{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
{{#Wiki_filter:UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the matter of:
 
FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating Station, Units 3 and 4)
BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
Docket Nos. 50-250-SLR-2 and 50-251-SLR-2 June 3, 2024 FLORIDA POWER & LIGHT COMPANYS ANSWER TO MIAMI WATERKEEPERS MOTION TO ADMIT AMENDED AND NEW CONTENTIONS IN RESPONSE TO THE NRC STAFFS FINAL SITE-SPECIFIC ENVIRONMENTAL IMPACT STATEMENT RYAN K. LIGHTY, Esq.
 
In the matter of:                                                                                                                                                                                             Docket Nos. 50-250-SLR-2 and 50-251-SLR-2 FLORIDA POWER & LIGHT COMPANY
 
(Turkey Point Nuclear Generating Station,                                                                                                                                                                    June 3, 2024 Units 3 and 4)
 
FLORIDA POWER & LIGHT COMPANYS   ANSWER TO MIAMI WATERKEEPERS MOTION TO ADMIT AMENDED AND NEW CONTENTIONS IN RESPONSE TO THE NRC STAFFS FINAL SITE   -SPECIFIC ENVIRONMENTAL IMPACT STATEMENT
 
RYAN K. LIGHTY, Esq.
PAUL M. BESSETTE, Esq.
PAUL M. BESSETTE, Esq.
SCOTT D. CLAUSEN, Esq.
SCOTT D. CLAUSEN, Esq.
MORGAN, LEWIS & BOCKIUS LLP
MORGAN, LEWIS & BOCKIUS LLP STEVEN HAMRICK, Esq.
 
FLORIDA POWER & LIGHT COMPANY Counsel for Florida Power & Light Company  
STEVEN HAMRICK, Esq.
FLORIDA POWER & LIGHT COMPANY
 
Counsel for Florida Power & Light Company TABLE OF CONTENTS
 
I.                                                                                                          INTRODUCTION ............................................................................................................. 1
 
II.                                                                                          BACKGROUND ............................................................................................................... 3 III.                                                                          EFFECT OF THE PENDING PART 51 RULEMAKING................................................ 6 IV.                                                                        THE BOARD SHOULD DENY THE MOTION .............................................................. 9 A.                                                                                        Legal Standards ...................................................................................................... 9 B.                                                                                          Contention 1-A (No-Action Alternative) ............................................................. 10
: 1.                                                                                                  Contention 1-A Is Not Based on New and Materially Different Information .............................................................................................. 11
: 2.                                                                                                  Contention 1-A Is Inadmissible ............................................................... 12 C.                                                                                          Contention 1-B (Potable Water) .......................................................................... 16
: 1.                                                                                                  Contention 1-B Is Not Based on New and Materially Different Information .............................................................................................. 16
: 2.                                                                                                  Contention 1-B Is Inadmissible ............................................................... 17 D.                                                                                        Contention 1-C (Groundwater Quality) ............................................................... 22
: 1.                                                                                                  Contention 1-C Is Not Based on New and Materially Different Information .............................................................................................. 22
: 2.                                                                                                  Contention 1-C Is Inadmissible ............................................................... 27 E.                                                                                            Contention 2 (Endangered Species) ..................................................................... 33
: 1.                                                                                                  Contention 2 Is Inadmissible ................................................................... 34 F.                                                                                                Contentions 3-A and 3-B (Climate Change) ........................................................ 43
: 1.                                                                                                  Contentions 3-A and 3-B Are Not Based on New and Materially Different Information ............................................................................... 43
: 2.                                                                                                  Contention 3-A Is Inadmissible ............................................................... 50
: 3.                                                                                                  Contention 3-B Is Inadmissible ............................................................... 55 V.                                                                                        THE BOARD SHOULD DENY THE WAIVER REQUEST ......................................... 58 A.                                                                                        Legal Standards for Waivers ................................................................................ 58 B.                                                                                          Petitioners Waiver Request Should Be Denied  .................................................. 60
: 1.                                                                                                  Under the Current Rule, the Board Should Deny the Waiver Request Because a Waiver Is Unnecessary ............................................. 60
: 2.                                                                                                  Under the New Rule, the Board Should Deny the Waiver Request Because Petitioner Has Not Made the Requisite Prima Facie Showing ................................................................................................... 61 V I.                                                                        CONCLUSION ................................................................................................................ 63 I.                                                                                                    INTRODUCTION
 
Pursuant to 10 C.F.R. § 2.309(i)(1), the Atomic Safety and Licensing Board                s (Board)
 
March 26, 2024 Initial Scheduling Order,                                                              1 and the Boards May 21, 2024 Memorandum and Order,      2
 
Florida Power & Light Company (FPL or Applicant) submits this Answer to M                                                                        iami
 
Waterkeepers (Petitioners) Motion to A                                                  dmit Amended and New Contentions in Response to the
 
NRC Staffs F              inal S                        ite-Specific Environmental I                                mpact S          tatement (Motion)                    3 and Petition                                                            for a
 
Waiver of 10 C.F.R. § 51.53(c)(3) and 51.71(D) and 10 C.F.R. Par 51, Subpart A, Appendix B
 
(Waiver Request)                  4 regarding the subsequent license renewal (SLR) application (SLRA) for
 
Turkey Point Nuclear Generating Station Units 3 and 4 (Turkey Point). The Motion seeks the
 
admission of one amended contention (with 3 sub-contentions) and two new contentions (one of
 
which has 2 sub-contentions). Petitioners Waiver Request asks that the application of certain U.S.
 
Nuclear Regulatory Commission (NRC) environmental regulations be set aside for Contention
 
3-B. As explained in detail below, the Motion and Waiver Request should be denied in their
 
entirety.
 
Petitioner seeks to challenge certain findings and conclusions in the Final Site            -Specific
 
Environmental Impact Statement (          2024 FSE IS) issued on March 29, 2024.          5  Contentions 1-                                                                              A,
 
1-B, and 1-C challenge various aspects of the NRCs groundwater impacts analysis in the
 
2024 FSE IS                                                                                                            . Contention 2 challenges the 2024 FSEISs analysis of the Miami cave crayfish, a
 
1                                                      Initial Scheduling Order at 3 (Mar. 26, 2024) (unpublished) (                        ML24086A446)                      (Initial Scheduling Order)                .
 
2                                                      Memorandum and Order (Requesting that Parties Address Applicability of Part 51 Amendments and Providing Notice of Dates for Possible Oral Argument) (  May 21, 2024) (unpublished) (ML24142A105)    (May 21 Order).
 
3                                                      Miami Waterkeepers Motion to Admit Amended and New Contentions in R                                      esponse to the NRC                                                                Staffs Final Site-Specific Environmental Impact Statement (May 8, 2024) (ML24129A220) (Motion).
 
4                                                      Miami Waterkeeper  s Petition For Waiver Of 10 C.F.R. 51.53(C)(3) And 51.71(D) And 10 C.F.R. Part 51, Subpart A, Appendix B  (May 8, 2024) ( ML24129A221)                                        (Waiver Request)                .
 
5                                                      Id. at 1; Motion at 2.
 
1 species proposed for listing            , but not yet listed under the Endangered Species Act (ESA)                              . And
 
Contentions 3-A and 3-B claim the NRC failed to consider certain                                                                                                    climate change-                                related risks
 
discussed in a recently issued report by the U.S. Government Accountability Office (GAO) on
 
actions the NRC should consider regarding potential effects of climate change (the GAO
 
Report).          6
 
In sum, the Motion should be denied as to Contentions 1-A, 1-B, and 1-C, and Contentions
 
3-A and 3-B because they                                                                            fail to meet the good cause standard for new or amended contentions in
 
10 C.F.R. § 2.309(c). In particular, those c                                                          ontentions are not based on new or materially different
 
information. Each attempts to raise arguments that simply did not occur to Petitioner at the outset,
 
or seeks to recycle or reinvigorate arguments Petitioner raised previously but were rejected                                  .
 
Additionally, the Motion should be denied as to all of the contentions because none satisfy
 
the admissibility requirements in 10 C.F.R. § 2.309(f). As an overarching matter, Contentions 1-                                                                    A,
 
1-B, and 1-C fail to engage with or dispute the relevant portions of the 2024 FSE IS                                    . These
 
contentions largely reference outdated information without acknowledging or discussing the more
 
recent data used by the NRC Staff in its analyses. Contention 2 largely relies on the claims
 
presented in 1-B and 1-C, and is inadmissible for the same reason. And Contention 3 is based on a
 
GAO Report that is little more than a compendium of long  -available information that offers                          nothing
 
to contest the discussion in the 2024 FSE IS                                                                                                                                    which the GAO Report does not purport to review or
 
analyze. Ultimately, none of these contentions raise a genuine material dispute, and all of them fail
 
to satisfy one or more of the admissibility criteria. For the reas                        ons set forth            below, the Board
 
should deny Petitioners Motion and Waiver                                                                Request.
 
6                                                      U.S. Government Accountability Office, Nuclear Power Plants, NRC Should Take Actions to Fully Consider the Potential Effects of Climate Change (Apr. 2024), https://www.gao.gov/products/gao-                                24-                                        106326                                                                                (GAO Report).
 
2 II.                                                                                  BACKGROUND
 
Much of the background information relevant to this pleading has been provided previously
 
in FPLs Answer Opposing Miami Waterkeepers Hearing Request and Petition                                                                    to Intervene dated
 
December 22, 2023 (FPL Answer).                    7  For the sake of brevity, that information is not republished
 
again here. Instead, FPL incorporates by reference its discussions regarding the scope and
 
objectives of the NRCs license renewal safety  and environmental review          s,  8 the history of the
 
cooling canal system (        CCS)          and FPLs efforts to retract the hypersaline plume,                                9 and the
 
procedural history of the Turkey Point SLRA            through October 2023. 10  The subsequent procedural
 
history is summarized below.
 
Miami Waterkeeper filed its Request for Hearing and Petition to Intervene (Petition                    ) on
 
November 27, 2023. 11  The Petition proposed five contentions based on alleged deficiencies in the
 
draft Site-Specific Environmental Impact Statement for  Turkey Points SLRA, issued on
 
August 31, 2023 (2023          DSEIS)        . 12  The Petition alleged that the 2023 DSEIS                                                                                                                                                  failed to            : (1)take a
 
hard look at the impacts to ground water caused by the continued operation of the CCS; (2)analyze
 
the benefits of replacing the CCS with cooling towers; (3)adequately consider the cumulativ                                                                      e
 
impacts fromclimate change during the subsequent period of extended operation                                                                                                                                            s; (4)address
 
whether the continued operations would impact the Miami cave crayfish; and (5) consider the effect
 
7                                                      Florida Power and Light Companys                                              Answer Opposing                                        Miami Waterkeepers    Hearing Request and Petition for Leave to Intervene                  (Dec. 22, 2023) ( ML23356A156) (FPL Answer).
 
8                                                      Id. at 3-4.
 
9                                                      Id. at 9-          10.
 
10                                          Id. at 4-          9.
 
11                                        Request for Hearing and Petition to Intervene Submitted by Miami Waterkeeper (Nov. 27, 2023) (ML23331A971)
(Petition). The Petition was filed with 18 exhibits.  (Package No. ML23332A301).
 
12                                          NUREG-                            1437, Supplement 5a, Second Renewal, Site Specific Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Draft Report for Comment (Aug. 31, 2023) (    ML23242A216) (        2023 DSEIS).
 
3 of climate change on accident risk.                                                            13  FPL filed its answer on                        December 22, 2023, 14 as did the NRC
 
Staff. 15  Both FPL and the NRC Staff            and argued that the Petition should be dismissed because
 
Miami Waterkeeper failed to submit an admissible contention. 16
 
On March 7, 2024, the Board issued its decision (LBP                                    03) granting Petitioner                                                            s hearing
 
request and admitting a narrowed and reformulated Contention 1. 17  As reformulated by the Board,
 
the admitted contention of omission was:
 
The 2023 Draft SEIS fails to take a hard look at impacts to groundwater quality because it does not include an explanation for the Staffs conclusion that the uncertainty in retracting the hypersaline groundwater plume could result in moderate impacts. 18
 
The Board dismissed the rest of Petitioners claims in Contentio                n 1 as inadmissible because Miami
 
Waterkeeper failed to provide sufficient information to raise a genuine, material dispute with the
 
existing information in the [ 2023 DSE IS                                                                                                            ].            19  The Board also found Contentions 2, 3, and 5 to be
 
inadmissible because they            did not raise a genuine, material dispute with the 2023 DSEIS                                                                                                                                    . 20  The


Board found Contention 4 to be premature and stated that Petitioner would have an opportunity to
TABLE OF CONTENTS I.
INTRODUCTION............................................................................................................. 1 II.
BACKGROUND............................................................................................................... 3 III.
EFFECT OF THE PENDING PART 51 RULEMAKING................................................ 6 IV.
THE BOARD SHOULD DENY THE MOTION.............................................................. 9 A.
Legal Standards...................................................................................................... 9 B.
Contention 1-A (No-Action Alternative)............................................................. 10
: 1.
Contention 1-A Is Not Based on New and Materially Different Information.............................................................................................. 11
: 2.
Contention 1-A Is Inadmissible............................................................... 12 C.
Contention 1-B (Potable Water).......................................................................... 16
: 1.
Contention 1-B Is Not Based on New and Materially Different Information.............................................................................................. 16
: 2.
Contention 1-B Is Inadmissible............................................................... 17 D.
Contention 1-C (Groundwater Quality)............................................................... 22
: 1.
Contention 1-C Is Not Based on New and Materially Different Information.............................................................................................. 22
: 2.
Contention 1-C Is Inadmissible............................................................... 27 E.
Contention 2 (Endangered Species)..................................................................... 33
: 1.
Contention 2 Is Inadmissible................................................................... 34 F.
Contentions 3-A and 3-B (Climate Change)........................................................ 43
: 1.
Contentions 3-A and 3-B Are Not Based on New and Materially Different Information............................................................................... 43
: 2.
Contention 3-A Is Inadmissible............................................................... 50
: 3.
Contention 3-B Is Inadmissible............................................................... 55 V.
THE BOARD SHOULD DENY THE WAIVER REQUEST......................................... 58 A.
Legal Standards for Waivers................................................................................ 58 B.
Petitioners Waiver Request Should Be Denied.................................................. 60
: 1.
Under the Current Rule, the Board Should Deny the Waiver Request Because a Waiver Is Unnecessary............................................. 60
: 2.
Under the New Rule, the Board Should Deny the Waiver Request Because Petitioner Has Not Made the Requisite Prima Facie Showing................................................................................................... 61 VI.
CONCLUSION................................................................................................................ 63


advance any arguments regarding the agencys [ESA]compliance relative to the Miami cave
1 I.
INTRODUCTION Pursuant to 10 C.F.R. § 2.309(i)(1), the Atomic Safety and Licensing Boards (Board)
March 26, 2024 Initial Scheduling Order,1 and the Boards May 21, 2024 Memorandum and Order,2 Florida Power & Light Company (FPL or Applicant) submits this Answer to Miami Waterkeepers (Petitioners) Motion to Admit Amended and New Contentions in Response to the NRC Staffs Final Site-Specific Environmental Impact Statement (Motion)3 and Petition for a Waiver of 10 C.F.R. § 51.53(c)(3) and 51.71(D) and 10 C.F.R. Par 51, Subpart A, Appendix B (Waiver Request)4 regarding the subsequent license renewal (SLR) application (SLRA) for Turkey Point Nuclear Generating Station Units 3 and 4 (Turkey Point). The Motion seeks the admission of one amended contention (with 3 sub-contentions) and two new contentions (one of which has 2 sub-contentions). Petitioners Waiver Request asks that the application of certain U.S.
Nuclear Regulatory Commission (NRC) environmental regulations be set aside for Contention 3-B. As explained in detail below, the Motion and Waiver Request should be denied in their entirety.
Petitioner seeks to challenge certain findings and conclusions in the Final Site-Specific Environmental Impact Statement (2024 FSEIS) issued on March 29, 2024.5 Contentions 1-A, 1-B, and 1-C challenge various aspects of the NRCs groundwater impacts analysis in the 2024 FSEIS. Contention 2 challenges the 2024 FSEISs analysis of the Miami cave crayfish, a 1
Initial Scheduling Order at 3 (Mar. 26, 2024) (unpublished) (ML24086A446) (Initial Scheduling Order).
2 Memorandum and Order (Requesting that Parties Address Applicability of Part 51 Amendments and Providing Notice of Dates for Possible Oral Argument) (May 21, 2024) (unpublished) (ML24142A105) (May 21 Order).
3 Miami Waterkeepers Motion to Admit Amended and New Contentions in Response to the NRC Staffs Final Site-Specific Environmental Impact Statement (May 8, 2024) (ML24129A220) (Motion).
4 Miami Waterkeepers Petition For Waiver Of 10 C.F.R. 51.53(C)(3) And 51.71(D) And 10 C.F.R. Part 51, Subpart A, Appendix B (May 8, 2024) (ML24129A221) (Waiver Request).
5 Id. at 1; Motion at 2.


crayfish in a new or amended contention when the Staff issues the [2024                                 FSEIS].                                       21
2 species proposed for listing, but not yet listed under the Endangered Species Act (ESA). And Contentions 3-A and 3-B claim the NRC failed to consider certain climate change-related risks discussed in a recently issued report by the U.S. Government Accountability Office (GAO) on actions the NRC should consider regarding potential effects of climate change (the GAO Report).6 In sum, the Motion should be denied as to Contentions 1-A, 1-B, and 1-C, and Contentions 3-A and 3-B because they fail to meet the good cause standard for new or amended contentions in 10 C.F.R. § 2.309(c). In particular, those contentions are not based on new or materially different information. Each attempts to raise arguments that simply did not occur to Petitioner at the outset, or seeks to recycle or reinvigorate arguments Petitioner raised previously but were rejected.
Additionally, the Motion should be denied as to all of the contentions because none satisfy the admissibility requirements in 10 C.F.R. § 2.309(f). As an overarching matter, Contentions 1-A, 1-B, and 1-C fail to engage with or dispute the relevant portions of the 2024 FSEIS. These contentions largely reference outdated information without acknowledging or discussing the more recent data used by the NRC Staff in its analyses. Contention 2 largely relies on the claims presented in 1-B and 1-C, and is inadmissible for the same reason. And Contention 3 is based on a GAO Report that is little more than a compendium of long-available information that offers nothing to contest the discussion in the 2024 FSEISwhich the GAO Report does not purport to review or analyze. Ultimately, none of these contentions raise a genuine material dispute, and all of them fail to satisfy one or more of the admissibility criteria. For the reasons set forth below, the Board should deny Petitioners Motion and Waiver Request.
6 U.S. Government Accountability Office, Nuclear Power Plants, NRC Should Take Actions to Fully Consider the Potential Effects of Climate Change (Apr. 2024), https://www.gao.gov/products/gao-24-106326 (GAO Report).  


13                                        See generally Petition.
3 II.
BACKGROUND Much of the background information relevant to this pleading has been provided previously in FPLs Answer Opposing Miami Waterkeepers Hearing Request and Petition to Intervene dated December 22, 2023 (FPL Answer).7 For the sake of brevity, that information is not republished again here. Instead, FPL incorporates by reference its discussions regarding the scope and objectives of the NRCs license renewal safety and environmental reviews,8 the history of the cooling canal system (CCS) and FPLs efforts to retract the hypersaline plume,9 and the procedural history of the Turkey Point SLRA through October 2023.10 The subsequent procedural history is summarized below.
Miami Waterkeeper filed its Request for Hearing and Petition to Intervene (Petition) on November 27, 2023.11 The Petition proposed five contentions based on alleged deficiencies in the draft Site-Specific Environmental Impact Statement for Turkey Points SLRA, issued on August 31, 2023 (2023 DSEIS).12 The Petition alleged that the 2023 DSEIS failed to: (1) take a hard look at the impacts to ground water caused by the continued operation of the CCS; (2) analyze the benefits of replacing the CCS with cooling towers; (3) adequately consider the cumulative impacts from climate change during the subsequent period of extended operations; (4) address whether the continued operations would impact the Miami cave crayfish; and (5) consider the effect 7
Florida Power and Light Companys Answer Opposing Miami Waterkeepers Hearing Request and Petition for Leave to Intervene (Dec. 22, 2023) (ML23356A156) (FPL Answer).
8 Id. at 3-4.
9 Id. at 9-10.
10 Id. at 4-9.
11 Request for Hearing and Petition to Intervene Submitted by Miami Waterkeeper (Nov. 27, 2023) (ML23331A971)
(Petition). The Petition was filed with 18 exhibits. (Package No. ML23332A301).
12 NUREG-1437, Supplement 5a, Second Renewal, Site Specific Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Draft Report for Comment (Aug. 31, 2023) (ML23242A216) (2023 DSEIS).  


14                                         See FPL Answer.
4 of climate change on accident risk.13 FPL filed its answer on December 22, 2023,14 as did the NRC Staff.15 Both FPL and the NRC Staff and argued that the Petition should be dismissed because Miami Waterkeeper failed to submit an admissible contention.16 On March 7, 2024, the Board issued its decision (LBP-24-03) granting Petitioners hearing request and admitting a narrowed and reformulated Contention 1.17 As reformulated by the Board, the admitted contention of omission was:
 
The 2023 Draft SEIS fails to take a hard look at impacts to groundwater quality because it does not include an explanation for the Staffs conclusion that the uncertainty in retracting the hypersaline groundwater plume could result in moderate impacts.18 The Board dismissed the rest of Petitioners claims in Contention 1 as inadmissible because Miami Waterkeeper failed to provide sufficient information to raise a genuine, material dispute with the existing information in the [2023 DSEIS].19 The Board also found Contentions 2, 3, and 5 to be inadmissible because they did not raise a genuine, material dispute with the 2023 DSEIS.20 The Board found Contention 4 to be premature and stated that Petitioner would have an opportunity to advance any arguments regarding the agencys [ESA] compliance relative to the Miami cave crayfish in a new or amended contention when the Staff issues the [2024 FSEIS].21 13 See generally Petition.
15                                         NRC Staff Answer Opposing Miami Waterkeepers Hearing Request (Dec. 22, 2023) (ML23356A162)                                                                   (NRC Staff Answer)       .
14 See FPL Answer.
 
15 NRC Staff Answer Opposing Miami Waterkeepers Hearing Request (Dec. 22, 2023) (ML23356A162) (NRC Staff Answer).
16                                         See generally                   FPL Answer; NRC Staff Answer.
16 See generally FPL Answer; NRC Staff Answer.
 
17 Fla. Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), LBP-24-03, 99 NRC __ (Mar. 7, 2024)
17                                         Fla. Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), LBP                                                     03, 99 NRC __ (Mar. 7, 2024)
(slip op.).
(slip op.).
18 Id. at __ (slip op. at 22).
19 Id. at __ (slip op. at 22).
20 Id. at __, __, and __ (slip op. at 24, 27, and 32).
21 Id. at __ (slip op. at 31).


18                                          Id. at __ (slip op. at 22).
5 After the Boards decision, the parties conferred and filed a joint motion regarding the hearing schedule, mandatory disclosures, and hearing file obligations for the proceeding, which the Board granted on March 26, 2024 (Joint Motion).22 The Boards Initial Scheduling Order provided a deadline for filing new or amended contentions based on the [2024 FSEIS].23 The NRC Staff published the 2024 FSEIS on March 29, 2024.24 The 2024 FSEIS expanded the discussion of impacts to groundwater and provided the basis for the Staffs conclusion that uncertainty in retracting the hypersaline groundwater plume could result in moderate impacts.25 This expanded discussion made the admitted contention of omission moot. As a result, the parties jointly filed an unopposed motion to dismiss the sole admitted contention,26 which the Board granted.27 Petitioner filed its Motion and Waiver Request on May 8, 2024. Petitioner seeks to admit three amended contentions (labeled Contentions 1-A, 1-B, and 1-C) and three new contentions (labeled Contentions 2, 3-A, and 3-B).28 Petitioners Waiver Request seeks a waiver of certain NRC environmental regulations to challenge the 2024 FSEISs evaluation of severe accident mitigation alternatives (SAMAs) in Contention 3-B.29 22 Initial Scheduling Order.
 
23 Id. at 2.
19                                          Id. at __ (slip op. at 22).
24 NUREG-1437, Supplement 5a, Second Renewal, Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Final Report (Mar. 29, 2024) (ML24087A061) (2024 FSEIS).
 
25 Id. at 2-38 to 2-40.
20                                          Id. at __, __, and __ (slip op. at 24, 27, and 32).
26 Joint Unopposed Motion to Dismiss Reformulated Contention 1 as Moot And Position of the NRC Staff and Miami Waterkeeper Regarding the Opportunity to File New or Amended Contentions (Apr. 4, 2024)
 
21                                          Id. at __ (slip op. at 31).
 
4 After the Boards decision, the parties conferred and filed a joint motion regarding the
 
hearing schedule, mandatory disclosures, and hearing file obligations for the proceeding, which the
 
Board granted on March 26, 2024 (Joint Motion).                     22 The Boards                                     Initial Scheduling Order
 
provided a deadline for filing new or amended contentions based on the [2024 FSE IS                                                                                            ].           23
 
The NRC Staff                                 published the 2024 FSE IS                                                                                                                        on March 29, 2024. 24 The 2024 FS EIS                                                                                                                                                                      expanded
 
the discussion of impacts to groundwater and provided the basis for the Staffs conclusion that
 
uncertainty in retracting the hypersaline groundwater plume could result in moderate impacts. 25
 
This expanded discussion made the admitted contention of omission moot. As a result, the parties
 
jointly filed an unopposed motion to dismiss the sole admitted contention             , 26 which the Board
 
granted. 27
 
Petitioner filed its Motion and Waiver Request on May 8, 2024. Petitioner seeks to admit
 
threeamended contentions (labeled Contentions 1-                                                               A, 1-B, and 1-           C) and threenew contentions
 
(labeled Contentions 2, 3-A, and 3-B). 28 Petitioner                        s Waiver Request seeks a waiver of             certain
 
NRC environmental regulations to challenge the 2024 FSE IS                                                                                    s evaluation of severe accident
 
mitigation al            ternatives (SAMAs) in Contention 3-                 B. 29
 
22                                         Initial Scheduling Order.
 
23                                         Id. at 2.
 
24                                         NUREG-                           1437, Supplement 5a, Second Renewal, Site   -Specific Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Final Report (Mar. 29, 2024) (ML24087A061) (             2024                     FSEIS).
 
25                                         Id. at 2-38 to 2-                                                 40.
 
26                                         Joint Unopposed Motion to Dismiss Reformulated Contention 1 as Moot       And Position of the NRC Staff and Miami Waterkeeper Regarding the Opportunity to File New or Amended Contentions (Apr. 4, 2024)
(ML24095A314).
(ML24095A314).
 
27 Memorandum and Order (Granting Unopposed Motion to Dismiss Contention 1) (May 9, 2024) (unpublished)
27                                         Memorandum and Order (Granting Unopposed Motion to Dismiss Contention 1) (May 9, 2024)         (unpublished)
(ML24130A205).
(ML24130A205).
28 See generally Motion.
29 Waiver Request.


