{{#Wiki_filter:August 26, 2021
{{#Wiki_filter:Mr. David Rhoades
Mr. David Rhoades
Senior VP, Exelon Generation Company, LLC
Senior VP, Exelon Generation Company, LLC
President and CNO, Exelon Nuclear
President and CNO, Exelon Nuclear
4300 Winfield Road
4300 Winfield Road
Warrenville, IL 60555
Warrenville, IL 60555
SUBJECT: QUAD CITIES NUCLEAR POWER STATION - NOTIFICATION OF AN NRC
SUBJECT:
                TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR
QUAD CITIES NUCLEAR POWER STATION - NOTIFICATION OF AN NRC  
                INFORMATION; INSPECTION REPORT 05000254/2021004; 05000265/2021004
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR  
INFORMATION; INSPECTION REPORT 05000254/2021004; 05000265/2021004
Dear Mr. Rhoades:
Dear Mr. Rhoades:
On December 6, 2021, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite
On December 6, 2021, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite  
portion of the Triennial Heat Sink Performance Inspection at your Quad Cities Nuclear Power
portion of the Triennial Heat Sink Performance Inspection at your Quad Cities Nuclear Power  
Plant. This inspection will be performed in accordance with NRC baseline Inspection
Plant. This inspection will be performed in accordance with NRC baseline Inspection  
Procedure 71111.07.
Procedure 71111.07.
In order to minimize the impact that the inspection has on the site and to ensure a productive
In order to minimize the impact that the inspection has on the site and to ensure a productive  
inspection, we have enclosed a request for documents needed for the inspection. The
inspection, we have enclosed a request for documents needed for the inspection. The  
documents have been divided into three groups.
documents have been divided into three groups.
    The first group lists information necessary for our initial inspection scoping activities. This
 
    information should be available to the lead inspector no later than October 11, 2021. By
The first group lists information necessary for our initial inspection scoping activities. This  
    October 25, 2021, the inspector will communicate the initial selected set of approximately
information should be available to the lead inspector no later than October 11, 2021. By  
    2-3 risk significant heat exchangers.
October 25, 2021, the inspector will communicate the initial selected set of approximately
    The second group is needed to support our in-office preparation activities. This set of
2-3 risk significant heat exchangers.
    documents, including the calculations associated with the selected heat exchangers, should
 
    be available at the Regional Office no later than November 22, 2021. This information
The second group is needed to support our in-office preparation activities. This set of  
    should be separated for each selected component, especially if provided electronically (e.g.,
documents, including the calculations associated with the selected heat exchangers, should  
    folder with component name that includes calculations, condition reports, maintenance
be available at the Regional Office no later than November 22, 2021. This information  
    history, etc). During the in-office preparation activities, the inspector may identify additional
should be separated for each selected component, especially if provided electronically (e.g.,  
    information needed to support the inspection.
folder with component name that includes calculations, condition reports, maintenance  
    The last group includes the additional information above as well as plant specific reference
history, etc). During the in-office preparation activities, the inspector may identify additional  
    material. This information should be available onsite to the inspector on December 6, 2021.
information needed to support the inspection.
    It is also requested that corrective action documents and/or questions developed during the
 
    inspection be provided to the inspector as the documents are generated.
The last group includes the additional information above as well as plant specific reference  
All requested documents are to be for the time period from the onsite inspection period back to
material. This information should be available onsite to the inspector on December 6, 2021.
the documents that were provided in response to the previous Heat Sink Performance
It is also requested that corrective action documents and/or questions developed during the  
Inspection. If no activities were accomplished in that time period, then the request applies to the
inspection be provided to the inspector as the documents are generated.
last applicable document in the previous time period. It is important that these documents be as
All requested documents are to be for the time period from the onsite inspection period back to  
complete as possible, in order to minimize the number of documents requested during the
the documents that were provided in response to the previous Heat Sink Performance  
Inspection. If no activities were accomplished in that time period, then the request applies to the  
last applicable document in the previous time period. It is important that these documents be as  
complete as possible, in order to minimize the number of documents requested during the  
preparation week or during the onsite inspection.
preparation week or during the onsite inspection.
August 26, 2021


