{{#Wiki_filter:TS:21:03003 UFC:5822.00 February 23, 2021 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:P.O. Box 2078 Carlsbad, New Mexico USA 88221-2078 Phone: (575) 234-7200 Fax: (575) 234-7083 TS:21:03003 UFC:5822.00 February 23, 2021 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001  


==Subject:==
==Subject:==
REVISION 25 OF THE TRUPACT-II SHIPPING PACKAGE APPLICATION, DOCKET NO. 71-9218, AND REVISION 8 OF THE HalfPACT SHIPPING PACKAGE APPLICATION, DOCKET NO. 71-9279
REVISION 25 OF THE TRUPACT-II SHIPPING PACKAGE APPLICATION, DOCKET NO. 71-9218, AND REVISION 8 OF THE HalfPACT SHIPPING PACKAGE APPLICATION, DOCKET NO. 71-9279  


==Dear Sir or Madam:==
==Dear Sir or Madam:==
Nuclear Waste Partnership LLC, on behalf of the U.S. Department of Energy (DOE), hereby submits Revision 25 of the application for a Certificate of Compliance (CoC) for the TRUPACT-II Packaging, U.S. Nuclear Regulatory Commission (NRC) Docket No. 71-9218, and Revision 8 to the application for a CoC for the HalfPACT Packaging, NRC Docket No. 71-9279.
Nuclear Waste Partnership LLC, on behalf of the U.S. Department of Energy (DOE), hereby submits Revision 25 of the application for a Certificate of Compliance (CoC) for the TRUPACT-II Packaging, U.S. Nuclear Regulatory Commission (NRC) Docket No. 71-9218, and Revision 8 to the application for a CoC for the HalfPACT Packaging, NRC Docket No. 71-9279.
The primary purpose of the application is to propose the addition of four new shielded container designs as authorized payload containers for the HalfPACT packaging - SC-30G2 shielded container, SC-30G3 shielded container, SC-55G1 shielded container, and SC-55G2 shielded container. Along with the currently authorized SC-30G1 shielded container, these new shielded container designs will allow WIPP emplacement of a portion of the DOE remote-handled transuranic (RH-TRU) waste inventory in stackable configurations instead of in RH-TRU removable lid canisters 1 in excavated boreholes underground. Borehole emplacement of waste was halted following the accident at the WIPP on February 14, 2014, and cannot resume until the underground facility ventilation system is upgraded as part of the recovery operations.
The primary purpose of the application is to propose the addition of four new shielded container designs as authorized payload containers for the HalfPACT packaging - SC-30G2 shielded container, SC-30G3 shielded container, SC-55G1 shielded container, and SC-55G2 shielded container. Along with the currently authorized SC-30G1 shielded container, these new shielded container designs will allow WIPP emplacement of a portion of the DOE remote-handled transuranic (RH-TRU) waste inventory in stackable configurations instead of in RH-TRU removable lid canisters1 in excavated boreholes underground. Borehole emplacement of waste was halted following the accident at the WIPP on February 14, 2014, and cannot resume until the underground facility ventilation system is upgraded as part of the recovery operations.
Currently, WIPP is able to accept for disposal only the subset of the DOE RH-TRU waste inventory that meets the requirements for HalfPACT shipment in the currently authorized SC-30G1 shielded container. The new shielded container designs will enable HalfPACT shipments of a larger portion of the RH-TRU inventory, relieving the currently strained storage capacity at DOE sites while affording safe ALARA practices for the employees prior to transport.
Currently, WIPP is able to accept for disposal only the subset of the DOE RH-TRU waste inventory that meets the requirements for HalfPACT shipment in the currently authorized SC-30G1 shielded container. The new shielded container designs will enable HalfPACT shipments of a larger portion of the RH-TRU inventory, relieving the currently strained storage capacity at DOE sites while affording safe ALARA practices for the employees prior to transport.
In addition to providing the structural, thermal, shielding, and criticality design basis for the SC-30G2, SC-30G3, SC-55G1, and SC-55G2 shielded containers, this application also includes minor revisions to drawings, administrative revisions to facilitate anticipated electronic documentation management, and technical changes outlined in Attachment A - Summary of Revisions. Technical changes are indicated by rightbars in the margin of the submittal documents summarized below.
In addition to providing the structural, thermal, shielding, and criticality design basis for the SC-30G2, SC-30G3, SC-55G1, and SC-55G2 shielded containers, this application also includes minor revisions to drawings, administrative revisions to facilitate anticipated electronic documentation management, and technical changes outlined in Attachment A - Summary of Revisions. Technical changes are indicated by rightbars in the margin of the submittal documents summarized below.
This submission contains files, one or more of which contains hyperlinks to other files or to Internet websites. These hyperlinks are either inoperable or are not essential to the use of the 1
This submission contains files, one or more of which contains hyperlinks to other files or to Internet websites. These hyperlinks are either inoperable or are not essential to the use of the 1 The RH-TRU removable lid canister is the authorized payload container for the RH-TRU 72-B Cask.  
The RH-TRU removable lid canister is the authorized payload container for the RH-TRU 72-B Cask.
P.O. Box 2078  Carlsbad, New Mexico USA 88221-2078 Phone: (575) 234-7200  Fax: (575) 234-7083


Document Control Desk                                                               TS:21:03003 filing. Any material referenced by hyperlinks to Internet websites that was essential for use of this filing has been submitted as part of the filing. Any material referenced by a hyperlink to another file that was essential for the use of this filing has either been included by reference or submitted as part of this filing.
Document Control Desk TS:21:03003 P.O. Box 2078 z Carlsbad, New Mexico USA 88221-2078 Phone: (575) 234-7200 z Fax: (575) 234-7083 filing. Any material referenced by hyperlinks to Internet websites that was essential for use of this filing has been submitted as part of the filing. Any material referenced by a hyperlink to another file that was essential for the use of this filing has either been included by reference or submitted as part of this filing.
To facilitate implementation, it is requested that the current package CoCs be valid for use one year from the date of issuance of the revised CoCs.
To facilitate implementation, it is requested that the current package CoCs be valid for use one year from the date of issuance of the revised CoCs.
If you have any questions regarding this submittal, please contact Scott Burns of my staff at (575) 706-7920.
If you have any questions regarding this submittal, please contact Scott Burns of my staff at (575) 706-7920.
Sincerely, TODD SELLMER              Digitally signed by TODD SELLMER (Affiliate)
Sincerely, T. E. Sellmer, Manager Packaging and Information Systems TES:clm cc: D. Foreman, CBFO K. E. Princen, CBFO D. Smith, CBFO D. L. Standiford, CBFO M. Toothman, CBFO J. A. Walker, CBFO J. Shuler, EM-4.24 J. Shenk, EM-4.24 L. F. Gelder, SRRC N. Santos Garcia, USNRC B. H. White, USNRC TODD SELLMER (Affiliate)
(Affiliate)              Date: 2021.02.22 13:17:02 -07'00' T. E. Sellmer, Manager Packaging and Information Systems TES:clm cc: D. Foreman, CBFO K. E. Princen, CBFO D. Smith, CBFO D. L. Standiford, CBFO M. Toothman, CBFO J. A. Walker, CBFO J. Shuler, EM-4.24 J. Shenk, EM-4.24 L. F. Gelder, SRRC N. Santos Garcia, USNRC B. H. White, USNRC P.O. Box 2078 z Carlsbad, New Mexico USA 88221-2078 Phone: (575) 234-7200 z Fax: (575) 234-7083
Digitally signed by TODD SELLMER (Affiliate)
Date: 2021.02.22 13:17:02 -07'00'


Document Control Desk                                                                       TS:21:03003 The following table summarizes the components of this submittal. No deviations occur from the NRC-prescribed PDF formatting for the submitted files. Please contact Ms. C. L. Morrison at (505) 350-3693 or cindy.morrison@wipp.ws to resolve any discrepancies in this submittal.
Document Control Desk TS:21:03003 P.O. Box 2078 Carlsbad, New Mexico USA 88221-2078 Phone: (575) 234-7200 Fax: (575) 234-7083 The following table summarizes the components of this submittal. No deviations occur from the NRC-prescribed PDF formatting for the submitted files. Please contact Ms. C. L. Morrison at (505) 350-3693 or cindy.morrison@wipp.ws to resolve any discrepancies in this submittal.
File Size Release    Submittal File Name (MB)     Level       Type Publicly 001 Transmittal Letter - February 2021.pdf                                     .5                 EIE Available Publicly 002 TRUPACT-II SAR R25 - February 2021.pdf                                   39.2                 EIE Available Publicly 003 HalfPACT SAR R8 - February 2021.pdf                                     40.9                 EIE Available Publicly 004 CH-TRAMPAC R6 - February 2021.pdf                                         6.2                 EIE Available 005 CH-TRU Payload Appendices R5 - February                                         Publicly 50.6                 EIE 2021.pdf                                                                            Available Publicly 006 SCA-CAL-0001 R0                                                           2.4                 EIE Available Publicly 007 SCA-CAL-0002 R0                                                           8.5                 EIE Available Publicly 008 HPT-REP-0001 R0                                                         58.5                 EIE Available P.O. Box 2078  Carlsbad, New Mexico USA 88221-2078 Phone: (575) 234-7200  Fax: (575) 234-7083
File Name File Size (MB)
Release Level Submittal Type 001 Transmittal Letter - February 2021.pdf  
.5 Publicly Available EIE 002 TRUPACT-II SAR R25 - February 2021.pdf 39.2 Publicly Available EIE 003 HalfPACT SAR R8 - February 2021.pdf 40.9 Publicly Available EIE 004 CH-TRAMPAC R6 - February 2021.pdf 6.2 Publicly Available EIE 005 CH-TRU Payload Appendices R5 - February 2021.pdf 50.6 Publicly Available EIE 006 SCA-CAL-0001 R0 2.4 Publicly Available EIE 007 SCA-CAL-0002 R0 8.5 Publicly Available EIE 008 HPT-REP-0001 R0 58.5 Publicly Available EIE  


ATTACHMENT A - Summary of Revisions Summary                                                       Pg.
ATTACHMENT A - Summary of Revisions February 2021 A-1 Summary Pg.
TRUPACT-II SAR, Revision 25                                   A-2 HalfPACT SAR, Revision 8                                       A-7 TRUPACT-II SAR Drawing, 2077-500SNP, Revision AA             A-11 Standard Pipe Overpack SAR Drawing, 163-001, Revision 9       A-12 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4   A-14 Criticality Control Overpack SAR Drawing, 163-009, Revision 2 A-23 SC-30G2 Shielded Container SAR Drawing, 163-010, Revision 0   A-24 SC-30G3 Shielded Container SAR Drawing, 163-011, Revision 0   A-24 SC-55G1 Shielded Container SAR Drawing, 163-012, Revision 0   A-24 SC-55G2 Shielded Container SAR Drawing, 163-013, Revision 0   A-24 CH-TRAMPAC, Revision 6                                       A-25 CH-TRU Payload Appendices, Revision 5                         A-29 February 2021                                                  A-1
TRUPACT-II SAR, Revision 25 A-2 HalfPACT SAR, Revision 8 A-7 TRUPACT-II SAR Drawing, 2077-500SNP, Revision AA A-11 Standard Pipe Overpack SAR Drawing, 163-001, Revision 9 A-12 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 A-14 Criticality Control Overpack SAR Drawing, 163-009, Revision 2 A-23 SC-30G2 Shielded Container SAR Drawing, 163-010, Revision 0 A-24 SC-30G3 Shielded Container SAR Drawing, 163-011, Revision 0 A-24 SC-55G1 Shielded Container SAR Drawing, 163-012, Revision 0 A-24 SC-55G2 Shielded Container SAR Drawing, 163-013, Revision 0 A-24 CH-TRAMPAC, Revision 6 A-25 CH-TRU Payload Appendices, Revision 5 A-29  


ATTACHMENT A - Summary of Revisions TRUPACT-II SAR, Revision 25, February 2021 Section         Page                   Change Description                                       Justification Administrative SAR changes are grouped into the following categories, which are used in this summary without additional change justification:
ATTACHMENT A - Summary of Revisions February 2021 A-2 TRUPACT-II SAR, Revision 25, February 2021 Section Page Change Description Justification Administrative SAR changes are grouped into the following categories, which are used in this summary without additional change justification:  
  = revisions to rename the currently authorized shielded container assembly design to SC-30G1 and to present the approved SC-30G1 analysis consistent with the new shielded container model numbers
= revisions to rename the currently authorized shielded container assembly design to SC-30G1 and to present the approved SC-30G1 analysis consistent with the new shielded container model numbers  
  = addition of four (4) new shielded container models (SC-30G2, SC-30G3, SC-55G1, and SC-55G2) as authorized payload containers.
= addition of four (4) new shielded container models (SC-30G2, SC-30G3, SC-55G1, and SC-55G2) as authorized payload containers.  
  = addition or revision of section heading, table or figure caption, and/or reference footnote General           Revised header for revision and date.               Administrative change. No impact to safety basis.
= addition or revision of section heading, table or figure caption, and/or reference footnote General Revised header for revision and date.
1.1, 2.0,   1.1-2, 2.1-1, Updated 10 CFR 71 citation.                         Administrative change. No impact to safety basis.
Administrative change. No impact to safety basis.
2.4.1, 2.6,   2.4-1, 2.6-1, 2.7,         2.7-1, 2.10.1.1.1,     2.10.1-2, 2.10.3, 3.0,    2.10.3-1, 3.4, 3.5,    3.1-1, 3.4-1, 4.2.1, 4.3-  3.5-1, 4.2-1, 2, 4.4.1,    4.3-1, 4.4-1, 5.0, 6.0,    5.1-1, 6.1-1, 6.2, 6.3.3,  6.2-1, 6.3-4, 6.4.3.2.5,  6.4-7, 7.1-6, 7.1.7, 8.1,  8.1-1, 9.2-1, 9.2.1, 9.3.2      9.3-1 1.1         1.1-3     Replaced Figure 1.1-1 with a color, rendered         Administrative change. No impact to safety basis.
1.1, 2.0, 2.4.1, 2.6, 2.7, 2.10.1.1.1, 2.10.3, 3.0, 3.4, 3.5, 4.2.1, 4.3-2, 4.4.1, 5.0, 6.0, 6.2, 6.3.3, 6.4.3.2.5, 7.1.7, 8.1, 9.2.1, 9.3.2 1.1-2, 2.1-1, 2.4-1, 2.6-1, 2.7-1, 2.10.1-2, 2.10.3-1, 3.1-1, 3.4-1, 3.5-1, 4.2-1, 4.3-1, 4.4-1, 5.1-1, 6.1-1, 6.2-1, 6.3-4, 6.4-7, 7.1-6, 8.1-1, 9.2-1, 9.3-1 Updated 10 CFR 71 citation.
version.
Administrative change. No impact to safety basis.
1.2.1.1,   1.2-1, 1.3.2- Revised to use singular version of ten drum         Administrative change. No impact to safety basis.
1.1 1.1-3 Replaced Figure 1.1-1 with a color, rendered version.
1.3.2,        4, 5.3-2   overpack (TDOP).
Administrative change. No impact to safety basis.
5.2.1.2 2.2.1, 2.2.2   2.2-1 thru  Revised to clarify that weights listed for the 55-   Administrative change. No impact to safety basis.
1.2.1.1, 1.3.2, 5.2.1.2 1.2-1, 1.3.2-4, 5.3-2 Revised to use singular version of ten drum overpack (TDOP).
2.2-3    gallon drum, 100-gallon drum, standard waste box (SWB), and TDOP are approximate.
Administrative change. No impact to safety basis.
February 2021                                                                                                                    A-2
2.2.1, 2.2.2 2.2-1 thru 2.2-3 Revised to clarify that weights listed for the 55-gallon drum, 100-gallon drum, standard waste box (SWB), and TDOP are approximate.
Administrative change. No impact to safety basis.