28                                        See generally                  Motion.
6 III.
 
THE ONGOING PART 51 RULEMAKING WILL HAVE NO IMPACT ON THIS ADJUDICATORY PROCEEDING On February 21, 2024, the NRC Staff submitted SECY-24-0017 to the Commission to obtain the Commissions approval to publish a final rule to amend 10 C.F.R. Part 51.30 The final rule would update Part 51, Appendix B, Table B-1 to codify Category 1 and Category 2 issues, which is supported by the revised Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Revision 2 (2024 GEIS).31 The Commission approved the publication of the final rule, subject to resolving comments from the Commissioners, on May 16, 2024.32 On May 21, 2024, the Board issued a Memorandum and Order asking the parties to address what impact, if any, the final rule may have on this proceeding if it takes effect during this adjudication.33 FPLs response is provided below.
29                                          Waiver Request.
The Part 51 rulemaking does not affect this proceeding. For SLR applications pending at the time CLI-22-3 was issued, the Commission established, by order, an alternative procedural pathway. That pathway permitted such applicants to submit a site-specific environmental report supplement, upon which the NRC would perform a site-specific review, instead of waiting for the staff to complete the rulemaking.34 As the Commission explained, applicants could submit a revised [ER] providing information on environmental impacts [for Category 1 issues] during the 30 SECY-24-0017, Final Rule: Renewing Nuclear Power Plant Operating LicensesEnvironmental Review (Feb.
 
5 III.                                                              THE ONGOINGPART 51 RULEMAKING                                                 WILL HAVE NO IMPACT ON THIS ADJUDICATORY PROCEEDING
 
On February 21, 2024, the NRC Staff                         submitted SECY           0017 to the Commission to
 
obtain the Commissions approval to publish a final rule to amend 10 C.F.R. Part 51. 30 The final
 
rule would update Part 51, Appendix B, Table B-1 to codify Category 1 and Category 2 issues,
 
which is supported by the revised Generic Environmental Impact Statement for License Renewal of
 
Nuclear Plants, Revision 2 (2024 GE IS).                                                                                                                                 31 The Commission approved the publication of the final
 
rule, subject to resolving comments from the Commissioners,             on May 16, 2024. 32 On May 21,
 
2024, the Board issued a Memorandum and Order asking the parties to address what impact                                                         , if any,
 
the final rule may have on this proceeding if it takes effect during this adjudication.                                                           33 FPLs
 
response is provided below.
 
The Part 51 rulemaking does not affect this proceeding. For SLR applications pending at
 
the time CLI-22-3 was issued, the Commission establi                                                          shed, by order, an alternative procedural
 
pathway. That pathway permitted such applicants to submit a site                                   -specific environmental report
 
supplement, upon which the NRC would perform a site-specific review, instead of waiting for the
 
staff to complete the rulemaking. 34 As t                        he Commission explained, applicants could submit a
 
revised [ER] providing information on environmental impacts [for Category 1 issues] during the
 
30                                         SECY                                       0017, Final Rule: Renewing Nuclear Power Plant Operating Licenses    Environmental Review (Feb.
21, 2024) (ML23302A150).
21, 2024) (ML23302A150).
31 See NUREG-1437, Rev. 2, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Final Rule (Feb. 2024) (Vol. 1, ML23201A224) (NUREG-1437, Rev. 2).
32 SECY-24-0017, Commission Voting Record (May 16, 2024) (ML24137A131).
33 May 21 Order.
34 Fla. Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), CLI-22-3, 95 NRC 40, 41-42 (2022).


31                                          See NUREG-                            1437, Rev. 2, Generic Environmental Impact Statement for License Renewal of Nuclear Plants : Final Rule (Feb. 2024) (Vol. 1, ML23201A224          ) (NUREG-                                    1437, Rev. 2)        .
7
 
[SLR] period.35 The Commissions intent in CLI-22-3 is clear: it provided an alternative pathway for applicants, separate and apart from the Part 51 rulemaking.
32                                          SECY                                        0017, Commission Voting Record (May 16, 2024) (    ML24137A131).
Moreover, the Commission endorsed this interpretation in its recent SRM. Specifically, as explained in the Comment Response Document provided as Appendix A to the 2024 GEIS, commenters requested clarification on this very issue. One commenter expressed concern that the rule could be construed as requiring the NRC to perform further environmental reviews to address the new final rule, potentially delaying the proceeding.36 As the commenter further noted, that would be inconsistent with Commission order CLl-22-3, in which the Commission provided applicants the option of proceeding with a site-specific environmental review that is not subject to the new final rule. In its response, the NRC assuaged this concern, explaining that:
 
Any application for an initial LR received before the effective date of the final rule will be processed under the current rule and the 2013 LR GEIS. Any application for an SLR received before the effective date of the final rule will be processed in accordance with Commission direction contained in CLI-22-02 [] and CLI-22-03 [].37 In its SRM, the Commission did not alter this (or any other) comment response, which reflects the Commissions endorsement of this interpretation of its orders.
33                                        May 21 Order.
Here, as envisioned by the Commission in CLI-22-3, FPL opted to pursue this alternative pathway and submitted a revised ER that provided updated site-specific information on the environmental impacts associated with a Turkey Point SLR period in lieu of waiting until the issuance of the updated GEIS. The NRC Staff then conducted its site-specific review, considering that information, and prepared the 2024 FSEIS in accordance with CLI-22-03.38 35 Id. at 41.
 
36 NUREG-1437, Rev. 2, App. A at A-317. Appendix A is contained in NUREG-1437, Rev. 2, Vol. 2 (Vol. 2 ML23201A225).
34                                        Fla. Power & Light Co.  (Turkey Point Nuclear Generating Units 3 and 4)  , CLI-22-3, 95 NRC 40, 41-                              42 (2022).
37 Id.
 
38 2024 FSEIS at xiv.
6
[SLR] period.           35 The Commissions intent in CLI                           3 is clear: it provided an alternative pathway
 
for applicants, separate and apart from the Part 51 rulemaking.
 
Moreover, the Commission endorsed this interpretation in its recent SRM. Specifically, as
 
explained in the Comment Response Document provided as Appendix A to the 2024 GE IS                                                                                                                                          ,
 
commenters requested clarification on this very issue. One                                   commenter             expressed concern that the
 
rule could be construed as requiring the NRC to perform further environmental reviews to address
 
the new final rule, potentially delaying the proceeding.           36 As the commenter                                     further noted,         that
 
would be inconsistent with Commission order CLl-22-3, in which the Commission provided
 
applicants the option of proceeding with a site-specific environmental review that is not subject to
 
the new final rule. In its response, the NRC assuaged this concern, explaining that:
 
Any application for an initial LR received before the effective date of the final rule will be processed under the current rule and the 2013 LR GE IS. Any application for an SLR received before the effective date of the final rule will be     processed in accordance with Commission direction contained in CLI-22-02 []                                                           and CLI-22-03 [].                                                                                             37
 
In its SRM, the Commission did not alter this (or any other) comment response, which reflects the
 
Commissions endorsement of this interpretation of its orders.
 
Here, as envisioned by the Commission in CLI-22-3, FPL                                                                                 opted to pursue this alternative
 
pathway and             submitted a revised ER that provided updated site                                   -specific information on the
 
environmental impacts associated with a Turkey Point SLR period in lieu                                                                         of           waiting until the


issuance of the updated GEIS. The NRC Staff                                                                     then conducted its site          -specific review, considering
8 Given the plain text of CLI-22-3, and the Commission-endorsed confirmatory explanation of the intent of that order in the 2024 GEIS, the 2024 Rule cannot be interpreted as requiring the environmental review process for Turkey Point to begin anew, or to somehow become subject to a whole new set of requirements. Accordingly, the 2024 Rule will continue to have no effect on this proceeding even after it becomes effective.
As a general matter, the 2024 Rule would not affect the content of the 2024 FSEIS. Both the 2023 DSEIS and 2024 FSEIS proactively and voluntarily analyzed the new and revised environmental issues as defined in the new rule.39 In other words, there are no content gaps in the 2024 FSEIS even assuming the 2024 Rule would apply to Turkey Point. And the new or amended contentions proposed in the Motion also would be unaffected by the 2024 Rule. Contentions 1-A, 1-B, 1-C, 2, and 3-A pertain to site-specific analyses that will remain Category 2 (i.e., site-specific) issues after the new rule becomes effective. So, the 2024 Rule has no material impact on those contentions.
Contention 3-B pertains to the site-specific SAMA analysis in the 2024 FSEIS. When the 2024 Rule becomes effective, SAMA analyses will be considered a Category 1 issue.40 That means the generic SAMA analysis in the 2024 GEIS will be codified in Table B-1 and will be available for applicants to rely upon in future environmental reports, and for the NRC Staff to rely upon in future environmental impact statements. If so, then the analysis could not be challenged in an adjudicatory proceeding absent a waiver under 10 C.F.R. § 2.335.
Here, however, neither FPLs ER nor the 2024 FSEIS purport to rely on the codified SAMA analysis in the 2024 Rule. So even when the 2024 Rule becomes effective, as discussed in 39 2023 DSEIS at E-3; 2024 FSEIS at E-3.
40 See SRM, Encl. at 52-53, 102.


that information, and prepared the 2024 FSEIS in accordance with CLI                                                                               03.           38
9 Section V below, a waiver is unnecessary for Contention 3-B because it purports to challenge the site-specific SAMA analysis presented in the 2024 FSEIS.41 And the 2024 Rule would not trigger the need for yet another supplement to the already-completed 2024 FSEIS.42 In sum, the 2024 Rule will have no impact on this adjudicatory proceeding.
IV.
THE BOARD SHOULD DENY THE MOTION A.
Legal Standards New contentions and amendments to prior contentions must meet the good cause standard in 10 C.F.R. § 2.309(c)(1). That regulation states that good cause exists to file new or amended contentions only if the petitioner can show: (1) the information on which the amended or new contention is based was not previously available; (2) the information on which the amended or new contention is based is materially different from information previously available; and (3) the amended or new contention is timely submitted based on the availability of the new information.43 The petitioner has the burden of proving that any new or amended contention meets the standards in 10 C.F.R. § 2.309(c)(1).44 Pursuant to the Initial Scheduling Order and April 26, 2024 Memorandum and Order Granting Motion for Extension of Time, motions to admit new and amended contentions challenging the 2024 FSEIS or the GAO Report were due within 40 days from the issuance of the 41 After the rule becomes effective, FPL or the NRC Staff could voluntarily supplement the ER or 2024 FSEIS to rely on the codified analyses. However, that has not occurred here.
42 Supplements to final EISs are governed by 10 C.F.R. § 51.92. Thereunder, supplements are required when new and significant information (e.g., something that would change an impact conclusion) arises before the proposed action has been taken. However, because the SAMA conclusion in the 2024 FSEIS is consistent with the SAMA conclusion in the 2024 Rule, the 2024 Rule is not new and significant information, and does not trigger the need for yet another supplemental EIS here.
43 10 C.F.R. § 2.309(c)(1)(i)-(iii).
44 AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-09-7, 69 NRC 235, 260-61 (2009).  


35                                          Id. at 41.
10 2024 FSEIS.45 Because Petitioner filed its Motion 40 days after the NRC released the 2024 FSEIS, Petitioner has made its filing in a timely fashion and satisfied the third element of the good cause standard in Section 2.309(c)(1). But Petitioner must still show that its new and amended contentions are based on information not previously available (i.e., based on new facts)46 and that the information is materially different from previously available information.47 Additionally, 10 C.F.R. § 2.309(c)(4) provides that the new or amended contention must meet the applicable contention admissibility requirements in Section 2.309(f). Thus, if the new or amended contention is not based on new facts that are materially different from those previously available, then the Board need not analyze the contentions admissibility.
B.
Contention 1-A (No-Action Alternative)
In Contention 1-A, Petitioner alleges that the 2024 FSEIS fails to adequately analyze groundwater conditions for the No Action alternative, which should be the conditions present when the plant is not operational.48 Petitioner claims the NRC Staff failed to evaluate the baseline conditions for the no action alternative49 which for Turkey Point would be closure at the end of the licensing term and ending the use of the CCS as a heat sink.50 Contention 1-A should be rejected because Petitioner has not demonstrated satisfaction of Sections 2.309(c)(1), (c)(4), or (f)(1).
45 Initial Scheduling Order at 2.
46 Entergy Nuclear Gen. Co. (Pilgrim Nuclear Power Station), CLI-12-10, 75 NRC 479, 493 n.70 (2012) (emphasis partially omitted).
47 See 10 C.F.R. § 2.309(c)(1)(i)-(ii).
48 Motion at 7.
49 Id. at 8.
50 Id. at 9.  


36                                          NUREG-                           1437, Rev. 2, App. A at A  -317. Appendix A is contained in NUREG  -1437, Rev. 2, Vol. 2 ( Vol. 2 ML23201A225).
11
: 1.
Contention 1-A Is Not Based on New and Materially Different Information In Contention 1-A, Petitioner apparently seeks to challenge Section 3.2 of the 2024 FSEIS, titled Comparison of Alternatives, because it allegedly does not compare groundwater impacts to a no action alternative where the CCS is no longer used as a heat sink.51 Petitioner notes that Section 3.2 references the no-action alternative analysis in the 2019 FSEIS.52 Petitioner then seeks to challenge Section 4.6.2 of the 2019 FSEIS for allegedly failing to objectively analyze, using best available science, how environmental conditions would benefit from the no action alternative.53 However, the 2019 FSEIS is not new; Petitioner could have challenged it earlier in this proceeding. In fact, Petitioner raised a substantially similar challenge in its original Petition, which was rejected by the Board in LBP-24-03.54 Likewise, the statements from Section 3.2 of the 2024 FSEIS referenced by Petitioner contain identical text to that presented in Section 3.2 of the 2023 DSEIS.55 Thus, there is nothing new there either.
The only new information Petitioner mentions in Contention 1-A is new information that the Petitioner provided to the NRC.56 Petitioner alleges that this information appears somewhere between pages 2-24 and 2-40 of the 2024 FSEIS.57 However, that conclusory assertion is unaccompanied by any further explanation. Petitioner does not say, specifically, what that information is. It does not explain why it is new. And it does not allege that such unspecified information is materially different from information that was previously available regarding the no 51 Id. at 13.
52 Id.
53 Id. at 13-14.
54 Turkey Point, LBP-24-03, 99 NRC at __ (slip op. at 24-26) (rejecting proposed contention 2).
55 Compare 2024 FSEIS at 3-2 (first full paragraph, beginning [t]he NRC Staff evaluated...) with 2023 DSEIS at 3-2 (first full paragraph, beginning [t]he NRC Staff evaluated...).
56 Motion at 13.
57 Id.  


37                                          Id.
12 action alternative.58 Ultimately, Petitioner simply has not met its affirmative burden to identify new and materially different information upon which Contention 1-A allegedly is based.
: 2.
Contention 1-A Is Inadmissible If the Board finds that Petitioner satisfied the good cause standard for Contention 1-A, the Board should nonetheless reject it as inadmissible.
As a general matter, Contention 1-A is not a model of clarity. It discusses and appears to conflate two concepts: the environmental baseline and the no-action alternative. As articulated in the caption for Contention 1-A, its primary claim is that the 2024 FSEIS fails to adequately analyze groundwater conditions for the no-action alternative.59 Petitioner also claims that the 2024 FSEIS does not compare groundwater impacts to a no action alternative where the CCS is no longer used as a heat sink.60 In the statement of the Contention itself, the issue being raised or controverted is whether the NRC Staff fully analyzed the difference between extending the license... and declining the application (i.e., the proposed action versus the no-action alternative).61 However, Petitioner devotes more than 5 pages of discussion to the (uncontroversial) proposition that an environmental impact statement (EIS) must contain an adequate discussion of the environmental baseline.62 And the basis statement for the contention argues that the NRC is required to compare the effects of the proposed action against a baseline of no action.63 58 More broadly, given that the discussion at pages 2-24 to 2-40 of the 2024 FSEIS relates to possible impacts of the proposed action, it is unclear how any new and materially different information on those pages would reveal any potentially new and material information regarding the no-action alternative, which is discussed primarily in the 2019 FSEIS and for which the NRC determined, in both the 2023 DSEIS and 2024 FSEIS (Sections 3.2), that no new and significant information exists.
59 Motion at 7.
60 Id. at 13.
61 Id. at 7.
62 Id. at 8-13.
63 Id. at 8.  


38                                        2024 FSEIS at           xiv.
13 This suggests Petitioner erroneously believes that the environmental baseline and the no action alternative are one and the same. But that is not the case. The environmental baseline is discussed primarily in Chapter 3 of the 2019 FSEIS.64 Whereas, the no-action alternative is discussed in various subsections of the 2019 FSEIS, including the discussion and comparison of alternatives in Chapters 2 and 5, and the discussion of environmental consequences, per resource area, throughout Chapter 4.65 As a threshold matter, Petitioners misunderstanding of the difference between the environmental baseline and the no-action alternative cannot give rise to an admissible contention. And as explained below, Contention 1-A does not raise a genuine dispute as to either one.
First, Petitioner claims that the NRC did not compare groundwater impacts to a no action alternative where the CCS is no longer used as a heat sink.66 But that assertion lacks the requisite support for an admissible contention and fails to demonstrate a genuine dispute because it is demonstrably untrue. The groundwater analysis for the no-action alternative is provided in Section 4.5.2.2 of the 2019 FSEIS.67 And Section 3.2 of the 2024 FSEIS, plainly titled Comparison of Alternatives,68 refers to Table 2-2 of the 2019 FSEIS, which provides a side-by-side comparison of groundwater impacts for the proposed action and the no-action alternative.69 64 See generally NUREG-1437, Supp. 5, Second Renewal, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 5, Second Renewal, Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Final Report at Ch. 3 (Oct. 2019) (ML19290H346) (2019 FSEIS).
See also generally, e.g., Reg. Guide 4.2, Supp. 1, Rev. 1 at 48 (June 2013) (ML13067A354) (explaining that the environmental baseline is presented in the affected environment discussion).
65 See generally 2019 FSEIS Ch. 4.
66 Motion at 13.
67 2019 FSEIS § 4.5.2.2. The no-action alternative and effects on groundwater is also discussed in Section 4.5.3.2 (p. 4-41), Section 4.5.7.2 (pp. 4-43 to 4-44), and Section 4.6.2.
68 2024 FSEIS at 3-1.
69 2019 FSEIS at 2-23 to 2-25.  


7 Given the plain text of CLI-22-3, and the Commission-endorsed confirmatory explanation of
14 Contrary to Petitioners claim, those impacts plainly have been compared. And Petitioner identifies no alleged error or deficiency in that comparison, which they ignore entirely.
Second, to the extent Petitioner claims that the 2024 FSEIS fails to adequately analyze the issue of groundwater resources for the no-action alternative, as suggested in the caption for Contention 1-A,70 it fails to articulate any specific dispute. In fact, as noted above, Petitioner appears entirely unaware that the analysis in Section 4.5.2.2 exists. Therein, the NRC states that the no action alternative would gradually reduce and eventually stop the discharge of condenser cooling water to the CCS.71 The NRC also states the no action alternative would result in a reduced thermal discharge and would reduce groundwater mounding beneath the CCS.72 Thus, under the no action alternative, the NRC would expect the amount of water needed to support freshening activities to comply with the consent orders could be reduced but probably not stopped.73 And the NRC expects that the operation of the recovery well system would need to continue until the initial remediation objectives are met.74 Petitioner does not acknowledge or dispute any of this information in Section 4.5.2.2; instead, Petitioner simply ignores it.
Third, Petitioners criticism of Section 4.6.2 of the 2019 FSEIS provides no support for the contention. Petitioner claims that, although Section 4.6.2 acknowledges the potential benefits of the no action alternative, it purportedly does not objectively analyze, using best available science, how environmental conditions would benefit from the no action alternative.75 As noted above, there is no reason Petitioner could not have raised this claim earlier, and thus it is inexcusably late.
70 Motion at 7.
71 2019 FSEIS at 4-37.
72 Id.
73 Id.
74 Id.
75 Motion at 13-14.


the intent of that order in the 2024 GE IS                                                                                                                        , the 2024 Rule cannot be interpreted as requiring the
15 Nevertheless, as relevant to Contention 1-A, Petitioner offers no explanation of how this alleged defect provides a basis or support here. As explained by Petitioner, Contention 1-A asserts that the NRC Staff failed to adequately consider the differences in terms of groundwater contamination.
 
But Section 4.6.2 of the 2019 FSEIS pertains to Terrestrial Resources, not groundwater contamination. And Petitioner offers no explanation of why Section 4.6.2 was purportedly required to analyze groundwater contamination, which is evaluated elsewhere in the 2019 FSEIS.
environmental review process for Turkey Point to begin anew, or to somehow become subject to a
Likewise, Petitioners claims regarding the environmental baseline fail to raise an admissible contention. Petitioner suggests that the discussion of the environmental baseline suffers from flaws76 and purports to contest[] the NRC Staffs reliance on an incorrect environmental baseline.77 The 2019 FSEIS sets the environmental baseline for the SLRA as the environment that currently exists at and around the Turkey Point site.78 This baseline included the impacts of past construction and operations of the plant and therefore, presented the nature of these past actions as well as ongoing actions.79 Relevant to this proceeding, Section 3.5.2 of the 2019 FSEIS discusses the environmental baseline for groundwater resources.80 This discussion explores the areas hydrology and aquifers;81 groundwater quality; past contamination and remediation efforts;82 and groundwater use, including recovery and injection wells.83 Although Petitioner offers vague 76 See, e.g., id. at 12-13 (claiming the baseline analysis... suffers from flaws.).
 
77 Id. at 15.
whole new set of requirements. Accordingly, the 2024 Rule will continue to have no effect on this
78 2019 FSEIS at 3-1.
 
79 Id. at 3-1.
proceeding even after it becomes effective.
80 Id. § 3.5.2.
 
81 Id. § 3.5.2.1.
As a general matter, the 2024 Rule would not affect the content of the 2024 FSE IS                                  . Both
82 Id. § 3.5.2.2.
 
83 Id. § 3.5.2.3  
the 2023 DSEIS                                                                                                                                              and 2024 FSE IS                                    proactively and voluntarily analyzed                                    the new and revised
 
environmental issues as defined in the new rule.          39  In other words, there are no content gaps in the
 
2024 FSEIS even assuming the 2024 Rule would apply to Turkey Point. And the new or amended
 
contentions proposed in the Motion also would be unaffected by the 2024 Rule. Contentions 1-A,
 
1-B, 1-C, 2, and 3-A pertain to site-specific analyses that will remain Category 2 (                              i.e., site                      -
 
specific) issues                                        after the new rule becomes effective. So                        , the 2024 Rule has no material impact on
 
those contentions.
 
Contention 3-B pertains to the site          -specific SAMA analysis in the 2024 FSEIS. When the
 
2024 Rule becomes effective, SAMA analyses will beconsidered a Category 1 issue.                                                                                                  40  That
 
means the generic SAMA analysis in the 2024 GEIS will be codified in Table B-1 and will be
 
available for applicants to rely upon in future                                    environmental reports, and for the NRC Staff to rely
 
upon in future                                    environmental impact statements            . If so, then the analysis could not be challenged in
 
an adjudicatory proceeding absent a waiver under 10 C.F.R. § 2.335.
 
Here, however, neither                        FPLs ER    nor the 2024 FSEIS purport to rely on the codified SAMA
 
analysis in the 2024 Rule. So even when the 2024 Rule becomes effective, as discussed in
 
39                                          2023                                                                                DSEIS at E-3; 2024                                        FSEIS                      at E-3.
 
40                                          See                                    SRM, Encl. at 52-        53, 102                                        .
 
8 Section V below, a waiver is unnecessary for Contention 3-                                  B because it purports to challenge the
 
site-specific SAMA analysis presented in the 2024 FSEIS.                                  41  And the 2024 Rule would not trigger
 
the need for yet another supplement to the already                                                                                -completed 2024 FSEIS. 42
 
In sum, the 2024 Rule will have no impact on this adjudicatory proceeding.
 
IV.                                                                  THE BOARD SHOULD                                                                                                                                                                DENY THE MOTION
 
A.                                                                                    Legal Standards
 
New contentions and a          mendments to prior contentions must meet the good cause standard
 
in 10 C.F.R. § 2.309(c)(1). That regulation states that good cause exists to file new or amended
 
contentions only if the petitioner can show: (1) the information on which the amended or new
 
contention is based was not previously available; (2) the information on which the amended or new
 
contention is based is materially differentfrom information previously available; and                                                                                                                                                            (3) the
 
amended or new contention is                                                                                            timely            submitted            based on the availability of the new information                                    . 43
 
The petitioner has the burden of proving that any new or amended contention meets the standards in
 
10 C.F.R. § 2.309(c)(1). 44
 
Pursuant to the Initial Scheduling Order and April 26, 2024 Memorandum and Order
 
Granting Motion for Extension of Time          , motions to admit new and amended contentions
 
challenging the 2024 FS EIS                                                                                                                        or the GAO Report            were due within 40 days from the issuance of the
 
41                                        After the rule becomes effective, FPL or the NRC Staff could voluntarily            supplement the ER or 2024 FSEIS to rely on the codified analyses. However, that has not occurred here.
 
42                                        Supplements to final EISs are governed by 10 C.F.R. § 51.92. Thereunder, supplements are required when new and significant information (e.g., something that would change                                            an impact conclusion) arises before the proposed action has been taken. However, because the SAMA conclusion in the 2024 FSEIS is consistent with the SAMA conclusion in the 2024 Rule, the 2024 Rule is not new and significant information, and does not trigger the need for yet another supplemental EIS here.
 
43                                        10 C.F.R. § 2.309(c)(1)(i)  -(iii).
 
44                                        AmerGen Energy Co.,          LLC (Oyster Creek Nuclear Generating Station), CLI-              09-7, 69 NRC 235, 260 -          61 (2009).
 
9 2024 FSE IS                                                                                                            . 45  Because Petitioner                                                        filed its Motion 40 days after the NRC released the 2024 FSE IS,
 
Petitioner has made its filing in a timely fashion and satisfied the third element of the good
 
cause standard in Section                                                                                          2.309(c)(1). But Petitioner            must still show that its new and amended
 
contentions are based on information not previously available (i.e., based on new                                              facts)                      46 and that
 
the information is materially different from previously available information.                            47  Additionally,
 
10 C.F.R. § 2.309(c)(4) provides that the new or amended contention must meet the applicable
 
contention admissibility requirements in Section              2.309(f). Thus, if the new or amended contention
 
is not based on new facts that are materially different from those previously available, then the
 
Board need not analyze the contentions                                                                                      admissibility.
 
B.                                                                                      Contention 1-A (No            -Action Alternative)
 
In Contention 1-A, Petitioner            alleges that the 2024 FSE IS                                                                                fails to adequately analyze
 
groundwater conditions for the No Action alternative, which should be the conditions present
 
when the plant is not operational.          48  Petitioner                        claims the NRC Staff                        failed to evaluate the
 
baseline conditions for the no action alternative          49 which for Turkey Point would be closure at the
 
end of the licensing term and ending the use of the CCS as a heat sink.            50  Contention 1-A should be
 
rejected because Petitioner has not demonstrated satisfaction of Sections 2.309(c)(1), (c)(4), or
 
(f)(1).
 
45                                        Initial Scheduling Order at 2.
 
46                                        Entergy Nuclear Gen. Co. (Pilgrim Nuclear Power Station), CLI                                                  10, 75 NRC 479, 493 n.70 (2012)    (emphasis partially omitted).
 
47                                          See                                    10 C.F.R. § 2.309(c)(1)(i)-          (ii).
 