D. Rhoades                                         -2-
D. Rhoades
The lead inspector for this inspection is Elba Sanchez Santiago. We understand that our
-2-
licensing contact for this inspection is Richard Swart of your organization. If there are any
The lead inspector for this inspection is Elba Sanchez Santiago. We understand that our  
questions about the inspection or the material requested in the enclosure, please contact the
licensing contact for this inspection is Richard Swart of your organization. If there are any  
questions about the inspection or the material requested in the enclosure, please contact the  
lead inspector at 630-829-9520 or via e-mail at elba.sanchezsantiago@nrc.gov.
lead inspector at 630-829-9520 or via e-mail at elba.sanchezsantiago@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
This letter does not contain new or amended information collection requirements subject to the  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
requirements were approved by the Office of Management and Budget, Control
requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
respond to, a request for information or an information collection requirement unless the
respond to, a request for information or an information collection requirement unless the  
requesting document displays a currently valid Office of Management and Budget Control
requesting document displays a currently valid Office of Management and Budget Control  
Number.
Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public  
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of  
this letter and its enclosure will be available electronically for public inspection in the NRC Public
this letter and its enclosure will be available electronically for public inspection in the NRC Public  
Document Room or from the Publicly Available Records (PARS) component of NRCs
Document Room or from the Publicly Available Records (PARS) component of NRCs  
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible  
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic  
Reading Room).
Reading Room).
                                                Sincerely,
Sincerely,
                                                                        Signed by Sanchez Santiago, Elba
Elba Sanchez Santiago, Senior Reactor Inspector
                                                                          on 08/26/21
Engineering Branch 2
                                                Elba Sanchez Santiago, Senior Reactor Inspector
Division of Reactor Safety
                                                Engineering Branch 2
                                                Division of Reactor Safety
Docket Nos. 50-254; 50-265
Docket Nos. 50-254; 50-265
License Nos. DPR-29; DPR-30
License Nos. DPR-29; DPR-30
Line 86: Line 89:
Triennial Heat Sink Performance
Triennial Heat Sink Performance
   Inspection Document Request
   Inspection Document Request
cc: Distribution via LISTSERV
cc: Distribution via LISTSERV
Signed by Sanchez Santiago, Elba
on 08/26/21


D. Rhoades                                   -3-
D. Rhoades
-3-
Letter to David Rhoades from Elba Sanchez Santiago dated August 26, 2021.
Letter to David Rhoades from Elba Sanchez Santiago dated August 26, 2021.
SUBJECT: QUAD CITIES NUCLEAR POWER STATION - NOTIFICATION OF AN NRC
SUBJECT:
              TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR
QUAD CITIES NUCLEAR POWER STATION - NOTIFICATION OF AN NRC  
              INFORMATION; INSPECTION REPORT 05000254/2021004; 05000265/2021004
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR  
INFORMATION; INSPECTION REPORT 05000254/2021004; 05000265/2021004
DISTRIBUTION:
DISTRIBUTION:
Jessie Quichocho
Jessie Quichocho
Line 105: Line 112:
DRPIII
DRPIII
DRSIII
DRSIII
ADAMS Accession Number: ML21238A314
ADAMS Accession Number: ML21238A314
    Publicly Available     Non-Publicly Available       Sensitive     Non-Sensitive
Publicly Available
OFFICE       RIII
Non-Publicly Available
NAME         ESanchezSantiago:
Sensitive
              mb
Non-Sensitive
DATE         08/26/2021
OFFICE
                                OFFICIAL RECORD COPY
RIII
NAME
ESanchezSantiago:
mb
DATE
08/26/2021
OFFICIAL RECORD COPY


      TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
Inspection Report:           05000254/2021004; 05000265/2021004
Enclosure
Inspection Dates:             December 6 - 10, 2021
Inspection Report:
Inspection Procedure:         IP 71111.07, Heat Sink Performance
05000254/2021004; 05000265/2021004
Lead Inspector:               Elba Sanchez Santiago
Inspection Dates:
                              630-829-9520
December 6 - 10, 2021
                              elba.sanchezsantiago@nrc.gov
Inspection Procedure:
      I.   Information Requested by October 11, 2021:
IP 71111.07, Heat Sink Performance
      1.   List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
Lead Inspector:
            Safety-Related Equipment, heat exchangers in order of risk significance.
Elba Sanchez Santiago
      2.   Copy of heat exchanger performance trending data tracked for each GL 89-13
630-829-9520
            heat exchanger.
elba.sanchezsantiago@nrc.gov
      3.   List of corrective action program documents (with a short description) associated
I.
            with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat
Information Requested by October 11, 2021:
            exchanger testing, for the previous 3 years or since the last corrective action
1.
            program document list was sent to the NRC for the previous heat sink
List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting  
            performance inspection. The list should include all corrective action program
Safety-Related Equipment, heat exchangers in order of risk significance.
            documents not on the last corrective action program document list.
2.
      4.   Copy of any self-assessment done on any of GL 89-13 heat exchangers.
Copy of heat exchanger performance trending data tracked for each GL 89-13  
      5.   Last two System Health Report(s) and maintenance rule system notebooks for all
heat exchanger.
            the GL 89-13 heat exchangers.
3.
      6.   List of engineering-related operator workarounds (with a short description)
List of corrective action program documents (with a short description) associated  
            associated with GL 89-13 heat exchangers. The requested documents are to be
with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat  
            for the time period from the onsite inspection period back to the documents that
exchanger testing, for the previous 3 years or since the last corrective action  
            were provided in response to the previous heat sink performance inspection.
program document list was sent to the NRC for the previous heat sink  
      7.   List of permanent and temporary modifications (with a short description)
performance inspection. The list should include all corrective action program  
            associated with GL 89-13 heat exchangers. The requested documents are to be
documents not on the last corrective action program document list.
            for the time period from the onsite inspection period back to the documents that
4.
            were provided in response to the previous heat sink performance inspection.
Copy of any self-assessment done on any of GL 89-13 heat exchangers.
II.   Information Requested by November 22, 2021:
5.
      1.   Copies of the GL 89-13 responses.
Last two System Health Report(s) and maintenance rule system notebooks for all  
      2.   Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to
the GL 89-13 heat exchangers.
            the GL 89-13 Heat Exchanger Program.
6.
                                                                                      Enclosure
List of engineering-related operator workarounds (with a short description)  
associated with GL 89-13 heat exchangers. The requested documents are to be  
for the time period from the onsite inspection period back to the documents that  
were provided in response to the previous heat sink performance inspection.
7.
List of permanent and temporary modifications (with a short description)  
associated with GL 89-13 heat exchangers. The requested documents are to be  
for the time period from the onsite inspection period back to the documents that  
were provided in response to the previous heat sink performance inspection.
II.
Information Requested by November 22, 2021:
1.
Copies of the GL 89-13 responses.
2.
Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to  
the GL 89-13 Heat Exchanger Program.


TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
3.   Copies of procedures developed to implement the recommendations of GL 89-13
2
      (e.g. the GL 89-13 Heat Exchanger Program description).
3.
4.   Copies of the selected corrective action program documents.
Copies of procedures developed to implement the recommendations of GL 89-13  
5.   For the specific heat exchangers selected:
(e.g. the GL 89-13 Heat Exchanger Program description).
      a. Copies of the UFSAR sections applicable for each heat exchanger.
4.
      b. Copy of system description and design basis document for the heat
Copies of the selected corrective action program documents.
          exchangers (as applicable).
5.
      c. Provide a list of calculations (with a short description) which currently apply to
For the specific heat exchangers selected:
          each heat exchanger.
a.
            i. establish the limiting design basis heat load required to be removed by
Copies of the UFSAR sections applicable for each heat exchanger.
              each of these heat exchangers;
b.
          ii. demonstrate the heat exchangers capacity to remove the limiting heat
Copy of system description and design basis document for the heat  
              load;
exchangers (as applicable).
          iii. correlate surveillance testing and/or inspection results from these heat
c.
              exchangers with design basis heat removal capability (e.g., basis for
Provide a list of calculations (with a short description) which currently apply to  
              surveillance test and/or inspection acceptance criteria);
each heat exchanger.
          iv. evaluate the potential for water hammer in each heat exchanger or
i.
              associated piping; and
establish the limiting design basis heat load required to be removed by  
          v. evaluate excessive tube vibration in each heat exchanger.
each of these heat exchangers;
      d. Copy of any operability determinations or other documentation of degradation
ii.
          associated with the heat exchangers or the systems that support the
demonstrate the heat exchangers capacity to remove the limiting heat  
          operation for the selected heat exchangers.
load;
      e. Copy of the construction code, Design Specification, heat exchanger data
iii.
          sheets, and vendor documents including component drawings applicable for
correlate surveillance testing and/or inspection results from these heat  
          the heat exchangers.
exchangers with design basis heat removal capability (e.g., basis for  
      f.   Copies of normal, abnormal, and emergency operating procedures
surveillance test and/or inspection acceptance criteria);
          associated with the selected heat exchangers.
iv.
6.   For the ultimate heat sink (UHS) and the safety-related service water system (or
evaluate the potential for water hammer in each heat exchanger or  
      equivalent):
associated piping; and
      a. Copies of the applicable UFSAR sections.
v.
      b. Copy of system description and design basis document (as applicable).
evaluate excessive tube vibration in each heat exchanger.
      c. Copy of any operability determinations or other documentation of degradation
d.
          associated with the UHS and the safety-related service water system.
Copy of any operability determinations or other documentation of degradation  
                                          2
associated with the heat exchangers or the systems that support the  
operation for the selected heat exchangers.
e.
Copy of the construction code, Design Specification, heat exchanger data  
sheets, and vendor documents including component drawings applicable for  
the heat exchangers.
f.
Copies of normal, abnormal, and emergency operating procedures  
associated with the selected heat exchangers.
6.
For the ultimate heat sink (UHS) and the safety-related service water system (or  
equivalent):
a.
Copies of the applicable UFSAR sections.
b.
Copy of system description and design basis document (as applicable).
c.
Copy of any operability determinations or other documentation of degradation  
associated with the UHS and the safety-related service water system.


    TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
            d. Copy of the document (e.g. UFSAR or Technical Requirements Manual) that
3
                states the maximum cooling water system inlet temperature limit that still
d.
                allows full licensed power operation of the nuclear reactor.
Copy of the document (e.g. UFSAR or Technical Requirements Manual) that  
            e. Copy of system description and design basis document (as applicable).
states the maximum cooling water system inlet temperature limit that still  
            f. Copy of the construction code and Design Specification.
allows full licensed power operation of the nuclear reactor.
            g. Copies of normal, abnormal, and emergency operating procedures
e.
                associated with the UHS and safety-related service water systems including
Copy of system description and design basis document (as applicable).
                procedures for loss of these systems.
f.
            h. Copies of corrective action documents associated with water hammer or
Copy of the construction code and Design Specification.
                hydraulic transients in the service water system since the last Heat Sink
g.
                Inspection.
Copies of normal, abnormal, and emergency operating procedures  
            i. If available, provide an electronic copy of piping and instrumentation
associated with the UHS and safety-related service water systems including  
                diagrams (P&IDs) for the service water system, including the intake structure.
procedures for loss of these systems.
            j. Provide a list of calculations (with a short description), which currently apply
h.
                to UHS and safety-related service water system.
Copies of corrective action documents associated with water hammer or  
            k. Provide a list of instruments (with a short description) associated with
hydraulic transients in the service water system since the last Heat Sink  
                automatic or alarm functions for the safety-related service water system
Inspection.
                and/or UHS.
i.
            l. Provide a list of any design change (with a short description) performed on
If available, provide an electronic copy of piping and instrumentation  
                the UHS or safety-related service water system since the last heat sink
diagrams (P&IDs) for the service water system, including the intake structure.
                performance inspection.
j.
      7.   A schedule of all inspections, cleanings, maintenance, or testing of any
Provide a list of calculations (with a short description), which currently apply  
            safety-related plant heat exchanger to be performed during the onsite portion of
to UHS and safety-related service water system.
            the inspection.
k.
III. Information Requested to Be Available on First Day of Inspection,
Provide a list of instruments (with a short description) associated with  
      December 6, 2021:
automatic or alarm functions for the safety-related service water system  
      1.   For the specific heat exchangers selected:
and/or UHS.
            a. Copy of the calculation which correlates surveillance testing results from
l.
                these heat exchangers with design basis heat removal capability (e.g. basis
Provide a list of any design change (with a short description) performed on  
                for surveillance test acceptance criteria).
the UHS or safety-related service water system since the last heat sink  
            b. Copies of the two most recent completed tests and evaluation data
performance inspection.
                confirming thermal performance for those heat exchangers which are
7.
                performance tested.
A schedule of all inspections, cleanings, maintenance, or testing of any
            c. Documentation and procedures that identify the types, accuracy, and location
safety-related plant heat exchanger to be performed during the onsite portion of  
                of any special instrumentation used for the two most recently completed
the inspection.
                thermal performance tests for the heat exchangers (e.g., high accuracy
III.
                ultrasonic flow instruments or temperature instruments). Include calibration
Information Requested to Be Available on First Day of Inspection,  
                                                3
December 6, 2021:
1.
For the specific heat exchangers selected:
a.
Copy of the calculation which correlates surveillance testing results from  
these heat exchangers with design basis heat removal capability (e.g. basis  
for surveillance test acceptance criteria).
b.
Copies of the two most recent completed tests and evaluation data  
confirming thermal performance for those heat exchangers which are  
performance tested.
c.
Documentation and procedures that identify the types, accuracy, and location  
of any special instrumentation used for the two most recently completed  
thermal performance tests for the heat exchangers (e.g., high accuracy  
ultrasonic flow instruments or temperature instruments). Include calibration  


TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
        records for the instruments used during these tests.
4
      d. Information regarding any alarms which monitor on-line performance.
records for the instruments used during these tests.
      e. Copy of the document describing the inspection results of each heat
d.
        exchanger. The requested documents are to be for the time period from the
Information regarding any alarms which monitor on-line performance.
        onsite inspection period back to the documents that were provided in
e.
        response to the previous heat sink performance inspection.
Copy of the document describing the inspection results of each heat  
      f. The cleaning and inspection maintenance schedule for each heat exchanger
exchanger. The requested documents are to be for the time period from the  
        for the next five years.
onsite inspection period back to the documents that were provided in  
      g. Copy of the Design Specification and heat exchanger data sheets for each
response to the previous heat sink performance inspection.
        heat exchanger.
f.
      h. Copy of the vendor manuals including component drawings for each heat
The cleaning and inspection maintenance schedule for each heat exchanger  
        exchanger.
for the next five years.
      i. Copy of the calculation which establishes the limiting (maximum) design
g.
        basis heat load which is required to be removed by each of these heat
Copy of the Design Specification and heat exchanger data sheets for each  
        exchangers.
heat exchanger.
      j. Copy of the operating procedure that ensures that the maximum cooling
h.
        water system inlet temperature limit is not exceeded.
Copy of the vendor manuals including component drawings for each heat  
      k. Copy of the calculations or documents which evaluate the potential for water
exchanger.
        hammer in each heat exchanger or associated piping.
i.
      l. Copy of the calculations that evaluate excessive tube vibration in each heat
Copy of the calculation which establishes the limiting (maximum) design  
        exchanger and the documents that describe the controls that prevent heat
basis heat load which is required to be removed by each of these heat  
        exchanger degradation due to excessive flow induced vibration during
exchangers.
        operation.
j.
      m. Copy of the periodic flow testing at or near maximum design flow. The
Copy of the operating procedure that ensures that the maximum cooling  
        requested documents are to be for the time period from the onsite inspection
water system inlet temperature limit is not exceeded.
        period back to the documents that were provided in response to the previous
k.
        heat sink performance inspection.
Copy of the calculations or documents which evaluate the potential for water  
      n. Copy of the document which identifies the current number of tubes in service
hammer in each heat exchanger or associated piping.
        for each heat exchanger and the supporting calculation which establishes the
l.
        maximum number of tubes which can be plugged in each heat exchanger.
Copy of the calculations that evaluate excessive tube vibration in each heat  
      o. Copy of the document establishing the repair criteria (plugging limit) for
exchanger and the documents that describe the controls that prevent heat  
        degraded tubes which are identified in each heat exchanger.
exchanger degradation due to excessive flow induced vibration during  
      p. Copies of the documents that verify the structural integrity of the heat
operation.
        exchanger (e.g. eddy current summary sheets, ultrasonic testing results, and
m. Copy of the periodic flow testing at or near maximum design flow. The  
        visual inspection results).
requested documents are to be for the time period from the onsite inspection  
      q. Copies of those documents that describe the methods taken to control water
period back to the documents that were provided in response to the previous  
        chemistry in the heat exchangers.
heat sink performance inspection.
                                      4
n.
Copy of the document which identifies the current number of tubes in service  
for each heat exchanger and the supporting calculation which establishes the  
maximum number of tubes which can be plugged in each heat exchanger.
o.
Copy of the document establishing the repair criteria (plugging limit) for  
degraded tubes which are identified in each heat exchanger.
p.
Copies of the documents that verify the structural integrity of the heat  
exchanger (e.g. eddy current summary sheets, ultrasonic testing results, and  
visual inspection results).
q.
Copies of those documents that describe the methods taken to control water  
chemistry in the heat exchangers.


TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
2.   For the review of the performance testing of the safety-related service water
5
      system (or equivalent) and the UHS:
2.
      a. Copies of the last two performance tests, such as the ASME in-service test,
For the review of the performance testing of the safety-related service water  
          for the pumps, valves, and, if applicable, the towers fans in the safety-related
system (or equivalent) and the UHS:
          service water system. If the components are not performance tested, please
a.
          provide documentation verifying performance by the methods actually used.
Copies of the last two performance tests, such as the ASME in-service test,  
      b. Copies of the documents that demonstrate that flow balance testing was
for the pumps, valves, and, if applicable, the towers fans in the safety-related  
          performed during the last three years. If the last flow test was performed
service water system. If the components are not performance tested, please  
          longer than three years, then provide the last flow test.
provide documentation verifying performance by the methods actually used.
      c. Copies of the documents that demonstrate that flow balance testing will
b.
          continue to be periodically done in the future.
Copies of the documents that demonstrate that flow balance testing was  
      d. Copies of procedures used to monitor interface valves between the safety
performed during the last three years. If the last flow test was performed  
          related section of the service water system and the non-safety related section
longer than three years, then provide the last flow test.
          and the associated results. The requested documents are to be for the time
c.
          period from the onsite inspection period back to the documents that were
Copies of the documents that demonstrate that flow balance testing will  
          provided in response to the previous heat sink performance inspection.
continue to be periodically done in the future.
      e. Copies of the procedures that verify the performance of risk significant
d.
          non-safety functions and the associated results. The requested documents
Copies of procedures used to monitor interface valves between the safety  
          are to be for the time period from the onsite inspection period back to the
related section of the service water system and the non-safety related section  
          documents that were provided in response to the previous heat sink
and the associated results. The requested documents are to be for the time  
          performance inspection.
period from the onsite inspection period back to the documents that were  
3.   For the review associated with the system walkdown of the service water intake
provided in response to the previous heat sink performance inspection.
      structure:
e.
      a. Copies of corrective maintenance for the last six years associated with
Copies of the procedures that verify the performance of risk significant
          service water strainers, traveling screens and trash racks.
non-safety functions and the associated results. The requested documents  
      b. Copies of the last two inspections and/or surveillances associated with
are to be for the time period from the onsite inspection period back to the  
          service water strainers, traveling screens and trash racks.
documents that were provided in response to the previous heat sink  
      c. List of preventive maintenance, including frequency, associated with service
performance inspection.
          water strainers, traveling screens and trash racks.
3.
      d. Copies of abnormal procedures for the traveling screens and service water
For the review associated with the system walkdown of the service water intake  
          strainers.
structure:
      e. Copies of the last two inspections and/or surveillances documenting that
a.
          component mounts have not excessively degraded (i.e., due to corrosion).
Copies of corrective maintenance for the last six years associated with  
          For example, inspections for the mounts for the, Service water pumps,
service water strainers, traveling screens and trash racks.
          service water strainers, traveling screens and trash racks.
b.
      f. Copies of the documents associated with the monitoring, trending, and
Copies of the last two inspections and/or surveillances associated with  
          remediation of silt accumulation at the service water pump bay.
service water strainers, traveling screens and trash racks.
                                        5
c.
List of preventive maintenance, including frequency, associated with service  
water strainers, traveling screens and trash racks.
d.
Copies of abnormal procedures for the traveling screens and service water  
strainers.
e.
Copies of the last two inspections and/or surveillances documenting that  
component mounts have not excessively degraded (i.e., due to corrosion).
For example, inspections for the mounts for the, Service water pumps,  
service water strainers, traveling screens and trash racks.
f.
Copies of the documents associated with the monitoring, trending, and  
remediation of silt accumulation at the service water pump bay.


        TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST
                g. Copies of surveillance procedures and testing results performed on the
6
                    service water pump bay water level instruments. The requested documents
g.
                    are to be for the time period from the onsite inspection period back to the
Copies of surveillance procedures and testing results performed on the  
                    documents that were provided in response to the previous heat sink
service water pump bay water level instruments. The requested documents  
                    performance inspection.
are to be for the time period from the onsite inspection period back to the  
                h. Copies of procedures associated with operating during adverse weather
documents that were provided in response to the previous heat sink  
                    conditions (e.g. icing, high temperatures, or low level).
performance inspection.
                i. Copy of the evaluation for the potential effects of low flow/level on underwater
h.
                    weir walls intended to limit silt or sand intake, if applicable.
Copies of procedures associated with operating during adverse weather  
If the information requested above will not be available, please contact Elba Sanchez Santiago
conditions (e.g. icing, high temperatures, or low level).
i.
Copy of the evaluation for the potential effects of low flow/level on underwater  
weir walls intended to limit silt or sand intake, if applicable.
If the information requested above will not be available, please contact Elba Sanchez Santiago  
as soon as possible at 630-829-9520 or e-mail elba.sanchezsantiago@nrc.gov.
as soon as possible at 630-829-9520 or e-mail elba.sanchezsantiago@nrc.gov.
                                                    6
}}
}}

Latest revision as of 23:36, 27 November 2024

Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000254/2021004; 05000265/2021004
ML21238A314
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 08/26/2021
From: Sanchez-Santiago E
NRC/RGN-III/DRS/EB2
To: Rhoades D
Exelon Generation Co, Exelon Nuclear
References
IR 2021004
Download: ML21238A314 (9)


See also: IR 05000254/2021004

Text

Mr. David Rhoades

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION - NOTIFICATION OF AN NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR

INFORMATION; INSPECTION REPORT 05000254/2021004; 05000265/2021004

Dear Mr. Rhoades:

On December 6, 2021, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite

portion of the Triennial Heat Sink Performance Inspection at your Quad Cities Nuclear Power

Plant. This inspection will be performed in accordance with NRC baseline Inspection

Procedure 71111.07.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the lead inspector no later than October 11, 2021. By

October 25, 2021, the inspector will communicate the initial selected set of approximately

2-3 risk significant heat exchangers.

The second group is needed to support our in-office preparation activities. This set of

documents, including the calculations associated with the selected heat exchangers, should

be available at the Regional Office no later than November 22, 2021. This information

should be separated for each selected component, especially if provided electronically (e.g.,

folder with component name that includes calculations, condition reports, maintenance

history, etc). During the in-office preparation activities, the inspector may identify additional

information needed to support the inspection.

The last group includes the additional information above as well as plant specific reference

material. This information should be available onsite to the inspector on December 6, 2021.

It is also requested that corrective action documents and/or questions developed during the

inspection be provided to the inspector as the documents are generated.

All requested documents are to be for the time period from the onsite inspection period back to

the documents that were provided in response to the previous Heat Sink Performance

Inspection. If no activities were accomplished in that time period, then the request applies to the

last applicable document in the previous time period. It is important that these documents be as

complete as possible, in order to minimize the number of documents requested during the

preparation week or during the onsite inspection.

