{{#Wiki_filter:EXHIBIT III
{{#Wiki_filter:APPENDIX K K.III-1 REV. 27, APRIL 2019 EXHIBIT III  


==SUMMARY==
==SUMMARY==
STRESS REPORT APPENDIX K      K.III-1          REV. 27, APRIL 2019
STRESS REPORT  


PBAPS UFSAR EXHIBIT III -  
PBAPS UFSAR EXHIBIT III -  
Line 30: Line 30:
The Unit 2 and 3 TPO power rerate did not change the normal operating pressure or temperature for the reactor vessel.
The Unit 2 and 3 TPO power rerate did not change the normal operating pressure or temperature for the reactor vessel.
The extended power uprate (EPU) design requirements for the reactor vessel are unchanged from the original design requirements specified on page K.III-7 of Exhibit III. The EPU did not change the normal operating pressure or temperature for the RPV.
The extended power uprate (EPU) design requirements for the reactor vessel are unchanged from the original design requirements specified on page K.III-7 of Exhibit III. The EPU did not change the normal operating pressure or temperature for the RPV.
GEH Report 0000-0100-9064-R1, Reactor Vessel Integrity - Stress and Fatigue Evaluation for PBAPS Units 2 and 3 Extended Power Uprate, June 2012 (G-080-VC-411) documents the stress and fatigue evaluation of limiting RPV components in accordance with the ASME B&PV Code, Section III. This analysis constitutes the stress report reconciliation and validates the use of the existing RPV APPENDIX K               K.III-1A             REV. 27, APRIL 2019
GEH Report 0000-0100-9064-R1, Reactor Vessel Integrity - Stress and Fatigue Evaluation for PBAPS Units 2 and 3 Extended Power Uprate, June 2012 (G-080-VC-411) documents the stress and fatigue evaluation of limiting RPV components in accordance with the ASME B&PV Code, Section III. This analysis constitutes the stress report reconciliation and validates the use of the existing RPV APPENDIX K K.III-1A REV. 27, APRIL 2019  


PBAPS UFSAR components for the EPU conditions. This analysis is primarily based on the design requirements specified in GEH certified design specification 26A8258 R2, Reactor Pressure Vessel -
PBAPS UFSAR  
 
components for the EPU conditions. This analysis is primarily based on the design requirements specified in GEH certified design specification 26A8258 R2, Reactor Pressure Vessel -
Extended Power Uprate (120% OLTP) (G-080-VC-412).
Extended Power Uprate (120% OLTP) (G-080-VC-412).
Additionally, supplementary analysis was performed by Structural Integrity Associates for the feedwater nozzle and other limiting RPV components, as documented in report PEAM-EPU-128, Environmentally Assisted Fatigue Analysis. This analysis addresses fatigue evaluation and incorporates environmental fatigue effects due to reactor coolant environment in determining the cumulative usage factors for a plant life of 60 years.
Additionally, supplementary analysis was performed by Structural Integrity Associates for the feedwater nozzle and other limiting RPV components, as documented in report PEAM-EPU-128, Environmentally Assisted Fatigue Analysis. This analysis addresses fatigue evaluation and incorporates environmental fatigue effects due to reactor coolant environment in determining the cumulative usage factors for a plant life of 60 years.
Line 38: Line 40:
documents the evaluation performed for the RSD interface with the RPV, with the conclusion that there is no impact on the stress and fatigue reconciliation performed by GEH as documented in report 0000-0100-9064-R1 (G-80-VC-411).
documents the evaluation performed for the RSD interface with the RPV, with the conclusion that there is no impact on the stress and fatigue reconciliation performed by GEH as documented in report 0000-0100-9064-R1 (G-80-VC-411).
The MUR power uprate to 4016 MWt for Units 2 and 3 did not change the normal operating pressure or temperature for the reactor vessel from those values which were established for EPU and MELLLA+.
The MUR power uprate to 4016 MWt for Units 2 and 3 did not change the normal operating pressure or temperature for the reactor vessel from those values which were established for EPU and MELLLA+.
GEH Report 003N5969 R-0, Reactor Vessel Integrity- Stress and Fatigue Evaluation for Peach Bottom Units 2 and 3 TPO, November 2016 (PEAM-MUR-0302) documents the stress and fatigue evaluation of limiting components in accordance with ASME B&PV Code Section III. This evaluation constitutes the stress reconciliation and validates the use of the existing RPV components for MUR conditions. This evaluation is primarily based on the EPU reports referenced above which are based on 102% EPU rated power (4030 MWt). The supplementary analyses of the feedwater nozzle and steam dryer support brackets referenced above are based on the power level of 4030 MWt and therefore remain bounding for MUR operation.
GEH Report 003N5969 R-0, Reactor Vessel Integrity-Stress and Fatigue Evaluation for Peach Bottom Units 2 and 3 TPO, November 2016 (PEAM-MUR-0302) documents the stress and fatigue evaluation of limiting components in accordance with ASME B&PV Code Section III. This evaluation constitutes the stress reconciliation and validates the use of the existing RPV components for MUR conditions. This evaluation is primarily based on the EPU reports referenced above which are based on 102% EPU rated power (4030 MWt). The supplementary analyses of the feedwater nozzle and steam dryer support brackets referenced above are based on the power level of 4030 MWt and therefore remain bounding for MUR operation.
APPENDIX K               K.III-1B             REV. 27, APRIL 2019
APPENDIX K K.III-1B REV. 27, APRIL 2019  


Prepare4 By:
PBAPS S.-aJ")' stress Report For Geaeral Eleetr1e - RED PElCRmTlUl II Genenl Eleetric Onler 10. 205-m56
PBAPS S.-aJ")' stress Report For Geaeral Eleetr1e - RED PElCRmTlUl II Genenl Eleetric Onler 10. 205-m56
              . . , Coatrac't 110.           610-0139-51 Prepare4 By:
.., Coatrac't 110.
I' 7
610-0139-51 I' teo gL
              //4=--     teo gL
//4=-- 7
            ~ . (~~1*" " ...-~
~
                                            ~
~. (~~1*" "...-~
                                        .- . ~_..-.---
. ~_..-.---
              ~ /?/IiUb(
~ /?/IiUb(
Jfucl ear Power Gmention D1n.~10D Tbe Babcock & Wllcox Ccapur lit. VenoD, I~aD&
Jfuclear Power Gmention D1n.~10D Tbe Babcock & Wllcox Ccapur lit. VenoD, I~aD&
Sept_bert 1970 K.III-2
Sept_bert 1970 K.III-2


PBAPS STRESS RL!lORTS C~{TIPICATION DOCl~~T Babcock   & Wilcox Co. Contrac£ No. 610-0139-51 User:   General Electric User Contra.ct No. ?05-RJ.156 All of the stress reports identified on Sheet I, dated 11-2-70 are complete and have \leen prepal:'ed in accorda.t1ce wi tIl the design specifications given on Sheet II, dated     11-2-70           The Babcock &
PBAPS STRESS RL!lORTS C~{TIPICATION DOCl~~T Babcock &Wilcox Co. Contrac£ No.
Wilcox Ca. p~essure   boundary drawings identified on Sheet III, dated 11-2-70     , and the 1965 Edition of the ASME Section !II Boiler & Pressure Vessel Code for Nuclear Vessels including addenda through hTT7oTT. -(,5._and Attested to this date   11-.3 . .70 By: ~ P, &Jt::                                   License No. E-298l0 J.P. Butti                                                 Ohio State Board Mechanical. Design Section                                 of Profession91 Nucleal:' Con~onents Engineering                           Engineers The Babcock & l-lilcox Company
610-0139-51 User:
, r " . -.......
General Electric User Contra.ct No.
K.III-3
?05-RJ.156 All of the stress reports identified on Sheet I, dated 11-2-70 are complete and have \\leen prepal:'ed in accorda.t1ce witIl the design specifications given on Sheet II, dated 11-2-70 The Babcock &
Wilcox Ca.
p~essure boundary drawings identified on Sheet III, dated 11-2-70
, and the 1965 Edition of the ASME Section !II Boiler & Pressure Vessel Code for Nuclear Vessels including addenda through hTT7oTT. -(,5._and Attested to this date 11-.3...70
,r".-.......
By: ~ P,&Jt::
J.P. Butti Mechanical. Design Section Nucleal:'
Con~onents Engineering The Babcock & l-lilcox Company K.III-3 License No. E-298l0 Ohio State Board of Profession91 Engineers


PBAPS SHEET I STRESS REPORTS November 2, 1970 HUMBER                          TITLE                                REVISION NUMBER 1         Sizing Calculations                                   0 2         Weight & Center of r,ravity Calculations             0 3         Closure Analysis                                     0 4         Feedwater Nozzle Analysis                             0 5         Control Rod Drive Nozzle Analysis                     0 6         Miscellaneous Nozzles Analysis                       0 7         Piping Reactions                                     0 8         Support Skirt Analysis                               0 9         Refueling Bellows An'l1ysis                           0
PBAPS SHEET I STRESS REPORTS HUMBER TITLE November 2, 1970 REVISION NUMBER 1
, 10         Brackets                                             0 11         Shroud Support System Analysis                       '2 12         Recirculation Outlet Nozzle Analysis                 0 13         Recirculation Inlet Nozzle Analysis                   0 14         Does Not Apply 15         CRD Hydraulic Return Nozzle Analysis                 0 16         Nozzle Ends                                           0 17         Core Spray Nozzle Analysis                           0 16         Does not apply 19         Does not apply 20         Shell Analysis                                       0 21         2" Instrwnentatj,on Nozzle Analysis                   0 Summary Report                                       2 Note:   The r~vision numb~r~ arc given in the first colwnn are those in effect at the d~~'
Sizing Calculations 0
shown on the f:i.r:;t pa2~ of this certi ficat:lc.n document and are certified provici r.-:
2 Weight &Center of r,ravity Calculations 0
by the first page is signed. Additional r(;vi~;ions must be initio.l(;d by c.utho~*i::r*
3 Closure Analysis 0
4 Feedwater Nozzle Analysis 0
5 Control Rod Drive Nozzle Analysis 0
6 Miscellaneous Nozzles Analysis 0
7 Piping Reactions 0
8 Support Skirt Analysis 0
9 Refueling Bellows An'l1ysis 0
, 10 Brackets 0
11 Shroud Support System Analysis
'2 12 Recirculation Outlet Nozzle Analysis 0
13 Recirculation Inlet Nozzle Analysis 0
14 Does Not Apply 15 CRD Hydraulic Return Nozzle Analysis 0
16 Nozzle Ends 0
17 Core Spray Nozzle Analysis 0
16 Does not apply 19 Does not apply 20 Shell Analysis 0
21 2" Instrwnentatj,on Nozzle Analysis 0
Summary Report 2
Note:
The r~vision numb~r~ arc given in the first colwnn are those in effect at the d~~'
shown on the f:i.r:;t pa2~ of this certificat:lc.n document and are certified provicir.-:
by the first page is signed.
Additional r(;vi~;ions must be initio.l(;d by c.utho~*i::r*
B&W Co. Professional Eneineers.
B&W Co. Professional Eneineers.
K.III-4
K.III-4


PBAPS II. USER SPECIFICATIONS November 2, 1970 NillffiER                               TITLJ<~                 REVISION J';'Tj}.ffi~R 211\1111        Reactor Pressure Ves~el l~rchase           9 Specificati.on with Clarification Document dated 10-22-70.
PBAPS II.
Note:     The reV1S10n numbers given are those in effect at the date sho~,~ on the first page of this certification document and are certified provided the first page is signed. Additional revisions must be initialed by authori7.l';:d IX,\'/ Co. Professional EnGi.neers.
USER SPECIFICATIONS NillffiER 211\\1111 TITLJ<~
Reactor Pressure Ves~el l~rchase Specificati.on with Clarification Document dated 10-22-70.
9 November 2, 1970 REVISION J';'Tj}.ffi~R Note:
The reV1S10n numbers given are those in effect at the date sho~,~ on the first page of this certification document and are certified provided the first page is signed.
Additional revisions must be initialed by authori7.l';:d IX,\\'/ Co. Professional EnGi.neers.
K.III-5
K.III-5


PBAPS III. BABCOCK & WILCOX CO. PRESSURE BOUNDARY DRAl'lINGS November 2, 1970 NUMBER                                 TITLE                       R ~ISION NUt>ffiFR 81745D           Shell Forming Details                     0 25466F           General Outline                           8 25467F           Outline Sections                           9 2546&           Vessel Sub-As:;cmbly                       7 12937lE           List of Material                         12 "129372E           Lower Head Assembly                       9 129373E           Lower Head Bottom Segment Assembly         8 129374E           Lower Head Upper Segment Assembly           8 129376E             Shell Segment I\ssembly Course Hl & #4     8 129377E             Shell Segment Assembly Course #3           1+
PBAPS III.
129378E           Shell Segment \;;sembly ('ourse #5         3 129379E           Shell Flange Detail                       3 129380E           Recirculation Nozzles                       1+
BABCOCK & WILCOX CO. PRESSURE BOUNDARY DRAl'lINGS November 2, 1970 NUMBER TITLE R ~ISION NUt>ffiFR 81745D Shell Forming Details 0
129381E           Steam Outlet Nozzle                       5 129382E           Feedwater Nozzle                           2 129383E           Cor~ Spray N07.71e                         3 129384F.           2" Inst. & 4" C.R.D. Hyd. System Return Nozzle                           6 129385E           4" Jet Pump Nozzle                         1+
25466F General Outline 8
129386E             Shroud Support                             6
25467F Outline Sections 9
        .129387E           Ve:;sel Attac1li'" .nt l'~h ils            5 129388E           Support Skirt                             7 129389E           Vessel Insulation Supports                 1 129390E           Vessel Thermocouple Pads                   2 12939lE           Refueling Containment Skirt               2 129392E           Closure Head ~ssembly                       7 129393E           Closure Head dazzles 129394E           Closure Head Fonning                       Z 4
2546&
129395E           Stud Assembly & Misc. Details 129396E           Stud, Nut & Washer Details                 6 129397E.         Vessel Sub-A~,,~mbly Details               7 129399E           controi Rod Nozzles Unit #1                 5 142117E           Shell Segment Assembly Course #2           1 142119E           Lower Head Forming Details                 1 151877E           Modification of 12" Recirculation Inlet Nozzle                                 0 151878E           ModH'ication of 28" Re.circulation Outle .
Vessel Sub-As:;cmbly 7
                                'Nozzle                                 0 151879E           Modification of 4" Jet Pump Nozzles         0 15l88oE           Modification of 2" Liquid Control Nozzl     0 9 4982C        7" Bushing                                 2 lO5291C         7" Tapped Hole Detail                       a
12937lE List of Material 12 "129372E Lower Head Assembly 9
... --- -_._-----~---_._-
129373E Lower Head Bottom Segment Assembly 8
Note:   The rev~non numbers gi,,-en in the first column are those in effect at the date shown on the first paGe of this certification document and are certified provided the first pa~e is signed. Acditioncl revizions must be initialed by e.\!:l.horizcd 'B~lV Professional Ent;inecrs.
129374E Lower Head Upper Segment Assembly 8
129376E Shell Segment I\\ssembly Course Hl &#4 8
129377E Shell Segment Assembly Course #3 1+
129378E Shell Segment
\\;;sembly ('ourse #5 3
129379E Shell Flange Detail 3
129380E Recirculation Nozzles 1+
129381E Steam Outlet Nozzle 5
129382E Feedwater Nozzle 2
129383E Cor~ Spray N07.71e 3
129384F.
2" Inst. & 4" C.R.D. Hyd. System Return Nozzle 6
129385E 4" Jet Pump Nozzle 1+
129386E Shroud Support 6
.129387E Ve:;sel Attac1li'".nt l'~hils 5
129388E Support Skirt 7
129389E Vessel Insulation Supports 1
129390E Vessel Thermocouple Pads 2
12939lE Refueling Containment Skirt 2
129392E Closure Head
~ssembly 7
129393E Closure Head dazzles Z
129394E Closure Head Fonning 129395E Stud Assembly &Misc. Details 4
129396E Stud, Nut & Washer Details 6
129397E.
Vessel Sub-A~,,~mbly Details 7
129399E controi Rod Nozzles Unit #1 5
142117E Shell Segment Assembly Course #2 1
142119E Lower Head Forming Details 1
151877E Modification of 12" Recirculation Inlet Nozzle 0
151878E ModH'ication of 28" Re.circulation Outle.
'Nozzle 0
151879E Modification of 4" Jet Pump Nozzles 0
15l88oE Modification of 2" Liquid Control Nozzl 0
94982C 7" Bushing 2
lO5291C 7" Tapped Hole Detail a
...--- -_._-----~---_._-
Note:
The rev~non numbers gi,,-en in the first column are those in effect at the date shown on the first paGe of this certification document and are certified provided the first pa~e is signed.
Acditioncl revizions must be initialed by e.\\!:l.horizcd 'B~lV Professional Ent;inecrs.
K.III-6
K.III-6


PBAPS Design Data B.&W. Contract 610-0139-51 General Electric N.E.D. COl1tract #205-Bl156 Engineering Specification - 2lAllll Discussion of Unit: Peachbottom II Reactor Vessel and head with special tools, test j'lc.teriaJ., vessel shipping skid and head sling.
PBAPS Design Data B.&W. Contract 610-0139-51 General Electric N.E.D. COl1tract #205-Bl156 Engineering Specification - 2lAllll Discussion of Unit:
Data                           Pressure                       Temperature Design                          1250 psi Operation                      1005* psi Hydrotest                      1565 psi Temperature of water cannot be above 2000 F Inside Radius (to clad}           Thickness Top Head                            125.5"                       4.0" Shell                                125.5"                       6.125" Bottom Head                          125.5"                  6.125"/8.0" Cladding                                                      3/16" nom./l/B" min.
Peachbottom II Reactor Vessel and head with special tools, test j'lc.teriaJ., vessel shipping skid and head sling.
Corrosion Allowance                                          1/16" outside surface 1/16" nonclad inside surface K.III-7
Data Design Operation Hydrotest Top Head Shell Bottom Head Cladding Corrosion Allowance Pressure 1250 psi 1005* psi 1565 psi Inside Radius (to clad}
125.5" 125.5" 125.5" K.III-7 Temperature Temperature of water cannot be above 2000 F Thickness 4.0" 6.125" 6.125"/8.0" 3/16" nom./l/B" min.
1/16" outside surface 1/16" nonclad inside surface


PBAPS MATERIALS               sm lOPER/DESIGN)                   PAM' Carl'lOn Steel      19,600/19,200       Sate end, Ba.ckins strip, Drain nozzle SA-508 CL2          26,700/26,700      External nozzles, Stab, Bracket Code Case 1332-2 SA-5404GR 23 or GR2                                                                  Code Case 1335-2 Inconel      SB-166, 6    A..'1  6 steel K. III- 8
MATERIALS Carl'lOn Steel SA-508 CL2 SA-5404GR 23 or GR2 Inconel SB-166, 6
A..'1 6
sm lOPER/DESIGN) 19,600/19,200 26,700/26,700 PBAPS PAM' Sate end, Ba.ckins strip, Drain nozzle External nozzles, Stab, Bracket Code Case 1332-2 Code Case 1335-2 steel K. III-8


PBAPS Pipe Size Nozz 1es                          Req. MK. No.         Dwg.     Mat'l. Location             (Dia. )
PBAPS Pipe Size N
Nl - Recirc. Outlet                         2     8     129380E     MN-MO       Shell 13' 5-1/2"           28" N2 - Recirc. Inlet                         10     7     l29380E     MN-MO       Shell 1;"   1"           12" N3 - Steam Outlet                           4     14     l29381E     MN-l-10     Shell 54' 10-1/2"         26" N4 - Feedwater                               6     10     l29382E     MN-MO       Shell 41' 6-1/2"           12" N5 - Core S1)ray                             2     11     12~~J~~     M!"J 10 Shell 40' 4-1/2"           10" SA-I05 N15- Drain                                   1     22     129373E     GR. II     Bottom Head               2" lJ7 _     Vpnt.                             1   204     l2q~q'~E     ~1N-MO     Top Head                   4"
1 ozz es Req.
'NQ -    e'Rn Hvn           'Ret.           1     l~     l2g184E     MN-MO       Shell 37' 4-1/2"           4" N10-Core Diff. Press.
MK. No.
1', T.; n   P();~()n                       1     17     12q17)IE     MH-MO       Bottom Head               2" Control Rod Drive                       185 101-128     12g1gqE     INCONEL     Bottom Head               6" NR -     .1F>t   "Pmnn       Tnstr         2     19       12q,:\8csE MN-MO       Shell 11' 3"               4" Jh _h H Tn.:::." ~*,.-(~~t.ilt.*i"r.       2   ?O6       l?O~q**n*; ~'1N-Ml)   'iou BeaU       ___.J     6" l'Jll _?" Tns .           lInt:  ::ILion   ?     12       12q~84E     INCONEL   Shell l~ 3' 1"             2" 1\110 _0"     T                 ""t;()n   ?   l?       12q~84E     INCONEL   Shell 49' 11"               2" 1\T1h. _0"     T"' ... ~-*-~..,t.!1t;("\n   ?     12     12q~84E     INCONEL     Shell ~O' 6"               2" K.III-9
Dwg.
Mat'l.
Location (Dia. )
Nl - Recirc. Outlet 2
8 129380E MN-MO Shell 13' 5-1/2" 28" N2 - Recirc. Inlet 10 7
l29380E MN-MO Shell 1;"
1" 12" N3 - Steam Outlet 4
14 l29381E MN-l-10 Shell 54' 10-1/2" 26" N4 - Feedwater 6
10 l29382E MN-MO Shell 41' 6-1/2" 12" N5 - Core S1)ray 2
11 12~~J~~
M!"J-1-10 Shell 40' 4-1/2" 10" N15-SA-I05 Drain 1
22 129373E GR. II Bottom Head 2"
lJ7
_ Vpnt.
1 204 l2q~q'~E
~1N-MO Top Head 4"
'NQ e'Rn Hvn
'Ret.
1 l~
l2g184E MN-MO Shell 37' 4-1/2" 4"
N10-Core Diff. Press.
1', T.; n P();~()n 1
17 12q17)IE MH-MO Bottom Head 2"
Control Rod Drive 185 101-128 12g1gqE INCONEL Bottom Head 6"
NR -
.1F>t "Pmnn Tnstr 2
19 12q,:\\8csE MN-MO Shell 11' 3" 4"
Jh _h H Tn.:::." ~*,.-(~~t.ilt.*i"r.
2
?O6 l?O~q**n*;
~'1N-Ml)
'iou BeaU
___.J 6"
l'Jll
_?"
Tns.
::ILion
?
12 12q~84E INCONEL Shell l~3' 1" 2"
lInt:
1\\110 _0" T
""t;()n
?
l?
12q~84E INCONEL Shell 49' 11" 2"
1\\T1h. _0" T"'... ~-*-~..,t.!1t;("\\n
?
12 12q~84E INCONEL Shell
~O' 6" 2"
K.III-9


PBAPS Support Brackets and Misc. Attachments A~tachrnent             Beq.                 MJ<. No.         Drawing       ~aterial     pemark Support Ski rt                _.1   . ----- '11-
PBAPS Support Brackets and Misc. Attachments A~tachrnent Beq.
::".:...4.
MJ<. No.
                                                        )10, '41     l2938~E     Hull Steel     BottoI:'l Head Shroud Sunnort                   1               1:),   -     1:)4   '2Q~86E     Inconel       Internal
Drawing
'Ref'lJel   Carlt ~ldrt       ,                              72     '2Q~qlE     Hull Steel     Vessel FlanQ:e Stabj]jze.r     e"'~c*1t.e:L ___8       _.-~             .l9.L-.... 12q~_6'7..j ~l:N-H()       ExternaJ S+,erm n-rye-r SllPPO-rt_       4 -         I           , ~l       '2q~87E     st. stL       TnT.ernal I
~aterial pemark Support Skirt
eOl"e Snralr   B~pcket         h                         1~2       '2Q-~fh~    :3t. StL       Internal
_.1
~l1ine   'Pan ~r~('kpt         2                         ,~4         12Q~87E     st. Stl.       Internal F. \-1. Snar;:c!' Bracke.t     .J? -.,                    135         129387E     st. St1.       Internal Drver Ho1ddmm Brack ~t           4                         rn         129187E     ?-iN-Me       Internal     ,
'11-
Surveillance      ~necJ-mer. 6                         199-200     129187E     st. stl.       Internal In~;ulo.";ion ~:2.ckei-.c::     ?4                       81- 8~.._ . 12q-;~qE   Carbo stl.     ~~t~!"!!!'.:l Hearl   Ljftj,rg LuS ._-"       4                         210         12q~q2E     MN-MO         Ton Head K.III-IO
)10, '41 l2938~E Hull Steel BottoI:'l Head
.----- ::".:...4.
Shroud Sunnort 1
1:), -
1:)4
'2Q~86E Inconel Internal
'Ref'lJel Carlt
~ldrt 72
'2Q~qlE Hull Steel Vessel FlanQ:e Stabj]jze.r e"'~c*1t.e:L ___8
_.-~
.l9.L-....
12q~_6'7..j
~l:N-H()
ExternaJ S+,erm n-rye-r SllPPO-rt_
4 -
I
, ~l
'2q~87E st. stL TnT.ernal I
'2Q-~fh~
eOl"e Snralr B~pcket h
1~2
:3t. StL Internal
~l1ine 'Pan
~r~('kpt 2
,~4 12Q~87E st. Stl.
Internal F. \\-1. Snar;:c!' Bracke.t
.J?
135 129387E st. St1.
Internal Drver Ho1ddmm Brack ~t 4
rn 129187E
?-iN-Me Internal Surveillance
~necJ-mer.
6 199-200 129187E st. stl.
Internal In~;ulo.";ion
~:2.ckei-.c::
?4 81-8~.._. 12q-;~qE Carbo stl.
~~t~!"!!!'.:l Hearl Ljftj,rg LuS._-"
4 210 12q~q2E MN-MO Ton Head K.III-IO


PBAPS z____         _
PBAPS K.III-Il z____
                ..        (A-I)
(A-I)
K.III-Il


PBAPS PR\. + ~&c..         CSTR~c:..~
0\\ \\<.~\\ -\\
                                  \N\~~~\\'{         ~~N.("\\::-.".:>
PBAPS 1'l_ORMM.
J\.~e-   S\\O\\J~     C)~ 'S\~\::-\c..,",
WA.-rE:R L~"E-\\..
0\ \<.~\ -\
PR\\. +
1'l_ORMM.
~&c..
WA.-rE:R L~"E-\..
CSTR~c:..~
P\~\. ME-t"\\>R~\~\:       ~\f'..~-~~
\\N\\~~~\\\\'{
1~\~~~~\\', \~ \.~s~ \t\f.I.\\
~~N.("\\\\::-.".:>
                              \\'\c-     ~\.\.o\..U~?,\..'C- ST~,E-S~
J\\.~e-S\\\\O\\\\J~
                              \~\~~~\"( O~ ~:"2.1 "CS\
C)~
'S\\~\\::-\\c..,",
P\\~\\.
ME-t"\\\\>R~\\~\\:
~\\f'..~-~~
1~\\~~~~\\\\',
\\~
\\.~s~ \\t\\f.I.\\\\
\\\\'\\c-
~\\.\\.o\\..U~?,\\..'C-ST~,E-S~
\\~\\~~~\\"( O~
~:"2.1 "CS\\
(A-2)
(A-2)
K.III-12
K.III-12
Line 120: Line 294:
K.III-13
K.III-13