ATTACHMENT A - Summary of Revisions TRUPACT-II SAR, Revision 25, February 2021 Section       Page           Change Description                                 Justification 5.0,   5.1-1, 5.1-4,                                     Administrative change. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-3 TRUPACT-II SAR, Revision 25, February 2021 Section Page Change Description Justification 5.0, 5.1.1.6, 5.1.2, 5.3.1.6, 5.4.1, 5.4.2, 5.4.4.5, 5.4.4.10, 5.5.5, 5.7, 5.7.1.7 5.1-1, 5.1-4, 5.1-10, 5.1-18, 5.3-4, 5.3-16, 5.3-17, 5.4-1, 5.4-2, 5.4-7, 5.4-11, 5.5-25 thru 5.5-28, 5.5-49, 5.7-1, 5.7.1-31 Administrative change. No impact to safety basis.
5.1.1.6, 5.1-10, 5.1-5.1.2,    18, 5.3-4, 5.3.1.6, 5.3-16, 5.3-5.4.1,    17, 5.4-1, 5.4.2,   5.4-2, 5.4-7, 5.4.4.5, 5.4-11, 5.5-5.4.4.10, 25 thru 5.5-5.5.5, 5.7,  28, 5.5-49, 5.7.1.7  5.7-1, 5.7.1-31 February 2021                                                                                                  A-3


ATTACHMENT A - Summary of Revisions TRUPACT-II SAR, Revision 25, February 2021 Section       Page                   Change Description                                     Justification 5.0,     5.1-1, 5.1-4 Revised to reflect shielding analyses performed The shielding analyses performed for the new 5.1.1.7,   thru 5.1-6, for the new shielded container designs          shielded container designs were performed using 5.1.1.8,   5.1-11 thru  (SC-30G2, SC-30G3, SC-55G1, SC-55G2).        the approved methodology documented in 5.1.1.9,   5.1-15, 5.1-                                                Section 5.0.
ATTACHMENT A - Summary of Revisions February 2021 A-4 TRUPACT-II SAR, Revision 25, February 2021 Section Page Change Description Justification 5.0, 5.1.1.7, 5.1.1.8, 5.1.1.9, 5.1.1.10, 5.3.1.7, 5.3.1.8, 5.3.1.9, 5.3.1.10, 5.4.1, 5.4.2, 5.4.4.6, 5.4.4.7, 5.4.4.8, 5.4.4.9, 5.4.4.10, 5.5.6, 5.5.7, 5.5.8, 5.5.9, 5.5.10, 5.7.1.8, 5.7.1.9, 5.7.1.10, 5.7.1.11 5.1-1, 5.1-4 thru 5.1-6, 5.1-11 thru 5.1-15, 5.1-18 thru 5.1-20, 5.3-4 thru 5.3-7, 5.3-18 thru 5.3-25, 5.4-1, 5.4-2, 5.4-8 thru 5.4-10, 5.4-12, 5.5-29 thru 5.5-50, 5.7.1-35 thru 5.7.1-72 Revised to reflect shielding analyses performed for the new shielded container designs (SC-30G2, SC-30G3, SC-55G1, SC-55G2).
5.1.1.10,   18 thru 5.1-5.3.1.7,     20, 5.3-4 5.3.1.8,    thru 5.3-7, 5.3.1.9,   5.3-18 thru 5.3.1.10,   5.3-25, 5.4-5.4.1,      1, 5.4-2, 5.4.2,     5.4-8 thru 5.4.4.6,   5.4-10, 5.4-5.4.4.7,    12, 5.5-29 5.4.4.8,   thru 5.5-50, 5.4.4.9,     5.7.1-35 5.4.4.10,   thru 5.7.1-5.5.6,         72 5.5.7, 5.5.8, 5.5.9, 5.5.10, 5.7.1.8, 5.7.1.9, 5.7.1.10, 5.7.1.11 5.2.2, 5.4.4 5.2-2, 5.4-4 Updated 252Cf specific activity for consistency The use of the updated 252Cf specific activity value with Table 3.1-2 in CH-TRAMPAC. Updated         does not result in changes to the energy-based corresponding total source strength calculation activity limits. No impact to safety basis.
The shielding analyses performed for the new shielded container designs were performed using the approved methodology documented in Section 5.0.
for 252Cf.
5.2.2, 5.4.4 5.2-2, 5.4-4 Updated 252Cf specific activity for consistency with Table 3.1-2 in CH-TRAMPAC. Updated corresponding total source strength calculation for 252Cf.
February 2021                                                                                                              A-4
The use of the updated 252Cf specific activity value does not result in changes to the energy-based activity limits. No impact to safety basis.  


ATTACHMENT A - Summary of Revisions TRUPACT-II SAR, Revision 25, February 2021 Section       Page                     Change Description                                     Justification Tables     5.1-16 thru Revised table values and example results to use The use of the updated 252Cf specific activity value 5.1-3 thru  5.1-18, 5.4-  the updated 252Cf specific activity value.      does not result in changes to the energy-based 5.1-7;    4 thru 5.4-7,                                                activity limits. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-5 TRUPACT-II SAR, Revision 25, February 2021 Section Page Change Description Justification Tables 5.1-3 thru 5.1-7; Tables 5.4-5 thru 5.4-11; Section 5.5.10.1.2 5.1-16 thru 5.1-18, 5.4-4 thru 5.4-7, 5.5-51 thru 5.5-54 Revised table values and example results to use the updated 252Cf specific activity value.
Tables    5.5-51 thru 5.4-5 thru    5.5-54 5.4-11; Section 5.5.10.1.2 5.5.10       5.5-49     Revised to reassign the currently approved     Eligibility for all shielded container payloads will be SC-30G1 payload from Case A to Case B for       determined as Case B. Using the Case B distributed source eligibility.                NUREG-1608 definition of distributed throughout is more appropriate for these payload comprised of a maximum of three payload containers than using a limited number of surface dose rate measurements for determination as Case A.
The use of the updated 252Cf specific activity value does not result in changes to the energy-based activity limits. No impact to safety basis.
6.1,     6.1-4, 6.4-8, Revised to change payload container FGE limits For drum payload configurations evaluated under 6.4.3.4,      6.4-10    to the allowed FGE per package for Cases A and Cases A and C, all fissile material within the 6.4.3.5                  C.                                              package is assumed to consolidate into a single fissile region within the package such that no credit is taken for individual payload container confinement or material absorption. The historically-implemented 200 FGE limit on individual drums is not related to or consistent with the Case A and Case C analysis assumptions.
5.5.10 5.5-49 Revised to reassign the currently approved SC-30G1 payload from Case A to Case B for distributed source eligibility.
Eligibility for all shielded container payloads will be determined as Case B. Using the Case B NUREG-1608 definition of distributed throughout is more appropriate for these payload comprised of a maximum of three payload containers than using a limited number of surface dose rate measurements for determination as Case A.
6.1, 6.4.3.4, 6.4.3.5 6.1-4, 6.4-8, 6.4-10 Revised to change payload container FGE limits to the allowed FGE per package for Cases A and C.
For drum payload configurations evaluated under Cases A and C, all fissile material within the package is assumed to consolidate into a single fissile region within the package such that no credit is taken for individual payload container confinement or material absorption. The historically-implemented 200 FGE limit on individual drums is not related to or consistent with the Case A and Case C analysis assumptions.
Therefore, the FGE limit for the package is appropriately equal to the FGE limit for an individual drum payload container (e.g., a drum at 325 FGE under Case A is allowable provided none of the other drums contain fissile material).
Therefore, the FGE limit for the package is appropriately equal to the FGE limit for an individual drum payload container (e.g., a drum at 325 FGE under Case A is allowable provided none of the other drums contain fissile material).
9.2.1, 9.3.1 9.2-1, 9.3-1 Revised to update NRC Regulatory Guide 7.10 to Administrative change. No impact to safety basis.
9.2.1, 9.3.1 9.2-1, 9.3-1 Revised to update NRC Regulatory Guide 7.10 to Version 3, June 2015.
Version 3, June 2015.
Administrative change. No impact to safety basis.  
February 2021                                                                                                                  A-5


ATTACHMENT A - Summary of Revisions TRUPACT-II SAR, Revision 25, February 2021 Section   Page               Change Description                               Justification 9.2.2     9.2-1 Revised reference from DOE Order 460.1B to   Administrative change. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-6 TRUPACT-II SAR, Revision 25, February 2021 Section Page Change Description Justification 9.2.2 9.2-1 Revised reference from DOE Order 460.1B to DOE Order 460.1D.
DOE Order 460.1D.
Administrative change. No impact to safety basis.  
February 2021                                                                                                  A-6


ATTACHMENT A - Summary of Revisions HalfPACT SAR, Revision 8, February 2021 Section         Page                     Change Description                                         Justification Administrative SAR changes are grouped into the following categories, which are used in this summary without additional change justification:
ATTACHMENT A - Summary of Revisions February 2021 A-7 HalfPACT SAR, Revision 8, February 2021 Section Page Change Description Justification Administrative SAR changes are grouped into the following categories, which are used in this summary without additional change justification:  
  = revisions to rename the currently authorized shielded container assembly design to SC-30G1 and to present the approved SC-30G1 analysis consistent with the new shielded container model numbers
= revisions to rename the currently authorized shielded container assembly design to SC-30G1 and to present the approved SC-30G1 analysis consistent with the new shielded container model numbers  
  = addition of four (4) new shielded container models (SC-30G2, SC-30G3, SC-55G1, and SC-55G2) as authorized payload containers.
= addition of four (4) new shielded container models (SC-30G2, SC-30G3, SC-55G1, and SC-55G2) as authorized payload containers.  
  = addition or revision of section heading, table or figure caption, and/or reference footnote General           Revised header for revision and date.               Administrative change. No impact to safety basis.
= addition or revision of section heading, table or figure caption, and/or reference footnote General Revised header for revision and date.
1.0           1.1-1         Revised to reference the design basis               The structural, thermal, shielding, and criticality evaluations for new shielded container designs       design bases are established in CH-TRU Payload (SC-30G2, SC-30G3, SC-55G1, and SC-55G2).           Appendices 4.7 - 4.10 for the SC-30G2, SC-30G3, SC-55G1, and SC-55G2, respectively.
Administrative change. No impact to safety basis.
1.1           1.1-2         Revised to accommodate new shielded container       Administrative change. No impact to safety basis.
1.0 1.1-1 Revised to reference the design basis evaluations for new shielded container designs (SC-30G2, SC-30G3, SC-55G1, and SC-55G2).
payload configurations.
The structural, thermal, shielding, and criticality design bases are established in CH-TRU Payload Appendices 4.7 - 4.10 for the SC-30G2, SC-30G3, SC-55G1, and SC-55G2, respectively.
1.1, 2.0,     1.1-2, 2.1-1, Updated 10 CFR 71 citation.                         Administrative change. No impact to safety basis.
1.1 1.1-2 Revised to accommodate new shielded container payload configurations.
2.4.1, 2.6,   2.4-1, 2.6-1, 2.7,           2.7-1, 2.10.1.1.1,   2.10.1-2, 2.10.3, 3.0,  2.10.3-1, 3.4, 3.5,      3.1-1, 3.4-1, 4.2.1,        3.5-1, 4.2-1, 4.3.2,        4.3-1, 4.4-1, 4.4.1, 5.0,    5-1, 6.1-1, 6.0, 6.2,      6.2-1, 6.3-4, 6.3.3,        6.4-7, 7.1-6, 6.4.3.2.5,    8.1-1, 9.2-1, 7.1.7, 8.1,    9.3-1 9.2.1, 9.3.2 1.1           1.1-3         Replaced Figure 1.1-1 with a color, rendered         Administrative change. No impact to safety basis.
Administrative change. No impact to safety basis.
version.
1.1, 2.0, 2.4.1, 2.6, 2.7, 2.10.1.1.1, 2.10.3, 3.0, 3.4, 3.5, 4.2.1, 4.3.2, 4.4.1, 5.0, 6.0, 6.2, 6.3.3, 6.4.3.2.5, 7.1.7, 8.1, 9.2.1, 9.3.2 1.1-2, 2.1-1, 2.4-1, 2.6-1, 2.7-1, 2.10.1-2, 2.10.3-1, 3.1-1, 3.4-1, 3.5-1, 4.2-1, 4.3-1, 4.4-1, 5-1, 6.1-1, 6.2-1, 6.3-4, 6.4-7, 7.1-6, 8.1-1, 9.2-1, 9.3-1 Updated 10 CFR 71 citation.
February 2021                                                                                                                          A-7
Administrative change. No impact to safety basis.
1.1 1.1-3 Replaced Figure 1.1-1 with a color, rendered version.
Administrative change. No impact to safety basis.  


ATTACHMENT A - Summary of Revisions HalfPACT SAR, Revision 8, February 2021 Section       Page                   Change Description                                     Justification 1.3.1       1.3.1-1       Updated to reference SAR drawings for new         Administrative change. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-8 HalfPACT SAR, Revision 8, February 2021 Section Page Change Description Justification 1.3.1 1.3.1-1 Updated to reference SAR drawings for new shielded container payload configurations.
shielded container payload configurations.
Administrative change. No impact to safety basis.
1.3.2       1.3.2-4       Revised shielded container definition to include Administrative change. No impact to safety basis.
1.3.2 1.3.2-4 Revised shielded container definition to include new shielded container designs (SC-30G2, SC-30G3, SC-55G1 and SC-55G2).
new shielded container designs (SC-30G2, SC-30G3, SC-55G1 and SC-55G2).
Administrative change. No impact to safety basis.
2.2, 2.2.1, 2.2-1, 2.2-3,                                                 Administrative change. No impact to safety basis.
2.2, 2.2.1, 2.2.2 2.2-1, 2.2-3, 2.2-7, 2.2-14 Administrative change. No impact to safety basis.
2.2.2       2.2-7, 2.2-14 2.2, 2.2.2.2-1, 2.2-Revised to reflect center of gravity calculations The center of gravity calculations for new shielded thru 2.2-5,  for the new shielded container designs           container payload configurations were performed 2.2-7, 2.2-8, (SC-30G2, SC-30G3, SC-55G1, and SC-55G2).         using the approved methodology documented in 2.2-15 thru                                                  Section 2.0.
2.2, 2.2.1 2.2-1, 2.2-3 thru 2.2-5, 2.2-7, 2.2-8, 2.2-15 thru 2.2-18 Revised to reflect center of gravity calculations for the new shielded container designs (SC-30G2, SC-30G3, SC-55G1, and SC-55G2).
2.2-18 2.2.1, 2.2.2 2.2-1 thru   Revised to clarify that weights listed for the    Administrative change. No impact to safety basis.
The center of gravity calculations for new shielded container payload configurations were performed using the approved methodology documented in Section 2.0.
2.2-3, 2.2-5 55-gallon drum, standard waste box (SWB), and 100-gallon drum are approximate.
2.2.1, 2.2.2 2.2-1 thru 2.2-3, 2.2-5 Revised to clarify that weights listed for the 55-gallon drum, standard waste box (SWB), and 100-gallon drum are approximate.
2.10.3.4     2.10.3-3     Revised to include the new shielded container     Administrative change. No impact to safety basis.
Administrative change. No impact to safety basis.
and          designs (SC-30G2, SC-30G3, SC-55G1 and SC-2.10.3-4      55G2), and associated payload weights and configurations.
2.10.3.4 2.10.3-3 and 2.10.3-4 Revised to include the new shielded container designs (SC-30G2, SC-30G3, SC-55G1 and SC-55G2), and associated payload weights and configurations.
3.1.2       3.1-2 and     Revised to include the new shielded container     Administrative change. No impact to safety basis.
Administrative change. No impact to safety basis.
3.1-3        designs (SC-30G2, SC-30G3, SC-55G1, and SC-55G2).
3.1.2 3.1-2 and 3.1-3 Revised to include the new shielded container designs (SC-30G2, SC-30G3, SC-55G1, and SC-55G2).
3.4.4.2.1   3.4-8,       Revised to include pressure calculations for the MNOP calculations for the new shielded container 3.4-16 thru  new shielded container payloads (SC-30G2,         payloads were performed using the approved 3.4-18        SC-30G3, SC-55G1, and SC-55G2).               methodology documented in Section 3.4.4.
Administrative change. No impact to safety basis.
5.0         5-1           Revised to reflect shielding analyses performed   Shielding analyses for the four new shielded for the new shielded container designs           container payload configurations are presented in (SC-30G2, SC-30G3, SC-55G1, and SC-55G2).         TRUPACT-II SAR Section 5.0.
3.4.4.2.1 3.4-8, 3.4-16 thru 3.4-18 Revised to include pressure calculations for the new shielded container payloads (SC-30G2, SC-30G3, SC-55G1, and SC-55G2).
February 2021                                                                                                                  A-8
MNOP calculations for the new shielded container payloads were performed using the approved methodology documented in Section 3.4.4.
5.0 5-1 Revised to reflect shielding analyses performed for the new shielded container designs (SC-30G2, SC-30G3, SC-55G1, and SC-55G2).
Shielding analyses for the four new shielded container payload configurations are presented in TRUPACT-II SAR Section 5.0.  


ATTACHMENT A - Summary of Revisions HalfPACT SAR, Revision 8, February 2021 Section       Page                   Change Description                                     Justification 6.0, 6.2.7, 6.1-1, 6.1-2, Revised descriptions of Case G and Case H to  Criticality safety analyses for the new shielded 6.2.8, 6.3, 6.2-5, 6.3-1, include new shielded containers (SC-30G2,     container payload configurations are presented in 6.4.3.4    6.4-8        SC-30G3, SC-55G1 and SC-55G2).               CH-TRU Payload Appendices 4.7, 4.8, 4.9, and 4.10.
ATTACHMENT A - Summary of Revisions February 2021 A-9 HalfPACT SAR, Revision 8, February 2021 Section Page Change Description Justification 6.0, 6.2.7, 6.2.8, 6.3, 6.4.3.4 6.1-1, 6.1-2, 6.2-5, 6.3-1, 6.4-8 Revised descriptions of Case G and Case H to include new shielded containers (SC-30G2, SC-30G3, SC-55G1 and SC-55G2).
6.1,       6.1-4, 6.4-8, Revised to change payload container FGE limits For drum payload configurations evaluated under 6.4.3.4,    6.4-10        to the allowed FGE per package for Cases A, C, Cases A and C, all fissile material within the 6.4.3.5                  G, and H.                                      package is assumed to consolidate into a single fissile region within the package such that no credit is taken for individual payload container confinement or material absorption. The historically-implemented 200 FGE limit on individual drums is not related to or consistent with the Case A and Case C analysis assumptions.
Criticality safety analyses for the new shielded container payload configurations are presented in CH-TRU Payload Appendices 4.7, 4.8, 4.9, and 4.10.
6.1, 6.4.3.4, 6.4.3.5 6.1-4, 6.4-8, 6.4-10 Revised to change payload container FGE limits to the allowed FGE per package for Cases A, C, G, and H.
For drum payload configurations evaluated under Cases A and C, all fissile material within the package is assumed to consolidate into a single fissile region within the package such that no credit is taken for individual payload container confinement or material absorption. The historically-implemented 200 FGE limit on individual drums is not related to or consistent with the Case A and Case C analysis assumptions.
Therefore, the FGE limit for the package is appropriately equal to the FGE limit for an individual drum payload container (e.g., a drum at 325 FGE under Case A is allowable provided none of the other drums contain fissile material).
Therefore, the FGE limit for the package is appropriately equal to the FGE limit for an individual drum payload container (e.g., a drum at 325 FGE under Case A is allowable provided none of the other drums contain fissile material).
For Cases G and H, the thick lead and/or steel walls of the shielded containers are evaluated explicitly in the criticality safety analyses to determine their impact as a neutron reflector.
For Cases G and H, the thick lead and/or steel walls of the shielded containers are evaluated explicitly in the criticality safety analyses to determine their impact as a neutron reflector.
However, the fissile material at the package FGE limit is modeled as a single sphere both inside and outside of the shielded containers. Thus, even for shielded container designs that allow up to three containers per HalfPACT, the analysis is not predicated on a FGE limit per container basis, thus the package limit is bounding.
However, the fissile material at the package FGE limit is modeled as a single sphere both inside and outside of the shielded containers. Thus, even for shielded container designs that allow up to three containers per HalfPACT, the analysis is not predicated on a FGE limit per container basis, thus the package limit is bounding.  
February 2021                                                                                                              A-9


ATTACHMENT A - Summary of Revisions HalfPACT SAR, Revision 8, February 2021 Section       Page                   Change Description                                 Justification 7.1.4, 7.2.4 7.1-3, 7.2-2 Revised to clarify dunnage requirements for   Administrative change. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-10 HalfPACT SAR, Revision 8, February 2021 Section Page Change Description Justification 7.1.4, 7.2.4 7.1-3, 7.2-2 Revised to clarify dunnage requirements for SC-30G1 and SC-30G2 payload configurations.
SC-30G1 and SC-30G2 payload configurations.
Administrative change. No impact to safety basis.
9.2.1, 9.3.1 9.2-1, 9.3-1 Revised to update NRC Regulatory Guide 7.10 to Administrative change. No impact to safety basis.
9.2.1, 9.3.1 9.2-1, 9.3-1 Revised to update NRC Regulatory Guide 7.10 to Version 3, June 2015.
Version 3, June 2015.
Administrative change. No impact to safety basis.
9.2.2       9.2-1       Revised reference from DOE Order 460.1B to     Administrative change. No impact to safety basis.
9.2.2 9.2-1 Revised reference from DOE Order 460.1B to DOE Order 460.1D.
DOE Order 460.1D.
Administrative change. No impact to safety basis.  
February 2021                                                                                                          A-10


ATTACHMENT A - Summary of Revisions TRUPACT-II SAR Drawing, 2077-500SNP, Revision AA Sheet     Zone             Change Description                                 Justification 1       A1 Updated Revision History block to include the Administrative change. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-11 TRUPACT-II SAR Drawing, 2077-500SNP, Revision AA Sheet Zone Change Description Justification 1
previous Approved Revision Date for historical purposes 8       C4 Removed an unintentional CAD artifact         Administrative change. No impact to safety basis.
A1 Updated Revision History block to include the previous Approved Revision Date for historical purposes Administrative change. No impact to safety basis.
displayed.
8 C4 Removed an unintentional CAD artifact displayed.
February 2021                                                                                                A-11
Administrative change. No impact to safety basis.  


