diagnostic instrumentation would always be available.
MR. BUCKBERG:           Thanks, Mr. Leyse.             I appreciate you highlighting those points for us.
I see those as, the second one I just think is terrible, especially in view of the fact of the decision I referred to that NRC published in 2016 regarding to abandon any regulation that would require better instrumentation. Anyway, if you would address that I would really appreciate it. Thank you.
MR. LEYSE:       You're welcome.
MR. BUCKBERG: Thanks, Mr. Leyse. I appreciate you highlighting those points for us.
MR. BUCKBERG:         Any other questions from the petitioners or members of the public, licensee.
MR. LEYSE: You're welcome.
I'm sorry.     Not members of the public just yet.
MR. BUCKBERG: Any other questions from the petitioners or members of the public, licensee.
I'm sorry. Not members of the public just yet.
Licensee or petitioner.
Licensee or petitioner.
Hearing none, if there's any members of the public, please provide feedback regarding the 2.206 petition process.       You can provide that now.         However, as stated in the opening, the purpose of this meeting is not to provide an opportunity for you to, or the NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Hearing none, if there's any members of the public, please provide feedback regarding the 2.206 petition process. You can provide that now. However, as stated in the opening, the purpose of this meeting is not to provide an opportunity for you to, or the  
(202) 234-4433      WASHINGTON, D.C. 20005-3701          (202) 234-4433


42 petitioner to question or examine the PRB regarding the merits of this petition request.
42 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
Any feedback from members of the public on the process?       Hearing none, before we close does the court reporter need any additional information for the meeting transcript?
(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 petitioner to question or examine the PRB regarding the merits of this petition request.
Any feedback from members of the public on the process? Hearing none, before we close does the court reporter need any additional information for the meeting transcript?
(No audible response)
(No audible response)
MR. BUCKBERG:         Thank you. We want to encourage the participants outside the NRC to provide public meeting feedback to the NRC staff, via the NRC public meeting website, if you feel so inclined.               With that last comment, this meeting is concluded, and we'll be terminating the phone connection.               Thanks for joining in everybody.
MR. BUCKBERG: Thank you. We want to encourage the participants outside the NRC to provide public meeting feedback to the NRC staff, via the NRC public meeting website, if you feel so inclined. With that last comment, this meeting is concluded, and we'll be terminating the phone connection. Thanks for joining in everybody.
(Whereupon,       the   above-entitled   matter went off the record at 3:09 p.m.)
(Whereupon, the above-entitled matter went off the record at 3:09 p.m.)}}
NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.
(202) 234-4433      WASHINGTON, D.C. 20005-3701        (202) 234-4433}}

Latest revision as of 11:02, 29 November 2024

OEDO-20-00413 Meeting Transcript - February 3, 2021, Beyond Nuclear Meeting with Petition Review Board - BWR Mark I Hardened Vents 2.206 Petition (Eid L-2020-CRS-0003)
ML21048A057
Person / Time
Issue date: 02/03/2021
From:
NRC/NRR/DORL/LPL2-2
To:
Buckberg P
References
2.206, EPID L-2020-CRS-0003, NRC-1335, OEDO-20-00413
Download: ML21048A057 (44)


Text

Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION

Title:

Petition Review Board Meeting with the Petitioner - 10 CFR 2.206 Petition Regarding Hardened Containment Vents for Boiling Water Reactors with Mark I Containments Docket Number:

(n/a)

Location:

teleconference Date:

Wednesday, February 3, 2021 Work Order No.:

NRC-1335 Pages 1-42 NEAL R. GROSS AND CO., INC.

Court Reporters and Transcribers 1323 Rhode Island Avenue, N.W.

Washington, D.C. 20005

(202) 234-4433

1 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

+ + + + +

10 CFR 2.206 PETITION REVIEW BOARD (PRB)

CONFERENCE CALL RE HARDENED CONTAINMENT VENTS OF ALL BOILING-WATER REACTORS WITH MARK I CONTAINMENTS (EPID L-2020-CRS-0003)

+ + + + +

WEDNESDAY FEBRUARY 3, 2021

+ + + + +

The conference call was held, Perry Buckberg, Petition Manager, presiding.

PETITIONERS: MARK LEYSE PAUL GUNTER, Beyond Nuclear PETITION REVIEW BOARD MEMBERS BRIAN SMITH, NRR/DANU BRIAN LEE, NRR/DSS/SCPB DON ALGAMA, RES/DSA/FSCB BOB BERNARDO, NRR/DORL/LPMB RAO KARIPINENI, NRR/DSS/SCPB

2 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 PETITION REVIEW BOARD CONTRIBUTORS HOSSEIN ESMAILI, RES/DSA/FSCB JOE SEBROSKY, NRR/DANU/UARP BRETT TITUS, NRR/DEX/EEEB OTHER NRC STAFF CAROLINE CARUSONE, NRR/DORL UNDINE SHOOP, NRR/DORL/LPL2-2 JENNY TOBIN, NRR/DORL/LPL1 TILDA LIU, NMSS/DFM/STLB LICENSEE STAFF LINDA DEWHIRST, Nebraska Public Power District TRACY ORF, Tennessee Valley Authority TIM ENFINGER, Southern Nuclear KIMBERLY HULVEY, Tennessee Valley Authority

3 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 C-O-N-T-E-N-T-S Introductions and Logistics........................4 Petitioner Presentation...........................17 Question and Answer Phase.........................39 Adjourn.............................................