48                                        Motion at 7.
 
49                                          Id. at 8.
 
50                                          Id. at 9.
 
10
: 1.                                                                                                                                  Contention 1-A Is Not Based on New and Materially Different Information
 
In Contention 1-A, Petitioner apparently seeks to challenge Section                                                                                3.2 of the 2024 FSE IS                                                                                                                        ,
 
titled Comparison of Alternatives, because it allegedly does not compare groundwater impacts to
 
a no action alternative where the CCS is no longer used as a heat sink.          51  Petitioner notes that
 
Section 3.2 references                                                                                    the no          -action alternative analysis in the 2019 FSEIS                                                                                                                        . 52  Petitioner then seeks
 
to challengeSection                                                                    4.6.2 of the 2019 FSE IS                                                                                                                                                          for allegedly            failing to objectively analyze, using
 
best available science, how environmental conditions would benefit from the no action
 
alternative.          53  However, the 2019 FSE IS                                                                                                                        is not new; Petitioner could have challenged it earlier in
 
this proceeding. In fact, Petitioner raised a substantially similar                                            challenge in its original Petition,
 
which was rejected by the Board in LBP-24-03. 54  Likewise, the statements from Section                                                                          3.2 of the
 
2024 FSE IS                                                                                                            referenced by Petitioner contain identical                                                          text to thatpresented in Section                                    3.2 of the
 
2023 DSEIS                                                                                                            . 55  Thus, there is nothing new there either.
 
The only                                          new information Petitioner mentions in Contention 1-        A is new information that
 
the Petitioner provided to the NRC.          56  Petitioner alleges that this information appears somewhere
 
between pages 2          -24 and 2-40 of the 2024 FSE IS                                                                                                                        . 57  However, that conclusory assertion is
 
unaccompanied by any further explanation. Petitioner does not say, specifically, what that
 
information is. It does not explain why it is new. And it does not allege that such unspecified
 
information is materially different from information that was previously available  regarding the no
 
51                                          Id. at 13.
 
52                                          Id.
 
53                                          Id. at 13-          14.
 
54                                        Turkey Point, LBP                                        03, 99 NRC at __ (slip op. at 24 -          26) (rejecting proposed contention 2).
 
55                                          Compare 2024                                                                                FSEIS                      at 3-2 (first full paragraph, beginning          [t]he NRC Staff evaluated . . .) with                  2023                    DSEIS at 3-2 (first full paragraph, beginning            [t]he NRC Staff evaluated . . .).
 
56                                        Motion at 13.
 
57                                          Id.
 
11 action alternative. 58  Ultimately, Petitioner simply has not met its affirmative burden to identify new
 
and materially different information upon which Contention 1-A allegedly is based.
: 2.                                                                                                                                  Contention 1-A Is Inadmissible
 
If the Board finds that Petitioner satisfied the good cause standard for Contention 1-A, the
 
Board should nonetheless reject it as inadmissible.
 
As a general matter, Contention 1-A is not a model of clarity. It discusses and appears to
 
conflate two concepts:  the environmental baseline and the no-action alternative. As articulated in
 
the caption for Contention 1-A, its primary claim is that the 2024 FSE IS                                                                                                                          fails to adequately analyze
 
groundwater conditions for the no-action alternative          . 59  Petitioner also claims that the                                  2024 FSE IS
 
does not compare groundwater impacts to a no action alternative where the CCS is no longer used
 
as a heat sink.          60  In the statement of the Contention itself, the issue being raised or controverted is
 
whether the NRC Staff                                fully analyzed the difference between extending the license . . . and
 
declining the application (        i.e., the proposed action versus the no-action alternative). 61  However,
 
Petitioner devotes more than 5 pages of discussion to the (uncontroversial) proposition that an
 
environmental impact statement (          E IS)          must contain an adequate discussion of the environmental
 
baseline. 62  And the basis statement for t                                                                                                                      he contention argues                                                            that the NRC is required to compare
 
the effects of the proposed action against a baseline of                                                    no action.                  63
 
58                                        More broadly, given that  the discussion at pages 2-                                24 to 2-                                                  40 of the 2024                                                    FSEIS                      relates to possible impacts of the proposed action, it is unclear how any new and materially different information on those pages                            would reveal any potentially new and material information regarding the no              -action alternative, which is discussed primarily in the 2019                                                                                FSEIS                      and for which the NRC determined, in both the    2023                                                                                DSEIS and 2024                                                            FSEIS                      (Sections 3.2), that no new and significa nt information exists.
 
59                                        Motion at 7.
 
60                                          Id. at 13.
 
61                                          Id. at 7.
 
62                                          Id. at 8-          13.
 
63                                          Id. at 8.
 
12 This suggests Petitioner erroneously believes that the environmental baseline and the no
 
action alternative are one and      the same. But that is not the case. The                                    environmental baseline is
 
discussed primarily in Chapter 3 of the 2019 FSE IS. 64  Whereas, the no-                                                        action alternative is
 
discussed in various subsections of the 2019 FSEIS                                                                                                                        , including the discussion and comparison of
 
alternatives in Chapters 2 and 5, and the discussion of environmental consequences, per resource
 
area, throughout Chapter 4. 65
 
As a threshold matter, Petitioner s misunderstanding of the difference between the
 
environmental baseline and t                  he no        -action alternative cannot give rise to an admissible
 
contention. And as explained below, Contention 1-A does not raise a genuine dispute as to either
 
one.
 
First, Petitioner claims that the NRC did              not compare groundwater impacts to a no action
 
alternative where the CCS is no longer used as a heat sink.                      66  But that assertion lacks the requisite
 
support for an admissible contention and fails to demonstrate a genuine dispute because it is
 
demonstrably untrue. The groundwater analysis for the no-a                                      ction alternative is provided in
 
Section 4.5.2.2 of the 2019 FSE IS                                                                                                                        . 67  And Section                                                            3.2 of the 2024 FSE IS                                                                                                                        , plainly titled
 
Comparison of Alternatives,                    68 refers to Table 2-2 of the 2019 FSE IS                                                                                                                                                                    , which provides a side-          by-
 
side comparison of groundwater impacts for the proposed action and the no-                                              action alternative. 69
 
64                                        See generally                  NUREG-                            1437, Supp. 5, Second Renewal, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 5, Second Renewal, Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Final Report at Ch. 3 (Oct. 2019) (ML19290H346) (2019 FSEIS)                        .
See also generally, e.g.  , Reg. Guide 4.2, Supp. 1, Rev. 1 at 48 (June 2013) (                                                      ML13067A354)                                          (explaining that the environmental baseline is presented in the affected environment discussion).
 
65                                        See generally                  2019                                                            FSEIS                      Ch. 4.
 
66                                        Motion at 13.
 
67                                          2019                                                                                FSEIS §                      4.5.2.2. The no -action alternative and effects on groundwater is also discussed in Se                                    ction 4.5.3.2 (p. 4-41), Section 4.5.7.2 (pp. 4-                              43 to 4-                                                  44), and Section                                                  4.6.2.
 
68                                          2024                                                                                FSEIS                      at 3-1.
 
69                                          2019                                                                                FSEIS                      at 2-23 to 2-                                                  25.
 
13 Contrary to Petitioners claim, those impacts plainly have been compared. And Petitioner
 
identifies no alleged error or deficiency in that comparison, which they ignore en                                  tirely.
 
Second, to the extent Petitioner claims that the 2024 FSE IS                                                                                                                                                                                                                                                                                        fails to adequately analyze the
 
issue of groundwater resources for the no-                                  action alternative, as suggested in the caption for
 
Contention 1-A, 70 it fails to articulate any specific dispute.              In fact, as noted above, Petitioner
 
appears entirely unaware that the analysis in Section                                    4.5.2.2 exists. Therein, the NRC states that the
 
no action alternative would gradually reduce and eventually stop the discharge of condenser cooling
 
water to the C                                CS. 71  The NRC also states the no action alternative would result in a reduced thermal
 
discharge and would reduce groundwater mounding  beneath the CCS.                                                                                                                                          72  Thus, under the no
 
action alternative, the NRC would expect the amount of water needed to support freshening
 
activities to comply with the consent orders could be reduced but probably not stopped.                    73  And
 
the NRC expects that the operation of the recovery well system would need to continue until the
 
initial remediation objectives are met. 74  Petitioner does not acknowledge or dispute any of this
 
information in Section                                    4.5.2.2; instead, Petitioner simply ignores it.
 
Third, Petitioner                          s criticism of Sectio                        n 4.6.2 of the 2019 FSE IS                                                                                                                        provides no support for the
 
contention. Petitioner claims that, although Section                                                                                                                                                  4.6.2 acknowledges the potential benefits of
 
the no action alternative, it purportedly does not objectively analyze, using best available science                  ,
 
how environmental conditions would benefit from the no action alternative.          75  As noted above,
 
there is no reason Petitioner could not have raised this claim earlier, and thus it is inexcusably late.
 
70                                        Motion at 7.
 
71                                          2019                                                                                FSEIS                      at 4-37.
 
72                                          Id.
 
73                                          Id.
 
74                                          Id.
 
75                                        Motion at 13-          14.
 
14 Nevertheless, as relevant t                      o Contention 1-A, Petitioner offers no explanation of how this alleged
 
defect provides a basis or support here. As explained by Petitioner, Contention 1-A asserts that the
 
NRC Staff failed to adequately consider the differences in terms of groundwater contamination.
 
But Section           4.6.2 of the 2019 FSE IS                                                                                                                        pertains to Terrestrial Resources, not groundwater
 
contamination. And Petitioner offers no explanation of why Section 4.6.2 was purportedly
 
required to analyze groundwater contamination, which is evaluated elsewhere in the 2            019 FSEIS.
 
Likewise, Petitioners claims regarding the environmental baseline fail to raise an
 
admissible contention. Petitioner suggests that the discussion of the environmental baseline suffers
 
from flaws          76 and purports to contest[] the NRC Staff                    s reliance on an incorrect environmental
 
baseline.           77 The 2019 FS EIS                                                                                                                                                                      sets the environmental baseline for the SLRA as the environment
 
that currently exists at and around the Turkey Point site.           78 This baseline included the impacts             of
 
past construction and operations of the plant and therefore, presented the nature of t                            hese past
 
actions as well as ongoing actions.           79 Relevant to this proceeding, Section                                                                       3.5.2 of the 2019 FSE IS
 
discusses the environmental baseline for groundwater resources.                     80 This discussion explores the
 
areas hydrology and aquifers;     81 groundwater quality; past contamination and remediation efforts;                           82
 
and groundwater use, including recovery and injection wells. 83 Although Petitioner offers vague
 
76                                         See, e.g.                                   , id. at 12-         13 (claiming the baseline analysis . . .         suffers from flaws.).
 
77                                         Id. at 15.
 
78                                         2019                                                                                 FSEIS                       at 3-1.
 
79                                         Id. at 3-1.
 
80                                         Id. § 3.5.2.
 
81                                         Id. § 3.5.2.1.
 
82                                         Id. § 3.5.2.2.
 
83                                         Id. § 3.5.2.3
 
15 and conclusory assertions suggesting this baseline is somehow improper,  84 Petitioner appears
 
unaware of the existence of the actual                                  environmental baseline discussion in the 2019 FSE IS                                                                                                                        . And
 
Petitioner certainly has notidentifie                          d any material dispute with that unacknowledged analysis.
 
Finally, Petitioner articulates no disagreement with the NRCs conclusion in      the 2024 FSE IS
 
that no new and significant information exists regarding the groundwater resources analysis for the
 
no-action alternative. But, to the extent Petitioner s oblique reference to that conclusion could be
 
interpreted as a challenge, it would be inadmissible. Petitioner offers no                                                          explanation            why that
 
conclusion is wrong, points to no specific missing information, and fails to engage with the
 
definition of significant.
 
In sum, Petitioner provides insufficient factual or expert support for Amended Contention
 
1-A, and supplies insufficient                        information to demonstrate the existence of a genuine dispute on a
 
material issue of law or fact.
 
Accordingly, Amended Contention 1-A is inadmissible because it fails to satisfy multiple
 
criteria in 10 C.F.R. § 2.309(f)(1).
 
C.                                                                                    Contention 1-B (Potable Water)
 
Contention 1-B should be rejected because Petitioner has not satisfied            Sections 2.309(c)(1),


16 and conclusory assertions suggesting this baseline is somehow improper,84 Petitioner appears unaware of the existence of the actual environmental baseline discussion in the 2019 FSEIS. And Petitioner certainly has not identified any material dispute with that unacknowledged analysis.
Finally, Petitioner articulates no disagreement with the NRCs conclusion in the 2024 FSEIS that no new and significant information exists regarding the groundwater resources analysis for the no-action alternative. But, to the extent Petitioners oblique reference to that conclusion could be interpreted as a challenge, it would be inadmissible. Petitioner offers no explanation why that conclusion is wrong, points to no specific missing information, and fails to engage with the definition of significant.
In sum, Petitioner provides insufficient factual or expert support for Amended Contention 1-A, and supplies insufficient information to demonstrate the existence of a genuine dispute on a material issue of law or fact.
Accordingly, Amended Contention 1-A is inadmissible because it fails to satisfy multiple criteria in 10 C.F.R. § 2.309(f)(1).
C.
Contention 1-B (Potable Water)
Contention 1-B should be rejected because Petitioner has not satisfied Sections 2.309(c)(1),
(c)(4), or (f)(1).
(c)(4), or (f)(1).
: 1.                                                                                                                                   Contention 1-B Is Not Based on New and Materially Different Information
: 1.
 
Contention 1-B Is Not Based on New and Materially Different Information In Amended Contention 1-B, Petitioner argues that the NRC employed the wrong standard to determine the impact of the CCS on drinking water and whether the hypersaline groundwater has destabilized the aquifer. But other than purporting to challenge the 2024 FSEIS, Petitioner has not 84 See Motion at 10-11 (discussing the need to analyze baseline data and claiming that [a]n agency cannot rely on future mitigation and monitoring to satisfy its duty to fully analyze the baseline conditions.).  
In Amended Contention 1-B, Petitioner argues that the NRC employed the wrong standard
 
to determine the impact             of the CCS on drinking water and whether the hypersaline groundwater has
 
destabilized the aquifer. But other than purporting to challenge the 2024 FSEIS, Petitioner has not
 
84                                         See                                     Motion at 10-                                                           11 (discussing the need to analyze baseline data and claiming that [a]n agency cannot rely on future mitigation and monitoring to satisfy its duty to fully analyze the baseline conditions.)                 .
 
16 shown that this                                    contention is based on new information because the 2023 D SEIS                                                                                                                                                                                                        uses the same
 
standard.
 
The 2023 DSE IS                                                                                                                                            , like the 2024 FSE IS                                                                                                                                                , uses hypersalinity as a standard and looks at whether
 
the hypersaline plume has destabilized the aquifer to prevent it use beneficial use as drinking water.
 
More specifically, the 2023 DSEIS                                                                                states that with continued freshening of the CCS and continued
 
operation of the [recovery well system (RWS)                            ] to halt and retract the westward migration of that
 
[hypersaline] plume, the operation of Turkey Point Units 3 and 4 during the SLR term would not
 
worsen the hypersaline groundwater plume outside the plant boundary, would not destabilize            th            e
 
groundwater resource, and would not adversely affect the beneficial uses of groundwater offsite by
 
existing users.          85  Using the hypersalinity standard, the 2023 DSEIS                                                                                                                        concluded that impacts on
 
ground water quality during the SLR term would be SMALL unless FPL cannot retract the
 
hypersaline plume to the CCS boundaries in which case they would be MODERATE. 86  This is the
 
same conclusion reached in the 2024 FSE IS                                                                                                                                          . 87
 
Thus, Petitioner has not shown the amended contention is based on new information. If
 
Petitioner wanted to challenge the NRCs use of the hypersalinity standard, it sh                                                                      ould have done so
 
when it filed its challenge to the 2023 DSE IS                                                                                                                        , because it used the same hypersalinity standard.
: 2.                                                                                                                                  Contention 1-B Is Inadmissible
 
If the Board finds that Petitioner satisfied the good cause standard for Contention 1-B, the
 
Board should nonetheless reject it because it is inadmissible.
 
85                                          2023                                                                                DSEIS at 2-31.
 
86                                          Id.
 
87                                          2024                                                                                FSEIS                      at 2-40 (concluding the impacts would be MODERATE if the hypersaline plume continues to extend outside the site boundary and SMALL if the hypersaline plume is retracted.)              .
 
17 In Contention 1-B, Petitioner                        alleges that the 2024 FSE IS                                                                                          employs the wrong standard to
 
determine the impact of the CCS on potable water.          88  According to Petitioner, the NRC
 
inappropriately used a standard for hypersalinity rather than potability to reach its conclusion that
 
the proposed action will have SMALL or MODERATE impacts to groundwater quality. 89
 
Petitioner argues that because the Biscayne aquifer is a source of potable drinking water, the
 
potable water standard must be used to determine whether the continued operation of the CCS will
 
render potable portions of the Biscayne aquifer non-potable.                    90  As explained below, this
 
contention is inadmissible for several reasons.
 
Petitioners basis for Amended Contention 1-  B is based on either a misreading of the
 
2024 FSE IS                                                                                                            or a carefully selected representation of the NRCs analysis. The NRCs analysis
 
considers two reasonably foreseeable scenarios:  (1)                the hypersaline plume not expanding, but
 
continuing to exist beyond the site boundary, and (2) the hypersaline plume being retracted to
 
within the site boundary. 91  Under the first scenario                      , the NRC Staff                                                          determined that impacts would
 
be MODERATE based on the Biscayne aquifers classification as Class [G]-II (potable)
 
groundwater west of the CCS. 92  Under the second scenario                      , the                        NRC Staff determined the impacts
 
would be SMALL based on the aquifers classi    fication as Class G-III (non-potable) groundwater
 
beneath the CCS.93  Thus, the staffs analysis is based, in part, on the location                of the plume during
 
the SLR term.
 
88                                        Motion at 16.
 
89                                          Id.
 
90                                          Id. at 17-          18.
 
91                                          2024                                                                                FSEIS                      at 2-39.
 
92                                          Id. Class G                  -II groundwater is groundwater in an aquifer that can be used for potable water and has a total dissolved solids content of less than 10,000 mg/l. F                        LA. ADMIN. CODE ANN. R. 62-520.410.
 
93                                          Id. at 2-40.
 
18 The NRC recognized that the extent (i.e., location) of the hypersaline plume and impacts to
 
aquifer users are different but related concepts. The NRC found that the hypersaline plume in the
 
shallow aquifer has largely been retracted to the FPL site boundary but extends 0.5 to 1.7 miles west
 
in the deeper aquifer. 94  In contrast, [t]he nearest                                public water supply wells are located about 6
 
mi[les]                                                  (9.7 km) from the northwest corner of the CCS.          95  Based on this, the NRC concluded that,
 
with continued freshening and operation of the recovery well system, operation of Turkey Point
 
would not worsen the hypersaline groundwater plume outside the plant boundary, destabilize the
 
groundwater resource, or adversely affect the beneficial uses of groundwater offsite by existing
 
users.          96
 
Petitioners chief complaint is that the NRC used the wrong standard (hypersalinity) to
 
determine whether the continued CCS operation is sufficient to destabilize [a] drinking water
 
resource.          97  But the NRCs use of hypersalinity as a standard stems from the Florida Department of
 
Environmental Protections (FDEP) Cons                      ent Order,  98 and the recent FDEP Final Order          rejecting
 
challenges to Turkey Points recently renewed NPDES permit.                99  The Consent Order used
 
hypersalinity to gauge the CCSs influence on the saltwater interface,                                    100 as does the Final Order.            101
 
As discussed in the Final Order, the saltwater interface had already moved west of where the CCS is
 
94                                          Id. at 2-38.
 
95                                          Id.
 
96                                          Id.
 
97                                        Motion at 18.
 
98                                          Florida Dept of Envtl. Prot. v. Fla. Power & Light Co.      , OGC File No. 16-0241, Consent Order (Fla. Dept of Envtl. Prot. 2016) ( ML16216A216) (Consent Order).
 
99                                        Florida Keys Aqueduct Auth. v. Fla. Power & Light    , OGC File No. 20-0820, Consolidated Final Order (F  la. Dept of Envtl. Prot. 2022), https://floridadep.gov/sites/default/files/20            -0820.pdf (Final Order).
 
100                            Consent Order ¶  19. The saltwater interface is the location in the aquifer at which Class G                            -II and G-II ground water intersect. Final Order        , Exh. A (Amended Recommended Order)    at 13.
 
101                            Final Order, Exh. A at 23-          24.
 
19 now located nearly two decades before the CCS was even constructed.          102  In light of the fact that
 
numerous activities, not just operation of the CCS bear on the movement of the saltwater
 
interface, FDEP declined            to require FPL to retract the saltwater interface (i.e., the potable water
 
boundary). 103  Instead, FDEP only requires FPL to retract the hypersaline plume, 104 in order to
 
ensure that it is no longer a factor                                                    in the location of the saltwater interface.                        105
 
Indeed, concerns regarding the impact of continued CCS operation on potable                                                                                                                        water
 
supplies were at the core of the FDEP                                proceeding that resulted in issuance of the Final Order. And
 
in that proceeding, FDEP concluded that there was reasonable assurance that all statutory and
 
regulatory water quality requirements would be satisfied, given that implementation of the Consent
 
Order will stop the westward movem        ent of the saltwater interface, to the extent such movement is
 
caused by the discharge of hypersaline water from the CCS into ground water.            106
 
Thus, while the saltwater interface and hypersaline plume do not directly overlap, the
 
Consent Order and Final Order represent a determination by the cognizant state authority that                                    the
 
location of the hypersaline plume is an appropriate proxy                                                      to determine the CCSs impact on the
 
aquifer and its potable water users. Petitioner does not acknowledge or dispute any of this
 
information. And it identifies no reason why the NRCs adoption of that same standard, as a proxy
 
to evaluate whether CCS operation would destabilize the aquifer, is materially deficient.
 
Additionally, Petitioner argues that the NRC should have used Miami-Dade Countys
 
drinking water standard, instead, because the Biscayne aquifer is used for that purpose. 107  As a
 
102                            Id. at 13 (By 1955, the saltwater interface already was located west of where the CCS is now located.).
 
103                            Id. at 74 n.35.
 
104                            Id.
 
105                            Id. at 75 n.37                                        (emphasis added) .
 
106                            Id. at 77-          78, 124.
 
107                            Motion at 18-          19.
 
20 general matter, however, the mere presentation of an alternative analysis method is not enough to
 
demonstrate a material dispute. Petitioner then speculates that non    -potable saltwater from the
 
CCS somehow could reach and impair the currently-potable portion of the Biscayne Aquifer.
 
However, Petitioner cites no authority, and fails to offer so much as a simple explanation, for this
 
dubious theory. Notably, both of these arguments ignore and fail to dispute relevant information in
 
the 2024 FSE IS                                                                                                                                            , including:
* the fact that the nearest drinking water supply well is more than 4 miles                                                                        beyond the furthest historical extent of the hypersaline plume;  108
* the fact that the hypersaline plume, at its current extent, has not affected drinking water;  109 and
* the fact that [a]        scenario where the plume would continue to expand overall within the Biscayne Aquifer was not considered by the staff because it is not reasonable given the available information and the aforementioned requirements that are subject to enforcement by State and local regulators.
 
In other words, Petitioner fails to acknowledge that drinking water is not currently impacted
 
(by either the hypersaline plume or non-        potable saltwater) and fails to engage with the NRCs
 
well-reasoned conclusion that the current state is bounding. Far more is required to demonstrate a
 
genuine dispute of material fact.
 
Ultimately, Petitioners preference for a different analysis method is not enough to
 
demonstrate a material dispute with the 2024 DSEIS. And Petitioner has not otherwise engaged
 
with or attempted to dispute the extensive information showing that the NRCs analysis method is
 
reasonable and appropriate. For those reasons, Contention 1-B lacks the requisite support for an
 
admissible contention and fails to raise a genuine dispute.
 
108                            2024                                                                                FSEIS                      at 2-38.
 
109                            Id. at 2-39.
 
21
 
Accordingly, Amended Contention 1-B is inadmissible because it fails to satisfy multiple
 
criteria in 10 C.F.R. § 2.309(f)(1).
 
D.                                                                                    Contention 1-C (Groundwater Quality)
 
Contention 1-C should be rejected because Petitioner has not demonstrated satisfaction of
 
Sections 2.309(c)(1), (c)(4), or (f)(1).
: 1.                                                                                                                                  Contention 1-C Is Not Based on New and Materially Different Information
 
In Contention 1-C, Petitioner claims that the 2024 FSE IS                                                  incorr                    ectly concluded that the
 
impacts of the proposed action on groundwater quality are SMALL to MODERATE.          110  However,
 
that conclusion to Section                                    2.8.3 of the 2024 FSEIS                                                                                                                        is not newthe exact same conclusion is
 
presented in Section                                    2.8.3 of the 2023 DSE IS                                                                                                                                                        . 111  And despite the NRC Staff            adding several
 
additional pages of discussion to Section                                    2.8.3, Petitioner does                                                            not point to any specific new
 
information in that s                          ection as providing the basis for Contention 1-C. In fact, nothing in the
 
discussion of Contention 1-C appears to meaningfully engage with or dispute one single wordof
 
new information in Section                                    2.8.3. Far more is required to demonstrate good cause for a new or
 
amended contention.
 
As detailed below, Petitioner seeks to challenge information that appeared previously in
 
documents of which the [Petitioner was] well aware.        112  However, questions about that information
 
110                            Motion at 21.
 
111                            Compare 2024                                                                                FSEIS                      at 2-40 with 2023                                                                                DSEIS at 2-31.
 
112                            See Hydro Res., Inc.          (P.O. Box 15910, Rio Rancho, NM 87174), CLI                                          33, 60 NRC 581, 591 (2004)  .
 
22 should have been raised long ago.                    113  It was the [Petitioners] ob                                      ligation to review the record
 
carefully for any material information on this issue.          114  As the Commission has explained:
 
If a party were free to raise new arguments once it realized                that maybe there was something after all to a challenge it either origina lly opted not to make or which simply did not occur to it at the outset,                          NRC adjudicatory proceedings would prove endless.            Thus,          [petitioners]
have an obligation to review the record closely and to raise their arguments promptly.                                                    The Commission must ins          ist that Intervenors and all parties be disciplined in their scrutiny of the record. 115
 
Here, Petitioner seeks to challenge information that has long been available. Thus, it has not
 
demonstrated good cause for submitting Contention 1-C.
: a.                                                                                                                                  Challenges to Mitigation Measures Are Not New
 
First, Petitioner seeks to  recycle prior challenges to FPLs mitigation measures.                                    116
 
Petitioner argues that the effect of the State - and County-ordered remediation activities, which
 
include adding less-saline water to the CCS and extracting more-                              saline water from the Biscayne
 
Aquifer, somehow increases the inland movement of the saltwater interface in the Biscayne
 
aquifer.          117  However, Petitioner identifies no new information about mitigation measures that
 
allegedly arose after the 2023 DSEIS                                                                                                            . In fact, it claims            the opposite. Petitioner readily admits                                                that
 
it raised this concern in its comment letter in response to the 2023 DSE IS                                                                                                                                    .          118  That comment letter
 
was submitted to the NRC on November 26, 2023, one day before                                    Petitioner filed its Petition.              119  If
 
113                            See id.
 
114                            See id.
 
115                            Id. (quoting Duke Energy Corp.            (McGuire Nuclear Station, Units 1 &          2; Catawba Nuclear Station, Units 1 &          2),
CLI-03-17, 58 NRC 419, 428 -          29 (2003) ).
 