ATTACHMENT A - Summary of Revisions Standard Pipe Overpack SAR Drawing, 163-001, Revision 9 Sheet         Zone               Change Description                               Justification General     Revised title block.                       Administrative change. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-12 Standard Pipe Overpack SAR Drawing, 163-001, Revision 9 Sheet Zone Change Description Justification General Revised title block.
1           D3 G/N 4: Removed "EACH PIPE COMPONENT         Leak test is not required because a filter vent that SHALL BE LEAK TESTED PRIOR TO USE PER      meets the requirements specified in Section 2.5.1 ANSI N14.5, ACCEPTANCE CRITERIA IS          of the CH-TRAMPAC is installed on each pipe LEAKTIGHT.                              component upon assembly for shipment. Rather than being confirmed by a leak test, weld integrity is affirmed via inspection per the ASME Code with proper filter vent and pipe component lid installation and o-ring sealing affirmed via procedural controls.
Administrative change. No impact to safety basis.
1           C3 F/N 9: Deleted "TYPE AC"                   Exterior grade plywood meets the structural requirements needed. The cosmetic grade defined by "TYPE AC" is not relevant to the structural requirements. No impact to safety basis.
1 D3 G/N 4: Removed "EACH PIPE COMPONENT SHALL BE LEAK TESTED PRIOR TO USE PER ANSI N14.5, ACCEPTANCE CRITERIA IS LEAKTIGHT.
2           D6 Removed "LEAK TEST/"                       Administrative clarification of the lid feature name as FILTER VENT PORT. No impact to safety basis.
Leak test is not required because a filter vent that meets the requirements specified in Section 2.5.1 of the CH-TRAMPAC is installed on each pipe component upon assembly for shipment. Rather than being confirmed by a leak test, weld integrity is affirmed via inspection per the ASME Code with proper filter vent and pipe component lid installation and o-ring sealing affirmed via procedural controls.
2           D6 Added (OPTIONAL)                         The Part Identification No. on the lid is not critical to the fabrication or performance of the pipe component. No impact to safety basis.
1 C3 F/N 9: Deleted "TYPE AC" Exterior grade plywood meets the structural requirements needed. The cosmetic grade defined by "TYPE AC" is not relevant to the structural requirements. No impact to safety basis.
3           D6 Added (OPTIONAL)                         The Part Identification No. on the lid is not critical to the fabrication or performance of the pipe component. No impact to safety basis.
2 D6 Removed "LEAK TEST/"
3           D6 Removed "LEAK TEST/"                       Administrative clarification of the lid feature name as FILTER VENT PORT. No impact to safety basis.
Administrative clarification of the lid feature name as FILTER VENT PORT. No impact to safety basis.
February 2021                                                                                                      A-12
2 D6 Added (OPTIONAL)
The Part Identification No. on the lid is not critical to the fabrication or performance of the pipe component. No impact to safety basis.
3 D6 Added (OPTIONAL)
The Part Identification No. on the lid is not critical to the fabrication or performance of the pipe component. No impact to safety basis.
3 D6 Removed "LEAK TEST/"
Administrative clarification of the lid feature name as FILTER VENT PORT. No impact to safety basis.  


ATTACHMENT A - Summary of Revisions Standard Pipe Overpack SAR Drawing, 163-001, Revision 9 Sheet     Zone             Change Description                               Justification 3       B7 Revised pipe component max diameter         Per ASTM A312/A999, for a NPS of 12, the fromn12.8 MAX to n12.9 MAX              maximum permissible outside diameter is 12.843.
ATTACHMENT A - Summary of Revisions February 2021 A-13 Standard Pipe Overpack SAR Drawing, 163-001, Revision 9 Sheet Zone Change Description Justification 3
This small increase in maximum pipe component diameter allows for fabrication of the 12 pipe component using standard pipe. No impact to safety basis.
B7 Revised pipe component max diameter fromn12.8 MAX to n12.9 MAX Per ASTM A312/A999, for a NPS of 12, the maximum permissible outside diameter is 12.843.
February 2021                                                                                                  A-13
This small increase in maximum pipe component diameter allows for fabrication of the 12 pipe component using standard pipe. No impact to safety basis.  


ATTACHMENT A - Summary of Revisions SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet         Zone               Change Description                                   Justification General     Added "SC-30G1" designator in title and       Administrative change. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-14 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification General Added "SC-30G1" designator in title and throughout drawing.
throughout drawing.
Administrative change. No impact to safety basis.
1           D3 G/N 3: Deleted "SHOWN" where it follows ALL   Some welds may be optional and, therefore, not WELDS and deleted SHELL where it is used to shown. Clarified to note that some dunnage describe materials.                            materials and not only shell materials may be joined via CJP welding. No impact to safety basis.
1 D3 G/N 3: Deleted "SHOWN" where it follows ALL WELDS and deleted SHELL where it is used to describe materials.
1           D3 F/N 7: LEAD MEETING THE MINIMUM               Revised to clarify that the optional use of STRUCTURAL REQUIREMENTS OF ASTM                radioactively contaminated lead shall be required B29. revised to LEAD THAT IS                to be mechanically equivalent to lead meeting MECHANICALLY EQUIVALENT TO LEAD                the chemical requirements of ASTM B29 since MEETING THE CHEMICAL REQUIREMENTS              specific structural requirements are not defined OF ASTM B29.                                  in ASTM B29. No impact to safety basis.
Some welds may be optional and, therefore, not shown. Clarified to note that some dunnage materials and not only shell materials may be joined via CJP welding. No impact to safety basis.
February 2021                                                                                                        A-14
1 D3 F/N 7: LEAD MEETING THE MINIMUM STRUCTURAL REQUIREMENTS OF ASTM B29. revised to LEAD THAT IS MECHANICALLY EQUIVALENT TO LEAD MEETING THE CHEMICAL REQUIREMENTS OF ASTM B29.
Revised to clarify that the optional use of radioactively contaminated lead shall be required to be mechanically equivalent to lead meeting the chemical requirements of ASTM B29 since specific structural requirements are not defined in ASTM B29. No impact to safety basis.  


ATTACHMENT A - Summary of Revisions SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet     Zone               Change Description                               Justification 1       C3 F/N 15: , WHERE CLEARANCE BETWEEN         Revised to be consistent with new shielded THE FOAM CORE AND ALL OUTER SKIN           container drawings. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-15 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification 1
MATERIALS IS MAINTAINED TO LESS THAN 1/8 IN. IN ANY DIRECTION. OPTIONALLY, FOAM MAY BE POURED-IN-PLACE THROUGH ACCESS PORTS IN THE OUTER SKINS (NOT SHOWN). MATERIAL SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 10%
C3 F/N 15:, WHERE CLEARANCE BETWEEN THE FOAM CORE AND ALL OUTER SKIN MATERIALS IS MAINTAINED TO LESS THAN 1/8 IN. IN ANY DIRECTION. OPTIONALLY, FOAM MAY BE POURED-IN-PLACE THROUGH ACCESS PORTS IN THE OUTER SKINS (NOT SHOWN). MATERIAL SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 10%
STRAIN AND 75°F OF 430 PSI IN THE AS-INSTALLED RADIAL DIRECTION. revised to CLEARANCE BETWEEN THE FOAM CORES AND ALL OUTER SKIN MATERIALS SHALL BE 1/8 IN. OR LESS IN ANY DIRECTION AS DETERMINED NEAR INSIDE/OUTSIDE EDGES AS APPLICABLE. OPTIONALLY, FOAM MAY BE POURED-IN-PLACE THROUGH ACCESS PORTS IN THE OUTER SKINS (NOT SHOWN).
STRAIN AND 75°F OF 430 PSI IN THE AS-INSTALLED RADIAL DIRECTION. revised to CLEARANCE BETWEEN THE FOAM CORES AND ALL OUTER SKIN MATERIALS SHALL BE 1/8 IN. OR LESS IN ANY DIRECTION AS DETERMINED NEAR INSIDE/OUTSIDE EDGES AS APPLICABLE. OPTIONALLY, FOAM MAY BE POURED-IN-PLACE THROUGH ACCESS PORTS IN THE OUTER SKINS (NOT SHOWN).
MATERIAL SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 10% STRAIN AND 75° +/-5°F OF 430 PSI IN THE AS-INSTALLED RADIAL DIRECTION.
MATERIAL SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 10% STRAIN AND 75° +/-5°F OF 430 PSI IN THE AS-INSTALLED RADIAL DIRECTION.
1       C2 F/N 16: MATERIAL: ASTM B-209/221, 6061-T6 Revised to add additional acceptable aluminum ALUM revised to MATERIAL: ASTM B209,     alloy. No impact to safety basis.
Revised to be consistent with new shielded container drawings. No impact to safety basis.
6061-T6/T651 ALUM.
1 C2 F/N 16: MATERIAL: ASTM B-209/221, 6061-T6 ALUM revised to MATERIAL: ASTM B209, 6061-T6/T651 ALUM.
1       C2 F/N 17. MATERIAL: ASTM B-221, 6061-T6     Revised to add additional acceptable aluminum ALUM revised to MATERIAL: ASTM           material shapes and alloys. No impact to safety B210/221/241, 6061-T6/T6510/T6511 ALUM. basis.
Revised to add additional acceptable aluminum alloy. No impact to safety basis.
February 2021                                                                                              A-15
1 C2 F/N 17. MATERIAL: ASTM B-221, 6061-T6 ALUM revised to MATERIAL: ASTM B210/221/241, 6061-T6/T6510/T6511 ALUM.
Revised to add additional acceptable aluminum material shapes and alloys. No impact to safety basis.  


ATTACHMENT A - Summary of Revisions SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet     Zone               Change Description                             Justification 1       B3 F/N 18. ", WHERE CLEARANCE BETWEEN         Revised to be consistent with new shielded THE FOAM CORE AND ALL OUTER SKIN           container drawings. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-16 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification 1
MATERIALS IS MAINTAINED TO LESS THAN 1/8 IN. IN ANY DIRECTION. OPTIONALLY, FOAM MAY BE POURED-IN-PLACE THROUGH ACCESS PORTS IN THE OUTER SKINS (NOT SHOWN). MATERIAL SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 10%
B3 F/N 18. ", WHERE CLEARANCE BETWEEN THE FOAM CORE AND ALL OUTER SKIN MATERIALS IS MAINTAINED TO LESS THAN 1/8 IN. IN ANY DIRECTION. OPTIONALLY, FOAM MAY BE POURED-IN-PLACE THROUGH ACCESS PORTS IN THE OUTER SKINS (NOT SHOWN). MATERIAL SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 10%
STRAIN AND 75°F OF 430 PSI IN THE AS-INSTALLED RADIAL DIRECTION. revised to CLEARANCE BETWEEN THE FOAM CORES AND ALL OUTER SKIN MATERIALS SHALL BE 1/8 IN. OR LESS IN ANY DIRECTION AS DETERMINED NEAR INSIDE/OUTSIDE EDGES AS APPLICABLE. OPTIONALLY, FOAM MAY BE POURED-IN-PLACE THROUGH ACCESS PORTS IN THE OUTER SKINS (NOT SHOWN).
STRAIN AND 75°F OF 430 PSI IN THE AS-INSTALLED RADIAL DIRECTION. revised to CLEARANCE BETWEEN THE FOAM CORES AND ALL OUTER SKIN MATERIALS SHALL BE 1/8 IN. OR LESS IN ANY DIRECTION AS DETERMINED NEAR INSIDE/OUTSIDE EDGES AS APPLICABLE. OPTIONALLY, FOAM MAY BE POURED-IN-PLACE THROUGH ACCESS PORTS IN THE OUTER SKINS (NOT SHOWN).
MATERIAL SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 10% STRAIN AND 75° +/-5°F OF 430 PSI IN THE AS-INSTALLED RADIAL DIRECTION.
MATERIAL SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 10% STRAIN AND 75° +/-5°F OF 430 PSI IN THE AS-INSTALLED RADIAL DIRECTION.
February 2021                                                                                              A-16
Revised to be consistent with new shielded container drawings. No impact to safety basis.


ATTACHMENT A - Summary of Revisions SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet     Zone               Change Description                               Justification 1       B3 F/N 22: WELD JOINTS MAY OPTIONALLY         Revised to be consistent with new shielded INCORPORATE BACKING BARS, 1/16 IN.          container drawings. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-17 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification 1
B3 F/N 22: WELD JOINTS MAY OPTIONALLY INCORPORATE BACKING BARS, 1/16 IN.
THICK ANGLES, OR OTHER SIMILAR REINFORCEMENT. INNER AND OUTER PLATES MAY OPTIONALLY INCLUDE ROLLED EDGE(S) WHICH OVERLAP AND ARE ATTACHED TO THE INNER AND OUTER SHELLS USING 1/16 IN. FILLET WELDS.
THICK ANGLES, OR OTHER SIMILAR REINFORCEMENT. INNER AND OUTER PLATES MAY OPTIONALLY INCLUDE ROLLED EDGE(S) WHICH OVERLAP AND ARE ATTACHED TO THE INNER AND OUTER SHELLS USING 1/16 IN. FILLET WELDS.
INDEPENDENT OF CORNER JOINT DETAIL, FOAM EDGES MAY INCLUDE UP TO 3/8 IN.
INDEPENDENT OF CORNER JOINT DETAIL, FOAM EDGES MAY INCLUDE UP TO 3/8 IN.
Line 168: Line 181:
CORNER CONNECTING COMPONENTS MAY OPTIONALLY INCLUDE ROLLED EDGE(s)
CORNER CONNECTING COMPONENTS MAY OPTIONALLY INCLUDE ROLLED EDGE(s)
WHICH OVERLAP USING 1/16-IN. FILLET WELDS. INDEPENDENT OF CORNER JOINT DETAIL, FOAM EDGES MAY INCLUDE UP TO 1 IN. CHAMFERS AND/OR BE COVERED BY ALUMINUM TAPE OR EQUIVALENT TO PROTECT FOAM DURING WELDING.
WHICH OVERLAP USING 1/16-IN. FILLET WELDS. INDEPENDENT OF CORNER JOINT DETAIL, FOAM EDGES MAY INCLUDE UP TO 1 IN. CHAMFERS AND/OR BE COVERED BY ALUMINUM TAPE OR EQUIVALENT TO PROTECT FOAM DURING WELDING.
1       A3 Added F/N 23 and F/N 24                     Revised to be consistent with new shielded container drawings. No impact to safety basis.
Revised to be consistent with new shielded container drawings. No impact to safety basis.
2       D6 Removed on 21.81 H.C. and 2X, 144° APART Detail relocated (sheet 3 D8 and D7) and revised to be consistent with new shielded container drawings. No impact to safety basis.
1 A3 Added F/N 23 and F/N 24 Revised to be consistent with new shielded container drawings. No impact to safety basis.
February 2021                                                                                                A-17
2 D6 Removed on 21.81 H.C. and 2X, 144° APART Detail relocated (sheet 3 D8 and D7) and revised to be consistent with new shielded container drawings. No impact to safety basis.  


ATTACHMENT A - Summary of Revisions SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet     Zone               Change Description                                 Justification 2       D5 Added reference to F/N 24                   To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-18 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification 2
To facilitate option to add a non-structural seal 2        D5  Included Optional seal weld weld to eliminate potential contamination crevice.
D5 Added reference to F/N 24 To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.
2       D4 Removed ON 21.81 H.C. and 3X, EQ. SP. @ Detail relocated (sheet 3 B6 and B5) and shown 120°                                      differently on drawing to be consistent with new shielded container drawings. No impact to safety basis.
2 D5 Included Optional seal weld To facilitate option to add a non-structural seal weld to eliminate potential contamination crevice.
2       D2 Added reference to F/N 24                   To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.
2 D4 Removed ON 21.81 H.C. and 3X, EQ. SP. @
2       D1 Added reference to F/N 24                   To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.
120° Detail relocated (sheet 3 B6 and B5) and shown differently on drawing to be consistent with new shielded container drawings. No impact to safety basis.
2       D1 Added reference to F/N 24                   To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.
2 D2 Added reference to F/N 24 To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.
2       C4 Added LID ASSEMBLY SHT 3                 Revised to be consistent with new shielded container drawings. No impact to safety basis.
2 D1 Added reference to F/N 24 To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.
2       C3 Added reference to F/N 24                   To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.
2 D1 Added reference to F/N 24 To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.
2       C2 Added 3X MAX                             Revised to clarify that there may be up to 3 plugs.
2 C4 Added LID ASSEMBLY SHT 3 Revised to be consistent with new shielded container drawings. No impact to safety basis.
No impact to safety basis.
2 C3 Added reference to F/N 24 To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.
February 2021                                                                                                  A-18
2 C2 Added 3X MAX Revised to clarify that there may be up to 3 plugs.
No impact to safety basis.  