August 26, 2021

D. Rhoades

-2-

The lead inspector for this inspection is Elba Sanchez Santiago. We understand that our

licensing contact for this inspection is Richard Swart of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact the

lead inspector at 630-829-9520 or via e-mail at elba.sanchezsantiago@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of

this letter and its enclosure will be available electronically for public inspection in the NRC Public

Document Room or from the Publicly Available Records (PARS) component of NRCs

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

Elba Sanchez Santiago, Senior Reactor Inspector

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-254; 50-265

License Nos. DPR-29; DPR-30

Enclosure:

Triennial Heat Sink Performance

Inspection Document Request

cc: Distribution via LISTSERV

Signed by Sanchez Santiago, Elba

on 08/26/21

D. Rhoades

-3-

Letter to David Rhoades from Elba Sanchez Santiago dated August 26, 2021.

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION - NOTIFICATION OF AN NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR

INFORMATION; INSPECTION REPORT 05000254/2021004; 05000265/2021004

DISTRIBUTION:

Jessie Quichocho

Aaron McCraw

RidsNrrDorlLpl3

RidsNrrPMQuadCities Resource

RidsNrrDroIrib Resource

John Giessner

Mohammed Shuaibi

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML21238A314

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

ESanchezSantiago:

mb

DATE

08/26/2021

OFFICIAL RECORD COPY

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

Enclosure

Inspection Report: 05000254/2021004; 05000265/2021004

Inspection Dates:

December 6 - 10, 2021

Inspection Procedure:

IP 71111.07, Heat Sink Performance

Lead Inspector:

Elba Sanchez Santiago

630-829-9520

elba.sanchezsantiago@nrc.gov

I.

Information Requested by October 11, 2021:

1.

List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2.

Copy of heat exchanger performance trending data tracked for each GL 89-13

heat exchanger.

3.

List of corrective action program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat

exchanger testing, for the previous 3 years or since the last corrective action

program document list was sent to the NRC for the previous heat sink

performance inspection. The list should include all corrective action program

documents not on the last corrective action program document list.

4.

Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5.

Last two System Health Report(s) and maintenance rule system notebooks for all

the GL 89-13 heat exchangers.

6.

List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be

for the time period from the onsite inspection period back to the documents that

were provided in response to the previous heat sink performance inspection.

7.

List of permanent and temporary modifications (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be

for the time period from the onsite inspection period back to the documents that

were provided in response to the previous heat sink performance inspection.

II.

Information Requested by November 22, 2021:

1.

Copies of the GL 89-13 responses.

2.

Copy of the Updated Final Safety Analysis Report (UFSAR) section applicable to

the GL 89-13 Heat Exchanger Program.

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

2

3.

Copies of procedures developed to implement the recommendations of GL 89-13

(e.g. the GL 89-13 Heat Exchanger Program description).

4.

Copies of the selected corrective action program documents.

5.

For the specific heat exchangers selected:

a.

Copies of the UFSAR sections applicable for each heat exchanger.

b.

Copy of system description and design basis document for the heat

exchangers (as applicable).

c.

Provide a list of calculations (with a short description) which currently apply to

each heat exchanger.

i.

establish the limiting design basis heat load required to be removed by

each of these heat exchangers;

ii.

demonstrate the heat exchangers capacity to remove the limiting heat

load;

iii.

correlate surveillance testing and/or inspection results from these heat

exchangers with design basis heat removal capability (e.g., basis for

surveillance test and/or inspection acceptance criteria);

iv.

evaluate the potential for water hammer in each heat exchanger or

associated piping; and

v.

evaluate excessive tube vibration in each heat exchanger.

d.

Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the

operation for the selected heat exchangers.

e.

Copy of the construction code, Design Specification, heat exchanger data

sheets, and vendor documents including component drawings applicable for

the heat exchangers.

f.

Copies of normal, abnormal, and emergency operating procedures

associated with the selected heat exchangers.

6.

For the ultimate heat sink (UHS) and the safety-related service water system (or

equivalent):

a.

Copies of the applicable UFSAR sections.

b.

Copy of system description and design basis document (as applicable).

c.

Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service water system.

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

3

d.

Copy of the document (e.g. UFSAR or Technical Requirements Manual) that

states the maximum cooling water system inlet temperature limit that still

allows full licensed power operation of the nuclear reactor.

e.

Copy of system description and design basis document (as applicable).

f.

Copy of the construction code and Design Specification.

g.

Copies of normal, abnormal, and emergency operating procedures

associated with the UHS and safety-related service water systems including

procedures for loss of these systems.

h.

Copies of corrective action documents associated with water hammer or

hydraulic transients in the service water system since the last Heat Sink

Inspection.

i.

If available, provide an electronic copy of piping and instrumentation

diagrams (P&IDs) for the service water system, including the intake structure.

j.