PBAPS A.l\..     'S'~N\F\C/~N\               \TE-M~ OF THE           \h-.1\T     WE~~
PBAPS A.l\\..
CON~\D'CRE:D \~                 T\-\'C     WT. 4- c...~. *E'\JA.\.\,)~\\O~.
'S'~N\\F\\C/~N\\
THOcs.e         rreN\~       CCN.S\D~R..t-\)         we~E- l c\..o S \J R~     \\&t.....t>
\\TE-M~ OF THE
STUDS ) l-l\.)Th)A.~\:) V"IA.'S.\\~i'...s "cSS~L         S.~Wc'r:T ~'t<\;tT
\\h-.1\\T WE~~
        ~"Ro \J t>     5\.> P~R\
CON~\\D'CRE:D
        ~E.F\,)E.L\~G. CONT~\~HE~T ~~\~T "07 L l~s.
\\~
        "E::>~ t=L. 5\\'CL\-
T\\-\\'C WT.
                                                                            /          ~
4-c...~.
I 1)~y       WE 16\-\1"                                             ~I "Et"'.
*E'\\JA.\\.\\,)~\\\\O~.
                                                                          '\               7 CLCSURc          \-\E~'V           1~2) 8BO     \bs S"flJ'C'S, J ~U-re-;:. }               60,0<)5   \~~                           <P-c .Ci.
THOcs.e rreN\\~
~~t>       w~'S.t\GR~
CCN.S\\D~R..t-\\)
we~E-l c\\..o S \\J R~
\\\\&t.....t>
STUDS ) l-l\\.)Th)A.~\\:)
V"IA.'S.\\\\~i'...s "cSS~L S.~Wc'r:T
~'t<\\;tT
~"Ro \\J t>
5\\.> P~R\\
~E.F\\,)E.L\\~G.
CONT~\\~HE~T
~~\\~T "07 L l~s.
"E::>~ t=L.
5\\\\'CL\\-
"Et"'.
1)~y WE 16\\-\\1" CLCSURc
\\-\\E~'V 1~2) 8BO \\bs S"flJ'C'S, J
~U-re-;:. }
60,0<)5
\\~~
~~t>
w~'S.t\\GR~
r
r
                                                          ~oq-
'lE~e.,-
'lE~e.,-                       \.1-1.'/7 J 974    t~.       'V I
\\.1-1.'/7 J974 t~.
f!J ToTAL                  'J500,9'f'l \b~               (()
~oq-
'V I
'J500,9'f'l
\\b~
f!J ToTAL
(()
/
~
I
~I
'\\
7
<P-c.Ci.
(A-4 )
(A-4 )
K.III-14
K.III-14


PBAPS BR~C.\<E:-\                                                  ~"I.\.OW =                 S ~\.\.C"IN =
PBAPS S""t>..)(.
S""t>..)(.        \. t;;' C:)\'(\ l'\C)"T      0.6 SM STA-B\L\ZE-R                                   2.9.?.           40.0               8. ,     \6.0 ST'E-A.\o1 DR'<FK 17.0             24.0               '3.7         ~.6 SIJ V*t=""~~?..\ _          ...                                                  ..  ~-
~"I.\\.OW =
  ~\E-b.."'"       t>~,<~p'"
l'\\C)"T S ~\\.\\.C"IN =
    ~\.l\~~-       (   \)\=>~;;:..9..'\
BR~C.\\<E:-\\
Is.e            24.0              2..5        C3.6 S1\:;-f.\..~ 'D~,<\::'r..
\\. t;;'
  ~\)\~C- (,-O'Ne.-~...)
C:)\\'(\\
                                                    \1.0            2.4.0            3.7            ~.*6
0.6 SM STA-B\\L\\ZE-R 2.9.?.
      ~~~O\<J~\ER                                                                                     Cj.6 2.2.             24.0             O.l
40.0 8.,
        ~~~RG.I:-R C.ORC- ~??.. ~y
\\6.0 ST'E-A.\\o1 DR'<FK 17.0 24.0
      \-\~~~ \...w.-. n~t:,.
'3.7
                                                  \B.e l~. 73 2.4.0 40.0 O.B
~.6 SIJ V*t=""~~?..\\
                                                                                      '3.\\
~-
                                                                                                    <?>.6 Ir.u, ,...,
~\\E-b.."'"
                                                                                                          \..J
t>~,<~p'"
                                                                                                                ~ ..
Is.e 24.0 2..5 C3.6
Lu~
~\\.l\\~~-
CS \.l R \/'t:, \.. L t>...\--\C\:-                                                 .s
( \\)\\=>~;;:..9..'\\
{LOWG~'>                    _..
S1\\:;-f.\\..~
3.8               ~o.o                           \2.0 SUR. ve,.\ \..\. ~~~t 'e;-                   6, '3 If.~~         00.0           o.B~*             \'2..0
'D~,<\\::'r..
(\)~~~~...\
\\1.0 2.4.0 3.7
J 'e:\       p\),~"                                                           0.6              9.6 10,6             ~4.0 R\s.\::-~
~.*6
    \~~\.H.. t-~\ \C~ ~'J~.
~\\)\\~C-(,-O'Ne.-~...)
t~\-\6\..L')                          2.7               \~.a           0.57             &#xa3;':'.0 (A-S)
~~~O\\<J~\\ER 2.2.
24.0 O.l Cj.6
~~~RG.I:-R
~..
C.ORC- ~??..~y
\\B.e 2.4.0 O.B
<?>.6
\\-\\~~~ \\...w..-n~t:,.
40.0
'3.\\\\
Ir.
l~. 73 u, \\..J Lu~
CS \\.l R \\/'t:,\\..L t>...\\--\\C\\:-
3.8
~o.o
.s
\\2.0
{LOWG~'>
SUR.ve,.\\\\..\\. ~~~t'e;-
6,'3 If.~~
00.0 o.B~*
\\'2..0
(\\)~~~~...\\
J 'e:\\
p\\),~"
10,6
~4.0 0.6 9.6 R\\s.\\::-~
\\~~\\.H.. t-~\\ \\C~
~'J~.
2.7
\\~.a 0.57
&#xa3;':'.0 t~\\-\\6\\..L')
(A-S)
K. III-IS
K. III-IS


PBAPS T\'\'C- \V\A.~\MUM '-O~O\~~ O~ ~E- \lE-~~E-'- Rt-~u\..\s FR~'~   """'E-     ~\~CO\L\7.~\~         ~R~~V"....e -\.
PBAPS T\\'\\'C-
Loc...~\..     ME:-M'ORJl....\'\t;.- : 2 G. b 7 (\~c..\... ~'Cs.';,. ~\RI::-o;::;~
\\V\\A.~\\MUM
                'S~\.\.QW -=- I. S CS m -=. 40.0 \<~\
'-O~O\\~~
PR\M. T ~\:-c.,. ST\l~~~ -=- 51,'2,0 (J NC,\. , ?~'C~. c:-s.TR-E-S~~
O~ ~E-
SI:\\.\..()W ,;;:. 3.0 ~rn = 80.0 ,,~\
\\lE-~~E-'-
(A-6) z;'c:""-: /
Rt-~u\\..\\s FR~'~ """'E-
~\\~CO\\L\\7.~\\~
~R~~V"....e-\\.
Loc...~\\..
ME:-M'ORJl....\\'\\t;.-
: 2 G. b 7
(\\~c..\\... ~'Cs.';,. ~\\RI::-o;::;~
'S~\\.\\.QW
-=-
I.S CSm
-=. 40.0 \\<~\\
PR\\M. T
~\\:-c.,.
ST\\l~~~ -=- 51,'2,0 (J NC,\\., ?~'C~.
c:-s.TR-E-S~~
SI:\\\\.\\..()W 3.0 ~rn = 80.0
,,~\\
(A-6) z;'c:""-:
/
K.III-16
K.III-16


PBAPS C~OBure I.R.             O.R.           B.C.       Height Head Flan&e             122.875"       139.625"           133.625"       ;U" Vossel Flanee           125.6875"     139.625"           133.625"       "36" No.             Dinm.           Stud Hole       Length Studs                       92-                 6"               1"       5'-5-3/16" Washers                     92               8-5/8" O.D.                   2.125"/.875" Stud Shank Dia.           Length S.83"                 2-7-;/8 11 Interface Sui"i"acc O.D.     =   260.625"                I.D. =        251.25" Inner Gasket Groove
PBAPS C~OBure I.R.
          .tean Radius                       126.6115
O.R.
-          Outer Gasket Groove
B.C.
          )of.ean Radius                     128.2365 Gaske~     Groove Yidth                 .59 Gaskets Location (top or bott~m flange)                 Top Flange Dopth of Cladding         1/4" Botto:n & Top Flange 5/g n Top Flange at Gaskets Clo&ure Sealing                                Jot!lt'l                   Diameter 2 O-Rings                                 Incone1                     253.25"/256.5" Fiber seal outside of O-Ring
Height Head Flan&e 122.875" 139.625" 133.625"
    ".lsc.     2 Spherical t.:ashers Per Stud nrawinc~ 1~9392Kc         Closure li~!ld Ass{;:!':bly 1~9379E~~    Shell !o')anec DoJtnils                         (A-7)
;U" Vossel Flanee 125.6875" 139.625" 133.625" "36" No.
K.III-l7
Dinm.
Stud Hole Length Studs 92-6" 1"
5'-5-3/16" Washers 92 8-5/8" O.D.
2.125"/.875" Stud Shank Dia.
Length S.83" 2-7-;/8 11 Interface Sui"i"acc O.D. = 260.625" Inner Gasket Groove
.tean Radius Outer Gasket Groove
)of.ean Radius Gaske~ Groove Yidth I.D.
=
251.25" 126.6115 128.2365
.59 Gaskets Location (top or bott~m flange)
Top Flange Dopth of Cladding Clo&ure Sealing 1/4" Botto:n & Top Flange 5/gn Top Flange at Gaskets Jot!lt'l Diameter 2 O-Rings Fiber seal outside of O-Ring Incone1 253.25"/256.5"
".lsc.
2 Spherical t.:ashers Per Stud nrawinc~
1~9392Kc 1~9379E~~
Closure li~!ld Ass{;:!':bly Shell !o')anec DoJtnils K.III-l7 (A-7)


PBAPS I'I                                               '5"
~ "
* 3J*   1"'C""-'-t....;.I         -t-                   '_~_~_rc....:.:e,~_o_.R....:...~_ _
12'2 &
I I I I                                         12'2 ~& " I.~.
I.~.
Iv "
\\2.S ',Gs J:. P..
PBAPS I'I
'5"
* 3J*
1"'C""-'-t....;.I
-t-
'_~_~_rc....:.:e,~_o_.R....:...~__
I I
I I
I I
, I I
I ~-_
_t_---_...;I.:::'3~'3~~.;~~*....:R:.:.;.:..6:;..:.=.c..::..:.~--
I I
I I
                  , I I
1 a6 11 l~~d
I ~-_            _t_---_...;I.:::'3~'3~~.;~~*....:R:.:.;.:..6:;..:.=.c..::..:.~--
--b-f, DIMENSIONS OF CLOSURE ASSEMBLY K.III-18 (A-8)
I I        1                                       Iv "
a6 11                                                 \ 2. S ',Gs J:. P..
l~~d
                                    --b-f, DIMENSIONS OF CLOSURE ASSEMBLY (A-8)
K.III-18


PBAPS MAY... 'PRo\. LocAL ME:MBR~~E:           STR~SS
PBAPS MAY... 'PRo\\.
                                                                              \~TE-W~\\Y:2~.o\<":>\
LocAL ME:MBR~~E:
67.Z1<bl~:                     I
STR~SS
( 'SfU t>>                     I I
\\~TE-W~\\\\Y:2~.o\\<":>\\
67.Z1<bl~:
I
( 'SfUt>>
I I
I I
I I
p~\. M'C:Mee~ ~\~;,       S\~~Ss.
FOR THE-s-r~o~
                                                                      \~.,.e-~S\TV           \~   o'CLOyJ T\-\e-   t:...\.lOW I:>..~\.e OF 5).'\'='26.7 K~\ Fo\t f\"~~<'lE:-S A~c Si-\&u...
M~)<.
9~.(',:) t,c::.\
fv\\&t'-"\\e.~t\\~s-
(~,ut>>           FOR THE-          s-r~o~
&l''i(~~S h~,.e~~\\\\'(
M~)<. fv\&t'-"\e.~t\~s- &l''i(~~S h~,.e~~\\'( ... 47.(,') \<.~I
... 47.(,')
                                                                        '5 """c>W : '2.~....  =73.0 ~~\
\\<.~I
MA"X \l../\~lV1         PR.\. ~ SE-c. CS"T~..'e*ss.
'5"""c>W :
\~T E ~ CS \TY             ~ P>..\oo\GE S\-\o''''l\~
'2.~.... =73.0 ~~\\
ON.       S\<...~\c.\\
p~\\.
S J>...... \.Ow '::. 3 S"", -;. eo \<..,'S\         Fc~ ~\..'~'N.('V..:s.
M'C:Mee~ ~\\~;,
5J.o.\'\.ov~     ::. '3 ~k -::. \ \0 \<.~,               \-Q~.. "'::)\op S CLOSURE STRESS                                       ?:''';:/. /
S\\~~Ss.
\\~.,.e-~S\\TV
\\~
o'CLOyJ T\\-\\e-t:...\\.lOW I:>..~\\.e OF 5).'\\'='26.7 K~\\ Fo\\t f\\"~~<'lE:-S A~c Si-\\&u...
9~.(',:) t,c::.\\
(~,ut>>
MA"X \\l../\\~lV1 PR.\\. ~ SE-c.
CS"T~..'e*ss.
\\~T E ~ CS \\TY
~ P>..\\oo\\GE S\\-\\o''''l\\~
ON.
S\\<...~\\c.\\\\
S J>......\\.Ow 3 S"", -;. eo \\<..,'S\\
Fc~
~\\..'~'N.('V..:s.
5J.o.\\'\\.ov~
::. '3 ~k
\\ \\0
\\<.~,
\\-Q~.. "'::)\\op S CLOSURE STRESS
?:''';:/.
/
(A-9)
(A-9)
K.III-19
K.III-19


PBAPS n
PBAPS n
    \~
\\~
SUPPORT SKIRT (A-IO)
K.III-20 SUPPORT SKIRT (A-IO)
K.III-20


PBAPS
PBAPS PI<II"'-;f7;~Y.:- S-ECOIJDFitZ;;
  --                      PI<II"'-;f7;~Y           .:- S-ECOIJDFitZ;;
~;-R.t:$s. :c.IJrE:"//S"I"Tt;/
                            ~;-R.t:$s. :c.IJrE:"//S"I"Tt;/ I!/-!/J~~""
I!/-!/J~~""
                            ~ 1\0,",'" 1\1       0   ~   "S\::E..T<:... \'\ ~.,
~ 1\\0,",'" 1\\1 0
cs. AL\... :   ~"i h"\ ~ ~~O. C KS]
~
                          'fc;:S \ *
"S\\::E..T<:... \\'\\
..,..-                 ~           86.0 \:::":- \
~.,
97.0\1::'"'":.\
cs. AL\\... :
  . : : l - - -_ _--l,P,./
~"i h"\\
                        ~ 8.'2..0 l'=:"'o> \
~ ~~O. C KS]
      )--------l"""
'fc;:S \\ *
                            """."f...., f>\l_l. N\e:./...,z~,)t~. /~t-.JE.    ~  ' ,";.:=:
"""."f...., f>\\l_l. N\\e:./...,z~,)t~.. /~t-.JE.
                                      '\.rre=_~"S:.n-y          -=. 1:S .. /      '~.::
~'',";.:=:
                  ~~ E. L "'-:";::;\ I C- - P l... A.'~ TI C       AN. l\ L_';- Sit
'\\.rre=_~"S:.n-y
                      \V/"~         l.)~='D         T6       ~ U<"..YI f'1 l-t\c>St:..           RAl..l     G~<;'         C;>?"C/\-;"!A;
-=. 1:S.. /
                    'y!\/\U TH. A.!-L-O\N/~~:'L.c:
'~.::
o F           ~ c;;. l"Y\.           U N,,\:<- ': o. -':',&#xa3;'
~ 86.0 \\:::":- \\
SUPPORT SKIRT                                   ,-:::",'.:.
97.0\\1::'"'":.\\
(A-II)
.::l---__--l,P,./
~ 8.'2..0 l'=:"'o> \\
)--------l"""
~~ E.L "'-:";::;\\ I C- - P l... A.'~TI C AN. l\\ L_';-Sit
\\V/"~
l.)~='D T6
~ U<"..YI f'1 l-t\\c>St:..
RAl..l G~<;'
C;>?"C/\\-;"!A;
'y!\\/\\U TH.
A.!-L-O\\N/~~:'L.c:
o F
~ c;;. l"Y\\.
UN,,\\:<-': o. -':',&#xa3;'
SUPPORT SKIRT (A-II)
K.III-21
K.III-21


PBAPS
PBAPS
_ _~/i(~.!-t1!25....               _
__~/i(~.!-t1!25....
_ _L.lI-i.l'::'?-~2~_.           "-1
__L.lI-i.l'::'?-~2~_.
                                        ~.O J~74 ~--                            --J
"-1
~.O
/S"g.37.::.5 1-12..2.5
--_.=--
--_.=--
1-12..2.5                          --~.!&#xa5;b-L~
J~74 ~--
iii
--J
                                                      ._-:7....:,.;.5:::.-. J..
--~.!&#xa5;b-L~
/S"g.37.::.5                    . _
._-:7....:,.;.5:::.-.
_ ._-~
J iii
REFUELING CONTAINMENT SKIRT                           (J\-12)
._-~
K.III-22
REFUELING CONTAINMENT SKIRT K.III-22 (J\\-12)


PBAPS Piz I V7r;.p..:J + ~&#xa3; c C ,1') ..,'>A /2. ')
PBAPS Piz IV7r;.p..:J + ~&#xa3; c C,1')..,'>A /2.')
sr.e.~ss       /1)rc,dSI7!1 /</;',.):;-1&#xa3; S\-\OWN.         1"\ ~\c::.~\<"l\
sr.e.~ss /1)rc,dSI7!1 /</;',.):;-1&#xa3; S\\-\\OWN.
                                                                                'S Il..>c... \" H c:
1"\\
R:f"UE.LP*-'~             C.O.U*',
~\\c::.~\\<"l\\
                                                                                "S.. ~1 e..T I~     l-JOT         A..
'S Il..>c...
                                                                                ~1::'1Z: ~~. l10 0 J-.) t:) A f<.'
\\" Hc:
                                                                              ~~w..o~ ?. OS)' ~ 8~                     \t::::"
R:f"UE.LP*-'~
                                                  ......                      I J JJ.. A..'" 1/-<\() i,1, p\<..\ \.../\ ~~ '<         ~T'Q.~ ~:J~         llJ Tt::.~\..~ \ ~~c y
C.O.U*',
                -=:. 7.0 r~ ~ \               ~ A\'.L(.",\J ::; !.SSi'l1 ";: '-/0. 0 REFUELING CONTAINMENT SKIRT                                     (A-13)
"S.. ~1 e..T I ~
K.III-23
l-JOT A..
~1::'1Z: ~~. l100 J-.) t:) A f<.'
~~w..o~ ?.OS)' ~ 8~
\\t::::"
JJ.. A..'" 1/-<\\() i,1,
-=:. 7.0 I
J p\\<..\\ \\.../\\ ~~'<
~T'Q.~ ~:J~
llJ Tt::.~\\..~ \\ ~~c y r~ ~ \\
~ A\\'.L(.",\\J ::; !.SSi'l1 ";: '-/0. 0 REFUELING CONTAINMENT SKIRT K.III-23 (A-13)


PBAPS
PBAPS
                              ~v-l-
~v-l-
                                ~L
~L
                              =:
=:
                                \,,1)
\\,,1)
N
N
                                ~
~
0 to 1
0to 1
L~
L~
                        *a   ,.
*a
                              .\1\
.\\1\\
: 11)   'N I-
11)
: e.   ,co
'N I-e.
                              '"an SHROUD.SUPPORT ASSEMBLY (A-14 )
,co an SHROUD.SUPPORT ASSEMBLY K. III-24 (A-14 )
K. III-24


PBAPS
PBAPS
                        ~"bo..,){. ?\'L\.       s.T?_~'Y'.... \~\-e~~\\'( =. 'Z.4.S \<~\
~"bo..,){.
S~\.L()\'.f =.~., S- -;:)\l1 ::: "3 S. C 't< s \
?\\'L\\.
                                        .:56 .. 0-~
s.T?_~'Y'....
5/,,\\.0'"'' = :'.0 '5b1     ;    6':). g (\N.c.o,,",~,-)
\\~\\-e~~\\\\'(
S~,\,.o'W ;.;:. "3.0 SYIi     ;- 4*(:... 0 (~s \,<1?~- 2>04)
=. 'Z.4.S
PRIMARY AND SECONDARY STRESS INTENSITY RANGE                         (A-IS)
\\<~\\
K.III-2S
S~\\.L()\\'.f
=.~.,.S- -;:)\\l1 "3 S. C
't<s \\
.:56..0-~
5/,,\\\\.0'"'' =:'.0 '5b1 6':). g
(\\N.c.o,,",~,-)
S~,\\,.o'W ;.;:. "3.0 SYIi ;- 4*(:...0
(~s \\,<1?~- 2>04)
PRIMARY AND SECONDARY STRESS INTENSITY RANGE K.III-2S (A-IS)