116                            Motion at 22.
 
117                            Id.
 
118                            Id. at 22-          23.
 
119                            Letter from A. Siu, Policy Director, Miami Waterkeeper to NRC, Program Management, Announcements and Editing Staff, Notice of Intent for Public Comment on Draft Environmental Impact Statement NUREG                      -          1437, Supplement 5a, Second Renewal, Site-                          Specific Environmental Impact Statement for License Renewal of Nuclear
 
23 Petitioner had this concern when it commented on the 2023 DSEIS                                                                                                                        , the time to raise a challenge on
 
it was in its Petition .
 
And in fact, Petitioner did try to challenge these                                                                                                                            mitigation measures in its original
 
Petition. However, the Board rejected that                      challenge because Petitioner failed to challenge the


analyses in the Draft SEIS [or] show that the Staffs analyses are unreasonable.               120  To the extent
17 shown that this contention is based on new information because the 2023 DSEIS uses the same standard.
The 2023 DSEIS, like the 2024 FSEIS, uses hypersalinity as a standard and looks at whether the hypersaline plume has destabilized the aquifer to prevent it use beneficial use as drinking water.
More specifically, the 2023 DSEIS states that with continued freshening of the CCS and continued operation of the [recovery well system (RWS)] to halt and retract the westward migration of that
[hypersaline] plume, the operation of Turkey Point Units 3 and 4 during the SLR term would not worsen the hypersaline groundwater plume outside the plant boundary, would not destabilize the groundwater resource, and would not adversely affect the beneficial uses of groundwater offsite by existing users.85 Using the hypersalinity standard, the 2023 DSEIS concluded that impacts on ground water quality during the SLR term would be SMALL unless FPL cannot retract the hypersaline plume to the CCS boundaries in which case they would be MODERATE.86 This is the same conclusion reached in the 2024 FSEIS.87 Thus, Petitioner has not shown the amended contention is based on new information. If Petitioner wanted to challenge the NRCs use of the hypersalinity standard, it should have done so when it filed its challenge to the 2023 DSEIS, because it used the same hypersalinity standard.
: 2.
Contention 1-B Is Inadmissible If the Board finds that Petitioner satisfied the good cause standard for Contention 1-B, the Board should nonetheless reject it because it is inadmissible.
85 2023 DSEIS at 2-31.
86 Id.
87 2024 FSEIS at 2-40 (concluding the impacts would be MODERATE if the hypersaline plume continues to extend outside the site boundary and SMALL if the hypersaline plume is retracted.).


Petitioner is attempting to cure those defects in Contention 1-C, its                        attempt is untimely. The
18 In Contention 1-B, Petitioner alleges that the 2024 FSEIS employs the wrong standard to determine the impact of the CCS on potable water.88 According to Petitioner, the NRC inappropriately used a standard for hypersalinity rather than potability to reach its conclusion that the proposed action will have SMALL or MODERATE impacts to groundwater quality.89 Petitioner argues that because the Biscayne aquifer is a source of potable drinking water, the potable water standard must be used to determine whether the continued operation of the CCS will render potable portions of the Biscayne aquifer non-potable.90 As explained below, this contention is inadmissible for several reasons.
Petitioners basis for Amended Contention 1-B is based on either a misreading of the 2024 FSEIS or a carefully selected representation of the NRCs analysis. The NRCs analysis considers two reasonably foreseeable scenarios: (1) the hypersaline plume not expanding, but continuing to exist beyond the site boundary, and (2) the hypersaline plume being retracted to within the site boundary.91 Under the first scenario, the NRC Staff determined that impacts would be MODERATE based on the Biscayne aquifers classification as Class [G]-II (potable) groundwater west of the CCS.92 Under the second scenario, the NRC Staff determined the impacts would be SMALL based on the aquifers classification as Class G-III (non-potable) groundwater beneath the CCS.93 Thus, the staffs analysis is based, in part, on the location of the plume during the SLR term.
88 Motion at 16.
89 Id.
90 Id. at 17-18.
91 2024 FSEIS at 2-39.
92 Id. Class G-II groundwater is groundwater in an aquifer that can be used for potable water and has a total dissolved solids content of less than 10,000 mg/l. FLA. ADMIN. CODE ANN. R. 62-520.410.
93 Id. at 2-40.  


requirements of 10 C.F.R. § 2.309(c) do not provide for a second bite at the proverbial apple simply
19 The NRC recognized that the extent (i.e., location) of the hypersaline plume and impacts to aquifer users are different but related concepts. The NRC found that the hypersaline plume in the shallow aquifer has largely been retracted to the FPL site boundary but extends 0.5 to 1.7 miles west in the deeper aquifer.94 In contrast, [t]he nearest public water supply wells are located about 6 mi[les] (9.7 km) from the northwest corner of the CCS.95 Based on this, the NRC concluded that, with continued freshening and operation of the recovery well system, operation of Turkey Point would not worsen the hypersaline groundwater plume outside the plant boundary, destabilize the groundwater resource, or adversely affect the beneficial uses of groundwater offsite by existing users.96 Petitioners chief complaint is that the NRC used the wrong standard (hypersalinity) to determine whether the continued CCS operation is sufficient to destabilize [a] drinking water resource.97 But the NRCs use of hypersalinity as a standard stems from the Florida Department of Environmental Protections (FDEP) Consent Order,98 and the recent FDEP Final Order rejecting challenges to Turkey Points recently renewed NPDES permit.99 The Consent Order used hypersalinity to gauge the CCSs influence on the saltwater interface,100 as does the Final Order.101 As discussed in the Final Order, the saltwater interface had already moved west of where the CCS is 94 Id. at 2-38.
95 Id.
96 Id.
97 Motion at 18.
98 Florida Dept of Envtl. Prot. v. Fla. Power & Light Co., OGC File No. 16-0241, Consent Order (Fla. Dept of Envtl. Prot. 2016) (ML16216A216) (Consent Order).
99 Florida Keys Aqueduct Auth. v. Fla. Power & Light, OGC File No. 20-0820, Consolidated Final Order (Fla. Dept of Envtl. Prot. 2022), https://floridadep.gov/sites/default/files/20-0820.pdf (Final Order).
100 Consent Order ¶ 19. The saltwater interface is the location in the aquifer at which Class G-II and G-II ground water intersect. Final Order, Exh. A (Amended Recommended Order) at 13.
101 Final Order, Exh. A at 23-24.


because Petitioner                                fell short on its first attempt.
20 now located nearly two decades before the CCS was even constructed.102 In light of the fact that numerous activities, not just operation of the CCS bear on the movement of the saltwater interface, FDEP declined to require FPL to retract the saltwater interface (i.e., the potable water boundary).103 Instead, FDEP only requires FPL to retract the hypersaline plume,104 in order to ensure that it is no longer a factor in the location of the saltwater interface.105 Indeed, concerns regarding the impact of continued CCS operation on potable water supplies were at the core of the FDEP proceeding that resulted in issuance of the Final Order. And in that proceeding, FDEP concluded that there was reasonable assurance that all statutory and regulatory water quality requirements would be satisfied, given that implementation of the Consent Order will stop the westward movement of the saltwater interface, to the extent such movement is caused by the discharge of hypersaline water from the CCS into ground water.106 Thus, while the saltwater interface and hypersaline plume do not directly overlap, the Consent Order and Final Order represent a determination by the cognizant state authority that the location of the hypersaline plume is an appropriate proxy to determine the CCSs impact on the aquifer and its potable water users. Petitioner does not acknowledge or dispute any of this information. And it identifies no reason why the NRCs adoption of that same standard, as a proxy to evaluate whether CCS operation would destabilize the aquifer, is materially deficient.
Additionally, Petitioner argues that the NRC should have used Miami-Dade Countys drinking water standard, instead, because the Biscayne aquifer is used for that purpose.107 As a 102 Id. at 13 (By 1955, the saltwater interface already was located west of where the CCS is now located.).
103 Id. at 74 n.35.
104 Id.
105 Id. at 75 n.37 (emphasis added).
106 Id. at 77-78, 124.
107 Motion at 18-19.  


Likewise, these same arguments were presented                                    and rejectedin the Turkey Point
21 general matter, however, the mere presentation of an alternative analysis method is not enough to demonstrate a material dispute. Petitioner then speculates that non-potable saltwater from the CCS somehow could reach and impair the currently-potable portion of the Biscayne Aquifer.
However, Petitioner cites no authority, and fails to offer so much as a simple explanation, for this dubious theory. Notably, both of these arguments ignore and fail to dispute relevant information in the 2024 FSEIS, including:
the fact that the nearest drinking water supply well is more than 4 miles beyond the furthest historical extent of the hypersaline plume;108 the fact that the hypersaline plume, at its current extent, has not affected drinking water;109 and the fact that [a] scenario where the plume would continue to expand overall within the Biscayne Aquifer was not considered by the staff because it is not reasonable given the available information and the aforementioned requirements that are subject to enforcement by State and local regulators.
In other words, Petitioner fails to acknowledge that drinking water is not currently impacted (by either the hypersaline plume or non-potable saltwater) and fails to engage with the NRCs well-reasoned conclusion that the current state is bounding. Far more is required to demonstrate a genuine dispute of material fact.
Ultimately, Petitioners preference for a different analysis method is not enough to demonstrate a material dispute with the 2024 DSEIS. And Petitioner has not otherwise engaged with or attempted to dispute the extensive information showing that the NRCs analysis method is reasonable and appropriate. For those reasons, Contention 1-B lacks the requisite support for an admissible contention and fails to raise a genuine dispute.
108 2024 FSEIS at 2-38.
109 Id. at 2-39.


NPDES renewal proceeding. For example, challengers there contented that the mitigation measures
22 Accordingly, Amended Contention 1-B is inadmissible because it fails to satisfy multiple criteria in 10 C.F.R. § 2.309(f)(1).
D.
Contention 1-C (Groundwater Quality)
Contention 1-C should be rejected because Petitioner has not demonstrated satisfaction of Sections 2.309(c)(1), (c)(4), or (f)(1).
: 1.
Contention 1-C Is Not Based on New and Materially Different Information In Contention 1-C, Petitioner claims that the 2024 FSEIS incorrectly concluded that the impacts of the proposed action on groundwater quality are SMALL to MODERATE.110 However, that conclusion to Section 2.8.3 of the 2024 FSEIS is not newthe exact same conclusion is presented in Section 2.8.3 of the 2023 DSEIS.111 And despite the NRC Staff adding several additional pages of discussion to Section 2.8.3, Petitioner does not point to any specific new information in that section as providing the basis for Contention 1-C. In fact, nothing in the discussion of Contention 1-C appears to meaningfully engage with or dispute one single word of new information in Section 2.8.3. Far more is required to demonstrate good cause for a new or amended contention.
As detailed below, Petitioner seeks to challenge information that appeared previously in documents of which the [Petitioner was] well aware.112 However, questions about that information 110 Motion at 21.
111 Compare 2024 FSEIS at 2-40 with 2023 DSEIS at 2-31.
112 See Hydro Res., Inc. (P.O. Box 15910, Rio Rancho, NM 87174), CLI-04-33, 60 NRC 581, 591 (2004).


would increase[] the hydrostatic head of water seeping from the CCS and exacerbate the
23 should have been raised long ago.113 It was the [Petitioners] obligation to review the record carefully for any material information on this issue.114 As the Commission has explained:
If a party were free to raise new arguments once it realized that maybe there was something after all to a challenge it either originally opted not to make or which simply did not occur to it at the outset, NRC adjudicatory proceedings would prove endless. Thus, [petitioners]
have an obligation to review the record closely and to raise their arguments promptly. The Commission must insist that Intervenors and all parties be disciplined in their scrutiny of the record.115 Here, Petitioner seeks to challenge information that has long been available. Thus, it has not demonstrated good cause for submitting Contention 1-C.
: a.
Challenges to Mitigation Measures Are Not New First, Petitioner seeks to recycle prior challenges to FPLs mitigation measures.116 Petitioner argues that the effect of the State-and County-ordered remediation activities, which include adding less-saline water to the CCS and extracting more-saline water from the Biscayne Aquifer, somehow increases the inland movement of the saltwater interface in the Biscayne aquifer.117 However, Petitioner identifies no new information about mitigation measures that allegedly arose after the 2023 DSEIS. In fact, it claims the opposite. Petitioner readily admits that it raised this concern in its comment letter in response to the 2023 DSEIS.118 That comment letter was submitted to the NRC on November 26, 2023, one day before Petitioner filed its Petition.119 If 113 See id.
114 See id.
115 Id. (quoting Duke Energy Corp. (McGuire Nuclear Station, Units 1 & 2; Catawba Nuclear Station, Units 1 & 2),
CLI-03-17, 58 NRC 419, 428-29 (2003)).
116 Motion at 22.
117 Id.
118 Id. at 22-23.
119 Letter from A. Siu, Policy Director, Miami Waterkeeper to NRC, Program Management, Announcements and Editing Staff, Notice of Intent for Public Comment on Draft Environmental Impact Statement NUREG-1437, Supplement 5a, Second Renewal, Site-Specific Environmental Impact Statement for License Renewal of Nuclear


movement of the hypersaline plume.           121 Simply put, these theories, and the information upon
24 Petitioner had this concern when it commented on the 2023 DSEIS, the time to raise a challenge on it was in its Petition.
 
And in fact, Petitioner did try to challenge these mitigation measures in its original Petition. However, the Board rejected that challenge because Petitioner failed to challenge the analyses in the Draft SEIS [or] show that the Staffs analyses are unreasonable.120 To the extent Petitioner is attempting to cure those defects in Contention 1-C, its attempt is untimely. The requirements of 10 C.F.R. § 2.309(c) do not provide for a second bite at the proverbial apple simply because Petitioner fell short on its first attempt.
which they are based, simply are not new.
Likewise, these same arguments were presentedand rejectedin the Turkey Point NPDES renewal proceeding. For example, challengers there contented that the mitigation measures would increase[] the hydrostatic head of water seeping from the CCS and exacerbate the movement of the hypersaline plume.121 Simply put, these theories, and the information upon which they are based, simply are not new.
: b.                                                                                                                                   The Petition Does Not Identify Any New Information
: b.
 
The Petition Does Not Identify Any New Information Moreover, the limited portions of Section 2.8.3 of the 2024 FSEIS that are, in fact, cited in Contention 1-C do not contain any new information (much less, anything that is materially different).
Moreover, the limited portions of Section           2.8.3 of the 2024 FSE IS                                                                                                                        that are, in fact, cited in
Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Draft Report for Comment, Docket Nos. 50-250 and 50-251; NRC-2022-0172 at Section II.B (Nov. 26, 2023)
 
Contention 1-C do not contain any new information (much less, anything that is materially
 
different).
 
Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Draft Report for Comment, Docket Nos. 50-                                                   250 and 50-251; NRC-2022-                                                                               0172 at Section         II.B (Nov. 26, 2023)
(ML23333A022).
(ML23333A022).
120 Turkey Point, LBP-24-03, 99 NRC at __ (slip op. at 22).
121 Final Order at 78 ¶ 302.


120                            Turkey Point, LBP                                        03, 99 NRC at __ (slip op. at 22).
25 First, Petitioner criticizes the discussion for allegedly failing to adequately acknowledge the transport and fate of saline water emanating from the [CCS].122 But as Petitioner noted, it raised this concern in its comment letter,123 so this obviously is not new.
 
Second, it discusses the NRCs resolution of that comment in an appendix to the 2024 FSEIS.124 Petitioners apparent complaint is that the NRC did not make any changes from the 2023 DSEIS to the 2024 FSEIS to address that comment.125 As Petitioner concedes, this complaint also does not identify any new information in Section 2.8.3 that purportedly is being challenged.
121                            Final Order at 78 ¶ 302.
Third, Petitioner notes that the analysis in Section 2.8.3 of the 2024 FSEIS posits two scenarios, one in which the plume is retracted to within the site boundary and one in which it is not.126 However, those are the same two scenarios described in Section 2.8.3 of the 2023 DSEIS.127 Fourth, Contention 1-C references the 2024 FSEIS for the values of the CCS salinity target (34 PSU), freshening well withdrawal allocation (10,950 MGY), and chloride concentration (19,000 mg/L) used in the NRC Staffs analysis.128 But those same values are also articulated in the 2023 DSEIS.129 That information is not new.
 
The Petition also devotes several pages to summarizing Dr. Nuttles Report (Nuttle Report). As detailed below, that document also does not purport to rely on or challenge any new information.
24 First, Petitioner                         criticizes the discussion for allegedly failing to adequately acknowledge the
122 Motion at 22-23. See also id. at 22-25 (discussing the volume of saline water).
 
123 Id. at 23.
transport and fate of saline water emanating from the [CCS].                                                           122 But as Petitioner noted, it
124 Id. at 23-24.
 
125 2024 FSEIS at A-45 to A-46.
raised this concern in its comment letter,                     123 so this obviously is not new.
126 Motion at 24-25 (citing 2024 FSEIS at 2-39).
 
127 2023 DSEIS at 2-22 to 2-31.
Second, it discusses the NRCs resolution of that comment in an appendix to the
128 Motion at 31-32 n.120, 31 n.121, 32-33 n.124.
 
129 2023 DSEIS at 2-23 to 2-24.
2024 FSE IS                                                                                                            . 124 Petitioners apparent complaint is that the NRC did not                                           make any changes from the


2023 DSEIS                                                                                                            to the 2024 FSE IS to address that comment.             125  As Petitioner concedes,                       this            complaint
26
: c.
The Nuttle Report Does Not Identify Any New Information In his Report, Dr. Nuttle focuses on the design of the CCS and the conditions that existed over 50 years ago and on FPLs past remediation activities.130 For example, Dr. Nuttle claims that the volume of CCS water present in the aquifer exceeds the capacity of the RWS.131 But this is based on conditions that existed [b]etween 2009 and 2015, which is before the Consent Order and much of FPLs remediation efforts.132 Dr. Nuttle also discusses estimates for the volume of CCS water in the aquifer from 2013 but does not update this estimate to account for FPLs remediation work.133 Dr. Nuttle next discusses two groundwater modeling studiesone from 2009 and one from 2018that looked that the effect of CCS had on salt water intrusion.134 None of this is new information.
In fact, the Nuttle Report cites the 2024 FSEIS only three times. First, he cites the impact conclusion of SMALL to MODERATE.135 But, as noted above, that conclusion is not new.
Second, cites the Staffs conclusion in the 2024 FSEIS that continued operation during the SLR term would have no additional adverse effect on the beneficial use of groundwater offsite by existing users.136 But that conclusion is not new either. The 2023 DSEIS also concluded that continued operation during the SLR term would not adversely affect the beneficial uses of groundwater offsite by existing users.137 Third, he cites a table titled Table 2-4: Turkey Point 130 See id. at 3-25.
131 Motion, Attach. A at 17 (Nuttle Report).
132 Id.
133 Id.
134 Id. at 18-20.
135 Id. at 2 (citing 2024 FSEIS, page not specified).
136 Id. at 3 (citing 2024 FSEIS at 2-39).
137 2023 DSEIS at 2-31.


also does not identify any new information in Section                                     2.8.3 that purportedly is being challenged.
27 Groundwater Withdrawal Wells.138 But the exact same table was presented in the 2023 DSEIS.139 Dr. Nuttles discussion of pre-existing information fails to identify anything that is new, much less materially so. And he otherwise identifies no allegedly new information that forms the basis for his disagreement with these previously available conclusions and tables.
Notably, the 2023 DSEIS and 2024 FSEIS discuss extensive new information, including five years of updated monitoring well data. Both Petitioners and Dr. Nuttles failure to engage with the 2024 FSEISs discussion of that new information is particularly conspicuous because it directly refutes many of Dr. Nuttles assertions and conclusions.
Ultimately, nothing in the Motion or the Nuttle Report identifies any new information (much less, any that is materially different) to satisfy the good cause standard. Accordingly, the Motion should be denied to the extent it seeks admission of Contention 1-C.
: 2.
Contention 1-C Is Inadmissible If the Board finds that Petitioner satisfied the good cause standard for Contention 1-C, the Board should nonetheless reject it because it is inadmissible. In Contention 1-C, Petitioner seeks to challenge the groundwater quality discussion in Section 2.8.3 because it allegedly fails to consider (or adequately consider) the purported negative effects of the remediation measures ordered by the cognizant state and local regulators. However, these claims are inadmissible for multiple, overlapping reasons. As an overarching matter, Petitioner and Dr. Nuttle base their analysis on outdated information or bare speculation that pre-dates the availability of actual monitoring data related to the mitigation measures. This leaves their claims far short of satisfying the requirement in 10 C.F.R. § 2.309(f)(1)(v) to identify adequate support for their contention. Likewise, they largely 138 Nuttle Report at 14 (citing 2024 FSEIS at 2-1[8], tbl. 2-4).
139 2023 DSEIS at 2-17, tbl. 2-4.  


Third, Petitioner notes that the analysis in Section                                    2.8.3 of the 2024 FSE IS                                                                                                                        posits two
28 ignore the extensive data analyzed or referenced in the 2024 FSEIS that is directly relevant to their claims (and which undermines or entirely refutes their speculative theories and outdated analyses).
By sidestepping this information, they have failed to raise a genuine dispute with the 2024 FSEIS on a material issue of fact or law, as required by 10 C.F.R. § 2.309(f)(1)(vi). Accordingly, Contention 1-C is inadmissible.
: a.
Petitioners Claims Fail to Raise a Genuine Dispute Because They Are Based on Outdated Information and Fail to Acknowledge or Controvert the Updated Information in the 2024 FSEIS Dr. Nuttle claims that the volume of CCS water present in the aquifer exceeds the capacity of the RWS.140 According to his estimate, the estimated total volume of CCS water present in the aquifer is 123 billion gallons, whereas at the current rate of [RWS] pumping removing 123 billion gallons would take about 30 years. Extrapolating from his assertion, Dr. Nuttle believes the current rate of RWS pumping is approximately 11 million gallons per day (MGD).141 But, as noted in the 2024 FSEIS, the current rate is actually 15 MGD.142 And FPL has requested approval from State and local authorities to pump 22 MGD, essentially twice the value Dr. Nuttle used.143 However, he fails to acknowledge, engage with, or dispute this updated information, and fails to explain how or why his analysis remains relevant in light of it. Far more is required to raise a genuine dispute.
Petitioner and Dr. Nuttle also claim that the rate of discharge (i.e., seepage or leakage) from the CCS to the aquifer is 9 MGD.144 But these claims appear to be based on old estimates 140 Nuttle Report at 17.
141 123,000,000,000 divided by 30 years, divided by 365 days, is 11.232 MGD.
142 See 2024 FSEIS at 2-18, tbl. 2-4.
143 Id. at 2-34.
144 Motion at 31; Nuttle Report at 17.


scenarios, one in which the plume is retracted to within the site            boundary and one in which it is
29 from 2013, when the CCS was hypersaline and before the RWS became operational.145 These claims ignore recent actual monitoring data presented in the 2024 FSEIS that directly contradict Petitioners and Dr. Nuttles outdated estimates. The 2024 FSEIS discusses seepage data and states that from 2017 to 2023, there has been a net seepage of approximately 1.2 MGD out of the CCS.146 The 2024 FSEIS also states that for the most recent annual reporting period (June 2022 through May 2023), FPL reported a net seepage of approximately 4 MGD out of the CCS.147 In other words, the actual data from the monitoring wells shows that the net seepage is far below Petitioners and Dr. Nuttles outdated estimate of 9 MGD.148 This is all discussed in the 2024 FSEIS, but Petitioner and Dr. Nuttle ignore that discussion for their analysis.
Petitioner also speculates that there will still be a net addition of salt to the Biscayne Aquifer from the [CCS], even if the [RWS] works as designed.149 However, that theoretical speculation is unsupported and disregards the actual, available data showing the exact opposite.
Actual data from monitoring wells west of the CCS show decreases in chloride since remediation began.150 FPLs Remedial Action Annual Status Report (RAASR) - Year 5 (2023 RAASR)151 also explains that during the most recent annual reporting period,152 FPL removed 2.37 billion pounds of salt (1.18 million tons).153 In comparison, FPLs 2023 Annual Monitoring Report (cited 145 Nuttle Report at 17.
146 2024 FSEIS at 2-25.
147 Id.
148 Motion at 31; Nuttle Report at 17.
149 Motion at 23.
150 Petition, Exh. 9 at 3-10 to 3-21.
151 The RAASR is prepared annually to document compliance with the Consent Order and Consent Agreement and to document the results of the RWS. The RAASRs are public documents and the 2023 RAASR was referenced and relied upon in the 2024 FSEIS. The 2023 RAASR was attached as Exhibit 9 to the original Petition and Dr. Nuttle references a few limited portions of the 2023 RAASR in his May 2024 Report. See Nuttle Report.
152 The 2023 RAASR reporting period is from July 1, 2022, through June 30, 2023.
153 Id. at 2-4.


not. 126  However, those are the same two scenarios described in Section                    2.8.3 of the 2023 DSE IS                                                                                                                        . 127
30 by both the 2024 FSEIS and Dr. Nuttle)154 acknowledges a net outflow of 62.7 tons of salt per day from the CCS, or approximately 23,000 tons of salt for the reporting period.155 While the annual reporting periods for the two reports are offset by one month, the data from publicly available reports upon which the 2024 FSEIS relies show that FPL is withdrawing significantly more salt than leaves the CCS (approximately 48 times more during the 2022-2023 timeframe alone: 23,000 tons annual outflow versus 1,100,000 tons annual withdrawal). Given this material information, which Petitioner ignores and fails to dispute, its net addition of salt argument fails to demonstrate a genuine dispute of material fact here.
 
As noted in the 2024 FSEIS, the NRC has considered actual monitoring data confirming that the remediation activities have largely halt[ed] the westward advance of the saltwater interface [i.e., not just the hypersaline plume] in the Biscayne Aquifer.156 Neither Petitioner nor Dr. Nuttle acknowledge or grapple with that new monitoring data. Far more is required to raise a genuine dispute.
Fourth, Contention 1-C references the 2024 FSEIS                                                                                                                                            for the            values of the CCS salinity target
: b.
 
The Limited References to the 2024 FSEIS in Contention 1-C Fail to Demonstrate a Genuine Dispute As noted above, Petitioner and Dr. Nuttle reference certain limited portions of the 2024 FSEIS that do not contain any new information compared to what was available in the 2023 DSEIS. Aside from failing to provide the good cause required for a new contention, those references also fail to demonstrate a genuine dispute on a material issue of fact or law.
(34 PSU), freshening well withdrawal allocation (10,950 MGY), and chloride concentration (19,000
154 2024 FSEIS at 4-8; Nuttle Report at 26.
 
155 Turkey Point Clean Energy Center Annual Monitoring Report at 4-6 to 4-7 (Aug. 31, 2023),
mg/L) used in the NRC Staff            s analysis  . 128  But those same values are also articulated in the
 
2023 DSEIS                                                                                                            . 129  That information is not new.
 
The Petition also devotes several pages to summarizing Dr. Nuttle                                                                      s    Report (Nuttle
 
Report)        . As detailed below, that document also does not purport to rely on or challenge any new
 
information.
 
122                            Motion at 22-          23. Se                    e also id. at 22-          25 (discussing the volume of saline water).
 
123                            Id. at 23.
 
124                            Id. at 23-          24.
 
125                            2024                                                                                FSEIS                      at A-45 to A-46.
 
126                            Motion at 24-          25 (citing 2024                    FSEIS                      at 2-39).
 
127                            2023                                                                                DSEIS at 2-22 to 2-                              31.
 
128                            Motion at 31-          32 n.120, 31 n.121,  32-          33 n.124.
 
129                            2023                                                                                DSEIS at 2-23 to 2-24.
 