4 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 P R O C E E D I N G S 2:01 p.m.

MR. BUCKBERG: Good afternoon. I'd like to thank everybody for attending this Nuclear Regulatory Commission, or NRC, public meeting. The purpose of today's meeting is to provide the petitioner, Beyond Nuclear, an opportunity to address the Petition Review Board, or PRB, regarding their petition to require that the hardened containment vent system venting capacity be increased for boiling water reactors with Mark 1 containments.

My name is Perry Buckberg, and I'm the petition manager for this petition. I'm also a Senior Project Manager in the Division of Operating Reactor Licensing in the NRC Office of Nuclear Reactor Regulations. I'm also the NRC's Agency 2.206 Petition Coordinator.

A Petition Review Board, again PRB, typically consists of a petition manager, a chairman at the Senior Executive Service level, an office or agency petition coordinator, and other Board Members who are determined based on the technical content of the petition.

The PRB Chairman is Brian Smith, Deputy Director of the Division of Advanced Reactors and

5 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 Non-Power Production and Utilization Facilities in the Office of Nuclear Reactor Regulation.

We will introduce the other PRB members later. As part of the review of their petition Beyond Nuclear has requested this opportunity to address the PRB.

This is a Category 1 meeting. The public is invited to observe this meeting, and will have an opportunity to communicate with the NRC after the business portion, but before the meeting is adjourned.

Any licensee staff may respond to questions if they choose.

There are three categories of NRC public meetings. More detailed information of these meetings can be found on NRC public website, www.nrc.gov.

As this is a public meeting there will be no safeguards, nor official use only information discussed. This meeting began at 2:00 p.m., and is scheduled to end at 3:00 p.m. Eastern Time. After introductory remarks, Beyond Nuclear will address the Board, and then there will be a brief question and answer phase.

The meeting is being moderated and recorded by the NRC Operations Center, and will be transcribed by a court reporter. The transcript will

6 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 become a supplement to the petition, and will also be made publicly available. Is the court reporter present and able to record the meeting?

(No audible response)

MR. BUCKBERG: Thank you. Now we'll do introductions. I have at least a partial list of people attending the meeting. When I read each person's name, please acknowledge you're on the phone by clearly stating your name, your position, and the office or organization you work for, so we have the information for the record.

Again, my name is Perry Buckberg. I'm a Senior Project Manager in the Division of Operating Reactor Licensing in the Office of Nuclear Reactor Regulation. That's DORL for short, for others that follow me.

For the PRB members first I have Brian Smith on the line.

MR. SMITH: Yes. This is Brian Smith. I'm here.

MR. BUCKBERG: Brian Lee.

MR. LEE: Yes, I'm on the line. This is Brian Lee. I'm a safety engineer.

MR. BUCKBERG: Brian, are you dialed into the phone number?

7 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 MR. LEE: Brian Lee or Brian Smith MR. BUCKBERG: Brian Lee.

MR. LEE: No, I'm not.

MR. BUCKBERG: You're going to need to do that. That's, I'll give it to you real quickly, 800-772-3842. And pass code is 2206.

MR. LEE: One more time.

MR. BUCKBERG: Sure. 800-772-3842.

Pass code is 2206.

MR. LEE: Okay.

MR.

BUCKBERG:

Anybody else who's connected virtually through the NRC needs to call that same phone number, if you haven't already. Thanks.

Let me continue. Don Algama.

MR. ALGAMA: Yes, sir, I'm here. Don Algama, Reactor Systems Engineer in the Office of Research.

MR. BUCKBERG: Thank you, Don. Bob Bernardo.

MR. BERNARDO: Yes, I'm here. It's Bob Bernardo in NRR, Division of Operator Reactor Licensing. And I'm a Project Manager.

MR. BUCKBERG: Thanks, Bob.

Rao Karipineni.

MR. KARIPINENI: Yes. Rao Karipineni.

8 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 I'm a Plant Systems Engineer, Safety and Plant Systems Engineer in the Division of Safety Systems of Nuclear Reactor Regulation.

MR. BUCKBERG: Thank you. For other PRB contributors, I have Hossein Esmaili. Are you on the line, Hossein? Brett Titus. Hossein or Brett, either one of you? Rob Carpenter. Please make sure you unmute your phones before you try to talk, in case I, in case you were trying.

I'll continue with other NRC staff I believe are in attendance. Caroline Carusone?

MS.

CARUSONE:

Hey, Perry, this is Caroline. Yes, I'm on the call. I'm the Deputy Division Director for the Division of Operating Reactor Licensing.

MR. BUCKBERG: Thank you. Undine Shoop.

Nate Jordan. BP Jain. Jenny Tobin.

MS. TOBIN: Hi. This is Jenny Tobin, J-E-N-N-Y, T-O-B-I-N. I am a Project Manager in DORL.

And Peach Bottom is one of my plants. Thank you.

MR. BUCKBERG: Thanks, Jenny. Andy Hon.

Zack Stone. Any members of the NRC whose names I didn't call?

MS. SHOOP: This is Undine Shoop. I'm the Branch Chief in DORL, with oversight of the 2.206

9 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 process.