PBAPS
PBAPS
::"'5?r:;*~:;,',;.;)~,:~/- ~.:.:-:-(.; .,2.:)/~-:::~~./y//           ~,<;',09/~~r-y/Y/~,I'1/             :BY         C;;   .c.       -::s-~.c:-C"   c/ AI/// /
::"'5?r:;*~:;,',;.;)~,:~/-
                                          ~.
~.:.:-:-(.;
                                        ~?7           r-O~ -;r;~M:=~'(",e- ..::s~~~~~.:$ /,:9r
.,2.:)/~-:::~~./y//
                                        '7 __ V~:.~         nw.D           T~~~.I,,**~~~iJ7VA:~.,.o;:     ~~/::-;~/-
~,<;',09/~~r-y/Y/~,I'1/
r!.Or? 2:>..:$
:BY C;;.c.
7,5,/       C,tJ-}
-::s-~.c:-C" c/AI/// /
                              ~
~.
                ~~hX ==- ~?,....)
~?7 r-O~
                                          -            JG""&-~       7~/f/.::s/GC:       :s'/,e"e::::~-.;.$"=; ~.:.?r
-;r;~M:=~'(",e-
~r~~Y9 ..-;':;-i'1/7       ;:z.k:/.:f'-"',;~.""e$       ......=?A/b     7-'~4-Y"~~~VA~ ~/77':/
..::s~~~~~.:$ /,:9r
.:::s~/-S-/n*/C         .~o&2>.s.-
'7 __ V~:.~ nw.D T~~~.I,,**~~~iJ7VA:~.,.o;:
7:.:5. / (C ')
~~/::-;~/-
:5/4 &,><         -:5:- / ... '5 ~...,/ rC/e ~~~.;-j"'/~ L.:::S7~~~'~~..:::1
r!.Or?2:>..:$
  ~r Or~,e~??/l/7                             r;-<?e-":..::,:,:::,U~":C     ~N..D /~j,~e-:.e".,'.;~/~e C"d/;;1""-/   //::',,~~:>~,       ,:::;,~/,=::'l",rl4/c.:.     -r- pET           CCJ/f)"Z::>5~
7,5,/ C,tJ-}
7:5. /       Cd) c=-             L-.                _.
~
              --?4/)X         -=     Z     0   :::j,,?7 r':O-oK /2::;A'/.::::;,/~.c =:jr,ee::....==-~~~s; fir     L'.e=-,::;:vy #         /-;-::C":::';'i$(/I.*.':~~.5   ~/,/.D       /2::./~~/:c"%*~7V/"':;'~-::= ~,.'/;-;:/
~~hX==-
  ,/C4/P",<",   .::5...~....::v4/C         -r- vt~T           C~"";'~L."'.J.s..
~?,....)
SHROUD SUPPORT LEGS                                 (A-1SA)
JG""&-~
K.III-26
7~/f/.::s/GC:
:s'/,e"e::::~-.;.$"=;
~.:.?r
~r~~Y9..-;':;-i'1/7
;:z.k:/.:f'-"',;~.""e$
......=?A/b 7-'~4-Y"~~~VA~
~/77':/
.:::s~/-S-/n*/C
.~o&2>.s.-
7:.:5. / (C')
:5/4 &,>< -:5:- /... '5 ~...,/ rC/e
~~~.;-j"'/~ L.:::S7~~~'~~..:::1
~r Or~,e~??/l/7 r;-<?e-":..::,:,:::,U~":C
~N..D
/~j,~e-:.e".,'.;~/~e C"d/;;1""-/
//::',,~~:>~,
,:::;,~/,=::'l",rl4/c.:. -r-pET CCJ/f)"Z::>5~
7:5. / Cd) c=-
L-.
--?4/)X -= Z 0
:::j,,?7 r':O-oK
/2::;A'/.::::;,/~.c
=:jr,ee::....==-~~~s; fir L'.e=-,::;:vy #
/-;-::C":::';'i$(/I.*.':~~.5
~/,/.D
/2::./~~/:c"%*~7V/"':;'~-::= ~,.'/;-;:/
,/C4/P",<",
.::5...~....::v4/C -r-vt~T C~"";'~L."'.J.s..
SHROUD SUPPORT LEGS K.III-26 (A-1SA)


PBAPS 7- S     ./(e)
PBAPS 7-S./(e)
            ~c~,Je'. ~. O. e;t. ~ ~Oe '-O/4r/R6"":~':'::=-1y ;&#xa3; ==s'~:.c:"'-;~.~.:.
~c~,Je'. ~. O. e;t. ~
n'''T"     -c:~~b       7-7e~~>s?',<:~           ,..-.;-?/t/.D   -;.c?~4 '?'e-/4P,t;.:;'C7~~k::e
~Oe '-O/4r/R6"":~':'::=-1y;&#xa3;
  ~/7?t'"       .:s.t::/~Y4/C       Co/?.DS
 
                  -:- ~.~x' (   / C. / KoSI") ~ 0 .. c;l ~ (>~~ '<-::5/                     0
==s'~:.c:"'-;~.~.:.
                                                                                              ' )
n'''T"
-c:~~b 7-7e~~>s?',<:~
,..-.;-?/t/.D
-;.c?~4
'?'e-/4P,t;.:;'C7~~k::e
~/7?t'"
.:s.t::/~Y4/C Co/?.DS
-:- ~.~x' (
/ C. / KoSI") ~
0.. c;l ~ (>~~'<-::5/
0
' )
7.:5./(~)
7.:5./(~)
            ~/4r)X.?- CJ. 0 ::5y ro/e ~2"-:4~e'.sS/.vC                                         :=5;;?:::."'C'.::s:se.;:
~/4r)X.?- CJ. 0 ::5y ro/e
  ,r9~       O?4'3?..-97//vc;           /:::Z~~~*U,.<:'E ..-9N..D                   7'"e/1.-??c&#xa3;/?7V&#xa3;c tA//;:;r/Y' /4/1X'.     ~e-/...::::>..-:?"/C 7' e/~ r         CO/.-1D..:5.
~2"-:4~e'.sS/.vC
                ~4;c1;< C~. 3~slJ)'''''::=:'           0, ~         $/ (/7: O/<.s"/)
:=5;;?:::."'C'.::s:se.;:
    ~6./(t?)
,r9~
            '..:5/f/,~)-'X ~ o.?::5y               ~oR           ~/A'p.e;...:.::5>s/~
O?4'3?..-97//vc;
~7'/.'.::;e:-.ss,.d:S       ~7- -e~KO                 ~~=-;;.::St:/A!:.t!I ,rr'A-"'.D ~60//J
/:::Z~~~*U,.<:'E..-9N..D 7'"e/1.-??c&#xa3;/?7V&#xa3;c tA//;:;r/Y' /4/1X'.
  -;;-E/./,/?',=;e/'/?z.,~e6'       ~.v/7?/     A4AJX:       ..5.c;/..:,.::;,,///,/c ~ ~c:r       LoAJD:;;J;.
~e-/...::::>..-:?"/C 7' e/~r CO/.-1D..:5.
    #~ c:"E"yS h-~~r ~LC:                                         7-?3c             C.z:-/T.-eA?'/r,,?
~4;c1;< C~. 3~slJ)'''''::=:' 0, ~ $/ (/7: O/<.s"/)
O~       -;?;:V6         -q:. ~.       c:&sect;;i"P6c/       r-/ C,.,.v -;??o"v..
~6./(t?)
'..:5/f/,~)-'X ~ o.?::5y
~oR
~/A'p.e;...:.::5>s/~
~7'/.'.::;e:-.ss,.d:S
~7-
-e~KO
~~=-;;.::St:/A!:.t!I
,rr'A-"'.D ~60//J
-;;-E/./,/?',=;e/'/?z.,~e6'
~.v/7?/
A4AJX:
..5.c;/..:,.::;,,///,/c ~ ~c:r LoAJD:;;J;.
#~
c:"E"yS h-~~r
~LC: 7-?3c C.z:-/T.-eA?'/r,,?
O~
-;?;:V6
-q:. ~.
c:&sect;;i"P6c/ r-/C,.,.v -;??o"v..
SHROUD SUPPORT LEGS (A-15B)
SHROUD SUPPORT LEGS (A-15B)
K.III-27
K.III-27


PBAPS Nozzlo       Rec1rc. Outlet No. Req       2             .n:. 110. 8               1)',18. No. &deg;12938oE toeation       Shell 13' 5-1/2" fro::l vessel zero JI.at '1   ).~-}.:O Inside D1wr ~ Shell         35.9"                 Tapor I.D. Yes Internal Lip     No Inside Diem 0 First Wold             25.90"
PBAPS Nozzlo Rec1rc. Outlet No. Req 2
~tsido     Diam   or Nozzle       53 ft Outside l>iaJU at First. Ycld 29.375" ClAdding                     Nom. ThY..         3/16" Distnnco     FrOl:l Vessel I.D. To bimetal weld Mat'l       ASTI-t 371 ER30~
.n:. 110.
Bimetp.l Weld                Distance fr.o:n Shell 26.125" Hat '1     psn*1 371 ER308 Connecting Pipe              Thickness       1.181" Min.
8 1)',18. No.
                              }~tll   Stainless~Steel         Type 316 Thermal Sleeve        No                    Welded                   Rolled Attached
&deg;12938oE toeation Shell 13' 5-1/2" fro::l vessel zero JI.at '1
~ipe   Reactions     Yes Tranaicnt~       Per GE Dr?win[; 729B762 Rev. 0 & 135B9990 Sheet 1, Rev. 1 (A-16 )
).~-}.:O Inside D1wr ~ Shell 35.9" Tapor I.D.
Yes Internal Lip No Inside Diem 0 First Wold 25.90"
~tsido Diam or Nozzle 53 ft Outside l>iaJU at First. Ycld 29.375" ClAdding Nom. ThY..
3/16" Bimetp.l Weld Connecting Pipe Thermal Sleeve No Distnnco FrOl:l Vessel I.D.
To bimetal weld Mat'l ASTI-t 371 ER30~
Distance fr.o:n Shell 26.125" Hat '1 psn*1 371 ER308 Thickness 1.181" Min.
}~tll Stainless~Steel Type 316 Welded Rolled Attached
~ipe Reactions Yes Tranaicnt~
Per GE Dr?win[; 729B762 Rev. 0 & 135B9990 Sheet 1, Rev. 1 (A-16 )
K.III-28
K.III-28


PBAPS
PBAPS
,-,.        ....: 1 -
}'
1.,375 "
1~5 /::.
a"%
II....,,. r:-
R rt. WELD
="""'.
                                              ---'---,    7.375
. \\,,;,---'
              \                                        --:.-.1__I I--
rt. WELD L
      \\                                                II .
1" 7
I
1~
                                                            ....,,. r:-
"3 R
                                                              ="""'.
/
                                                              \,,;
7.375 I
                                  "'                            L 7
\\
1" 1~
--:.-.1__
                          "3 " R
I--
                      /
I 1.,375"
I
....:1-a"% R
    ,:__.-.-       lo.SS h - L......
\\
i
\\
                                    *                   ..          }'
h I
1~5          /::.
lo.SS -L......
RECIRCULATION OUTLET NOZZLE         (A-I? )
i*
RECIRCULATION OUTLET NOZZLE (A-I? )
K.III-29
K.III-29


PBAPS FT~.I.   -r ~ l:::.c.....     ~,-~C::"-~     os lNTE...NSIY,,/              Kl\ l--!('.:;>E,   wI p, P\~~       "R~p...c-nC)~
FT~.I. -r
F'o~     ~A. ~((.~           ty\:t:. ~\<o
~ l:::.c.....
~J\ Pi::. E.H~
lNTE...NSIY,,/
                                                          \6,0 -
PBAPS
1"1.0
~,-~C::"-~ os Kl\\ l--!('.:;>E, wI p, P\\~~
___~~.~ ... 39.:?_
"R~p...c-nC)~
51*3"           . 64:5   f I
F'o~
I I
~A.
                              \6 .C>/-.---                     --.,;..:J,. 29.0 I
~((.~ ty\\:t:. ~\\<o
1.1. 0   .                                 . 21.0
~J\\Pi::.
                                                                                  'L Q[
E.H~
31.6 2.4.0 rriII I*
\\6,0 1"1.0
I 21.0, .                                                  I I
___~~.~... 39.:?_
RECIRCULATION OUTLET NOZZLE                           (A-18)
51*3"
K.III-30
. 64:5 I
\\6.C>/-.---
--.,;..:J,. 29.0 I
1.1. 0
. 21.0 2.4.0 31.6 21.0,.
f I
I
'L Q[
rriII I*I I
I RECIRCULATION OUTLET NOZZLE K.III-30 (A-18)


PBAPS
PBAPS
  ~\~E:.~<;'         E.~           ~\-    "\L              ~AF E:
~\\~E:.~<;' E.~
g, M \::)     A:r~     :        TO        ~E:.
g,M \\::)
COM.\>A.~E..~                     ,C>           \.<;~m         -=- 2G.'
A:r~ :
COM.\\>A.~E..~
~\\-
"\\L
~AF E:
TO
~E:.
,C>
\\.<;~m -=- 2G.'
\\1.34 I
I I
I I
                                                                                                  \1.34 I
ir I
MA."f...     ~G. +r--'aE.~~.                   ~-re.E..~"::..       I "l"n::'Ws. 'TV OS \\ O""'N N         0   IoJ.   ~ ~ 't:."'\ c.. \0{
~.o:20 '"
cs. "-'-'\...0-...1../ -= '=:>.0 ~l),         -=. 8 0.. <:;)
L-
""A'I.... Il'\E1A':n~.J\\.)E:         T pe.l::S~
.. -"J-------
~T~e.~"~             U...JT'C:.l-l ~   n-Y                                                             "
C...eqh- :Cc;co;:::'7'""'""" 7
  =27.09
;eel/* 0')
'SALLOW ~ I           C;-~m       -== 4*0..*0       ~-------------,;"-}
N0,- i::
i rI
~
                            ~.o:20 ' "- .. - " J - - - - - - -
1-" L L
L-C...eqh-            :Cc;co;:::'7'""'"""      7 ;eel/* 0')
<:;;*r'f.~c. os.~, '2..";,>
N 0,- i::      ~    1-" L L          <:;;*r'f.~c. os.~, '2..";,> A \::.E:
A \\::.E:
                                            \ ).l    -,;;: $. \
\\).l
RECIRCULATION OUTLET NOZZLE (A-19)
-,;;:$. \\
K.III-31
RECIRCULATION OUTLET NOZZLE MA."f...
~G.
+r--'aE.~~.
~-re.E..~"::..
I"l"n::'Ws. 'TV OS\\\\ O""'N N 0
IoJ.
~ ~'t:."'\\ c.. \\0{
cs. "-'-'\\...0-...1../ -= '=:>.0 ~l),
-=. 80.. <:;)
""A'I....
Il'\\E1A':n~.J\\\\.)E: T pe.l::S~
~T~e.~"~
U...JT'C:.l-l ~ n-Y
=27.09
'SALLOW ~ I C;-~m -== 4*0.. 0
~-------------,;"-}
K.III-31 (A-19)


PBAPS Nozzle   Recirc. Inlet No. Req       10               Mk. No.       7             Dwg. No. 129380E Location     Shell 1S' 1" from vessel zero Ma't'l..     MN-ID Inside Diam.@ Shell li.568"                       Taper I.D. *No Internal Lip   No Inside Diem   @ First '*leld   1l.507" Outside Diem of Nozz1e"          25" Outside Diem at First Weld           13.875" Cladding                   Nom. Thk.       3/16" nistance From Vessel I.D. To bimetal we1.d J.1at'1. ASTM A371 ER308.
PBAPS Nozzle Recirc. Inlet No. Req 10 Mk. No.
Bimetal. ~!eld.            Distance from Shell       22.875" J.lat'l..   .ASTM A371 ER30E Connecting Pipe            Thickness .817" Min.
7 Location Shell 1S' 1" from vessel zero Ma't'l..
Mat'l stainless Steel Type 316 Thermal Sleeve     Yes               Welded                     Rolled Attached   by others Pipe Reactions      Yes Transients     Per GE dra~~ng     729E762 Rev. 0 and 135B9990 Rev. 1 (A- 20")
MN-ID Inside Diam.@ Shell li.568" Dwg. No.
K.III-32
129380E Taper I.D. *No Internal Lip No Inside Diem @ First '*leld Outside Diem of Nozz1e" Outside Diem at First Weld 1l.507" 25" 13.875" Cladding Nom. Thk.
3/16" Bimetal.
~!eld.
Connecting Pipe nistance From Vessel I.D. To bimetal we1.d J.1at'1.
ASTM A371 ER308.
Distance from Shell 22.875" J.lat'l..
.ASTM A371 ER30E Thickness
.817" Min.
Mat'l stainless Steel Type 316 Thermal Sleeve Yes Pipe Reactions Yes Welded Attached by others Rolled Transients Per GE dra~~ng 729E762 Rev. 0 and 135B9990 Rev. 1 K.III-32 (A-20")


PBAPS 5.lo/!&#xa3;; "R                 --.B?/S I
PBAPS 5.lo/!&#xa3;; R
  .. --                                      1;;. ViE.LD
--.B?/S
                                                                                  ---r-cr-I I
---r-4.'1?>7S (A-21) t II
S.,*:S*65 r<&#xa2;..
~~ R II 1;;. ViE.LD 1.loq."
1.loq."
f II 4-t R 4.."A.'OI:tS
4-t R II f
_____i__;
4.."A.'OI:tS
5.1,,15 U
: 4. '1?> 7S
I
_____i_ _;
/
II It
. 1-. 1= R II II
_a -.;,::.. . . ~_
~~
-------.---==========-
.l_._J__
---------- --1--
1 I
I.,
r)
I ')C
-_.* K If.,
II
._!>- b.71/~S--~
RECIRCULATION INLET NOZZLE It
_a -.;,::...... ~_
I~
I~
II                  t II                                        ,.
I cr-I S.,*:S*65 r<&#xa2;..
                          ._!>- b.71/~S--~                ~~      R                    5.1,,15
I K.III-33
                                        , U
                                  . 1-. 1= R
                                                                              *-1-I II              ~~
II
                              /
                                  -------.---==========-
                                    ----.--.----.         ---------- --1--
                                                                          .l_._J__1 RECIRCULATION INLET NOZZLE                                  I                     I .,
Kr)
(A-21)        I ',....) C-.>  -_.*
If.,
K.III-33


PBAPS
PBAPS
--J~"\. 1 (\u'S\c,=-}--- <73
--J~"\\. 1 (\\u'S\\c,=-}---
:k.,.   "'5 (O,n"S\t--:.;) .. 17*f. L        Jc.,. 1          (01)\'$\0;;::.)        _0'    107
<73
~,.z. (\\{'S\O~'")-" II*-;!
:k.,. "'5 (O,n"S\\t--:.;).. 17*f.
>:.:(.-:s (\\-1S\Os\   -0 ,~I               )c."-T. ~-     (Ou''$\O'<:.") --- 8a
~,.z.
                                              )c.,.   "'l. _(OU\-s \o~) -_.' 76
(\\\\{'S\\O~'")-" II*-;!
>:-""1. eo. (hJ-:'\~~\o, e:J EL. \, "Z., if "S-- S,. c:;-n.... \9. ~\L:;~- ~A'"                         ~7..
>:.:(.-:s (\\\\-1S\\Os\\ -0,~I
                                                \:~. ~ ~       0,_ -_"   00;5""'(. "'5-T\..,. \?"".> o"\- - -     5", ... ~-,
>:-""1. eo. (hJ-:'\\~~\\o, e:J L
t.L.v - '0 -           0 ~A.-Sos             Cl. ~   ~ -_" "'S A. ~   caD S\~'=. 'Pg,. -\- -S'C--<:.. 12'ii;;?Ql.J\ecl...;~u-rs                       A~f;;;;
Jc.,. 1 (01)\\'$\\0;;::.) _0' 107
                                                    ~OT Mc.:\               e. ~G\:**~. "2..3.~.cor e                     'B,O\\\
)c."-T. ~- (Ou''$\\O'<:.") ---
53 -      c.. - 62     ~uer-kc..cs.-S         If @ ~\,)'-,)c...,.vv_t:: S e
8a
                                                  \\-\\::" Ov\S\C~ -SUQ_~AC.l;.. Au                               ~'-l~,,!;\\~--'
)c.,. "'l. _(OU\\-s \\o~) -_.' 76 EL. \\, "Z., if "S-- S,. c:;-n.... \\9. ~\\L:;~- ~A'"
                                                    ?\.k.s*n<: Aub"\,,......o;; \"$             W"..I... PEj:c?"POI2.MC"_I,;)
~7..
                                                          \"\\":-'.J:::. C~CA-r\C,.J~. ~e                     ~\.J,"",-rlFIC.l~\\OI..'
\\:~.
                                                    ~---13
~ ~ 0,_ -_"
                        /9 -
00;5""'(. "'5-T\\..,.
                                                              ~\. ~ (>>\-s\oec.) ..,.-- "2.\
\\?"".> o"\\- - - 5",... ~-,
                                                              ~c:.-r. ~ ~o~\-;;\'V~')--- S3
t.L.v - '0 -
                                                                                                                      \
0
                                                                                    \0 48 (A-22)
~A.-Sos Cl. ~
PRIMARY AND SECONDARY STRESS INTENSITY RANGES - FINAL TOTAL VALUES K.III-34
~ -_"
"'S A. ~ caD 53 c..
/9 -
S\\~'=.'Pg,. -\\- -S'C--<:..
12'ii;;?Ql.J\\ecl...;~u-rs A~f;;;;
~OT Mc.:\\ e.
~G\\:**~. "2..3.~.cor e
'B,O\\\\\\
- 62
~uer-kc..cs.-S If
~\\,)'-,)c...,.vv_t:: S e
\\\\-\\\\::"
Ov\\S\\C~ -SUQ_~AC.l;.. Au
~'-l~,,!;\\\\~--'
?\\.k.s*n<:
Aub"\\,,......o;; \\"$ W"..I...
PEj:c?"POI2.MC"_I,;)
 
\\"\\\\":-'.J:::.
C~CA-r\\C,.J~. ~e
~\\.J,"",-rlFIC.l~\\\\OI..'
~---13
~\\. ~ (>>\\-s\\oec.)..,.-- "2.\\
~c:.-r. ~
~o~\\-;;\\'V~')--- S3
\\
(A-22)
\\0 48 PRIMARY AND SECONDARY STRESS INTENSITY RANGES -
FINAL TOTAL VALUES K.III-34


PBAPS
PBAPS
  ~T~t:-- 'SS                 J"t"y E...~-S (*C\ ~ ~                     AT" -rHc.
~T~t:--'SS J"t"y E...~-S (*C\\ ~ ~
  ~AF E:.               E.ND           A t:E                       "TC:>         ~C COlv\..P;.~.. ~&#xa3;'b                   -\0                   \ ..<:;"' -~rt\ -=::.     ZG.'
AT"
                                                                                                            \7.Cfl
-rHc.
                                                                                      --tl- 'V:r-L~-~-                         I I
~AF E:.
                                                                                                                              ,J
E.ND A t:E "TC:>
  }/\J.\'1... .. ~Ec... i- ~t:"E.:~...~                   ~\\~t::.~~                   '''l-r-E)~''-:-::. \\-y       \~
~C COlv\\..P;.~.. ~&#xa3;'b
  '5 H o~v :-.\               Ok)     ~_~ Eo\""c                   H
-\\0
            ~ALt.o'.../ =.. "3.C>S >n                     -00:::::. BO~C>
\\..<:;"' -~rt\\ -=::. ZG.'
  'S,-"Co\;-:.<:.~ '"oS     u-' -\E. ~-..\ "S. \ TY               ~::'"2 6.5 :3
\\7.Cfl
    ~ I, L Loy,/ -:::. -\ e- C;; <2... . ('f\           -::::'.40 .. C>
--tl- 'V:r-L~-~-
                        \
}/\\J.\\'1..... ~Ec... i-
                        "~--_.       ----
~t:"E.:~...~
~\\\\~t::.~~
'''l-r-E)~''-:-::. \\\\-y
\\~
'5Ho~v :-.\\
Ok)
~_~Eo\\""c H
~ALt.o'.../ =.. "3.C>S >n
-00:::::.
BO~C>
'S,-"Co\\;-:.<:.~'"oS u-'-\\E. ~-..\\ "S. \\TY
~::'"26.5:3
~I,L Loy,/
-:::. -\\ e-C;; <2......('f\\ -::::'.40..C>
\\
II J,
"~--_.----
27*77 ">.
27*77 ">.
("-ee,c.o-7?&#xa3;?C>I'2'r# 7 ~&#xa3;vr:--O')
("-ee,c.o-7?&#xa3;?C>I'2'r# 7
l -'o-r'C'
~&#xa3;vr:--O')
                            "\    ''--          I... ' I
l-'o-r'C' I... I'
                                                  "     ' ''- ' " - '": ...... r.. r.:::--..:.~~....
"..... to>>
                                                                            \ to>>  _~  __"") .;;') ~ ;::. r, -..,.-..
r.:::--..:.~~....
A't0r.-
A't0r.-
RECIRC INLET. NOZZLE PIPING REACTION STRES&ES                                                               (A-23)
"\\
K.III-35
"'''-'"-':. \\
r.. _~__"").;;') ~ ;::.
r, -..,.-..
RECIRC INLET. NOZZLE PIPING REACTION STRES&ES K.III-35 (A-23)


PBAPS Nozzle   . Steam Outl.et No. Req. 4               MIt. No. 14              Dwg. No. 12938lE Location Shell 54'~10!"
PBAPS Nozzle
Mat'l. MN-MO Inside Diam.@ Shell 23.75"                   iraper I. D. No Internal Lip      No Inside Diam   @ First Weld   24.326"
. Steam Outl.et No. Req.
. Outside Diam of Nozzle       42.625" Outside Diem a.t First Weld     26.374" Cladding                 Bom. Thk. 3/16" Distance From VC:;.3cl Mat'l. ASTM A371 ER308 Bimetal \oleld No       Distance from Shell Mat'l.
4 Location Shell 54'~10!"
Connecting Pipe         Thickness     1.019 Mat'l   SA-105 Gr. II Thennal Sleeve    No              Weided                     Rolled Attached Pipe Reactions    Yes Transients     Per GE Drawing 729E762 Rev'. 0 and 135B9990 Hev. 1 (A-24)
Mat'l.
MN-MO MIt. No.
14 Dwg. No. 12938lE Inside Diam.@ Shell 23.75" Inside Diam @ First Weld 24.326"
. Outside Diam of Nozzle 42.625" Outside Diem a.t First Weld 26.374" iraper I. D.
No Internal Lip No Cladding Bom. Thk.
3/16" Distance From VC:;.3cl Mat'l.
ASTM A371 ER308 Bimetal \\oleld No Distance from Shell Mat'l.
Connecting Pipe Thickness 1.019 Thennal Sleeve No Pipe Reactions Yes Mat'l SA-105 Gr. II Weided Attached Rolled Transients Per GE Drawing 729E762 Rev'. 0 and 135B9990 Hev. 1 (A-24)
K.III-36
K.III-36


PBAPS l   I,         rz..I~~
PBAPS l I, rz..I~~
                                  -'5A- \ oS   ~:II:
-'5A- \\oS
REF.     ecpole.T       #"~
~:II:
                                                            ,eev: o.
REF.
A -t----               ---II--A
ecpole.T #"~
  --1;---------''b'- .-1-----------~
,eev: o.
                \ \-Va"              C) '!Jc..
A -t----
---II--A
\\ \\-Va" C)'!Jc..
--1;---------''b'-.-1-----------~
c..
c..
I "Sc>\- ~\
I "Sc>\\- ~\\*s\\\\-
* s\\-
e::..u-.c0\\~~
e::..u-.c 0\ ~~                                                                   ,
~
                                                                                          ~
I
_.                                                                        I I
~.
                                                                                      ~.
I
                                                                                        ~~
~~
STEAM OUTLET NOZZLE 14       ~~GIO~:=)-==           ==(=A=-:'::;S=)===~--~ 1~
STEAM OUTLET NOZZLE 14 ~~GIO~:=)-==
NOZZLE JUSTIFIED BY N41S.1       &   N4S0 OF SECTION III           Ie.. /2C;/. /
==(=A=-:'::;S=)===~--~1~
NOZZLE JUSTIFIED BY N41S.1
& N4S0 OF SECTION III Ie.. /2C;/. /
K.III-37
K.III-37


PBAPS D E~\<::'\\~     ME-<.\4.?\ 9\ 1'\~ <S,~. .\?-~S~~
1 PBAPS D E~\\<::'\\\\~
18.0'"       II   IS.8'Z.   (;ee,&;'~epO;er~/<:' ~eY.O)
ME-<.\\4.?\\ 9\\ 1'\\~
              --:JJL .---t                       "",&#xa3;\...l:>
<S,~...\\?-~S~~
                          ~Tt:.E..~*~       1"'\E\.tS\T\c;:.~               A\ Tt\\..:.* ~~\-"c EI.1\":)   A~:             To         ~e: c:'OM...~~t~~~                       ,-0 I*'t   ~ r" = ? '(. 0
18.0'"II IS.8'Z. (;ee,&;'~epO;er~/<:' ~eY.O)
                                        . h\A..'I..... -SE..G. 1-?R.Ss'$. ~T~E_~-;'
--:JJL.---t
                                                  \).\Te.t-.\"S fl"~         \~       ~\-\o"''').,l       0   l-.,)
"",&#xa3;\\...l:>
                                                      \"t\E:. ~\<:t::.\"Gl-t
~Tt:.E..~*~
                                                              ~A..'-'-~w -~.
1"'\\E\\.tS\\T\\c;:.~
                                                                                -  "::lo. 0"-
A\\ Tt\\\\..:.*
rl'\ ~-
~~\\-"c EI.1\\":)
r~,._    ,..,..
A~:
                                                                                                            ~,;,'-J .........
To
M~":l..   . A\ '2'. ~A 'i?:>R. F\ N t:.:       +-
~e:
t>k ~'"~4.         'S Of" e ::-Z":>'";. n.,rn:. N -
c:'OM...~~t~~~,-0 I *'t ~r" = ? '(. 0
                                                              ~ l"Y         = 2C;.7t:;}
. h\\A..'I..... -SE..G. 1-?R.Ss'$.
                                                              *~J,LLo-N - l ..'So ~rl'\ -::: 40.0 1
~T~E_~-;'
2G.47 2'7.01 J.,'O,,\E. ~ A L\._
\\).\\Te.t-.\\"S fl"~
r......  ~T'~' ~-'.~"'s.t:::....~\     I''''
\\~
r-..I    ~'"
~\\-\\o"''').,l 0
                                                                      ' " ..,  \
l-.,)
STEAM OUTLET NOZZLE PIPE REACTION STRESSES (A-26)
\\"t\\E:.
K.III-38
~\\<:t::.\\"Gl-t
"::lo. 0"-
r~,._,..,..
~A..'-'-~w -~.
:::> rl'\\ ~-
~,;,'-J.........
M~":l... A\\'2'. ~A'i?:>R. F\\ N t:.:
+-
t>k~'"~4.
'SOf"e ::-Z":>'";. n.,rn:. N -
~ l"Y =2C;.7t:;}
*~J,LLo-N -
l..'So ~rl'\\ -::: 40.0 2G.47 (A-26) 2'7.01 J.,'O,,\\E.
~
A L\\._
~T'~' ~-'.~"'s.t:::....~\\
I''''
~'" \\
r......
r-..I STEAM OUTLET NOZZLE PIPE REACTION STRESSES K.III-38


PBAPS Nozzle Feedwater No. Req. 6                 I*ik. No. 10             Dwg. No. 129382E Location    Shell 41' -6tn from vessel zero Mat'l.      MIHMO Inside Diam.@ Sht.:ll 11, r{o2"                 Taper J D. No Internal Lip  No Inside Diam @ First l-le1d       11.7" Outside Diam of Nozzle           26" Outside Dia'D at First Held       14.125" Cladding               Nom. Thk.         3/16" Distance From Vessel I.D.       17.0625" Mat'l.       ASTM A371 ER30e Bimetal Weld    No      Distance from Shell Mat'l*.
PBAPS Nozzle Feedwater Shell 41'-6tn from vessel zero MIHMO No. Req.
Connecting Pipe        Thickness         .953" Min.
Location Mat'l.
Mat'l           SA-105 GR. II Thenl1al Sleeve   Yes               Welded                   Rolled Attached   Not attached in nozzle Pipe Reactions   Yes Transients   Per GE DraT,*;inE; 729&#xa3;762 Rev. 0 arid 13539990 Rev. 1 (A-27)
6 I*ik. No.
10 Dwg. No.
129382E Inside Diam.@ Sht.:ll 11, r{o2" Taper J D.
No Inside Diam @ First l-le1d 11.7" Outside Diam of Nozzle 26" Outside Dia'D at First Held 14.125" Internal Lip No Cladding Bimetal Weld No Connecting Pipe Nom. Thk.
3/16" Distance From Vessel I.D.
17.0625" Mat'l.
ASTM A371 ER30e Distance from Shell Mat'l*.
Thickness
.953" Min.
Mat'l SA-105 GR. II Thenl1al Sleeve Yes Welded Rolled Attached Not attached in nozzle Pipe Reactions Yes Transients Per GE DraT,*;inE; 729&#xa3;762 Rev. 0 arid 13539990 Rev. 1 (A-27)
K.III-39
K.III-39


PBAPS
PBAPS
_.c;5<6       .'
_.c;5<6 A-I If 3.0025 (A-28 )
t I.~ I2.S--:'-:-' 4 - - - - -
.1' 3+ R 5.9375 I-3" 5-1 I
                                            ~VE l.D A-I  If 3.0025 5.9375 I-D
-----..- 12" FEEDWATER NOZZLE II "3.0 R D
            ~
~
Ib Bs'n r--~5"':"*~_ _-~----1.1~ - - - - - . I It
Ib t
                                                                .1' 5-3" 1
~VE l.D I.~ I2.S--:'-:-'-1-4---- - -----..-
3+ R I
Bs'n It r--~5"':"*~__-~----1.1~ -----.I K.III-40
                                                            -----..-                                              II "3.0 R 12" FEEDWATER NOZZLE                            (A-28 )
K.III-40


PBAPS p~\     ."\-     ~EC. ~il:.t::'$~ 1~1... t!.t.J~\l*Y (r6~.' ?=,po&#xa3;.,...t,~4                       lC,c;/,O)
PBAPS p~\\."\\- ~EC.
  ~f..,)..\C:.. E::         \V/ P/PINe- REJ~G7IoN                         STREsSES F"o J::. Tn     r::         "SAF' t!. "E.N t)
~il:.t::'$~
  ~"'LLo'N 0;:, ~.o ~"" :: S'"?.<+
1~1...t!.t.J~\\l*Y (r6~.'
tO~       Tl\e.                 NOr.CoLE:
?=,po&#xa3;.,...t,~4 lC,c;/,O)
~ ,..                 ::::.    "=t r"'l ~     -:::: <7'>,'-" - . .
~f..,)..\\C:..E::
  ~ .. ,l,..L~V"                 _.".. t",         ~ ......... --...J 2.6   '2.8
\\V/ P/PINe-REJ~G7IoN STREsSES F"oJ::.
                                                                                  ~s     '25 39       '35'
Tn r::
~\~ 't\.~CS\\c.... - ~\..~ST\~                                                 5'2  - ~4-I\~~\."\~\'S                     \s ~e:~\.)\\'>~~\)                                   0)5
"SAF't!.
~O~ ~c..T                   "l\ S ~ ~G\       ts   ~
"E.N t)
O\),..~ \t?So-                                                                                 I
~"'LLo'N 0;:, ~.o ~"" :: S'"?.<+
                                            , *~5r---------1 *45
tO~
                                                                                        '3' t
Tl\\e.
                                                                                              ..I
NOr.CoLE:
                                                  '------------1.$<;
~,..
86 S3
"=t r"'l
                      '-!OTE::             /-'Ll-         'S..~\k C. ~.':::,   C~
~
                                          \~            \:::0.:::..\
-:::: <7'>,'-" -..
12" FEEDWATER NOZZLE                       (A-29 )
~..,l,..L~V" t",
~......... --...J 2.6
'2.8
~s
'25 39
'35' 5'2
- ~4-0)5 I
'3' t
I
*45
'------------1.$<;
, *~5r---------1
~\\~
't\\.~CS\\\\c.... - ~\\..~ST\\~
I\\~~\\."\\~\\'S
\\s
~e:~\\.)\\\\'>~~\\)
~O~
~c..T "l\\ S
~
~G\\ ts ~
O\\),..~\\t?So-86 S3
'-!OTE::
/-'Ll-
\\~
'S..~\\kC. ~.':::, C ~
\\:::0.:::..\\
12" FEEDWATER NOZZLE (A-29 )
K.III-41
K.III-41


PBAPS
PBAPS Io\\A.'f...
  'C';'-V:..t:': '::;.<;..    , I'J Y CJ.-l'-;' \ ' \ t t::: "$.      AT"          Tl\C
~E.c.. + y~,~*s~
  ~A.~ Eo            E"-1 '\:S        A . .*?. c:.      ,0        'B '2: <:.D/t" 'f> ~1<..e ~
~*rl"-\\::."S<;'
  ,0              10:<5      ~ M. -;::.              1-"{.?
IN'TE1'\\"S\\"TY
I Io\A.'f...  ~E.c..         + y~,~*s~                     ~ *rl"-\::."S<;'
\\~
IN'TE1'\"S\"TY                     \~         ~\-\O'\llV           0\0         ,nt::
~\\-\\O'\\llV 0\\0
"S. l::: E:Tc }-{
,nt::
            ~''''LLO'N                 -==:   ~,O<;t"t\           = eo,         0                               1 Mf:\Y-.. */AE.'';\ '& l~_I-\ w c.                   T'\::>l::.C~.       ~\-1:l;;:.:'::::'s.
"S.l:::E:Tc }-{
'tV\~\...l~\\Y                   '::=   2~     .4t "s, ALLO'N           "=.' \
~''''LLO'N -==:
* S'         ~ r.....   -=- 4*<:;> * (:)                             \6.\B
~,O<;t"t\\ = eo, 0
                                                          -~
'C';'-V:..t:':'::;.<;..
                                                                                                    ~
, I'JY CJ.-l'-;' \\ '\\ t t::: "$.
J WcL.D---":"
~A.~ Eo E"-1'\\:S A....*?.c:.,0
        ~~ -~*.e~po-e.r~:1J:/(p~t!:1/. 0                                         )           J-~
,0 10:<5
I fI 2"5.e~"
~ M.
L.~_..__._ 2?:_3~.~                                                           _~         .    .
-;::. 1-"{.?
C;:CL.-:'~.' Z/~7"b/.::*;_ . :.r*?"                         7':-~Y":     0')
AT" Tl\\C
HO\-~ ~                     AL.L       c::,*n~l::.~-s.E_<::'     A~C. I~   ~s \.
'B'2:
                            -12" FEEDWATER NOZZLE PIPING REACTION STRESSES                                                       (A-30)
<:.D/t" 'f> ~1<..e ~
K.III-42
I 1
Mf:\\Y-.. */AE.'';\\'& l~_I-\\w c.
T'\\::>l::.C~.
~\\-1:l;;:.:'::::'s.
'tV\\~\\...l~\\\\Y
'::= 2~.4t "s, ALLO'N "=.' \\
* S' ~ r..... -=- 4*<:;> * (:)
J
-~ WcL.D---":"
~~ -~*.e~po-e.r~:1J:/(p~t!:1/. 0 )
J-~
2"5.e~"
\\6.\\B
~
I f
I L.~_..__._ 2?:_3~.~
_~
C;:CL.-:'~.' Z/~7"b/.::*;_..:.r*?"
7':-~Y": 0')
HO\\-~
~
AL.L c::,*n~l::.~-s.E_<::'
A~C.
I~
~s \\.
-12" FEEDWATER NOZZLE PIPING REACTION STRESSES K.III-42 (A-30)


PBAPS Nozzlo Core Spray No. Req. 2                 )oDe. Uo. 11           I>Jg. 110. n.29383E Location. Shell 40' ':4l" above vessel zero Mat '1 l-1N-MO Inside DiaJ"   ~ Shell     .8.18.5"          Taper I.D.      No Internal Lip    No Inside Diem C First Veld           8.785" Outside Dia.'i1 or l:ozzle         21:'
PBAPS Taper I.D.
Outside Diam at First Weld 11.5" CJ.eddine                 Nom. Thk.       1/4" Distance* From Vessel I.D.       To bimeta~ w.eld
No Internal Lip No
                                )O~t 11  ASTM A311 ER308 Bimetal Wald               Distance from Shell 15.3125" list 11 ASTM A371 ER308:
.8.18.5" Nozzlo Core Spray No. Req.
Connecting Pipe           Thick~ess       .55" Min.
2
l~tfl     Stainless Steel Type*316 Thermal Sleeve Yes                       ~olded                 Rolled Attached *interference fit   by "cld ~hrinkage Pipe Reactions Yes
)oDe. Uo.
  . Tran81ents Per GE Drawing 729E762-0 and 135B9990-0 (A-31 )
11 I>Jg. 110. n.29383E Location.
Shell 40' ':4l" above vessel zero Mat'1 l-1N-MO Inside DiaJ"
~ Shell Inside Diem C First Veld 8.785" Outside Dia.'i1 or l:ozzle 21:'
Outside Diam at First Weld 11.5" CJ.eddine Nom. Thk.
1/4" Distance* From Vessel I.D.
To bimeta~ w.eld
)O~t11 ASTM A311 ER308 Bimetal Wald Distance from Shell 15.3125" list 11 ASTM A371 ER308:
Connecting Pipe Thick~ess
.55" Min.
l~tfl Stainless Steel Type*316 Thermal Sleeve Yes
~olded Rolled Attached *interference fit by "cld ~hrinkage Pipe Reactions Yes
. Tran81ents Per GE Drawing 729E762-0 and 135B9990-0 (A-31 )
K.III-43
K.III-43


PBAPS II
PBAPS II
    .555
.555
                    -------
-------
* r~7S-
* r~7S-
            ,f G.1075" N
,f G.1075" N
                                        ~
'1:$.67/
jY'                                       ~
CORE SPRAY NOZZLE
~=================================d _f,--l--_.'
~
CORE SPRAY NOZZLE (A-32)
jY'
                                            '1:$.67/
~
~=================================d _f,--l--_.'
(A-32)
K.III-44
K.III-44


PBAPS
PBAPS
_EC?~'*~~~!~V .:'!:..._S&#xa3;ca~/.c/l..s...y.
_EC?~'*~~~!~V
                    ~--;::~S,.$     ..b/ TE//..S / ;~y     ,81/6 E" FOR         '\H E:. NO c. C.l- t::
.:'!:..._S&#xa3;ca~/.c/l..s...y.
                                                ~A\..\"'O'N   -= ""3 ..o~rl'\   7.:. 'i->>o. <.::> ~\
~--;::~S,.$..b/TE//..S/ ;~y,81/6E" FOR
-\_~54- .l::'SI           /N.
'\\H E:.
              ~ B ~S.l               0(,17.             A" .E\..~~i\c...   '~,-/:l.,.~\ \c-
NOc. C.l-t::
                                                        ~~~\..'1s.\~ \s ~e,<\) \~~~
~A\\..\\"'O'N -= ""3..o~rl'\\
A.T. ~c..". ~     \
7.:. 'i->>o. <.::> ~ \\
,..f TI                                    '27 KSI
-\\_~54-.l::'SI
                                        /7 /CSI
/N.
                                                    /.Y, 0'..J7:
~B ~S.l 0(,17.
I
A".E\\..~~i\\c...
                                      . f3z KS1 /,y.
'~,-/:l.,.~\\ \\c-
l:?z .<SI o:lT                   26 Ksr.        IN *
~~~\\..'1s.\\~
                                                                        "37 K5I        Of.JT.
\\s
                      -_. . . _... ._-----------_._._--I
~e,<\\)\\~~~
          ~~==:====-------
A.T.
          ~
~c..". ~ \\
_--~---------------
,..f T
CORE SPRAY NOZZLE                                   (A-33)
I I
'27 KSI
/.Y,
/7 /CSI 0'..J7:
26 Ksr IN *
"37 K5I Of.JT.
.. f3z KS1 /,y.
l:?z.<SI o:lT I
~~==:====-------..._..._--~---------------
~
CORE SPRAY NOZZLE (A-33)
K.III-45
K.III-45


