ML23258A093: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Form 2.3-2 Operating Test Quality Checklist Facilitv: (     p                                 Date of Examination: 1 / 11 /1 3   Qperatina Test Number:
{{#Wiki_filter:Form 2.3-2 Operating Test Quality Checklist Facilitv: ( p 
lll ;n
Date of Examination: 1 / 11 / 1 3 lll ;n Qperatina Test Number:  
                                                                                                                  }" I (Y)es /(N o General Criteria a   b*     d'
}" I General Criteria (Y)es /(N o a
                                                                                                        'I \(
b*
: a. The operating test meets the criteria on the associated test outline.                                           Y
d'
: b. There are enough test items so that test items will not be repeated on more than 1 day of the operating test.                                                                               y          Y C. The operating test does not duplicate items from the applicants' audit test(s).
: a.
(   "       Y
The operating test meets the criteria on the associated test outline.
: d. Overlap with the written examination and between different parts of the operating test is minimized.                                                                                         t          Y
'I \\(
: e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level.
b.
f i          Y Walkthrouah Criteria
There are enough test items so that test items will not be repeated on more than 1 day of y 
: a. Each job performance measure (JPM) includes the following, as applicable:
the operating test.
task standard initial conditions initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if the facility licensee deems it to be time critical alternate path JPMs are labeled as "alternate path" operationally important specific performance criteria that include the following:
C.
y y          Y detailed expected actions with exact criteria and nomenclature L     system response and other examiner cues statements describing important observations to be made by the applicant
The operating test does not duplicate items from the applicants' audit test(s).
      ./     criteria for successful completion of the JPM task standard L     identification of critical steps and their associated performance standards J'     restrictions on the seauence of steos, if aoolicable
( "
                                                                                                        '/ y
d.
: b. Ensure that any changes from the previously approved JPM outlines (Fonns 3.2*1 and 3.2-2) have not caused the test to deviate from any of the acceptance criteria (e.g., item                           Y distribution, bank use, repetition from the last two NRC examinations) specified on those forms.
Overlap with the written examination and between different parts of the operating test is t 
Simulator Scenario Set Criteria for Scenario Numbers:         l/ l I 3 QUALITATIVE ATTRIBUTES y
minimized.
: 1. The initial conditions are realistic in that some equipment and/or instrumentation may be out of service, but it does not cue the operators into expected events.                             f          Y
e.
: 2. The scenarios consist mostly of related events.                                                   y 'I       Y
It appears that the operating test will differentiate between competent and f i less-than-competent applicants at the designated license level.
: 3. Each event description consists of the following:
Walkthrouah Criteria a.
the point in the scenario when it is to be initiated the malfunction(s) or conditions that are entered to initiate the event                     y    y    Y the symptoms/cues that will be visible to the crew the expected operator actions (by shift position)
Each job performance measure (JPM) includes the following, as applicable:
      ,I     the event termination point (if applicable)
task standard initial conditions initiating cues
ES-2.3, Page 10 of 19

references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific

designation if the facility licensee deems it to be time critical y y alternate path JPMs are labeled as "alternate path" operationally important specific performance criteria that include the following:
 
detailed expected actions with exact criteria and nomenclature L
system response and other examiner cues statements describing important observations to be made by the applicant  
./
criteria for successful completion of the JPM task standard L
identification of critical steps and their associated performance standards J'
restrictions on the seauence of steos, if aoolicable
: b.
Ensure that any changes from the previously approved JPM outlines (Fonns 3.2*1 and 3.2-2) '/
have not caused the test to deviate from any of the acceptance criteria (e.g., item y
distribution, bank use, repetition from the last two NRC examinations) specified on those forms.
Simulator Scenario Set Criteria for Scenario Numbers: l/ l I 3 QUALITATIVE ATTRIBUTES 1.
The initial conditions are realistic in that some equipment and/or instrumentation may be f y out of service, but it does not cue the operators into expected events.
2.
The scenarios consist mostly of related events.
y 'I 3.
Each event description consists of the following:
the point in the scenario when it is to be initiated y y

the malfunction(s) or conditions that are entered to initiate the event the symptoms/cues that will be visible to the crew the expected operator actions (by shift position)  
,I the event termination point (if applicable)
ES-2.3, Page 10 of 19 Y
Y Y
Y Y
Y Y
Y Y
Y