MR. BUCKBERG: Hi, Undine. I'm sorry.

I called your name earlier. I hope I didn't talk over you.

MS. SHOOP: I know. No. Actually I was a little bit late. I apologize for that.

MR. BUCKBERG: Not at all. Anybody else from the NRC?

MR. SEBROSKY: This is Joe Sebrosky. I'm late, Perry, sorry.

MR. BUCKBERG: Thanks, Joe. Any other NRC staff on the phone?

MR. TITUS: Perry, this is Brett Titus.

I don't know if you called my name earlier as well.

I was joining the phone call.

MR. BUCKBERG: Thats good. I've got Joe and Brett now. Any other NRC staff want to identify themselves?

MS. LIU: Tilda Liu. I'm from NMSS.

MR. BUCKBERG: Please mute your phones if you're not talking. I'll get to it later but *6 is the way to mute. You can probably mute your phones otherwise the old fashion way. Thanks, Tilda.

Anybody else from the NRC? Please speak up.

MR. ESMAILI: Perry, did you get my name?

10 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 This is Hossein.

MR. BUCKBERG: I did. At least, I called on you. But thanks for verifying. I'll move on to the petitioners. Mr. Gunter, Paul Gunter, are you on the line?

MR. GUNTER: Yes. Can you hear me?

MR. BUCKBERG: I can hear you fine. Thank you. Mark Leyse.

MR. LEYSE: Yes, I'm on the line.

MR. BUCKBERG: Thank you. Licensee staff. Anybody from the licensees? BWR Mark 1 licensees who would like to identify themselves?

MR. ENFINGER: Hey, Perry. This is Tim Enfinger from Southern Nuclear.

MR. BUCKBERG: Thank you.

MS. HULVEY: Kimberly Hulvey of Tennessee Valley Authority.

MR. BUCKBERG: Thank you, Kim.

MS. DEWHIRST: Linda Dewhirst, Nebraska Public Power District.

MR. BUCKBERG: Thank you.

MR. ORF: Tracy Orf, Tennessee Valley Authority.

MR. BUCKBERG: Good afternoon. Thank you. Any other licensee staff? I'll move on. It is

11 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 not required for members of the public to introduce themselves for this call. However, if there are any members of the public on the phone that wish to do so at this time, please state your name for the record.

Any members of the public? Hearing none, I'll continue.

I'd like to emphasize that we each need to speak clearly and loudly to make sure that the court reporter can accurately transcribe this meeting. If you do have something that you would like to say please first state your name for the record.

For those dialing into the meeting, please remember to mute your phone to minimize any background noise or distractions. If you do not have a mute button this can be done by pressing the keys *6. To unmute, press the *6 keys again. Thank you.

The agenda for today's meeting, after this introduction, is for the petitioner to provide new information to the PRB, for the PRB to consider in the petition's acceptability for review or final assessment.

After the petitioner's presentation we will enter a brief question and answer phase. At this time I'll turn it over to the PRB Chairman, Brian Smith.

MR. SMITH: All right. Excuse me. Thank

12 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 you, Perry. Welcome, everyone, to this meeting regarding the 2.206 petition submitted by Beyond Nuclear. I'd like to first share some background on our process.

Section 2.206 of Title 10 in the Code of Federal Regulations describes the petition process, which is the primary mechanism for the public to request enforcement action by the NRC in a public process.

This process permits anyone to petition NRC to take enforcement-type actions related to the NRC licensees or license activity. Depending on the results of its evaluation NRC could modify, suspend, or revoke an NRC-issued license, or take any other appropriate enforcement action.

The NRC staff's guidance for the disposition of 2.206 petitions request is Management Directive 8.11, which is publicly available.

The purpose of today's meeting is to give the petitioner an opportunity to provide any relevant additional explanation in support for the petition, after having received the PRB's initial assessment.

This meeting is not a hearing, nor is it an opportunity for the petitioner or other members of the public to question or examine the Petition Review Board on its merits or the issues presented in the

13 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 petition request.

During the question and answer phase the NRC staff may ask clarifying questions of the petitioner and the licensee. The licensee may ask the Petition Review Board questions related to the issues raised in the petition, and then the petitioner and the licensee may ask the Petition Review Board questions related to the 2.206 petition process in general.

No decisions regarding the merits of the petition will be made during this meeting. Following this meeting the Petition Review Board will conduct its internal deliberations. The outcome of this internal meeting will be provided to the petitioner in a letter.

I would like to summarize the scope of the petition under consideration, and the NRC activities to date.

Beyond Nuclear submitted a petition to the NRC on October 16th, 2020. The petition requested that the U.S.

Nuclear Regulatory Commission take enforcement action against licensees of all boiling water reactors with Mark 1 containment systems, in the form of a suspension of operating licenses until all hardened containment vent systems are replaced.

14 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 The basis of your petition is that the hardened containment vent requirements in NRC Order EA-13-109 do not account for the thermal energy produced by chemical reactions that would occur during a severe accident and therefore would not prevent a BWR Mark 1 primary containment from failing in a severe accident.

The petition includes various severe accident phenomena that could cause higher flow than what the hardened containment vent is designed to pass.

To provide some background, the Petition Review Board first evaluates petitions using Management Directive 8.11, Section 3(c)(1) as criteria for accepting petitions, to assess whether or not further review is warranted.

