IR 07200074/2021401: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 33: Line 33:
component of NRC's Agencywide Document Access and Management System (ADAMS).
component of NRC's Agencywide Document Access and Management System (ADAMS).


ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). To the extent possible, your response, if you choose to provide one, should not include
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). To the extent possible, your response, if you choose to provide one, should not include  


KPeters   2 any security related, personal privacy, or proprietary information so that it can be made available to the public without redaction.
KPeters  


Sincerely, Ray L. Digitally signed by Ray L. Kellar Kellar Date: 2021.03.17 08:38:59 -05'00'
any security related, personal privacy, or proprietary information so that it can be made available to the public without redaction.
Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 07200074
 
Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety  
 
Docket No. 07200074  


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Number: 07200074 License Number: NPF-87 and NPF-89 Report Number: 07200074/2021401 Enterprise Identifier: I-2021-401-0019 Licensee: Vistra Operations Company LLC Facility: Comanche Peak Nuclear Power Plant Location: Glen Rose, TX Inspection Dates: February 23 to February 25, 2021 Inspectors: D. Holman, Senior Physical Security Inspector Approved By: Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety
Docket Number:
07200074  
 
License Number:
NPF-87 and NPF-89  
 
Report Number:
07200074/2021401  
 
Enterprise Identifier: I-2021-401-0019  
 
Licensee:
Vistra Operations Company LLC  
 
Facility:
Comanche Peak Nuclear Power Plant  
 
Location:
Glen Rose, TX  
 
Inspection Dates:
February 23 to February 25, 2021  
 
Inspectors:
D. Holman, Senior Physical Security Inspector  
 
Approved By:
Ray L. Kellar, P.E., Chief
Plant Support Branch 1
Division of Reactor Safety  


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at the Fort Calhoun Station, in accordance with Inspection Procedure 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations.
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at the Fort Calhoun Station, in accordance with Inspection Procedure 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations.


List of Violations No violations of more than minor significance were identified.
List of Violations  
 
No violations of more than minor significance were identified.


=INSPECTION SCOPES=
=INSPECTION SCOPES=
Line 55: Line 89:
Inspections were conducted using Inspection Procedure 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations, and review of general license requirements contained in 72.212(b), the approved physical security plan (PSP), and applicable ISFSI security orders. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Inspections were conducted using Inspection Procedure 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations, and review of general license requirements contained in 72.212(b), the approved physical security plan (PSP), and applicable ISFSI security orders. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.


81311 - Physical Security Requirements for Independent Spent Fuel Storage Installations 1. Inspection Scope The inspector verified the licensee protects the spent fuel against the design basis threat of radiological sabotage in accordance with the provisions and requirements as are set forth in the licensees physical security plan pursuant to 10 CFR 73.55 and the conditions and exemptions under the provisions of 10 CFR 72.212(b)(9) and any site specific security orders.
81311 - Physical Security Requirements for Independent Spent Fuel Storage Installations  
 
===1. Inspection Scope===
The inspector verified the licensee protects the spent fuel against the design basis threat of radiological sabotage in accordance with the provisions and requirements as are set forth in the licensees physical security plan pursuant to 10 CFR 73.55 and the conditions and exemptions under the provisions of 10 CFR 72.212(b)(9) and any site specific security orders.


The inspector verified the licensees ISFSI physical protection measures do not decrease the effectiveness of the physical protection program for the protection of vital equipment associated with the reactor and spent fuel pool required by 10 CFR 73.55.
The inspector verified the licensees ISFSI physical protection measures do not decrease the effectiveness of the physical protection program for the protection of vital equipment associated with the reactor and spent fuel pool required by 10 CFR 73.55.


        (10 CFR 72.212(b)(9)(i).
(10 CFR 72.212(b)(9)(i).


The inspector verified the storage of spent fuel is within a protected area, in accordance with 10 CFR 73.55(e). (10 CFR 72.212(b)(9)(ii).
The inspector verified the storage of spent fuel is within a protected area, in accordance with 10 CFR 73.55(e). (10 CFR 72.212(b)(9)(ii).
Line 65: Line 102:
The inspector verified at a minimum, personnel searches are performed by physical pat-down searches or by firearms and explosives detection equipment prior to admission to the protected area. (10 CFR73.55(h)(3)) and (10 CFR 72.212(b)(9)(iii).
The inspector verified at a minimum, personnel searches are performed by physical pat-down searches or by firearms and explosives detection equipment prior to admission to the protected area. (10 CFR73.55(h)(3)) and (10 CFR 72.212(b)(9)(iii).


