IR 05000413/2022010: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 36: Line 36:


==Inspection Report==
==Inspection Report==
Docket Numbers: 05000413 and 05000414
Docket Numbers:
 
05000413 and 05000414
License Numbers: NPF-35 and NPF-52
License Numbers:
 
NPF-35 and NPF-52
Report Numbers: 05000413/2022010 and 05000414/2022010
Report Numbers:
 
05000413/2022010 and 05000414/2022010
Enterprise Identifier: I-2022-010-0038
Enterprise Identifier: I-2022-010-0038
 
Licensee:
Licensee: Duke Energy Carolinas, LLC
Duke Energy Carolinas, LLC
 
Facility:
Facility: Catawba Nuclear Station
Catawba Nuclear Station
 
Location:
Location: York, SC
York, SC
 
Inspection Dates:
Inspection Dates: May 23, 2022, to June 10, 2022
May 23, 2022, to June 10, 2022
 
Inspectors:
Inspectors: R. Fanner, Reactor Inspector N. Morgan, Intergovernmental Liaison Project Manager G. Ottenberg, Senior Reactor Inspector J. Zudans, Contractor
R. Fanner, Reactor Inspector
 
N. Morgan, Intergovernmental Liaison Project Manager
Approved By: James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety
G. Ottenberg, Senior Reactor Inspector
 
J. Zudans, Contractor
Approved By:
James B. Baptist, Chief
Engineering Branch 1
Division of Reactor Safety
Enclosure
Enclosure


Line 75: Line 79:
{{IP sample|IP=IP 71111.21|count=8}}
{{IP sample|IP=IP 71111.21|count=8}}
The inspectors:
The inspectors:
a. Evaluated whether the sampled POVs are being tested and maintained in accordance with NRC regulations along with the licensees commitments and/or licensing bases.
a. Evaluated whether the sampled POVs are being tested and maintained in accordance with NRC regulations along with the licensees commitments and/or licensing bases.


Line 83: Line 86:


d. Evaluated maintenance activities including a walkdown of the sampled POVs (if accessible).
d. Evaluated maintenance activities including a walkdown of the sampled POVs (if accessible).
: (1) 1KC050A, Auxiliary Building Non-Essential Header Isolation
 
: (2) 1ND027, 1A Residual Heat Removal (ND) Heat Exchanger Bypass Control
(1)1KC050A, Auxiliary Building Non-Essential Header Isolation (2)1ND027, 1A Residual Heat Removal (ND) Heat Exchanger Bypass Control (3)2CA050A, Auxiliary Feedwater (CA) Pump 2 Discharge to Steam Generator 2C Isolation (4)1NV010A, Letdown Orifice 1B Outlet Containment Isolation (5)2CA056, CA Pump 2A Flow to Steam Generator 2B (6)2NC035B, Pressurizer Power Operated Relief Valve Isolation (7)2NI173A, ND Header 2A to Cold Legs C & D (8)1CF033, 1A Steam Generator Feedwater Containment Isolation
: (3) 2CA050A, Auxiliary Feedwater (CA) Pump 2 Discharge to Steam Generator 2C Isolation
: (4) 1NV010A, Letdown Orifice 1B Outlet Containment Isolation
: (5) 2CA056, CA Pump 2A Flow to Steam Generator 2B
: (6) 2NC035B, Pressurizer Power Operated Relief Valve Isolation
: (7) 2NI173A, ND Header 2A to Cold Legs C & D
: (8) 1CF033, 1A Steam Generator Feedwater Containment Isolation


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Line 102: Line 99:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
71111.21N.02 Calculations AD-EG-ALL-1117 U2, 6.9KV, 4.16KV, & 600V Auxiliary Power Systems 19
Type
Designation
Description or Title
Revision or
Date
71111.21N.02
Calculations
AD-EG-ALL-1117
U2, 6.9KV, 4.16KV, & 600V Auxiliary Power Systems
Safety-Related Voltage Analysis
Safety-Related Voltage Analysis
CNC -1205.19-00- Generic Letter 89-10 MOV Calculations, NC System; 1(2)11
CNC -1205.19-00-
28 NC033A, 035B, 1NC031B
Generic Letter 89-10 MOV Calculations, NC System; 1(2)
CNC -1205.19-00- 89-10 Calculation for 1&2 CA038A, 42B, 46B, 50A, 54B, 14
28
29 58A, 62A, 66B
NC033A, 035B, 1NC031B
CNC -1205.19-00- Generic Letter 89-10 Calculation For Valves 1 and 4
CNC -1205.19-00-
0033 NI173A and NI178B
89-10 Calculation for 1&2 CA038A, 42B, 46B, 50A, 54B,
CNC -1205.19-00- GL 89-10 Set-Up Calculation for Valves 1KC001A, 3
29
0110 1KC002B, 1KC050A, 1KC053B, 2KC001A, AND
58A, 62A, 66B
CNC -1205.19-00-
Generic Letter 89-10 Calculation For Valves 1 and
0033
NI173A and NI178B
CNC -1205.19-00-
GL 89-10 Set-Up Calculation for Valves 1KC001A,
0110
1KC002B, 1KC050A, 1KC053B, 2KC001A, AND
2KC002B
2KC002B
CNC -1205.19-00- Required Thrust Calculation for 1(2)NC31B, 33A, 35B 000
CNC -1205.19-00-
0195 (AD/DD PPM); Item NO. 09J-363 & 364
Required Thrust Calculation for 1(2)NC31B, 33A, 35B
CNC -1205.41-00- 1 (2) ND 26, 27, 60, and 61 Fisher Actuator and Margin1
000
27 Capability Calculations
0195
CNC -1206.02-80- KCC - Component Cooling Heat Exchangers 1 A & 1 B to 018
(AD/DD PPM); Item NO. 09J-363 & 364
2019 the RHR Heat Exchangers 1A & 1 B. Also to the Inlet of
CNC -1205.41-00-
(2) ND 26, 27, 60, and 61 Fisher Actuator and Margin
27
Capability Calculations
CNC -1206.02-80-
KCC - Component Cooling Heat Exchangers 1 A & 1 B to
018
2019
the RHR Heat Exchangers 1A & 1 B. Also to the Inlet of
the Letdown & Fuel Pool Heat Exchangers
the Letdown & Fuel Pool Heat Exchangers
CNC -1223.11-00- Limiting 1ST Stroke Time for ND26, ND27, ND60 and 000
CNC -1223.11-00-
0055 ND6V
Limiting 1ST Stroke Time for ND26, ND27, ND60 and
CNC -1381.05-00- U2, 6.9KV, 4.16KV, & 600V AUXILIARY POWER 19
000
0199 SYSTEMS SAFETY-RELATED VOLTAGE ANALYSIS
0055
CNC 1205.41-00- 1 (2) NV 010A, 011A, and 013A Required Thrust 2
ND6V
0018 Evaluation supporting Air Operated Valve (AOV) Program
CNC -1381.05-00-
CNC-1205.41-00- Air Operated Valve (AOV) Program Scope Calculation 5
U2, 6.9KV, 4.16KV, & 600V AUXILIARY POWER
0199
SYSTEMS SAFETY-RELATED VOLTAGE ANALYSIS
CNC 1205.41-00-
(2) NV 010A, 011A, and 013A Required Thrust
0018
Evaluation supporting Air Operated Valve (AOV) Program
CNC-1205.41-00-
Air Operated Valve (AOV) Program Scope Calculation
0001
0001
CNC-1205.41-00- FEEDWATER ISOLATION VALVES, 1(2)CF33, 42, 51, 05/03/2022
CNC-1205.41-00-
0005 AND
FEEDWATER ISOLATION VALVES, 1(2)CF33, 42, 51,
05/03/2022
0005
AND
60, DESIGN BASIS SIZING CALCULATION
60, DESIGN BASIS SIZING CALCULATION
CNC-1205.41-00- Catawba Air-operated Valve (AOV) Risk Ranking 1
CNC-1205.41-00-
0016 Calculation
Catawba Air-operated Valve (AOV) Risk Ranking
CNC-1205.41-00- 1 (2) NV 010A, 011A, and 013A Required Thrust 2
0016
Inspection Type Designation Description or Title Revision or
Calculation
Procedure Date
CNC-1205.41-00-
0018 Evaluation supporting Air Operated Valve (AOV) Program
(2) NV 010A, 011A, and 013A Required Thrust
CNC-1205.41-00- 1(2) CA-040, 044, 056, 060 and 1(2) CA-036, 048, 052, 1
 