ATTACHMENT A - Summary of Revisions SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet     Zone               Change Description                                   Justification 2       B4 Added BODY ASSEMBLY SHT 3                   Revised to be consistent with new shielded container drawings. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-19 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification 2
2       B4 Added reference to F/N 24                     To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.
B4 Added BODY ASSEMBLY SHT 3 Revised to be consistent with new shielded container drawings. No impact to safety basis.
2       B4 Added reference to F/N 23                     Revised to clarify material of filter shield plug lead.
2 B4 Added reference to F/N 24 To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.
2 B4 Added reference to F/N 23 Revised to clarify material of filter shield plug lead.
No impact to safety basis.
No impact to safety basis.
2       B1 Revised from Material: BLK AS SAE J429, GR 8 Revised to clarify that steel and grade 8 material is 15X to STEEL, GR 8                        sufficient for required material properties. No impact to safety basis.
2 B1 Revised from Material: BLK AS SAE J429, GR 8 15X to STEEL, GR 8 Revised to clarify that steel and grade 8 material is sufficient for required material properties. No impact to safety basis.
3       D8 Added 144°                                 Revised to be consistent with new shielded container drawings. No impact to safety basis.
3 D8 Added 144° Revised to be consistent with new shielded container drawings. No impact to safety basis.
3       D7 Revised 18° to hard dimension                 Revised to be consistent with new shielded container drawings. No impact to safety basis.
3 D7 Revised 18° to hard dimension Revised to be consistent with new shielded container drawings. No impact to safety basis.
3       D7 Added 21.81 B.C.                           Revised to be consistent with new shielded container drawings. No impact to safety basis.
3 D7 Added 21.81 B.C.
3       D6 Revised 24° to hard dimension                 Revised to be consistent with new shielded container drawings. No impact to safety basis.
Revised to be consistent with new shielded container drawings. No impact to safety basis.
3       D5 Added (DO NOT BREAK THRU)                   Revised to be consistent with new shielded container drawings. No impact to safety basis.
3 D6 Revised 24° to hard dimension Revised to be consistent with new shielded container drawings. No impact to safety basis.
3       D5 Removed tolerance                             Redundant to tolerance block. No impact to safety basis.
3 D5 Added (DO NOT BREAK THRU)
3       D3 Added (LID BOLT HOLE)                       Revised to be consistent with new shielded container drawings. No impact to safety basis.
Revised to be consistent with new shielded container drawings. No impact to safety basis.
February 2021                                                                                                      A-19
3 D5 Removed tolerance Redundant to tolerance block. No impact to safety basis.
3 D3 Added (LID BOLT HOLE)
Revised to be consistent with new shielded container drawings. No impact to safety basis.  


ATTACHMENT A - Summary of Revisions SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet     Zone               Change Description                               Justification 3       D1 Removed x.94 DRILL ON 21.81 H.C. 15X, EQ. x.94 drill information removed from SAR drawing SP. @ 24°                                  because the 1/2 -13UNC depth symbol .88 provides adequate detail. The location and spacing details are relocated (sheet 3 D7 and D6) and shown differently on drawing to be consistent with new shielded container drawings. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-20 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification 3
3       C8 Body Assembly moved from A8 and deleted     Revised to be consistent with new shielded SHIELDED CONTAINER                        container drawings. No impact to safety basis.
D1 Removed x.94 DRILL ON 21.81 H.C. 15X, EQ.
3       C6 Removed LIFT ATTACHMENT HOLE 3X           Detail relocated (sheet 3 B4) on drawing to be consistent with new shielded container drawings.
SP. @ 24° x.94 drill information removed from SAR drawing because the 1/2 -13UNC depth symbol.88 provides adequate detail. The location and spacing details are relocated (sheet 3 D7 and D6) and shown differently on drawing to be consistent with new shielded container drawings. No impact to safety basis.
3 C8 Body Assembly moved from A8 and deleted SHIELDED CONTAINER Revised to be consistent with new shielded container drawings. No impact to safety basis.
3 C6 Removed LIFT ATTACHMENT HOLE 3X Detail relocated (sheet 3 B4) on drawing to be consistent with new shielded container drawings.
No impact to safety basis.
No impact to safety basis.
3       C5 Added 18°                                   Revised to be consistent with new shielded container drawings. No impact to safety basis.
3 C5 Added 18° Revised to be consistent with new shielded container drawings. No impact to safety basis.
3       C4 Removed tolerance                           Redundant to tolerance block. No impact to safety basis.
3 C4 Removed tolerance Redundant to tolerance block. No impact to safety basis.
3       C4 Clarified chamfer call out                 Revised to be consistent with new shielded container drawings. No impact to safety basis.
3 C4 Clarified chamfer call out Revised to be consistent with new shielded container drawings. No impact to safety basis.
3       C4 Added GROOVE                             Revised to be consistent with new shielded container drawings. No impact to safety basis.
3 C4 Added GROOVE Revised to be consistent with new shielded container drawings. No impact to safety basis.
3       C3 Revised the dimensioning of the hole and   Revised dimensioning to be consistent with removed 2X, 144° APART                   ANSI-Y14.5. Removed detail relocated (sheet 3 B6) on drawing to be consistent with new shielded container drawings. No impact to safety basis.
3 C3 Revised the dimensioning of the hole and removed 2X, 144° APART Revised dimensioning to be consistent with ANSI-Y14.5. Removed detail relocated (sheet 3 B6) on drawing to be consistent with new shielded container drawings. No impact to safety basis.
3       B8 Revised to use fractional dimension         Revised to be consistent with new shielded container drawings. No impact to safety basis.
3 B8 Revised to use fractional dimension Revised to be consistent with new shielded container drawings. No impact to safety basis.
3       B6 Added 144° to note location of features     Revised to be consistent with new shielded container drawings. No impact to safety basis.
3 B6 Added 144° to note location of features Revised to be consistent with new shielded container drawings. No impact to safety basis.  
February 2021                                                                                                A-20


ATTACHMENT A - Summary of Revisions SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet     Zone               Change Description                                   Justification 3       B5 Added 14 B.C. and 21.81 B.C. to note location of Revised to be consistent with new shielded features                                        container drawings. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-21 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification 3
3       B4 Removed LID BOLT HOLE 15X                     Detail relocated (sheet 3 D3) on drawing to be consistent with new shielded container drawings.
B5 Added 14 B.C. and 21.81 B.C. to note location of features Revised to be consistent with new shielded container drawings. No impact to safety basis.
3 B4 Removed LID BOLT HOLE 15X Detail relocated (sheet 3 D3) on drawing to be consistent with new shielded container drawings.
No impact to safety basis.
No impact to safety basis.
3       B4 Detail 13 added to show clarifications           Revised to be consistent with new shielded container drawings. No impact to safety basis.
3 B4 Detail 13 added to show clarifications Revised to be consistent with new shielded container drawings. No impact to safety basis.
3       B1 Added 3X MAX                                   Revised to be consistent with new shielded container drawings. No impact to safety basis.
3 B1 Added 3X MAX Revised to be consistent with new shielded container drawings. No impact to safety basis.
3       A6 Deleted SHIELDED CONTAINER                     Revised to be consistent with new shielded container drawings. No impact to safety basis.
3 A6 Deleted SHIELDED CONTAINER Revised to be consistent with new shielded container drawings. No impact to safety basis.
3       A5 Relocated spring pin information                 Detail relocated (sheet 3 A3, new Section R-R) on drawing to be consistent with new shielded container drawings. No impact to safety basis.
3 A5 Relocated spring pin information Detail relocated (sheet 3 A3, new Section R-R) on drawing to be consistent with new shielded container drawings. No impact to safety basis.
3       A5 Added SEAL & SLOTTED SPRING PIN                 Revised to be consistent with new shielded REMOVED FOR CLARITY                            container drawings. No impact to safety basis.
3 A5 Added SEAL & SLOTTED SPRING PIN REMOVED FOR CLARITY Revised to be consistent with new shielded container drawings. No impact to safety basis.
3       A3 Added Section R-R                               Revised to be consistent with new shielded container drawings. No impact to safety basis.
3 A3 Added Section R-R Revised to be consistent with new shielded container drawings. No impact to safety basis.
4       D4 Revised material call out to reference F/N 16    The note better defines the aluminum material.
4 D4 Revised material call out to reference F/N 16 The note better defines the aluminum material.
Revised to be consistent with new shielded container drawings. No impact to safety basis.
4        D3  Revised material call out to reference F/N 16   The note better defines the aluminum material.
Revised to be consistent with new shielded container drawings. No impact to safety basis.
Revised to be consistent with new shielded container drawings. No impact to safety basis.
4       C4  Revised material call out to reference F/N 17    The note better defines the aluminum material.
4 D3 Revised material call out to reference F/N 16 The note better defines the aluminum material.
Revised to be consistent with new shielded container drawings. No impact to safety basis.
Revised to be consistent with new shielded container drawings. No impact to safety basis.
February 2021                                                                                                    A-21
4 C4 Revised material call out to reference F/N 17 The note better defines the aluminum material.
Revised to be consistent with new shielded container drawings. No impact to safety basis.


ATTACHMENT A - Summary of Revisions SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet     Zone               Change Description                                 Justification 4       C4 Revised material call out to reference F/N 17 The note better defines the aluminum material.
ATTACHMENT A - Summary of Revisions February 2021 A-22 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification 4
C4 Revised material call out to reference F/N 17 The note better defines the aluminum material.
Revised to be consistent with new shielded container drawings. No impact to safety basis.
Revised to be consistent with new shielded container drawings. No impact to safety basis.
4       C3 Revised material call out to reference F/N 17 The note better defines the aluminum material.
4 C3 Revised material call out to reference F/N 17 The note better defines the aluminum material.
Revised to be consistent with new shielded container drawings. No impact to safety basis.
Revised to be consistent with new shielded container drawings. No impact to safety basis.
4       C1 Added chamfer description to new Section L-L Revised to be consistent with new shielded container drawings. No impact to safety basis.
4 C1 Added chamfer description to new Section L-L Revised to be consistent with new shielded container drawings. No impact to safety basis.
4       B1 View L-L revised to new Section L-L           Revised to be consistent with new shielded container drawings. No impact to safety basis.
4 B1 View L-L revised to new Section L-L Revised to be consistent with new shielded container drawings. No impact to safety basis.
5       C2 Removed F/N 22 from detail 9                 Detail relocated (sheet 5 B7) on drawing to be consistent with new shielded container drawings.
5 C2 Removed F/N 22 from detail 9 Detail relocated (sheet 5 B7) on drawing to be consistent with new shielded container drawings.
No impact to safety basis.
No impact to safety basis.
5       B8 Added (SLOT FOAM AS REQUIRED FOR LIFT       Revised to be consistent with new shielded PIN CLEARANCE)                              container drawings. No impact to safety basis.
5 B8 Added (SLOT FOAM AS REQUIRED FOR LIFT PIN CLEARANCE)
5       B7 Relocated F/N 22 to assembly and added       Revised to be consistent with new shielded SC-30G1                                    container drawings. No impact to safety basis.
Revised to be consistent with new shielded container drawings. No impact to safety basis.
5       B4 Removed F/N 22 from detail 7                 Detail relocated (sheet 5 B7) on drawing to be consistent with new shielded container drawings.
5 B7 Relocated F/N 22 to assembly and added SC-30G1 Revised to be consistent with new shielded container drawings. No impact to safety basis.
5 B4 Removed F/N 22 from detail 7 Detail relocated (sheet 5 B7) on drawing to be consistent with new shielded container drawings.
No impact to safety basis.
No impact to safety basis.
5       A4 Removed F/N 22 from detail 8                 Detail relocated (sheet 5 B7) on drawing to be consistent with new shielded container drawings.
5 A4 Removed F/N 22 from detail 8 Detail relocated (sheet 5 B7) on drawing to be consistent with new shielded container drawings.
No impact to safety basis.
No impact to safety basis.
5       A2 Removed F/N 22 from detail 10                 Detail relocated (sheet 5 B7) on drawing to be consistent with new shielded container drawings.
5 A2 Removed F/N 22 from detail 10 Detail relocated (sheet 5 B7) on drawing to be consistent with new shielded container drawings.
No impact to safety basis.
No impact to safety basis.
6       B7 Added F/N 22 to assembly and added SC-30G1 Revised to be consistent with new shielded container drawings. No impact to safety basis.
6 B7 Added F/N 22 to assembly and added SC-30G1 Revised to be consistent with new shielded container drawings. No impact to safety basis.  
February 2021                                                                                                A-22


ATTACHMENT A - Summary of Revisions Criticality Control Overpack SAR Drawing, 163-009, Revision 2 Sheet     Zone                 Change Description                                     Justification 1       C3 Added the following language to the end of Flag   This change is part of an effort to accommodate Note 8: "IF USED, THE LIFTING ATTACHMENT         alternate lift attachment designs. The SHALL PROTRUDE NO MORE THAN 5/8-INCH             implemented height restriction on lift attachments ABOVE THE TOP OF THE CCC LID WHEN                 ensures compliance with the original HAC drop ASSEMBLED IN THE CCO."                            testing of the CCO. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-23 Criticality Control Overpack SAR Drawing, 163-009, Revision 2 Sheet Zone Change Description Justification 1
2       D4 Updated the heavy hex head bolt leader note to   This change is part of an effort to accommodate remove "STAINLESS" from the material             robotic handling of the CCCs. By allowing ferritic description and add the following to the material bolt materials to be utilized, magnetics can be specification: ".OR SAE J429, GRADE 2 MIN."     used to remotely grapple the CCC lid closure bolts. The mechanical properties of SAE J429 Grade 2 material are superior to those of ASTM A193 Grade 8, Class 1 with regard to yield and tensile minimum strengths. With regard to fracture toughness, NUREG/CR-1815 Section 5 excludes bolts from consideration as fracture-critical components. No impact to safety basis.
C3 Added the following language to the end of Flag Note 8: "IF USED, THE LIFTING ATTACHMENT SHALL PROTRUDE NO MORE THAN 5/8-INCH ABOVE THE TOP OF THE CCC LID WHEN ASSEMBLED IN THE CCO."
2       C4 Added to the lift attachment leader note the     This change is intended to clarify the intent of following: "(HOIST RING DEPICTED FOR              depicting a hoist ring on the CCO SAR drawing.
This change is part of an effort to accommodate alternate lift attachment designs. The implemented height restriction on lift attachments ensures compliance with the original HAC drop testing of the CCO. No impact to safety basis.
VISUAL REFERENCE ONLY)"                          Lift attachments are optional and a hoist ring is depicted for visual reference only as a representative lift attachment. No impact to safety basis.
2 D4 Updated the heavy hex head bolt leader note to remove "STAINLESS" from the material description and add the following to the material specification: ".OR SAE J429, GRADE 2 MIN."
2       A2 Revised the parenthetical of the blind flange     The blind flange utilized as the base of the CCC is (base) leader note to the following: "(HOLES     an off-the-shelf, industry standard component that AND RAISED FACE ARE OPTIONAL)"                    acts as a base plate for the CCC confinement boundary. Features like the through holes and the raised face, which are intended for forming a bolted, pressure tight joint with other ASME flanged components, and are not necessary for the function of the CCC base. No impact to safety basis.
This change is part of an effort to accommodate robotic handling of the CCCs. By allowing ferritic bolt materials to be utilized, magnetics can be used to remotely grapple the CCC lid closure bolts. The mechanical properties of SAE J429 Grade 2 material are superior to those of ASTM A193 Grade 8, Class 1 with regard to yield and tensile minimum strengths. With regard to fracture toughness, NUREG/CR-1815 Section 5 excludes bolts from consideration as fracture-critical components. No impact to safety basis.
February 2021                                                                                                        A-23
2 C4 Added to the lift attachment leader note the following: "(HOIST RING DEPICTED FOR VISUAL REFERENCE ONLY)"
This change is intended to clarify the intent of depicting a hoist ring on the CCO SAR drawing.
Lift attachments are optional and a hoist ring is depicted for visual reference only as a representative lift attachment. No impact to safety basis.
2 A2 Revised the parenthetical of the blind flange (base) leader note to the following: "(HOLES AND RAISED FACE ARE OPTIONAL)"
The blind flange utilized as the base of the CCC is an off-the-shelf, industry standard component that acts as a base plate for the CCC confinement boundary. Features like the through holes and the raised face, which are intended for forming a bolted, pressure tight joint with other ASME flanged components, and are not necessary for the function of the CCC base. No impact to safety basis.  