The inspector verified that the protected area assessment capability provides for the assessment of detected activity at the protected area perimeter and the initiation of timely response. (10 CFR 72.212(b)(9)(iv) and 10 CFR 73.55(i)(3)).
The inspector verified that the protected area assessment capability provides for the assessment of detected activity at the protected area perimeter and the initiation of timely response. (10 CFR 72.212(b)(9)(iv) and 10 CFR 73.55(i)(3)).  
 
The inspector verified the licensee protects safeguards information against unauthorized disclosure. (10 CFR 73.21 and 10 CFR 73.22).
The inspector verified the licensee protects safeguards information against unauthorized disclosure. (10 CFR 73.21 and 10 CFR 73.22).


Line 78: Line 116:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type             Designation       Description or Title                                   Revision or
Inspection
Procedure                                                                                              Date
Procedure
81311     Corrective Action IR                2021-001420, 2021-001421, 2021-001422
Type
Designation
Description or Title
Revision or
Date
81311
Corrective Action
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Corrective Action TR                2021-001455, 2021-001466, 2021-001467, 2021-001470,
IR
Documents                           2021-001471
21-001420, 2021-001421, 2021-001422
Corrective Action
Documents
Resulting from
Resulting from
Inspection
Inspection
Miscellaneous     Entry Access List ISFSI Access List                                       2/09/2021
TR
Validation List   Monthly Vital Area Validation                           11/11/2020
21-001455, 2021-001466, 2021-001467, 2021-001470,
Validation List   Monthly Vital Area Validation                           12/08/2020
21-001471
Validation List   Monthly Vital Area Validation                           01/07/2021
Miscellaneous
Form 8011-1       Escort Guidelines, Linked to SEC-302-3 R16             08/17
Entry Access List
Form STA-902-1   Access Level Form, Linked to STA-902                   Revision 13
ISFSI Access List
NRC Order EA-     ISFSI Order For Implementation of Additional Security   2004
2/09/2021
04-187            Measures Associated With Access Authorization
Validation List
Plan             CPNPP Physical Security Plan, ISFSI Annex               Revision 12
Monthly Vital Area Validation
Procedures       SEC 506           Security Equipment and Firearms Testing and Observation Revision 36
11/11/2020
SI 3.2           Access Control                                         Revision 65
Validation List
SI 5.0           ISFSI Access Control                                   Revision 7
Monthly Vital Area Validation
SI 5.2           ISFSI Security                                         Revision 6
2/08/2020
STA-902           Access To CNPP Site Areas                               Revision 26
Validation List
Monthly Vital Area Validation
01/07/2021
Form 8011-1
Escort Guidelines, Linked to SEC-302-3 R16
08/17
Form STA-902-1
Access Level Form, Linked to STA-902
Revision 13
NRC Order EA-
04-187
ISFSI Order For Implementation of Additional Security
Measures Associated With Access Authorization
2004
Plan
CPNPP Physical Security Plan, ISFSI Annex
Revision 12
Procedures
SEC 506
Security Equipment and Firearms Testing and Observation
Revision 36
SI 3.2
Access Control
Revision 65
SI 5.0
ISFSI Access Control
Revision 7
SI 5.2
ISFSI Security
Revision 6
STA-902
Access To CNPP Site Areas
Revision 26
}}
}}

Latest revision as of 10:42, 29 November 2024

(CPNPP) Independent Spent Fuel Storage Installation (ISFSI) IR 07200074/2021401 3-3
ML21064A220
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 03/17/2021
From: Ray Kellar
Division of Reactor Safety IV
To: Peters K
Vistra Operations Company
References
IR 2021401
Download: ML21064A220 (7)


Text

March 17, 2021

SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT - INDEPENDENT SPENT FUEL STORAGE INSTALLATION, PHYSICAL SECURITY REQUIREMENTS FOR INDEPENDENT SPENT FUEL STORAGE INSTALLATIONS INSPECTION REPORT 07200074/2021401

Dear Mr. Peters:

On February 25, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Comanche Peak Nuclear Power Plant independent spent fuel storage facility.

