{{#Wiki_filter:Attachment 5 of Holtec Letter 5014917 Multi-Purpose Canister (MPC) 3.1.1 COMPLETION CONDITION                       REQUIRED ACTION TIME E. Required Actions and         E.1   Remove all fuel assemblies     30 days associated Completion              from the SFSC.
{{#Wiki_filter:Multi-Purpose Canister (MPC) 3.1.1 Certificate of Compliance No. 1014 Amendment No. 165 Appendix A-100U 3.1.1-3 CONDITION REQUIRED ACTION COMPLETION TIME E.
Times not met.
Required Actions and associated Completion Times not met.
SURVEILLANCE REQUIREMENTS SURVEILLANCE                                   FREQUENCY SR 3.1.1.1         Verify that the MPC cavity has been dried in           Once, prior to accordance with the applicable limits in Table         TRANSPORT 3-1, within the specified vacuum drying time limits   OPERATIONS as applicable.
E.1 Remove all fuel assemblies from the SFSC.
SR 3.1.1.2         Verify MPC helium backfill quantity is within the     Once, prior to limit specified in Table 3-2 for the applicable MPC   TRANSPORT model. Re-performance of this surveillance is not     OPERATIONS required upon successful completion of Action C.2.2.
30 days SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.1.1 Verify that the MPC cavity has been dried in accordance with the applicable limits in Table 3-1, within the specified vacuum drying time limits as applicable.
SR 3.1.1.3         Verify that the helium leak rate through the MPC       Once, prior to vent and drain port confinement welds meets the       TRANSPORT leaktight criteria of ANSI N14.5-1997. This           OPERATIONS surveillance does not need to be performed in the MPC utilizing the REDUNDANT PORT COVER DESIGN.
Once, prior to TRANSPORT OPERATIONS SR 3.1.1.2 Verify MPC helium backfill quantity is within the limit specified in Table 3-2 for the applicable MPC model. Re-performance of this surveillance is not required upon successful completion of Action C.2.2.
Certificate of Compliance No. 1014                                        Amendment No. 165 Appendix A-100U                              3.1.1-3 1 of 1}}
Once, prior to TRANSPORT OPERATIONS SR 3.1.1.3 Verify that the helium leak rate through the MPC vent and drain port confinement welds meets the leaktight criteria of ANSI N14.5-1997. This surveillance does not need to be performed in the MPC utilizing the REDUNDANT PORT COVER DESIGN.
Once, prior to TRANSPORT OPERATIONS of Holtec Letter 5014917 1 of 1}}

Latest revision as of 10:37, 29 November 2024

HI-STORM 100 Amendment 16 Certificate of Compliance, Appendix A-100U
ML21068A367
Person / Time
Site: Holtec
Issue date: 03/09/2021
From:
Holtec
To:
Office of Nuclear Material Safety and Safeguards
Shared Package
ML21068A360 List:
References
5014917
Download: ML21068A367 (1)


Text

Multi-Purpose Canister (MPC) 3.1.1 Certificate of Compliance No. 1014 Amendment No. 165 Appendix A-100U 3.1.1-3 CONDITION REQUIRED ACTION COMPLETION TIME E.

Required Actions and associated Completion Times not met.

E.1 Remove all fuel assemblies from the SFSC.

30 days SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.1.1 Verify that the MPC cavity has been dried in accordance with the applicable limits in Table 3-1, within the specified vacuum drying time limits as applicable.

Once, prior to TRANSPORT OPERATIONS SR 3.1.1.2 Verify MPC helium backfill quantity is within the limit specified in Table 3-2 for the applicable MPC model. Re-performance of this surveillance is not required upon successful completion of Action C.2.2.

Once, prior to TRANSPORT OPERATIONS SR 3.1.1.3 Verify that the helium leak rate through the MPC vent and drain port confinement welds meets the leaktight criteria of ANSI N14.5-1997. This surveillance does not need to be performed in the MPC utilizing the REDUNDANT PORT COVER DESIGN.

Once, prior to TRANSPORT OPERATIONS of Holtec Letter 5014917 1 of 1