A petition must basically provide facts not previously reviewed and/or resolved by the NRC to warrant further review.

On December 18th, 2020 the petition manager contacted you to inform you of the Petition Review Board's initial assessment that your petition did not meet the criteria for accepting petitions.

This is because in issuing NRC Order EA-13-109 the hardened containment vent system was not intended to be used by itself to prevent containment

15 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 failure. The hardened containment vent system is one of a range of tools, along with severe accident water addition and severe accident water management, that the operators could use to prevent or mitigate an environmental relief and containment failure.

Also, a study documented in NUREG-2206 demonstrated that the hardened containment vent system was a beneficial part of strategy for preventing and mitigating releases under many severe accident scenarios, and concluded that additional regulatory requirements were not justified.

NUREG-2206 documents the simulation of accident progression and source term for a range of severe accident scenarios.

Consistent with Management Directive 8.11,Section III.C.1(b)(ii), because the issues that you raised in your petition have previously been subject of a facility-specific or generic NRC staff review, the Petition Review Board then concluded that none of the following Section III.C.1(b)(ii) additional circumstances apply.

Those being, the prior review did not resolve the issues raised by the petitioner, or the resolution of the issues in the prior review does not apply to the facts provided by the petitioner to support

16 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 the requested action, and the petition provides significant new information that the staff did not consider in the prior review. Essentially, none of those circumstances apply.

The petition manager offered you an opportunity to address the Petition Review Board to clarify or supplement your petition in response to this assessment. And you requested to address the Petition Review Board in this forum.

As a reminder for all participants, please identify yourself if you make any remarks, as this will help us in the preparation of the meeting transcript that will be made publicly available. Thank you.

Beyond Nuclear, Mr. Paul Gunter, I will now turn it over to you to provide any information that you believe the Petition Review Board should consider as part of this petition.

MR. GUNTER: Good afternoon. My name is Paul Gunter. I'm on staff for the petitioner, Beyond Nuclear, which is based in Takoma Park, Maryland.

The October 16, 2020 enforcement petition in today's supplemental information request to the NRC to suspend operations of 19 General Electric Mark 1 Boiling Water Reactors cited in Alabama, Georgia,

Illinois, Pennsylvania,
Michigan, Minnesota,

17 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 Nebraska, New Jersey, and North Carolina, that are identified with the acknowledged design flaw, and severe accident vulnerability involving the volumetrically undersized GE pressure suppression containment system.

This same undersized containment structure demonstrated a 100 percent failure rate for the three Tokyo Electric Power Company's Fukushima Daiichi units that were at full power on March 11, 2011, and following the Tohoku earthquake and tsunami, experiencing multiple severe nuclear accidents, breach of containments, and the widespread release of radioactivity.

None of the actions to date by the Nuclear Regulatory Commission and the operators here in the United States have corrected the GE pressure suppression system's underlying design flaw and operational vulnerability first identified and then suppressed by the Atomic Energy Commission in 1972.

The petitioners charge that the Agency and the industry's post-Fukushima compensatory actions as stipulated by NRC Order and Enforcement Action 2013-109 leave the public at unreasonable and undue risk.

Today's supplemental materials and remarks are presented to the Petition Review Board by

18 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 our petition's principle researcher and author, and co-petitioner, Mr. Mark Leyse. Mark.

MR. LEYSE: Hi. Thank you, Paul. This is Mark Leyse. And I first want to say that the way the petition was described is actually, it's not incorrect what you said. It's just not really the primary point of the petition.

You said that, you know, because the NRC didn't account for the thermal energy produced by chemical reactions that, you know, that's basically the point of the petition.

That's, like I say, that is not incorrect.

But the petition is very simple. The petition just says, basically, the vents required by Order EA-13-109 cannot be guaranteed to prevent failure of the primary containment because they do not have the capacity to discharge the total amount of thermal energy that would be generated over some periods of time in various severe accident scenarios.

That is the essence of the petition. And then we also requested that the NRC revoke the licenses of any BWR Mark 1 units that are not modified to have a venting capacity that would guarantee prevention of containment failure under severe accident conditions.

So, this total amount of thermal energy,

19 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 yeah, it would include chemical energy, like from the zirconium-steam reaction. It would also include decay heat. But there are points in time where there's just so much more thermal energy generated by the chemical reactions.

So, that's the real point. Anyway, I have sent a letter responding to statements that the Petition Review Board made. That's a letter that was sent December 18th, 2020. So, what I discuss in this presentation is explained in more detail, and referenced in the written response that I sent to the Petition Review Board.

So, I just want to start now basically.

We cited evidence showing that the vents required by Order EA-13-109 lack the capacity to perform reliably under severe accident conditions.

Idaho National Engineering Laboratory, now it's INL, reported that in order to successfully operate in a severe accident, a hardened containment vent needs to have the capacity that is seven times as great as that of the vents that are required by Order EA-13-109.

That is one of the items that we presented that I note that in the Petition Review Board's statement they did not acknowledge what Idaho National

20 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 Labs had said, nor did they address that.

Anyway, so we presented that along with a lot of other evidence just showing that over some periods of time, they may be very brief, there can be tremendous amounts of thermal energy generated, which would overwhelm a vent.