The NRC inspector discussed the results of this inspection with Mr. T. McCool, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

No violations of significance were noted and no response to this letter is required.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's Public Inspections, Exemptions, Requests for Withholding. a copy of this letter, its enclosure and your response, if you choose to provide one, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS)

component of NRC's Agencywide Document Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). To the extent possible, your response, if you choose to provide one, should not include

KPeters

any security related, personal privacy, or proprietary information so that it can be made available to the public without redaction.

Sincerely, Ray L. Kellar, P.E., Chief Plant Support Branch 1 Division of Reactor Safety

Docket No. 07200074

Enclosure:

As stated

Inspection Report

Docket Number:

07200074

License Number:

NPF-87 and NPF-89

Report Number:

07200074/2021401

Enterprise Identifier: I-2021-401-0019

Licensee:

Vistra Operations Company LLC

Facility:

Comanche Peak Nuclear Power Plant

Location:

Glen Rose, TX

Inspection Dates:

February 23 to February 25, 2021

Inspectors:

D. Holman, Senior Physical Security Inspector

Approved By:

Ray L. Kellar, P.E., Chief

Plant Support Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at the Fort Calhoun Station, in accordance with Inspection Procedure 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations.

List of Violations

No violations of more than minor significance were identified.

INSPECTION SCOPES

Inspections were conducted using Inspection Procedure 81311, Physical Security Requirements for Independent Spent Fuel Storage Installations, and review of general license requirements contained in 72.212(b), the approved physical security plan (PSP), and applicable ISFSI security orders. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

81311 - Physical Security Requirements for Independent Spent Fuel Storage Installations

1. Inspection Scope

The inspector verified the licensee protects the spent fuel against the design basis threat of radiological sabotage in accordance with the provisions and requirements as are set forth in the licensees physical security plan pursuant to 10 CFR 73.55 and the conditions and exemptions under the provisions of 10 CFR 72.212(b)(9) and any site specific security orders.

The inspector verified the licensees ISFSI physical protection measures do not decrease the effectiveness of the physical protection program for the protection of vital equipment associated with the reactor and spent fuel pool required by 10 CFR 73.55.

(10 CFR 72.212(b)(9)(i).

The inspector verified the storage of spent fuel is within a protected area, in accordance with 10 CFR 73.55(e). (10 CFR 72.212(b)(9)(ii).

The inspector verified at a minimum, personnel searches are performed by physical pat-down searches or by firearms and explosives detection equipment prior to admission to the protected area. (10 CFR73.55(h)(3)) and (10 CFR 72.212(b)(9)(iii).

The inspector verified that the protected area assessment capability provides for the assessment of detected activity at the protected area perimeter and the initiation of timely response. (10 CFR 72.212(b)(9)(iv) and 10 CFR 73.55(i)(3)).

The inspector verified the licensee protects safeguards information against unauthorized disclosure. (10 CFR 73.21 and 10 CFR 73.22).

INSPECTION RESULTS

No violations were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

On February 18, 2021, the inspector presented the security baseline inspection results to Mr. T. McCool, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

81311

Corrective Action

Documents

Resulting from

Inspection

IR

21-001420, 2021-001421, 2021-001422

Corrective Action

Documents

Resulting from

Inspection

TR

21-001455, 2021-001466, 2021-001467, 2021-001470,

21-001471

Miscellaneous

Entry Access List

ISFSI Access List

2/09/2021

Validation List

Monthly Vital Area Validation

11/11/2020

Validation List

Monthly Vital Area Validation

2/08/2020

Validation List

Monthly Vital Area Validation

01/07/2021

Form 8011-1

Escort Guidelines, Linked to SEC-302-3 R16

08/17

Form STA-902-1

Access Level Form, Linked to STA-902

Revision 13

NRC Order EA-

04-187

ISFSI Order For Implementation of Additional Security

Measures Associated With Access Authorization

2004

Plan

CPNPP Physical Security Plan, ISFSI Annex

Revision 12

Procedures

SEC 506

Security Equipment and Firearms Testing and Observation

Revision 36

SI 3.2

Access Control

Revision 65

SI 5.0

ISFSI Access Control

Revision 7

SI 5.2

ISFSI Security

Revision 6

STA-902

Access To CNPP Site Areas

Revision 26