25
: c.                                                                                                  The Nuttle Report Does Not Identify Any New Information
 
In his Report, Dr. Nuttle                        focuses on the design of the CCS and the conditions that existed
 
over 50 years ago and on FPLs                past            remediation activities.              130  For example, Dr. Nuttle claims that
 
the volume of CCS water present in the aquifer exceeds the capacity of the RW                                    S.          131  But this is
 
based on conditions that existed [b]etween 2009 and 2015, which is before the Consent Order and
 
much of FPLs remediation efforts.      132  Dr. Nuttle also discusses estimates for the volume of CCS
 
water in the aquifer from 2013 but does not update this estimate to account for FPLs remediation
 
work. 133  Dr. Nuttle next discusses two groundwater modeling studiesone from 2009 and one
 
from 2018that looked that the effect of CCS had on salt water intrusion.                                      134  None of this is new
 
information.
 
In fact, the Nuttle Report cites            the 2024 FSE IS                                                                                                                                                          only threetimes. First, h                                                                                          e cites the impact
 
conclusion of SMALL to MODERATE. 135  But, as noted above, that conclusion is not new.
 
Second, cites the                                                                                                Staffs conclusion in the 2024 FSEISthat continued operation during the SLR
 
term would have no additional adverse effect on the beneficial use of groundwater offsite by
 
existing users.          136  But that conclusion is not new either. The 2023 DSE IS                                                                                                                        also concluded that
 
continued operation during the SLR term would not adversely affect the beneficial uses of
 
groundwater offsite by existing users.          137  Third, he cites a tabletitled Table                                                      2-4: Turkey Point
 
130                            See id. at 3-25.
 
131                            Motion, Attach. A at 17 (      Nuttle Report)      .
 
132                            Id.
 
133                            Id.
 
134                            Id. at 18-          20.
 
135                            Id. at 2 (citing 2024 FSEIS, page not specified).
 
136                            Id. at 3 (citing 2024 FSEIS                      at 2-39).
 
137                            2023                                                                                DSEIS at 2-31.
 
26 Groundwater Withdrawal Wells.          138  But the exact same table was presented in the 2023 DSEIS                                                                                                                                                                . 139
 
Dr. Nuttles discussion of pre-    existing information fails to identify anythin g that is new, much
 
less materially so. And he otherwise identifies no allegedly new information that forms the basis
 
for his disagreement with these previously available conclusions and tables.
 
Notably, the 2023 DSE IS                                                                                                                                                                                              and 2024 FSE IS                                                                                                                                                                        discuss extensive new information, including five
 
years of updated monitoring well data. Both Petitioners                                        and Dr. Nuttles failure to engage with the
 
2024 FSEISs discussion of that new information is particularly conspicuous because itdirectly
 
refutes many of Dr. Nuttles assertions and conclusions.
 
Ultimately, nothing in the Motion or the Nuttle Report identifies any new                                                            information (much
 
less, any that is materially different) to satisfy the good cause standard. Accordingly, the Motion
 
should be denied to the extent it seeks admission of Contention 1-C.
: 2.                                                                                                                                  Contention 1-C Is Inadmissible
 
If the Board finds that Petitioner satisfied the good cause standard for Contention 1-C, the
 
Board should nonetheless reject it because it is inadmissible. In Contention 1-C, Petitioner                        seeks to
 
challenge the groundwater quality discussion in Section                                                                    2.8.3 because it allegedly fails to consider
 
(or adequately consider) the purported negative effects of the remediation measures ordered by the
 
cognizant state and local regulators. However, these claims are inadmissible for multiple,
 
overlapping reasons. As an overarching matter, Petitioner and Dr. Nuttle                                                            base their analysis on
 
outdated information or bare speculation that pre-dates the availability of actual monitoring data
 
related to the mitigation measures. This leaves their claims far short of satisfying the requirement in
 
10 C.F.R. § 2.309(f)(1)(v) to identify adequate support for their contention. Likewise, they largely
 
138                            Nuttle Report            at 14                                        (citing 2024                                        FSEIS                      at 2-1[8], tbl. 2-                              4).
 
139                            2023                                                                                DSEIS at 2-17, tbl. 2-4.
 
27 ignore the extensive data analyzed                                            or referenced in            the 2024 FSE IS                                                                                                                                                          that is directly relevant to their
 
claims (and which undermines or entirely refutes their speculative theories and outdated analyses).
 
By sidestepping this information, they have failed to raise a genuine dispute with the 2024 FSE IS
 
on a material issue of fact or law, as required by 10 C.F.R. § 2.309(f)(1)(vi). Accordingly,
 
Contention 1-C is inadmissible.
: a.                                                                                                                                  Petitioners Claims Fail to Raise a Genuine Dispute Because They Are Based on Outdated Information and Fail to Acknowledge or Controvert the Updated Information in the 2024 FSEIS
 
Dr. Nuttle claims that the volume of CCS water present in the aquifer exceeds the capacity
 
of the RWS.          140  According to his estimate, the estimated total volume of CCS water present in the
 
aquifer is 123 billion gallon                                                                                                s, whereas at the current rate of [RWS] pumping removing 123 billion
 
gallons would take about 30 years. Extrapolating from his assertion, Dr. Nuttle believes the
 
current rate of RWS pumping is approximately 11 million gallons per day (M                          GD)                                                                              . 141  But, as
 
noted in the 2024 FSE IS                                                                                                                        , the current rate is actually 15                                        MGD.              142  And FPL has requested
 
approval from State and local authorities                        to pump 22 MGD, essentially twice                                                                                                            the value Dr. Nuttle
 
used. 143  However, he fails to acknowledge, engage with, or dispute this updated information, and
 
fails to explain how or why his analysis remains relevant in light of it. Far more is required to raise
 
a genuine dispute.
 
Petitioner and Dr. Nuttle also claim that the rate of discharge (i.e., seepage or                                                                                            leakage)
 
from the CCS to the aquifer is 9 MGD.                                                                                                                      144  But these claims                        appear to be based on old estimates
 
140                            Nuttle Report at 17.
 
141                            123,000,000,000 divided by 30 years, divided by 365 days, is 11.232 MGD.
 
142                            See 2024                                        FSEIS                      at 2-18, tbl. 2-4.
 
143                            Id. at 2-34.
 
144                            Motion at 31; Nuttle Report at 17.
 
28 from 2013, when the CCS was hypersaline and before the RWS became operational. 145  These
 
claims ignore recent actual monitoring data presented in the 2024 FSE IS                                                                                                                                                                                that directly contradict
 
Petitioners and Dr. Nuttles                                                                    outdated estimates                    .          The 2024 FSE IS                                                                                                                                              discusses seepage data and
 
states that from 2017 to 2023, there has been a net seepage of approximately 1.2 MGD out of the
 
CCS.          146  Th                        e 2024 FSE IS                                                                                                                                              also states that for the most recent annual reporting period (June 2022
 
through May 2023), FPL reported a net seepage of approximately 4 MGD out of the CCS.          147  In
 
other words, the actual data from the monitoring wells shows that the net seepage is far below
 
Petitioners and Dr. Nuttles outdated estimate                                      of 9            MGD.              148  This is all discussed in the
 
2024 FSE IS                                                                                                            , but Petitioner and Dr. Nuttle ignore that                        discussion for their analysis.
 
Petitioner also            speculates that                                                                                there will still be a net a ddition of salt            to the Biscayne
 
Aquifer from the [CCS], even if the [RWS] works as designed.                          149  However, that theoretical
 
speculation is unsupported and disregards the actual, available data showing the exact opposite.
 
Actual data from monitoring wells              west of the CCS show decreases in chloride since remediation
 
began. 150  FPLs                            Remedial Action Annual Status Report (RAASR)                              - Year 5 (2023 RAASR                                                                                                                                                                                )          151
 
also explains that during the most recent annual reporting period,              152 FPL removed 2.37 billion
 
pounds of salt (1.18 million tons).                                                                                                          153  In comparison,                        FPLs 2023 Annual Monitoring Report (cited
 
145                            Nuttle Report at 17.
 
146                            2024                                                                                FSEIS                      at 2-25.
 
147                            Id.
 
148                            Motion at 31; Nuttle Report at 17.
 
149                            Motion at 23.
 
150                            Petition, Exh. 9 at 3-                    10 to 3-21.
 
151                            The RAASR is prepared annually to document compliance with the Consent Order and Consent Agreement and to document the results of the RWS. The RAASRs are public documents and the        2023                    RAASR was referenced and relied upon in the 2024 FSEIS. The                        2023 RAASR was attached as Exhibit 9 to the original Petition                                        and Dr. Nuttle references                                    a few limited portions of the 2023 RAASR in his May 2024 Report  . See Nuttle Report.
 
152                            The 2023 RAASR reporting period is from July 1, 2022,                                              through June  30, 2023.
 
153                            Id. at 2-4.
 
29 by both the 2024 FSEIS and Dr. Nuttle) 154 acknowledges a net outflow of 62.7 tons of salt per day
 
from the CCS, or approximately 23,000 tons of salt for the re          porting period. 155 While the annual
 
reporting periods for the two reports are offset by one month, the data from                                                                                 publicly available
 
reports upon which the 2024 FSEIS relies show that FPL is withdrawing significantly more salt than
 
leaves the CCS (approximately 48 times more during the 2022-2023 timeframe alone                     : 23,000 tons
 
annual outflow versus 1,100,000 tons annual withdrawal). Given this material information, which
 
Petitioner ignores and fails to dispute, its net addition of salt argument fails to demonstrate a
 
genuine dispute of material fact here.
 
As noted in the 2024 FS EIS                                                                                                                        , the NRC has considered actual monitoring data confirming
 
that the remediation activities have largely halt[ed] the westward advance of the saltwater
 
interface [i.e., not just the hypersaline plume] in the Biscayne Aquifer.           156 Neither Petitioner nor
 
Dr. Nuttle acknowledge or grapple with that new monitoring data. Far more is required to raise a
 
genuine dispute.
: b.                                                                                                                                   The Limited References to the 2024 FSEIS                                                                                                                                                                                         in Contention 1-C Fail to Demonstrate a Genuine Dispute
 
As noted above, Petitioner and Dr. Nuttle reference certain limited portions of the
 
2024 FSE IS                                                                                                            that do not contain any new information compared to what was available in the
 
2023 DSEIS                                                                                                           . Aside from failing to provide the good cause required for a new contention, those
 
references also fail to demonstrate a genuine dispute on a material issue of f      act or law.
 
154                             2024                                                                               FSEIS at 4-8; Nuttle Report at 26.
 
155                             Turkey Point Clean Energy Center Annual Monitoring Report at 4-               6 to 4-7 (Aug. 31, 2023),
https://ecmrer.miamidade.gov/hpi/search (Full-Text Search: 2023 Annual Monitoring Report; Facility Name:
https://ecmrer.miamidade.gov/hpi/search (Full-Text Search: 2023 Annual Monitoring Report; Facility Name:
Turkey Point; Case No.: HWR-                                                                                         01006; Folio: 3070270000010) . The reporting period for the 2023 Annual Monitoring Report is from June             1, 2022,                                         through May                     31, 2023.
Turkey Point; Case No.: HWR-01006; Folio: 3070270000010). The reporting period for the 2023 Annual Monitoring Report is from June 1, 2022, through May 31, 2023.
 
156 Id. at 2-30.  
156                             Id. at 2-30.
 
30 First, Petitioner criticizes Section 2.8.3 of the 2024 FSEIS for allegedly providing an
 
inadequate analysis of the transport and fate of saline water emanating from the [CCS]                                              157 and
 
for only considering two scenarios related to the extent of the hypersaline plume.                    158  And it
 
disputes the NRC Staff                                            s conclusion in the 2024 FSEIS that continued operation during the SLR
 
term would have no additional adverse effect on the beneficial use of groundwater offsite by
 
existing users.          159  However, Petitioner and Dr. Nuttle fail to acknowledge and controvert the
 
information in the 2024 FSE                                                                                                                        IS relevant to these arguments. They disregard the fact that the goal of
 
the RWS (in regard to the CCS) is not merely to intercept hypersaline water. Rather, its goal is to
 
prevent additional CCS-        sourced water, regardless                                of salinity (i.e., hypersaline, saline, brackish, or
 
fresh), from moving inland. 160
 
Furthermore, the analysis provided in the 2023 RAASR                                                                                                                        , upon which the NRC relied in
 
developing the 2024 FSE IS                                                                                                                        , indicates that the RWS is highly effective in this regard  but Petitioner
 
does                                                not say a single word about that information. 161  And as noted above, Petitioner fails to
 
acknowledge or engage with the actual data underlying the 2024 FSE IS                                                                                                                                                                                                                                                      showing that the mitigation
 
measures have halted the westward advance of the saltwater interface                                      in the Biscay          ne Aquifer.            162
 
157                            Motion at 22-          23. See also id. at 2                                        2-          25 (discussing the volume of saline water).
 
158                            Id. at 24-          25 (citing 2024                    FSEIS                      at 2-39). See also                                                                      id. at 26 (citing 2024                              FSEIS                      at 2-39).
 
159                            Nuttle Report          at 3 (citing 2024                    FSEIS                      at 2-39).
 
160                            2024                                                                                FSEIS                      at 2-30. See also                      Final Order, Exh. A at 69 (The RWS                                                          create[es] a hydraulic barrier such that none                                                            of the CCS water that seeps into ground water is able to move westward past the RWS. The extraction of the hypersaline ground water beneath the CCS reduces the driving force that contributed to lateral movement away from the CCS thereby halting the westward migration of hypersaline water from the CCS. Thus, since May 2018, the RWS has functionedand continues to functionas a hydrologic barrier that has halted the                                                                                                                                westward movement of hypersaline water from the CCS.          ).
 
161                            The 2023                                        RAASR explains that        RWS operations extend the hydraulic barrier effect of the interceptor ditch (ID) operation in the upper portion of the Biscayne aquifer to the base of the aquifer.                            Petition, Exh. 9 at 2-                    1. It also notes that particle tracking                                    confirmed hypersaline water from the CCS is intercepted, captured, and contained beneath the CCS and no longer migrates into the compliance zone and that the RWS prevents water from the CCS from flowing through and westward past the RWS. Id.                                at 5-9. Petitioner                              and Dr. Nuttle ignore and do not dispute this discussion.
 
162                            2024                                                                                FSEIS                      at 2-30 (emphasis added).
 
31 Given this fact-based conclusion, plus the extensive new monitoring data discussed in the
 
2024 FSE IS                                                                                                            , which Petitioner disregards, and the information provided in FPLs response to
 
Contention 1-B above, it is unclear why                                    any further analysis would be required or what requirement
 
allegedly is unmetand Petitioner provides no such explanation.
 
Second, Petitioner references its comment to the NRC on the 2023 DSEIS                                                                                                                                                                                                                          regarding its net
 
addition of salt theory, and it claims that the NRCs response was merely to note that FPLs
 
remedial action is subject to significant ongoing state and local oversight.          163  Petitioner claims this
 
response is inadequate because permit compliance, alone, is not a substitute for, and does not
 
negate the requirement for NRC to weigh all environmental effects of the proposed action.            164
 
However, Petitioner misreads the NRCs response to its comment. As noted above, Petitioners
 
net addi        tion of salt theory is factually unsupported and fails to confront or controvert actual data
 
that undermines this theory. The NRCs comment response references the NRCs analysis of that
 
data.                        165  So, far from merely asserting that its obligations are met due to permit compliance, the
 
NRC updated its substantive analysis            and weighed the associated environmental effects. Because
 
Petitioner ignores that new information, it has not identified a genuine dispute with the 2024 FSE IS
 
on that issue.
 
Third, Dr. Nu                      ttle criticizes a table titled Table 2                  -4: Turkey Point Groundwater Withdrawal
 
Wells, because it does not include a separate line item for operation of the Interceptor Ditch and
 
because the NRC allegedly omitted this information from its assessment. 166  No                        tably, the Board
 
163                            Motion at 23-          24.
 
164                            Id. at 24 (quoting 10 C.F.R. § 51.71 n.3).
 
165                            2024                                                                                FSEIS                      at A-46 (      Section 2.8.3 of this site -specific EIS has been revised to reflect the status of FPLs remedial action based on the information provided in FPLs Year 5 Remedial Action Annual Status Report.                      ).
 
166                            Nuttle Report            at 14 (citing 2024                                        FSEIS                      at 2-1[8], tbl. 2-                              4).
 
32 rejected asimilar claim in LBP                                            03. 167  More importantly, Petitioner submitted this criticism in
 
its comment letter on the 2023 DSEIS                                                                                                                          and the NRC responded in the 2024 FSE IS. Specifically, the
 
NRC noted that Sections 3.1 and 3.5 of the 2019          FSE IS describe the operation of the interceptor
 
ditch in detail. The NRC Staff                                                          did not identify any new and significant information related to the
 
impacts from operation of the interceptor ditch that would change the conclusions reached in the
 
FSE IS.          168  Petitioner fails to dispute these assertions. It also fails entirely to acknowledge the
 
relevant discussion in the 2019 FSE IS                                                                                                                        regarding interceptor ditch operations. 169  It fails to engage
 
with the updated discussion of those operations in the 2023 RAASR                                                                                                                        , which describes                                    FPLs
 
proposed alternative operating procedure to reduce pumping operations. 170  And it fails to
 
controvert the NRCs conclusion that no new and significant information exists on that topic.                  171
 
Quite clearly, a petitioner cannot demonstrate a genuine dispute with information that it fails to
 
acknowledge or discuss. And for that reason, Petitioner has not met its burden to do so here.
 
Accordingly, Amended Contention 1-C is inadmissible because it fails to satisfy multiple
 
criteria in 10 C.F.R. § 2.309(f)(1).
 
E.                                                                                      Contention 2 (Endangered Species)
 
Contention 2 should be rejected because Petitioner has not demonstrated satisfaction of
 
Sections 2.309(c)(4) or (f)(1).
 
167                            Turkey Point, LBP                                        03, 99 NRC at __ (slip op. at 22  -          23).
 
168                            2024                                                                                FSEIS                      at A-49.
 
169                            2019                                                                                FSEIS 3-                    8 to 3-10.
 
170                            Petition, Exh. 9 at 2-          11.
 
171                            2024                                                                                FSEIS at A-49.
 
33
: 1.                                                                                                                                  Contention 2 Is Inadmissible
 
In Contention 2, Petitioner                                                                                                            alleges that the 2024                                                      FSE ISs analysis of the potential impacts
 
of Turkey Points continued operation during the renewal period on Miami cave crayfish is
 
inadequate and its determination that continued operation is unlikely to adversely affect or
 
jeopardize the Miami cave crayfish is unsupported.        172  As the Board is aware, after the NRC
 
published the 2023 DSEIS                                                                                                                        , the U.S. Fish and Wildlife Service (FWS) published a proposal in the
 
Federal Register to list the Miami cave crayfish as a threatened species under the ESA.        173
 
Petitioner challenged the 2023 DSEIS                                                                                                            because it did not address the Miami cave crayfish.          174  The
 
Board rejected this contention as premature because it was impossible for the 2023 DSE IS                                                                                                                                        to
 
address something that occurred after it was published. The Board also said Petitioner would have
 
an opportunity to advance ESA            compliance in the FSEIS.                                                                    175  Petitioner now challenges the
 
2024 FSE IS                                                                                                            s analysis. As discussed below, the    new contention is inadmissible because it does not
 
demonstrate a genuine dispute on a material issue of law or fact. A brief background discussion is
 
also provided below.
 
The Miami Cave Crayfish                                :  I                                    n the 2024 FSEIS, the NRC relied on information from the
 
FWSs Federal Register                notice, which reflects the          best available scientific                                and commercial
 
information available about the crayfishs life cycle, feeding, range, and possible factors that could
 
affect it. 176  The Miami cave crayfish is a small, freshwater, subterranean crayfish endemic to
 
172                            Motion at 36.
 
173                            Endangered and Threatened Wildlife and Plants; Threatened Species Status With Section                                    4(d) Rule for the Miami Cave Crayfish; Proposed Rule, 88 Fed. Reg. 64,856 (Sept. 20, 2023)      (Proposed Listing)                .
 
174                            Petition at 63-          74.
 
175                            Turkey Point, LBP                                        03, 99 NRC at __ (slip op. at 30  -          31).
 
176                            2024                                                                                FSEIS                      at 2-63 to 2-                                                  64                                        (quoting  Proposed Listing,                                        88 Fed. Reg. at 64,58 6 (stating the FWS reviewed the best available scientific and commercial information)).
 
34 southern and central Miami-Dade County.          177  The species has been collected from wells in those
 
areas at depths from 7.9 to 36 feet, but [d]espite significant sampling efforts                                  , has no                    t been found
 
in groundwater wells of similar depths within Everglades National Park, which lies west of
 
Turkey Point. 178  The crayfish has not been found in the vicinity of Turkey Point, and its closest
 
range lies approximately six          kilometers to the northwest of the northern most part of the CCS.              179
 
According to the FWS, the primary threat to the crayfish is saltwater intrusion associated
 
with sea level rise.          180  Other threats include modification of surface cover from agriculture,
 
urbanization, and development; modification of karstic limestone from below-ground construction
 
and infrastructure; aquifer drawdown from residential, agricultural, industrial, municipal, and
 
recreational uses; and groundwater contamination by various anthropogenic sources.          181
 
Duty to Confer on Proposed Species:  T                                    he NRCs need to confer with the FWS on a
 
proposed species is governed by 50 C.F.R. § 402.10. Section                                                                                    402.10 states that a federal agency
 
shall confer  on any action which is likely                                                          to jeopardize the continued existence of any proposed
 
species.          182  Thus, if the NRC determines that the proposed action is not likely to jeopardize the
 
crayfish, then the NRC need not confer with the FWS. As discussed below, the NRC concluded,
 
based on its evaluation of FPLs efforts to both retract the legacy plume and prevent CCS water
 
from moving westward beyond the CCS, that operation of the CCS during the SLR term is not
 
likely to jeopardize the continued existence of the crayfish. Thus, NRC did not need to confer with
 
the FWS.
 
177                            Id. at 2-63.
 
178                            Id.
 
179                            Id. at 2-64.
 
180                            Id. at 2-63 (emphasis added).
 
181                            Id.
 
182                            50 C.F.R. § 402.10(a) (emphasis added).
 
35 2024 FSE IS                                                                                                            E          valuation of Miami Cave Crayfish:  To determine the potential impacts to the
 
crayfish during the SLR term, the NRC evaluated two potential impacts:  (1) exposure to
 
radionuclides and (2) habitat loss from saltwater intrusion. 183  Because Petitioner challenges only
 
the NRCs analysis and conclusions on saltwater intrusion, the 2024 FSE IS                                                                                                                            s analysis of exposure
 
to radionuclides is not at issue here.
 
On saltwater intrusion, the 2024 FSE IS                                                                                                                        points out the that the hypersaline plume does not
 
currently overlap with the endemic range of the Miami cave crayfish.            184  The NRC also discusses
 
FPLs efforts to retract the legacy plume. According to the 2024 FSE IS                                                                                                                                                                                                                , the data shows that since
 
implementation of the RWS in 2018, the hypersaline plume in the upper layers of the aquifer has
 
almost been fully retracted to within the FPL site boundary.                185  In other words, FPL has been
 
successful in retracting the legacy plume in the upper level of the aquifer.


As to the impacts from the CCS during the SLR term, the NRC found that with continued
31 First, Petitioner criticizes Section 2.8.3 of the 2024 FSEIS for allegedly providing an inadequate analysis of the transport and fate of saline water emanating from the [CCS]157 and for only considering two scenarios related to the extent of the hypersaline plume.158 And it disputes the NRC Staffs conclusion in the 2024 FSEIS that continued operation during the SLR term would have no additional adverse effect on the beneficial use of groundwater offsite by existing users.159 However, Petitioner and Dr. Nuttle fail to acknowledge and controvert the information in the 2024 FSEIS relevant to these arguments. They disregard the fact that the goal of the RWS (in regard to the CCS) is not merely to intercept hypersaline water. Rather, its goal is to prevent additional CCS-sourced water, regardless of salinity (i.e., hypersaline, saline, brackish, or fresh), from moving inland.160 Furthermore, the analysis provided in the 2023 RAASR, upon which the NRC relied in developing the 2024 FSEIS, indicates that the RWS is highly effective in this regardbut Petitioner does not say a single word about that information.161 And as noted above, Petitioner fails to acknowledge or engage with the actual data underlying the 2024 FSEIS showing that the mitigation measures have halted the westward advance of the saltwater interface in the Biscayne Aquifer.162 157 Motion at 22-23. See also id. at 22-25 (discussing the volume of saline water).
158 Id. at 24-25 (citing 2024 FSEIS at 2-39). See also id. at 26 (citing 2024 FSEIS at 2-39).
159 Nuttle Report at 3 (citing 2024 FSEIS at 2-39).
160 2024 FSEIS at 2-30. See also Final Order, Exh. A at 69 (The RWS create[es] a hydraulic barrier such that none of the CCS water that seeps into ground water is able to move westward past the RWS. The extraction of the hypersaline ground water beneath the CCS reduces the driving force that contributed to lateral movement away from the CCS thereby halting the westward migration of hypersaline water from the CCS. Thus, since May 2018, the RWS has functionedand continues to functionas a hydrologic barrier that has halted the westward movement of hypersaline water from the CCS.).
161 The 2023 RAASR explains that RWS operations extend the hydraulic barrier effect of the interceptor ditch (ID) operation in the upper portion of the Biscayne aquifer to the base of the aquifer. Petition, Exh. 9 at 2-1. It also notes that particle tracking confirmed hypersaline water from the CCS is intercepted, captured, and contained beneath the CCS and no longer migrates into the compliance zone and that the RWS prevents water from the CCS from flowing through and westward past the RWS. Id. at 5-9. Petitioner and Dr. Nuttle ignore and do not dispute this discussion.
162 2024 FSEIS at 2-30 (emphasis added).


freshening of the CCS and continued operation of the RWS during the SLR term          , it is likely that the
32 Given this fact-based conclusion, plus the extensive new monitoring data discussed in the 2024 FSEIS, which Petitioner disregards, and the information provided in FPLs response to Contention 1-B above, it is unclear why any further analysis would be required or what requirement allegedly is unmetand Petitioner provides no such explanation.
Second, Petitioner references its comment to the NRC on the 2023 DSEIS regarding its net addition of salt theory, and it claims that the NRCs response was merely to note that FPLs remedial action is subject to significant ongoing state and local oversight.163 Petitioner claims this response is inadequate because permit compliance, alone, is not a substitute for, and does not negate the requirement for NRC to weigh all environmental effects of the proposed action.164 However, Petitioner misreads the NRCs response to its comment. As noted above, Petitioners net addition of salt theory is factually unsupported and fails to confront or controvert actual data that undermines this theory. The NRCs comment response references the NRCs analysis of that data.165 So, far from merely asserting that its obligations are met due to permit compliance, the NRC updated its substantive analysis and weighed the associated environmental effects. Because Petitioner ignores that new information, it has not identified a genuine dispute with the 2024 FSEIS on that issue.
Third, Dr. Nuttle criticizes a table titled Table 2-4: Turkey Point Groundwater Withdrawal Wells, because it does not include a separate line item for operation of the Interceptor Ditch and because the NRC allegedly omitted this information from its assessment.166 Notably, the Board 163 Motion at 23-24.
164 Id. at 24 (quoting 10 C.F.R. § 51.71 n.3).
165 2024 FSEIS at A-46 (Section 2.8.3 of this site-specific EIS has been revised to reflect the status of FPLs remedial action based on the information provided in FPLs Year 5 Remedial Action Annual Status Report.).
166 Nuttle Report at 14 (citing 2024 FSEIS at 2-1[8], tbl. 2-4).


