{{#Wiki_filter:BRIEFING ON NUCLEAR REGULATORY RESEARCH PROGRAM Forward-looking Research Associated with Advanced Reactor Technologies
{{#Wiki_filter:© 2023 Electric Power Research Institute, Inc. All rights reserved.
w w w. e p r i. c o m Steve Chengelis Director, Future Fleet March 30, 2023 BRIEFING ON NUCLEAR REGULATORY RESEARCH PROGRAM Forward-looking Research Associated with Advanced Reactor Technologies


Steve Chengelis Director, Future Fleet
© 2023 Electric Power Research Institute, Inc. All rights reserved.
2 Advanced Reactor Roadmap - Strategy and Implementation 2022 April 2023 February 2023 Summer 2023 Ongoing Implement and Maintain Action Plan Example Roadmap Action: Initiate 709 Testing Program Engaged industry stakeholders; analyzed strategic elements Issue Final Roadmap Document Issue Draft Roadmap for Review Timeline Strategy A shared (industry-wide) strategy to ensure the success of advanced reactors Align organizations and foster collaboration in implementing the strategy Serving government, academic, industrial, and public stakeholders


March 30, 2023
© 2023 Electric Power Research Institute, Inc. All rights reserved.
3 Material Performance and Inspection Mitigation Techniques Risk-Informed Strategies Advanced Sensors Enhanced Specifications Advanced Manufacturing Advanced Manufacturing and Materials GOAL VALUE Identify, develop, qualify, & implement more economical manufacturing, inspection & new materials that enable:
New Materials Development AR Materials Development Materials Qualification Degradation Mechanism (MMM/MDM)
Evaluate, Qualify, and Demonstrate Advanced Manufacturing Methods Additive Manufacturing PM-HIP Advanced Welding Mechanical Connections Advanced Cladding Higher Quality Components l Reduced Lead Times l Alternative Supply Chains l Cost Competitiveness l Enable Deployment Sample Lateral motion Ball in hydrostatic bearing Normal force applied Tool body Pressurized fluid


www.epri.com © 2023 Electric Power Research Institute, Inc. All rights reserved.
© 2023 Electric Power Research Institute, Inc. All rights reserved.
Advanced Reactor Roadmap - Strategy and Implementation Strategy
4 EPRI Project Development and Execution Guidance EPRI Owner-Operator Mission Requirements EPRI Siting Guide Define Mission Requirements Planning Need New Generation Select Location EPRI Owner-Operator Technology Specific Requirements EPRI Technology Assessment Guide Select Technology Define Design Requirements (bid specs.)


A shared (industry-wide) Align organizations and foster Serving government, academic, strategy to ensure the success collaboration in implementing industrial, and public of advanced reactors the strategy stakeholders
© 2023 Electric Power Research Institute, Inc. All rights reserved.
 
5 TogetherShaping the Future of Energy}}
Timeline 2022 April 2023February 2023 Summer 2023 Ongoing
 
Engaged industry Issue Draft Issue Final Example Roadmap Implement and stakeholders; analyzed Roadmap for Roadmap Action: Initiate 709 Maintain Action strategic elements Review Document Testing Program Plan
 
2 © 2023 Electric Power Research Institute, Inc. All rights reserved.
Advanced Manufacturing and Materials
 
Identify, develop, qualify, & implement more economical manufacturing, inspection & new materials that enable:
 
Higher Quality Components l Reduced Lead Times l Alternative Supply Chains l Cost Competitiveness l Enable Deployment
* Mitigation Techniques
* Risk-Informed Strategies
* Advanced Sensors
* Enhanced Specifications
* Evaluate, Qualify, and Demonstrate
 
N ormal f orce applied Advanced Manufacturing Methods
* Additive Manufacturing Late ral moti on Tool body
* AR Materials Development
 
Pre ssuri ze d f luid
* PM-HIP
* Materials Qualification Ball in hydrostatic bearing
* Advanced Welding Sample
* Degradation Mechanism
* Mechanical Connections (MMM/MDM)
* Advanced Cladding Advanced Manufacturing Material Performance New Materials and Inspection Development
 
3 © 2023 Electric Power Research Institute, Inc. All rights reserved.
EPRI Project Development and Execution Guidance
 
EPRI Siting Guide
 
EPRI Owner-Operator EPRI Owner-Operator Mission Requirements Technology Specific Requirements
 
Planning Select Location
 
Need New Generation Define Mission Define Design Requirements Requirements (bid specs.)
Select Technology
 
EPRI Technology Assessment Guide
 
4 © 2023 Electric Power Research Institute, Inc. All rights reserved.
TogetherShaping the Future of Energy  
 
5 © 2023 Electric Power Research Institute, Inc. All rights reserved.}}

Latest revision as of 07:44, 27 November 2024

M230330: Slides/Supporting Presentation Material - S. Chengelis - Briefing on Nuclear Regulatory Research Program
ML23083B944
Person / Time
Issue date: 03/30/2023
From:
NRC/OCM
To:
Shared Package
ML23067A027 List:
References
M230330
Download: ML23083B944 (5)


Text

© 2023 Electric Power Research Institute, Inc. All rights reserved.

w w w. e p r i. c o m Steve Chengelis Director, Future Fleet March 30, 2023 BRIEFING ON NUCLEAR REGULATORY RESEARCH PROGRAM Forward-looking Research Associated with Advanced Reactor Technologies

© 2023 Electric Power Research Institute, Inc. All rights reserved.

2 Advanced Reactor Roadmap - Strategy and Implementation 2022 April 2023 February 2023 Summer 2023 Ongoing Implement and Maintain Action Plan Example Roadmap Action: Initiate 709 Testing Program Engaged industry stakeholders; analyzed strategic elements Issue Final Roadmap Document Issue Draft Roadmap for Review Timeline Strategy A shared (industry-wide) strategy to ensure the success of advanced reactors Align organizations and foster collaboration in implementing the strategy Serving government, academic, industrial, and public stakeholders

© 2023 Electric Power Research Institute, Inc. All rights reserved.

3 Material Performance and Inspection Mitigation Techniques Risk-Informed Strategies Advanced Sensors Enhanced Specifications Advanced Manufacturing Advanced Manufacturing and Materials GOAL VALUE Identify, develop, qualify, & implement more economical manufacturing, inspection & new materials that enable:

New Materials Development AR Materials Development Materials Qualification Degradation Mechanism (MMM/MDM)

Evaluate, Qualify, and Demonstrate Advanced Manufacturing Methods Additive Manufacturing PM-HIP Advanced Welding Mechanical Connections Advanced Cladding Higher Quality Components l Reduced Lead Times l Alternative Supply Chains l Cost Competitiveness l Enable Deployment Sample Lateral motion Ball in hydrostatic bearing Normal force applied Tool body Pressurized fluid

© 2023 Electric Power Research Institute, Inc. All rights reserved.

4 EPRI Project Development and Execution Guidance EPRI Owner-Operator Mission Requirements EPRI Siting Guide Define Mission Requirements Planning Need New Generation Select Location EPRI Owner-Operator Technology Specific Requirements EPRI Technology Assessment Guide Select Technology Define Design Requirements (bid specs.)

© 2023 Electric Power Research Institute, Inc. All rights reserved.

5 TogetherShaping the Future of Energy