For example, you could have 25 percent of the entire thermal power level of the reactor that could be generated. It would be a power level of over 25 percent. And it would sustain for a period of, you know, say one minute. And that would just blow the vents, and the containment wouldn't work.

Anyway, so that is, like I said, that's thoroughly documented in the petition. It's also documented in the letter that I sent as a reply. But anyway, the Petition Review Board, as you said, the initial recommendation is to not accept our petition for review.

And I just want to note that a number of petitioners, and I would be among them, allege that Petition Review Boards are biased. A report from 2017 by the NRC's Office of the Inspector General, on their audit of the Petition Review Board process states, quote, some petitioners said that 10 CFR 2.206 petition process is a conflict of interest.

21 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 Specifically, petitioners assert that NRC cannot objectively review petitions that appeal or challenge NRC decisions, because the staff performing the review are the same staff who made the original decision, end of quote.

So now, in the Fukushima accident, March 2011, hardened vents that were installed in Mark 1 primary containments failed to prevent hydrogen gas from leaking into reactor buildings, and exploding.

And the NRC became very concerned that the vents that had been previously voluntarily installed in Mark 1 units in the United States were inadequate.

So, after tens of BWR Mark 1 units had operated in the U.S. for roughly four decades, the NRC finally, prompted by the Fukushima accident, decided to impose legally binding requirements to finally solve the problem of Mark 1

primary containment overpressurization.

Among other things, Order EA-13-109 stipulated that the new BWR Mark 1 vents must have the capacity to handle a continuous thermal energy input at a rate equal to one percent of the reactor's rated maximum thermal power while maintaining the primary containment at a pressure lower than its design pressure.

22 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 The NRC has explained -- and also I just want to say, this was not acknowledged in the statement that the Petition Review Board sent on December 18th last year. It was not addressed.

And also, anyway, basically in 2013 the NRC explained that the venting capacity stipulated by Order EA-13-109 is based on quantities of thermal power that are generated by decay heating.

According to the NRC, after the reactor shuts down in an accident, the wet well suspension pool is typically capable of absorbing the nuclear fuel's decay heat for a period of three hours. After three hours the thermal power from continuous decay heat generation has typically decreased to less than one percent of the reactor's rated maximum thermal power.

So, like I said, that's an explanation that the NRC had, 2013. It's also in NEI documents. And when -- and that's thoroughly documented in our petition, and at the end of the Petition Review Board statement there is a different, a table where it says on one side petition information. On the other side it says NRC response.

And the reply to what I just said was basically that NUREG-2206, that all phases of severe accidents had been considered, and including thermal

23 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 energy generated by the metal-water reaction, et cetera.

But the problem is, you know, we just said how the NRC explained the venting capacity. And that was explained in 2013. And NUREG-2206 was completed three years later, published five years later.

So, I just, I was really bothered by that.

It's like you're saying that a document that was completed in 2016 negates statements which again you did not acknowledge, that the NRC made in 2013.

And just as someone who put a lot of time into this petition, you know, I just would expect a more honest review, something that just acknowledges, yes, the NRC did say that back in 2013. Then maybe you could say, however, we subsequently realized, blah, blah, blah.

But you don't even acknowledge that the NRC made that statement in 2013. And that's among a number of other problems with your statement regarding your initial decision. And I'm going to now cover some of those.

Anyway, the problem is that the vents that are required by Order EA-13-109, they're incapable of discharging the total amount of thermal energy that would be generated under the harshest of severe

24 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 accident conditions.

As stated in our petition, there are some severe accident scenarios in which very large amounts of thermal energy are rapidly generated over short periods of time, far more than that which is solely generated by decay heating.

So, you, your statement, the PRB statement says, quote, the PRB's initial assessment is that in issuing NRC Order EA-13-109, and since the NRC did not consider, I'm sorry, did, I'm sorry, the NRC did consider and/or analyze any document that severe accident conditions included in your petition, unquote.

In fact, I'm now going to talk about the MELCOR. MELCOR is a computer program. It simulates accidents. So, I'm now going to discuss the MELCOR analyses, which are discussed in NUREG-2206. And they did not simulate the harshest conditions that may occur in a severe accident.

So for example, none of the MELCOR analyses in NUREG-2206 -- I'll now refer to it just as the NUREG

-- stipulated any postulated severe accidents with scenarios similar to ones which in a period of time of one minute, about seven, 6800 kilograms of zirconium would react with about 2700 kilograms of steam, to yield

25 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 300 kilograms of hydrogen, and about 44,000 megajoules of thermal energy.

The NUREG does not disclose how many megajoules of thermal energy were generated in its MELCOR simulations. But we can actually see with some basic graphs how much hydrogen was generated, at what time. And from that we can kind of discern that the rates of thermal energy were not what I'm describing as those moments of time where it can just be a real blast of thermal energy.

Now, according to the OECD nuclear energy agency, flooding the melting-down reactor core with coolant water may generate from five to ten kilograms of hydrogen per second.

And now I'm going to refer to the letter I just sent you. Section 1 of my response in the letter, it's titled, quote, A Case of Cherry Picking.

The analyses of NUREG-2206 did not simulate phenomena as harsh as ones that occurred in the Fukushima Daiichi accident, unquote.