CCS would not worsen the hypersaline groundwater plume outside the plant boundary, destabilize
33 rejected a similar claim in LBP-24-03.167 More importantly, Petitioner submitted this criticism in its comment letter on the 2023 DSEIS and the NRC responded in the 2024 FSEIS. Specifically, the NRC noted that Sections 3.1 and 3.5 of the 2019 FSEIS describe the operation of the interceptor ditch in detail. The NRC Staff did not identify any new and significant information related to the impacts from operation of the interceptor ditch that would change the conclusions reached in the FSEIS.168 Petitioner fails to dispute these assertions. It also fails entirely to acknowledge the relevant discussion in the 2019 FSEIS regarding interceptor ditch operations.169 It fails to engage with the updated discussion of those operations in the 2023 RAASR, which describes FPLs proposed alternative operating procedure to reduce pumping operations.170 And it fails to controvert the NRCs conclusion that no new and significant information exists on that topic.171 Quite clearly, a petitioner cannot demonstrate a genuine dispute with information that it fails to acknowledge or discuss. And for that reason, Petitioner has not met its burden to do so here.
Accordingly, Amended Contention 1-C is inadmissible because it fails to satisfy multiple criteria in 10 C.F.R. § 2.309(f)(1).
E.
Contention 2 (Endangered Species)
Contention 2 should be rejected because Petitioner has not demonstrated satisfaction of Sections 2.309(c)(4) or (f)(1).
167 Turkey Point, LBP-24-03, 99 NRC at __ (slip op. at 22-23).
168 2024 FSEIS at A-49.
169 2019 FSEIS 3-8 to 3-10.
170 Petition, Exh. 9 at 2-11.
171 2024 FSEIS at A-49.


the groundwater resource, or adversely affect the beneficial uses of groundwater offsite by existing
34
: 1.
Contention 2 Is Inadmissible In Contention 2, Petitioner alleges that the 2024 FSEISs analysis of the potential impacts of Turkey Points continued operation during the renewal period on Miami cave crayfish is inadequate and its determination that continued operation is unlikely to adversely affect or jeopardize the Miami cave crayfish is unsupported.172 As the Board is aware, after the NRC published the 2023 DSEIS, the U.S. Fish and Wildlife Service (FWS) published a proposal in the Federal Register to list the Miami cave crayfish as a threatened species under the ESA.173 Petitioner challenged the 2023 DSEIS because it did not address the Miami cave crayfish.174 The Board rejected this contention as premature because it was impossible for the 2023 DSEIS to address something that occurred after it was published. The Board also said Petitioner would have an opportunity to advance ESA compliance in the FSEIS.175 Petitioner now challenges the 2024 FSEISs analysis. As discussed below, the new contention is inadmissible because it does not demonstrate a genuine dispute on a material issue of law or fact. A brief background discussion is also provided below.
The Miami Cave Crayfish: In the 2024 FSEIS, the NRC relied on information from the FWSs Federal Register notice, which reflects the best available scientific and commercial information available about the crayfishs life cycle, feeding, range, and possible factors that could affect it.176 The Miami cave crayfish is a small, freshwater, subterranean crayfish endemic to 172 Motion at 36.
173 Endangered and Threatened Wildlife and Plants; Threatened Species Status With Section 4(d) Rule for the Miami Cave Crayfish; Proposed Rule, 88 Fed. Reg. 64,856 (Sept. 20, 2023) (Proposed Listing).
174 Petition at 63-74.
175 Turkey Point, LBP-24-03, 99 NRC at __ (slip op. at 30-31).
176 2024 FSEIS at 2-63 to 2-64 (quoting Proposed Listing, 88 Fed. Reg. at 64,586 (stating the FWS reviewed the best available scientific and commercial information)).


users.           186  The NRC also found that continued freshening of the CCS during the SLR term would
35 southern and central Miami-Dade County.177 The species has been collected from wells in those areas at depths from 7.9 to 36 feet, but [d]espite significant sampling efforts, has not been found in groundwater wells of similar depths within Everglades National Park, which lies west of Turkey Point.178 The crayfish has not been found in the vicinity of Turkey Point, and its closest range lies approximately six kilometers to the northwest of the northern most part of the CCS.179 According to the FWS, the primary threat to the crayfish is saltwater intrusion associated with sea level rise.180 Other threats include modification of surface cover from agriculture, urbanization, and development; modification of karstic limestone from below-ground construction and infrastructure; aquifer drawdown from residential, agricultural, industrial, municipal, and recreational uses; and groundwater contamination by various anthropogenic sources.181 Duty to Confer on Proposed Species: The NRCs need to confer with the FWS on a proposed species is governed by 50 C.F.R. § 402.10. Section 402.10 states that a federal agency shall confer on any action which is likely to jeopardize the continued existence of any proposed species.182 Thus, if the NRC determines that the proposed action is not likely to jeopardize the crayfish, then the NRC need not confer with the FWS. As discussed below, the NRC concluded, based on its evaluation of FPLs efforts to both retract the legacy plume and prevent CCS water from moving westward beyond the CCS, that operation of the CCS during the SLR term is not likely to jeopardize the continued existence of the crayfish. Thus, NRC did not need to confer with the FWS.
177 Id. at 2-63.
178 Id.
179 Id. at 2-64.
180 Id. at 2-63 (emphasis added).
181 Id.
182 50 C.F.R. § 402.10(a) (emphasis added).


ensure that water originating from the CCS does not influence the saltwater/freshwater interface
36 2024 FSEIS Evaluation of Miami Cave Crayfish: To determine the potential impacts to the crayfish during the SLR term, the NRC evaluated two potential impacts: (1) exposure to radionuclides and (2) habitat loss from saltwater intrusion.183 Because Petitioner challenges only the NRCs analysis and conclusions on saltwater intrusion, the 2024 FSEISs analysis of exposure to radionuclides is not at issue here.
On saltwater intrusion, the 2024 FSEIS points out the that the hypersaline plume does not currently overlap with the endemic range of the Miami cave crayfish.184 The NRC also discusses FPLs efforts to retract the legacy plume. According to the 2024 FSEIS, the data shows that since implementation of the RWS in 2018, the hypersaline plume in the upper layers of the aquifer has almost been fully retracted to within the FPL site boundary.185 In other words, FPL has been successful in retracting the legacy plume in the upper level of the aquifer.
As to the impacts from the CCS during the SLR term, the NRC found that with continued freshening of the CCS and continued operation of the RWS during the SLR term, it is likely that the CCS would not worsen the hypersaline groundwater plume outside the plant boundary, destabilize the groundwater resource, or adversely affect the beneficial uses of groundwater offsite by existing users.186 The NRC also found that continued freshening of the CCS during the SLR term would ensure that water originating from the CCS does not influence the saltwater/freshwater interface within the species range.187 183 2024 FSEIS at 2-65.
184 Id. at 2-67.
185 Id.
186 Id.
187 Id.


within the species range.             187
37 Based on the above factors, the NRC concluded that Miami cave crayfish are unlikely to experience measurable effects from saltwater intrusion associated with the proposed continued operation of Turkey Point during the SLR term.188 The NRC also concluded that all potential impacts on Miami cave crayfish from the proposed continued operation of Turkey Point during the SLR term would not be able to be meaningfully measured, detected, or evaluated, and would, therefore, be insignificant.189 To be clear, the NRC did not omit an evaluation of these effects; it squarely evaluated them and concluded that they were negligible.
: a.
Petitioners Hypersalinity Arguments Are Unsupported and Fail to Demonstrate a Genuine Dispute According to Petitioner, the 2024 FSEIS is fundamentally deficient because it ma[de] no reference to the crayfishs intolerance to even low salinity levels.190 Petitioner claims that this failure means that the NRC did not use science-based standards for determining harmful impacts and that the 2024 FSEIS fails to consider the concept of a gradient of salinity throughout the aquifer.191 Petitioner also relies on its earlier arguments made in Contention 1 criticizing the NRCs analysis of the hypersaline plume to gauge the impacts of the CCS on the Biscayne Aquifer.
However, none of these arguments are adequately supported or demonstrate a genuine dispute on a material issue.
For example, Petitioner argues that the NRC improperly focuses on hypersalinity and therefore ignores the movement of the saltwater/freshwater interface caused by the CCS, echoing 188 Id.
189 Id.; see also U.S. Fish and Wildlife Service, Endangered Species Consultation Handbook at 3-12 to 3-13 (1998)
(describing discountable effects), https://www.fws.gov/sites/default/files/documents/endangered-species-consultation-handbook.pdf.
190 Motion at 42.
191 Id.  


183                            2024                                                                                 FSEIS                     at 2-65.
38 claims made in Contentions 1-B and 1-C.192 But as explained in FPLs corresponding discussions above, which are incorporated here by reference, the NRCs use of hypersalinity is based on the FDEPs use of hypersalinity to gauge the CCSs influence on the saltwater interface. As with Contentions 1-B and 1-C, Petitioner fails to provide any reasoned explanation for why that approach is technically inadequate or legally insufficient. In fact, it fails to engage with that information at all. In sum, many factors other than the CCS influence the saltwater interface; whereas, the cognizant state regulatory authority has determined that removing the hypersaline plume as a factor that affects that interface is sufficiently protective of potable water to fully satisfy all legal requirements. More than a mere disagreement with the NRCs method is required to demonstrate a genuine dispute, which Petitioner failed to do.
Given all of this, Petitioners criticism of the 2024 DSEIS for not referencing the crayfishs likely intolerance to speculative salinity thresholds, or not discussing salinity gradients, also fails to raise a genuine dispute. The thrust of the NRCs analysis is that mitigation measures have halted the expansion of the saltwater interface. Given that conclusion, which is based on underlying current data that Petitioner disregards entirely, it is unclear why any further analysis is needed to comply with NEPA. And Petitioner offers no explanation.
Petitioner also repeats various arguments from Contention 1-C that rely on outdated data and fail to acknowledge, consider, or dispute more recent data on those topics as presented or referenced in the 2024 FSEIS. For example, Petitioner recycles its argument that the CCS is continuing to flush large volumes of saline water into the aquifer.193 But as discussed above, Petitioners claim is directly refuted by evidence from FPLs monitoring wells, which Petitioner ignores. The data show 192 Id. at 41-44, 46-48.
193 Motion at 23.  


184                            Id. at 2-67.
39 that the RWS is extracting more saline water than Dr. Nuttle (and Petitioner) claim is being flushed from the CCS.194 Likewise, Petitioner claims that data from USGS wells prove that the saltwater interface is advancing.195 But those claims are based on data that is more than a decade old, well before the RWS became operational. And those claims fail to acknowledge or confront the new data considered in the 2024 FSEIS confirming that the saltwater interface has been halted. Because Petitioner simply ignores all of the extensive new monitoring data on these matters as discussed or referenced in the 2024 FSEIS, it has failed to raise a genuine dispute on this topic.
 
Furthermore, these recycled arguments already have been rejected by the cognizant state regulator. As noted above, challengers in the Turkey Point NPDES renewal proceeding before FDEP contented that the mitigation measures would increase[] the hydrostatic head of water seeping from the CCS and exacerbate the movement of the hypersaline plume.196 In rejecting that theory, the judge noted that it fails to take into account that... operation of the RWS prevents any water seeping from the CCS into ground water from moving west of the CCS.197 To the extent Petitioner wants to relitigate the outcome of the FDEP proceeding, it is in the wrong forum. And to the extent it has failed to acknowledge or dispute the extensive, updated data discussed in or underlying the 2024 FSEIS, it has failed to demonstrate a genuine dispute.
185                            Id.
: b.
 
Petitioners Cumulative Impact Arguments Are Unsupported and Fail to Demonstrate a Genuine Dispute According to Petitioner, the NRC needed to examine, analyze, and address the cumulative impacts from continued operation of the CCS during the SLR term coupled with the impacts of 194 See Petition, Exh. 9 at 2-1.
186                            Id.
195 Id. at 43.
 
196 Final Order at 78 ¶ 302.
187                            Id.
197 Id. ¶ 303.  
 
36 Based on the above factors, the NRC concluded that          Miami cave crayfish are unlikely to
 
experience measurable effects from saltwater intrusion associated with the proposed continued
 
operation of Turkey Point during the SLR term.          188  The NRC also concluded that all potential
 
impacts on Miami cave crayfish from the proposed continued operation of Turkey Point during the
 
SLR term would not be able to be meaningfully measured, detected, or evaluated, and would,
 
therefore, be insignificant.          189  To be clear, the NRC did not omit an evaluation of these effects; it
 
squarely evaluated them and concluded that they were negligible.
: a.                                                                                                                                  Petitioners    Hypersalinity Arguments Are Unsupported and Fail to Demonstrate a Genuine Dispute
 
According to Petitioner, the 2024 FSE IS                                                                                                                        is fundamentally deficient because it ma                      [de] no
 
reference to the crayfishs  intolerance                                                                          to even low salinity levels.                        190  Petitioner claims that this
 
failure means that the NRC did not use science-based standards for determining ha                                                rmful impacts
 
and that the 2024 FSE IS                                                                                                                        fails to consider the concept of a gradient of salinity throughout the
 
aquifer.          191  Petitioner                        also relies on its earlier              arguments made in Contention 1 criticizing the
 
NRCs analysis of the hypersaline plume to gauge the impacts of the CCS on the Biscayne Aquifer.
 
However, none of these arguments are adequately supported or demonstrate a genuine dispute on a
 
material issue.
 
For example, Petitioner argues that the NRC improperly focuses on hypersalinity and
 
therefore ignores the movement of the saltwater/freshwater interface caused by the CCS, echoing
 
188                            Id.
 
189                            Id.; see also U.S. Fish and Wildlife Service, Endangered Species Consultation Handbook              at 3-12 to 3-                              13 (1998)
(describing discountable effects), https://www.fws.gov/sites/default/files/documents/endangered                                      -species-consultation-handbook.pdf .
 
190                            Motion at 42.
 
191                            Id.
 
37 claims made in Contentions 1-B and 1-C.              192  But as explained                        in FPLs corresponding discussions
 
above, which are incorporated here by reference, the NRCs use of hypersalinity is based on the
 
FDEPs use of hypersalinity to gauge the CCSs influence on the saltwater interface. As with
 
Contentions 1-B and 1-C, Petitioner                        fail            s to provide any reasoned explanation for why that approach
 
is technically inadequate or legally insufficient.                                            In fact, it fails to engage with that information at
 
all. In sum, many factors other than the CCS influence the saltwater interface; whereas          , the
 
cognizant state regulatory authority has determined that removing the hypersaline plume as a factor
 
that affects that interface is sufficiently protective of potable water  to fully satisfy all legal
 
requirements. More than a mere disagreement with the NRCs method is required to demonstrate a
 
genuine dispute, which Petitioner failed to do.
 
Given all of this, Petitioners criticism of the 2024 DSEIS for not referencing the crayfishs
 
likely intolerance to speculative salinity thresholds          , or not discussing salinity gradients, also fails
 
to raise a genuine dispute. The thrust of the NRCs analysis is that mitigation measures have halted
 
the expansion of the saltwater interface. Given that conclusion, which is based on underlying
 
current data that Petitioner disregards entirely            , it is unclear why any further analysis is needed to
 
comply with NEPA. And Petitioner offers no explanation.
 
Petitioner also repeats various arguments from Contention 1-C that rely on outdated data and
 
fail to acknowledge, consider, or dispute more recent data on those topics as presented or referenced
 
in the 2024 FSE IS                                                                                                                        . For example, Petitioner recycles its argument that the CCS is continuing to
 
flush large volumes of saline water into the aquifer. 193  But as discussed above, Petitioners claim is
 
directly refuted by evidence from FPLs monitoring wells, which Petitioner ignores. The data show
 
192                            Id. at 41-4        4, 46-          48.
 
193                            Motion at 23.
 
38 that the RWS is extracting more saline water than Dr. Nuttle (and Petitioner) claim is being flushed
 
from the CCS. 194 Likewise, Petitioner claims that data from USGS wells prove that the saltwater
 
interface is advancing.                                       195 But those claims are based on data that is more than a decade old, well
 
before the RWS became operational. And those claims fail to acknowledge or confront the new
 
data considered in the 2024 FSE IS                                                            confirming that the saltwater interface has be            en halted. Because
 
Petitioner simply ignores all of the extensive new monitoring data on these matters a  s discussed or
 
referenced in the 2024 FSEIS, it has failed to raise a genuine dispute on this topic.
 
Furthermore, these recycled arguments already have been rejected by the cognizant state
 
regulator. As noted above, challengers in the Turkey Point NPDES renewal proceeding before
 
FDEP contented that the mitigation measures would increase[] the hydrostati        c head of water
 
seeping from the CCS and exacerbate the movement of the hypersaline plume.                             196 In rejecting
 
that theory, the judge noted that it fails to take into account that . . . operation of the RWS prevents
 
any water seeping from the CCS into ground water from moving west of the CCS.           197
 
To the extent Petitioner wants to relitigate the outcome of the FDEP proceeding, it is in the
 
wrong forum. And to the extent it has failed to acknowledge or dispute the extensive, updated data
 
discussed in or underlying the 2024 FSEIS, it has failed to demonstrate a genuine dispute.
: b.                                                                                                                                   Petitioners Cumulative Impact Arguments Are Unsupported and Fail to Demonstrate a Genuine Dispute
 
According to Petitioner, the NRC needed to examine, analyze, and address the cumulative
 
impacts from continued operation of the CCS during the SLR term coupled with the impacts of
 
194                             See Petition, Exh. 9 at 2-1.
 
195                             Id. at 43.
 
196                             Final Order at 78 ¶ 302.
 
197                             Id. ¶ 303.
 
39 rising sea levels. 198  While FPL concedes that saltwater intrusion from rising sea levels will have far
 
greater impact on the crayfish than water from the CCS, Peti                      tioner fails to explain why any further
 
analysis is required here.
 
As a general matter, these arguments are rooted in Petitioner                                                s defective arguments
 
regarding the alleged volume of saline water exiting the CCS, secondary impacts of RWS operation,
 
and the allegedly advancing saltwater interface.                  199  Those arguments are unsupported and fail to
 
dispute the updated analytical data discussed or referenced in the 2024 FSEIS                                                                                                                                                                              for all of the reasons
 
explained above.
 
Ultimately, the NRC concludes  (based on empirical data ignored by Petitioner) that the
 
mitigation measures are expected to ensure that water originating from the CCS does not influence
 
the Biscayne Aquifers saltwater/freshwater interface within the species range.              200  Petitioner not
 
only fails to engage with or dispute the data or analysis that led to that conclusion, but it also offers
 
no competing analysis or data that purports to refute the NRCs conclusion. And if CCS water does
 
not influence the saltwater interface, it is uncle  ar what other SLR-related impact theoretically could
 
combine with climate-change-                    based sea level rise to yield some unspecified cumulative impact.


40 rising sea levels.198 While FPL concedes that saltwater intrusion from rising sea levels will have far greater impact on the crayfish than water from the CCS, Petitioner fails to explain why any further analysis is required here.
As a general matter, these arguments are rooted in Petitioners defective arguments regarding the alleged volume of saline water exiting the CCS, secondary impacts of RWS operation, and the allegedly advancing saltwater interface.199 Those arguments are unsupported and fail to dispute the updated analytical data discussed or referenced in the 2024 FSEIS for all of the reasons explained above.
Ultimately, the NRC concludes (based on empirical data ignored by Petitioner) that the mitigation measures are expected to ensure that water originating from the CCS does not influence the Biscayne Aquifers saltwater/freshwater interface within the species range.200 Petitioner not only fails to engage with or dispute the data or analysis that led to that conclusion, but it also offers no competing analysis or data that purports to refute the NRCs conclusion. And if CCS water does not influence the saltwater interface, it is unclear what other SLR-related impact theoretically could combine with climate-change-based sea level rise to yield some unspecified cumulative impact.
And Petitioner offers no theory. Far more is required to demonstrate a genuine dispute.
And Petitioner offers no theory. Far more is required to demonstrate a genuine dispute.
: c.                                                                                                 Petitioners Uncer  tainty Arguments Are Unsupported and Fail to Demonstrate a Genuine Dispute
: c.
 
Petitioners Uncertainty Arguments Are Unsupported and Fail to Demonstrate a Genuine Dispute Finally, Petitioner highlights the inherent uncertainty in this type of analysis and alleges that this lack of information undermines the analysis in the 2024 FSEIS.201 Specifically, Petitioner 198 Id. at 44-46.
Finally, Petitioner highlights the inherent uncertainty in this type of analysis and alleges that
199 Motion at 45.
200 2024 FSEIS at 2-67.
201 Motion at 48.


this lack of information undermines the analysis in the 2024 FSEIS                                                                                                                                                                                                          . 201  Specifically, Petitioner
41 notes that there is uncertainty in aquifer modeling and uncertainty regarding the crayfishs range.202 Petitioner then claims that these uncertainties somehow render the NRC Staffs analysis deficient.203 But Petitioner does not explain that conclusory assertion or reconcile it with NEPAs rule of reason.204 Far more is required to demonstrate a genuine dispute.
 
To the extent Petitioner complains about uncertainty regarding groundwater modeling, the NRC has plainly acknowledged and explained that uncertainty.205 NEPA does not require certitude.
198                            Id. at 44-          46.
To the contrary, disclosure of incomplete or unavailable information and significant uncertainties is all that NEPA requires.206 Petitioner fails to explain why anything more is required as to groundwater modeling here. Likewise, Petitioner fails to explain why uncertainty in the crayfishs range is material. Petitioner relies on the FWSs statement that the crayfish is highly unlikely to survive in even slightly salty water.207 If so, the then crayfishs current range does not include areas beyond the current saltwater interface; and as discussed in the 2024 FSEIS, continued operation of Turkey Point is not expected to contribute to further expansion of that interface during the SLR term. Petitioner does not explain why further precision in the exact range of the crayfish is necessary to evaluate the potential impacts of SLR.
 
202 Id. at 46-47.
199                            Motion at 45.
203 Id. at 46.
 
204 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-22, 72 NRC 202, 208 (2010) (stating that NEPA requirements are tempered by a practical rule of reason. and [a]n [EIS] is not intended to be a research document.) (citations omitted).
200                            2024                                                                                FSEIS                      at 2-67.
205 See, e.g., FSEIS at 2-38 (However, the ultimate extent and timing of this retraction cannot be fully known. This recognition of uncertainty is based on a hard look at all of the relevant information available to date.).
 
206 Pilgrim, CLI-10-22, 72 NRC at 208.
201                            Motion at 48.
207 Motion at 41-42.  
 
40 notes that there is uncertainty in aquifer modeling and                                                             uncertainty regarding the crayfishs range.     202
 
Petitioner then claims that these uncertainties somehow render the NRC Staff                          s analysis
 
deficient.                   203 But Petitioner                         does                                                             not explain that conclusory assertion or                                                             reconcile it with NEPAs
 
rule of reason       .           204 Far more is required to demonstrate a genuine dispute.
 
To the extent Petitioner complains about uncertainty regarding groundwater modeling, the
 
NRC has plainly acknowledged and explained that uncertainty. 205 NEPA does not require certitude.
 
To the contrary, disclosure of incomplete or unavailable information and significant uncertainties        
 
is all that NEPA requires. 206 Petitioner fails to explain why anything more is required as to
 
groundwater modeling here. Likewise                                   , Petitioner                         fails to explain why uncertainty in                                     the crayfishs
 
range is material. Petitioner                       relie          s on the FWSs                                                                           statement that the crayfish is highly unlikely to
 
survive in even slightly salty water. 207 If so, the then crayfishs     current range does not include
 
areas beyond the current                               saltwater interface; and as discussed in the 2024 FSEIS, continued
 
operation of Turkey Point is not expected to contribute to further expansion of that interface during
 
the SLR term. Petitioner does not explain why further precision in the exact range of the crayfish is
 
necessary to evaluate the potential impacts of SLR.
 
202                             Id. at 46-         47.
 
203                             Id. at 46.
 
204                             Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-22, 72 NRC 202, 208 (2010) (stating that NEPA requirements are tempered by a practical rule of reason. and [a]n [EIS]                                                   is not intended to be a research document.         ) (citations omitted).
 
205                             See, e.g., FSEIS at 2-38 (       However, the ultimate extent and timing of this retraction cannot be fully known. This recognition of uncertainty is based on a hard look at all of the relevant information available to date.         ).
 
206                             Pilgrim, CLI                                       22, 72 NRC                                                             at 208.
 
207                             Motion at 41-         42.
 
41 At most, Petitioner offers a footnote citation to a licensing board decision for the proposition
 
that agency analysis methodologies must be reasonable.                    208  But they make no attempt to explain
 
why that standard is not met here. In fact, that decision appears to contradict their claim. As the
 
licensing board explained:


42 At most, Petitioner offers a footnote citation to a licensing board decision for the proposition that agency analysis methodologies must be reasonable.208 But they make no attempt to explain why that standard is not met here. In fact, that decision appears to contradict their claim. As the licensing board explained:
NEPA requires that an agency take a hard look at the environmental consequences of a planned action. NEPA does not, however, require agencies to analyze every conceivable aspect of a proposed project.
NEPA requires that an agency take a hard look at the environmental consequences of a planned action. NEPA does not, however, require agencies to analyze every conceivable aspect of a proposed project.
Rather, NEPAs requisite hard look is subject to a rule of reason.
Rather, NEPAs requisite hard look is subject to a rule of reason.  
                . . .       Moreover, the Commission recognizes that an environmental impact statement is not a research document,                                   and, in assessing foreseeable impacts, there will always be more data [that]   could be gathered, so that agencies must have some discretion to draw the line and move forward with decisionmaking. In assessing these impacts, the agency is not required to use the best scientific methodology or study phenomena for which there are not yet standard methods of measurement or analysis.         209
... Moreover, the Commission recognizes that an environmental impact statement is not a research document, and, in assessing foreseeable impacts, there will always be more data [that] could be gathered, so that agencies must have some discretion to draw the line and move forward with decisionmaking. In assessing these impacts, the agency is not required to use the best scientific methodology or study phenomena for which there are not yet standard methods of measurement or analysis.209 Petitioner fails to engage with any of these legal standards and offers no explanation about what more is purportedly required to satisfy the hard look requirement. It fails to explain what more is required regarding aquifer modeling for the analysis of potential impacts on the crayfish beyond the extensive work that already has been completed across many years of collection and analysis of vast amounts of data (the most recent of which Petitioner ignores) using state-of-the-art modeling (which Petitioner fails to dispute).
 
As the Commission has often explained, [o]ur boards do not sit to flyspeck environmental documents or to add details or nuances. If the ER (or EIS) on its face comes to grips with all 208 Id. at 48 n.187 (citing Powertech USA, Inc. (Dewey-Burdock in Situ Uranium Recovery Facility), LBP-17-9, 86 NRC 167, 191 (2017)).
Petitioner fails to engage with any of these legal standards and offers no explanation about
209 Id. (citations omitted).  
 
what more is purportedly required to satisfy the hard look requirement.                     It fails to explain what
 
more is required regarding aquifer modeling for the analysis of potential impacts on the crayfish
 
beyond the extensive work that already has been completed across many years of collection and
 
analysis of vast amounts of data (the most recent of which Petitioner ignores) using state-of-the-art
 
modeling (which Petitioner fails to dispute).
 