ATTACHMENT A - Summary of Revisions SC-30G2 Shielded Container SAR Drawing, 163-010, Revision 0 Sheet         Zone             Change Description                             Justification General     New drawing                               New drawing SC-30G3 Shielded Container SAR Drawing, 163-011, Revision 0 Sheet         Zone             Change Description                             Justification General     New drawing                               New drawing SC-55G1 Shielded Container SAR Drawing, 163-012, Revision 0 Sheet         Zone             Change Description                             Justification General     New drawing                               New drawing SC-55G2 Shielded Container SAR Drawing, 163-013, Revision 0 Sheet         Zone             Change Description                             Justification General     New drawing.                               New drawing February 2021                                                                                    A-24
ATTACHMENT A - Summary of Revisions February 2021 A-24 SC-30G2 Shielded Container SAR Drawing, 163-010, Revision 0 Sheet Zone Change Description Justification General New drawing New drawing SC-30G3 Shielded Container SAR Drawing, 163-011, Revision 0 Sheet Zone Change Description Justification General New drawing New drawing SC-55G1 Shielded Container SAR Drawing, 163-012, Revision 0 Sheet Zone Change Description Justification General New drawing New drawing SC-55G2 Shielded Container SAR Drawing, 163-013, Revision 0 Sheet Zone Change Description Justification General New drawing.
New drawing  


ATTACHMENT A - Summary of Revisions CH-TRAMPAC, Revision 6, February 2021 Section         Page                     Change Description                                 Justification General           Revised header for date.                       Administrative change. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-25 CH-TRAMPAC, Revision 6, February 2021 Section Page Change Description Justification General Revised header for date.
xiii, xiv Revised to update the List of CH-TRU Payload   Administrative change. No impact to safety basis.
Administrative change. No impact to safety basis.
Appendices 1.5, 1.5.1,    xi, 1.5-1  Revised to delete references to the hardcopy    Revision required to reflect the anticipated 1.5.2, 4.2,       thru    document version of the CH-TRUCON              electronic management of the CH-TRUCON 5.1.2.1,     1.5-3,    (DOE/WIPP 01-3194), to rephrase steps requiring content, which will replace the current hardcopy 5.1.2.2,     4.2-1,    the completion of CH-TRUCON development        document. CH-TRUCON required elements are 5.2.4.2,     5.1-4,    steps in writing, and to edit outdated        unchanged. No impact to safety basis.
xiii, xiv Revised to update the List of CH-TRU Payload Appendices Administrative change. No impact to safety basis.
6.2.1.1.1,      5.1-5,   descriptions of the CH-TRUCON content.
1.5, 1.5.1, 1.5.2, 4.2, 5.1.2.1, 5.1.2.2, 5.2.4.2, 6.2.1.1.1, 6.2.1.1.2 xi, 1.5-1 thru 1.5-3, 4.2-1, 5.1-4, 5.1-5, 5.2-25, 5.2-26, 6.2-2, 6.2-9 Revised to delete references to the hardcopy document version of the CH-TRUCON (DOE/WIPP 01-3194), to rephrase steps requiring the completion of CH-TRUCON development steps in writing, and to edit outdated descriptions of the CH-TRUCON content.
6.2.1.1.2    5.2-25, 5.2-26, 6.2-2, 6.2-9 2.1.1, 2.3.1.1,   2.1-1,    Revised to rename the currently authorized      Revision required to differentiate currently 3.2.1, 3.3.1.1,   2.3-1,    shielded container assembly design to SC-30G1 authorized shielded container assembly from the 5.2.5.3.3,     3.2-1,                                                    new shielded container designs. No impact to 6.2.1.1.1     3.3-1,                                                   safety basis.
Revision required to reflect the anticipated electronic management of the CH-TRUCON content, which will replace the current hardcopy document. CH-TRUCON required elements are unchanged. No impact to safety basis.
5.2-38, 5.2-40, 6.2-2 2.1.1, 2.3.1.1,   2.1-1,    Revised to add new authorized payload          Revisions define the payload controls necessary 2.9.12,       2.3-1,    containers (SC-30G2, SC-30G3, SC-55G1, and      for the new payload containers.
2.1.1, 2.3.1.1, 3.2.1, 3.3.1.1, 5.2.5.3.3, 6.2.1.1.1 2.1-1, 2.3-1, 3.2-1, 3.3-1, 5.2-38, 5.2-40, 6.2-2 Revised to rename the currently authorized shielded container assembly design to SC-30G1 Revision required to differentiate currently authorized shielded container assembly from the new shielded container designs. No impact to safety basis.
2.9.13,       2.9-47    SC-55G2) for shipment in the HalfPACT 2.9.14,         thru    packaging.
2.1.1, 2.3.1.1, 2.9.12, 2.9.13, 2.9.14, 2.9.15, 3.2.1, 3.3.1.1, 3.3.2.1, 5.1, 5.2.5.3.3, 6.2.1.1.1 2.1-1, 2.3-1, 2.9-47 thru 2.9-62, 3.2-1, 3.3-1, 3.3-2, 5.1-3, 5.2-38, 6.2-2 Revised to add new authorized payload containers (SC-30G2, SC-30G3, SC-55G1, and SC-55G2) for shipment in the HalfPACT packaging.
2.9.15, 3.2.1,  2.9-62, 3.3.1.1,     3.2-1, 3.3.2.1, 5.1,   3.3-1, 5.2.5.3.3,     3.3-2, 6.2.1.1.1      5.1-3, 5.2-38, 6.2-2 February 2021                                                                                                              A-25
Revisions define the payload controls necessary for the new payload containers.


ATTACHMENT A - Summary of Revisions CH-TRAMPAC, Revision 6, February 2021 Section   Page                   Change Description                                     Justification 2.1.2   2.1-2 Revised to use a more general reference for         The dunnage assemblies differ for the five dunnage associated with shielded container        shielded container designs in terms of using shipments.                                          radial, axial, and lateral dunnage as detailed in CH-TRAMPAC Section 2.9.
ATTACHMENT A - Summary of Revisions February 2021 A-26 CH-TRAMPAC, Revision 6, February 2021 Section Page Change Description Justification 2.1.2 2.1-2 Revised to use a more general reference for dunnage associated with shielded container shipments.
2.9.10   2.9-40 Revised to rename the currently authorized         Revision required to differentiate currently thru  shielded container assembly design to SC-30G1     authorized shielded container assembly from the 2.9-43 and to present the approved SC-30G1                 new shielded container designs and for specifications consistent with the new authorized  consistency with new Sections 2.9.12, 2.9.13, payload container specifications.                  2.9.14 and 2.9.15 added for the SC-30G2, SC-30G3, SC-55G1, and SC-55G2 shielded containers, respectively. No impact to safety basis.
The dunnage assemblies differ for the five shielded container designs in terms of using radial, axial, and lateral dunnage as detailed in CH-TRAMPAC Section 2.9.
2.9.11   2.9-44 Revised to replace "stainless steel" to steel in Text revision required for consistency with revised the description of the CCC lid -inch heavy hex     CCO SAR drawing, 163-009 Revision 2.
2.9.10 2.9-40 thru 2.9-43 Revised to rename the currently authorized shielded container assembly design to SC-30G1 and to present the approved SC-30G1 specifications consistent with the new authorized payload container specifications.
head bolts.
Revision required to differentiate currently authorized shielded container assembly from the new shielded container designs and for consistency with new Sections 2.9.12, 2.9.13, 2.9.14 and 2.9.15 added for the SC-30G2, SC-30G3, SC-55G1, and SC-55G2 shielded containers, respectively. No impact to safety basis.
3.1.1   3.1-2 Revised to change payload container FGE limits     Payload container FGE limits are not needed in to match allowed FGE per package for drums and     some cases for waste 1% by weight Be/BeO shielded containers with 1% by weight Be/BeO,     and/or not machine compacted because the to allow full credit for Pu-240 poisoning credit to structure of or containment within a payload be realized, and to allow Pu-240 poisoning credit   container is not credited in the current to be extended to a TDOP containing non-           TRUPACT-II and HalfPACT criticality analyses.
2.9.11 2.9-44 Revised to replace "stainless steel" to steel in the description of the CCC lid -inch heavy hex head bolts.
machine compacted waste with 1% by weight          No impact to safety basis.
Text revision required for consistency with revised CCO SAR drawing, 163-009 Revision 2.
Be/BeO.
3.1.1 3.1-2 Revised to change payload container FGE limits to match allowed FGE per package for drums and shielded containers with 1% by weight Be/BeO, to allow full credit for Pu-240 poisoning credit to be realized, and to allow Pu-240 poisoning credit to be extended to a TDOP containing non-machine compacted waste with 1% by weight Be/BeO.
3.1.2   3.1-3, Revised to cite current references and to update   Revisions reflect current references. No impact to 3.1-11 the Pu-239 fissile gram equivalent values in       safety basis.
Payload container FGE limits are not needed in some cases for waste 1% by weight Be/BeO and/or not machine compacted because the structure of or containment within a payload container is not credited in the current TRUPACT-II and HalfPACT criticality analyses.
thru  Table 3.1-2 consistent with these references.
No impact to safety basis.
3.1-13 February 2021                                                                                                            A-26
3.1.2 3.1-3, 3.1-11 thru 3.1-13 Revised to cite current references and to update the Pu-239 fissile gram equivalent values in Table 3.1-2 consistent with these references.
Revisions reflect current references. No impact to safety basis.  


ATTACHMENT A - Summary of Revisions CH-TRAMPAC, Revision 6, February 2021 Section     Page                   Change Description                                       Justification 5.1.1     5.1-4 Revised to clarify that the 20-day close proximity   Revision ensures that sites that are shipping shipping period is an option for shipment           within a 1,000-mile radius may also opt to use the distances within a 1,000-mile radius regardless of  more conservative 60-day default shipping period.
ATTACHMENT A - Summary of Revisions February 2021 A-27 CH-TRAMPAC, Revision 6, February 2021 Section Page Change Description Justification 5.1.1 5.1-4 Revised to clarify that the 20-day close proximity shipping period is an option for shipment distances within a 1,000-mile radius regardless of destination (rather than a required shipping period).
destination (rather than a required shipping period).
Revision ensures that sites that are shipping within a 1,000-mile radius may also opt to use the more conservative 60-day default shipping period.
5.1.1     5.1-4 Revised to allow the use of an actual hydrogen       Revision required to reflect the anticipated release rate determined for a confinement layer in   electronic management of the CH-TRUCON the shipping category determination rather than      content, which will allow determination of the use of a bounding value.                        CH-TRUCON code shipping categories without the current simplifying approach that assigns other confinement layers to one of the confinement layers listed in CH-TRU Payload Appendix 2.2.
5.1.1 5.1-4 Revised to allow the use of an actual hydrogen release rate determined for a confinement layer in the shipping category determination rather than the use of a bounding value.
Revision required to reflect the anticipated electronic management of the CH-TRUCON content, which will allow determination of CH-TRUCON code shipping categories without the current simplifying approach that assigns other confinement layers to one of the confinement layers listed in CH-TRU Payload Appendix 2.2.
CH-TRUCON code shipping category methodology is unchanged. No impact to safety basis.
CH-TRUCON code shipping category methodology is unchanged. No impact to safety basis.
5.2.4.2   5.2-26, Revised to consolidate Option 2 DAC values           Packaging configurations and DAC values added 5.2-29  previously calculated according to governing        to Tables 5.2-3, 5.2-7, and 5.2-8 were determined thru  equations and methodology defined by                per CH-TRAMPAC Section 5.2.4.2, but to date 5.2-32  CH-TRAMPAC Section 5.2.4.2. Revised to clarify      have been published in the CH-TRUCON the packaging configuration descriptions in          document (DOE/WIPP 01-3194) for Table 5.2-3.                                        implementation purposes. Revision combines all Option 2 DAC values in a single document location. No impact to safety basis.
5.2.4.2 5.2-26, 5.2-29 thru 5.2-32 Revised to consolidate Option 2 DAC values previously calculated according to governing equations and methodology defined by CH-TRAMPAC Section 5.2.4.2. Revised to clarify the packaging configuration descriptions in Table 5.2-3.
5.2.5.3   5.2-53 Revised Table 5.2-12 to replace the checkbox         Revision simplifies compliance evaluation options for individual authorized payload           documentation format. No impact to safety basis.
Packaging configurations and DAC values added to Tables 5.2-3, 5.2-7, and 5.2-8 were determined per CH-TRAMPAC Section 5.2.4.2, but to date have been published in the CH-TRUCON document (DOE/WIPP 01-3194) for implementation purposes. Revision combines all Option 2 DAC values in a single document location. No impact to safety basis.
containers with a blank field allowing for the input of an authorized payload container type.
5.2.5.3 5.2-53 Revised Table 5.2-12 to replace the checkbox options for individual authorized payload containers with a blank field allowing for the input of an authorized payload container type.
6.2.1.1.1,   6.2-7, Revised to clarify the activity limits to satisfy    Revision clarifies currently approved activity limits.
Revision simplifies compliance evaluation documentation format. No impact to safety basis.
6.2.2,   6.2-19, Normal Conditions of Transport and Hypothetical      No impact to safety basis.
6.2.1.1.1, 6.2.2, Tables 6.2-1, 6.2-3, and 6.2-5 6.2-7, 6.2-19, 6.2-23, 6.2-30, 6.2-34 Revised to clarify the activity limits to satisfy Normal Conditions of Transport and Hypothetical Accident Condition dose rate requirements in the compliance evaluation documentation.
Tables 6.2-1, 6.2-23, Accident Condition dose rate requirements in the 6.2-3, and  6.2-30, compliance evaluation documentation.
Revision clarifies currently approved activity limits.
6.2-5    6.2-34 February 2021                                                                                                                A-27
No impact to safety basis.  


ATTACHMENT A - Summary of Revisions CH-TRAMPAC, Revision 6, February 2021 Section     Page                   Change Description                                     Justification Tables 6.2-1, 6.2-19, Revised to replace the checkbox options for        Revision simplifies compliance evaluation 6.2-3, and  6.2-23, individual authorized payload containers with a    documentation format. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-28 CH-TRAMPAC, Revision 6, February 2021 Section Page Change Description Justification Tables 6.2-1, 6.2-3, and 6.2-5 6.2-19, 6.2-23, 6.2-33 Revised to replace the checkbox options for individual authorized payload containers with a blank field allowing for the input of an authorized payload container type (Section 6.2.1.1.1) or an authorized payload (Section 6.2.2) configuration.
6.2-5    6.2-33 blank field allowing for the input of an authorized payload container type (Section 6.2.1.1.1) or an authorized payload (Section 6.2.2) configuration.
Revision simplifies compliance evaluation documentation format. No impact to safety basis.
6.2.2,     6.2-19, Revised to clarify design decay heat limits per    Revision clarifies currently approved design decay Tables 6.2-1, 6.2-23, CCO and for TRUPACT-II and HalfPACT                 heat limits. No impact to safety basis.
6.2.2, Tables 6.2-1, 6.2-3, and 6.2-5 6.2-19, 6.2-23, 6.2-30, 6.2-34 Revised to clarify design decay heat limits per CCO and for TRUPACT-II and HalfPACT payloads.
6.2-3, and  6.2-30, payloads.
Revision clarifies currently approved design decay heat limits. No impact to safety basis.
6.2-5    6.2-34 Table 6.2-5 6.2-34 Revised to provide space to document the           Revision clarifies required compliance evaluation evaluation of compliance with the payload total     documentation. No impact to safety basis.
Table 6.2-5 6.2-34 Revised to provide space to document the evaluation of compliance with the payload total gas release rate limit.
gas release rate limit.
Revision clarifies required compliance evaluation documentation. No impact to safety basis.  
February 2021                                                                                                            A-28


ATTACHMENT A - Summary of Revisions CH-TRU Payload Appendices, Revision 5, February 2021 Section         Page                 Change Description                                     Justification General         Revised header for date.                           Administrative change. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-29 CH-TRU Payload Appendices, Revision 5, February 2021 Section Page Change Description Justification General Revised header for date.
2.1, 2.2, 3.8,   2.1-4, Revised to allow the use of an actual hydrogen     Revision required to reflect the anticipated 6.13          2.2-2, release rate determined for a confinement layer in electronic management of the CH-TRUCON 2.2-6, the shipping category determination rather than    content, which will allow determination of 3.8-1, the use of a bounding value.                      CH-TRUCON code shipping categories without 3.8-2,                                                    the current simplifying approach that assigns other 6.13-2,                                                    confinement layers to one of the confinement 6.13-5                                                    layers listed in CH-TRU Payload Appendix 2.2.
Administrative change. No impact to safety basis.
2.1, 2.2, 3.8, 6.13 2.1-4, 2.2-2, 2.2-6, 3.8-1, 3.8-2, 6.13-2, 6.13-5 Revised to allow the use of an actual hydrogen release rate determined for a confinement layer in the shipping category determination rather than the use of a bounding value.
Revision required to reflect the anticipated electronic management of the CH-TRUCON content, which will allow determination of CH-TRUCON code shipping categories without the current simplifying approach that assigns other confinement layers to one of the confinement layers listed in CH-TRU Payload Appendix 2.2.
CH-TRUCON code shipping category methodology is unchanged. No impact to safety basis.
CH-TRUCON code shipping category methodology is unchanged. No impact to safety basis.
2.2, 2.4       2.2-6, Revised to rename the currently authorized         Revision required to differentiate currently 2.2-8, shielded container assembly (SCA) design to       authorized SCA from the new shielded container 2.2-10, SC-30G1                                          designs. No impact to safety basis.
2.2, 2.4 2.2-6, 2.2-8, 2.2-10, 2.4-3 Revised to rename the currently authorized shielded container assembly (SCA) design to SC-30G1 Revision required to differentiate currently authorized SCA from the new shielded container designs. No impact to safety basis.
2.4-3 2.1, 2.2, 2.4    2.1-3, Revised to add new authorized payload             Revisions establish values required to apply 2.2-6, containers (SC-30G2, SC-30G3, SC-55G1, and         current compliance evaluation methodologies to 2.2-8, SC-55G2) for shipment in the HalfPACT             the new payload containers.
2.1, 2.2, 2.4 2.1-3, 2.2-6, 2.2-8, 2.2-10, 2.4-3 Revised to add new authorized payload containers (SC-30G2, SC-30G3, SC-55G1, and SC-55G2) for shipment in the HalfPACT packaging.
2.2-10, packaging.
Revisions establish values required to apply current compliance evaluation methodologies to the new payload containers.
2.4-3 2.2, 3.5       2.2-5, Revised to clarify that the 20-day close proximity Revisions ensure that sites that are shipping 3.5-1, shipping period is an option for shipment         within a 1,000-mile radius may also opt to use the 3.5-5  distances within a 1,000-mile radius regardless of more conservative 60-day default shipping period.
2.2, 3.5 2.2-5, 3.5-1, 3.5-5 Revised to clarify that the 20-day close proximity shipping period is an option for shipment distances within a 1,000-mile radius regardless of destination (rather than a required shipping period).
destination (rather than a required shipping period).
Revisions ensure that sites that are shipping within a 1,000-mile radius may also opt to use the more conservative 60-day default shipping period.  
February 2021                                                                                                              A-29