I'm paraphrasing. The PRB's statement discusses the MELCOR computer simulations of NUREG-2206, MELCOR-simulated molten materials relocating downward, and boiling off water located in the lower region of the reactor core, causing a pressure

26 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 spike inside the reactor pressure vessel.

The PRB says that the primary containment is successfully vented at its pressure limit. And that's true. I read the NUREG. An example of the pressure spike is in Figure 3-10 of NUREG-2206.

Now, Figure 3-10 concerns Case 9. The pressure spike of Case 9 reached nearly 500 pounds per square inch absolute. Containment failure was prevented in Case 9 by employing water management and injection, as well as containment venting.

Now, Case 10 of NUREG-2206 concerns a MELCOR simulation of a severe accident at a Mark 1 unit in which there was a combination of severe accident water addition and containment venting. And there was a failure of the, containment was prevented.

And there was also a pressure spike in Case 10 from debris locating downward to the lower reactor pressure vessel. And it reached nearly 400 pounds per square inch absolute.

And NUREG-2206 says that both Case 9 and Case 10 were selected to represent a number of MELCOR simulations that were of similar scenarios that were done in the same study.

So, the Case 9 and Case 10 MELCOR simulations of severe accidents at BWR Mark 1 units

27 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 did not simulate conditions as harsh as ones that were observed in the Fukushima Daiichi accident.

A huge pressure spike was observed in the Fukushima Daiichi Unit 3 reactor pressure vessel. It was ten days after the tsunami struck on March 21st, 2010. And they believe that it was after, there was a remelting of core contents. And the highest recorded pressure was measured at nearly 1,700 pounds per square inch absolute.

According to a Journal of Nuclear Science and Technology paper, the huge pressure spike can be interpreted as a consequence of a large amount of steam generation due to interaction of melting core materials with water. End of quote.

And analysis of the Unit 3 accident performed by Japanese experts estimated that the pressure spike that occurred on March 21st, 2010 actually reached a value greater than 1,900 pounds per square inch absolute.

So, none of the MELCOR analyses, including what you referred to, Case 9, discussed in NUREG-2206 simulated any accidents with scenarios in which there was a pressure spike as great as one that was actually recorded at the Fukushima Unit 3 reactor.

And so, like, again, this is documented

28 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 in my, the letter I sent to you, referenced everything.

So, not analyzing conditions as harsh as what occurred at Fukushima, that's what is called cherry picking.

That's cherry picking.

So, as covered in our petition, an analysis of the Fukushima Unit 3 accident found that on March 13, 2010 a large amount of materials relocated downward in the pressure vessel rapidly vaporized a large amount of water. And the vaporized water, the steam, reacted with molten materials, rapidly generating large amounts of hydrogen and thermal energy, in a short time period of unspecified duration, but is quite short.

And about 14 -- I'm sorry, about 4,200 kilograms of water vaporized and reacted with core materials, rapidly generating about 472, 475 kilograms of hydrogen and nearly 70,000 megajoules of thermal energy.

So, none of the MELCOR analyses discussed in NUREG-2206 simulated any severe accident scenarios like that. Nothing even close. And by the way, one can look at the graphs in NUREG-2206 and see the hydrogen generation plot.

And we see that in Case 9 of NUREG-2206 hydrogen generation was negligible at the time that the core relocated to the lower plenum. And if that

29 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 means, that also means that the thermal energy was also negligible.

So, how can one legitimately dismiss the safety issues that we raised in our petition based on the MELCOR analyses, and the analyses of NUREG-2206, which did not simulate conditions as harsh as ones that occurred in the Fukushima Unit 3 accident?

Now, Section, another part of my response to the Petition Review Board is titled, Worse than Worthless. Analyses that simulate unrealistic circumstances yield unrealistic results.

In a draft regulatory analysis for rulemaking activity the NRC did in May 2015, the NRC stated, operator actions to prevent or mitigate severe accidents are contingent on the availability and functionality of equipment and diagnostic instruments under severe accident conditions.

The operator relies on instruments to know when to add water and/or take other severe accident management actions.

So, in that same document the NRC also stated that the MELCOR analyses conducted for its regulatory analysis assumed that instruments measuring the reactor pressure vessel and containment water levels and pressures would be available and functional

30 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 under severe accident conditions.

NUREG-2206 states that the MELCOR analyses it discusses are the same as those of the draft regulatory analysis for a rulemaking activity dated May 2015.

So, the MELCOR analyses of NUREG-2206 simulated unrealistic circumstances. There is no guarantee that instruments measuring reactor pressure vessel and containment water levels and pressure would be functional under severe accident conditions.

In fact, it's highly likely they would be unavailable or malfunctional. Analyses that simulate unrealistic circumstances yield unrealistic results.

The MELCOR, the results of the MELCOR analyses of NUREG-2206, they demonstrate, yes, they demonstrate a false narrative. Because plant operators, basically the false narrative is that plant operators will always have diagnostic instruments that are reliable under severe accident conditions.

And therefore, they will always save the primary containment by employing a combination of properly executed venting and severe accident management, and/or water addition strategies.

To say that the MELCOR analyses of NUREG-2206 may be worse than worthless, it sounds like

31 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 an insult. But I don't mean it that way. I just mean it to actually describe the potential dangers of unrealistic analyses.