22 064 Actuator Capability Evaluation Supporting Air
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
0018
Evaluation supporting Air Operated Valve (AOV) Program
CNC-1205.41-00-
1(2) CA-040, 044, 056, 060 and 1(2) CA-036, 048, 052,
22
064 Actuator Capability Evaluation Supporting Air
Operated (AOV) Program
Operated (AOV) Program
CNC-1206.03-00- Doghouse Environmental Temperature Due to Main Rev. 3
CNC-1206.03-00-
0181 Steam Line Break
Doghouse Environmental Temperature Due to Main
CNC-1223.02-00- Inservice Testing (IST) Valve Response Measurement 04/08/2011
Rev. 3
23 Uncertainty
0181
CNC-1223.12-00- Design Parameters for ND Header to Cold Leg 4
Steam Line Break
0045 Containment Isolation Valves 1 & 2 NI173A, NI178B
CNC-1223.02-00-
CNC-1552.08-00- Long-Term Containment Response - Manual NS Initiation 7
Inservice Testing (IST) Valve Response Measurement
04/08/2011
23
Uncertainty
CNC-1223.12-00-
Design Parameters for ND Header to Cold Leg
0045
Containment Isolation Valves 1 & 2 NI173A, NI178B
CNC-1552.08-00-
Long-Term Containment Response - Manual NS Initiation
0390
0390
CNM 1205.00- Design/Seismic Report (Weak Link) for 09J-2056, 2", 5
CNM 1205.00-
2182.001 1500#, SS, Gate Valve
Design/Seismic Report (Weak Link) for 09J-2056, 2",
CNM 1205.01-Design & Seismic RPT 6J-339 C
2182.001
1500#, SS, Gate Valve
CNM 1205.01-
Design & Seismic RPT 6J-339
C
0797.001
0797.001
Corrective Action ARs 02373087, 02294259, 01497427, 02407695, 02294259,
Corrective Action
Documents 01497427, 02428219, 01898027, 02300922
ARs
Corrective Action NCR 02318266 OP-CN-CF-CF lesson plan does not identify the safety 06/24/2022
2373087, 02294259, 01497427, 02407695, 02294259,
Documents related power supply for Feedwater Isolation Valve's
Documents
Resulting from NCR 02429804 2022 NRC DBAI POV - 2NI173A Motor Brake Internals 06/02/2022
01497427, 02428219, 01898027, 02300922
Inspection NCR 02430135 2022 NRC DBAI POV - 1KC-50A Maximum Transmitted 06/06/2022
Corrective Action
NCR 02318266
OP-CN-CF-CF lesson plan does not identify the safety
06/24/2022
Documents
related power supply for Feedwater Isolation Valve's
Resulting from
NCR 02429804
22 NRC DBAI POV - 2NI173A Motor Brake Internals
06/02/2022
Inspection
NCR 02430135
22 NRC DBAI POV - 1KC-50A Maximum Transmitted
06/06/2022
Torque
Torque
NCR 02430281 2022 NRC DBAI POV - Lesson Plans not revised post 06/07/2022
NCR 02430281
22 NRC DBAI POV - Lesson Plans not revised post
06/07/2022
Mod
Mod
NCR 02430301 PT/1/A/4350/002 E enclosure 13.16 could not be located06/07/2022
NCR 02430301
NCR 02430342 2022 NRC POV DBAI - Incorrect Reference in Flowserve 06/07/2022
PT/1/A/4350/002 E enclosure 13.16 could not be located
06/07/2022
NCR 02430342
22 NRC POV DBAI - Incorrect Reference in Flowserve
06/07/2022
Letter
Letter
NCR 02430464 Obstructions on 522' elevation floor drains 06/08/2022
NCR 02430464
NCR 02430567 NRC DBAI POV-EOPs do not align with UFSAR 06/09/2022
Obstructions on 522' elevation floor drains
NCR 02430713 2022 NRC DBAI POV - 2NC35B - Actuator Fastener Bolt 06/09/2022
06/08/2022
NCR 02430567
NRC DBAI POV-EOPs do not align with UFSAR
06/09/2022
NCR 02430713
22 NRC DBAI POV - 2NC35B - Actuator Fastener Bolt
06/09/2022
Preload
Preload
NCR 02431086 2022 NRC DBAI POV - UFSAR sec.6.2.4.1 incorrect 06/14/2022
NCR 02431086
22 NRC DBAI POV - UFSAR sec.6.2.4.1 incorrect
06/14/2022
statement
statement
Inspection Type Designation Description or Title Revision or
Inspection
Procedure Date
Procedure
NCR 2428952 2022 NRC DBAI POV - 2NC035B High Temp Torque 05/26/2022
Type
Designation
Description or Title
Revision or
Date
NCR 2428952
22 NRC DBAI POV - 2NC035B High Temp Torque
Factor
Factor
NCR 2430567 NRC DBAI POV-EOPs do not align with UFSAR 06/09/2022
05/26/2022
Drawings 02-403-0012-3 Limitorque Valve Control DI
NCR 2430567
40846-08 20- Class 150 Valve Assembly and Limitorque H2BC-DE
NRC DBAI POV-EOPs do not align with UFSAR
06/09/2022
2-403-0012-3
Limitorque Valve Control
DI
40846-08
20- Class 150 Valve Assembly and Limitorque H2BC-
SMB-00-10
SMB-00-10
CN -1561-01.00 Flow Diagram of Residual Heat Removal System (ND) 34
DE
CN -2561-01.00 Flow Diagram of Residual Heat Removal System (ND) 38
CN -1561-01.00
CN -2562-01.01 Flow Diagram, Safety Injection System (NI) 23
Flow Diagram of Residual Heat Removal System (ND)
CN -2592-01.01 Flow Diagram Auxiliary Feedwater System (CA) 33
CN -2561-01.00
CN-1573-01.0 Flow Diagram of Component Cooling System (KC) 30
Flow Diagram of Residual Heat Removal System (ND)
CN-2499-CA.07-Instrument Detail Motor Driven Auxiliary Feedwater Pump 9
CN -2562-01.01
Flow Diagram, Safety Injection System (NI)
CN -2592-01.01
Flow Diagram Auxiliary Feedwater System (CA)
CN-1573-01.0
Flow Diagram of Component Cooling System (KC)
CN-2499-CA.07-
Instrument Detail Motor Driven Auxiliary Feedwater Pump
to Steam Generator Flow Control
to Steam Generator Flow Control
CN-2553-01.01 Flow Diagram of Reactor Coolant System (NC) 20
CN-2553-01.01
CN-2562-01.03 Flow Diagram of Safety Injection System (NI) 28
Flow Diagram of Reactor Coolant System (NC)
CNEE-0247-04.12 Auxiliary Feedwater System (CA) CA Pump No. 2 Disch 4
CN-2562-01.03
Flow Diagram of Safety Injection System (NI)
CNEE-0247-04.12
Auxiliary Feedwater System (CA) CA Pump No. 2 Disch
to S/D 2C Isol. Vlv. 2CA050A
to S/D 2C Isol. Vlv. 2CA050A
CNEE-0247-Auxiliary Feedwater System (CA) CA Pump No. 2 Disch 2
CNEE-0247-
04.12-01 to S/D 2C Isol. Vlv. 2CA050A Controls
04.12-01
CNEE-0250-01.09 Reactor Coolant System (NC) Pzr Power Operated Relief 12
Auxiliary Feedwater System (CA) CA Pump No. 2 Disch
to S/D 2C Isol. Vlv. 2CA050A Controls
CNEE-0250-01.09
Reactor Coolant System (NC) Pzr Power Operated Relief
Isolation Valve 2NC035B
Isolation Valve 2NC035B
CNEE-0251-01.32 Elementary Diagram Safety Injection System (NI) ND 6
CNEE-0251-01.32
Elementary Diagram Safety Injection System (NI) ND
HDR to NC Cold Legs C and D Isolation Valve 2NI173A
HDR to NC Cold Legs C and D Isolation Valve 2NI173A
CNM 1205.00- 8"SS Motor Oper Gate Vlv Item 9J211 16
CNM 1205.00-
0074.001
0074.001
CNM 1205.00- O/L Drawing for 09J-2056, 2", 1500#, SS, Gate Valve 0
8"SS Motor Oper Gate Vlv Item 9J211
CNM 1205.00-
2181.001
2181.001
CNM 1205.01-4" 1500LB CS EMO DP Gate Valve 6J-339 H
O/L Drawing for 09J-2056, 2", 1500#, SS, Gate Valve
CNM 1205.01-
0790.001
0790.001
CNM 1205.01-4" 1500LB CS DP Gate Valve 6J-339 J
4" 1500LB CS EMO DP Gate Valve 6J-339
H
CNM 1205.01-
0790.002
0790.002
CNM 1205.06-O/L, C/S, B/M, OPR, W/D Control Valves 1&2/CA/40, 44, J
4" 1500LB CS DP Gate Valve 6J-339