PBAPS
PBAPS Fo\\?
                              \l\8:.\\. 'B \'\ \~ ~                      S~~~<;:,E-S ~
T t\\ c.
e:,;\~(7.'" ''::'~.        1"lrt::H~ \1\ E.'-~                      AT  '\He
~0 -:c.7_L ~
                                        'SA-FE.            ~t-.\D            A?..E"_        ,0            cc.. ~ t'v\.i-,;,\~t.i)
"TO c;:;\\\\ E.L'-
                                          ,0*                I.e:;            ~ 11\      = 2G.1 Fo \? T t\ c. ~ 0 -:c. 7_ L ~ "TO c;:; \\ E. L'- .k.\".
.k.\\".
                              ,y..!\'J...... J".EI-t\BEf\\j~. "\- ?~~;:...: .. ~T~.~";;'
,y..!\\'J......
U*rrE".N S \ '\,V               '- 2.G."33
J".EI-t\\BEf\\\\j~.
\1.3\         \C<:..L .." <::'A,LI,0V./ -=:. \.<;:" c:;, ..,"\ =- 40.0
"\\- ?~~;:...:..
      \ (     /               (;eG,c': 7?dPc>,cr#/&> ;eev: 0)
~T~.~";;'
U*rrE".N S \\'\\,V
'- 2.G."33
\\1.3\\
\\C<:..L.."
<::'A,LI,0V./ -=:.
\\.<;:" c:;,..,"\\ =- 40.0
\\
(
/
(;eG,c': 7?dPc>,cr#/&> ;eev: 0)
--~~_':_'1::-_W&#xa3;L~
--~~_':_'1::-_W&#xa3;L~
11\1\"!... c;. EG .. -to                 "p';~.E.~S.               ~\t:.E.S"'S
11\\1\\"!...
                  \~-rt::.l-.!~'\\c."S                     A~E:.               ~Hov .... ).J           OJ...) Tac..
c;. EG.. -to "p';~.E.~S.
                  .-;;. y.;:: t::."\ C. \-\
~\\t:.E.S"'S
                                                ~27.o5
\\~-rt::.l-.!~'\\\\c."S A~E:.
_.                                ,P
~Hov.... ).J OJ...) Tac..
          - ---7;,....~ ;;..-;:-~,:::~~
.-;;. y.;:: t::."\\C. \\-\\
L  ,-~''''.
\\l\\8:.\\\\. 'B\\'\\ \\~~ S~~~<;:,E-S~
                                              ;;'--:_~*:-~*7*-:"
e:,;\\~(7.'" ''::'~.
                                      ,.",-~_,r- :.~",,-..
1"lrt::H~ \\1\\ E.'-~
:,.:'-/ :;:---'1"--"--'"
AT
                                                                                                  '-"'" )
'\\He
No",-C I. ALL             "~*\\:'.C,'):':*"C."':'.     "'\.\"-C".         1"'->         \C~\
'SA-FE.
CORE SPRAY NOZZLE PIPING REACTION STRESSES                                                         (A-34)
~t-.\\D A?..E"_,0 cc..
K.III-46
~ t'v\\.i-,;,\\~t.i)
,0*
I.e:;
~ 11\\ = 2G.1
~27.o5
,P
----7;,....~ ;;..-;:-~,:::~~ ;;'--:_~*:-~*7*-:" :,.:'-/ :;:---'.;::;-:;:.:;;;-:;:,--,-:-'
L
,-~''''.
,.",-~_,r-
:.~",,-..
1"--"--'"
)
No",-C I.
ALL
"~*\\\\:'.C,'):':*"C."':'.
"'\\.\\"-C".
1"'->
\\C~\\
CORE SPRAY NOZZLE PIPING REACTION STRESSES K.III-46 (A-34)


PBAPS Nozzle Dra.in No. *Req. 1               }1k. No.      22                1)'",g. No. 129373E Location Bottom Head.
}1k. No.
Mat'l. SA-105 Gr. II Inside Diam.@ Shell 1.939"                       Taper Ie D. No Internal Lip No Inside DiaT&l @ First lo!eld 1.993" Outside Di.~ of' Nozzle     3.0" Outside Dia.~ at First \veld     2.50" Cladding     No         Nom. Thk.
22 PBAPS Nozzle Dra.in No. *Req.
D"lstanct: Fl'oJU V:sSE:l I. D.
1 Location Bottom Head.
Mat'l.
SA-105 Gr. II Inside Diam.@ Shell 1.939" Inside DiaT&l @ First lo!eld 1.993" Outside Di.~ of' Nozzle 3.0" Outside Dia.~ at First \\veld 2.50" 1)'",g. No. 129373E Taper Ie D.
No Internal Lip No Cladding No Bimetal Weld No Nom. Thk.
D"lstanct: Fl'oJU V:sSE:l I. D.
Mat'l.
Mat'l.
Bimetal Weld    No      Distance     ~rom Shell Mat'l.
Distance
Connectinc Pipe Yes     Thi.ckness     .253" J.lat'l SA-106 Gr. B Thermal Sleeve No                   \tlelded                         Rolled Attached Pipe Reactions    Yes Transients       Per GE Drawing 729E762 Rev. 0 (A-35 )
~rom Shell Mat'l.
K.III-47
Connectinc Pipe Yes Thi.ckness
.253" J.lat'l SA-106 Gr. B Thermal Sleeve No Pipe Reactions Yes
\\tlelded Attached Rolled Transients Per GE Drawing 729E762 Rev. 0 K.III-47 (A-35 )


PBAPS rI
PBAPS r
                            --\---- - -4: WElO
I
              ,~
~
                ~
,~ l::..
l::..
--\\---- - -4: WElO c,........-e..~o'-'
c,... . . -e..~o'-'
51t::r,~,-
51t::r,~,-
2" DRAIN NOZZLE 22 (REGION C)     (A-36)
2" DRAIN NOZZLE 22 (REGION C)
(A-36)
NOZZLE JUSTIFIED BY N415.1 & N450 OF SECTION III K.III-4B
NOZZLE JUSTIFIED BY N415.1 & N450 OF SECTION III K.III-4B


