ML24108A079: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:From:                                                                                                                                                                             Richard Knott To:                                                                                                                                                                                                             Hoc, HOO X Cc:                                                                                                                                                                                                               Daniel Dale; Joe Garguilo; Jim Hootman; Ross Lorberbaum
{{#Wiki_filter:From:
Richard Knott To:
Hoc, HOO X Cc:
Daniel Dale; Joe Garguilo; Jim Hootman; Ross Lorberbaum


==Subject:==
==Subject:==
[External_Sender] Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage VR Type Circuit Breaker Part Number V5D4133Y000 Date:                                                                                                                                                                                   Tuesday, April 16, 2024 11:28:55 PM Attachments:                                                                                 Interim Report P21-04152024-INT.pdf
[External_Sender] Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage VR Type Circuit Breaker Part Number V5D4133Y000 Date:
 
Tuesday, April 16, 2024 11:28:55 PM Attachments:
Good Evening,
Interim Report P21-04152024-INT.pdf Good Evening,


Please see attached Interim Report provided per 10CFR Part 21 section 21.21(a)(2).
Please see attached Interim Report provided per 10CFR Part 21 section 21.21(a)(2).
Line 33: Line 36:


Confidentiality Note: The information contained in this message (and attachments) is confidential and may be legally privileged. The message is intended solely for the addressee(s). If you are not the intended recipient, you are hereby notified that any use, dissemination, or reproduction is strictly prohibited and may be unlawful. If you are not the intended recipient please contact the sender by return e-mail and destroy all copies of the original message and attachments.
Confidentiality Note: The information contained in this message (and attachments) is confidential and may be legally privileged. The message is intended solely for the addressee(s). If you are not the intended recipient, you are hereby notified that any use, dissemination, or reproduction is strictly prohibited and may be unlawful. If you are not the intended recipient please contact the sender by return e-mail and destroy all copies of the original message and attachments.
4/16/2024


To:                                                             Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Fax Number (301)816-5151
Paragon Energy Solutions 7410 Pebble Drive
 
* Fort Worth, Texas
10CFR Part 21 Interim Notification: P21-04162024-INT
* 76118 817-284-0077
* Fax 817-590-0484 Page 1 of 1 4/16/2024 To:
Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Fax Number (301)816-5151 10CFR Part 21 Interim Notification: P21-04162024-INT  


==Subject:==
==Subject:==
Interim Report                   Regarding a Potential Defect with Schneider Electric Medium Voltage VR                         Type Circuit B          reakerPart Number V5D4133Y000.
Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage VR Type Circuit Breaker Part Number V5D4133Y000.
 
Pursuant to 10CFR 21.21 (a)(2), Paragon Energy Solutions, LLC is providing this interim notification of ongoing analysis for Part 21 reportability of a potential defect with the subject circuit breaker part number V5D4133Y000.
Pursuant to 10CFR 21.21 (a)(2), Paragon Energy Solutions, LLC is providing this interim notification of ongoing analysis for Part 21 reportability of a potential defect with the subject circuit breaker part number V5D4133Y000.
 
Potential Affected Plants:
Potential Affected Plants:
 
Plant Customer PO#
Plant                     Customer PO#               Line #                   CatID/Item       QTY Duke-Oconee               156762                     001                       881325           8 Note: Paragon is currently evaluating the extent of condition as it pertains to other plants and equipment that may utilize the same or similar circuit breakers.
Line #
 
CatID/Item QTY Duke-Oconee 156762 001 881325 8
Note: Paragon is currently evaluating the extent of condition as it pertains to other plants and equipment that may utilize the same or similar circuit breakers.
Condition being evaluated:
Condition being evaluated:
 
On February 15th, 2024, Paragon completed initial documentation of a potential defect with the subject circuit breaker in which Duke-Oconee had identified failure to close on demand or delayed operation to close with extended application of the remote closing signal. Since the primary safety function of the circuit breaker is to close and maintain continuity of power to downstream loads, failure to close could potentially contribute to a substantial safety hazard.
On     February     15th, 2024,     Paragon                                                                   completed initial documentation             of a potential defect with the subject circuit breaker in which Duke-                             Oconee had identified failure to close                                           on demand or delayed operation to close with extended application of the remote closing signal. Since the primary safety function of the circuit breaker is to close and maintain continuity of power to downstream loads, failure to close could potentially contribute to a substantial safety hazard.
This is the first reported instance of this failure mode, and Paragon suspects the issue to be related to aging of the circuit breakers lubrication. Paragon requires more time to complete our testing and analysis to confirm the failure mode and determine reportability.
 