20.001 56 & 60
J
W9223811, Sht. 1 3"- 1530 Weld Ends Stainless Steel Double Disc Gate B
CNM 1205.06-
Inspection Type Designation Description or Title Revision or
20.001
Procedure Date
O/L, C/S, B/M, OPR, W/D Control Valves 1&2/CA/40, 44,  
& 60
J
Drawings
W9223811, Sht. 1
3"- 1530 Weld Ends Stainless Steel Double Disc Gate
B
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Valve for SMB-00-15 Limitorque Actuator
Valve for SMB-00-15 Limitorque Actuator
W9223811, Sht. 2 3"- 1530 Weld Ends Stainless Steel Double Disc Gate B
W9223811, Sht. 2
3"- 1530 Weld Ends Stainless Steel Double Disc Gate
Valve for SMB-00-15 Limitorque Actuator
Valve for SMB-00-15 Limitorque Actuator
Engineering CN 20328 Modify control circuit wiring on 2NI-9A, 10B, 100B, 183B, 11/07/1988
B
Changes 162A, 173A, 178B, 184B, 185A, 2NV-89A, 91B, 188A,
CN 20328
Modify control circuit wiring on 2NI-9A, 10B, 100B, 183B,
2A, 173A, 178B, 184B, 185A, 2NV-89A, 91B, 188A,
189B, 252A, 253B, 312A, and 314B to provide "limit
189B, 252A, 253B, 312A, and 314B to provide "limit
actuated" torque switch bypass contacts which can be
actuated" torque switch bypass contacts which can be
adjusted independent of Indication or interlocks.
adjusted independent of Indication or interlocks.
CN 21319 Modify CA Control Valves to Prevent S/G Overfill During 08/11/1999
11/07/1988
CN 21319
Modify CA Control Valves to Prevent S/G Overfill During
SGTR
SGTR
EC 0000106724 Revise MOV Set-Up Sheets to Meet GL 96-05 09/07/2012
08/11/1999
EC 0000106724
Revise MOV Set-Up Sheets to Meet GL 96-05
Requirements for 1KC001A, 002B, 050A
Requirements for 1KC001A, 002B, 050A
EC 0000402775 U-1 AND U-2 NW System Isolation to Specific CIVs 1
09/07/2012
Engineering CNC -1205.19-00- EC420978 - Revise valve factor for 1(2)NI173A & 000
Engineering
Evaluations 0176-ICC-0003 1(2)NI178B
Changes
CNC -1205.19-00- Kalsi Engineering Report 2919C, GL96-05 Periodic 0
EC 0000402775
0179 Verification Program for Butterfly Valves with 316
U-1 AND U-2 NW System Isolation to Specific CIVs
CNC -1205.19-00-
0176-ICC-0003
EC420978 - Revise valve factor for 1(2)NI173A &
1(2)NI178B
000
CNC -1205.19-00-
0179
Kalsi Engineering Report 2919C, GL96-05 Periodic
Verification Program for Butterfly Valves with 316
Microseal Bearings {JOG Class D)
Microseal Bearings {JOG Class D)
CNC -1381.05-00- U2, 6.9KV, 4.16KV, & 600V Auxiliary Power Systems 19
CNC -1381.05-00-
0199 Safety-Related Voltage Analysis
0199
CNC-1205.00-00- GL 95-07 Pressure Locking and Thermal Binding Review 1
U2, 6.9KV, 4.16KV, & 600V Auxiliary Power Systems
0048 of Valves Without an Active to Open Safety Function
Safety-Related Voltage Analysis
CNC-1205.19-00- Operability Evaluation of Rotork Part 21 for Switch 1
CNC-1205.00-00-
0170 Mechanisms
0048
CNM 1205.00- ASME Section III Gate Valve Seismic Report 5
GL 95-07 Pressure Locking and Thermal Binding Review
of Valves Without an Active to Open Safety Function
CNC-1205.19-00-
0170
Operability Evaluation of Rotork Part 21 for Switch
Mechanisms
CNM 1205.00-
0549.001
0549.001
CNM 1205.00- Design and Seismic Analysis Report for 3" EMO Gate 00C
ASME Section III Gate Valve Seismic Report
2050.001 Valve, Item 9J-364
CNM 1205.00-
CNM 1205.02-Weak-Link Report for CNS BFV Item Number 05B-501 0
2050.001
Design and Seismic Analysis Report for 3" EMO Gate
Valve, Item 9J-364
00C
CNM 1205.02-
0766.001
0766.001
CNM 1205.19-Stress Report for Westinghouse Class 1 Nuclear Valves-D3
Weak-Link Report for CNS BFV Item Number 05B-501
0094.001 Gate Valves
CNM 1205.19-
CNM 1205.19-9J-211 Seismic and Weak Link Analysis Report for 0
0094.001
099.011 Westinghouse Class 1 Nuclear Valve
Stress Report for Westinghouse Class 1 Nuclear Valves-
Inspection Type Designation Description or Title Revision or
Gate Valves
Procedure Date
D3
DPC 1205.41-00- Evaluation of AOV Issues Needed for Margin Calculations2
Engineering
Evaluations
CNM 1205.19-
099.011
9J-211 Seismic and Weak Link Analysis Report for
Westinghouse Class 1 Nuclear Valve
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
DPC 1205.41-00-
0001
0001
DPC-1205.00-00- Microseal Bearing Test Report: Kalsi Engineering 0
Evaluation of AOV Issues Needed for Margin Calculations
0008 Document 2800C
DPC-1205.00-00-
Miscellaneous [N/A] OAC Alarm Response Information for loss of SOV Power
0008
BACKGROUND ES-1.3 Transfer to Cold Leg Recirculation HP-Rev. 3 03/31/2014
Microseal Bearing Test Report: Kalsi Engineering
Document 2800C
[N/A]
OAC Alarm Response Information for loss of SOV Power
BACKGROUND
INFORMATION
INFORMATION
FOR
FOR
Line 260: Line 431:
RESPONSE
RESPONSE
GUIDELINE
GUIDELINE
CDUK-1205.41-Unit 1 and Unit 2 AOV Test Set Up Sheets 7
ES-1.3 Transfer to Cold Leg Recirculation HP-Rev. 3
03/31/2014
CDUK-1205.41-
0001.001
0001.001
CE 0000106724 Revise MOV Set-Up Sheets to Meet GL 96-05 09/17/2012
Unit 1 and Unit 2 AOV Test Set Up Sheets
CE 0000106724
Revise MOV Set-Up Sheets to Meet GL 96-05
Requirements for 1KC001A, 002B, 050A, AND 053B
Requirements for 1KC001A, 002B, 050A, AND 053B
CN 500404 Allow Replacement of Solenoid Valves w/ New Model 05/17/2005
09/17/2012
CN-11413 De-energize the Hydraulic Solenoids on the Main 08/06/2001
CN 500404
Allow Replacement of Solenoid Valves w/ New Model
05/17/2005
CN-11413
De-energize the Hydraulic Solenoids on the Main
Feedwater Isolation Valves
Feedwater Isolation Valves
CNC -1205.19-00- EC420956-Revise Valve Factor and Functions for CA 0
08/06/2001
0176-ICC-0004 MOVs
CNC -1205.19-00-
CNM 1205.00- l/B Manual M/0 Gate Valves & Swing Check Vlvs D10
0176-ICC-0004
EC420956-Revise Valve Factor and Functions for CA
MOVs
CNM 1205.00-
22.001
22.001
CNM 1205.00- EMO Torque Switch Setting Sheets 90
l/B Manual M/0 Gate Valves & Swing Check Vlvs
D10
CNM 1205.00-
1997.001
1997.001
CNM 1205.00- EMO Torque Switch Setting Sheets 90
EMO Torque Switch Setting Sheets
CNM 1205.00-
1997.001
1997.001
CNM 1205.00- Instruction Manual Number ET347 for 3" 1530 Class 10/01/1997
EMO Torque Switch Setting Sheets
2049-001 Double Disc Gate Valves with Motor Actuators
CNM 1205.00-
CNM 1205.02-Posi-Seal Butterfly Valve Technical Bulletin Series 0
2049-001
Instruction Manual Number ET347 for 3" 1530 Class
Double Disc Gate Valves with Motor Actuators
10/01/1997
CNM 1205.02-
0762.001
0762.001
CNM 1205.06-I/M & Parts List for Control Valves and Regulators 42
Posi-Seal Butterfly Valve Technical Bulletin Series
Inspection Type Designation Description or Title Revision or
Miscellaneous
Procedure Date
CNM 1205.06-
I/M & Parts List for Control Valves and Regulators
 
