ML23083B944: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:BRIEFING ON NUCLEAR REGULATORY RESEARCH PROGRAM Forward-looking Research Associated with Advanced Reactor Technologies Steve Chengelis Director, Future Fleet March 30, 2023 www.epri.com  © 2023 Electric Power Research Institute, Inc. All rights reserved.
{{#Wiki_filter:© 2023 Electric Power Research Institute, Inc. All rights reserved.
w w w. e p r i. c o m Steve Chengelis Director, Future Fleet March 30, 2023 BRIEFING ON NUCLEAR REGULATORY RESEARCH PROGRAM Forward-looking Research Associated with Advanced Reactor Technologies


Advanced Reactor Roadmap - Strategy and Implementation Strategy A shared (industry-wide)           Align organizations and foster                                                   Serving government, academic, strategy to ensure the success        collaboration in implementing                                                            industrial, and public of advanced reactors                              the strategy                                                              stakeholders Timeline 2022                  February 2023                    April 2023                                      Summer 2023                      Ongoing Engaged industry          Issue Draft                      Issue Final                                    Example Roadmap                Implement and stakeholders; analyzed      Roadmap for                        Roadmap                                      Action: Initiate 709            Maintain Action strategic elements            Review                        Document                                        Testing Program                    Plan 2                                            © 2023 Electric Power Research Institute, Inc. All rights reserved.
© 2023 Electric Power Research Institute, Inc. All rights reserved.
2 Advanced Reactor Roadmap - Strategy and Implementation 2022 April 2023 February 2023 Summer 2023 Ongoing Implement and Maintain Action Plan Example Roadmap Action: Initiate 709 Testing Program Engaged industry stakeholders; analyzed strategic elements Issue Final Roadmap Document Issue Draft Roadmap for Review Timeline Strategy A shared (industry-wide) strategy to ensure the success of advanced reactors Align organizations and foster collaboration in implementing the strategy Serving government, academic, industrial, and public stakeholders


Advanced Manufacturing and Materials GOAL&VALUE Identify, develop, qualify, & implement more economical manufacturing, inspection & new materials that enable:
© 2023 Electric Power Research Institute, Inc. All rights reserved.
Higher Quality Components l Reduced Lead Times l Alternative Supply Chains l Cost Competitiveness l Enable Deployment
3 Material Performance and Inspection Mitigation Techniques Risk-Informed Strategies Advanced Sensors Enhanced Specifications Advanced Manufacturing Advanced Manufacturing and Materials GOAL VALUE Identify, develop, qualify, & implement more economical manufacturing, inspection & new materials that enable:
* Mitigation Techniques
New Materials Development AR Materials Development Materials Qualification Degradation Mechanism (MMM/MDM)
* Risk-Informed Strategies
Evaluate, Qualify, and Demonstrate Advanced Manufacturing Methods Additive Manufacturing PM-HIP Advanced Welding Mechanical Connections Advanced Cladding Higher Quality Components l Reduced Lead Times l Alternative Supply Chains l Cost Competitiveness l Enable Deployment Sample Lateral motion Ball in hydrostatic bearing Normal force applied Tool body Pressurized fluid
* Advanced Sensors
* Enhanced Specifications
* Evaluate, Qualify, and Demonstrate Advanced Manufacturing Methods                            Normal force applied
* Additive Manufacturing                  Lateral motion                  Tool body
* AR Materials Development
* PM-HIP                                                                    Pressurized fluid Ball in hydrostatic bearing
* Materials Qualification
* Advanced Welding                                          Sample
* Degradation Mechanism
* Mechanical Connections                                                                                                (MMM/MDM)
* Advanced Cladding Material Performance                                                    New Materials Advanced Manufacturing                                and Inspection                                                        Development 3                                                        © 2023 Electric Power Research Institute, Inc. All rights reserved.


EPRI Project Development and Execution Guidance EPRI Siting Guide EPRI Owner-Operator                                                                             EPRI Owner-Operator Mission Requirements                                                                      Technology Specific Requirements Select Location Planning Need New Generation Define Mission                                                                            Define Design Requirements                                                                              Requirements (bid specs.)
© 2023 Electric Power Research Institute, Inc. All rights reserved.
Select Technology EPRI Technology Assessment Guide 4                                    © 2023 Electric Power Research Institute, Inc. All rights reserved.
4 EPRI Project Development and Execution Guidance EPRI Owner-Operator Mission Requirements EPRI Siting Guide Define Mission Requirements Planning Need New Generation Select Location EPRI Owner-Operator Technology Specific Requirements EPRI Technology Assessment Guide Select Technology Define Design Requirements (bid specs.)


TogetherShaping the Future of Energy 5            © 2023 Electric Power Research Institute, Inc. All rights reserved.}}
© 2023 Electric Power Research Institute, Inc. All rights reserved.
5 TogetherShaping the Future of Energy}}

Latest revision as of 07:44, 27 November 2024

M230330: Slides/Supporting Presentation Material - S. Chengelis - Briefing on Nuclear Regulatory Research Program
ML23083B944
Person / Time
Issue date: 03/30/2023
From:
NRC/OCM
To:
Shared Package
ML23067A027 List:
References
M230330
Download: ML23083B944 (5)


Text

© 2023 Electric Power Research Institute, Inc. All rights reserved.

w w w. e p r i. c o m Steve Chengelis Director, Future Fleet March 30, 2023 BRIEFING ON NUCLEAR REGULATORY RESEARCH PROGRAM Forward-looking Research Associated with Advanced Reactor Technologies

© 2023 Electric Power Research Institute, Inc. All rights reserved.

2 Advanced Reactor Roadmap - Strategy and Implementation 2022 April 2023 February 2023 Summer 2023 Ongoing Implement and Maintain Action Plan Example Roadmap Action: Initiate 709 Testing Program Engaged industry stakeholders; analyzed strategic elements Issue Final Roadmap Document Issue Draft Roadmap for Review Timeline Strategy A shared (industry-wide) strategy to ensure the success of advanced reactors Align organizations and foster collaboration in implementing the strategy Serving government, academic, industrial, and public stakeholders

© 2023 Electric Power Research Institute, Inc. All rights reserved.

3 Material Performance and Inspection Mitigation Techniques Risk-Informed Strategies Advanced Sensors Enhanced Specifications Advanced Manufacturing Advanced Manufacturing and Materials GOAL VALUE Identify, develop, qualify, & implement more economical manufacturing, inspection & new materials that enable:

New Materials Development AR Materials Development Materials Qualification Degradation Mechanism (MMM/MDM)

Evaluate, Qualify, and Demonstrate Advanced Manufacturing Methods Additive Manufacturing PM-HIP Advanced Welding Mechanical Connections Advanced Cladding Higher Quality Components l Reduced Lead Times l Alternative Supply Chains l Cost Competitiveness l Enable Deployment Sample Lateral motion Ball in hydrostatic bearing Normal force applied Tool body Pressurized fluid

© 2023 Electric Power Research Institute, Inc. All rights reserved.

4 EPRI Project Development and Execution Guidance EPRI Owner-Operator Mission Requirements EPRI Siting Guide Define Mission Requirements Planning Need New Generation Select Location EPRI Owner-Operator Technology Specific Requirements EPRI Technology Assessment Guide Select Technology Define Design Requirements (bid specs.)

© 2023 Electric Power Research Institute, Inc. All rights reserved.

5 TogetherShaping the Future of Energy