Inspection Manual Change Notice 22-011,: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:NRC INSPECTION MANUAL                                               IRIB Change Notice 22-011 DELETED:                                         TRANSMITTED:
{{#Wiki_filter:Issue Date: 06/01/22 1
Number                       Date               Number                     Date
22-011 NRC INSPECTION MANUAL IRIB Change Notice 22-011 DELETED:
: 1. IMC 0308 Att 4               05/15/17           IMC 0308 Att 4             06/01/22
TRANSMITTED:
: 2. IP 43005                     10/08/15           IP 43005                   06/01/22 TRAINING:       No special training is required for any documents issued with this Change Notice.
Number Date Number Date
REMARKS:       IMC 0308 Attachment 4, "Technical Basis for Assessment." Revised to include transition of new plants from construction oversight to the ROP and note the change to the start date for inspection findings IP 43005, "NRC Oversight of Third-Party Organizations Implementing Quality Assurance Requirements." Updated requirement to address trip report to Director of Reactor Oversight in the Office of Nuclear Reactor Regulation.
: 1.
IMC 0308 Att 4 05/15/17 IMC 0308 Att 4 06/01/22
: 2.
IP 43005 10/08/15 IP 43005 06/01/22 TRAINING:
No special training is required for any documents issued with this Change Notice.
REMARKS:
IMC 0308 Attachment 4, "Technical Basis for Assessment." Revised to include transition of new plants from construction oversight to the ROP and note the change to the start date for inspection findings IP 43005, "NRC Oversight of Third-Party Organizations Implementing Quality Assurance Requirements." Updated requirement to address trip report to Director of Reactor Oversight in the Office of Nuclear Reactor Regulation.
Updated lead organization to IQVB.
Updated lead organization to IQVB.
EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):
EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):
Line 27: Line 33:
Standard Official Use Only (OUO)-Security Related Information.
Standard Official Use Only (OUO)-Security Related Information.
Please contact: _______________ Phone: ________
Please contact: _______________ Phone: ________
END Issue Date: 06/01/22                              1                                        22-011}}
END}}

Latest revision as of 16:53, 27 November 2024

Inspection Manual Change Notice 22-011
ML22151A315
Person / Time
Issue date: 06/01/2022
From: Madeleine Arel
NRC/NRR/DRO/IRIB
To:
Madeleine.Arel@nrc.gov
Shared Package
ML22124A305 List:
References
CN 22-011
Download: ML22151A315 (1)


Text

Issue Date: 06/01/22 1

22-011 NRC INSPECTION MANUAL IRIB Change Notice 22-011 DELETED:

TRANSMITTED:

Number Date Number Date

1.

IMC 0308 Att 4 05/15/17 IMC 0308 Att 4 06/01/22

2.

IP 43005 10/08/15 IP 43005 06/01/22 TRAINING:

No special training is required for any documents issued with this Change Notice.

REMARKS:

IMC 0308 Attachment 4, "Technical Basis for Assessment." Revised to include transition of new plants from construction oversight to the ROP and note the change to the start date for inspection findings IP 43005, "NRC Oversight of Third-Party Organizations Implementing Quality Assurance Requirements." Updated requirement to address trip report to Director of Reactor Oversight in the Office of Nuclear Reactor Regulation.

Updated lead organization to IQVB.

EDITORIAL REVISIONS FROM PREVIOUS CHANGE NOTICES (As Required):

DISTRIBUTION:

Standard Official Use Only (OUO)-Security Related Information.

Please contact: _______________ Phone: ________

END