ATTACHMENT A - Summary of Revisions CH-TRU Payload Appendices, Revision 5, February 2021 Section       Page                   Change Description                                       Justification 3.9, 5.3, 6.7, 3.9-4, Revised to delete references to the hardcopy          Revision required to reflect the anticipated 6.11, 6.13     3.9-5, document version of the CH-TRUCON                     electronic management of the CH-TRUCON 5.3-4, (DOE/WIPP 01-3194), to rephrase steps requiring       content, which will replace the current hardcopy 5.3-6, the completion of CH-TRUCON development               document. CH-TRUCON required elements are 6.7-2, steps in writing, and to edit dated descriptions of unchanged. No impact to safety basis.
ATTACHMENT A - Summary of Revisions February 2021 A-30 CH-TRU Payload Appendices, Revision 5, February 2021 Section Page Change Description Justification 3.9, 5.3, 6.7, 6.11, 6.13 3.9-4, 3.9-5, 5.3-4, 5.3-6, 6.7-2, 6.11-1, 6.13-1 Revised to delete references to the hardcopy document version of the CH-TRUCON (DOE/WIPP 01-3194), to rephrase steps requiring the completion of CH-TRUCON development steps in writing, and to edit dated descriptions of the CH-TRUCON content.
6.11-1, the CH-TRUCON content.
Revision required to reflect the anticipated electronic management of the CH-TRUCON content, which will replace the current hardcopy document. CH-TRUCON required elements are unchanged. No impact to safety basis.
6.13-1 3.9       3.9-5, Revised to consolidate Option 2 DAC3 values           Packaging configurations and DAC values added 3.9-8  previously calculated according to governing          to Tables 3.9-2, 3.9-6, and 3.9-7 were determined thru  equations and methodology defined by CH-TRU          per CH-TRU Payload Appendix Section 3.9.2.2, 3.9-11  Payload Appendix Section 3.9.2.2. Revised to          but to date have been published in the CH-clarify the packaging configuration descriptions in  TRUCON document (DOE/WIPP 01-3194) for Table 3.9-2.                                          implementation purposes. Revision combines all Option 2 DAC3 values in a single document location. No impact to safety basis.
3.9 3.9-5, 3.9-8 thru 3.9-11 Revised to consolidate Option 2 DAC3 values previously calculated according to governing equations and methodology defined by CH-TRU Payload Appendix Section 3.9.2.2. Revised to clarify the packaging configuration descriptions in Table 3.9-2.
4.2, 4.3, 4.4   4.2-1, Revised to clarify the use of fiberboard dunnage   Revisions for text consistency with approved 4.3-1, in lieu of cane fiberboard dunnage consistent       drawings. No impact to safety basis.
Packaging configurations and DAC values added to Tables 3.9-2, 3.9-6, and 3.9-7 were determined per CH-TRU Payload Appendix Section 3.9.2.2, but to date have been published in the CH-TRUCON document (DOE/WIPP 01-3194) for implementation purposes. Revision combines all Option 2 DAC3 values in a single document location. No impact to safety basis.
4.4-1  with the approved SAR drawings.
4.2, 4.3, 4.4 4.2-1, 4.3-1, 4.4-1 Revised to clarify the use of fiberboard dunnage in lieu of cane fiberboard dunnage consistent with the approved SAR drawings.
4.5         All Revised to rename the currently authorized           Revision required to differentiate currently shielded container assembly design to SC-30G1       authorized shielded container assembly from the and to present the approved SC-30G1                   new shielded container designs and for documentation consistent with the new authorized      consistency with new Appendices 4.7, 4.8, 4.9, payload container safety bases.                      and 4.10 added for the SC-30G2, SC-30G3, SC-55G1, and SC-55G2 shielded containers, respectively. No impact to safety basis.
Revisions for text consistency with approved drawings. No impact to safety basis.
4.6       4.6-1 Revised to replace stainless steel with steel in Text revision required for consistency with revised description of the CCC lid -inch heavy hex head     CCO SAR drawing, 163-009 Revision 2.
4.5 All Revised to rename the currently authorized shielded container assembly design to SC-30G1 and to present the approved SC-30G1 documentation consistent with the new authorized payload container safety bases.
bolts.
Revision required to differentiate currently authorized shielded container assembly from the new shielded container designs and for consistency with new Appendices 4.7, 4.8, 4.9, and 4.10 added for the SC-30G2, SC-30G3, SC-55G1, and SC-55G2 shielded containers, respectively. No impact to safety basis.
4.7         All Added new appendix to define the safety basis for     Structural, thermal, shielding, and criticality design the SC-30G2.                                          basis for the SC-30G2 is summarized and demonstrated in the appendix.
4.6 4.6-1 Revised to replace stainless steel with steel in description of the CCC lid -inch heavy hex head bolts.
February 2021                                                                                                                  A-30
Text revision required for consistency with revised CCO SAR drawing, 163-009 Revision 2.
4.7 All Added new appendix to define the safety basis for the SC-30G2.
Structural, thermal, shielding, and criticality design basis for the SC-30G2 is summarized and demonstrated in the appendix.  


ATTACHMENT A - Summary of Revisions CH-TRU Payload Appendices, Revision 5, February 2021 Section   Page             Change Description                                     Justification 4.8     All Added new appendix to define the safety basis for Structural, thermal, shielding, and criticality design the SC-30G3.                                      basis for the SC-30G3 is summarized and demonstrated in the appendix.
ATTACHMENT A - Summary of Revisions February 2021 A-31 CH-TRU Payload Appendices, Revision 5, February 2021 Section Page Change Description Justification 4.8 All Added new appendix to define the safety basis for the SC-30G3.
4.9     All Added new appendix to define the safety basis for Structural, thermal, shielding, and criticality design the SC-55G1.                                      basis for the SC-55G1 is summarized and demonstrated in the appendix.
Structural, thermal, shielding, and criticality design basis for the SC-30G3 is summarized and demonstrated in the appendix.
4.10     All Added new appendix to define the safety basis for Structural, thermal, shielding, and criticality design the SC-55G2.                                      basis for the SC-55G2 is summarized and demonstrated in the appendix.
4.9 All Added new appendix to define the safety basis for the SC-55G1.
February 2021                                                                                                        A-31}}
Structural, thermal, shielding, and criticality design basis for the SC-55G1 is summarized and demonstrated in the appendix.
4.10 All Added new appendix to define the safety basis for the SC-55G2.
Structural, thermal, shielding, and criticality design basis for the SC-55G2 is summarized and demonstrated in the appendix.}}

Latest revision as of 10:57, 29 November 2024

5 of the TRUPACT-II Shipping Package Application, Docket No. 71-9218, and Revision 8 of the Halfpact Shipping Package Application, Docket No. 71-9279
ML21054A051
Person / Time
Site: 07109218, 07109279
Issue date: 02/23/2021
From: Sellmer T
Nuclear Waste Partnership, US Dept of Energy (DOE)
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML21054A050 List:
References
TS:21:03003, UFC:C:5822.0
Download: ML21054A051 (34)


Text

P.O. Box 2078 Carlsbad, New Mexico USA 88221-2078 Phone: (575) 234-7200 Fax: (575) 234-7083 TS:21:03003 UFC:5822.00 February 23, 2021 ATTN: Document Control Desk Director, Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

REVISION 25 OF THE TRUPACT-II SHIPPING PACKAGE APPLICATION, DOCKET NO. 71-9218, AND REVISION 8 OF THE HalfPACT SHIPPING PACKAGE APPLICATION, DOCKET NO. 71-9279

Dear Sir or Madam:

Nuclear Waste Partnership LLC, on behalf of the U.S. Department of Energy (DOE), hereby submits Revision 25 of the application for a Certificate of Compliance (CoC) for the TRUPACT-II Packaging, U.S. Nuclear Regulatory Commission (NRC) Docket No. 71-9218, and Revision 8 to the application for a CoC for the HalfPACT Packaging, NRC Docket No. 71-9279.

The primary purpose of the application is to propose the addition of four new shielded container designs as authorized payload containers for the HalfPACT packaging - SC-30G2 shielded container, SC-30G3 shielded container, SC-55G1 shielded container, and SC-55G2 shielded container. Along with the currently authorized SC-30G1 shielded container, these new shielded container designs will allow WIPP emplacement of a portion of the DOE remote-handled transuranic (RH-TRU) waste inventory in stackable configurations instead of in RH-TRU removable lid canisters1 in excavated boreholes underground. Borehole emplacement of waste was halted following the accident at the WIPP on February 14, 2014, and cannot resume until the underground facility ventilation system is upgraded as part of the recovery operations.

Currently, WIPP is able to accept for disposal only the subset of the DOE RH-TRU waste inventory that meets the requirements for HalfPACT shipment in the currently authorized SC-30G1 shielded container. The new shielded container designs will enable HalfPACT shipments of a larger portion of the RH-TRU inventory, relieving the currently strained storage capacity at DOE sites while affording safe ALARA practices for the employees prior to transport.

In addition to providing the structural, thermal, shielding, and criticality design basis for the SC-30G2, SC-30G3, SC-55G1, and SC-55G2 shielded containers, this application also includes minor revisions to drawings, administrative revisions to facilitate anticipated electronic documentation management, and technical changes outlined in Attachment A - Summary of Revisions. Technical changes are indicated by rightbars in the margin of the submittal documents summarized below.

This submission contains files, one or more of which contains hyperlinks to other files or to Internet websites. These hyperlinks are either inoperable or are not essential to the use of the 1 The RH-TRU removable lid canister is the authorized payload container for the RH-TRU 72-B Cask.

Document Control Desk TS:21:03003 P.O. Box 2078 z Carlsbad, New Mexico USA 88221-2078 Phone: (575) 234-7200 z Fax: (575) 234-7083 filing. Any material referenced by hyperlinks to Internet websites that was essential for use of this filing has been submitted as part of the filing. Any material referenced by a hyperlink to another file that was essential for the use of this filing has either been included by reference or submitted as part of this filing.

To facilitate implementation, it is requested that the current package CoCs be valid for use one year from the date of issuance of the revised CoCs.

If you have any questions regarding this submittal, please contact Scott Burns of my staff at (575) 706-7920.

Sincerely, T. E. Sellmer, Manager Packaging and Information Systems TES:clm cc: D. Foreman, CBFO K. E. Princen, CBFO D. Smith, CBFO D. L. Standiford, CBFO M. Toothman, CBFO J. A. Walker, CBFO J. Shuler, EM-4.24 J. Shenk, EM-4.24 L. F. Gelder, SRRC N. Santos Garcia, USNRC B. H. White, USNRC TODD SELLMER (Affiliate)

Digitally signed by TODD SELLMER (Affiliate)

Date: 2021.02.22 13:17:02 -07'00'

Document Control Desk TS:21:03003 P.O. Box 2078 Carlsbad, New Mexico USA 88221-2078 Phone: (575) 234-7200 Fax: (575) 234-7083 The following table summarizes the components of this submittal. No deviations occur from the NRC-prescribed PDF formatting for the submitted files. Please contact Ms. C. L. Morrison at (505) 350-3693 or cindy.morrison@wipp.ws to resolve any discrepancies in this submittal.

File Name File Size (MB)

Release Level Submittal Type 001 Transmittal Letter - February 2021.pdf

.5 Publicly Available EIE 002 TRUPACT-II SAR R25 - February 2021.pdf 39.2 Publicly Available EIE 003 HalfPACT SAR R8 - February 2021.pdf 40.9 Publicly Available EIE 004 CH-TRAMPAC R6 - February 2021.pdf 6.2 Publicly Available EIE 005 CH-TRU Payload Appendices R5 - February 2021.pdf 50.6 Publicly Available EIE 006 SCA-CAL-0001 R0 2.4 Publicly Available EIE 007 SCA-CAL-0002 R0 8.5 Publicly Available EIE 008 HPT-REP-0001 R0 58.5 Publicly Available EIE

ATTACHMENT A - Summary of Revisions February 2021 A-1 Summary Pg.

TRUPACT-II SAR, Revision 25 A-2 HalfPACT SAR, Revision 8 A-7 TRUPACT-II SAR Drawing, 2077-500SNP, Revision AA A-11 Standard Pipe Overpack SAR Drawing, 163-001, Revision 9 A-12 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 A-14 Criticality Control Overpack SAR Drawing, 163-009, Revision 2 A-23 SC-30G2 Shielded Container SAR Drawing, 163-010, Revision 0 A-24 SC-30G3 Shielded Container SAR Drawing, 163-011, Revision 0 A-24 SC-55G1 Shielded Container SAR Drawing, 163-012, Revision 0 A-24 SC-55G2 Shielded Container SAR Drawing, 163-013, Revision 0 A-24 CH-TRAMPAC, Revision 6 A-25 CH-TRU Payload Appendices, Revision 5 A-29

ATTACHMENT A - Summary of Revisions February 2021 A-2 TRUPACT-II SAR, Revision 25, February 2021 Section Page Change Description Justification Administrative SAR changes are grouped into the following categories, which are used in this summary without additional change justification:

= revisions to rename the currently authorized shielded container assembly design to SC-30G1 and to present the approved SC-30G1 analysis consistent with the new shielded container model numbers

= addition of four (4) new shielded container models (SC-30G2, SC-30G3, SC-55G1, and SC-55G2) as authorized payload containers.

= addition or revision of section heading, table or figure caption, and/or reference footnote General Revised header for revision and date.

Administrative change. No impact to safety basis.

1.1, 2.0, 2.4.1, 2.6, 2.7, 2.10.1.1.1, 2.10.3, 3.0, 3.4, 3.5, 4.2.1, 4.3-2, 4.4.1, 5.0, 6.0, 6.2, 6.3.3, 6.4.3.2.5, 7.1.7, 8.1, 9.2.1, 9.3.2 1.1-2, 2.1-1, 2.4-1, 2.6-1, 2.7-1, 2.10.1-2, 2.10.3-1, 3.1-1, 3.4-1, 3.5-1, 4.2-1, 4.3-1, 4.4-1, 5.1-1, 6.1-1, 6.2-1, 6.3-4, 6.4-7, 7.1-6, 8.1-1, 9.2-1, 9.3-1 Updated 10 CFR 71 citation.

Administrative change. No impact to safety basis.

1.1 1.1-3 Replaced Figure 1.1-1 with a color, rendered version.

Administrative change. No impact to safety basis.

1.2.1.1, 1.3.2, 5.2.1.2 1.2-1, 1.3.2-4, 5.3-2 Revised to use singular version of ten drum overpack (TDOP).

Administrative change. No impact to safety basis.

2.2.1, 2.2.2 2.2-1 thru 2.2-3 Revised to clarify that weights listed for the 55-gallon drum, 100-gallon drum, standard waste box (SWB), and TDOP are approximate.

Administrative change. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-3 TRUPACT-II SAR, Revision 25, February 2021 Section Page Change Description Justification 5.0, 5.1.1.6, 5.1.2, 5.3.1.6, 5.4.1, 5.4.2, 5.4.4.5, 5.4.4.10, 5.5.5, 5.7, 5.7.1.7 5.1-1, 5.1-4, 5.1-10, 5.1-18, 5.3-4, 5.3-16, 5.3-17, 5.4-1, 5.4-2, 5.4-7, 5.4-11, 5.5-25 thru 5.5-28, 5.5-49, 5.7-1, 5.7.1-31 Administrative change. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-4 TRUPACT-II SAR, Revision 25, February 2021 Section Page Change Description Justification 5.0, 5.1.1.7, 5.1.1.8, 5.1.1.9, 5.1.1.10, 5.3.1.7, 5.3.1.8, 5.3.1.9, 5.3.1.10, 5.4.1, 5.4.2, 5.4.4.6, 5.4.4.7, 5.4.4.8, 5.4.4.9, 5.4.4.10, 5.5.6, 5.5.7, 5.5.8, 5.5.9, 5.5.10, 5.7.1.8, 5.7.1.9, 5.7.1.10, 5.7.1.11 5.1-1, 5.1-4 thru 5.1-6, 5.1-11 thru 5.1-15, 5.1-18 thru 5.1-20, 5.3-4 thru 5.3-7, 5.3-18 thru 5.3-25, 5.4-1, 5.4-2, 5.4-8 thru 5.4-10, 5.4-12, 5.5-29 thru 5.5-50, 5.7.1-35 thru 5.7.1-72 Revised to reflect shielding analyses performed for the new shielded container designs (SC-30G2, SC-30G3, SC-55G1, SC-55G2).

The shielding analyses performed for the new shielded container designs were performed using the approved methodology documented in Section 5.0.

5.2.2, 5.4.4 5.2-2, 5.4-4 Updated 252Cf specific activity for consistency with Table 3.1-2 in CH-TRAMPAC. Updated corresponding total source strength calculation for 252Cf.

The use of the updated 252Cf specific activity value does not result in changes to the energy-based activity limits. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-5 TRUPACT-II SAR, Revision 25, February 2021 Section Page Change Description Justification Tables 5.1-3 thru 5.1-7; Tables 5.4-5 thru 5.4-11; Section 5.5.10.1.2 5.1-16 thru 5.1-18, 5.4-4 thru 5.4-7, 5.5-51 thru 5.5-54 Revised table values and example results to use the updated 252Cf specific activity value.

The use of the updated 252Cf specific activity value does not result in changes to the energy-based activity limits. No impact to safety basis.

5.5.10 5.5-49 Revised to reassign the currently approved SC-30G1 payload from Case A to Case B for distributed source eligibility.

Eligibility for all shielded container payloads will be determined as Case B. Using the Case B NUREG-1608 definition of distributed throughout is more appropriate for these payload comprised of a maximum of three payload containers than using a limited number of surface dose rate measurements for determination as Case A.

6.1, 6.4.3.4, 6.4.3.5 6.1-4, 6.4-8, 6.4-10 Revised to change payload container FGE limits to the allowed FGE per package for Cases A and C.