Y Y
Y Y
Line 48: Line 78:
Y Y
Y Y
Y Y
Y Y
Y Travis D. Iskierka-Boggs Digitally signed by Travis D. Iskierka-Boggs Date: 2023.06.20 07:01:45 -04'00' Theodore V. Wingfield   Digitally signed by Theodore V. Wingfield Date: 2023.06.20 08:03:53 -04'00' April M. Nguyen         Digitally signed by April M. Nguyen Date: 2023.07.06 10:48:00 -05'00'}}
Y Travis D. Iskierka-Boggs Digitally signed by Travis D. Iskierka-Boggs Date: 2023.06.20 07:01:45 -04'00' Theodore V. Wingfield Digitally signed by Theodore V. Wingfield Date: 2023.06.20 08:03:53 -04'00' April M. Nguyen Digitally signed by April M. Nguyen Date: 2023.07.06 10:48:00 -05'00'}}

Latest revision as of 08:48, 25 November 2024

Form 2.3-2 Operating Test Quality Checklist (Clinton 2023)
ML23258A093
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/06/2023
From:
NRC/RGN-III
To:
Constellation Energy Generation
Ted Wingfield
Shared Package
ML22007A089 List:
References
U-604754
Download: ML23258A093 (2)


Text

Form 2.3-2 Operating Test Quality Checklist Facilitv: ( p 

Date of Examination: 1 / 11 / 1 3 lll ;n Qperatina Test Number:

}" I General Criteria (Y)es /(N o a

b*

d'

a.

The operating test meets the criteria on the associated test outline.

'I \\(

b.

There are enough test items so that test items will not be repeated on more than 1 day of y 

the operating test.

C.

The operating test does not duplicate items from the applicants' audit test(s).

( "

d.

Overlap with the written examination and between different parts of the operating test is t 

minimized.

e.

It appears that the operating test will differentiate between competent and f i less-than-competent applicants at the designated license level.

Walkthrouah Criteria a.

Each job performance measure (JPM) includes the following, as applicable:

task standard initial conditions initiating cues



references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific



designation if the facility licensee deems it to be time critical y y alternate path JPMs are labeled as "alternate path" operationally important specific performance criteria that include the following:

detailed expected actions with exact criteria and nomenclature L

system response and other examiner cues statements describing important observations to be made by the applicant

./

criteria for successful completion of the JPM task standard L

identification of critical steps and their associated performance standards J'

restrictions on the seauence of steos, if aoolicable

b.

Ensure that any changes from the previously approved JPM outlines (Fonns 3.2*1 and 3.2-2) '/

have not caused the test to deviate from any of the acceptance criteria (e.g., item y

distribution, bank use, repetition from the last two NRC examinations) specified on those forms.

Simulator Scenario Set Criteria for Scenario Numbers: l/ l I 3 QUALITATIVE ATTRIBUTES 1.

The initial conditions are realistic in that some equipment and/or instrumentation may be f y out of service, but it does not cue the operators into expected events.

2.

The scenarios consist mostly of related events.

y 'I 3.

Each event description consists of the following:

the point in the scenario when it is to be initiated y y



the malfunction(s) or conditions that are entered to initiate the event the symptoms/cues that will be visible to the crew the expected operator actions (by shift position)

,I the event termination point (if applicable)

ES-2.3, Page 10 of 19 Y

Y Y

Y Y

Y Y

Y Y

Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Y

Y Travis D. Iskierka-Boggs Digitally signed by Travis D. Iskierka-Boggs Date: 2023.06.20 07:01:45 -04'00' Theodore V. Wingfield Digitally signed by Theodore V. Wingfield Date: 2023.06.20 08:03:53 -04'00' April M. Nguyen Digitally signed by April M. Nguyen Date: 2023.07.06 10:48:00 -05'00'