As the Commission has often explained, [o]ur boards do not sit to flyspeck environmental
 
documents or to add details or nuances. If the ER (or EIS) on its face comes to grips with all
 
208                             Id. at 48 n.187 (citing Powertech USA, Inc.                                                                                 (Dewey-Burdock in Situ Uranium Recovery Facility), LBP-                     17-                                         9, 86 NRC 167, 191 (2017)).
 
209                             Id. (citations omitted).
 
42 important considerations nothing more need be done.          210  The NRCs analysis does so here; and
 
Petitioners conclusory assertion otherwise is not enough to generate a genuine dispute.
 
Accordingly, Contention 2 is inadmissible because it fails to satisfy multiple criteria in
 
10 C.F.R. § 2.309(f)(1).
 
F.                                                                                          Contentions 3-            A and 3-B (Climate Change)
 
Contentions 3-A and 3-B both allege that the 2024 FSEIS failed to analyze the effects of
 
climate change during the SLR period. Contention 3-A alleges that the 2024 FSEIS contain          s an
 
inadequate discussion how climate change will exacerbate seal level rise, hurricanes, and increase
 
temperatures and drought and how these climate-related impacts will affect Turkey point during the
 
SLR period. 211  Contention 3-B alleges that the NRC failed to adequately update its evaluation of
 
FPLs SAMA analysis to reflect the effects of climate change on accident risk.                              212  Both Contention
 
3-A and 3-B rely on the recent GAO Report as a basis for each contention.
 
Contentions 3-A and 3-B should be rejected because Petitioner has not demonstrated
 
satisfaction of Sections 2.309(c)(1), (c)(4), or (f)(1).
: 1.                                                                                                                                  Contentions 3-A and 3-B Are Not Based on New and Materially Different Information


Petitioners stated basis for Contentions 3-   A and                                               3-B is the GAO Report issued on
43 important considerations nothing more need be done.210 The NRCs analysis does so here; and Petitioners conclusory assertion otherwise is not enough to generate a genuine dispute.
Accordingly, Contention 2 is inadmissible because it fails to satisfy multiple criteria in 10 C.F.R. § 2.309(f)(1).
F.
Contentions 3-A and 3-B (Climate Change)
Contentions 3-A and 3-B both allege that the 2024 FSEIS failed to analyze the effects of climate change during the SLR period. Contention 3-A alleges that the 2024 FSEIS contains an inadequate discussion how climate change will exacerbate seal level rise, hurricanes, and increase temperatures and drought and how these climate-related impacts will affect Turkey point during the SLR period.211 Contention 3-B alleges that the NRC failed to adequately update its evaluation of FPLs SAMA analysis to reflect the effects of climate change on accident risk.212 Both Contention 3-A and 3-B rely on the recent GAO Report as a basis for each contention.
Contentions 3-A and 3-B should be rejected because Petitioner has not demonstrated satisfaction of Sections 2.309(c)(1), (c)(4), or (f)(1).
: 1.
Contentions 3-A and 3-B Are Not Based on New and Materially Different Information Petitioners stated basis for Contentions 3-A and 3-B is the GAO Report issued on April 2, 2024.213 According to Petitioner, the GAO Report was not previously available and 210 Systems Energy Res., Inc. (Early Site Permit for Grand Gulf ESP Site), CLI-05-4, 61 NRC 10, 13 (2005) (citation omitted).
211 Motion at 55-56.
212 Id. at 69.
213 Id. at 52-53.


April 2, 2024. 213  According to Petitioner, the GAO Report was not previously available and
44 therefore it satisfies the requirement that new contentions be based on new facts.214 Petitioner claims the GAO Report satisfies the materially different requirement in Section 2.309(c)(1)(ii) for new contentions because it provides information showing that it is genuinely plausible that consideration of the climate risks and associated environmental impacts identified in the report would change the NRC Staffs conclusions regarding climate change-related environmental impacts.215 Contrary to Petitioners claims, the GAO Report provides no new information on the anticipated effects of climate change. Even a cursory review of the GAO Report reveals that it relies on already existing data that was available to Petitioner before the hearing request deadline on November 27, 2023. In essence, the GAO Report is merely a compendium of historical information that has long been publicly available. Also contrary to Petitioners claim, the GAO Report provides no new analysis about the effects of climate change on nuclear reactors generally, or Turkey Point specifically. In short, the GAO Report is not based on new facts that are materially different and thus, Petitioner cannot demonstrate good cause for the new contentions. For these reasons, and as discussed below, and the Board should deny the Motion to admit Contentions 3-A and 3-B.
As noted above, while the GAO Report is new, none of the data or reports it relied on are new. The GAO Report only summarizes (at a high level) and repackages government data and reports already available to Petitioner before it filed its Petition in November 2023. The GAO admits as much in describing its methodology for the report. To prepare the report, the GAO first reviewed its own past reports and then conducted a literature review for relevant articles published 214 Id. at 52; see Pilgrim, CLI-12-10, 75 NRC at 493 n.70 (new contentions must be based on new facts) (emphasis omitted).
215 Id. at 52.


210                            Systems Energy Res., Inc. (Early Site Permit for Grand Gulf ESP Site), CLI-              05-                                      4, 61 NRC 10, 13 (2005)  (citation omitted).
45 from January 2012 through January 2023.216 The GAO specifically relied on the following government reports and national-level data sets from federal agencies for various climate-related hazards:217
 
211                            Motion at 55                    -          56.
 
212                            Id. at 69.
 
213                            Id. at 52-          53.
 
43 therefore it satisfies the requirement that new contentions be based on new facts.                                                                          214  Petitioner
 
claims the GAO Report satisfies the materially different requirement in                              Section 2.309(c)(1)(ii)
 
for new contentions because it provides information showing that it is genuinely plausible that
 
consideration of the climate risks and associated environmental impacts identified in the report
 
would change the NRC Staffs conclusions regarding climate change-  related environmental
 
impacts.          215
 
Contrary to Petitioners claims, the GAO Report provides no new information on the
 
anticipated effects of climate change. Even a cursory review of the GAO Report reveals that it
 
relies on already existing data that was availab          le to Petitioner            before            the hearing request deadline on
 
November 27, 2023. In essence, the GAO Report is merely a compendium of historical information
 
that has long been publicly available. Also contrary to Petitioners claim, the GAO Report provides
 
no new analysis about the effects of climate change on nuclear reactors generally, or Turkey Point
 
specifically. In short, the GAO Report is not based on new facts that are materially different and
 
thus, Petitioner                        cannot demonstrate good cause for the new contentions. For these reasons, and as
 
discussed below, and the Board should deny the Motion to admit Contentions 3-A and 3-                                              B.
 
As noted above, while the GAO Report is new, none of the data or reports it relied on are
 
new. The GAO Report only summarizes (at a high level) and repackages government data and
 
reports already available to Petitioner                                                        before it filed its Petition in November 2023. The GAO
 
admits as much in describing its methodology for the report. To prepare the report, the GAO first
 
reviewed its own past reports and then conducted a literature review for relevant articles published
 
214                            Id. at 52; see Pilgrim                    , CLI                                      10, 75 NRC at  493 n.70 (new contentions must be based on new facts)                      (emphasis omitted).
 
215                            Id. at 52.
 
44 from January 2012 through January 2023.                     216 The GAO specifically relied on the following
 
government reports and national-         level data sets from federal agencies for various climate-                         related
 
hazards: 217
* the National Climate Assessment (for heat and cold hazards);218
* the National Climate Assessment (for heat and cold hazards);218
* the Federal Emergency Management Agencys (FEMA) National Flood Hazard Layer (for flooding risks); 219
* the Federal Emergency Management Agencys (FEMA) National Flood Hazard Layer (for flooding risks);219
* the U.S. Forest Services Wildfire Hazard Potential (for wildfire hazards); 220
* the U.S. Forest Services Wildfire Hazard Potential (for wildfire hazards);220
* the National Oceanic and Atmospheric Administrations (NOAA                       ) Sea, Lake, and Overland Surges from Hurricane model (for storm surge); 221 and
* the National Oceanic and Atmospheric Administrations (NOAA) Sea, Lake, and Overland Surges from Hurricane model (for storm surge);221 and
* an interagency report on sea level rise.222
* an interagency report on sea level rise.222 All of the reports and data above were available to Petitioner before it filed its Petition in November 2023. Indeed, Petitioner cited both the National Climate Assessment and the interagency report on sea level rise in its Petition.223 That Petitioner already cited these sources shows the information the GAO relied on for the report was previously available to Petitioner, and Petitioner 216 GAO Report at 42-43.
 
217 Id. at 43.
All of the reports and data above were available to Petitioner before it filed its Petition in
218 Id. at 44, 49-50 (citing the Fourth and Fifth National Climate Assessments). The GAO relied on the Fourth National Climate Assessment, which was published in 2018. See U.S. Global Change Research Program, Fourth National Climate Assessment (2018), https://nca2018.globalchange.gov/downloads. The Fifth National Climate Assessment was published on November 14, 2023 (https://nca2023.globalchange.gov), before Miami Waterkeeper filed its Petition. The GAO reviewed this assessment and identified no major differences major differences for the selected hazards. GAO Report at 44 n.9.
 
219 GAO Report at 44-45, 51 (citing FEMAs National Flood Hazard Layer, https://www.fema.gov/flood-maps/national-flood-hazard-layer).
November 2023. Indeed, Petitioner cited both the National Climate Assessment and the interagency
220 Id. at 44, 50-51 (citing the Forest Services Wildfire Hazard Potential Map, https://www.firelab.org/
 
report on sea level rise in its Petition. 223 That Petitioner already cited these sources shows the
 
information the GAO relied on for the report was previously available to Petitioner, and Petitioner
 
216                             GAO Report at 42-         43.
 
217                             Id. at 43.
 
218                             Id. at 44, 49-         50 (citing the Fourth and Fifth National Climate Assessments). The GAO relied on the Fourth National Climate Assessment, which was published in 2018. See                         U.S. Global Change Research Program, Fourth National Climate Assessment           (2018), https://nca2018.globalchange.gov/downloads   . The Fifth National Climate Assessment was published on November 14, 2023 (   https://nca2023.globalchange.gov   ), before Miami Waterkeeper filed its Petition. The GAO reviewed this assessment and identified no major differences major differences for the selected hazards. GAO Report at 44 n.9.
 
219                             GAO Report at 44-         45, 51 (citing FEMAs National Flood Hazard Layer, https://www.fema.gov/flood                 -
maps/national-flood-hazard-layer).
 
220                             Id. at 44, 50-         51 (citing the Forest Services Wildfire Hazard Potential Map, https://www.firelab.org/
project/wildfire-hazard-potential).
project/wildfire-hazard-potential).
221 Id. at 45, 52 (citing NOAAs Sea, Lake and Overland Surges from Hurricanes model, https://www.nhc.noaa.gov/surge/slosh.php#SMODEL).
222 Id. at 45, 52-53 (referencing W.V. Sweet et al., Global and Regional Sea Level Rise Scenarios for the United States: Updated Mean Projections and Extreme Water Level Probabilities Along U.S. Coastlines (Feb. 2022),
https://oceanservice.noaa.gov/hazards/sealevelrise/sealevelrise-tech-report-sections.html (Sea Level Report)).
223 Petition at 58 n. 228 (citing Donald J. Wuebbles et al., Climate Science Special Report: Fourth National Climate Assessment, U.S. Global Change Research Program 197, tbl. 6.4 (2017), https://science2017.globalchange.gov/
downloads/CSSR2017_FullReport.pdf; id. at 51 n.198 (citing Sea Level Report)).


221                            Id. at 45, 52 (citing NOAAs  Sea, Lake and Overland Surges from Hurricanes model, https://www.nhc.noaa.gov/surge/slosh.php#SMODEL  ).
46 knew how to access the information. As a result, Petitioner cannot satisfy the first element of the good cause standardthat the information was not previously availablein Section 2.309(c)(1).224 Petitioners failure to satisfy the first element of the three-part good cause standard for a new contention should, by itself, result in the Boards denial of the Motion.
 
Furthermore, the information in the GAO Report also is not materially different than previously available information. Even so, Petitioner claims that the GAO Report satisfies the materially different requirement because it provides materially different information about three specific categories of climate risks to Turkey Point: (1) flooding risks from rising sea levels and intensifying hurricanes; (2) safety risks from stronger hurricanes; and (3) increased salinity in the CCS because of rising temperatures and drought.225 As shown below, however, the GAO Report provides no materially different information on these climate-related impacts either generally or specific to Turkey Point. As a result, Petitioner cannot satisfy the second element of the good cause standard,226 and the Board should deny the Motion.
222                            Id. at 45, 52-          53 (referencing W.V. Sweet et al., Global and Regional Sea Level Rise Scenarios for the United States:  Updated Mean Projections and Extreme Water Level Probabilities Along U.S. Coastlines        (Feb. 2022) ,
Sea Level Rise: According to Petitioner, the GAO Report provides materially different information about flooding risks due to sea level rise and intensifying hurricanes at Turkey Point.
https://oceanservice.noaa.gov/hazards/sealevelrise/sealevelrise-tech                                -report-sections.html          (Sea Level Report)).
To support this claim, Petitioner cites several findings in the GAO Report that Turkey Point is:
 
(1) susceptible to sea level rise, storm surges, and flooding;227 (2) located in a high flood hazard area;228 and (3) susceptible to storm surges from Category 4 and 5 hurricanes.229 Petitioner also 224 10 C.F.R. § 2.309(c)(1)(i) (a participant must demonstrate good cause by showing that: (i) the information upon which the filing is based was not previously available.).
223                            Petition at 58 n. 228 (citing Donald J. Wuebbles et al., Climate Science Special Report: Fourth National Climate Assessment, U.S. Global Change Research Program 197, tbl. 6.4 (2017), https://science2017.globalchange.gov/
225 Motion at 56-57.
downloads/CSSR2017_FullReport.pdf;    id. at 51 n.198 (citing  Sea Level Report)).
226 10 C.F.R. § 2.309(c)(1)(ii).
 
227 Motion at 57.
45 knew how to access the information. As a result, Petitioner cannot satisfy the first element of the
228 Id.
 
229 Id.  
good cause standardthat the information was not previously availablein
 
Section 2.309(c)(1). 224 Petitioners failure to satisfy the first element of the three-                                                                                   part                     good cause
 
standard for a new contention should, by itself, result in the Boards denial of the Motion.
 
Furthermore, the information in the GAO Report also is not materially different than
 
previously available information. Even so, Petitioner                                                 claims that the GAO Report satisfies the
 
materially different requirement because it provides materially different information about three
 
specific categories of climate risks to Turkey Point: (1) flooding risks from rising sea levels and
 
intensifying hurricanes; (2) safety risks from stronger hurricanes; and (3) increased salinity in the
 
CCS because of rising temperatures and drought. 225 As shown below, however, the GAO Report
 
provides no mate        rially different information on these climate         -related impacts either generally or
 
specific to Turkey Point. As a result, Petitioner cannot satisfy the second element of the good
 
cause standard,           226 and the Board should deny the Motion.
 
Sea Level Rise: According to Petitioner, the GAO Report provides materially different
 
information about flooding risks due to sea level rise and intensifying hurricanes at Turkey Point.
 
To support this claim, Petitioner cites several findings in the GAO Report that Tu                    rkey Point is:
 
(1) susceptible to sea level rise, storm surges, and flooding;                 227 (2) located in a high flood hazard
 
area;           228 and (3) susceptible to storm surges from Category 4 and 5 hurricanes.                                                                                                                   229 Petitioner also
 
224                             10 C.F.R. § 2.309(c)(1)(i) (a participant must demonstrate good cause by showing that: (i) the information upon which the filing is based was not previously available.).
 
225                             Motion at 56-         57.
 
226                             10 C.F.R. § 2.309(c)(1)(ii).
 
227                             Motion at 57.
 
228                             Id.
 
229                             Id.
 
46 claims that the GAO Report provides my          riad information demonstrating the reasonably
 
foreseeable risk of overtopping of the Turkey Point CCS. But nothing in the GAO Report on these
 
risks is materially different from previously available information. In addition, these specific risks
 
have already been analyzed by the NRC as part of CLB activities            in response to the accident at the
 
Fukushima Daiichi plant in Japan. 230  And those CLB safety conclusions are beyond the scope of
 
this proceeding.
 
First, the data cited in the GAO Report on sea level rise at Turkey Point is not materially
 
different from previously available information. As noted above, the GAO relied on an interagency
 
report from February 2022 on sea level rise,  231 which is publicly available on NOAAs website.      232
 
Not only was the report available when Petitioner                                    filed its November 2023 Petition, but itcited the
 
report in its Petition. 233  The GAO Report does not contain any new analysis on sea level rise
 
unique to Turkey Point, it merely repackaged the data. For example, the GAO Report includes a
 
map showing projected sea level rise by coastal region (Figure 8 on page 24). 234  But the data in this
 
map is taken directly from the interagency report (Table 2.2 on page 19). 235  The only change to the
 
data made by the GAO was to convert the projected sea level rise from meters to feet.236
 
Converting meters to feet is not materially different information.
 
230                            See                                    Letter from R.          Kuntz, NRC, to M . Nazar, NextEra Energy,                  Turkey Point Nuclear Generating Station, Unit Nos. 3 and 4 -                                Staff Assessment of Response to 10 CFR                          50.54(f) Information Request -            Flood-                                                          Causing Mechanism Reevaluation (TAC No. MF1114 and MF1115)          (Dec. 4, 2014) ( ML14324A816) (Flooding Reevaluation).
 
231                            GAO Report at 23 n.32 (citing Sea Level Report).
 
232                            See Sea Level Report.
 
233                            See Petition at 51 n.198.
 
234                            GAO Report at 24 fig.                                                              8.


235                             Sea Level Report at 19 tbl.           2.2. Moreover, Turkey Points coastal location had not previously been a secret.
47 claims that the GAO Report provides myriad information demonstrating the reasonably foreseeable risk of overtopping of the Turkey Point CCS. But nothing in the GAO Report on these risks is materially different from previously available information. In addition, these specific risks have already been analyzed by the NRC as part of CLB activities in response to the accident at the Fukushima Daiichi plant in Japan.230 And those CLB safety conclusions are beyond the scope of this proceeding.
First, the data cited in the GAO Report on sea level rise at Turkey Point is not materially different from previously available information. As noted above, the GAO relied on an interagency report from February 2022 on sea level rise,231 which is publicly available on NOAAs website.232 Not only was the report available when Petitioner filed its November 2023 Petition, but it cited the report in its Petition.233 The GAO Report does not contain any new analysis on sea level rise unique to Turkey Point, it merely repackaged the data. For example, the GAO Report includes a map showing projected sea level rise by coastal region (Figure 8 on page 24).234 But the data in this map is taken directly from the interagency report (Table 2.2 on page 19).235 The only change to the data made by the GAO was to convert the projected sea level rise from meters to feet.236 Converting meters to feet is not materially different information.
230 See Letter from R. Kuntz, NRC, to M. Nazar, NextEra Energy, Turkey Point Nuclear Generating Station, Unit Nos. 3 and 4 - Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation (TAC No. MF1114 and MF1115) (Dec. 4, 2014) (ML14324A816) (Flooding Reevaluation).
231 GAO Report at 23 n.32 (citing Sea Level Report).
232 See Sea Level Report.
233 See Petition at 51 n.198.
234 GAO Report at 24 fig. 8.
235 Sea Level Report at 19 tbl. 2.2. Moreover, Turkey Points coastal location had not previously been a secret.
236 Compare id. with GAO Report at 24 fig. 8.  


236                            Compare id. with GAO Report at 24 fig.                                                             8.
48 Second, the GAO Report provides no new analysis of risks posed to Turkey Point from rising sea levels. Indeed, the only Turkey Point-specific statement on sea level rise in the GAO Report is in a footnote. In that footnote, the GAO notes that NOAA officials said that the plant is an example of a plant where, if unaddressed, sea level rise could lead to salt water intrusion into the plants cooling canals.237 This cursory statement is not materially different information. In fact, the 2019 FSEIS previously analyzed the potential for overtopping of the CCS.238 Third, the NRC has already reviewed flooding risks from storm surges at Turkey Point caused by more powerful storms and exacerbated by rising sea levels.239 But Petitioner does not engage with the NRCs analysis of these risks at Turkey Point, compare the information used in those analyses to the information in the GAO Report, or otherwise explain how the information in the GAO Report is new or materially different. It is Petitioners burden to demonstrate the existence of new and materially different information, and it has not done so here.
Hurricane Risk: It is simply not news that Turkey Point, located in South Florida, may experience strong hurricanes. Because of its location, Turkey Points CLB includes structures built to withstand such hurricanes and detailed hurricane readiness procedures that FPL must implement before the projected arrival of tropical storm force winds.240 The closest the GAO Report comes to discussing these procedures is providing a picture of a flood barrier at Turkey Point.241 That is not materially different information.
237 GAO Report at 23 n.31.
238 See, e.g., 2019 FSEIS at A-39.
239 See, e.g., Flooding Reevaluation at 13-15.
240 Id. at 7.
241 GAO Report at 19.  


47 Second, the GAO Report provides no new analysis of risks posed to Turkey Point from
49 Rising Temperatures: Petitioner claims the GAO Report provides new, materially different information on the effect rising temperature may have on evaporation rates and, by extension, salinity levels in the CCS. In particular, Petitioner claims that the GAO Report warns that both rising temperatures and sea level rise could exacerbate saltwater intrusion into the CCS and local drinking water aquifers.242 Based on this, Petitioner argues that whereas the Board previously dismissed Petitioners concerns regarding the effects of rising temperatures, citing a lack of evidence that the rising temperature would increase salinity levels to the extent that would affect the environment, the GAO Report has specifically warned that such impacts are reasonably foreseeable.243 The GAO Report does little to apply any data on rising temperatures to Turkey Point, doing so in a small sidebar discussing the drought conditions in 2014 and the NRC-approved increase in cooling water temperature.244 But none of the data in the GAO Report is materially different from previously available information. For example, the 2019 FSEIS squarely discusses the relationship between ambient air temperatures and the CCS, as well as the aforementioned drought conditions in 2014.245 This information is neither new nor materially different from previously available information.
In the NRCs response to the GAO, the NRC noted that the GAO Reports recommendations are very broad but consistent with actions either underway or under development.246 And while the NRC said that the GAO report fairly characterized the NRCs regulatory structure, process, and strengths, the NRC did not agree with its conclusion that it does not address the impacts of climate 242 Motion at 63.
243 Id. at 63-64.
244 GAO Report at 15.
245 2019 FSEIS at 3-53 to 3-54.
246 GAO Report at 65.


rising sea levels. Indeed, the only Turkey Point-specific statement on sea level rise in the GAO
50 change.247 In particular, the layers of conservatism, safety margins, and defense-in-depth policies are incorporated into NRCs processes and provide reasonable assurance regarding any plausible natural hazard for the operational lifetime of the reactor, including those that could result from climate change.248 The NRC also noted that its mission and delegated authority is focused on nuclear safety and, as such, it cannot impose requirements without a nuclear safety justification.249 At bottom, the GAO is an oversight agency that works for Congress to help the government save money and work more efficiently. The GAO is not a technical expert and merely produced a high-level summary of existing government data. And that data was available to Petitioner in November 2023. While the GAOs collection of these sources in a single document is new, the underlying data are not. And even to the extent that the GAO Report discusses potential climate change impacts to Turkey Point, it presents no materially different information from that already available. For these reasons, Petitioner has failed to show good cause for the new contentions, and the Board should deny the Motion for leave to file Contentions 3-A and 3-B.
Accordingly, the Motion should be denied as to Contentions 3-A and 3-B for Petitioners failure to demonstrate good cause as required by 10 C.F.R. § 2.309(c)(1).
: 2.
Contention 3-A Is Inadmissible If the Board finds that Petitioner satisfied the good cause standard for Contention 3-A, the Board should nonetheless reject it because it is inadmissible. Petitioner alleges that the 2024 FSEIS fails to adequately analyze climate change-related environmental impacts that are 247 Id.
248 Id.
249 Id.


Report is in a footnote. In that footnote, the GAO notes that NOAA officials said that the plant is
51 reasonably foreseeable to occur during the [SLR] period.250 In particular, Petitioners claim sea level rise, storm surges and stronger hurricanes, and increased temperatures as climate-related impacts faced by Turkey Point during the SLR period. However, Petitioner fails to raise a genuine dispute on a material issue with the 2024 FSEIS.
: a.
The GAO Report, Itself, Fails to Demonstrate a Genuine Dispute Because It Does Not Evaluate the 2024 FSEIS At most, the GAO Report presents a generalized discussion of potential gaps in the NRCs existing regulatory regime regarding climate change. But this sort of generalized discussion, that has no regulatory weight and presents no criticisms specific to the 2024 FSEIS, falls well short of satisfying the Commissions admissibility requirements.251 In past adjudicatory proceedings, petitioners have cited GAO reports as a purported basis for proposed contentions. Presiding officers have often found that such reports do not provide an independent basis for the admission of a contention because they do not pertain directly to the application being considered. For example, one licensing board found that a GAO report provided useful background on issues raised in a petition.252 But the board did not rely on the GAO report to admit a contention.253 The Commission has also not accorded much weight to generalized conclusions in GAO reports or claims extrapolated from these generalized conclusions. For example, in the recent 250 Motion at 53.
251 See Tenn. Valley Auth. (Bellefonte Nuclear Power Plant), LBP-08-16, 68 NRC 361, 388 (2008) (denying admission of a contention that relied on a GAO report because the contention failed to provide any evidence of environmental or safety concerns specific to the application and constituted no more than an inadmissible generalized grievance regarding NRCs enforcement and regulatory policies.).
252 Va. Elec. & Power Co. (North Anna Power Station, Unit 3), LBP-08-15, 68 NRC 294, 312 n.82 (2008) (discussing a GAO report on the status of low-level radioactive waste disposal availability and the pending closure of the Barnwell, South Carolina facility to non-Atlantic Compact states).
253 See id. at 293-325 (admitting a safety contention as a contention of omission but denying the environmental portion of the contention related to storage and disposal of low-level radioactive waste). The petitioner cited a GAO report on low-level radioactive waste disposal. The board found the GAO report provided some background but the GAO report did not provide a basis for the admitted contention. Id. at 312 n.82.


an example                    of a plant where, if unaddressed, sea level rise could lead to salt water intrusion into
52 license transfer proceeding for the Palisades Nuclear Power Plant, the Commission found that the petitioners costs estimates, which came from industry-wide cost estimates in a GAO report, were too general to support an admissible contention.254 With this background, and as shown below, the GAO Report is too general to support an admissible contention.
As discussed above, the GAO relied on existing data to prepare a broad summary of known potential impacts from climate change for all nuclear plants. In other words, the GAO Report was not singularly, or even remotely focused on Turkey Point or the SLRA. While the GAO performed a site visit to Turkey Point and highlighted some climate-related risks to Turkey Point in the report, none of these risks were new or unknown before the GAO Report. And the generalized treatment of climate risks in the GAO Report lacks the necessary specificity to support an admissible contention.
For example, the GAO Report contains a sidebar on Heat and Drought at Turkey Point Nuclear Generating Station.255 This sidebar summarizes the drought conditions suffered by Turkey Point in 2014 and the NRCs decision to allow Turkey Point to exceed its maximum allowable intake temperature.256 The GAO Report then states that those high temperatures and drought at Turkey Point potentially created risks to local drinking water because of higher salinity levels in the CCS.257 The GAO Report then notes that FPL constructed a series of wells to decrease salinity levels in the CCS.258 In sum, the GAO Reports treatment of heat and drought is 254 Entergy Nuclear Operations. Inc. (Palisades Nuclear Power Plant and Big Rock Point Site), CLI-22-8, 96 NRC 1, 84 (2022) (While the GAO table is broadly cited as support for Joint Petitioners ultimate estimate... none of these categories are specifically identified as forming the basis for the... estimate developed by Joint Petitioners.).
255 GAO Report at 15.
256 Id.
257 Id.
258 Id.


the plants cooling canals.               237  This cursory statement is not materially different information.                           In
53 entirely backward looking. It makes no attempt to use climate data to forecast what might happen in the future during the period of subsequently extended operations. This type of historical review simply fails to raise a genuine dispute with the 2024 FSEIS.
The GAO Report contains little other specific information on climate-related risks for Turkey Point. The other mentions of Turkey Point are in a footnote,259 a picture of a flood protection barrier,260 a statement about the NRCs safety review for Turkey Point Units 6 and 7,261 and in a table summarizing data for every nuclear plant.262 Thus, contrary to Petitioners claim that the GAO Report contains novel analysis of the effects of climate change on nuclear reactors,263 when it comes to Turkey Point, the GAO Report contains little analysis at all.
At bottom, the GAO Report offers little more than the type of generalized conclusions that past boards found insufficient to support an admissible contention.
: b.
Petitioners Arguments Regarding Sea Level Rise, Hurricanes, and Rising Temperatures Fail to Demonstrate a Genuine Dispute Petitioner devotes several pages in Contention 3-A to discussing general information from the GAO Report regarding sea level rise, hurricanes, and rising temperatures. However, it offers only a few vague criticisms of the 2024 FSEIS on these topics. And as explained below, these criticisms are wholly insufficient to demonstrate a genuine dispute.
259 Id. at 23 n.31 (NOAA officials said that Turkey Point Nuclear Generating Station is an example of a plant where, if unaddressed, sea level rise could lead to saltwater intrusion into the plants cooling canals.). Regardless, the GAO Report does not indicate how saltwater intrusion into the saltwater CCS is a material environmental issue.
260 Id. at 19.
261 Id. at 47 n.16.
262 Id. at 55-59.
263 Motion at 53.  


fact, the 2019                                 FSE IS previously analyzed th                                    e potential for overtopping of the CCS.                   238
54 First, Petitioner claims that the discussion of climate-change related sea level rise in the 2024 FSEIS is cursory.264 It points to the NRC Staffs discussion of the Fifth National Climate Assessment and corresponding conclusion that this information did not paint a seriously different picture from what was considered in the 2019 FSEIS. Petitioner purports to dispute the basis for this conclusion, but fails to engage with the conclusion itself or identify any reason the conclusion is incorrect. Far more is required to demonstrate a genuine dispute.
Petitioner also criticizes the 2024 FSEIS for allegedly failing to analyze the impacts of overtopping the CCS.265 However, that analysis is provided in the 2019 FSEIS.266 Whereas, Petitioner fails to engage with that analysis or explain any reason it is deficient in any way.
Likewise, Petitioner appears to criticize the length of the discussion of hurricane-related environmental impacts.267 But it does not explain why anything further is required. Petitioner does not identify any requirement that allegedly is unmet and offers no explanation of why the 2024 FSEIS purportedly falls short of that unidentified requirement.
As to rising temperatures, Petitioner also derides the 2024 FSEIS discussion as cursory and general.268 But its only specific criticism is that it does not discuss how rising temperatures and drought caused by climate change will affect groundwater quality and to what extent.269 However, the discussion of cumulative impacts on water resources is found in Section 4.16.2 of the 2019 FSEIS, which Petitioner did not challenge. As noted therein, [c]limate change can impact groundwater availability and quality as a result of changes in temperature and precipitation, as well 264 Id. at 59.
265 Id. at 60.
266 See, e.g., 2019 FSEIS at A-39.
267 Petition at 60, 62.
268 Motion at 65.
269 Id. at 66.  