PBAPS STRE-'5~ \~\E~S\\\E-b 1\,           T\-\E:-
PBAPS STRE-'5~
S~~E- 't~t:>       ~~~     To CO-e.-
\\~\\E~S\\\\\\E-b 1\\,
c..oV\~~~~o     To \. 5 St~ ': 'Z7.   ~
T\\-\\E:-
M~'(. S~(". + \>~~~~. ~\\:le-c:s
S~~E-
                                                  \\\T~~~\\,( \~ CS\o\ow~ ~ 'S,,~,(t+
't~t:>
                                                  <s ~\.OW :: 3.0 Sm ':- ~O. 0 M~')(. ~\;:M~~~\\C' -\- \'il:C:~~\JR~
~~~ To CO-e.-
                                                  ~\R'CS<::' \~\~",s.\\"( :. C).COZ5 S,,\\OW =   \.5' CS~ ':. 40.0
c..oV\\~~~~o To
                    , 1'l.17
\\. 5 St~ ': 'Z7. ~
                  ~                             ~\o.o
M~'(.
('rc~."   ;<::'"G;'!70,er #" 7 ;:::6 t/. 0 ')
S~(". + \\>~~~~.
N o,e--: ~\.'- CS\~~"::~~'e--:' h\ ~~ \
~\\\\:le-c:s
2" DRAIN NOZZLE MK 22 PIPING REACTION STRESSES                               (A-37 )
\\\\\\T~~~\\\\,(
\\~
CS\\o\\ow~ ~ 'S,,~,(t+
<s ~\\.OW
:: 3.0 Sm
':- ~O. 0 M~')(.
~\\;:M~~~\\\\C' -\\-
\\'il:C:~~\\JR~
~\\R'CS<::'
\\~\\~",s.\\\\"(
:. C).COZ5 S,,\\\\OW = \\.5' CS~ ':. 40.0
, 1'l.17
~
~\\o.o
('rc~."
;<::'"G;'!70,er #"7 ;:::6t/. 0 ')
No,e--:
~\\.'-
CS\\~~"::~~'e--:' h\\ ~~\\
2" DRAIN NOZZLE MK 22 PIPING REACTION STRESSES (A-37 )
K.III-49
K.III-49


PBAPS Nozzle   Vent No. Req. 1.                   t-1k. No. 204              D'~g. No. 129393E Location   Top Head Mat'l. t-m-}oiO Inside Diom.@ Shell         4 250" c                      Taper I.D. Uo Internal. Lip No Inside Dia:il @   First \-leld       3.875" Outside DiaJll of Nozzle             7" Outside Diem at First Held               5.5" Cladding                   Nom. Thk.             1/4" Distance From Vessel I.D. To bimetal weld Mat' 1..       ASTI-1 A37l ER308 Bimetal. Weld               Distance from Shell               7.218" l-la t ' 1.
PBAPS Nozzle Vent No. Req.
* ASTt*1 A371 ER308.
1.
Connecting Pipe             Thickness Flange Connections Mat'1. Stainless Steel Thenna1. Sleeve No                       Welded                      Rolled Attached Pipe Reactions       Yes*
Location Top Head Mat'l.
Transients       Per GE Dra".*rinG 7291':762 Rev. 0 (A-38 )
t-m-}oiO Inside Diom.@ Shell t-1k. No.
K.III-SO
204 4 c 250" D'~g. No. 129393E Taper I.D.
Uo Internal. Lip No Inside Dia:il @ First \\-leld 3.875" Outside DiaJll of Nozzle 7"
Outside Diem at First Held 5.5" Cladding Nom. Thk.
1/4" Distance From Vessel I.D.
To bimetal weld Mat' 1..
ASTI-1 A37l ER308 Bimetal. Weld Distance from Shell l-lat ' 1.*
ASTt*1 A371 ER308.
7.218" Connecting Pipe Thickness Flange Connections Mat'1.
Stainless Steel Thenna1. Sleeve No Pipe Reactions Yes*
Welded Attached Rolled Transients Per GE Dra".*rinG 7291':762 Rev. 0 K.III-SO (A-38 )


PBAPS -+ \~     .
PBAPS -+
    \ . ,<...
\\
\\~..
-SY;z.
t-.I\\'-J - WI. ()
Sb.-~l.
Gf':.~
It 2"3~
It 2"3~
        ,  tl 2.~
tl 2.~
    -SY;z.
_1 (A-39)
_1             _
t-.I\ '-J - WI. ()
Sb.-~l.          Gf':. ~
(A-39)
VENT NOZZLE 204 (REGION A)
VENT NOZZLE 204 (REGION A)
NOZZLE JUSTIFIED BY N41S.1 & N4S0 OF SECTION III K.III-SI
NOZZLE JUSTIFIED BY N41S.1 & N4S0 OF SECTION III K.III-SI


PBAPS DES\~~ MEC.\-t ?\~\~<;. S\RE-~~~
PBAPS DES\\~~
STR&~~ \"\\&#xa3;=-~~\\\'C:~ ~\ ,\\e-
MEC.\\-t
                                    ~A.PC:- 't:~tl t>..\'_":- \0 ~~
?\\~\\~<;.
c.otJ\('~~&#xa3;O     To \.s-   ~~ ':'.27.3 MA.'#.. ~E'<... + PRG-~~. ~~&cs.'S
S\\RE-~~~
                                      \~\e.N~\\'( \~ ~~ow~ O~ CS't\c.\"\
STR&~~
S~\.\.ow =- 3.0 SW\ ':I 80.0 M~,')!. Me\J\s~. .~~cc.+ ~R~~,SIJ\L~
\\"\\\\&#xa3;=-~~\\\\\\'C:~
5T~c-~~ \\-\\~~~\\'( -::. \9.65
~\\,\\\\e-
                                      ~M\.C>W ::. I. S ~"" :.. 40,0 I
~A.PC:-
c:ee~.- ;;t?~.Pt.?"e-r"#7' ~t/. 0)
't:~tl t>..\\'_":- \\0 ~~
                                    \~.~5" (A-40)
c.otJ\\('~~&#xa3;O To \\.s- ~~ ':'.27.3 MA.'#..
VENT NOZZLE MK 204 PIPING REACTION STRESSES K.III-52
~E'<... + PRG-~~.
~~&cs.'S
\\~\\e.N~\\\\'(
\\~ ~~ow~ O~ CS't\\c.\\"\\
S~\\.\\.ow =- 3.0 SW\\ ':I 80.0 M~,')!.
Me\\J\\s~...~~cc.+ ~R~~,SIJ\\L~
5T~c-~~
\\\\-\\\\~~~\\\\'(
-::. \\9.65
~M\\.C>W
::. I. S ~"" :.. 40,0 I
c:ee~.-
;;t?~.Pt.?"e-r"#7' ~t/.0)
\\~.~5" VENT NOZZLE MK 204 PIPING REACTION STRESSES K.III-52 (A-40)


PBAPS Nozzlo     CRD Hyd. ReOturn No. Req.     1.-         l-D<. No.       13         INg. No. 129384E Location Shell 37' -4t"           from vessel zero Hat 11 . j.:N-MO Inside DieJr tJ Shell 3.870"                       Taper I.D. No Internal Lip Yes Inside  Die~    C First Weld        3.870" Outside Diem.or Nozzle           11.495" Outside Di~~ at First Weld 2.,625" Cladding                   Nom. Thk.           3/16" Distenc~OFrnm           Vehsel 1.0. To bimetal weld
PBAPS Nozzlo CRD Hyd. ReOturn No. Req.
                          }lASt '1   .P.s1-i-*t A3 /l ER308 r
1.-
Bimetal lo:eld              Distance     trOI!1   Shell   4.25" Mat '1     AS'I)1 A371 ER308 Connecting Pipe             Thickness             .278"
l-D<. No.
                            )~t'l     stainless Steel Type*304 Thermal Sleeve No                         \1elded                   Rolled Attached Inside Vessel Pipo R~actions     Yes Transients           Per GE Drawing 729E762 Rev. 0 and 135B9990 Rev.           0 (A-41 )
13 INg. No.
K.III-53
129384E Location Shell 37' -4t" Hat 11
. j.:N-MO Inside DieJr tJ Shell 3.870" Inside Die~ C First Weld from vessel zero Taper I.D.
No Internal Lip Yes 3.870" Outside Diem.or Nozzle 11.495" Outside Di~~ at First Weld 2.,625" Cladding Nom. Thk.
3/16" Bimetal lo:eld Distenc~OFrnm Vehsel 1.0.
To bimetal weld
}lASt'1
.P.s1-i-*t A3 r/l ER308 Distance trOI!1 Shell 4.25" Mat '1 AS'I)1 A371 ER308 Connecting Pipe Thickness
.278"
)~t'l stainless Steel Type*304 Thermal Sleeve No
\\1elded Rolled Pipo R~actions Yes Attached Inside Vessel Transients Per GE Drawing 729E762 Rev. 0 and 135B9990 Rev.
0 K.III-53 (A-41 )


PBAPS 5.5208 I
PBAPS 5.5208 IV f-a:? ~
V f-a:? ~
--------..,~----t-lD'I; I
?..I2.ZS *      --------..,~----t-lD'I; I
.._-----==:::...-======-~ -+--_.. -!-
          . _-----==:::...-======-~ -+--_..
3/,,,
3/,,,
CRD HYD. RET. NOZZLE     (A-42 )
?..I2.ZS CRD HYD.
RET.
NOZZLE (A-42 )
K.III-54
K.III-54


PBAPS
PBAPS
          ?~\V\~~'(       -+ 'S~C.O\~\)~\~Y ~\;~c::. \~\G~~\"'< ~~~~~
?~\\V\\~~'(
          "U/   P\P\Nt"\   ~~<:'1'\O'~ ~\""?....5~:S Fo~ Tt\e ~~~E ~\)
-+ 'S~C.O\\~\\)~\\~Y
S1\u,()u.) : 30 ~l11   :   4e ,,~\
~\\;~c::.
                                                                                    \
\\~\\G~~\\"'<
tO~ "'H~ ~~:r..LE'
~~~~~
'SPM.Ol.c) :: 3.0 ~ =- eo.o \<.'2,\
"U/
3 f - - - - - - - - l 2SK~'
P\\P\\Nt"\\
~~<:'1'\\O'~ ~\\""?....5~:S Fo~ Tt\\e
~~~E ~\\)
S1\\u,()u.) : 30 ~l11 : 4e,,~\\
\\
tO~ "'H~
~~:r..LE'
'SPM.Ol.c) :: 3.0 ~ =- eo.o \\<.'2,\\
3 f--------l 2SK~'
4
4
                                                                    ~---""'55K~\
~---""'55K~\\
        ~                           60..:...:--.:Y.":,:~;,,!,,,\~------I6& K~'
~
7 eRD HYD. RET. NOZZLE                                         (A-43)
60..:...:--.:Y.":,:~;,,!,,,\\~------I6& K~'
K.III-55
7 eRD HYD.
RET.
NOZZLE K.III-55 (A-43)


PBAPS DE-~\c..-,~ -_.
PBAPS DE-~\\c..-,~
                ~'\::c.\-\. -p, ~'\~.~   ~'\~_~C::>l;S-S S\~'C-~rs \\4Te~~\\\'CS ~\             \\\TC-S~~\::- \::~~ ~~~ To B~
~'\\::c.\\-\\. -p, ~'\\~.~
COM~~S-&#xa3;:-"'O       To \.55"" = 2.~.7 foR. ~OZ:LLE- \0 ~\t-\..\.. \~l\,)~\c...\0~~
~'\\~_~C::>l;S-S S\\~'C-~rs
M~~. Mt=M'O~A.~,=--\- ~~E-~. ~~~s~
\\\\4Te~~\\\\\\'CS
lNTe~~\"\'(           =- 26.7.9 SA,\.\.Ow :::   \.S Sb1 "; 4-c~O M p..)C. CS'i::-C. -\- ?~~~~. ~\\(..~':;.~.
~\\ \\\\\\TC-S~~\\::-
                                    ,~\~~ ~\T\~               ~~~ ~\-\O"""'\~
\\::~~ ~~~ To B~
ON T\-\&- ~"e-TC...\-\
COM~~S-&#xa3;:-"'O To \\.55"" = 2.~.7 foR. ~OZ:LLE- \\0 ~\\t-\\..\\.. \\~l\\,)~\\c...\\0~~
CSf;\\.\.W-/ ~   3. 0   ~~ -::..80. D
M~~.
~\.\. ~""R~~\:-~       \H   \(S\
Mt=M'O~A.~,=--\\- ~~E-~.
CRD HYD. RETURN NOZZLE (A-44)
~~~s~
PIPING REACTION STRESSES K.III-56
lNTe~~\\"\\'(
=- 26.7.9 SA,\\.\\.Ow
::: \\.S Sb1 "; 4-c~O Mp..)C. CS'i::-C. -\\- ?~~~~.
~\\\\(..~':;.~.
,~\\~~ ~\\T\\~
~~~
~\\-\\O"""'\\~
ON T\\-\\&- ~"e-TC...\\-\\
CSf;\\\\.\\.W-/
~ 3. 0
~~ -::..80. D
~\\.\\. ~""R~~\\:-~ \\H \\(S\\
CRD HYD.
RETURN NOZZLE PIPING REACTION STRESSES K.III-56 (A-44)


PBAPS Nozzle   Core Diff. Press. & Liquid Control No. Req. 1                     Mk. No.       17             Dwg. No. l29374E Location Bottom Head Mat'l.     ~lN-~~O Inside lJ';a.-n.@ SheJ_l 1.90625"                 Taper I.D.
Taper I.D.
Internal Lip Inside Diam @ First 1-reid     .l.90625" Outside Diam of Nozz1e           5.937" Outside Diam at First Weld 3.126" Cladding                   Nom. Thk.       3/16" Dist.ance From Vessel I. D. To bimetal we1d
Internal Lip PBAPS Nozzle Core Diff. Press. & Liquid Control No. Req.
                          ).~at*l. ASTI~ A3'!l ER308 Bimetal Weld              Distance from Shell       3.875" Mat' 1. ASTl-1 A37l ER308 Connecting Pipe            Thickness     .206" Mat'l     Stainless Steel Type 304 Thcnnal Sleeve      No              Welded                     Rolled Attached Pipe Reactions        Yes Transients     Per G.E. DrawInG 729E162 Rev. 0 and l35B9990 - Rev. 0 (A-45 )
1 Mk. No.
K.III-57
17 Location Bottom Head Mat'l.
~lN-~~O Inside lJ';a.-n.@ SheJ_l 1.90625" Inside Diam @ First 1-reid
.l.90625" Outside Diam of Nozz1e 5.937" Outside Diam at First Weld 3.126" Dwg. No. l29374E Cladding Nom. Thk.
3/16" Bimetal Weld Connecting Pipe Dist.ance From Vessel I. D.
To bimetal we1d
).~at*l.
ASTI~ A3'!l ER308 Distance from Shell 3.875" Mat' 1.
ASTl-1 A37l ER308 Thickness
.206" Thcnnal Sleeve No Pipe Reactions Yes Mat'l Stainless Steel Type 304 Welded Attached Rolled Transients Per G.E. DrawInG 729E162 Rev. 0 and l35B9990 - Rev. 0 K.III-57 (A-45 )


PBAPS A -+I--A V'\u- t-"\ I)                 I
PBAPS A -+I--A V'\\u-t-"\\ I)
                '$C:. :-~o"- <:;; C. 'T3.   ~~
I
(A-46)
'$C:. :-~o"- <:;;C. 'T3.
~~
LIQUID CONTROL NOZZLE 17 (REGION C)
LIQUID CONTROL NOZZLE 17 (REGION C)
NOZZLE JUSTIFIED BY N415.1 & N450 OF SECTION III K.III-58
NOZZLE JUSTIFIED BY N415.1 & N450 OF SECTION III (A-46)
K.III-58


PBAPS DE"5\(...~ \l\EOA. ?t~\N('" 'S~\;~~~~
PBAPS DE"5\\(...~
STR.'C-~~ \\"\\~~~\,\&#xa3;:-~         f\T T\"\'f=-
\\l\\EOA. ?t~\\N('" 'S~\\;~~~~
S~~t:- t;~~         ~~\: To .'OE-C.o""p~~~ \0           '.S ~h'\:' 23.7 FoR. t--\O"1:"l_\.~\0 S\\~\.L JC"T.
STR.'C-~~ \\\\"\\\\~~~\\,\\&#xa3;:-~ f\\T T\\"\\'f=-
M~. ME-~~~"t,;--\'" ?R.~~. STR~~
S~~t:-
II'\,.e~~ \T'{ ::. \~ .B4-s~\\.Oy.l 0::. I. 5 ~   -:=. 40.0 M~. CSe-c... + t>R~"S~.   ~TR'C-S~
t;~~
                            \\o.\1~~\\\~ . ~~~ ~\-\ovJ~
~~\\: To.'OE-C.o""p~~~ \\0 '.S
o~ T~E- ~~Eo\C.\\
~h'\\:' 23.7 FoR.
S~\\.ow ::. 3.0 S\1\ -... <00,0
t--\\O"1:"l_\\.~\\0 S\\\\~\\.L JC"T.
                  /1'2.:0$
M~.
                            \2..9f}
ME-~~~"t,;--\\'" ?R.~~. STR~~
LIQUID CONTROL NOZZLE                         (A-47 )
II'\\,.e~~\\T'{
PIPING REACTION STRESSES K.III-59
::. \\~.B4-s~\\\\.Oy.l 0::. I. 5 ~ -:=. 40.0 M~. CSe-c...+ t>R~"S~. ~TR'C-S~
\\\\o.\\1~~\\\\\\~. ~~~
~\\-\\ovJ~
o~ T~E-
~~Eo\\C.\\\\
S~\\\\.ow ::. 3.0 S\\1\\ -... <00,0
/1'2.:0$
\\2..9f}
LIQUID CONTROL NOZZLE PIPING REACTION STRESSES K.III-59 (A-47 )


PBAPS Nozzle     Control Rod Drive No. Req. 185                     .1k. no. 101-12B       Dwg. Ito. - 129399E Location    Bottom Head Mat'l        Inconel Inside DiElI11. @ Shell   6.0"                 Taper I. D. No Internal Lip  No Inside Diem.     @ First l~eld     6.0" outside Diam.     or Uozzle       7.5" Outside Di~.     at First Weld   7.75" Cladding     rro           Nom. Thk.
PBAPS Nozzle Control Rod Drive No. Req.
185 Location Bottom Head Mat'l Inconel
.1k. no. 101-12B Dwg. Ito. - 129399E Inside DiElI11. @ Shell 6.0" Taper I. D.
No Inside Diem. @ First l~eld 6.0" outside Diam. or Uozzle 7.5" Outside Di~. at First Weld 7.75" Internal Lip No Cladding rro Bimeta.l '-leld IIo Connecting Pipe No Thermal Sleeve No Nom. Thk.
Distance From Vessel lAD.
Distance From Vessel lAD.
Ma.t'!
Ma.t'!
Bimeta.l '-leld IIo        Distance from Shell Mat'l Connecting Pipe No          Thickness J.lat'l Thermal Sleeve        No                    Welded             Rolled Attached Pipe Reactions       Yes Transients         Per GE Dra~in~:     886n499 Rev. 5, Sheet 2 1.35B9990 Rev. 0 729E162 *Rev. 0 886n~99 Sheet 7 (A-48)
Distance from Shell Mat'l Thickness J.lat'l Welded Rolled Attached Pipe Reactions Yes Transients Per GE Dra~in~:
K.III-60
886n499 Rev. 5, Sheet 2 1.35B9990 Rev. 0 729E162
*Rev. 0 886n~99 Sheet 7 K.III-60 (A-48)


PBAPS
PBAPS 3.75 I
                -        3.75
2.9<)5" l'"--
* I
*~t
                    -    2.9<)5" l'"--
~
                    *~t
I
              ~
~
                                . I
                              ~
:-&#xa3;
:-&#xa3;
                            *0 C()
*0 C()
                        *    .0
.0
        ---.      ~7So I
~7So I
I CONTROL ROD DRIVE NOZZLE               (A-49 )
I CONTROL ROD DRIVE NOZZLE (A-49 )
K.III-61
K.III-61


PBAPS PR\ \""~~'<     -t   SE-CO'* t>~RY 1N\"G-~S rr\,       R~~~E:-
PBAPS PR\\ \\""~~'<
                                -    3.0     ~\--\ -= 70 KS\
-t SE-CO'*t>~RY 1N\\"G-~Srr\\,
                                -    3.0 5~         - ~O \(S\
R~~~E:-
                    ~.                                   --J Mftx Pt.I. S7R&#xa3;S.5       IN;EN~,.rY SMfr'l'= 8,0 ks   I   I SAI..L t=: 1',0 (6iP/lu..r~s)
3.0
          .$MA'IC ;   J~,OKSI   J S~L.L. ,;;.2.3,0 llNC.O,,/&#xa3;L)
~\\--\\ -=
CONTROL ROD DRIVE NOZZLE                   (A-50 )
70 KS\\
K.III-62
3.0 5~ -
~O \\(S\\
~.
--J Mftx Pt.I. S7R&#xa3;S.5 IN;EN~,.rY SMfr'l'= 8,0 ks I I SAI..L t=: 1',0 (6iP/lu..r~s)
.$MA'IC ;
J~,OKSI J
S~L.L.,;;.2.3,0 llNC.O,,/&#xa3;L)
CONTROL ROD DRIVE NOZZLE K.III-62 (A-50 )


PBAPS Nozzle   Jet Pump Inst.
PBAPS Nozzle Jet Pump Inst.
No. Req. 2                 MIt. No.         19           Dwg. No. l29385E Location   Shell n* 3" above vessel zero Mat'l. MN-MO Inside piam.@ Shell_     3.8125"                   Taper I.D. No Internal Lip No Inside Diam.. @ First \*!eld J 8125" c.
No. Req.
Outside Diam of Nozzle       8" Outside Dia-n at First Weld         5.375" Cladding                 Nom. Thk
2 MIt. No.
* 1/4"
19 Location Shell n* 3" above vessel zero Mat'l.
,-                          Distance From Vessel I.D.         To bimetal weld Kat
MN-MO Inside piam.@ Shell_
* J.. AST1-1 371 ER308 Bimetal Weld            Di stance r~om Shell 3.875"
3.8125" Inside Diam.. @ First \\*!eld J c. 8125" Outside Diam of Nozzle 8"
                            }.{at-I.l. ASTM   371 ER308 Connecting Pipe          Thickness       0.311" Mat'l       Stainless Steel Type 304 Thermal Sleeve No                     Welded                      Rolled Attached Pipe Reactions   Yes Transients   Per GE Drawing 729E762 Rev. 0 (A-51 )
Outside Dia-n at First Weld 5.375" Dwg. No. l29385E Taper I.D.
No Internal Lip No Cladding Bimetal Weld Connecting Pipe Thk 1/4" Nom.
Distance From Vessel I.D.
To bimetal weld Kat*J..
AST1-1 371 ER308 Distance r~om Shell 3.875"
}.{at-I.l.
ASTM 371 ER308 Thickness 0.311" Mat'l Stainless Steel Type 304 Thermal Sleeve No Pipe Reactions Yes Welded Attached Rolled Transients Per GE Drawing 729E762 Rev. 0 (A-51 )
K.III-63
K.III-63


PBAPS
PBAPS
____ ~ v.."e-O I. C).:t<.
____~ v.."e-O I.C).:t<.
                -tz...
-tz...
l7 Mu-Mo
l7 Mu-Mo
            ~~
~~
          ~~ _.
~
                                              ~=--t 1            .
1
l\M:.'~ \.1'\ \I~.
~ _.
(A- 5 2) 4" JET PUMP NOZZLE 19 (REGION B)
~=--t l\\M
NOZZLE JUSTIFIED BY N415.1 & N450 OF SECTION III K". 1II-64
:.'~ \\.1'\\ \\I~.
4" JET PUMP NOZZLE 19 (REGION B)
NOZZLE JUSTIFIED BY N415.1 & N450 OF SECTION III K". 1II-64 (A-5 2)


PBAPS O'E-~\<:'"'~ ME<...\\. ?\~\~C.... '5n"t't-~~E-~
\\0.10 PBAPS O'E-~\\<:'"'~
                                ~\\'t'E-~c:... \~TE-"~\\\E-~ t\., \W~*
ME<...\\\\.
                                ~ta..f=e- ~~() ~S...E \0 '\SE-C.OMP~RE:b \0 \.5 CS\-n =. '2.?;,*7 Fo~       -Woz:z.\.'C:- \0 ~""~L'- J0~CT~R..~
?\\~\\~C....
M"~. \-1t=\'\'S~""'~~ -\- ~~,.~. STilt=~S
'5n"t't-~~E-~
                                  \\-\''E:~~\,.X = 2.G:.. '2.~
~\\\\'t'E-~c:...
M~. ~E-C ..... V~ES.S. '5T~~~~
\\~TE-"~\\\\\\E-~
h~.,.&"-\~\\\~~ ~~'=- ~ow~ O~
t\\., \\W~*
                                  \\\E. ~\<.~\c..\\
~ta..f=e-
                                  ~~\.\.()w -= '5.b S"'1     = eo. D
~~()
\0.10 2.5.15 4" JET PUMP NOZZLE MK 19                           (A-53)
~S...E \\0 '\\SE-C.OMP~RE:b
PIPING REACTION STRESSES K.III-65
\\0 \\.5 CS\\-n =. '2.?;,*7 Fo~ -Woz:z.\\.'C:- \\0 ~""~L'- J0~CT~R..~
M"~. \\-1t=\\'\\'S~""'~~-\\- ~~,.~.
STilt=~S
\\\\-\\''E:~~\\,.X
= 2.G:.. '2.~
M~.
~E-C..... V~ES.S. '5T~~~~
h~.,.&"-\\~\\\\\\~~
~~'=- ~ow~
O~
\\\\\\E.
~\\<.~\\c..\\\\
~~\\.\\.()w
-= '5.b S"'1 =eo. D 2.5.15 4" JET PUMP NOZZLE MK 19 PIPING REACTION STRESSES K.III-65 (A-53)


PBAPS Nozzle     2" InstruInentation No. Req.                         Nl'.* No. 12 Location     Shel13CP -;-6" ,4.3' -1" ,and 49' ,..l?--tf above vessel zero l-tat'l. Inconel Inside Dic:n.@ Shel,L     1.9~) . )"                   Taper I.D. No Internal Lip No Inside Di8.:'1l @ First \*leld       1.953" Outside* Dia:n   o~ Nozzle           2.755" Outside Diaro at l"irst Weld           2.755" Cladding       No           Nom. Thk.
PBAPS Nozzle 2" InstruInentation No. Req.
Nl'.* No.
12 Location Shel13CP -;-6",4.3' -1",and 49',..l?--tf above vessel zero l-tat'l.
Inconel Inside Dic:n.@ Shel,L 1.9~)..)"
Taper I.D.
No Inside Di8.:'1l @ First \\*leld 1.953" Outside* Dia:n o~ Nozzle 2.755" Outside Diaro at l"irst Weld 2.755" Internal Lip No Cladding No Nom. Thk.
Distance F:ro!!l V~ssel !. D.
Distance F:ro!!l V~ssel !. D.
Mat'l.
Mat'l.
Bimetal l-:e ld    No       Distance from Shell Mat'1.
Bimetal l-:eld No Connecting Pipe Distance from Shell Mat'1.
Connecting Pipe            Thickness       .2422" stainless Steel Type 304 Thennal Sleeve No                         Welded                      Rolled Attached 1'5 }'C Reacti.ons Yes Pc r CS Dz";;.',: inc 729E7G2 and 13)B9~90 Rev. 0 (A-54 )
Thickness
.2422" stainless Steel Type 304 Thennal Sleeve No 1'5 }'C Reacti.ons Yes Welded Attached Rolled Pc r CS Dz";;.',:inc 729E7G2 and 13)B9~90 Rev. 0 (A-54 )
K.III-66
K.III-66


PBAPS
PBAPS f()
                          .~1bS "
N-.
f()
\\D
-\D.
.~1bS "
N 2" INSTRUMENT NOZZLE       (A-55)
2" INSTRUMENT NOZZLE K.III-67 (A-55)
K.III-67


PBAPS PR\\,,\f:\RY + Sc-c..o~,\>~~Y S"'Rr-~~ \N"~~~\\'( \<.f>-..~~':
51,'2. ~\\
CSA.\....o~ = 3~", '::. 70.0 ,,~\
PBAPS PR\\\\,,\\f:\\RY +
51,'2. ~\
Sc-c..o~,\\>~~Y S"'Rr-~~
\\N"~~~\\\\'(
\\<.f>-..~~':
CSA.\\....o~ = 3~",
'::. 70.0
,,~\\
(A-56) 2 11 INSTRUMENT NOZZLE K.III-68
(A-56) 2 11 INSTRUMENT NOZZLE K.III-68


PBAPS
PBAPS
                \':1'6, \t -       'l. \~. \ ~S"';"~_\H~"'2':\\t:-;\\v~ \\OL."l.'-~
\\':1'6, \\t - 'l. \\~.
p,? ~==\_~,,;..-.~p..,.(".:\\O~ ~t':..,1.;"~~~
\\ ~S"';"~_\\H~"'2':\\\\t:-;\\\\v~
5,"<..E       T'\-\E     \--\'t::. \l.. ~ t,) \~"5\~ME~\~\\C>~ ~C>t-:eu:::-::-..>> ~~&
\\\\OL."l.'-~
~\-"t""-C..\-\~~ \0 T\"\e' \h:~'>"~~L c:;.\-\~\.'- ~'( ~ ~,,~..T\h..\... V\:~~\~~\\Cl-\
p,? ~==\\_~,,;..-.~p..,.(".:\\\\O~ ~t':..,1.;"~~~
\VG-l.t). THe \)"5~ C~ ~~.w LoI--fPUTc:;.tK, ~P~~(,~N'-1 elJ                           1.., 7 (e 'J\.I\.lf)~()
5,"<..E T'\\-\\E
~~"'\'<~Ie:-) \3 ~o\ \J "\"\0. T\,\E'" ~\Q\~G. 1<~I\.('\\O~~ ~\\\. Se-E-'J ~\..uA..T~t) ~ Co "-'TR.\ B\JT\\oj~ \() ~ ~"'~~ \'<P~ +~\L\J~
\\--\\'t::. \\l.. ~ t,) \\~"5\\~ME~\\~\\\\C>~
h\ \\'F.;: \~ ~\.. (> ~~-~"
~C>t-:eu:::-::-..>>
T"e Mt-..XtMUM ~'.Je9'J'..('''(=' ~Ht:.e...),\..)'-"' ~\i>...e:"'&#xa3;"S. \~ 3.(,Zo4
~~&
  \<\~ I \\-\ 'Z. c.ot-\P~_e-\) To p....~           t\\_\"owA~~\.~- "S'l"~-e;.s.s. o~ \2.<:>0 \<'\9"5:. "\-\ 20,
~\\-"t""-C..\\-\\~~ \\0 T\\"\\e'
  \~\E ~'"T~~.;s. \~ \N~\..\.                 'Be\.ow \\'\~ Pa..\.\.o"".., al.& ~~O Y\e'E::"l" \\-\~
\\h:~'>"~~L c:;.\\-\\~\\.'-
  \t~~\j\~~~Ct.lTb               O~ 'SGC.,'lOt-\ -:m.. J OF ",,,,=" ~c;, "16- c.o~.
~'(
T\-\e     ~o'Z."Z.'..e- ~"O S\~~~~ \~\~~~\,\t~ ~9...~ \
~ ~,,~..T\\h..\\... V\\:~~\\~~\\\\Cl-\\
O...s\~\"V~             S ~\   ":. \Eo
\\VG-l.t). THe
* 2. S- ~s 1
\\)"5~ C~
                        \~~\{)e                '5~,   -=;:. 1l. 85 \<~ \
~~.w LoI--fPUTc:;.tK, ~P~~(,~N'-1 elJ 1..,7 (e 'J\\.I\\.lf)~()
(A-57)
~~"'\\'<~Ie:-) \\3
MK 2 INSTRUMENTATION NOZZLE PIPING REACTION STRESSES K.III-69
~o\\ \\J "\\"\\0.
T\\,\\E'"
~\\Q\\~G.
1<~I\\.('\\\\O~~ ~\\\\\\. Se-E-'J ~\\..uA..T~t) ~ Co "-'TR.\\ B\\JT\\\\oj~ \\()
~ ~"'~~\\'<P~ +~\\L\\J~
h\\ \\\\'F.;:
\\~ ~\\..(>
~~-~"
T"e Mt-..XtMUM
~'.Je9'J'..('''(='
~Ht:.e...),\\..)'-"' ~\\i>...e:"'&#xa3;"S.
\\~
3.(,Zo4
\\<\\~I \\\\-\\'Z.
c.ot-\\P~_e-\\) To p....~
t\\\\_\\"owA~~\\.~- "S'l"~-e;.s.s.
o~
\\2.<:>0 \\<'\\9"5:. "\\-\\ 20,
\\~\\E
~'"T~~.;s.
\\~
\\N~\\..\\.
'Be\\.ow
\\\\'\\~ Pa..\\.\\.o""..,al.&
~~O Y\\e'E::"l" \\\\-\\~
\\t~~\\j\\~~~Ct.lTb O~
'SGC.,'lOt-\\ -:m.. J OF ",,,,=" ~c;, "16-c.o~.
T\\-\\e
~o'Z."Z.'..e- ~"O S\\~~~~ \\~\\~~~\\,\\t~ ~9...~ \\
O...s\\~\\"V~
\\~~\\{)e S
~\\ ":. \\Eo *2. S- ~s 1
'5~,
-=;:.
1l. 85
\\<~\\
MK 2 INSTRUMENTATION NOZZLE PIPING REACTION STRESSES K.III-69 (A-57)


PBAPS Nozzle   6" InstruJ'aents.tion (Head Spray)
PBAPS Nozzle 6" InstruJ'aents.tion (Head Spray)
No. Rcq. 2                                                   D'Ng. No:. 129393 Location Top Head Mat'i. MN-MO Inside Dia.-n.@ 8"lH.:11 6.218'{)                   Teper I.D.     No Internal Lip    No Inside Diam @ First \~eld           5.8125" Outside Diam of Nozzle             11.4375" Outside Dianl at first Welt! '1.5" Cladding                   Nom. Thk.     1/4" Distance From Vessel I.D. To bU(letal weld 1-1at 'I. ASTl'-1 A37l ER308 Bimetal Held Yes           Distance from Shell 9.125" Mat'l.     ASTI~   A37l ER308 Connecting Pipe           Thickness Flange Connection Mat'1       Stainless Steel ThCl~al Sleeve Yes                     Welded                       Rolled For use as Head Spray Attached Clamped between flanges Pipe Reactions     Yes Transients     Per GE Dra*.....i ng 729=;762 Rev. 0 & l35B9990 Rev*. 0 (A-58 )
No. Rcq.
K.III-70
2 D'Ng. No:. 129393 Location Top Head Mat'i.
MN-MO Inside Dia.-n.@ 8"lH.:11 6.218'{)
Teper I.D.
No Inside Diam @ First \\~eld 5.8125" Outside Diam of Nozzle 11.4375" Outside Dianl at first Welt! '1.5" Internal Lip No Cladding Nom. Thk. 1/4" Distance From Vessel I.D.
To bU(letal weld 1-1at 'I.
ASTl'-1 A37l ER308 Bimetal Held Yes Distance from Shell 9.125" Mat'l.
ASTI~ A37l ER308 Connecting Pipe Thickness Flange Connection Mat'1 Stainless Steel ThCl~al Sleeve Yes Welded For use as Head Spray Rolled Attached Clamped between flanges Pipe Reactions Yes Transients Per GE Dra*.....ing 729=;762 Rev. 0 & l35B9990 Rev*. 0 K.III-70 (A-58 )


PBAPS
PBAPS
            --f--~
--f--~
c..
c..
                    ..-1--------.. .
-_._-_:"'!..-1--------.....
IM~-""'O               .,
IM~-""'O
                        *Sb..:~oL G e.'i3 . 4-
*Sb..:~oL G e.'i3.
          ~-----t-------_--l._---..L..-
4-
I
____I
_ _ _ _I I
~-----t-------_--l._---..L..-
I (A-59 )
I II (A-59 )
6" INSTRUMENTATION NOZZLE 206 (REGION A)
6" INSTRUMENTATION NOZZLE 206 (REGION A)
NOZZLE JUSTIFIED BY N415.1 & N450 OF SECTION III K.III-71
NOZZLE JUSTIFIED BY N415.1 & N450 OF SECTION III K.III-71


PBAPS O~\C.....\ \ ""'CC.\-\. ~\,,\~&#xa3;? ~~...~C:."::>~~
PBAPS O~\\C.....\\\\
S\~~"5~ \~\C~~\\\~ h.., \\\~
""'CC.\\-\\.
S~~!C- ~~ I\~. . e- \0 ~'i:
~\\,,\\~&#xa3;? ~~...~C:."::>~~
COMPA.~~'\:>         \0     \~S ~W\ = '2.7.3 Fo\>", ~OL1..'-\:-         \0 ~\\E\..\. ~c.1"7 V\~y.. M~6R~~~ ~~~~~. ~~t::.
S\\~~"5~
                                          \~\~~~\\'{         -;;:. \~. e~
\\~\\C~~\\\\\\~ h.., \\\\\\~
\4 ..1B - - .
S~~!C- ~~
M flo..-x.. ~\:.C. 0\0 ~~~. ~CL';-c:.,~ ~
I\\~....e- \\0 ~'i:
                                              \~\e.-~~\T\~               ~~~ CS>r\OW\-\
COMPA.~~'\\:> \\0
CA., T\'\s- S~~\U\
\\~S ~W\\ = '2.7.3 Fo\\>", ~OL1..'-\\:- \\0 ~\\\\E\\..\\.
S~\C'M :: 0.0 CSW\ ";:. COO. C) 6" INSTRUMENTATION NOZZLE MK 206                               (A-60)
~c.1"7 V\\~y..
PIPING REACTION STRESSES K.III-72
M~6R~~~ ~~~~~. ~~t::.
\\~\\~~~\\\\'{ -;;:.
\\~. e~
\\4..1B --.
M flo..-x..
~\\:.C. 0\\0 ~~~.
~CL';-c:.,~
~
\\~\\e.-~~\\T\\~
~~~ CS>r\\OW\\-\\
CA., T\\'\\s-S~~\\U\\
S~\\C'M :: 0.0 CSW\\ ";:. COO. C) 6" INSTRUMENTATION NOZZLE MK 206 PIPING REACTION STRESSES K.III-72 (A-60)


PBAPS
PBAPS
                              ','AXIl*1Ur*1 US.~GE FAC'roRS Recirculation Outlet Nozzle                                 stainJ.ess Steel     .10 Mn Moly             .30 SA-376 Type 316     .233 SA- 312 Type 304   .147 Mn Moly             .027 l"eea.watcr                                                Mn Moly             .70 Core Spray Noz zle                                          stainless Stce1     .01 Mn Moly             .02 CRD Hyd. Ret. lk>z,zle                                    Stain1ess Steel No uSRge *ractor Mn I~oly             .363 Control Rod Drive Nozzle                                    Inconel             .005
','AXIl*1Ur*1 US.~GE FAC'roRS Recirculation Outlet Nozzle l"eea.watcr Core Spray Nozzle CRD Hyd. Ret. lk>z,zle Control Rod Drive Nozzle
?"  JY)~t.rumentat:ion Nozzl e                              Inconel              .06 Support Skirt                                              Mn Moly             .55 Refueling  Cont~.inment  Skirt                            Mn Moly             .328 Shroud Support                                              Mn Moly               .17 Closure                                                    ~1n Moly             .000 Stud                 .762 Vessel Shells                                              Water Level Area     .009 Lower Head Area     .032 (A-61 )
?"
K.III-73
JY)~t.rumentat:ion Nozzl e Support Skirt Refueling Cont~.inment Skirt Shroud Support Closure Vessel Shells K.III-73 stainJ.ess Steel
.10 Mn Moly
.30 SA-376 Type 316
.233 SA-312 Type 304
.147 Mn Moly
.027 Mn Moly
.70 stainless Stce1
.01 Mn Moly
.02 Stain1ess Steel No uSRge *ractor Mn I~oly
.363 Inconel
.005 Inconel
.06 Mn Moly
.55 Mn Moly
.328 Mn Moly
.17
~1n Moly
.000 Stud
.762 Water Level Area
.009 Lower Head Area
.032 (A-61 )


PBAPS This section of tlle report contains a tabulation of all deviations that affect the   struct.u~.~al integrity of t'he reactor vessel and closure head.
PBAPS This section of tlle report contains a tabulation of all deviations that affect the struct.u~.~al integrity of t'he reactor vessel and closure head.
      !he deviations are listed by CV numbers; also, the corresponding VN numbers are shown. A description of the variation is given along loTi. th a summary of the engil'leertng justif.l.catio~1 .~)f' that variation.
!he deviations are listed by CV numbers; also, the corresponding VN numbers are shown.
A description of the variation is given along loTi.th a summary of the engil'leertng justif.l.catio~1
.~)f' that variation.
K.III-74
K.III-74


PBAPS cv#           Description 139-6A 50472       A dimensional inspection of the 26" steam Outlet Nozzle revealed that the 5-7/8" radius was machined 1/4" too deep into the 45&deg; angle.
cv#
Conclusion In keeping t.he originu configuration, 1/4" of the reinfol Cl;Iaent area was machined off of the 45&deg; slope. This was justified from Article 1-6 of the A.S.M.E   Code, Section III.
139-6A 139-19A 139-22 50472 70207 75028 PBAPS Description A dimensional inspection of the 26" steam Outlet Nozzle revealed that the 5-7/8" radius was machined 1/4" too deep into the 45&deg; angle.
139-19A 70207  Description Th~ minimum shank diameter of one of the studs is 5.8195" which is 0.0105" too small.
Conclusion In keeping t.he originu configuration, 1/4" of the reinfol Cl;Iaent area was machined off of the 45&deg; slope.
 