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
268.001
268.001
CNM 1205.19-Limitorque Nuclear Qualification Reports 3
CNM 1205.19-
0001.001
0001.001
CNM 1205.19-Technical Repair Guide for Rotork Valve Actuators "NA" 9
Limitorque Nuclear Qualification Reports
0083.001 Range Models
CNM 1205.19-
CNM 1205.19-Rotork Motor Operator Bench Test Certificates D7
0083.001
Technical Repair Guide for Rotork Valve Actuators "NA"
Range Models
CNM 1205.19-
0114.001
0114.001
CNS-1205.00-00- ASME Section 3 Stainless Steel Gate Globe and Check 5
Rotork Motor Operator Bench Test Certificates
0008 Valves
D7
CNS-1205.06-00- Control Valves to ASME Section III 17
CNS-1205.00-00-
0008
ASME Section 3 Stainless Steel Gate Globe and Check
Valves
CNS-1205.06-00-
0003
0003
CNS-1553.NC-00- Reactor Coolant System (NC) Design Basis Specification 50
Control Valves to ASME Section III
CNS-1553.NC-00-
0001
0001
CNS-1554.NV-00- Chemical and Volume Control System (NV) Design Basis 53
Reactor Coolant System (NC) Design Basis Specification
0001 Specification
CNS-1554.NV-00-
CNS-1561.ND-00- Design Basis Specification for The Residual Heat 42
0001
0001 Removal (ND) System
Chemical and Volume Control System (NV) Design Basis
CNS-1562.NI-00- Design Basis Specification For the Safety Injection (NI) 52
Specification
0001 System
CNS-1561.ND-00-
CNS-1573.KC-00- Component Cooling System (KC) Design Basis 49
0001
0001 Specification
Design Basis Specification for The Residual Heat
CNS-1591.CF-00- Design Basis Specification for the Feedwater (CF) Rev. 034
Removal (ND) System
0001 System
CNS-1562.NI-00-
CNS-1592.CA-00- Auxiliary Feedwater System (CA) Design Basis 50
0001
0001 Specification
Design Basis Specification For the Safety Injection (NI)
CNS-1592.CA-00- Auxiliary Feedwater System (CA) Design Basis 50
System
0001 Specification
CNS-1573.KC-00-
DPS 1205.00-00- Nuclear Safety Related Carbon and Stainless Steel 4
0001
0002 Forged and Cast Electric Motor Operated Valves
Component Cooling System (KC) Design Basis
DPS-1205.19-00- Safety Related Rotork Motor Operators and Spare Parts 4
Specification
CNS-1591.CF-00-
0001
Design Basis Specification for the Feedwater (CF)
System
Rev. 034
CNS-1592.CA-00-
0001
Auxiliary Feedwater System (CA) Design Basis
Specification
CNS-1592.CA-00-
0001
Auxiliary Feedwater System (CA) Design Basis
Specification
DPS 1205.00-00-
0002
Nuclear Safety Related Carbon and Stainless Steel
Forged and Cast Electric Motor Operated Valves
DPS-1205.19-00-
0004
0004
EQMM-1393.01-Environmental Qualification Maintenance Manual 15
Safety Related Rotork Motor Operators and Spare Parts
Q03-01 Equipment Type: Solenoid Valve Manufacturer: Valcor
EQMM-1393.01-
Q03-01
Environmental Qualification Maintenance Manual
Equipment Type: Solenoid Valve Manufacturer: Valcor
Engineering Corporation Model/Series: V70900-65 Series
Engineering Corporation Model/Series: V70900-65 Series
Inspection Type Designation Description or Title Revision or
 