Unrealistic analyses that are nonconservative are dangerous, because they purvey a false sense of security. Plant operators should not be led to believe that instruments will be available and functional under severe accident conditions if they, well actually, if they may actually be unavailable or malfunctional. MELCOR analyses should be used to reduce risk, not increase risk.

An Oak Ridge, now an Oak Ridge National Laboratory report from 2015 says that in a severe accident there may be widespread instrument failure or inaccurate and/or misleading instrument indications.

At Fukushima Daiichi workers were misled during the early hours of the accident by erroneous readings of the Unit 1 reactor's condition. The reactor's water level appeared to be above the top of the fuel rods, when in fact they were uncovered and melting down. The water levels of all the stricken Fukushima reactors read erroneously high.

Now, that was in the petition that we submitted and documented. So, I think maybe before

32 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 you started leaning on NUREG-2206 to just show us how wrong we were, maybe you should have actually reviewed NUREG-2206 to see that it had a premise where the instruments are supposed to always work.

Now, back to the Oak Ridge Laboratory report. It said, during the Fukushima Daiichi accident numerous instrumentation measurements were unavailable as a result of loss of power supplies.

Even after power was restored the instrumentation measurements were inaccurate, or differed in values, or trends across the instruments measuring the same parameters.

Temperature and pressure conditions in containment affected reactor level and pressure instrumentation, and may have complicated accident management. End of quote.

The rosy picture depicted by the results of the MELCOR analyses of NUREG-2206, they depend on how the idealistic circumstances that are unlikely to occur in a natural accident.

Without available or functional, without available and functional instruments operators will not know when to add water or to take other accident management actions.

In the aftermath of the Fukushima accident

33 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 the NRC actually imposed, imposing regulation that would require enhancements to reactor and containment instruments.

Then in 2016, after evaluations the NRC announced that enhancements would, would not provide a substantial safety enhancement. And therefore, additional regulatory actions were not warranted. End of quote.

So, I have to say, you know, the degree of the NRC's cynicism is remarkable. Diagnostic instruments weren't available in the Fukushima accident. Nonetheless, the NRC decided against requiring that nuclear plants operate with instruments capable of providing reliable readings under severe accident conditions.

There is no guarantee that there would be reliable instrumentation essential to mitigating the severe accident that will be developed any time soon, that is, instrumentation robust enough to provide accurate readings throughout the duration of the harsh conditions of a severe accident.

So, I'll just say that the MELCOR analyses of 20, of NUREG-2206 found that the vents required by Order EA-13-109 are incapable of preventing the failure of a Mark 1 primary containment in the event of a severe

34 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 accident.

According to the NUREG it, to successfully prevent containment failure the vents must be employed along with severe accident water management, or water addition strategies.

So, if there is an accident here in the U.S. it's likely that, instruments would likely be about as reliable as they were at Fukushima. And so, lacking reliable readings plants, operators would not know when to add water to either the reactor pressure vessel or the primary containment.

So, venting the containment would not be complemented with properly executed severe accident water management, and/or additions strategies.

Containment would fail, enabling hydrogen gas to leak into and explode in the reactor building.

So, the NRC undermines nuclear safety by refusing to require enhancements to reactor and containment instruments that would ensure their reliability under severe accident conditions.

Then, in a display of cynicism the NRC decided the MELCOR analyses NUREG-2206 would assume that instruments measuring the reactor pressure vessel and containment water levels and pressures would always be available and functional in the event of a severe

35 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 accident.

The MELCOR analyses of NUREG-2206 are also not legally binding, like some for design basis accidents. There's no requirement that the most sever postulated accident scenarios be simulated. So, that's also another thing.

So, you know, NUREG-2206, it can do these couple of very low kind of more simple, easy scenarios, not nearly as harsh as what even occurred at Fukushima.

And there's no problem because it's not legally binding.

Now, I realize we're coming to a close.

And not so much time. I request a little time to go over. But I'm almost done. So, I'd say, is the NRC really claiming that the problem of Mark 1 primary containment over pressurization in the event of a severe accident finally is solved?

NUREG-2206 says, venting alone is not adequate, as it does not prevent other modes of containment failure, such as liner melt through, and over temperature failure of the upper dry well head, by pass of the suppression pole, and direct release of radioactivity to the environment.

A combination of venting and water injection is required to prevent such failures. And

36 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 the current work provides a sound technical basis that that effect thus, to that effect. Thus, supporting adequate protection of the containment.

And I'll just say, everything I quote, I'm going through it pretty quickly. It's all accurately quoted in the email I just sent to you. Anyway, Case 1 of NUREG-2206, it concerns a simulation where there was only containment, venting without the aid of water management or addition.

And the containment fails in Case 1, even under severe accident conditions that are not as harsh as ones that occurred at Fukushima. In Case 1 the dry well head is pushed upward due to over pressure, enabling hydrogen gas to leak into and explode in the reactor building. Destruction of the reactor building leads to a release of radioactive material into the environment.

So, is, like I say, is the NRC really claiming that the problem with Mark 1 primary containment over pressurization in the event of a severe accident is finally solved?

Now, it's claiming this NUREG-2206 provides a sound technical basis that demonstrates that the problem is finally solved after tens of BWR Mark 1 units have operated in the U.S. for decades, after

37 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 decades of NRC coverups and false insurances regarding the safety, supposed safety of the Mark 1 primary containments, where now members of the public are supposed to believe this.