This was justified from Article 1-6 of the A.S.M.E Code, Section III.
== Conclusion:==
Description Th~ minimum shank diameter of one of the studs is 5.8195" which is 0.0105" too small.


The maximum primary + secondary stress in-tensity is 100 ksi. The allowable is 110 ksi; therefore, the stud as machined meets the stress requirements of the   AS~m Code, Section III.
==
139-22  75028
Conclusion:==
 
The maximum primary + secondary stress in-tensity is 100 ksi.
== Description:==
The allowable is 110 ksi; therefore, the stud as machined meets the stress requirements of the AS~m Code, Section III.


==
Description:==
Flux Monitor Penetrations exceeded the radial tolerance of 0.060" with the maximum off center of 0.164" on penetration #22-C.
Flux Monitor Penetrations exceeded the radial tolerance of 0.060" with the maximum off center of 0.164" on penetration #22-C.
(B-2)
(B-2)
K.III-75
K.III-75


PBAPS
139-23B 127-23B 75019 PBAPS
 
== Conclusion:==


                    ~le resulting reinforcement area is still in excess of the required area.
==
139-23B 75019 
Conclusion:==
 
~le resulting reinforcement area is still in excess of the required area.
== Description:==


==
Description:==
A maximum mismatch of 1-3!i6" between MK-2 (Lower Head Upper Segment) and MK-57 (Shell Course
A maximum mismatch of 1-3!i6" between MK-2 (Lower Head Upper Segment) and MK-57 (Shell Course
                #1 Assembly).
#1 Assembly).
Conelusi.on:
Conelusi.on:
The maximum primary plus secondary stress is 37 ksi. The allowable is 80 ksi; therefore, the as built assembly meets the stress require:
The maximum primary plus secondary stress is 37 ksi.
The allowable is 80 ksi; therefore, the as built assembly meets the stress require:
ments of the A.S.M.E. Code, Section III.
ments of the A.S.M.E. Code, Section III.
127-23B A dimensional inspection of the Lower Head Dome to Torus Assembly showed a maximum mismatch of 1/2" on th e 0 .D.
A dimensional inspection of the Lower Head Dome to Torus Assembly showed a maximum mismatch of 1/2" th 0 D on e..
 
== Conclusion:==


Engineering calculations show the maximum primary local membrane stress intensity to be 26.8 ksi. Sallow = 1.5 Sm = 40 ksi. The maximun primary + secondary stress intensity is 35.7 ksi.
==
Sallow = 3.0 Sm = 80 ksi.
Conclusion:==
Engineering calculations show the maximum primary local membrane stress intensity to be 26.8 ksi. Sallow = 1.5 Sm = 40 ksi.
The maximun primary + secondary stress intensity is 35.7 ksi.
Sallow = 3.0 Sm = 80 ksi.
(B-3 )
(B-3 )
K.III-76
K.III-76


PBAPS cv#     VNI!  Description l27-24B 50655       A dimensional inspection of the torus to the lower head assembly showed a mismatch of 7/8" maximum I. D. and 1/4" maximum o. D.
cv#
Conclusion Engineering calculations show the primary local membrane stress intensity for mismatch geometry to be 26.8 ksi. Sedlow. = 1.5 Sm =
l27-24B 127-36 VNI!
40.0 ksi. The maximum primary + secondary stress intensity is 19.6 ksi. Sallow.   = 3.0 Sm = 80.0 ksi. Therefore engineering recommends acceptance "as is".
50655 51403 PBAPS Description A dimensional inspection of the torus to the lower head assembly showed a mismatch of 7/8" maximum I. D. and 1/4" maximum o. D.
127-36  51403 
Conclusion Engineering calculations show the primary local membrane stress intensity for mismatch geometry to be 26.8 ksi. Sedlow.
 
= 1.5 Sm =
== Description:==
40.0 ksi.
The maximum primary + secondary stress intensity is 19.6 ksi. Sallow. = 3.0 Sm = 80.0 ksi.
Therefore engineering recommends acceptance "as is".


==
Description:==
CRD and Flux l-1onitor "J" groove deviations.
CRD and Flux l-1onitor "J" groove deviations.


== Conclusion:==
==
 
Conclusion:==
The reported weld groove variations are satisfactory from the standpoint of base metal reinforcement and ligament efficiency.
The reported weld groove variations are satisfactory from the standpoint of base metal reinforcement and ligament efficiency.
K.III-77
K.III-77


PBAPS CB&I Deviation        
CB&I Deviation Report IfJ IC)('?-1 CB&I Deviation Report #4962-2 PBAPS
 
== Description:==
 
Repo rt IfJ I C)( '?-1 A maximum mismatch of 1- 3/8" between MK-202 (closure head segment) and MK-209 (closure head fl<i.nge) .


== Conclusion:==
==
Description:==
A maximum mismatch of 1-3/8" between MK-202 (closure head segment) and MK-209 (closure head fl<i.nge).


The maxlmum primary + seconda.ry stress intensity is 75.7 ksi.       The allowable is 80.0 ksi; therefore, the as built assembly meets the stress   ~equirements   of the   AS~ffi Code, ~ection III.
==
CB&I Deviation          Description Report #4962-2 Three of the tapped stud bushing holes
Conclusion:==
(#14,32,66) had defective threads.           Also, the bottom 2-1/2 inches of thread of one side of hole #31 were incomplete or missing.
The maxlmum primary + seconda.ry stress intensity is 75.7 ksi.
 
The allowable is 80.0 ksi; therefore, the as built assembly meets the stress
== Conclusion:==
~equirements of the AS~ffi Code,
~ection III.
Description Three of the tapped stud bushing holes
(#14,32,66) had defective threads.
Also, the bottom 2-1/2 inches of thread of one side of hole #31 were incomplete or missing.


==
Conclusion:==
Special overzize bushings were used for the thread holes (14,32,66) that hn.d defective threads.
Special overzize bushings were used for the thread holes (14,32,66) that hn.d defective threads.
The minim\UTI effecti.ve thr(:.:-Jl lenGth that (B-5 )
The minim\\UTI effecti.ve thr(:.:-Jl lenGth that (B-5 )
K.III-78
K.III-78


PBAPS cv#           VNI   Conclusion - (Cont'd.)
cv#
is required in the flange is 4.07 in. Therefore, the 8 inches of good thread'in hole #31 is acceptable.
CB&I Deviation Report #4962-8 VNI PBAPS Conclusion - (Cont'd.)
CB&I Deviation      Description-Report #4962-8 Two thin areas in the lower head vnth the minimum thickness of 7.99 in. which includes the cladding thickness.
is required in the flange is 4.07 in.
 
Therefore, the 8 inches of good thread'in hole #31 is acceptable.
== Conclusion:==
Description-Two thin areas in the lower head vnth the minimum thickness of 7.99 in. which includes the cladding thickness.


These two thin areas are outside the eRD and in-core penetration region. Since the required thickness in this region is 3.0751", the 7.99 in. thickness is acceptable.
==
Conclusion:==
These two thin areas are outside the eRD and in-core penetration region.
Since the required thickness in this region is 3.0751", the 7.99 in. thickness is acceptable.
(B-6)
(B-6)
K.III-79}}
K.III-79}}

Latest revision as of 09:43, 29 November 2024

8 to Updated Final Safety Analysis Report, Appendix K, Exhibit III, Summary Stress Report
ML21109A098
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/08/2021
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21110A638 List: ... further results
References
Download: ML21109A098 (81)


Text

{{#Wiki_filter:APPENDIX K K.III-1 REV. 27, APRIL 2019 EXHIBIT III

SUMMARY

STRESS REPORT

PBAPS UFSAR EXHIBIT III -

SUMMARY

STRESS REPORT The power rerate design requirements are unchanged from the original design requirements specified on page K.III-7 of Exhibit III (i.e., design pressure of 1250 psig at bottom of the reactor vessel, design temperature of 575°F). The operating pressure is increased from 1005 psig to 1035 psig. The operating temperature is increased from 546°F to 551°F. GE report NEDC-32166, "Reactor Pressure Vessel, Power Rerate, Stress Report Reconciliation for the Peach Bottom Nuclear Power Plant Units 2 and 3," January 1993, documents the ASME Boiler and Pressure Vessel Code, Section III, analysis of limiting reactor pressure vessel components for PBAPS. This analysis constitutes the stress report reconciliation for validating the use of existing reactor pressure vessel components for the power rerate conditions. GE report GE-NE-523-61-0493 "Fatigue Evaluation of the Peach Bottom II and III Reactor Vessels," May 1993, GE letter GENE B13-01805-73, October 18, 1996, GE letter WFW 9607, November 13, 1996, and Calculation PM-1164 document the re-evaluation of reactor vessel fatigue in accordance with UFSAR Table 4.2.4. Closure stresses and usage factors have been re-evaluated in M-1-A-411 based on a reduced number of tensioning and detensioning passes for RPV assembly and disassembly. The Unit 2 and 3 TPO power rerate did not change the normal operating pressure or temperature for the reactor vessel. The extended power uprate (EPU) design requirements for the reactor vessel are unchanged from the original design requirements specified on page K.III-7 of Exhibit III. The EPU did not change the normal operating pressure or temperature for the RPV. GEH Report 0000-0100-9064-R1, Reactor Vessel Integrity - Stress and Fatigue Evaluation for PBAPS Units 2 and 3 Extended Power Uprate, June 2012 (G-080-VC-411) documents the stress and fatigue evaluation of limiting RPV components in accordance with the ASME B&PV Code, Section III. This analysis constitutes the stress report reconciliation and validates the use of the existing RPV APPENDIX K K.III-1A REV. 27, APRIL 2019

PBAPS UFSAR

components for the EPU conditions. This analysis is primarily based on the design requirements specified in GEH certified design specification 26A8258 R2, Reactor Pressure Vessel - Extended Power Uprate (120% OLTP) (G-080-VC-412). Additionally, supplementary analysis was performed by Structural Integrity Associates for the feedwater nozzle and other limiting RPV components, as documented in report PEAM-EPU-128, Environmentally Assisted Fatigue Analysis. This analysis addresses fatigue evaluation and incorporates environmental fatigue effects due to reactor coolant environment in determining the cumulative usage factors for a plant life of 60 years. The existing steam dryer support brackets and the attachment points within the RPV have been evaluated for the replacement steam dryer (RSD) by Westinghouse as documented in Report LTRBWR-ENG-14-001, Revision 1, February 27, 2014. There is no adverse impact on the original bracket design or structural integrity of the RPV due to increased weight of the RSD. GEH Report 0000-0148-0814-R1, December 2013 (PEAM-EPU-130), documents the evaluation performed for the RSD interface with the RPV, with the conclusion that there is no impact on the stress and fatigue reconciliation performed by GEH as documented in report 0000-0100-9064-R1 (G-80-VC-411). The MUR power uprate to 4016 MWt for Units 2 and 3 did not change the normal operating pressure or temperature for the reactor vessel from those values which were established for EPU and MELLLA+. GEH Report 003N5969 R-0, Reactor Vessel Integrity-Stress and Fatigue Evaluation for Peach Bottom Units 2 and 3 TPO, November 2016 (PEAM-MUR-0302) documents the stress and fatigue evaluation of limiting components in accordance with ASME B&PV Code Section III. This evaluation constitutes the stress reconciliation and validates the use of the existing RPV components for MUR conditions. This evaluation is primarily based on the EPU reports referenced above which are based on 102% EPU rated power (4030 MWt). The supplementary analyses of the feedwater nozzle and steam dryer support brackets referenced above are based on the power level of 4030 MWt and therefore remain bounding for MUR operation. APPENDIX K K.III-1B REV. 27, APRIL 2019

Prepare4 By: PBAPS S.-aJ")' stress Report For Geaeral Eleetr1e - RED PElCRmTlUl II Genenl Eleetric Onler 10. 205-m56 .., Coatrac't 110. 610-0139-51 I' teo gL //4=-- 7 ~ ~. (~~1*" "...-~ . ~_..-.--- ~ /?/IiUb( Jfuclear Power Gmention D1n.~10D Tbe Babcock & Wllcox Ccapur lit. VenoD, I~aD& Sept_bert 1970 K.III-2

PBAPS STRESS RL!lORTS C~{TIPICATION DOCl~~T Babcock &Wilcox Co. Contrac£ No. 610-0139-51 User: General Electric User Contra.ct No. ?05-RJ.156 All of the stress reports identified on Sheet I, dated 11-2-70 are complete and have \\leen prepal:'ed in accorda.t1ce witIl the design specifications given on Sheet II, dated 11-2-70 The Babcock & Wilcox Ca. p~essure boundary drawings identified on Sheet III, dated 11-2-70 , and the 1965 Edition of the ASME Section !II Boiler & Pressure Vessel Code for Nuclear Vessels including addenda through hTT7oTT. -(,5._and Attested to this date 11-.3...70 ,r".-....... By: ~ P,&Jt:: J.P. Butti Mechanical. Design Section Nucleal:' Con~onents Engineering The Babcock & l-lilcox Company K.III-3 License No. E-298l0 Ohio State Board of Profession91 Engineers

PBAPS SHEET I STRESS REPORTS HUMBER TITLE November 2, 1970 REVISION NUMBER 1 Sizing Calculations 0 2 Weight &Center of r,ravity Calculations 0 3 Closure Analysis 0 4 Feedwater Nozzle Analysis 0 5 Control Rod Drive Nozzle Analysis 0 6 Miscellaneous Nozzles Analysis 0 7 Piping Reactions 0 8 Support Skirt Analysis 0 9 Refueling Bellows An'l1ysis 0 , 10 Brackets 0 11 Shroud Support System Analysis '2 12 Recirculation Outlet Nozzle Analysis 0 13 Recirculation Inlet Nozzle Analysis 0 14 Does Not Apply 15 CRD Hydraulic Return Nozzle Analysis 0 16 Nozzle Ends 0 17 Core Spray Nozzle Analysis 0 16 Does not apply 19 Does not apply 20 Shell Analysis 0 21 2" Instrwnentatj,on Nozzle Analysis 0 Summary Report 2 Note: The r~vision numb~r~ arc given in the first colwnn are those in effect at the d~~' shown on the f:i.r:;t pa2~ of this certificat:lc.n document and are certified provicir.-: by the first page is signed. Additional r(;vi~;ions must be initio.l(;d by c.utho~*i::r* B&W Co. Professional Eneineers. K.III-4

PBAPS II. USER SPECIFICATIONS NillffiER 211\\1111 TITLJ<~ Reactor Pressure Ves~el l~rchase Specificati.on with Clarification Document dated 10-22-70. 9 November 2, 1970 REVISION J';'Tj}.ffi~R Note: The reV1S10n numbers given are those in effect at the date sho~,~ on the first page of this certification document and are certified provided the first page is signed. Additional revisions must be initialed by authori7.l';:d IX,\\'/ Co. Professional EnGi.neers. K.III-5

PBAPS III. BABCOCK & WILCOX CO. PRESSURE BOUNDARY DRAl'lINGS November 2, 1970 NUMBER TITLE R ~ISION NUt>ffiFR 81745D Shell Forming Details 0 25466F General Outline 8 25467F Outline Sections 9 2546& Vessel Sub-As:;cmbly 7 12937lE List of Material 12 "129372E Lower Head Assembly 9 129373E Lower Head Bottom Segment Assembly 8 129374E Lower Head Upper Segment Assembly 8 129376E Shell Segment I\\ssembly Course Hl &#4 8 129377E Shell Segment Assembly Course #3 1+ 129378E Shell Segment \\;;sembly ('ourse #5 3 129379E Shell Flange Detail 3 129380E Recirculation Nozzles 1+ 129381E Steam Outlet Nozzle 5 129382E Feedwater Nozzle 2 129383E Cor~ Spray N07.71e 3 129384F. 2" Inst. & 4" C.R.D. Hyd. System Return Nozzle 6 129385E 4" Jet Pump Nozzle 1+ 129386E Shroud Support 6 .129387E Ve:;sel Attac1li'".nt l'~hils 5 129388E Support Skirt 7 129389E Vessel Insulation Supports 1 129390E Vessel Thermocouple Pads 2 12939lE Refueling Containment Skirt 2 129392E Closure Head ~ssembly 7 129393E Closure Head dazzles Z 129394E Closure Head Fonning 129395E Stud Assembly &Misc. Details 4 129396E Stud, Nut & Washer Details 6 129397E. Vessel Sub-A~,,~mbly Details 7 129399E controi Rod Nozzles Unit #1 5 142117E Shell Segment Assembly Course #2 1 142119E Lower Head Forming Details 1 151877E Modification of 12" Recirculation Inlet Nozzle 0 151878E ModH'ication of 28" Re.circulation Outle. 'Nozzle 0 151879E Modification of 4" Jet Pump Nozzles 0 15l88oE Modification of 2" Liquid Control Nozzl 0 94982C 7" Bushing 2 lO5291C 7" Tapped Hole Detail a ...--- -_._-----~---_._- Note: The rev~non numbers gi,,-en in the first column are those in effect at the date shown on the first paGe of this certification document and are certified provided the first pa~e is signed. Acditioncl revizions must be initialed by e.\\!:l.horizcd 'B~lV Professional Ent;inecrs. K.III-6

PBAPS Design Data B.&W. Contract 610-0139-51 General Electric N.E.D. COl1tract #205-Bl156 Engineering Specification - 2lAllll Discussion of Unit: Peachbottom II Reactor Vessel and head with special tools, test j'lc.teriaJ., vessel shipping skid and head sling. Data Design Operation Hydrotest Top Head Shell Bottom Head Cladding Corrosion Allowance Pressure 1250 psi 1005* psi 1565 psi Inside Radius (to clad} 125.5" 125.5" 125.5" K.III-7 Temperature Temperature of water cannot be above 2000 F Thickness 4.0" 6.125" 6.125"/8.0" 3/16" nom./l/B" min. 1/16" outside surface 1/16" nonclad inside surface

MATERIALS Carl'lOn Steel SA-508 CL2 SA-5404GR 23 or GR2 Inconel SB-166, 6 A..'1 6 sm lOPER/DESIGN) 19,600/19,200 26,700/26,700 PBAPS PAM' Sate end, Ba.ckins strip, Drain nozzle External nozzles, Stab, Bracket Code Case 1332-2 Code Case 1335-2 steel K. III-8

PBAPS Pipe Size N 1 ozz es Req. MK. No. Dwg. Mat'l. Location (Dia. ) Nl - Recirc. Outlet 2 8 129380E MN-MO Shell 13' 5-1/2" 28" N2 - Recirc. Inlet 10 7 l29380E MN-MO Shell 1;" 1" 12" N3 - Steam Outlet 4 14 l29381E MN-l-10 Shell 54' 10-1/2" 26" N4 - Feedwater 6 10 l29382E MN-MO Shell 41' 6-1/2" 12" N5 - Core S1)ray 2 11 12~~J~~ M!"J-1-10 Shell 40' 4-1/2" 10" N15-SA-I05 Drain 1 22 129373E GR. II Bottom Head 2" lJ7 _ Vpnt. 1 204 l2q~q'~E ~1N-MO Top Head 4" 'NQ e'Rn Hvn 'Ret. 1 l~ l2g184E MN-MO Shell 37' 4-1/2" 4" N10-Core Diff. Press. 1', T.; n P();~()n 1 17 12q17)IE MH-MO Bottom Head 2" Control Rod Drive 185 101-128 12g1gqE INCONEL Bottom Head 6" NR - .1F>t "Pmnn Tnstr 2 19 12q,:\\8csE MN-MO Shell 11' 3" 4" Jh _h H Tn.:::." ~*,.-(~~t.ilt.*i"r. 2 ?O6 l?O~q**n*; ~'1N-Ml) 'iou BeaU ___.J 6" l'Jll _?" Tns.

ILion

? 12 12q~84E INCONEL Shell l~3' 1" 2" lInt: 1\\110 _0" T ""t;()n ? l? 12q~84E INCONEL Shell 49' 11" 2" 1\\T1h. _0" T"'... ~-*-~..,t.!1t;("\\n ? 12 12q~84E INCONEL Shell ~O' 6" 2" K.III-9

PBAPS Support Brackets and Misc. Attachments A~tachrnent Beq. MJ<. No. Drawing ~aterial pemark Support Skirt _.1 '11- )10, '41 l2938~E Hull Steel BottoI:'l Head .----- ::".:...4. Shroud Sunnort 1 1:), - 1:)4 '2Q~86E Inconel Internal 'Ref'lJel Carlt ~ldrt 72 '2Q~qlE Hull Steel Vessel FlanQ:e Stabj]jze.r e"'~c*1t.e:L ___8 _.-~ .l9.L-.... 12q~_6'7..j ~l:N-H() ExternaJ S+,erm n-rye-r SllPPO-rt_ 4 - I , ~l '2q~87E st. stL TnT.ernal I '2Q-~fh~ eOl"e Snralr B~pcket h 1~2

3t. StL Internal

~l1ine 'Pan ~r~('kpt 2 ,~4 12Q~87E st. Stl. Internal F. \\-1. Snar;:c!' Bracke.t .J? 135 129387E st. St1. Internal Drver Ho1ddmm Brack ~t 4 rn 129187E ?-iN-Me Internal Surveillance ~necJ-mer. 6 199-200 129187E st. stl. Internal In~;ulo.";ion ~:2.ckei-.c:: ?4 81-8~.._. 12q-;~qE Carbo stl. ~~t~!"!!!'.:l Hearl Ljftj,rg LuS._-" 4 210 12q~q2E MN-MO Ton Head K.III-IO

PBAPS K.III-Il z____ (A-I)

0\\ \\<.~\\ -\\ PBAPS 1'l_ORMM. WA.-rE:R L~"E-\\.. PR\\. + ~&c.. CSTR~c:..~ \\N\\~~~\\\\'{ ~~N.("\\\\::-.".:> J\\.~e-S\\\\O\\\\J~ C)~ 'S\\~\\::-\\c..,", P\\~\\. ME-t"\\\\>R~\\~\\: ~\\f'..~-~~ 1~\\~~~~\\\\', \\~ \\.~s~ \\t\\f.I.\\\\ \\\\'\\c- ~\\.\\.o\\..U~?,\\..'C-ST~,E-S~ \\~\\~~~\\"( O~ ~:"2.1 "CS\\ (A-2) K.III-12

PBAPS Sizing Calculations The vessel shell, upper and lower heads, and all nozzles satisfy the thickness formulae of 1-110 and 1-120 of Section III of the A.8.M.E. Code. The compensation requirement of N-450 has been met for all nozzle openings in the vessel shell, closure head, and lower head. (Ref. Report* #1 - Rev. 0). (A-3) K.III-13

PBAPS A.l\\.. 'S'~N\\F\\C/~N\\ \\TE-M~ OF THE \\h-.1\\T WE~~ CON~\\D'CRE:D \\~ T\\-\\'C WT. 4-c...~.

  • E'\\JA.\\.\\,)~\\\\O~.

THOcs.e rreN\\~ CCN.S\\D~R..t-\\) we~E-l c\\..o S \\J R~ \\\\&t.....t> STUDS ) l-l\\.)Th)A.~\\:) V"IA.'S.\\\\~i'...s "cSS~L S.~Wc'r:T ~'t<\\;tT ~"Ro \\J t> 5\\.> P~R\\ ~E.F\\,)E.L\\~G. CONT~\\~HE~T ~~\\~T "07 L l~s. "E::>~ t=L. 5\\\\'CL\\- "Et"'. 1)~y WE 16\\-\\1" CLCSURc \\-\\E~'V 1~2) 8BO \\bs S"flJ'C'S, J ~U-re-;:. } 60,0<)5 \\~~ ~~t> w~'S.t\\GR~ r 'lE~e.,- \\.1-1.'/7 J974 t~. ~oq- 'V I 'J500,9'f'l \\b~ f!J ToTAL (() / ~ I ~I '\\ 7 <P-c.Ci. (A-4 ) K.III-14

PBAPS S""t>..)(. ~"I.\\.OW = l'\\C)"T S ~\\.\\.C"IN = BR~C.\\<E:-\\ \\. t;;' C:)\\'(\\ 0.6 SM STA-B\\L\\ZE-R 2.9.?. 40.0 8., \\6.0 ST'E-A.\\o1 DR'<FK 17.0 24.0 '3.7 ~.6 SIJ V*t=""~~?..\\ ~- ~\\E-b.."'" t>~,<~p'" Is.e 24.0 2..5 C3.6 ~\\.l\\~~- ( \\)\\=>~;;:..9..'\\ S1\\:;-f.\\..~ 'D~,<\\::'r.. \\1.0 2.4.0 3.7 ~.*6 ~\\)\\~C-(,-O'Ne.-~...) ~~~O\\<J~\\ER 2.2. 24.0 O.l Cj.6 ~~~RG.I:-R ~.. C.ORC- ~??..~y \\B.e 2.4.0 O.B <?>.6 \\-\\~~~ \\...w..-n~t:,. 40.0 '3.\\\\ Ir. l~. 73 u, \\..J Lu~ CS \\.l R \\/'t:,\\..L t>...\\--\\C\\:- 3.8 ~o.o .s \\2.0 {LOWG~'> SUR.ve,.\\\\..\\. ~~~t'e;- 6,'3 If.~~ 00.0 o.B~* \\'2..0 (\\)~~~~...\\ J 'e:\\ p\\),~" 10,6 ~4.0 0.6 9.6 R\\s.\\::-~ \\~~\\.H.. t-~\\ \\C~ ~'J~. 2.7 \\~.a 0.57 £':'.0 t~\\-\\6\\..L') (A-S) K. III-IS

PBAPS T\\'\\'C- \\V\\A.~\\MUM '-O~O\\~~ O~ ~E- \\lE-~~E-'- Rt-~u\\..\\s FR~'~ """'E- ~\\~CO\\L\\7.~\\~ ~R~~V"....e-\\. Loc...~\\.. ME:-M'ORJl....\\'\\t;.-

2 G. b 7

(\\~c..\\... ~'Cs.';,. ~\\RI::-o;::;~ 'S~\\.\\.QW -=- I.S CSm -=. 40.0 \\<~\\ PR\\M. T ~\\:-c.,. ST\\l~~~ -=- 51,'2,0 (J NC,\\., ?~'C~. c:-s.TR-E-S~~ SI:\\\\.\\..()W 3.0 ~rn = 80.0 ,,~\\ (A-6) z;'c:""-: / K.III-16

PBAPS C~OBure I.R. O.R. B.C. Height Head Flan&e 122.875" 139.625" 133.625"

U" Vossel Flanee 125.6875" 139.625" 133.625" "36" No.