Procedure Date
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Valves
Valves
OEDB Number: LIMITORQUE TECHNICAL UPDATE #92-O1 Kalsi 01/06/1992
OEDB Number:
2-12415 Engineering Document #17O7-C, Rev. o (11-25-91)
2-12415
LIMITORQUE TECHNICAL UPDATE #92-O1 Kalsi
Engineering Document #17O7-C, Rev. o (11-25-91)
Thrust Rating Increase SMB-OOO, SMB-OO, SMB-O &
Thrust Rating Increase SMB-OOO, SMB-OO, SMB-O &
SMB-1 Actuators
SMB-1 Actuators
OP-CN-CF-CF Feedwater System Lesson Plan 04/07/2014
01/06/1992
OP-CN-EP-INTRO Emergency Procedures Intro Lesson Plan CNOB50 11
OP-CN-CF-CF
System Health KC - Component Cooling System 04/19/2022
Feedwater System Lesson Plan
04/07/2014
OP-CN-EP-INTRO
Emergency Procedures Intro Lesson Plan CNOB50
System Health
Report
Report
System Health ND - Residual Heat Removal System 04/19/2022
KC - Component Cooling System
04/19/2022
System Health
Report
Report
System Health CA - CNS l Unit 2 l CA - Auxiliary Feedwater System 04/19/2022
ND - Residual Heat Removal System
04/19/2022
System Health
Report
Report
Torque and As Left C1R26 10/23/2021
CA - CNS l Unit 2 l CA - Auxiliary Feedwater System
04/19/2022
Torque and
Margin for 1ND27
Margin for 1ND27
Westinghouse ES-1.3 Transfer to Cold Leg Recirculation HP-Rev 3 03/31/2014
As Left C1R26
10/23/2021
Westinghouse
Guideline
Guideline
Document
Document
Procedures AD-EG-ALL-1432 Air Operated Valve Design Basis Review 1
ES-1.3 Transfer to Cold Leg Recirculation HP-Rev 3
AD-EG-ALL-1433 Air Operated Valve Testing Requirements 2
03/31/2014
AD-OP-ALL-0105 Operability Determinations 6
AD-EG-ALL-1432
AD-OP-ALL-0205 Time Critical Actions/Time Sensitive Actions 2
Air Operated Valve Design Basis Review
CNC-1205.19-00- JOG Classification of Catawbas GL96-05 MOV 9
AD-EG-ALL-1433
0176 Population
Air Operated Valve Testing Requirements
DPS-1205.19-00- Guideline for Performing Motor Operated Valve Reviews 4
AD-OP-ALL-0105
0002 and Calculations (For Engineering use only)
Operability Determinations
EP/2/A/5000/E-3 CNS Steam Generator Tube Rupture 41
AD-OP-ALL-0205
EP/2/A/5000/ES-Transfer to Cold Leg Recirculation 31
Time Critical Actions/Time Sensitive Actions
CNC-1205.19-00-
0176
JOG Classification of Catawbas GL96-05 MOV
Population
DPS-1205.19-00-
0002
Guideline for Performing Motor Operated Valve Reviews
and Calculations (For Engineering use only)
EP/2/A/5000/E-3
CNS Steam Generator Tube Rupture
EP/2/A/5000/ES-
1.3
1.3
IP/0/A/3820/004 Q MOV Diagnostic Testing 13
Transfer to Cold Leg Recirculation
IP/0/A/3820/004 Q MOV Diagnostic Testing 13
IP/0/A/3820/004 Q
IP/0/A/3820/034 Removal/Restoration of Interferences and Packing Re-43
MOV Diagnostic Testing
IP/0/A/3820/004 Q
MOV Diagnostic Testing
IP/0/A/3820/034
Removal/Restoration of Interferences and Packing Re-
Torque on Air Operated Valves (AOVs)
Torque on Air Operated Valves (AOVs)
IP/0/A/3820/047 AOV Diagnostic Testing using the QUIKLOOK3 System 5
Procedures
Inspection Type Designation Description or Title Revision or
IP/0/A/3820/047
Procedure Date
AOV Diagnostic Testing using the QUIKLOOK3 System
OP/1/A/6100/010K Annunciator Response for Panel 1AD-10 21
Inspection
OP/1/B/6100/010 Annunciator Response for Radiation Monitoring Panel 67
Procedure
X 1RAD-1
Type
OP/1/B/6100/010 Annunciator Response for Radiation Monitoring Panel 25
Designation
Z 1RAD-3
Description or Title
PD-EG-ALL-1430 Air Operated Valve Program 2
Revision or
PT/0/A/4700/061 Time Critical Actions/ Time Sensitive Actions 9
Date
PT/1/A/4200/021 KC Valve Inservice Test (QU) 79
OP/1/A/6100/010K
Annunciator Response for Panel 1AD-10
OP/1/B/6100/010
X
Annunciator Response for Radiation Monitoring Panel
1RAD-1
OP/1/B/6100/010
Z
Annunciator Response for Radiation Monitoring Panel
1RAD-3
PD-EG-ALL-1430
Air Operated Valve Program
PT/0/A/4700/061
Time Critical Actions/ Time Sensitive Actions
PT/1/A/4200/021
A
A
PT/2/4/4200/013 NI Valve Inservice Test (UNK) 41,
KC Valve Inservice Test (QU)
G completed
PT/2/4/4200/013
G
NI Valve Inservice Test (UNK)
41,
completed
04/11/2021
04/11/2021
PT/2/A/4200/0 CA Valve Inservice Test (QU) 13E
PT/2/A/4200/0
PT/2/A/4200/013 CA Valve Inservice Test (QU) 66
CA Valve Inservice Test (QU)
13E
PT/2/A/4200/013
E
E
PT/2/A/4200/023 NC Valve Inservice Test (QU) 21,
CA Valve Inservice Test (QU)
PT/2/A/4200/023
NC Valve Inservice Test (QU)
21,
completed
completed
03/22/2022
03/22/2022
PT/2/A/4200/079 Auxiliary Feedwater Flow Control Valve Air Accumulator 11
PT/2/A/4200/079
Auxiliary Feedwater Flow Control Valve Air Accumulator
Leakage Test
Leakage Test
PT/l/A/4200/001 T Containment Penetration Valve Injection Water System 76
PT/l/A/4200/001 T
Containment Penetration Valve Injection Water System
Performance Test
Performance Test
PT/l/A/4200/013 I NV Valve Inservice Test 49
PT/l/A/4200/013 I
SI/0/A/5200/006 MOV Actuator Lubrication and Inspection 33
NV Valve Inservice Test
Work Orders WO 1899772 ASSIST THE C.C.I. TECH IN REASSEMBLING THE 12/16/2009
SI/0/A/5200/006
MOV Actuator Lubrication and Inspection
WO 1899772
ASSIST THE C.C.I. TECH IN REASSEMBLING THE
C.F.I.V. VALVES
C.F.I.V. VALVES
WO 20338520 01 1. Duke_WorkOrderPackage_Rpt_B 1CF - REPLACE 05/17/2020
2/16/2009
WO 20338520 01
1. Duke_WorkOrderPackage_Rpt_B 1CF - REPLACE
HYDRAULIC FLUID/INSPECT DESICCANT FOR CFIV 2.
HYDRAULIC FLUID/INSPECT DESICCANT FOR CFIV 2.
IP/0/A/3010/024 MAIN FEEDWATER (CF) SYSTEM
IP/0/A/3010/024 MAIN FEEDWATER (CF) SYSTEM
FEEDWATER ISOLATION
FEEDWATER ISOLATION
WOs 02050985, 20341710 01, 20436333 01, 20444997 02,
05/17/2020
Work Orders
WOs
2050985, 20341710 01, 20436333 01, 20444997 02,
204646 01, 02119855 01, 20407902 01, 20380724 01
204646 01, 02119855 01, 20407902 01, 20380724 01
11
11
}}
}}