And, like I say, these are assurances that are based on analyses of, that cherry picked severe accident scenarios. And I ask, why would the NRC intentionally cherry pick the severe accident scenarios? That is, to make sure the scenarios were too, not too harsh that were analyzed for NUREG-2206.

And there's a simple answer. To provide results to define its decision to limit the capacity of the vents required by Order EA-13-109. The results of the MELCOR analyses, they also provide a false demonstration that the problem of over pressurization has finally been solved now, after Fukushima. And that spares owners the expense of providing an actual solution.

And I have to say, it's characterized, it's commonplace to characterize the NRC as a captured regulator. Deceiving the public to spare industry the expense of improving safety is par for the course.

And I also say that the NRC's decision that you just had in your petition to not consider it for review, it's based on those cherry picked results.

38 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 And it's also based on the decision to assume that instruments are always reliable in the MELCOR analyses.

And I think to ignore the fact that instruments were often unreliable or malfunctional in the Fukushima accident is indefensible. So, like I say, I'm now concluding.

Basically last questions. Just, you know, how do plant operators perform all the water management and/or water addition strategies that you claim with, along with venting prevent the primary containment from failing in a severe accident, if their diagnostic instruments are unavailable or malfunctional?

And so, I leave you with that question.

And thank you for your time. And I appreciate your letting me go a little past 1:00 p.m. This is the end of Mark Leyse's presentation.

(Off the record comments)

MR. BUCKBERG: Thank you, Mr. Leyse for the presentation. Thanks for taking the time to provide the NRC staff with clarifying information on the petition you've submitted.

As stated at the opening we'll now enter into a question and answer phase. At this time do the members of the PRB have any questions for the

39 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 petitioner? Hearing none, do the petitioner or licensees have any questions about the 2.206 process in general? Please speak up.

MR. GUNTER: This is Paul Gunter, Beyond Nuclear.

MR. BUCKBERG: We can hear you. Please.

MR. GUNTER: Okay. My question is, will we see the draft director's decision before it's published in the Federal Register?

MR. BUCKBERG: If the process goes that far. So, the initial assessment that I sent to you on December 18th was that we would not be accepting your petition for further review, which would mean that we would not be moving towards developing a director's decision. We're now going to consider the information you submitted today, and see if that initial assessment changes. If it does not we will end the petition's evaluation. If our initial --

MR. GUNTER: Okay.

MR. BUCKBERG: -- assessment is changed we would do a director's decision. But normally proposed director's decision are publicly available, and you would see a copy.

MR. GUNTER: Right. So, that leads to the follow-up question. Are you going to, is, will the

40 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 Petition Review Board provide the petitioners with answers to the specific questions that this supplemental session has asked?

MR. BUCKBERG: We attempt to answer all of the petitioner's concerns. So, without having the time to really review what was just discussed I'd say that that's our goal in general. But we'll, we try to be thorough in our response.

MR.

GUNTER:

One additional final follow-up. Will the answers to this, any of the responses from the PRB to this supplemental session, will they be docketed in ADAMS? Or what, are we just going to get an email? But will that be docketed?

MR. BUCKBERG: Actually, the December 18th email is docketed in ADAMS. It's publicly available. The next document we will provide you is a formal letter on whether we're accepting or not accepting the petition. That will be publicly available in ADAMS as well.

MR. GUNTER: Okay. Thank you. I have no further questions.

MR. LEYSE: Mark Leyse. Just to follow-up with what Paul said. Yes. I would really appreciate it in your, after this meeting that you would actually address the two primary points that I, well,

41 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 more than two.

But, you know, the two main things about NUREG-2206 that I allege, that it did not simulate accidents as harsh as with, conditions as harsh as what occurred at Fukushima. And then also its assumption that the diagnostic instrumentation would always be available.

I see those as, the second one I just think is terrible, especially in view of the fact of the decision I referred to that NRC published in 2016 regarding to abandon any regulation that would require better instrumentation. Anyway, if you would address that I would really appreciate it. Thank you.

MR. BUCKBERG: Thanks, Mr. Leyse. I appreciate you highlighting those points for us.

MR. LEYSE: You're welcome.

MR. BUCKBERG: Any other questions from the petitioners or members of the public, licensee.

I'm sorry. Not members of the public just yet.

Licensee or petitioner.

Hearing none, if there's any members of the public, please provide feedback regarding the 2.206 petition process. You can provide that now. However, as stated in the opening, the purpose of this meeting is not to provide an opportunity for you to, or the

42 NEAL R. GROSS COURT REPORTERS AND TRANSCRIBERS 1323 RHODE ISLAND AVE., N.W.

(202) 234-4433 WASHINGTON, D.C. 20005-3701 (202) 234-4433 petitioner to question or examine the PRB regarding the merits of this petition request.

Any feedback from members of the public on the process? Hearing none, before we close does the court reporter need any additional information for the meeting transcript?

(No audible response)

MR. BUCKBERG: Thank you. We want to encourage the participants outside the NRC to provide public meeting feedback to the NRC staff, via the NRC public meeting website, if you feel so inclined. With that last comment, this meeting is concluded, and we'll be terminating the phone connection. Thanks for joining in everybody.

(Whereupon, the above-entitled matter went off the record at 3:09 p.m.)