Dinm. Stud Hole Length Studs 92-6" 1" 5'-5-3/16" Washers 92 8-5/8" O.D. 2.125"/.875" Stud Shank Dia. Length S.83" 2-7-;/8 11 Interface Sui"i"acc O.D. = 260.625" Inner Gasket Groove .tean Radius Outer Gasket Groove )of.ean Radius Gaske~ Groove Yidth I.D. = 251.25" 126.6115 128.2365 .59 Gaskets Location (top or bott~m flange) Top Flange Dopth of Cladding Clo&ure Sealing 1/4" Botto:n & Top Flange 5/gn Top Flange at Gaskets Jot!lt'l Diameter 2 O-Rings Fiber seal outside of O-Ring Incone1 253.25"/256.5" ".lsc. 2 Spherical t.:ashers Per Stud nrawinc~ 1~9392Kc 1~9379E~~ Closure li~!ld Ass{;:!':bly Shell !o')anec DoJtnils K.III-l7 (A-7)

~ " 12'2 & I.~. Iv " \\2.S ',Gs J:. P.. PBAPS I'I '5"

  • 3J*

1"'C""-'-t....;.I -t- '_~_~_rc....:.:e,~_o_.R....:...~__ I I I I I I , I I I ~-_ _t_---_...;I.:::'3~'3~~.;~~*....:R:.:.;.:..6:;..:.=.c..::..:.~-- I I 1 a6 11 l~~d --b-f, DIMENSIONS OF CLOSURE ASSEMBLY K.III-18 (A-8)

PBAPS MAY... 'PRo\\. LocAL ME:MBR~~E: STR~SS \\~TE-W~\\\\Y:2~.o\\<":>\\ 67.Z1<bl~: I ( 'SfUt>> I I I I FOR THE-s-r~o~ M~)<. fv\\&t'-"\\e.~t\\~s- &li(~~S h~,.e~~\\\\'( ... 47.(,') \\<.~I '5"""c>W : '2.~.... =73.0 ~~\\ p~\\. M'C:Mee~ ~\\~;, S\\~~Ss. \\~.,.e-~S\\TV \\~ o'CLOyJ T\\-\\e-t:...\\.lOW I:>..~\\.e OF 5).'\\'='26.7 K~\\ Fo\\t f\\"~~<'lE:-S A~c Si-\\&u... 9~.(',:) t,c::.\\ (~,ut>> MA"X \\l../\\~lV1 PR.\\. ~ SE-c. CS"T~..'e*ss. \\~T E ~ CS \\TY ~ P>..\\oo\\GE S\\-\\o'l\\~ ON. S\\<...~\\c.\\\\ S J>......\\.Ow 3 S"", -;. eo \\<..,'S\\ Fc~ ~\\..'~'N.('V..:s. 5J.o.\\'\\.ov~

. '3 ~k

\\ \\0 \\<.~, \\-Q~.. "'::)\\op S CLOSURE STRESS ?:;:/. / (A-9) K.III-19

PBAPS n \\~ K.III-20 SUPPORT SKIRT (A-IO)

PBAPS PI<II"'-;f7;~Y.:- S-ECOIJDFitZ;; ~;-R.t:$s. :c.IJrE:"//S"I"Tt;/ I!/-!/J~~"" ~ 1\\0,",'" 1\\1 0 ~ "S\\::E..T<:... \\'\\ ~., cs. AL\\... : ~"i h"\\ ~ ~~O. C KS] 'fc;:S \\ * """."f...., f>\\l_l. N\\e:./...,z~,)t~.. /~t-.JE. ~,";.:=: '\\.rre=_~"S:.n-y -=. 1:S.. / '~.:: ~ 86.0 \\:::":- \\ 97.0\\1::'"'":.\\ .::l---__--l,P,./ ~ 8.'2..0 l'=:"'o> \\ )--------l""" ~~ E.L "'-:";::;\\ I C- - P l... A.'~TI C AN. l\\ L_';-Sit \\V/"~ l.)~='D T6 ~ U<"..YI f'1 l-t\\c>St:.. RAl..l G~<;' C;>?"C/\\-;"!A; 'y!\\/\\U TH. A.!-L-O\\N/~~:'L.c: o F ~ c;;. l"Y\\. UN,,\\:<-': o. -':',£' SUPPORT SKIRT (A-II) K.III-21

PBAPS __~/i(~.!-t1!25.... __L.lI-i.l'::'?-~2~_. "-1 ~.O /S"g.37.::.5 1-12..2.5 --_.=-- J~74 ~-- --J --~.!¥b-L~ ._-:7....:,.;.5:::.-. J iii ._-~ REFUELING CONTAINMENT SKIRT K.III-22 (J\\-12)

PBAPS Piz IV7r;.p..:J + ~£ c C,1')..,'>A /2.') sr.e.~ss /1)rc,dSI7!1 /</;',.):;-1£ S\\-\\OWN. 1"\\ ~\\c::.~\\<"l\\ 'S Il..>c... \\" Hc: R:f"UE.LP*-'~ C.O.U*', "S.. ~1 e..T I ~ l-JOT A.. ~1::'1Z: ~~. l100 J-.) t:) A f<.' ~~w..o~ ?.OS)' ~ 8~ \\t::::" JJ.. A..'" 1/-<\\() i,1, -=:. 7.0 I J p\\<..\\ \\.../\\ ~~'< ~T'Q.~ ~:J~ llJ Tt::.~\\..~ \\ ~~c y r~ ~ \\ ~ A\\'.L(.",\\J ::; !.SSi'l1 ";: '-/0. 0 REFUELING CONTAINMENT SKIRT K.III-23 (A-13)

PBAPS ~v-l- ~L =: \\,,1) N ~ 0to 1 L~

  • a

.\\1\\ 11) 'N I-e. ,co an SHROUD.SUPPORT ASSEMBLY K. III-24 (A-14 )

PBAPS ~"bo..,){. ?\\'L\\. s.T?_~'Y'.... \\~\\-e~~\\\\'( =. 'Z.4.S \\<~\\ S~\\.L()\\'.f =.~.,.S- -;:)\\l1 "3 S. C 't<s \\ .:56..0-~ 5/,,\\\\.0'" =:'.0 '5b1 6':). g (\\N.c.o,,",~,-) S~,\\,.o'W ;.;:. "3.0 SYIi ;- 4*(:...0 (~s \\,<1?~- 2>04) PRIMARY AND SECONDARY STRESS INTENSITY RANGE K.III-2S (A-IS)

PBAPS

"'5?r:;*~:;,',;.;)~,:~/-

~.:.:-:-(.; .,2.:)/~-:::~~./y// ~,<;',09/~~r-y/Y/~,I'1/

BY C;;.c.

-::s-~.c:-C" c/AI/// / ~. ~?7 r-O~ -;r;~M:=~'(",e- ..::s~~~~~.:$ /,:9r '7 __ V~:.~ nw.D T~~~.I,,**~~~iJ7VA:~.,.o;: ~~/::-;~/- r!.Or?2:>..:$ 7,5,/ C,tJ-} ~ ~~hX==- ~?,....) JG""&-~ 7~/f/.::s/GC:

s'/,e"e::::~-.;.$"=;

~.:.?r ~r~~Y9..-;':;-i'1/7

z.k
/.:f'-"',;~.""e$

......=?A/b 7-'~4-Y"~~~VA~ ~/77':/ .:::s~/-S-/n*/C .~o&2>.s.- 7:.:5. / (C')