Latest revision as of 16:21, 27 November 2024

Design Basis Assurance Inspection (Programs) Inspection Report 05000413/2022010 and 05000414/2022010
ML22202A530
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/21/2022
From: James Baptist
NRC/RGN-II/DRS/EB1
To: Simril T
Duke Energy Carolinas
References
IR 2022010
Download: ML22202A530 (13)


Text

July 21, 2022

SUBJECT:

CATAWBA NUCLEAR STATION - DESIGN BASIS ASSURANCE INSPECTION (PROGRAMS) INSPECTION REPORT 05000413/2022010 AND 05000414/2022010

Dear Mr. Simril:

On June 10, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Catawba Nuclear Station and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 05000413 and 05000414 License Nos. NPF-35 and NPF-52

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000413 and 05000414

License Numbers:

NPF-35 and NPF-52

Report Numbers:

05000413/2022010 and 05000414/2022010

Enterprise Identifier: I-2022-010-0038

Licensee:

Duke Energy Carolinas, LLC

Facility:

Catawba Nuclear Station

Location:

York, SC

Inspection Dates:

May 23, 2022, to June 10, 2022

Inspectors:

R. Fanner, Reactor Inspector

N. Morgan, Intergovernmental Liaison Project Manager

G. Ottenberg, Senior Reactor Inspector

J. Zudans, Contractor

Approved By:

James B. Baptist, Chief

Engineering Branch 1

Division of Reactor Safety

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a design basis assurance inspection (programs) inspection at Catawba Nuclear Station, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.21N.02 - Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements POV Review (IP Section 03)

The inspectors:

a. Evaluated whether the sampled POVs are being tested and maintained in accordance with NRC regulations along with the licensees commitments and/or licensing bases.

Specific Guidance b. Evaluated whether the sampled POVs are capable of performing their design-basis functions.

c. Evaluated whether testing of the sampled POVs is adequate to demonstrate the capability of the POVs to perform their safety functions under design-basis conditions.

d. Evaluated maintenance activities including a walkdown of the sampled POVs (if accessible).

(1)1KC050A, Auxiliary Building Non-Essential Header Isolation (2)1ND027, 1A Residual Heat Removal (ND) Heat Exchanger Bypass Control (3)2CA050A, Auxiliary Feedwater (CA) Pump 2 Discharge to Steam Generator 2C Isolation (4)1NV010A, Letdown Orifice 1B Outlet Containment Isolation (5)2CA056, CA Pump 2A Flow to Steam Generator 2B (6)2NC035B, Pressurizer Power Operated Relief Valve Isolation (7)2NI173A, ND Header 2A to Cold Legs C & D (8)1CF033, 1A Steam Generator Feedwater Containment Isolation

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On June 10, 2022, the inspectors presented the design basis assurance inspection (programs) inspection results to Tom Simril and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.21N.02

Calculations

AD-EG-ALL-1117

U2, 6.9KV, 4.16KV, & 600V Auxiliary Power Systems

Safety-Related Voltage Analysis

CNC -1205.19-00-

Generic Letter 89-10 MOV Calculations, NC System; 1(2)