For drum payload configurations evaluated under Cases A and C, all fissile material within the package is assumed to consolidate into a single fissile region within the package such that no credit is taken for individual payload container confinement or material absorption. The historically-implemented 200 FGE limit on individual drums is not related to or consistent with the Case A and Case C analysis assumptions.

Therefore, the FGE limit for the package is appropriately equal to the FGE limit for an individual drum payload container (e.g., a drum at 325 FGE under Case A is allowable provided none of the other drums contain fissile material).

9.2.1, 9.3.1 9.2-1, 9.3-1 Revised to update NRC Regulatory Guide 7.10 to Version 3, June 2015.

Administrative change. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-6 TRUPACT-II SAR, Revision 25, February 2021 Section Page Change Description Justification 9.2.2 9.2-1 Revised reference from DOE Order 460.1B to DOE Order 460.1D.

Administrative change. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-7 HalfPACT SAR, Revision 8, February 2021 Section Page Change Description Justification Administrative SAR changes are grouped into the following categories, which are used in this summary without additional change justification:

= revisions to rename the currently authorized shielded container assembly design to SC-30G1 and to present the approved SC-30G1 analysis consistent with the new shielded container model numbers

= addition of four (4) new shielded container models (SC-30G2, SC-30G3, SC-55G1, and SC-55G2) as authorized payload containers.

= addition or revision of section heading, table or figure caption, and/or reference footnote General Revised header for revision and date.

Administrative change. No impact to safety basis.

1.0 1.1-1 Revised to reference the design basis evaluations for new shielded container designs (SC-30G2, SC-30G3, SC-55G1, and SC-55G2).

The structural, thermal, shielding, and criticality design bases are established in CH-TRU Payload Appendices 4.7 - 4.10 for the SC-30G2, SC-30G3, SC-55G1, and SC-55G2, respectively.

1.1 1.1-2 Revised to accommodate new shielded container payload configurations.

Administrative change. No impact to safety basis.

1.1, 2.0, 2.4.1, 2.6, 2.7, 2.10.1.1.1, 2.10.3, 3.0, 3.4, 3.5, 4.2.1, 4.3.2, 4.4.1, 5.0, 6.0, 6.2, 6.3.3, 6.4.3.2.5, 7.1.7, 8.1, 9.2.1, 9.3.2 1.1-2, 2.1-1, 2.4-1, 2.6-1, 2.7-1, 2.10.1-2, 2.10.3-1, 3.1-1, 3.4-1, 3.5-1, 4.2-1, 4.3-1, 4.4-1, 5-1, 6.1-1, 6.2-1, 6.3-4, 6.4-7, 7.1-6, 8.1-1, 9.2-1, 9.3-1 Updated 10 CFR 71 citation.

Administrative change. No impact to safety basis.

1.1 1.1-3 Replaced Figure 1.1-1 with a color, rendered version.

Administrative change. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-8 HalfPACT SAR, Revision 8, February 2021 Section Page Change Description Justification 1.3.1 1.3.1-1 Updated to reference SAR drawings for new shielded container payload configurations.

Administrative change. No impact to safety basis.

1.3.2 1.3.2-4 Revised shielded container definition to include new shielded container designs (SC-30G2, SC-30G3, SC-55G1 and SC-55G2).

Administrative change. No impact to safety basis.

2.2, 2.2.1, 2.2.2 2.2-1, 2.2-3, 2.2-7, 2.2-14 Administrative change. No impact to safety basis.

2.2, 2.2.1 2.2-1, 2.2-3 thru 2.2-5, 2.2-7, 2.2-8, 2.2-15 thru 2.2-18 Revised to reflect center of gravity calculations for the new shielded container designs (SC-30G2, SC-30G3, SC-55G1, and SC-55G2).

The center of gravity calculations for new shielded container payload configurations were performed using the approved methodology documented in Section 2.0.

2.2.1, 2.2.2 2.2-1 thru 2.2-3, 2.2-5 Revised to clarify that weights listed for the 55-gallon drum, standard waste box (SWB), and 100-gallon drum are approximate.

Administrative change. No impact to safety basis.

2.10.3.4 2.10.3-3 and 2.10.3-4 Revised to include the new shielded container designs (SC-30G2, SC-30G3, SC-55G1 and SC-55G2), and associated payload weights and configurations.

Administrative change. No impact to safety basis.

3.1.2 3.1-2 and 3.1-3 Revised to include the new shielded container designs (SC-30G2, SC-30G3, SC-55G1, and SC-55G2).

Administrative change. No impact to safety basis.

3.4.4.2.1 3.4-8, 3.4-16 thru 3.4-18 Revised to include pressure calculations for the new shielded container payloads (SC-30G2, SC-30G3, SC-55G1, and SC-55G2).

MNOP calculations for the new shielded container payloads were performed using the approved methodology documented in Section 3.4.4.

5.0 5-1 Revised to reflect shielding analyses performed for the new shielded container designs (SC-30G2, SC-30G3, SC-55G1, and SC-55G2).

Shielding analyses for the four new shielded container payload configurations are presented in TRUPACT-II SAR Section 5.0.

ATTACHMENT A - Summary of Revisions February 2021 A-9 HalfPACT SAR, Revision 8, February 2021 Section Page Change Description Justification 6.0, 6.2.7, 6.2.8, 6.3, 6.4.3.4 6.1-1, 6.1-2, 6.2-5, 6.3-1, 6.4-8 Revised descriptions of Case G and Case H to include new shielded containers (SC-30G2, SC-30G3, SC-55G1 and SC-55G2).

Criticality safety analyses for the new shielded container payload configurations are presented in CH-TRU Payload Appendices 4.7, 4.8, 4.9, and 4.10.

6.1, 6.4.3.4, 6.4.3.5 6.1-4, 6.4-8, 6.4-10 Revised to change payload container FGE limits to the allowed FGE per package for Cases A, C, G, and H.

For drum payload configurations evaluated under Cases A and C, all fissile material within the package is assumed to consolidate into a single fissile region within the package such that no credit is taken for individual payload container confinement or material absorption. The historically-implemented 200 FGE limit on individual drums is not related to or consistent with the Case A and Case C analysis assumptions.

Therefore, the FGE limit for the package is appropriately equal to the FGE limit for an individual drum payload container (e.g., a drum at 325 FGE under Case A is allowable provided none of the other drums contain fissile material).

For Cases G and H, the thick lead and/or steel walls of the shielded containers are evaluated explicitly in the criticality safety analyses to determine their impact as a neutron reflector.

However, the fissile material at the package FGE limit is modeled as a single sphere both inside and outside of the shielded containers. Thus, even for shielded container designs that allow up to three containers per HalfPACT, the analysis is not predicated on a FGE limit per container basis, thus the package limit is bounding.

ATTACHMENT A - Summary of Revisions February 2021 A-10 HalfPACT SAR, Revision 8, February 2021 Section Page Change Description Justification 7.1.4, 7.2.4 7.1-3, 7.2-2 Revised to clarify dunnage requirements for SC-30G1 and SC-30G2 payload configurations.

Administrative change. No impact to safety basis.

9.2.1, 9.3.1 9.2-1, 9.3-1 Revised to update NRC Regulatory Guide 7.10 to Version 3, June 2015.

Administrative change. No impact to safety basis.

9.2.2 9.2-1 Revised reference from DOE Order 460.1B to DOE Order 460.1D.

Administrative change. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-11 TRUPACT-II SAR Drawing, 2077-500SNP, Revision AA Sheet Zone Change Description Justification 1

A1 Updated Revision History block to include the previous Approved Revision Date for historical purposes Administrative change. No impact to safety basis.

8 C4 Removed an unintentional CAD artifact displayed.

Administrative change. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-12 Standard Pipe Overpack SAR Drawing, 163-001, Revision 9 Sheet Zone Change Description Justification General Revised title block.

Administrative change. No impact to safety basis.

1 D3 G/N 4: Removed "EACH PIPE COMPONENT SHALL BE LEAK TESTED PRIOR TO USE PER ANSI N14.5, ACCEPTANCE CRITERIA IS LEAKTIGHT.

Leak test is not required because a filter vent that meets the requirements specified in Section 2.5.1 of the CH-TRAMPAC is installed on each pipe component upon assembly for shipment. Rather than being confirmed by a leak test, weld integrity is affirmed via inspection per the ASME Code with proper filter vent and pipe component lid installation and o-ring sealing affirmed via procedural controls.

1 C3 F/N 9: Deleted "TYPE AC" Exterior grade plywood meets the structural requirements needed. The cosmetic grade defined by "TYPE AC" is not relevant to the structural requirements. No impact to safety basis.

2 D6 Removed "LEAK TEST/"

Administrative clarification of the lid feature name as FILTER VENT PORT. No impact to safety basis.

2 D6 Added (OPTIONAL)

The Part Identification No. on the lid is not critical to the fabrication or performance of the pipe component. No impact to safety basis.

3 D6 Added (OPTIONAL)

The Part Identification No. on the lid is not critical to the fabrication or performance of the pipe component. No impact to safety basis.

3 D6 Removed "LEAK TEST/"

Administrative clarification of the lid feature name as FILTER VENT PORT. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-13 Standard Pipe Overpack SAR Drawing, 163-001, Revision 9 Sheet Zone Change Description Justification 3

B7 Revised pipe component max diameter fromn12.8 MAX to n12.9 MAX Per ASTM A312/A999, for a NPS of 12, the maximum permissible outside diameter is 12.843.

This small increase in maximum pipe component diameter allows for fabrication of the 12 pipe component using standard pipe. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-14 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification General Added "SC-30G1" designator in title and throughout drawing.

Administrative change. No impact to safety basis.

1 D3 G/N 3: Deleted "SHOWN" where it follows ALL WELDS and deleted SHELL where it is used to describe materials.

Some welds may be optional and, therefore, not shown. Clarified to note that some dunnage materials and not only shell materials may be joined via CJP welding. No impact to safety basis.

1 D3 F/N 7: LEAD MEETING THE MINIMUM STRUCTURAL REQUIREMENTS OF ASTM B29. revised to LEAD THAT IS MECHANICALLY EQUIVALENT TO LEAD MEETING THE CHEMICAL REQUIREMENTS OF ASTM B29.

Revised to clarify that the optional use of radioactively contaminated lead shall be required to be mechanically equivalent to lead meeting the chemical requirements of ASTM B29 since specific structural requirements are not defined in ASTM B29. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-15 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification 1

C3 F/N 15:, WHERE CLEARANCE BETWEEN THE FOAM CORE AND ALL OUTER SKIN MATERIALS IS MAINTAINED TO LESS THAN 1/8 IN. IN ANY DIRECTION. OPTIONALLY, FOAM MAY BE POURED-IN-PLACE THROUGH ACCESS PORTS IN THE OUTER SKINS (NOT SHOWN). MATERIAL SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 10%

STRAIN AND 75°F OF 430 PSI IN THE AS-INSTALLED RADIAL DIRECTION. revised to CLEARANCE BETWEEN THE FOAM CORES AND ALL OUTER SKIN MATERIALS SHALL BE 1/8 IN. OR LESS IN ANY DIRECTION AS DETERMINED NEAR INSIDE/OUTSIDE EDGES AS APPLICABLE. OPTIONALLY, FOAM MAY BE POURED-IN-PLACE THROUGH ACCESS PORTS IN THE OUTER SKINS (NOT SHOWN).

MATERIAL SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 10% STRAIN AND 75° +/-5°F OF 430 PSI IN THE AS-INSTALLED RADIAL DIRECTION.

Revised to be consistent with new shielded container drawings. No impact to safety basis.

1 C2 F/N 16: MATERIAL: ASTM B-209/221, 6061-T6 ALUM revised to MATERIAL: ASTM B209, 6061-T6/T651 ALUM.

Revised to add additional acceptable aluminum alloy. No impact to safety basis.

1 C2 F/N 17. MATERIAL: ASTM B-221, 6061-T6 ALUM revised to MATERIAL: ASTM B210/221/241, 6061-T6/T6510/T6511 ALUM.

Revised to add additional acceptable aluminum material shapes and alloys. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-16 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification 1

B3 F/N 18. ", WHERE CLEARANCE BETWEEN THE FOAM CORE AND ALL OUTER SKIN MATERIALS IS MAINTAINED TO LESS THAN 1/8 IN. IN ANY DIRECTION. OPTIONALLY, FOAM MAY BE POURED-IN-PLACE THROUGH ACCESS PORTS IN THE OUTER SKINS (NOT SHOWN). MATERIAL SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 10%

STRAIN AND 75°F OF 430 PSI IN THE AS-INSTALLED RADIAL DIRECTION. revised to CLEARANCE BETWEEN THE FOAM CORES AND ALL OUTER SKIN MATERIALS SHALL BE 1/8 IN. OR LESS IN ANY DIRECTION AS DETERMINED NEAR INSIDE/OUTSIDE EDGES AS APPLICABLE. OPTIONALLY, FOAM MAY BE POURED-IN-PLACE THROUGH ACCESS PORTS IN THE OUTER SKINS (NOT SHOWN).

MATERIAL SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH AT 10% STRAIN AND 75° +/-5°F OF 430 PSI IN THE AS-INSTALLED RADIAL DIRECTION.

Revised to be consistent with new shielded container drawings. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-17 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification 1

B3 F/N 22: WELD JOINTS MAY OPTIONALLY INCORPORATE BACKING BARS, 1/16 IN.

THICK ANGLES, OR OTHER SIMILAR REINFORCEMENT. INNER AND OUTER PLATES MAY OPTIONALLY INCLUDE ROLLED EDGE(S) WHICH OVERLAP AND ARE ATTACHED TO THE INNER AND OUTER SHELLS USING 1/16 IN. FILLET WELDS.

INDEPENDENT OF CORNER JOINT DETAIL, FOAM EDGES MAY INCLUDE UP TO 3/8 IN.

CHAMFERS AND/OR BE COVERED BY ALUMINUM TAPE OR EQUIVALENT TO PROTECT THE FOAM DURING WELD OUT.

revised to WELD JOINTS MAY OPTIONALLY INCORPORATE BACKING BARS, ANGLES, OR OTHER SIMILAR REINFORCEMENT.

CORNER CONNECTING COMPONENTS MAY OPTIONALLY INCLUDE ROLLED EDGE(s)

WHICH OVERLAP USING 1/16-IN. FILLET WELDS. INDEPENDENT OF CORNER JOINT DETAIL, FOAM EDGES MAY INCLUDE UP TO 1 IN. CHAMFERS AND/OR BE COVERED BY ALUMINUM TAPE OR EQUIVALENT TO PROTECT FOAM DURING WELDING.

Revised to be consistent with new shielded container drawings. No impact to safety basis.

1 A3 Added F/N 23 and F/N 24 Revised to be consistent with new shielded container drawings. No impact to safety basis.

2 D6 Removed on 21.81 H.C. and 2X, 144° APART Detail relocated (sheet 3 D8 and D7) and revised to be consistent with new shielded container drawings. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-18 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification 2

D5 Added reference to F/N 24 To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.

2 D5 Included Optional seal weld To facilitate option to add a non-structural seal weld to eliminate potential contamination crevice.

2 D4 Removed ON 21.81 H.C. and 3X, EQ. SP. @

120° Detail relocated (sheet 3 B6 and B5) and shown differently on drawing to be consistent with new shielded container drawings. No impact to safety basis.

2 D2 Added reference to F/N 24 To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.

2 D1 Added reference to F/N 24 To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.

2 D1 Added reference to F/N 24 To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.

2 C4 Added LID ASSEMBLY SHT 3 Revised to be consistent with new shielded container drawings. No impact to safety basis.

2 C3 Added reference to F/N 24 To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.

2 C2 Added 3X MAX Revised to clarify that there may be up to 3 plugs.

No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-19 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification 2

B4 Added BODY ASSEMBLY SHT 3 Revised to be consistent with new shielded container drawings. No impact to safety basis.

2 B4 Added reference to F/N 24 To clarify that alternate weld joints are acceptable as long as CJP is achieved to be consistent with new shielded container drawings. No impact to safety basis.

2 B4 Added reference to F/N 23 Revised to clarify material of filter shield plug lead.

No impact to safety basis.

2 B1 Revised from Material: BLK AS SAE J429, GR 8 15X to STEEL, GR 8 Revised to clarify that steel and grade 8 material is sufficient for required material properties. No impact to safety basis.

3 D8 Added 144° Revised to be consistent with new shielded container drawings. No impact to safety basis.

3 D7 Revised 18° to hard dimension Revised to be consistent with new shielded container drawings. No impact to safety basis.

3 D7 Added 21.81 B.C.

Revised to be consistent with new shielded container drawings. No impact to safety basis.

3 D6 Revised 24° to hard dimension Revised to be consistent with new shielded container drawings. No impact to safety basis.

3 D5 Added (DO NOT BREAK THRU)

Revised to be consistent with new shielded container drawings. No impact to safety basis.

3 D5 Removed tolerance Redundant to tolerance block. No impact to safety basis.

3 D3 Added (LID BOLT HOLE)

Revised to be consistent with new shielded container drawings. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-20 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification 3

D1 Removed x.94 DRILL ON 21.81 H.C. 15X, EQ.

SP. @ 24° x.94 drill information removed from SAR drawing because the 1/2 -13UNC depth symbol.88 provides adequate detail. The location and spacing details are relocated (sheet 3 D7 and D6) and shown differently on drawing to be consistent with new shielded container drawings. No impact to safety basis.

3 C8 Body Assembly moved from A8 and deleted SHIELDED CONTAINER Revised to be consistent with new shielded container drawings. No impact to safety basis.

3 C6 Removed LIFT ATTACHMENT HOLE 3X Detail relocated (sheet 3 B4) on drawing to be consistent with new shielded container drawings.

No impact to safety basis.

3 C5 Added 18° Revised to be consistent with new shielded container drawings. No impact to safety basis.

3 C4 Removed tolerance Redundant to tolerance block. No impact to safety basis.

3 C4 Clarified chamfer call out Revised to be consistent with new shielded container drawings. No impact to safety basis.