Provide a list of calculations (with a short description), which currently apply

to UHS and safety-related service water system.

k.

Provide a list of instruments (with a short description) associated with

automatic or alarm functions for the safety-related service water system

and/or UHS.

l.

Provide a list of any design change (with a short description) performed on

the UHS or safety-related service water system since the last heat sink

performance inspection.

7.

A schedule of all inspections, cleanings, maintenance, or testing of any

safety-related plant heat exchanger to be performed during the onsite portion of

the inspection.

III.

Information Requested to Be Available on First Day of Inspection,

December 6, 2021:

1.

For the specific heat exchangers selected:

a.

Copy of the calculation which correlates surveillance testing results from

these heat exchangers with design basis heat removal capability (e.g. basis

for surveillance test acceptance criteria).

b.

Copies of the two most recent completed tests and evaluation data

confirming thermal performance for those heat exchangers which are

performance tested.

c.

Documentation and procedures that identify the types, accuracy, and location

of any special instrumentation used for the two most recently completed

thermal performance tests for the heat exchangers (e.g., high accuracy

ultrasonic flow instruments or temperature instruments). Include calibration

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

4

records for the instruments used during these tests.

d.

Information regarding any alarms which monitor on-line performance.

e.

Copy of the document describing the inspection results of each heat

exchanger. The requested documents are to be for the time period from the

onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection.

f.

The cleaning and inspection maintenance schedule for each heat exchanger

for the next five years.

g.

Copy of the Design Specification and heat exchanger data sheets for each

heat exchanger.

h.

Copy of the vendor manuals including component drawings for each heat

exchanger.

i.

Copy of the calculation which establishes the limiting (maximum) design

basis heat load which is required to be removed by each of these heat

exchangers.

j.

Copy of the operating procedure that ensures that the maximum cooling

water system inlet temperature limit is not exceeded.

k.

Copy of the calculations or documents which evaluate the potential for water

hammer in each heat exchanger or associated piping.

l.

Copy of the calculations that evaluate excessive tube vibration in each heat

exchanger and the documents that describe the controls that prevent heat

exchanger degradation due to excessive flow induced vibration during

operation.

m. Copy of the periodic flow testing at or near maximum design flow. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

n.

Copy of the document which identifies the current number of tubes in service

for each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

o.

Copy of the document establishing the repair criteria (plugging limit) for

degraded tubes which are identified in each heat exchanger.

p.

Copies of the documents that verify the structural integrity of the heat

exchanger (e.g. eddy current summary sheets, ultrasonic testing results, and

visual inspection results).

q.

Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

5

2.

For the review of the performance testing of the safety-related service water

system (or equivalent) and the UHS:

a.

Copies of the last two performance tests, such as the ASME in-service test,

for the pumps, valves, and, if applicable, the towers fans in the safety-related

service water system. If the components are not performance tested, please

provide documentation verifying performance by the methods actually used.

b.

Copies of the documents that demonstrate that flow balance testing was

performed during the last three years. If the last flow test was performed

longer than three years, then provide the last flow test.

c.

Copies of the documents that demonstrate that flow balance testing will

continue to be periodically done in the future.

d.

Copies of procedures used to monitor interface valves between the safety

related section of the service water system and the non-safety related section

and the associated results. The requested documents are to be for the time

period from the onsite inspection period back to the documents that were

provided in response to the previous heat sink performance inspection.

e.

Copies of the procedures that verify the performance of risk significant

non-safety functions and the associated results. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

3.

For the review associated with the system walkdown of the service water intake

structure:

a.

Copies of corrective maintenance for the last six years associated with

service water strainers, traveling screens and trash racks.

b.

Copies of the last two inspections and/or surveillances associated with

service water strainers, traveling screens and trash racks.

c.

List of preventive maintenance, including frequency, associated with service

water strainers, traveling screens and trash racks.

d.

Copies of abnormal procedures for the traveling screens and service water

strainers.

e.

Copies of the last two inspections and/or surveillances documenting that

component mounts have not excessively degraded (i.e., due to corrosion).

For example, inspections for the mounts for the, Service water pumps,

service water strainers, traveling screens and trash racks.

f.

Copies of the documents associated with the monitoring, trending, and

remediation of silt accumulation at the service water pump bay.

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION DOCUMENT REQUEST

6

g.

Copies of surveillance procedures and testing results performed on the

service water pump bay water level instruments. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

h.

Copies of procedures associated with operating during adverse weather

conditions (e.g. icing, high temperatures, or low level).

i.

Copy of the evaluation for the potential effects of low flow/level on underwater

weir walls intended to limit silt or sand intake, if applicable.

If the information requested above will not be available, please contact Elba Sanchez Santiago

as soon as possible at 630-829-9520 or e-mail elba.sanchezsantiago@nrc.gov.