28

NC033A, 035B, 1NC031B

CNC -1205.19-00-

89-10 Calculation for 1&2 CA038A, 42B, 46B, 50A, 54B,

29

58A, 62A, 66B

CNC -1205.19-00-

Generic Letter 89-10 Calculation For Valves 1 and

0033

NI173A and NI178B

CNC -1205.19-00-

GL 89-10 Set-Up Calculation for Valves 1KC001A,

0110

1KC002B, 1KC050A, 1KC053B, 2KC001A, AND

2KC002B

CNC -1205.19-00-

Required Thrust Calculation for 1(2)NC31B, 33A, 35B

000

0195

(AD/DD PPM); Item NO. 09J-363 & 364

CNC -1205.41-00-

(2) ND 26, 27, 60, and 61 Fisher Actuator and Margin

27

Capability Calculations

CNC -1206.02-80-

KCC - Component Cooling Heat Exchangers 1 A & 1 B to

018

2019

the RHR Heat Exchangers 1A & 1 B. Also to the Inlet of

the Letdown & Fuel Pool Heat Exchangers

CNC -1223.11-00-

Limiting 1ST Stroke Time for ND26, ND27, ND60 and

000

0055

ND6V

CNC -1381.05-00-

U2, 6.9KV, 4.16KV, & 600V AUXILIARY POWER

0199

SYSTEMS SAFETY-RELATED VOLTAGE ANALYSIS

CNC 1205.41-00-

(2) NV 010A, 011A, and 013A Required Thrust

0018

Evaluation supporting Air Operated Valve (AOV) Program

CNC-1205.41-00-

Air Operated Valve (AOV) Program Scope Calculation

0001

CNC-1205.41-00-

FEEDWATER ISOLATION VALVES, 1(2)CF33, 42, 51,

05/03/2022

0005

AND

60, DESIGN BASIS SIZING CALCULATION

CNC-1205.41-00-

Catawba Air-operated Valve (AOV) Risk Ranking

0016

Calculation

CNC-1205.41-00-

(2) NV 010A, 011A, and 013A Required Thrust

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

0018

Evaluation supporting Air Operated Valve (AOV) Program

CNC-1205.41-00-

1(2) CA-040, 044, 056, 060 and 1(2) CA-036, 048, 052,

22

064 Actuator Capability Evaluation Supporting Air

Operated (AOV) Program

CNC-1206.03-00-

Doghouse Environmental Temperature Due to Main

Rev. 3

0181

Steam Line Break

CNC-1223.02-00-

Inservice Testing (IST) Valve Response Measurement

04/08/2011

23

Uncertainty

CNC-1223.12-00-

Design Parameters for ND Header to Cold Leg

0045

Containment Isolation Valves 1 & 2 NI173A, NI178B

CNC-1552.08-00-

Long-Term Containment Response - Manual NS Initiation

0390

CNM 1205.00-

Design/Seismic Report (Weak Link) for 09J-2056, 2",

2182.001

1500#, SS, Gate Valve

CNM 1205.01-

Design & Seismic RPT 6J-339

C

0797.001

Corrective Action

ARs

2373087, 02294259, 01497427, 02407695, 02294259,

Documents

01497427, 02428219, 01898027, 02300922

Corrective Action

NCR 02318266

OP-CN-CF-CF lesson plan does not identify the safety

06/24/2022

Documents

related power supply for Feedwater Isolation Valve's

Resulting from

NCR 02429804

22 NRC DBAI POV - 2NI173A Motor Brake Internals

06/02/2022

Inspection

NCR 02430135

22 NRC DBAI POV - 1KC-50A Maximum Transmitted

06/06/2022

Torque

NCR 02430281

22 NRC DBAI POV - Lesson Plans not revised post

06/07/2022

Mod

NCR 02430301

PT/1/A/4350/002 E enclosure 13.16 could not be located

06/07/2022

NCR 02430342

22 NRC POV DBAI - Incorrect Reference in Flowserve

06/07/2022

Letter

NCR 02430464

Obstructions on 522' elevation floor drains

06/08/2022

NCR 02430567

NRC DBAI POV-EOPs do not align with UFSAR

06/09/2022

NCR 02430713

22 NRC DBAI POV - 2NC35B - Actuator Fastener Bolt

06/09/2022

Preload

NCR 02431086

22 NRC DBAI POV - UFSAR sec.6.2.4.1 incorrect

06/14/2022

statement

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

NCR 2428952

22 NRC DBAI POV - 2NC035B High Temp Torque

Factor

05/26/2022

NCR 2430567

NRC DBAI POV-EOPs do not align with UFSAR

06/09/2022

2-403-0012-3

Limitorque Valve Control

DI

40846-08

20- Class 150 Valve Assembly and Limitorque H2BC-

SMB-00-10

DE

CN -1561-01.00

Flow Diagram of Residual Heat Removal System (ND)

CN -2561-01.00

Flow Diagram of Residual Heat Removal System (ND)

CN -2562-01.01

Flow Diagram, Safety Injection System (NI)

CN -2592-01.01

Flow Diagram Auxiliary Feedwater System (CA)

CN-1573-01.0

Flow Diagram of Component Cooling System (KC)

CN-2499-CA.07-

Instrument Detail Motor Driven Auxiliary Feedwater Pump

to Steam Generator Flow Control

CN-2553-01.01

Flow Diagram of Reactor Coolant System (NC)

CN-2562-01.03

Flow Diagram of Safety Injection System (NI)

CNEE-0247-04.12

Auxiliary Feedwater System (CA) CA Pump No. 2 Disch

to S/D 2C Isol. Vlv. 2CA050A

CNEE-0247-

04.12-01

Auxiliary Feedwater System (CA) CA Pump No. 2 Disch

to S/D 2C Isol. Vlv. 2CA050A Controls

CNEE-0250-01.09

Reactor Coolant System (NC) Pzr Power Operated Relief

Isolation Valve 2NC035B

CNEE-0251-01.32

Elementary Diagram Safety Injection System (NI) ND

HDR to NC Cold Legs C and D Isolation Valve 2NI173A

CNM 1205.00-

0074.001

8"SS Motor Oper Gate Vlv Item 9J211

CNM 1205.00-

2181.001

O/L Drawing for 09J-2056, 2", 1500#, SS, Gate Valve

CNM 1205.01-

0790.001

4" 1500LB CS EMO DP Gate Valve 6J-339

H

CNM 1205.01-

0790.002

4" 1500LB CS DP Gate Valve 6J-339

J

CNM 1205.06-

20.001

O/L, C/S, B/M, OPR, W/D Control Valves 1&2/CA/40, 44,

& 60

J

Drawings

W9223811, Sht. 1

3"- 1530 Weld Ends Stainless Steel Double Disc Gate

B

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Valve for SMB-00-15 Limitorque Actuator

W9223811, Sht. 2

3"- 1530 Weld Ends Stainless Steel Double Disc Gate

Valve for SMB-00-15 Limitorque Actuator

B

CN 20328

Modify control circuit wiring on 2NI-9A, 10B, 100B, 183B,

2A, 173A, 178B, 184B, 185A, 2NV-89A, 91B, 188A,

189B, 252A, 253B, 312A, and 314B to provide "limit

actuated" torque switch bypass contacts which can be

adjusted independent of Indication or interlocks.

11/07/1988

CN 21319

Modify CA Control Valves to Prevent S/G Overfill During

SGTR

08/11/1999

EC 0000106724

Revise MOV Set-Up Sheets to Meet GL 96-05

Requirements for 1KC001A, 002B, 050A

09/07/2012

Engineering

Changes

EC 0000402775

U-1 AND U-2 NW System Isolation to Specific CIVs

CNC -1205.19-00-

0176-ICC-0003

EC420978 - Revise valve factor for 1(2)NI173A &

1(2)NI178B

000

CNC -1205.19-00-

0179

Kalsi Engineering Report 2919C, GL96-05 Periodic

Verification Program for Butterfly Valves with 316

Microseal Bearings {JOG Class D)

CNC -1381.05-00-

0199

U2, 6.9KV, 4.16KV, & 600V Auxiliary Power Systems

Safety-Related Voltage Analysis

CNC-1205.00-00-

0048

GL 95-07 Pressure Locking and Thermal Binding Review

of Valves Without an Active to Open Safety Function

CNC-1205.19-00-

0170

Operability Evaluation of Rotork Part 21 for Switch

Mechanisms

CNM 1205.00-

0549.001

ASME Section III Gate Valve Seismic Report

CNM 1205.00-

2050.001

Design and Seismic Analysis Report for 3" EMO Gate

Valve, Item 9J-364

00C

CNM 1205.02-

0766.001

Weak-Link Report for CNS BFV Item Number 05B-501

CNM 1205.19-

0094.001

Stress Report for Westinghouse Class 1 Nuclear Valves-

Gate Valves

D3

Engineering

Evaluations

CNM 1205.19-

099.011

9J-211 Seismic and Weak Link Analysis Report for

Westinghouse Class 1 Nuclear Valve

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

DPC 1205.41-00-

0001

Evaluation of AOV Issues Needed for Margin Calculations

DPC-1205.00-00-

0008

Microseal Bearing Test Report: Kalsi Engineering

Document 2800C

[N/A]