3 C4 Added GROOVE Revised to be consistent with new shielded container drawings. No impact to safety basis.

3 C3 Revised the dimensioning of the hole and removed 2X, 144° APART Revised dimensioning to be consistent with ANSI-Y14.5. Removed detail relocated (sheet 3 B6) on drawing to be consistent with new shielded container drawings. No impact to safety basis.

3 B8 Revised to use fractional dimension Revised to be consistent with new shielded container drawings. No impact to safety basis.

3 B6 Added 144° to note location of features Revised to be consistent with new shielded container drawings. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-21 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification 3

B5 Added 14 B.C. and 21.81 B.C. to note location of features Revised to be consistent with new shielded container drawings. No impact to safety basis.

3 B4 Removed LID BOLT HOLE 15X Detail relocated (sheet 3 D3) on drawing to be consistent with new shielded container drawings.

No impact to safety basis.

3 B4 Detail 13 added to show clarifications Revised to be consistent with new shielded container drawings. No impact to safety basis.

3 B1 Added 3X MAX Revised to be consistent with new shielded container drawings. No impact to safety basis.

3 A6 Deleted SHIELDED CONTAINER Revised to be consistent with new shielded container drawings. No impact to safety basis.

3 A5 Relocated spring pin information Detail relocated (sheet 3 A3, new Section R-R) on drawing to be consistent with new shielded container drawings. No impact to safety basis.

3 A5 Added SEAL & SLOTTED SPRING PIN REMOVED FOR CLARITY Revised to be consistent with new shielded container drawings. No impact to safety basis.

3 A3 Added Section R-R Revised to be consistent with new shielded container drawings. No impact to safety basis.

4 D4 Revised material call out to reference F/N 16 The note better defines the aluminum material.

Revised to be consistent with new shielded container drawings. No impact to safety basis.

4 D3 Revised material call out to reference F/N 16 The note better defines the aluminum material.

Revised to be consistent with new shielded container drawings. No impact to safety basis.

4 C4 Revised material call out to reference F/N 17 The note better defines the aluminum material.

Revised to be consistent with new shielded container drawings. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-22 SC-30G1 Shielded Container SAR Drawing, 163-008, Revision 4 Sheet Zone Change Description Justification 4

C4 Revised material call out to reference F/N 17 The note better defines the aluminum material.

Revised to be consistent with new shielded container drawings. No impact to safety basis.

4 C3 Revised material call out to reference F/N 17 The note better defines the aluminum material.

Revised to be consistent with new shielded container drawings. No impact to safety basis.

4 C1 Added chamfer description to new Section L-L Revised to be consistent with new shielded container drawings. No impact to safety basis.

4 B1 View L-L revised to new Section L-L Revised to be consistent with new shielded container drawings. No impact to safety basis.

5 C2 Removed F/N 22 from detail 9 Detail relocated (sheet 5 B7) on drawing to be consistent with new shielded container drawings.

No impact to safety basis.

5 B8 Added (SLOT FOAM AS REQUIRED FOR LIFT PIN CLEARANCE)

Revised to be consistent with new shielded container drawings. No impact to safety basis.

5 B7 Relocated F/N 22 to assembly and added SC-30G1 Revised to be consistent with new shielded container drawings. No impact to safety basis.

5 B4 Removed F/N 22 from detail 7 Detail relocated (sheet 5 B7) on drawing to be consistent with new shielded container drawings.

No impact to safety basis.

5 A4 Removed F/N 22 from detail 8 Detail relocated (sheet 5 B7) on drawing to be consistent with new shielded container drawings.

No impact to safety basis.

5 A2 Removed F/N 22 from detail 10 Detail relocated (sheet 5 B7) on drawing to be consistent with new shielded container drawings.

No impact to safety basis.

6 B7 Added F/N 22 to assembly and added SC-30G1 Revised to be consistent with new shielded container drawings. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-23 Criticality Control Overpack SAR Drawing, 163-009, Revision 2 Sheet Zone Change Description Justification 1

C3 Added the following language to the end of Flag Note 8: "IF USED, THE LIFTING ATTACHMENT SHALL PROTRUDE NO MORE THAN 5/8-INCH ABOVE THE TOP OF THE CCC LID WHEN ASSEMBLED IN THE CCO."

This change is part of an effort to accommodate alternate lift attachment designs. The implemented height restriction on lift attachments ensures compliance with the original HAC drop testing of the CCO. No impact to safety basis.

2 D4 Updated the heavy hex head bolt leader note to remove "STAINLESS" from the material description and add the following to the material specification: ".OR SAE J429, GRADE 2 MIN."

This change is part of an effort to accommodate robotic handling of the CCCs. By allowing ferritic bolt materials to be utilized, magnetics can be used to remotely grapple the CCC lid closure bolts. The mechanical properties of SAE J429 Grade 2 material are superior to those of ASTM A193 Grade 8, Class 1 with regard to yield and tensile minimum strengths. With regard to fracture toughness, NUREG/CR-1815 Section 5 excludes bolts from consideration as fracture-critical components. No impact to safety basis.

2 C4 Added to the lift attachment leader note the following: "(HOIST RING DEPICTED FOR VISUAL REFERENCE ONLY)"

This change is intended to clarify the intent of depicting a hoist ring on the CCO SAR drawing.

Lift attachments are optional and a hoist ring is depicted for visual reference only as a representative lift attachment. No impact to safety basis.

2 A2 Revised the parenthetical of the blind flange (base) leader note to the following: "(HOLES AND RAISED FACE ARE OPTIONAL)"

The blind flange utilized as the base of the CCC is an off-the-shelf, industry standard component that acts as a base plate for the CCC confinement boundary. Features like the through holes and the raised face, which are intended for forming a bolted, pressure tight joint with other ASME flanged components, and are not necessary for the function of the CCC base. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-24 SC-30G2 Shielded Container SAR Drawing, 163-010, Revision 0 Sheet Zone Change Description Justification General New drawing New drawing SC-30G3 Shielded Container SAR Drawing, 163-011, Revision 0 Sheet Zone Change Description Justification General New drawing New drawing SC-55G1 Shielded Container SAR Drawing, 163-012, Revision 0 Sheet Zone Change Description Justification General New drawing New drawing SC-55G2 Shielded Container SAR Drawing, 163-013, Revision 0 Sheet Zone Change Description Justification General New drawing.

New drawing

ATTACHMENT A - Summary of Revisions February 2021 A-25 CH-TRAMPAC, Revision 6, February 2021 Section Page Change Description Justification General Revised header for date.

Administrative change. No impact to safety basis.

xiii, xiv Revised to update the List of CH-TRU Payload Appendices Administrative change. No impact to safety basis.

1.5, 1.5.1, 1.5.2, 4.2, 5.1.2.1, 5.1.2.2, 5.2.4.2, 6.2.1.1.1, 6.2.1.1.2 xi, 1.5-1 thru 1.5-3, 4.2-1, 5.1-4, 5.1-5, 5.2-25, 5.2-26, 6.2-2, 6.2-9 Revised to delete references to the hardcopy document version of the CH-TRUCON (DOE/WIPP 01-3194), to rephrase steps requiring the completion of CH-TRUCON development steps in writing, and to edit outdated descriptions of the CH-TRUCON content.

Revision required to reflect the anticipated electronic management of the CH-TRUCON content, which will replace the current hardcopy document. CH-TRUCON required elements are unchanged. No impact to safety basis.

2.1.1, 2.3.1.1, 3.2.1, 3.3.1.1, 5.2.5.3.3, 6.2.1.1.1 2.1-1, 2.3-1, 3.2-1, 3.3-1, 5.2-38, 5.2-40, 6.2-2 Revised to rename the currently authorized shielded container assembly design to SC-30G1 Revision required to differentiate currently authorized shielded container assembly from the new shielded container designs. No impact to safety basis.

2.1.1, 2.3.1.1, 2.9.12, 2.9.13, 2.9.14, 2.9.15, 3.2.1, 3.3.1.1, 3.3.2.1, 5.1, 5.2.5.3.3, 6.2.1.1.1 2.1-1, 2.3-1, 2.9-47 thru 2.9-62, 3.2-1, 3.3-1, 3.3-2, 5.1-3, 5.2-38, 6.2-2 Revised to add new authorized payload containers (SC-30G2, SC-30G3, SC-55G1, and SC-55G2) for shipment in the HalfPACT packaging.

Revisions define the payload controls necessary for the new payload containers.

ATTACHMENT A - Summary of Revisions February 2021 A-26 CH-TRAMPAC, Revision 6, February 2021 Section Page Change Description Justification 2.1.2 2.1-2 Revised to use a more general reference for dunnage associated with shielded container shipments.

The dunnage assemblies differ for the five shielded container designs in terms of using radial, axial, and lateral dunnage as detailed in CH-TRAMPAC Section 2.9.

2.9.10 2.9-40 thru 2.9-43 Revised to rename the currently authorized shielded container assembly design to SC-30G1 and to present the approved SC-30G1 specifications consistent with the new authorized payload container specifications.

Revision required to differentiate currently authorized shielded container assembly from the new shielded container designs and for consistency with new Sections 2.9.12, 2.9.13, 2.9.14 and 2.9.15 added for the SC-30G2, SC-30G3, SC-55G1, and SC-55G2 shielded containers, respectively. No impact to safety basis.

2.9.11 2.9-44 Revised to replace "stainless steel" to steel in the description of the CCC lid -inch heavy hex head bolts.

Text revision required for consistency with revised CCO SAR drawing, 163-009 Revision 2.

3.1.1 3.1-2 Revised to change payload container FGE limits to match allowed FGE per package for drums and shielded containers with 1% by weight Be/BeO, to allow full credit for Pu-240 poisoning credit to be realized, and to allow Pu-240 poisoning credit to be extended to a TDOP containing non-machine compacted waste with 1% by weight Be/BeO.

Payload container FGE limits are not needed in some cases for waste 1% by weight Be/BeO and/or not machine compacted because the structure of or containment within a payload container is not credited in the current TRUPACT-II and HalfPACT criticality analyses.

No impact to safety basis.

3.1.2 3.1-3, 3.1-11 thru 3.1-13 Revised to cite current references and to update the Pu-239 fissile gram equivalent values in Table 3.1-2 consistent with these references.

Revisions reflect current references. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-27 CH-TRAMPAC, Revision 6, February 2021 Section Page Change Description Justification 5.1.1 5.1-4 Revised to clarify that the 20-day close proximity shipping period is an option for shipment distances within a 1,000-mile radius regardless of destination (rather than a required shipping period).

Revision ensures that sites that are shipping within a 1,000-mile radius may also opt to use the more conservative 60-day default shipping period.

5.1.1 5.1-4 Revised to allow the use of an actual hydrogen release rate determined for a confinement layer in the shipping category determination rather than the use of a bounding value.

Revision required to reflect the anticipated electronic management of the CH-TRUCON content, which will allow determination of CH-TRUCON code shipping categories without the current simplifying approach that assigns other confinement layers to one of the confinement layers listed in CH-TRU Payload Appendix 2.2.

CH-TRUCON code shipping category methodology is unchanged. No impact to safety basis.

5.2.4.2 5.2-26, 5.2-29 thru 5.2-32 Revised to consolidate Option 2 DAC values previously calculated according to governing equations and methodology defined by CH-TRAMPAC Section 5.2.4.2. Revised to clarify the packaging configuration descriptions in Table 5.2-3.

Packaging configurations and DAC values added to Tables 5.2-3, 5.2-7, and 5.2-8 were determined per CH-TRAMPAC Section 5.2.4.2, but to date have been published in the CH-TRUCON document (DOE/WIPP 01-3194) for implementation purposes. Revision combines all Option 2 DAC values in a single document location. No impact to safety basis.

5.2.5.3 5.2-53 Revised Table 5.2-12 to replace the checkbox options for individual authorized payload containers with a blank field allowing for the input of an authorized payload container type.

Revision simplifies compliance evaluation documentation format. No impact to safety basis.

6.2.1.1.1, 6.2.2, Tables 6.2-1, 6.2-3, and 6.2-5 6.2-7, 6.2-19, 6.2-23, 6.2-30, 6.2-34 Revised to clarify the activity limits to satisfy Normal Conditions of Transport and Hypothetical Accident Condition dose rate requirements in the compliance evaluation documentation.

Revision clarifies currently approved activity limits.

No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-28 CH-TRAMPAC, Revision 6, February 2021 Section Page Change Description Justification Tables 6.2-1, 6.2-3, and 6.2-5 6.2-19, 6.2-23, 6.2-33 Revised to replace the checkbox options for individual authorized payload containers with a blank field allowing for the input of an authorized payload container type (Section 6.2.1.1.1) or an authorized payload (Section 6.2.2) configuration.

Revision simplifies compliance evaluation documentation format. No impact to safety basis.

6.2.2, Tables 6.2-1, 6.2-3, and 6.2-5 6.2-19, 6.2-23, 6.2-30, 6.2-34 Revised to clarify design decay heat limits per CCO and for TRUPACT-II and HalfPACT payloads.

Revision clarifies currently approved design decay heat limits. No impact to safety basis.

Table 6.2-5 6.2-34 Revised to provide space to document the evaluation of compliance with the payload total gas release rate limit.

Revision clarifies required compliance evaluation documentation. No impact to safety basis.

ATTACHMENT A - Summary of Revisions February 2021 A-29 CH-TRU Payload Appendices, Revision 5, February 2021 Section Page Change Description Justification General Revised header for date.

Administrative change. No impact to safety basis.

2.1, 2.2, 3.8, 6.13 2.1-4, 2.2-2, 2.2-6, 3.8-1, 3.8-2, 6.13-2, 6.13-5 Revised to allow the use of an actual hydrogen release rate determined for a confinement layer in the shipping category determination rather than the use of a bounding value.

Revision required to reflect the anticipated electronic management of the CH-TRUCON content, which will allow determination of CH-TRUCON code shipping categories without the current simplifying approach that assigns other confinement layers to one of the confinement layers listed in CH-TRU Payload Appendix 2.2.

CH-TRUCON code shipping category methodology is unchanged. No impact to safety basis.

2.2, 2.4 2.2-6, 2.2-8, 2.2-10, 2.4-3 Revised to rename the currently authorized shielded container assembly (SCA) design to SC-30G1 Revision required to differentiate currently authorized SCA from the new shielded container designs. No impact to safety basis.

2.1, 2.2, 2.4 2.1-3, 2.2-6, 2.2-8, 2.2-10, 2.4-3 Revised to add new authorized payload containers (SC-30G2, SC-30G3, SC-55G1, and SC-55G2) for shipment in the HalfPACT packaging.

Revisions establish values required to apply current compliance evaluation methodologies to the new payload containers.

2.2, 3.5 2.2-5, 3.5-1, 3.5-5 Revised to clarify that the 20-day close proximity shipping period is an option for shipment distances within a 1,000-mile radius regardless of destination (rather than a required shipping period).

Revisions ensure that sites that are shipping within a 1,000-mile radius may also opt to use the more conservative 60-day default shipping period.

ATTACHMENT A - Summary of Revisions February 2021 A-30 CH-TRU Payload Appendices, Revision 5, February 2021 Section Page Change Description Justification 3.9, 5.3, 6.7, 6.11, 6.13 3.9-4, 3.9-5, 5.3-4, 5.3-6, 6.7-2, 6.11-1, 6.13-1 Revised to delete references to the hardcopy document version of the CH-TRUCON (DOE/WIPP 01-3194), to rephrase steps requiring the completion of CH-TRUCON development steps in writing, and to edit dated descriptions of the CH-TRUCON content.

Revision required to reflect the anticipated electronic management of the CH-TRUCON content, which will replace the current hardcopy document. CH-TRUCON required elements are unchanged. No impact to safety basis.

3.9 3.9-5, 3.9-8 thru 3.9-11 Revised to consolidate Option 2 DAC3 values previously calculated according to governing equations and methodology defined by CH-TRU Payload Appendix Section 3.9.2.2. Revised to clarify the packaging configuration descriptions in Table 3.9-2.

Packaging configurations and DAC values added to Tables 3.9-2, 3.9-6, and 3.9-7 were determined per CH-TRU Payload Appendix Section 3.9.2.2, but to date have been published in the CH-TRUCON document (DOE/WIPP 01-3194) for implementation purposes. Revision combines all Option 2 DAC3 values in a single document location. No impact to safety basis.

4.2, 4.3, 4.4 4.2-1, 4.3-1, 4.4-1 Revised to clarify the use of fiberboard dunnage in lieu of cane fiberboard dunnage consistent with the approved SAR drawings.

Revisions for text consistency with approved drawings. No impact to safety basis.

4.5 All Revised to rename the currently authorized shielded container assembly design to SC-30G1 and to present the approved SC-30G1 documentation consistent with the new authorized payload container safety bases.

Revision required to differentiate currently authorized shielded container assembly from the new shielded container designs and for consistency with new Appendices 4.7, 4.8, 4.9, and 4.10 added for the SC-30G2, SC-30G3, SC-55G1, and SC-55G2 shielded containers, respectively. No impact to safety basis.

4.6 4.6-1 Revised to replace stainless steel with steel in description of the CCC lid -inch heavy hex head bolts.

Text revision required for consistency with revised CCO SAR drawing, 163-009 Revision 2.

4.7 All Added new appendix to define the safety basis for the SC-30G2.

Structural, thermal, shielding, and criticality design basis for the SC-30G2 is summarized and demonstrated in the appendix.

ATTACHMENT A - Summary of Revisions February 2021 A-31 CH-TRU Payload Appendices, Revision 5, February 2021 Section Page Change Description Justification 4.8 All Added new appendix to define the safety basis for the SC-30G3.

Structural, thermal, shielding, and criticality design basis for the SC-30G3 is summarized and demonstrated in the appendix.

4.9 All Added new appendix to define the safety basis for the SC-55G1.

Structural, thermal, shielding, and criticality design basis for the SC-55G1 is summarized and demonstrated in the appendix.

4.10 All Added new appendix to define the safety basis for the SC-55G2.

Structural, thermal, shielding, and criticality design basis for the SC-55G2 is summarized and demonstrated in the appendix.