5/4 &,>< -:5:- /... '5 ~...,/ rC/e

~~~.;-j"'/~ L.:::S7~~~'~~..:::1 ~r Or~,e~??/l/7 r;-<?e-":..::,:,:::,U~":C ~N..D /~j,~e-:.e".,'.;~/~e C"d/;;1""-/ //::',,~~:>~, ,:::;,~/,=::'l",rl4/c.:. -r-pET CCJ/f)"Z::>5~ 7:5. / Cd) c=- L-. --?4/)X -= Z 0

j,,?7 r':O-oK

/2::;A'/.::::;,/~.c =:jr,ee::....==-~~~s; fir L'.e=-,::;:vy # /-;-::C":::';'i$(/I.*.':~~.5 ~/,/.D /2::./~~/:c"%*~7V/"':;'~-::= ~,.'/;-;:/ ,/C4/P",<", .::5...~....::v4/C -r-vt~T C~"";'~L."'.J.s.. SHROUD SUPPORT LEGS K.III-26 (A-1SA)

PBAPS 7-S./(e) ~c~,Je'. ~. O. e;t. ~ ~Oe '-O/4r/R6"":~':'::=-1y;£

==s'~:.c:"'-;~.~.:. nT" -c:~~b 7-7e~~>s?',<:~ ,..-.;-?/t/.D -;.c?~4 '?'e-/4P,t;.:;'C7~~k::e ~/7?t'" .:s.t::/~Y4/C Co/?.DS -:- ~.~x' ( / C. / KoSI") ~ 0.. c;l ~ (>~~'<-::5/ 0 ' ) 7.:5./(~) ~/4r)X.?- CJ. 0 ::5y ro/e ~2"-:4~e'.sS/.vC

=5;;?:::."'C'.::s:se.;:

,r9~ O?4'3?..-97//vc; /:::Z~~~*U,.<:'E..-9N..D 7'"e/1.-??c£/?7V£c tA//;:;r/Y' /4/1X'. ~e-/...::::>..-:?"/C 7' e/~r CO/.-1D..:5. ~4;c1;< C~. 3~slJ)::=:' 0, ~ $/ (/7: O/<.s"/) ~6./(t?) '..:5/f/,~)-'X ~ o.?::5y ~oR ~/A'p.e;...:.::5>s/~ ~7'/.'.::;e:-.ss,.d:S ~7- -e~KO ~~=-;;.::St:/A!:.t!I ,rr'A-"'.D ~60//J -;;-E/./,/?',=;e/'/?z.,~e6' ~.v/7?/ A4AJX: ..5.c;/..:,.::;,,///,/c ~ ~c:r LoAJD:;;J;.

  1. ~

c:"E"yS h-~~r ~LC: 7-?3c C.z:-/T.-eA?'/r,,? O~ -;?;:V6 -q:. ~. c:§;i"P6c/ r-/C,.,.v -;??o"v.. SHROUD SUPPORT LEGS (A-15B) K.III-27

PBAPS Nozzlo Rec1rc. Outlet No. Req 2 .n:. 110. 8 1)',18. No. °12938oE toeation Shell 13' 5-1/2" fro::l vessel zero JI.at '1 ).~-}.:O Inside D1wr ~ Shell 35.9" Tapor I.D. Yes Internal Lip No Inside Diem 0 First Wold 25.90" ~tsido Diam or Nozzle 53 ft Outside l>iaJU at First. Ycld 29.375" ClAdding Nom. ThY.. 3/16" Bimetp.l Weld Connecting Pipe Thermal Sleeve No Distnnco FrOl:l Vessel I.D. To bimetal weld Mat'l ASTI-t 371 ER30~ Distance fr.o:n Shell 26.125" Hat '1 psn*1 371 ER308 Thickness 1.181" Min. }~tll Stainless~Steel Type 316 Welded Rolled Attached ~ipe Reactions Yes Tranaicnt~ Per GE Dr?win[; 729B762 Rev. 0 & 135B9990 Sheet 1, Rev. 1 (A-16 ) K.III-28

PBAPS }' 1~5 /::. II....,,. r:- ="""'. . \\,,;,---' rt. WELD L 1" 7 1~ "3 R / 7.375 I \\ --:.-.1__ I-- I 1.,375" ....:1-a"% R \\ \\ h I lo.SS -L...... i* RECIRCULATION OUTLET NOZZLE (A-I? ) K.III-29

FT~.I. -r ~ l:::.c..... lNTE...NSIY,,/ PBAPS ~,-~C::"-~ os Kl\\ l--!('.:;>E, wI p, P\\~~ "R~p...c-nC)~ F'o~ ~A. ~((.~ ty\\:t:. ~\\<o ~J\\Pi::. E.H~ \\6,0 1"1.0 ___~~.~... 39.:?_ 51*3" . 64:5 I \\6.C>/-.--- --.,;..:J,. 29.0 I 1.1. 0 . 21.0 2.4.0 31.6 21.0,. f I I 'L Q[ rriII I*I I I RECIRCULATION OUTLET NOZZLE K.III-30 (A-18)

PBAPS ~\\~E:.~<;' E.~ g,M \\::) A:r~ : COM.\\>A.~E..~ ~\\- "\\L ~AF E: TO ~E:. ,C> \\.<;~m -=- 2G.' \\1.34 I I I ir I ~.o:20 '" L- .. -"J------- C...eqh- :Cc;co;:::'7'""'""" 7

eel/* 0')

N0,- i:: ~ 1-" L L <:;;*r'f.~c. os.~, '2..";,> A \\::.E: \\).l -,;;:$. \\ RECIRCULATION OUTLET NOZZLE MA."f... ~G. +r--'aE.~~. ~-re.E..~"::.. I"l"n::'Ws. 'TV OS\\\\ O""'N N 0 IoJ. ~ ~'t:."'\\ c.. \\0{ cs. "-'-'\\...0-...1../ -= '=:>.0 ~l), -=. 80.. <:;) ""A'I.... Il'\\E1A':n~.J\\\\.)E: T pe.l::S~ ~T~e.~"~ U...JT'C:.l-l ~ n-Y =27.09 'SALLOW ~ I C;-~m -== 4*0.. 0 ~-------------,;"-} K.III-31 (A-19)

PBAPS Nozzle Recirc. Inlet No. Req 10 Mk. No. 7 Location Shell 1S' 1" from vessel zero Ma't'l.. MN-ID Inside Diam.@ Shell li.568" Dwg. No. 129380E Taper I.D. *No Internal Lip No Inside Diem @ First '*leld Outside Diem of Nozz1e" Outside Diem at First Weld 1l.507" 25" 13.875" Cladding Nom. Thk. 3/16" Bimetal. ~!eld. Connecting Pipe nistance From Vessel I.D. To bimetal we1.d J.1at'1. ASTM A371 ER308. Distance from Shell 22.875" J.lat'l.. .ASTM A371 ER30E Thickness .817" Min. Mat'l stainless Steel Type 316 Thermal Sleeve Yes Pipe Reactions Yes Welded Attached by others Rolled Transients Per GE dra~~ng 729E762 Rev. 0 and 135B9990 Rev. 1 K.III-32 (A-20")

PBAPS 5.lo/!£; R --.B?/S ---r-4.'1?>7S (A-21) t II ~~ R II 1;;. ViE.LD 1.loq." f II 4-t R 4.."A.'OI:tS _____i__; 5.1,,15 U I / . 1-. 1= R II II ~~


.---==========-

.l_._J__


--1--

1 I I., r) I ')C -_.* K If., II ._!>- b.71/~S--~ RECIRCULATION INLET NOZZLE It _a -.;,::...... ~_ I~ I cr-I S.,*:S*65 r<¢.. I K.III-33

PBAPS --J~"\\. 1 (\\u'S\\c,=-}--- <73

k.,. "'5 (O,n"S\\t--:.;).. 17*f.

~,.z. (\\\\{'S\\O~'")-" II*-;! >:.:(.-:s (\\\\-1S\\Os\\ -0,~I >:-""1. eo. (hJ-:'\\~~\\o, e:J L Jc.,. 1 (01)\\'$\\0;;::.) _0' 107 )c."-T. ~- (Ou$\\O'<:.") --- 8a )c.,. "'l. _(OU\\-s \\o~) -_.' 76 EL. \\, "Z., if "S-- S,. c:;-n.... \\9. ~\\L:;~- ~A'" ~7.. \\:~. ~ ~ 0,_ -_" 00;5""'(. "'5-T\\..,. \\?"".> o"\\- - - 5",... ~-, t.L.v - '0 - 0 ~A.-Sos Cl. ~ ~ -_" "'S A. ~ caD 53 c.. /9 - S\\~'=.'Pg,. -\\- -S'C--<:.. 12'ii;;?Ql.J\\ecl...;~u-rs A~f;;;; ~OT Mc.:\\ e. ~G\\:**~. "2..3.~.cor e 'B,O\\\\\\ - 62 ~uer-kc..cs.-S If ~\\,)'-,)c...,.vv_t:: S e \\\\-\\\\::" Ov\\S\\C~ -SUQ_~AC.l;.. Au ~'-l~,,!;\\\\~--' ?\\.k.s*n<: Aub"\\,,......o;; \\"$ W"..I... PEj:c?"POI2.MC"_I,;)

\\"\\\\":-'.J:::. C~CA-r\\C,.J~. ~e ~\\.J,"",-rlFIC.l~\\\\OI..' ~---13 ~\\. ~ (>>\\-s\\oec.)..,.-- "2.\\ ~c:.-r. ~ ~o~\\-;;\\'V~')--- S3 \\ (A-22) \\0 48 PRIMARY AND SECONDARY STRESS INTENSITY RANGES - FINAL TOTAL VALUES K.III-34

PBAPS ~T~t:--'SS J"t"y E...~-S (*C\\ ~ ~ AT" -rHc. ~AF E:. E.ND A t:E "TC:> ~C COlv\\..P;.~.. ~£'b -\\0 \\..<:;"' -~rt\\ -=::. ZG.' \\7.Cfl --tl- 'V:r-L~-~- }/\\J.\\'1..... ~Ec... i- ~t:"E.:~...~ ~\\\\~t::.~~ 'l-r-E)~-:-::. \\\\-y \\~ '5Ho~v :-.\\ Ok) ~_~Eo\\""c H ~ALt.o'.../ =.. "3.C>S >n -00:::::. BO~C> 'S,-"Co\\;-:.<:.~'"oS u-'-\\E. ~-..\\ "S. \\TY ~::'"26.5:3 ~I,L Loy,/ -:::. -\\ e-C;; <2......('f\\ -::::'.40..C> \\ II J, "~--_.---- 27*77 ">. ("-ee,c.o-7?£?C>I'2'r# 7 ~£vr:--O') l-'o-r'C' I... I' "..... to>> r.:::--..:.~~.... A't0r.- "\\ "-'"-':. \\ r.. _~__"").;;') ~ ;::. r, -..,.-.. RECIRC INLET. NOZZLE PIPING REACTION STRES&ES K.III-35 (A-23)

PBAPS Nozzle . Steam Outl.et No. Req. 4 Location Shell 54'~10!" Mat'l. MN-MO MIt. No. 14 Dwg. No. 12938lE Inside Diam.@ Shell 23.75" Inside Diam @ First Weld 24.326" . Outside Diam of Nozzle 42.625" Outside Diem a.t First Weld 26.374" iraper I. D. No Internal Lip No Cladding Bom. Thk. 3/16" Distance From VC:;.3cl Mat'l. ASTM A371 ER308 Bimetal \\oleld No Distance from Shell Mat'l. Connecting Pipe Thickness 1.019 Thennal Sleeve No Pipe Reactions Yes Mat'l SA-105 Gr. II Weided Attached Rolled Transients Per GE Drawing 729E762 Rev'. 0 and 135B9990 Hev. 1 (A-24) K.III-36

PBAPS l I, rz..I~~ -'5A- \\oS ~:II: REF. ecpole.T #"~ ,eev: o. A -t---- ---II--A \\ \\-Va" C)'!Jc.. --1;---------b'-.-1-----------~ c.. I "Sc>\\- ~\\*s\\\\- e::..u-.c0\\~~ ~ I ~. I ~~ STEAM OUTLET NOZZLE 14 ~~GIO~:=)-== ==(=A=-:'::;S=)===~--~1~ NOZZLE JUSTIFIED BY N41S.1 & N4S0 OF SECTION III Ie.. /2C;/. / K.III-37

1 PBAPS D E~\\<::'\\\\~ ME-<.\\4.?\\ 9\\ 1'\\~ <S,~...\\?-~S~~ 18.0'"II IS.8'Z. (;ee,&;'~epO;er~/<:' ~eY.O) --:JJL.---t "",£\\...l:> ~Tt:.E..~*~ 1"'\\E\\.tS\\T\\c;:.~ A\\ Tt\\\\..:.* ~~\\-"c EI.1\\":) A~: To ~e: c:'OM...~~t~~~,-0 I *'t ~r" = ? '(. 0 . h\\A..'I..... -SE..G. 1-?R.Ss'$. ~T~E_~-;' \\).\\Te.t-.\\"S fl"~ \\~ ~\\-\\o").,l 0 l-.,) \\"t\\E:. ~\\<:t::.\\"Gl-t "::lo. 0"- r~,._,..,.. ~A..'-'-~w -~.

> rl'\\ ~-

~,;,'-J......... M~":l... A\\'2'. ~A'i?:>R. F\\ N t:.: +- t>k~'"~4. 'SOf"e ::-Z":>'";. n.,rn:. N - ~ l"Y =2C;.7t:;}

  • ~J,LLo-N -

l..'So ~rl'\\ -::: 40.0 2G.47 (A-26) 2'7.01 J.,'O,,\\E. ~ A L\\._ ~T'~' ~-'.~"'s.t:::....~\\ I' ~'" \\ r...... r-..I STEAM OUTLET NOZZLE PIPE REACTION STRESSES K.III-38

PBAPS Nozzle Feedwater Shell 41'-6tn from vessel zero MIHMO No. Req. Location Mat'l. 6 I*ik. No. 10 Dwg. No. 129382E Inside Diam.@ Sht.:ll 11, r{o2" Taper J D. No Inside Diam @ First l-le1d 11.7" Outside Diam of Nozzle 26" Outside Dia'D at First Held 14.125" Internal Lip No Cladding Bimetal Weld No Connecting Pipe Nom. Thk. 3/16" Distance From Vessel I.D. 17.0625" Mat'l. ASTM A371 ER30e Distance from Shell Mat'l*. Thickness .953" Min. Mat'l SA-105 GR. II Thenl1al Sleeve Yes Welded Rolled Attached Not attached in nozzle Pipe Reactions Yes Transients Per GE DraT,*;inE; 729£762 Rev. 0 arid 13539990 Rev. 1 (A-27) K.III-39

PBAPS _.c;5<6 A-I If 3.0025 (A-28 ) .1' 3+ R 5.9375 I-3" 5-1 I


..- 12" FEEDWATER NOZZLE II "3.0 R D

~ Ib t ~VE l.D I.~ I2.S--:'-:-'-1-4---- - -----..- Bs'n It r--~5"':"*~__-~----1.1~ -----.I K.III-40

PBAPS p~\\."\\- ~EC. ~il:.t::'$~ 1~1...t!.t.J~\\l*Y (r6~.' ?=,po£.,...t,~4 lC,c;/,O) ~f..,)..\\C:..E:: \\V/ P/PINe-REJ~G7IoN STREsSES F"oJ::. Tn r:: "SAF't!. "E.N t) ~"'LLo'N 0;:, ~.o ~"" :: S'"?.<+ tO~ Tl\\e. NOr.CoLE: ~,.. "=t r"'l ~ -:::: <7'>,'-" -.. ~..,l,..L~V" t", ~......... --...J 2.6 '2.8 ~s '25 39 '35' 5'2 - ~4-0)5 I '3' t I

  • 45

'------------1.$<; , *~5r---------1 ~\\~ 't\\.~CS\\\\c.... - ~\\..~ST\\~ I\\~~\\."\\~\\'S \\s ~e:~\\.)\\\\'>~~\\) ~O~ ~c..T "l\\ S ~ ~G\\ ts ~ O\\),..~\\t?So-86 S3 '-!OTE:: /-'Ll- \\~ 'S..~\\kC. ~.':::, C ~ \\:::0.:::..\\ 12" FEEDWATER NOZZLE (A-29 ) K.III-41

PBAPS Io\\A.'f... ~E.c.. + y~,~*s~ ~*rl"-\\::."S<;' IN'TE1'\\"S\\"TY \\~ ~\\-\\O'\\llV 0\\0 ,nt:: "S.l:::E:Tc }-{ ~'LLO'N -==: ~,O<;t"t\\ = eo, 0 'C';'-V:..t:':'::;.<;.. , I'JY CJ.-l'-;' \\ '\\ t t::: "$. ~A.~ Eo E"-1'\\:S A....*?.c:.,0 ,0 10:<5 ~ M. -;::. 1-"{.? AT" Tl\\C 'B'2: <:.D/t" 'f> ~1<..e ~ I 1 Mf:\\Y-.. */AE.;\\'& l~_I-\\w c. T'\\::>l::.C~. ~\\-1:l;;:.:'::::'s. 'tV\\~\\...l~\\\\Y '::= 2~.4t "s, ALLO'N "=.' \\

  • S' ~ r..... -=- 4*<:;> * (:)

J -~ WcL.D---":" ~~ -~*.e~po-e.r~:1J:/(p~t!:1/. 0 ) J-~ 2"5.e~" \\6.\\B ~ I f I L.~_..__._ 2?:_3~.~ _~ C;:CL.-:'~.' Z/~7"b/.::*;_..:.r*?" 7':-~Y": 0') HO\\-~ ~ AL.L c::,*n~l::.~-s.E_<::' A~C. I~ ~s \\. -12" FEEDWATER NOZZLE PIPING REACTION STRESSES K.III-42 (A-30)

PBAPS Taper I.D. No Internal Lip No .8.18.5" Nozzlo Core Spray No. Req. 2 )oDe. Uo. 11 I>Jg. 110. n.29383E Location. Shell 40' ':4l" above vessel zero Mat'1 l-1N-MO Inside DiaJ" ~ Shell Inside Diem C First Veld 8.785" Outside Dia.'i1 or l:ozzle 21:' Outside Diam at First Weld 11.5" CJ.eddine Nom. Thk. 1/4" Distance* From Vessel I.D. To bimeta~ w.eld )O~t11 ASTM A311 ER308 Bimetal Wald Distance from Shell 15.3125" list 11 ASTM A371 ER308: Connecting Pipe Thick~ess .55" Min. l~tfl Stainless Steel Type*316 Thermal Sleeve Yes ~olded Rolled Attached *interference fit by "cld ~hrinkage Pipe Reactions Yes . Tran81ents Per GE Drawing 729E762-0 and 135B9990-0 (A-31 ) K.III-43

PBAPS II .555


  • r~7S-

,f G.1075" N '1:$.67/ CORE SPRAY NOZZLE ~ jY' ~ ~=================================d _f,--l--_.' (A-32) K.III-44

PBAPS _EC?~'*~~~!~V .:'!:..._S£ca~/.c/l..s...y. ~--;::~S,.$..b/TE//..S/ ;~y,81/6E" FOR '\\H E:. NOc. C.l-t:: ~A\\..\\"'O'N -= ""3..o~rl'\\ 7.:. 'i->>o. <.::> ~ \\ -\\_~54-.l::'SI /N. ~B ~S.l 0(,17. A".E\\..~~i\\c... '~,-/:l.,.~\\ \\c- ~~~\\..'1s.\\~ \\s ~e,<\\)\\~~~ A.T. ~c..". ~ \\ ,..f T I I '27 KSI /.Y, /7 /CSI 0'..J7: 26 Ksr IN * "37 K5I Of.JT. .. f3z KS1 /,y. l:?z.<SI o:lT I ~~==:====-------..._..._--~--------------- ~ CORE SPRAY NOZZLE (A-33) K.III-45

PBAPS Fo\\? T t\\ c. ~0 -:c.7_L ~ "TO c;:;\\\\ E.L'- .k.\\". ,y..!\\'J...... J".EI-t\\BEf\\\\j~. "\\- ?~~;:...:.. ~T~.~";;' U*rrE".N S \\'\\,V '- 2.G."33 \\1.3\\ \\C<:..L.." <::'A,LI,0V./ -=:. \\.<;:" c:;,..,"\\ =- 40.0 \\ ( / (;eG,c': 7?dPc>,cr#/&> ;eev: 0) --~~_':_'1::-_W£L~ 11\\1\\"!... c;. EG.. -to "p';~.E.~S. ~\\t:.E.S"'S \\~-rt::.l-.!~'\\\\c."S A~E:. ~Hov.... ).J OJ...) Tac.. .-;;. y.;:: t::."\\C. \\-\\ \\l\\8:.\\\\. 'B\\'\\ \\~~ S~~~<;:,E-S~ e:,;\\~(7.'" ::'~. 1"lrt::H~ \\1\\ E.'-~ AT '\\He 'SA-FE. ~t-.\\D A?..E"_,0 cc.. ~ t'v\\.i-,;,\\~t.i) ,0* I.e:; ~ 11\\ = 2G.1 ~27.o5 ,P


7;,....~ ;;..-;:-~,:::~~ ;;'--:_~*:-~*7*-:" :,.:'-/ :;:---'.;::;-:;:.:;;;-:;:,--,-:-'

L ,-~'. ,.",-~_,r-

.~",,-..

1"--"--'" ) No",-C I. ALL "~*\\\\:'.C,'):':*"C."':'. "'\\.\\"-C". 1"'-> \\C~\\ CORE SPRAY NOZZLE PIPING REACTION STRESSES K.III-46 (A-34)

}1k. No. 22 PBAPS Nozzle Dra.in No. *Req. 1 Location Bottom Head. Mat'l. SA-105 Gr. II Inside Diam.@ Shell 1.939" Inside DiaT&l @ First lo!eld 1.993" Outside Di.~ of' Nozzle 3.0" Outside Dia.~ at First \\veld 2.50" 1)'",g. No. 129373E Taper Ie D. No Internal Lip No Cladding No Bimetal Weld No Nom. Thk. D"lstanct: Fl'oJU V:sSE:l I. D. Mat'l. Distance ~rom Shell Mat'l. Connectinc Pipe Yes Thi.ckness .253" J.lat'l SA-106 Gr. B Thermal Sleeve No Pipe Reactions Yes \\tlelded Attached Rolled Transients Per GE Drawing 729E762 Rev. 0 K.III-47 (A-35 )

PBAPS r I ~ ,~ l::.. --\\---- - -4: WElO c,........-e..~o'-' 51t::r,~,- 2" DRAIN NOZZLE 22 (REGION C) (A-36) NOZZLE JUSTIFIED BY N415.1 & N450 OF SECTION III K.III-4B

PBAPS STRE-'5~ \\~\\E~S\\\\\\E-b 1\\, T\\-\\E:- S~~E- 't~t:> ~~~ To CO-e.- c..oV\\~~~~o To \\. 5 St~ ': 'Z7. ~ M~'(. S~(". + \\>~~~~. ~\\\\:le-c:s \\\\\\T~~~\\\\,( \\~ CS\\o\\ow~ ~ 'S,,~,(t+ <s ~\\.OW

3.0 Sm

':- ~O. 0 M~')(. ~\\;:M~~~\\\\C' -\\- \\'il:C:~~\\JR~ ~\\R'CS<::' \\~\\~",s.\\\\"(

. C).COZ5 S,,\\\\OW = \\.5' CS~ ':. 40.0

, 1'l.17 ~ ~\\o.o ('rc~."

<
:'"G;'!70,er #"7 ;:::6t/. 0 ')

No,e--: ~\\.'- CS\\~~"::~~'e--:' h\\ ~~\\ 2" DRAIN NOZZLE MK 22 PIPING REACTION STRESSES (A-37 ) K.III-49

PBAPS Nozzle Vent No. Req. 1. Location Top Head Mat'l. t-m-}oiO Inside Diom.@ Shell t-1k. No. 204 4 c 250" D'~g. No. 129393E Taper I.D. Uo Internal. Lip No Inside Dia:il @ First \\-leld 3.875" Outside DiaJll of Nozzle 7" Outside Diem at First Held 5.5" Cladding Nom. Thk. 1/4" Distance From Vessel I.D. To bimetal weld Mat' 1.. ASTI-1 A37l ER308 Bimetal. Weld Distance from Shell l-lat ' 1.* ASTt*1 A371 ER308. 7.218" Connecting Pipe Thickness Flange Connections Mat'1. Stainless Steel Thenna1. Sleeve No Pipe Reactions Yes* Welded Attached Rolled Transients Per GE Dra".*rinG 7291':762 Rev. 0 K.III-SO (A-38 )

PBAPS -+ \\ \\~.. -SY;z. t-.I\\'-J - WI. () Sb.-~l. Gf':.~ It 2"3~ tl 2.~ _1 (A-39) VENT NOZZLE 204 (REGION A) NOZZLE JUSTIFIED BY N41S.1 & N4S0 OF SECTION III K.III-SI

PBAPS DES\\~~ MEC.\\-t ?\\~\\~<;. S\\RE-~~~ STR&~~ \\"\\\\£=-~~\\\\\\'C:~ ~\\,\\\\e- ~A.PC:- 't:~tl t>..\\'_":- \\0 ~~ c.otJ\\('~~£O To \\.s- ~~ ':'.27.3 MA.'#.. ~E'<... + PRG-~~. ~~&cs.'S \\~\\e.N~\\\\'( \\~ ~~ow~ O~ CS't\\c.\\"\\ S~\\.\\.ow =- 3.0 SW\\ ':I 80.0 M~,')!. Me\\J\\s~...~~cc.+ ~R~~,SIJ\\L~ 5T~c-~~ \\\\-\\\\~~~\\\\'( -::. \\9.65 ~M\\.C>W

. I. S ~"" :.. 40,0 I

c:ee~.-

t?~.Pt.?"e-r"#7' ~t/.0)

\\~.~5" VENT NOZZLE MK 204 PIPING REACTION STRESSES K.III-52 (A-40)

PBAPS Nozzlo CRD Hyd. ReOturn No. Req. 1.- l-D<. No. 13 INg. No. 129384E Location Shell 37' -4t" Hat 11 . j.:N-MO Inside DieJr tJ Shell 3.870" Inside Die~ C First Weld from vessel zero Taper I.D. No Internal Lip Yes 3.870" Outside Diem.or Nozzle 11.495" Outside Di~~ at First Weld 2.,625" Cladding Nom. Thk. 3/16" Bimetal lo:eld Distenc~OFrnm Vehsel 1.0. To bimetal weld }lASt'1 .P.s1-i-*t A3 r/l ER308 Distance trOI!1 Shell 4.25" Mat '1 AS'I)1 A371 ER308 Connecting Pipe Thickness .278" )~t'l stainless Steel Type*304 Thermal Sleeve No \\1elded Rolled Pipo R~actions Yes Attached Inside Vessel Transients Per GE Drawing 729E762 Rev. 0 and 135B9990 Rev. 0 K.III-53 (A-41 )

PBAPS 5.5208 IV f-a:? ~


..,~----t-lD'I; I

.._-----==:::...-======-~ -+--_.. -!- 3/,,, ?..I2.ZS CRD HYD. RET. NOZZLE (A-42 ) K.III-54

PBAPS ?~\\V\\~~'( -+ 'S~C.O\\~\\)~\\~Y ~\\;~c::. \\~\\G~~\\"'< ~~~~~ "U/ P\\P\\Nt"\\ ~~<:'1'\\O'~ ~\\""?....5~:S Fo~ Tt\\e ~~~E ~\\) S1\\u,()u.) : 30 ~l11 : 4e,,~\\ \\ tO~ "'H~ ~~:r..LE' 'SPM.Ol.c) :: 3.0 ~ =- eo.o \\<.'2,\\ 3 f--------l 2SK~' 4 ~---""'55K~\\ ~ 60..:...:--.:Y.":,:~;,,!,,,\\~------I6& K~' 7 eRD HYD. RET. NOZZLE K.III-55 (A-43)

PBAPS DE-~\\c..-,~ ~'\\::c.\\-\\. -p, ~'\\~.~ ~'\\~_~C::>l;S-S S\\~'C-~rs \\\\4Te~~\\\\\\'CS ~\\ \\\\\\TC-S~~\\::- \\::~~ ~~~ To B~ COM~~S-£:-"'O To \\.55"" = 2.~.7 foR. ~OZ:LLE- \\0 ~\\t-\\..\\.. \\~l\\,)~\\c...\\0~~ M~~. Mt=M'O~A.~,=--\\- ~~E-~. ~~~s~ lNTe~~\\"\\'( =- 26.7.9 SA,\\.\\.Ow

\\.S Sb1 "; 4-c~O Mp..)C. CS'i::-C. -\\- ?~~~~.

~\\\\(..~':;.~. ,~\\~~ ~\\T\\~ ~~~ ~\\-\\O"""'\\~ ON T\\-\\&- ~"e-TC...\\-\\ CSf;\\\\.\\.W-/ ~ 3. 0 ~~ -::..80. D ~\\.\\. ~""R~~\\:-~ \\H \\(S\\ CRD HYD. RETURN NOZZLE PIPING REACTION STRESSES K.III-56 (A-44)

Taper I.D. Internal Lip PBAPS Nozzle Core Diff. Press. & Liquid Control No. Req. 1 Mk. No. 17 Location Bottom Head Mat'l. ~lN-~~O Inside lJ';a.-n.@ SheJ_l 1.90625" Inside Diam @ First 1-reid .l.90625" Outside Diam of Nozz1e 5.937" Outside Diam at First Weld 3.126" Dwg. No. l29374E Cladding Nom. Thk. 3/16" Bimetal Weld Connecting Pipe Dist.ance From Vessel I. D. To bimetal we1d ).~at*l. ASTI~ A3'!l ER308 Distance from Shell 3.875" Mat' 1. ASTl-1 A37l ER308 Thickness .206" Thcnnal Sleeve No Pipe Reactions Yes Mat'l Stainless Steel Type 304 Welded Attached Rolled Transients Per G.E. DrawInG 729E162 Rev. 0 and l35B9990 - Rev. 0 K.III-57 (A-45 )

PBAPS A -+I--A V'\\u-t-"\\ I) I '$C:. :-~o"- <:;;C. 'T3. ~~ LIQUID CONTROL NOZZLE 17 (REGION C) NOZZLE JUSTIFIED BY N415.1 & N450 OF SECTION III (A-46) K.III-58

PBAPS DE"5\\(...~ \\l\\EOA. ?t~\\N('" 'S~\\;~~~~ STR.'C-~~ \\\\"\\\\~~~\\,\\£:-~ f\\T T\\"\\'f=- S~~t:- t;~~ ~~\\: To.'OE-C.o""p~~~ \\0 '.S ~h'\\:' 23.7 FoR. t--\\O"1:"l_\\.~\\0 S\\\\~\\.L JC"T. M~. ME-~~~"t,;--\\'" ?R.~~. STR~~ II'\\,.e~~\\T'{

. \\~.B4-s~\\\\.Oy.l 0::. I. 5 ~ -:=. 40.0 M~. CSe-c...+ t>R~"S~. ~TR'C-S~

\\\\o.\\1~~\\\\\\~. ~~~ ~\\-\\ovJ~ o~ T~E- ~~Eo\\C.\\\\ S~\\\\.ow ::. 3.0 S\\1\\ -... <00,0 /1'2.:0$ \\2..9f} LIQUID CONTROL NOZZLE PIPING REACTION STRESSES K.III-59 (A-47 )

PBAPS Nozzle Control Rod Drive No. Req. 185 Location Bottom Head Mat'l Inconel .1k. no. 101-12B Dwg. Ito. - 129399E Inside DiElI11. @ Shell 6.0" Taper I. D. No Inside Diem. @ First l~eld 6.0" outside Diam. or Uozzle 7.5" Outside Di~. at First Weld 7.75" Internal Lip No Cladding rro Bimeta.l '-leld IIo Connecting Pipe No Thermal Sleeve No Nom. Thk. Distance From Vessel lAD. Ma.t'! Distance from Shell Mat'l Thickness J.lat'l Welded Rolled Attached Pipe Reactions Yes Transients Per GE Dra~in~: 886n499 Rev. 5, Sheet 2 1.35B9990 Rev. 0 729E162

  • Rev. 0 886n~99 Sheet 7 K.III-60 (A-48)

PBAPS 3.75 I 2.9<)5" l'"--

  • ~t

~ I ~

  • 0 C()

.0 ~7So I I CONTROL ROD DRIVE NOZZLE (A-49 ) K.III-61

PBAPS PR\\ \\""~~'< -t SE-CO'*t>~RY 1N\\"G-~Srr\\, R~~~E:- 3.0 ~\\--\\ -= 70 KS\\ 3.0 5~ - ~O \\(S\\ ~. --J Mftx Pt.I. S7R£S.5 IN;EN~,.rY SMfr'l'= 8,0 ks I I SAI..L t=: 1',0 (6iP/lu..r~s) .$MA'IC ; J~,OKSI J S~L.L.,;;.2.3,0 llNC.O,,/£L) CONTROL ROD DRIVE NOZZLE K.III-62 (A-50 )

PBAPS Nozzle Jet Pump Inst. No. Req. 2 MIt. No. 19 Location Shell n* 3" above vessel zero Mat'l. MN-MO Inside piam.@ Shell_ 3.8125" Inside Diam.. @ First \\*!eld J c. 8125" Outside Diam of Nozzle 8" Outside Dia-n at First Weld 5.375" Dwg. No. l29385E Taper I.D. No Internal Lip No Cladding Bimetal Weld Connecting Pipe Thk 1/4" Nom. Distance From Vessel I.D. To bimetal weld Kat*J.. AST1-1 371 ER308 Distance r~om Shell 3.875" }.{at-I.l. ASTM 371 ER308 Thickness 0.311" Mat'l Stainless Steel Type 304 Thermal Sleeve No Pipe Reactions Yes Welded Attached Rolled Transients Per GE Drawing 729E762 Rev. 0 (A-51 ) K.III-63

PBAPS ____~ v.."e-O I.C).:t<. -tz... l7 Mu-Mo ~~ ~ 1 ~ _. ~=--t l\\M

.'~ \\.1'\\ \\I~.

4" JET PUMP NOZZLE 19 (REGION B) NOZZLE JUSTIFIED BY N415.1 & N450 OF SECTION III K". 1II-64 (A-5 2)

\\0.10 PBAPS O'E-~\\<:'"'~ ME<...\\\\. ?\\~\\~C.... '5n"t't-~~E-~ ~\\\\'t'E-~c:... \\~TE-"~\\\\\\E-~ t\\., \\W~* ~ta..f=e- ~~() ~S...E \\0 '\\SE-C.OMP~RE:b \\0 \\.5 CS\\-n =. '2.?;,*7 Fo~ -Woz:z.\\.'C:- \\0 ~""~L'- J0~CT~R..~ M"~. \\-1t=\\'\\'S~""'~~-\\- ~~,.~. STilt=~S \\\\-\\E:~~\\,.X = 2.G:.. '2.~ M~. ~E-C..... V~ES.S. '5T~~~~ h~.,.&"-\\~\\\\\\~~ ~~'=- ~ow~ O~ \\\\\\E. ~\\<.~\\c..\\\\ ~~\\.\\.()w -= '5.b S"'1 =eo. D 2.5.15 4" JET PUMP NOZZLE MK 19 PIPING REACTION STRESSES K.III-65 (A-53)

PBAPS Nozzle 2" InstruInentation No. Req. Nl'.* No. 12 Location Shel13CP -;-6",4.3' -1",and 49',..l?--tf above vessel zero l-tat'l. Inconel Inside Dic:n.@ Shel,L 1.9~)..)" Taper I.D. No Inside Di8.:'1l @ First \\*leld 1.953" Outside* Dia:n o~ Nozzle 2.755" Outside Diaro at l"irst Weld 2.755" Internal Lip No Cladding No Nom. Thk. Distance F:ro!!l V~ssel !. D. Mat'l. Bimetal l-:eld No Connecting Pipe Distance from Shell Mat'1. Thickness .2422" stainless Steel Type 304 Thennal Sleeve No 1'5 }'C Reacti.ons Yes Welded Attached Rolled Pc r CS Dz";;.',:inc 729E7G2 and 13)B9~90 Rev. 0 (A-54 ) K.III-66

PBAPS f() N-. \\D .~1bS " 2" INSTRUMENT NOZZLE K.III-67 (A-55)

51,'2. ~\\ PBAPS PR\\\\,,\\f:\\RY + Sc-c..o~,\\>~~Y S"'Rr-~~ \\N"~~~\\\\'( \\<.f>-..~~': CSA.\\....o~ = 3~", '::. 70.0 ,,~\\ (A-56) 2 11 INSTRUMENT NOZZLE K.III-68

PBAPS \\':1'6, \\t - 'l. \\~. \\ ~S"';"~_\\H~"'2':\\\\t:-;\\\\v~ \\\\OL."l.'-~ p,? ~==\\_~,,;..-.~p..,.(".:\\\\O~ ~t':..,1.;"~~~ 5,"<..E T'\\-\\E \\--\\'t::. \\l.. ~ t,) \\~"5\\~ME~\\~\\\\C>~ ~C>t-:eu:::-::-..>> ~~& ~\\-"t""-C..\\-\\~~ \\0 T\\"\\e' \\h:~'>"~~L c:;.\\-\\~\\.'- ~'( ~ ~,,~..T\\h..\\... V\\:~~\\~~\\\\Cl-\\ \\VG-l.t). THe \\)"5~ C~ ~~.w LoI--fPUTc:;.tK, ~P~~(,~N'-1 elJ 1..,7 (e 'J\\.I\\.lf)~() ~~"'\\'<~Ie:-) \\3 ~o\\ \\J "\\"\\0. T\\,\\E'" ~\\Q\\~G. 1<~I\\.('\\\\O~~ ~\\\\\\. Se-E-'J ~\\..uA..T~t) ~ Co "-'TR.\\ B\\JT\\\\oj~ \\() ~ ~"'~~\\'<P~ +~\\L\\J~ h\\ \\\\'F.;: \\~ ~\\..(> ~~-~" T"e Mt-..XtMUM ~'.Je9'J'..((=' ~Ht:.e...),\\..)'-"' ~\\i>...e:"'£"S. \\~ 3.(,Zo4 \\<\\~I \\\\-\\'Z. c.ot-\\P~_e-\\) To p....~ t\\\\_\\"owA~~\\.~- "S'l"~-e;.s.s. o~ \\2.<:>0 \\<'\\9"5:. "\\-\\ 20, \\~\\E ~'"T~~.;s. \\~ \\N~\\..\\. 'Be\\.ow \\\\'\\~ Pa..\\.\\.o""..,al.& ~~O Y\\e'E::"l" \\\\-\\~ \\t~~\\j\\~~~Ct.lTb O~ 'SGC.,'lOt-\\ -:m.. J OF ",,,,=" ~c;, "16-c.o~. T\\-\\e ~o'Z."Z.'..e- ~"O S\\~~~~ \\~\\~~~\\,\\t~ ~9...~ \\ O...s\\~\\"V~ \\~~\\{)e S ~\\ ":. \\Eo *2. S- ~s 1 '5~, -=;:. 1l. 85 \\<~\\ MK 2 INSTRUMENTATION NOZZLE PIPING REACTION STRESSES K.III-69 (A-57)

PBAPS Nozzle 6" InstruJ'aents.tion (Head Spray) No. Rcq. 2 D'Ng. No:. 129393 Location Top Head Mat'i. MN-MO Inside Dia.-n.@ 8"lH.:11 6.218'{) Teper I.D. No Inside Diam @ First \\~eld 5.8125" Outside Diam of Nozzle 11.4375" Outside Dianl at first Welt! '1.5" Internal Lip No Cladding Nom. Thk. 1/4" Distance From Vessel I.D. To bU(letal weld 1-1at 'I. ASTl'-1 A37l ER308 Bimetal Held Yes Distance from Shell 9.125" Mat'l. ASTI~ A37l ER308 Connecting Pipe Thickness Flange Connection Mat'1 Stainless Steel ThCl~al Sleeve Yes Welded For use as Head Spray Rolled Attached Clamped between flanges Pipe Reactions Yes Transients Per GE Dra*.....ing 729=;762 Rev. 0 & l35B9990 Rev*. 0 K.III-70 (A-58 )

PBAPS --f--~ c.. -_._-_:"'!..-1--------..... IM~-""'O

  • Sb..:~oL G e.'i3.

4- ____I ~-----t-------_--l._---..L..- I II (A-59 ) 6" INSTRUMENTATION NOZZLE 206 (REGION A) NOZZLE JUSTIFIED BY N415.1 & N450 OF SECTION III K.III-71

PBAPS O~\\C.....\\\\ ""'CC.\\-\\. ~\\,,\\~£? ~~...~C:."::>~~ S\\~~"5~ \\~\\C~~\\\\\\~ h.., \\\\\\~ S~~!C- ~~ I\\~....e- \\0 ~'i: COMPA.~~'\\:> \\0 \\~S ~W\\ = '2.7.3 Fo\\>", ~OL1..'-\\:- \\0 ~\\\\E\\..\\. ~c.1"7 V\\~y.. M~6R~~~ ~~~~~. ~~t::. \\~\\~~~\\\\'{ -;;:. \\~. e~ \\4..1B --. M flo..-x.. ~\\:.C. 0\\0 ~~~. ~CL';-c:.,~ ~ \\~\\e.-~~\\T\\~ ~~~ CS>r\\OW\\-\\ CA., T\\'\\s-S~~\\U\\ S~\\C'M :: 0.0 CSW\\ ";:. COO. C) 6" INSTRUMENTATION NOZZLE MK 206 PIPING REACTION STRESSES K.III-72 (A-60)

PBAPS ','AXIl*1Ur*1 US.~GE FAC'roRS Recirculation Outlet Nozzle l"eea.watcr Core Spray Nozzle CRD Hyd. Ret. lk>z,zle Control Rod Drive Nozzle ?" JY)~t.rumentat:ion Nozzl e Support Skirt Refueling Cont~.inment Skirt Shroud Support Closure Vessel Shells K.III-73 stainJ.ess Steel .10 Mn Moly .30 SA-376 Type 316 .233 SA-312 Type 304 .147 Mn Moly .027 Mn Moly .70 stainless Stce1 .01 Mn Moly .02 Stain1ess Steel No uSRge *ractor Mn I~oly .363 Inconel .005 Inconel .06 Mn Moly .55 Mn Moly .328 Mn Moly .17 ~1n Moly .000 Stud .762 Water Level Area .009 Lower Head Area .032 (A-61 )

PBAPS This section of tlle report contains a tabulation of all deviations that affect the struct.u~.~al integrity of t'he reactor vessel and closure head. !he deviations are listed by CV numbers; also, the corresponding VN numbers are shown. A description of the variation is given along loTi.th a summary of the engil'leertng justif.l.catio~1 .~)f' that variation. K.III-74

cv# 139-6A 139-19A 139-22 50472 70207 75028 PBAPS Description A dimensional inspection of the 26" steam Outlet Nozzle revealed that the 5-7/8" radius was machined 1/4" too deep into the 45° angle. Conclusion In keeping t.he originu configuration, 1/4" of the reinfol Cl;Iaent area was machined off of the 45° slope. This was justified from Article 1-6 of the A.S.M.E Code, Section III. Description Th~ minimum shank diameter of one of the studs is 5.8195" which is 0.0105" too small.

== Conclusion:== The maximum primary + secondary stress in-tensity is 100 ksi. The allowable is 110 ksi; therefore, the stud as machined meets the stress requirements of the AS~m Code, Section III.

== Description:== Flux Monitor Penetrations exceeded the radial tolerance of 0.060" with the maximum off center of 0.164" on penetration #22-C. (B-2) K.III-75

139-23B 127-23B 75019 PBAPS

== Conclusion:== ~le resulting reinforcement area is still in excess of the required area.

== Description:== A maximum mismatch of 1-3!i6" between MK-2 (Lower Head Upper Segment) and MK-57 (Shell Course

  1. 1 Assembly).

Conelusi.on: The maximum primary plus secondary stress is 37 ksi. The allowable is 80 ksi; therefore, the as built assembly meets the stress require: ments of the A.S.M.E. Code, Section III. A dimensional inspection of the Lower Head Dome to Torus Assembly showed a maximum mismatch of 1/2" th 0 D on e..

== Conclusion:== Engineering calculations show the maximum primary local membrane stress intensity to be 26.8 ksi. Sallow = 1.5 Sm = 40 ksi. The maximun primary + secondary stress intensity is 35.7 ksi. Sallow = 3.0 Sm = 80 ksi. (B-3 ) K.III-76

cv# l27-24B 127-36 VNI! 50655 51403 PBAPS Description A dimensional inspection of the torus to the lower head assembly showed a mismatch of 7/8" maximum I. D. and 1/4" maximum o. D. Conclusion Engineering calculations show the primary local membrane stress intensity for mismatch geometry to be 26.8 ksi. Sedlow.

1.5 Sm

40.0 ksi. The maximum primary + secondary stress intensity is 19.6 ksi. Sallow. = 3.0 Sm = 80.0 ksi. Therefore engineering recommends acceptance "as is".

== Description:== CRD and Flux l-1onitor "J" groove deviations.

== Conclusion:== The reported weld groove variations are satisfactory from the standpoint of base metal reinforcement and ligament efficiency. K.III-77

CB&I Deviation Report IfJ IC)('?-1 CB&I Deviation Report #4962-2 PBAPS

== Description:== A maximum mismatch of 1-3/8" between MK-202 (closure head segment) and MK-209 (closure head fl<i.nge).

== Conclusion:== The maxlmum primary + seconda.ry stress intensity is 75.7 ksi. The allowable is 80.0 ksi; therefore, the as built assembly meets the stress ~equirements of the AS~ffi Code, ~ection III. Description Three of the tapped stud bushing holes (#14,32,66) had defective threads. Also, the bottom 2-1/2 inches of thread of one side of hole #31 were incomplete or missing.

== Conclusion:== Special overzize bushings were used for the thread holes (14,32,66) that hn.d defective threads. The minim\\UTI effecti.ve thr(:.:-Jl lenGth that (B-5 ) K.III-78

cv# CB&I Deviation Report #4962-8 VNI PBAPS Conclusion - (Cont'd.) is required in the flange is 4.07 in. Therefore, the 8 inches of good thread'in hole #31 is acceptable. Description-Two thin areas in the lower head vnth the minimum thickness of 7.99 in. which includes the cladding thickness.

== Conclusion:== These two thin areas are outside the eRD and in-core penetration region. Since the required thickness in this region is 3.0751", the 7.99 in. thickness is acceptable. (B-6) K.III-79}}