OAC Alarm Response Information for loss of SOV Power

BACKGROUND

INFORMATION

FOR

WESTINGHOUSE

OWNERS

GROUP

EMERGENCY

RESPONSE

GUIDELINE

ES-1.3 Transfer to Cold Leg Recirculation HP-Rev. 3

03/31/2014

CDUK-1205.41-

0001.001

Unit 1 and Unit 2 AOV Test Set Up Sheets

CE 0000106724

Revise MOV Set-Up Sheets to Meet GL 96-05

Requirements for 1KC001A, 002B, 050A, AND 053B

09/17/2012

CN 500404

Allow Replacement of Solenoid Valves w/ New Model

05/17/2005

CN-11413

De-energize the Hydraulic Solenoids on the Main

Feedwater Isolation Valves

08/06/2001

CNC -1205.19-00-

0176-ICC-0004

EC420956-Revise Valve Factor and Functions for CA

MOVs

CNM 1205.00-

22.001

l/B Manual M/0 Gate Valves & Swing Check Vlvs

D10

CNM 1205.00-

1997.001

EMO Torque Switch Setting Sheets

CNM 1205.00-

1997.001

EMO Torque Switch Setting Sheets

CNM 1205.00-

2049-001

Instruction Manual Number ET347 for 3" 1530 Class

Double Disc Gate Valves with Motor Actuators

10/01/1997

CNM 1205.02-

0762.001

Posi-Seal Butterfly Valve Technical Bulletin Series

Miscellaneous

CNM 1205.06-

I/M & Parts List for Control Valves and Regulators

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

268.001

CNM 1205.19-

0001.001

Limitorque Nuclear Qualification Reports

CNM 1205.19-

0083.001

Technical Repair Guide for Rotork Valve Actuators "NA"

Range Models

CNM 1205.19-

0114.001

Rotork Motor Operator Bench Test Certificates

D7

CNS-1205.00-00-

0008

ASME Section 3 Stainless Steel Gate Globe and Check

Valves

CNS-1205.06-00-

0003

Control Valves to ASME Section III

CNS-1553.NC-00-

0001

Reactor Coolant System (NC) Design Basis Specification

CNS-1554.NV-00-

0001

Chemical and Volume Control System (NV) Design Basis

Specification

CNS-1561.ND-00-

0001

Design Basis Specification for The Residual Heat

Removal (ND) System

CNS-1562.NI-00-

0001

Design Basis Specification For the Safety Injection (NI)

System

CNS-1573.KC-00-

0001

Component Cooling System (KC) Design Basis

Specification

CNS-1591.CF-00-

0001

Design Basis Specification for the Feedwater (CF)

System

Rev. 034

CNS-1592.CA-00-

0001

Auxiliary Feedwater System (CA) Design Basis

Specification

CNS-1592.CA-00-

0001

Auxiliary Feedwater System (CA) Design Basis

Specification

DPS 1205.00-00-

0002

Nuclear Safety Related Carbon and Stainless Steel

Forged and Cast Electric Motor Operated Valves

DPS-1205.19-00-

0004

Safety Related Rotork Motor Operators and Spare Parts

EQMM-1393.01-

Q03-01

Environmental Qualification Maintenance Manual

Equipment Type: Solenoid Valve Manufacturer: Valcor

Engineering Corporation Model/Series: V70900-65 Series

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Valves

OEDB Number:

2-12415

LIMITORQUE TECHNICAL UPDATE #92-O1 Kalsi

Engineering Document #17O7-C, Rev. o (11-25-91)

Thrust Rating Increase SMB-OOO, SMB-OO, SMB-O &

SMB-1 Actuators

01/06/1992

OP-CN-CF-CF

Feedwater System Lesson Plan

04/07/2014

OP-CN-EP-INTRO

Emergency Procedures Intro Lesson Plan CNOB50

System Health

Report

KC - Component Cooling System

04/19/2022

System Health

Report

ND - Residual Heat Removal System

04/19/2022

System Health

Report

CA - CNS l Unit 2 l CA - Auxiliary Feedwater System

04/19/2022

Torque and

Margin for 1ND27

As Left C1R26

10/23/2021

Westinghouse

Guideline

Document

ES-1.3 Transfer to Cold Leg Recirculation HP-Rev 3

03/31/2014

AD-EG-ALL-1432

Air Operated Valve Design Basis Review

AD-EG-ALL-1433

Air Operated Valve Testing Requirements

AD-OP-ALL-0105

Operability Determinations

AD-OP-ALL-0205

Time Critical Actions/Time Sensitive Actions

CNC-1205.19-00-

0176

JOG Classification of Catawbas GL96-05 MOV

Population

DPS-1205.19-00-

0002

Guideline for Performing Motor Operated Valve Reviews

and Calculations (For Engineering use only)

EP/2/A/5000/E-3

CNS Steam Generator Tube Rupture

EP/2/A/5000/ES-

1.3

Transfer to Cold Leg Recirculation

IP/0/A/3820/004 Q

MOV Diagnostic Testing

IP/0/A/3820/004 Q

MOV Diagnostic Testing

IP/0/A/3820/034

Removal/Restoration of Interferences and Packing Re-

Torque on Air Operated Valves (AOVs)

Procedures

IP/0/A/3820/047

AOV Diagnostic Testing using the QUIKLOOK3 System

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

OP/1/A/6100/010K

Annunciator Response for Panel 1AD-10

OP/1/B/6100/010

X

Annunciator Response for Radiation Monitoring Panel

1RAD-1

OP/1/B/6100/010

Z

Annunciator Response for Radiation Monitoring Panel

1RAD-3

PD-EG-ALL-1430

Air Operated Valve Program

PT/0/A/4700/061

Time Critical Actions/ Time Sensitive Actions

PT/1/A/4200/021

A

KC Valve Inservice Test (QU)

PT/2/4/4200/013

G

NI Valve Inservice Test (UNK)

41,

completed

04/11/2021

PT/2/A/4200/0

CA Valve Inservice Test (QU)

13E

PT/2/A/4200/013

E

CA Valve Inservice Test (QU)

PT/2/A/4200/023

NC Valve Inservice Test (QU)

21,

completed

03/22/2022

PT/2/A/4200/079

Auxiliary Feedwater Flow Control Valve Air Accumulator

Leakage Test

PT/l/A/4200/001 T

Containment Penetration Valve Injection Water System

Performance Test

PT/l/A/4200/013 I

NV Valve Inservice Test

SI/0/A/5200/006

MOV Actuator Lubrication and Inspection

WO 1899772

ASSIST THE C.C.I. TECH IN REASSEMBLING THE

C.F.I.V. VALVES

2/16/2009

WO 20338520 01

1. Duke_WorkOrderPackage_Rpt_B 1CF - REPLACE

HYDRAULIC FLUID/INSPECT DESICCANT FOR CFIV 2.

IP/0/A/3010/024 MAIN FEEDWATER (CF) SYSTEM

FEEDWATER ISOLATION

05/17/2020

Work Orders

WOs

2050985, 20341710 01, 20436333 01, 20444997 02,

204646 01, 02119855 01, 20407902 01, 20380724 01

11