Date when evaluation is expected to be complete: 5/03/2023.
This is the first reported instance of this failure mode                             , and Paragon suspects the issue to be related to aging of the circuit breaker                      s lubrication. Paragon requires more time to complete our testing and analysis                                                     to confirm the failure mode and determine reportability.
: Regards, Richard Knott Vice President Quality Assurance Paragon Energy Solutions 817-284-0077 rknott@paragones.com}}
 
Date when evaluation is expected to be                                                       complete: 5/03/2023.
: Regards,
 
Richard Knott Vice President Quality Assurance Paragon Energy Solutions 817-284-0077 rknott@paragones.com
 
Paragon Energy Solutions 7410 Pebble Drive
* Fort Worth, Texas
* 76118 817-284-0077
* Fax 817-590-0484 Page 1 of 1}}

Latest revision as of 18:38, 24 November 2024

EN 57079 Paragon Energy Solutions Email Forwarding Part 21 Interim Report Re Potential Defect with Schneider Electric Medium Voltage Vr Type Circuit Breaker Part Number V5D4133Y000
ML24108A079
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/16/2024
From: Knott R
Paragon Energy Solutions
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML24108A081 List:
References
P21-04162024-INT
Download: ML24108A079 (1)


Text

From:

Richard Knott To:

Hoc, HOO X Cc:

Daniel Dale; Joe Garguilo; Jim Hootman; Ross Lorberbaum

Subject:

[External_Sender] Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage VR Type Circuit Breaker Part Number V5D4133Y000 Date:

Tuesday, April 16, 2024 11:28:55 PM Attachments:

Interim Report P21-04152024-INT.pdf Good Evening,

Please see attached Interim Report provided per 10CFR Part 21 section 21.21(a)(2).

Please let me know if there are any questions regarding this submittal.

Best Regards, Richard

Richard Knott Vice President, Quality Assurance (518)450-9706 (C) l www.ParagonES.com

Confidentiality Note: The information contained in this message (and attachments) is confidential and may be legally privileged. The message is intended solely for the addressee(s). If you are not the intended recipient, you are hereby notified that any use, dissemination, or reproduction is strictly prohibited and may be unlawful. If you are not the intended recipient please contact the sender by return e-mail and destroy all copies of the original message and attachments.

Paragon Energy Solutions 7410 Pebble Drive

  • 76118 817-284-0077
  • Fax 817-590-0484 Page 1 of 1 4/16/2024 To:

Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Fax Number (301)816-5151 10CFR Part 21 Interim Notification: P21-04162024-INT

Subject:

Interim Report Regarding a Potential Defect with Schneider Electric Medium Voltage VR Type Circuit Breaker Part Number V5D4133Y000.

Pursuant to 10CFR 21.21 (a)(2), Paragon Energy Solutions, LLC is providing this interim notification of ongoing analysis for Part 21 reportability of a potential defect with the subject circuit breaker part number V5D4133Y000.

Potential Affected Plants:

Plant Customer PO#

Line #

CatID/Item QTY Duke-Oconee 156762 001 881325 8

Note: Paragon is currently evaluating the extent of condition as it pertains to other plants and equipment that may utilize the same or similar circuit breakers.

Condition being evaluated:

On February 15th, 2024, Paragon completed initial documentation of a potential defect with the subject circuit breaker in which Duke-Oconee had identified failure to close on demand or delayed operation to close with extended application of the remote closing signal. Since the primary safety function of the circuit breaker is to close and maintain continuity of power to downstream loads, failure to close could potentially contribute to a substantial safety hazard.

This is the first reported instance of this failure mode, and Paragon suspects the issue to be related to aging of the circuit breakers lubrication. Paragon requires more time to complete our testing and analysis to confirm the failure mode and determine reportability.

Date when evaluation is expected to be complete: 5/03/2023.

Regards, Richard Knott Vice President Quality Assurance Paragon Energy Solutions 817-284-0077 rknott@paragones.com