Third, the NRC has already reviewed                                                            flooding risks from storm surges at Turkey Point
55 as due to sea level rise.270 That statement is followed by several paragraphs of information, none of which Petitioner engages with or disputes. Ultimately, Petitioner fails to explain why anything further is required.
In sum, Petitioners conclusory criticisms of the 2024 FSEIS discussion of sea level rise and hurricanes fail to supply the requisite demonstration of a genuine material dispute.
Accordingly, Contention 3-A is inadmissible because it fails to satisfy multiple criteria in 10 C.F.R. § 2.309(f)(1).
: 3.
Contention 3-B Is Inadmissible If the Board finds that Petitioner satisfied the good cause standard for Contention 3-B, the Board should nonetheless reject it because it is inadmissible. In Contention 3-B, Petitioner claims the 2024 FSEIS does not comply with NEPA because the NRC fail[ed] to adequately update its evaluation of FPLs SAMA analysis to reflect the effects of climate change on accident risk.271 The basis for Contention 3-B is the GAO Report, which Petitioner claims provides new and significant information concerning climate change-related severe accident risks272 and paints a seriously different picture than the 2024 FSEISs evaluation of severe accident risks.273 As explained below, Contention 3-B is inadmissible because it raises issues outside the scope of this license renewal proceeding and fails to raise a genuine dispute on a material issue.
270 2019 FSEIS at 4-132. The 2024 FSEIS also addresses this topic in Appendix E noting that [s]easonal, annual average, and extreme precipitation across the Southeast will continue to increase and will be driven primarily by more extreme events with greater increases in global surface temperature. 2024 FSEIS at E-9. The 2024 FSEIS also recognizes projected increases in coastal flooding, the intensity of hurricanes, and sea level rise. Id. at E-9 to E-10. The NRC Staff ultimately concludes that it did not identify any new information that would change the 2019 analysis and continues to rely on that analysis. Id. at E-11.
271 Motion at 69.
272 Id. at 70.
273 Id. at 77.


caused by more powerful storms and exacerbated by rising sea levels. 239  But Petitioner does not
56
: a.
Petitioners Spent Fuel Arguments Are Outside the Scope of This Proceeding Contention 3-B relies, in part, on the GAO Reports discussion of increased flooding and storm surge risks caused by climate change.274 Petitioner quotes the GAO Reports statements that by exposing the facility to salt water for prolonged periods, flooding could degrade or corrode a casks exterior, potentially posing risks to the environment275 and that flood waters could interfere with heat removal from spent fuel pools by blocking ventilation ports with water.276 Petitioner then argues that Turkey Points high vulnerability to hurricane storm surges is particularly troubling, as casks of spent nuclear fuel may remain on site after closure.277 In sum, Petitioners flooding concern is entirely premised on risks to spent fuel and spent fuel storage. Such concern, as it relates to SAMAs, is outside the scope of a reactor license renewal proceeding. The Commission has made clear that SAMAs apply only to reactor accidents, not to spent fuel pool accidents.278 As a result, the portion of Contention 3-B that claims the 2024 FSEIS is deficient because the SAMAs do not address increased flooding risks to the safe storage of spent fuel fail to satisfy 10 C.F.R. § 2.309(f)(1)(iii).
: b.
Petitioners Arguments Regarding Sea Level Rise, Hurricanes, and Rising Temperatures Fail to Demonstrate a Genuine Dispute Contention 3-B claims to challenge the 2024 FSEISs evaluation of FPLs SAMA analysis.
But Petitioner has not identified even one specific SAMA that it purports to challenge. And it has not explained how any unspecified SAMAs are insufficient to account for climate change or why 274 Id. at 72-73.
275 Id. at 72 (quoting GAO Report at 19).
276 Id. at 72-73 (quoting GAO Report at 19).
277 Id. at 73.
278 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), LBP-06-23, 64 NRC 257, 291 (2006) (citing Fla. Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI-01-17, 54 NRC 3, 21-22 (2001)).


engage with the NRCs analysis of these risks at Turkey Point, compare the information used in
57 the analysis thereof would lead to any different outcome. As a threshold matter, this approach is inadequate to raise a genuine dispute with regard to the adequacy of the SAMA.279 As a result, Petitioner has not raised a genuine dispute with the 2024 FSEIS.
According to the Commission, a SAMA analysis rests largely on selected inputs and so it may always be possible to conceive of alternative and more conservative inputs, whose use in the analysis could result in greater estimated accident consequences.280 But the Commission also cautioned that SAMA adjudications would prove endless if hearings were triggered merely by suggested alternative inputs and methodologies that conceivably could alter the cost-benefit conclusions.281 Thus, [a] contention proposing alternative inputs or methodologies must present some factual or expert basis for why the proposed changes in the analysis are warranted
[o]therwise, there is no genuine material dispute with the SAMA analysis that was done, only a proposal for an alternative NEPA analysis that may be no more accurate or meaningful.282 Unless it looks genuinely plausible that inclusion of an additional factor or use of other assumptions or models may change the cost-benefit conclusions for the SAMA candidates evaluated, no purpose would be served to further refine the SAMA analysis, whose goal is only to determine what safety enhancements are cost-effective to implement.283 While Petitioner makes vague arguments about including climate risks in the SAMA analysis, these arguments fail to identify specific SAMAs or specific inputs that would change the SAMA analysis. More specifically, at the beginning of each of the first three subsections in 279 Nuclear Mgmt. Co., LLC (Monticello Nuclear Generating Plant), LBP-05-31, 62 NRC 735, 762 (2005).
280 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), CLI-12-5, 75 NRC 301, 323 (2012).
281 Id.
282 Id.
283 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287, 317 (2010).


those analyses to the information in the GAO Report, or otherwise explain how                        the information in
58 Contention 3-B, related to Flooding-related risks, Hurricane-related risks, and Temperature-related risks, Petitioner includes a rote assertion that The 2024 FSEIS fails to adequately update its SAMA evaluation to reflect the [flooding/hurricane/temperature]-related effects of climate change on accident risk.284 Petitioner then provides a summary of the GAO report on each subject.
However, it does not engage with any portion of the SAMA analysis. It does not identify any SAMA that potentially would be affected by flooding, or hurricanes, or ambient air temperature. It does not explain the current parameters of those SAMAs or contrast those parameters with some new parameter that allegedly should be used instead, or explain why the existing parameter is materially insufficient. In other words, contrary to 10 C.F.R. § 2.309(f)(1)(vi), Petitioner has not bothered to identify the specific portions of the SAMA analysis that it disputes or any supporting reasons to explain why those unidentified SAMAs fall short of some unspecified requirement in Part 51. Simply put, Contention 3-B falls well short of what is needed for an admissible contention on SAMAs.
Accordingly, Contention 3-B is inadmissible because it fails to satisfy multiple criteria in 10 C.F.R. § 2.309(f)(1).
V.
THE BOARD SHOULD DENY THE WAIVER REQUEST A.
Legal Standards for Waivers As the Commission has explained, Section 2.335(b) provides only a limited exception to the NRCs general prohibition against challenges to NRC rules or regulations in adjudicatory proceedings.285 In general, when the Commission decides to carv[e] out issues from adjudication, 284 Motion at 72-74.
285 Exelon Generation Co., LLC (Limerick Generating Station, Units 1 and 2), CLI-13-7, 78 NRC 199, 206 (2013).


the GAO Report is new or materially different. It is Petitioners burden to demonstrate t                  he
59 it does so carefully and deliberately pursuant to its broad statutory discretion to transact its business broadly, through rulemaking, or case-by-case, through adjudication.286 Thus, to challenge the generic application of a rule, a petitioner seeking waiver must show that there is something extraordinary about the subject matter of the proceeding such that the rule should not apply.287 More specifically, to litigate an issue that otherwise would be outside the scope of an adjudication, a petitioner must show that special circumstances with respect to the subject matter of the particular proceeding are such that the application of the rule or regulation (or a provision of it) would not serve the purposes for which... [it] was adopted.288 The waiver petitioner must include an affidavit that states with particularity the special circumstances that justify waiver of the rule.289 In 2005, in the Millstone license renewal proceeding, the Commission set forth a four-part test that it has long used in ruling on waiver petitions.290 That test requires the petitioner to show that:
(1)
The rules strict application would not serve the purposes for which it was adopted; (2)
Special circumstances exist that were not considered, either explicitly or by necessary implication, in the rulemaking proceeding leading to the rule sought to be waived; (3)
Those circumstances are unique to the facility rather than common to a large class of facilities; and (4)
Waiver of the regulation is necessary to reach a significant safety (or environmental) problem.291 286 Id. at 207 (citations omitted).
287 Id.
288 Id. at 206-07 (quoting 10 C.F.R. § 2.335(b)).
289 Id. at 207 (quoting 10 C.F.R. § 2.335(b)).
290 Dominion Nuclear Conn., Inc. (Millstone Nuclear Power Station, Units 2 and 3), CLI-05-24, 62 NRC 551, 559-60 (2005).
291 See id.


existence of new and materially different information, and it has not done so here.
60 All four Millstone elements must be met to justify a rule waiver.292 The Commission has noted that this purposefully places a substantial burden on waiver petitioners because the agency will not set aside a duly-promulgated regulation lightly, and because the Commissions longstanding view is that in general, challenges to regulations are best evaluated through generic means.293 In the context of a Part 51 waiver, the Commission has held that a petitioner must present specific, fact-based claims... not mere allegations.294 In other words, a waiver petition is not an opportunity to embark upon a fishing expedition; waiver petitioners must make the requisite presentation upfront.
B.
Petitioners Waiver Request Should Be Denied Petitioner seeks a waiver of 10 C.F.R. §§ 51.53(c)(3), 51.71(d) and Part 51 Subpart A, Appendix B, in order to challenge the adequacy of the 2024 FSEISs alleged failure to update the SAMA analysis.295 Petitioner claims that it requests a waiver in case the Board interprets those regulations to preclude Petitioners Contention 3-B.
: 1.
The Board Should Deny the Waiver Request Because It Is Unnecessary As explained above in Section III, the 2024 Rule does not impact this proceeding. In FPLs view, a waiver is not needed for the Board to consider Contention 3-B. That contention challenges a site-specific SAMA analysis in the 2024 FSEIS that does not rely on the 2024 Rule. Because a waiver is not needed to challenge a site-specific analysis, the Waiver Request should be denied.
292 See Limerick, CLI-13-7, 78 NRC at 208.
293 Id.
294 Interim Storage Partners LLC (WCS Consolidated Interim Storage Facility), CLI-20-15, 92 NRC 491, 506 n.111 (2020) (quoting Private Fuel Storage, LLC (Indep. Spent Fuel Storage Installation), CLI-04-22, 60 NRC 125, 134 (2004)).
295 Waiver Request at 1.  


Hurricane Risk: It is simply not news that Turkey Point, located in South Florida, may
61
: 2.
If the Board Determines a Waiver is Necessary to Consider Contention 3-B, It Should Deny the Waiver Request Because Petitioner Has Not Made the Requisite Prima Facie Showing Alternatively, if the Board nevertheless concludes that 2024 Rule does apply and precludes Contention 3-B absent a waiver, the Board should deny the Waiver Request because, as shown below, Petitioner has not satisfied the requirements for a waiver.
: a.
Millstone Factor 1: Purpose for Which the Regulation was Adopted Petitioner failed to show that strict application of the rules would not serve the purpose for which they were enacted. To the contrary, strict application of the new rules for SLR environmental reviews would precisely serve the purpose for which those rules were enacted. The new rules reflect the culmination of a two-year review by the NRC of environmental impacts during one term of SLR. At the end of that process, the NRC determined that severe accidents should be a Category 1 issue. According to NRC Staff, after its review of new information it determined that the overall risk posed by severe accidents is less than originally stated by a significant margin.296 In addition, the NRC determined that new information in the 2024 GEIS did not contribute sufficiently to the environmental impacts to warrant further SAMA analysis because the likelihood of finding cost-effective significant plant improvements is small.297 The NRCs decision to categorize severe accidents as Category 1 issue was based on a reasoned analysis, and Petitioner has not shown why the application of the new rule would not serve the purpose for which it was adopted. In fact, the Waiver Request does not mention, discuss, or analyze those purposes whatsoever. It merely makes the conclusory assertion that application of the rule would preclude the admission of Contention 3-B, which Petitioner claims would therefore 296 SECY-24-0017, Final Rule: Renewing Nuclear Power Plant Operating LicensesEnvironmental Review at Encl. 1, p. 51 (Feb. 21, 2024) (ML23205A024) (emphasis added).
297 Id.


experience strong hurricanes. Because of its location, Turkey Points CLB includes structures built
62 undermine the safety purposes of the SAMA analysis.298 However, SAMA analyses are environmental reviews; they have no safety purpose whatsoever. Petitioner fundamentally misunderstands the purpose of SAMA analyses, and identifies no reason that application of the rule would not serve its purpose.
 
: b.
to withstand such hurricanes and detailed hurricane readiness procedures that FPL must implement
Millstone Factors 2 and 3: Special Circumstances Unique to the Plant The second and third Millstone elements require demonstration of a circumstance that was not considered, either explicitly or by necessary implication, in the rulemaking proceeding leading to the rule sought to be waived,299 and that is specific to the plant. Petitioner claims the recent publication of the GAO Report and its identification of Turkey Point as being at high risk for flooding and high-intensity hurricanes constitute special circumstances.300 But the GAO Report, and the occurrence of flooding and hurricanes at Turkey Point, is not such a circumstance.
 
The GAO Report is not a new and novel analysis of climate risk as Petitioner claims. As explained above, the GAO Report compiled and summarized already available government data and provided a high-level overview of climate risks generally. While the GAO document is new, the underlying information and data have long been publicly available.
before the projected arrival of tropical storm force winds. 240  The closest the GAO Report comes to
Even so, Petitioner identifies no information in the GAO Report that is surprising or unexpected in the context of severe accident analysis. For example, Petitioner notes that the GAO Report identified Turkey Point to be at risk of high-intensity hurricanes.301 But that is not new information and does not constitute a special circumstance of which the NRC was unaware when it promulgated the rule. Turkey Points ability to withstand flooding and strong hurricanes has been 298 Waiver Request at 7.
 
299 Millstone, CLI-05-24, 62 NRC at 559-60 (citation omitted).
discussing these procedures is providing a picture of a flood barrier at Turkey Point. 241  Th                        at is not
300 Waiver Request at 8.
 
301 Id. at 8.  
materially different information.
 
237                            GAO Report at 23 n.31.
 
238                            See, e.g., 2019                                        FSEIS                      at A-39.
 
239                            See, e.g.                                  , Flooding Reevaluation at 1  3-          15.
 
240                            Id. at 7.
 
241                            GAO Report at 19.
 
48 Rising Temperatures:  Petitioner claims the GAO Report provides new, materially different
 
information on the effect rising temperature may have on evaporation rates and, by extension,
 
salinity levels in the CCS. In particular, Petitioner claims that the GAO Report warns that both
 
rising temperatures and sea level rise could exacerbate saltwater intrusion into the CCS and local
 
drinking water aquifers. 242  Based on this, Petitioner argues that whereas the Board previously
 
dismissed Petitioners concerns regarding the effects of rising temperatures, citing a lack of
 
evidence that the rising temperature would increase salinity levels to the extent that would affect the
 
environment, the GAO Report has specifically warned that such impacts are reasonably
 
foreseeable.          243  The GAO Report does little to apply any data on rising temperatures to Turkey
 
Point, doing so in a small sidebar            discussing the drought conditions in 2014 and the NRC-approved
 
increase in cooling water temperature.244  But none of the data in the GAO Report is materially
 
different from previously available information. For example, the 2019 FSEIS squarely discusses
 
the relationship between ambient air temperatures and the CCS, as well as the aforementioned
 
drought conditions in 2014. 245  This information is neither new nor materially different from
 
previously available information.
 
In the NRCs response to the GAO, the NRC noted that the GAO Reports recommendations
 
are very broad but consistent with actions either underway or under development.                                                246  And while
 
the NRC said that the GAO report fairly characterized the NRCs regulatory structure, process                        , and
 
strengths, the NRC did not agree with its conclusion that it does not address the impacts of climate
 
242                            Motion at 63.
 
243                            Id. at 63-          64.
 
244                            GAO Report at 15.
 
245                            2019                                                                                FSEIS                      at 3-53 to 3-                              54.
 
246                            GAO Report at 65.
 
49 change. 247  In particular, the layers of          conservatism, safety margins, and defense-in-depth policies
 
are incorporated into NRCs processes and provide reasonable assurance regarding any plausible
 
natural hazard for the                  operational lifetime of the reactor, including those that could result from
 
climate change.          248  The NRC also noted that its mission and delegated authority is focused on
 
nuclear safety and, as such, it cannot impose requirements without a nuclear safety justification. 249
 
At bottom, the GAO is an oversight agency that works for Congress to help the government
 
save money and work more efficiently. The GAO is not a technical expert and merely produced a
 
high-level summary of existing government data. And that data was available to Petitioner in
 
November 2023. While the GAOs collection of these sources in a single document is new, the
 
underlying data are not. And even to the extent that the GAO Report discusses potential climate
 
change impacts to Turkey Point, it presents no materially different information from that already
 
available. For these reasons, Petitioner has failed to show good cause for the new contentions,
 
and the Board should deny the Motion for leave to file Contentions 3-A and 3-                                              B.
 
Accordingly, the Motion should be denied as to Contentions 3-A and                                              3-B for Petitioners
 
failure to demonstrate good cause as required by 10 C.F.R. § 2.309(c)(1).
: 2.                                                                                                                                  Contention 3-A Is Inadmissible
 
If the Board finds that Petitioner satisfied the good cause standard for Contention 3-A, the
 
Board should nonetheless reject it because it is inadmissible. Petitioner                                    alleges that the
 
2024 FSE IS                                                                                                                      fails to adequately analyze climate c        hange-related environmental impacts that are
 
247                            Id.
 
248                            Id.
 
249                            Id.
 
50 reasonably foreseeable to occur during the [SLR] period.                          250  In particular, Petitioners claim sea
 
level rise, storm surges and stronger hurricanes, and increased temperatures as climate-related
 
impacts faced by Turkey Point during the SLR period. However, Petitioner fails to raise a genuine
 
dispute on a material issue with the 2024 FSE IS                                                                                                                        .
: a.                                                                                                                                  The GAO Report, Itself, Fails to Demonstrate a Genuine Dispute Because It Does Not Evaluate the 2024 FSEIS
 
At most, the GAO Report presents a generalized discussion of potential                        gaps in the NRCs
 
existing regulatory regime regarding climate change. But this sort of generalized discussion, that
 
has no regulatory weight and presents no criticisms specific to the 2024 F                                                                        S EIS, falls well short of
 
satisfying the Commissions admissibility requirements.                  251  In past adjudicatory proceedings,
 
petitioners have cited GAO reports as a purported bas                                          is for proposed contentions. Presiding officers
 
have often found that such reports do not provide an independent basis for the admission of a
 
contention because they do not pertain directly to the application being considered. For example,
 
one licensing board found that a GAO report provided useful background on issues raised in a
 
petition. 252  But the board did not rely on the GAO report to admit a contention. 253
 
The Commission has also not accorded much weight to generalized conclusions in GAO
 
reports or claims extrapolated from these generalized conclusions. For example, in the recent
 
250                            Motion at 53.
 
251                            See                                    Tenn. Valley Auth. (Bellefonte Nuclear Power Plant), LBP                                      16, 68 NRC 361, 388 (2008) (denying admission of a contention that relied on a GAO report because the contention failed to provide any evidence of environmental or safety concerns specific to the appl        ication and constituted no more than an inadmissible generalized grievance regarding NRCs enforcement and regulatory policies.).
 
252                            Va. Elec. & Power Co. (North Anna Power Station, Unit 3), LBP                                          15, 68 NRC 294, 312 n.82 (2008) (discussing a GAO report on the status of low -level radioactive waste disposal availability and the pending closure of the Barnwell, South Carolina facility to non-Atlantic Compact states).
 
253                            See id. at 293-        325 (admitting a safety contention as a contention of omission but denying the environmental portion of the contention related to storage and disposal of low      -level radioactive waste).            The petitioner cited a GAO report on low -level radioactive waste disposal. The board found the GAO report provided some background but the GAO report did not provide a basis for the admitted contention. Id.                          at 312 n.82.
 
51 license transfer proceeding for the Palisades Nuclear Power Plant, the Commission found that the
 
petitioners costs estimates, which came from                industry-wide cost estimates in a GAO report, were
 
too general to support an admissible contention. 254  With this background, and as shown below, the
 
GAO Report is too general to support an admissible contention.
 
As discussed above, the GAO relied on existing data to prepare a broad summary of known
 
potential impacts from climate change for all nuclear plants. In other words, the GAO Report was
 
not singularly, or even remotely focused on Turkey Point or the SLRA. While the GAO performed
 
a site visit to Turkey Point and highlighted some climate  -related risks to Turkey Point in the report,
 
none of these risks were new or unknown before the GAO Report. And the generalized treatment
 
of climate risks in the GAO R            eport lacks the necessary specificity to support an admissible
 
contention.
 
For example, the GAO Report contains a sidebar                      on Heat and Drought at Turkey Point
 
Nuclear Generating Station.          255  This sidebar                                    summarizes the drought conditions suffered by
 
Turkey Point in 2014 and the NRCs decision to allow Turkey Point to exceed its maximum
 
allowable intake temperature. 256  The GAO Report then states that those high temperatures and
 
drought at Turkey Point potentially created risks to local drinking water because of higher
 
salinity levels in the CCS.            257  The GAO Report then notes that FPL constructed a series of wells to
 
decrease salinity levels in the CCS.258  In sum, the GAO Reports treatment of heat and drought is
 
254                            Entergy Nuclear Operations. Inc. (            Palisades Nuclear Power Plant and Big Rock Point Site)  , CLI                                        8, 96 NRC 1, 84 (2022)  (While the GAO table is broadly cited as support for Joint Petitioners ultimate estimate .          . . none of these categories are specifically identified as forming the basis for the .  . . estimate developed by Joint Petitioners.      ).
 
255                            GAO Report at 15.
 
256                            Id.
 
257                            Id.
 
258                            Id.
 
52 entirely backward looking. It makes no attempt to use                        climate data to forecast what might happen
 
in the future during the period of subsequently extended operations. This type of historical review
 
simply fails to raise a genuine dispute with the 2024 FSE IS                                                                                                                          .
 
The GAO R                                                                                                                              eport contains little other specific info            rmation on climate                                                                                                                        -related risks for
 
Turkey Point. The other mentions of Turkey Point are in a footnote,  259 a picture of a flood
 
protection barrier,  260 a statement about the NRCs safety review for Turkey Point Units 6 and 7,                                                  261
 
and in a table summarizing data for every nuclear plant.262  Thus, contrary to Petitioners claim that
 
the GAO Report contains novel analysis of the effects of climate change on nuclear reactors,                    263
 
when it comes to Turkey Point, the GAO Report contains little analysis at all.
 
At bottom, the GAO Report offers little more than the type of generalized conclusions that
 
past boards found insufficient to support an admissible contention.
: b.                                                                                                                                  Petitioners Arguments Regarding Sea Level Rise, Hurricanes, and Rising Temperatures Fail to Demonstrate a Genuine Dispute
 
Petitioner devotes several pages in Contention 3-A to discussing general information from
 
the GAO Report regarding sea level rise, hurricanes, and rising temperatures. However, it offers
 
only a few vague criticisms of the 2024 FSE IS                                                                                                                        on these topics. And as explained below, these
 
criticisms are wholly insufficient to demonstrate a genuine dispute.
 
259                            Id. at 23 n.31 (NOAA officials said that Turkey Point Nuclear Generating Station is an example of a plant where, if unaddressed, sea level rise could lead to saltwater intrusion into the plants cooling canals.          )      . Regardless, the GAO Report does not indicate how saltwater intrusion into the saltwater CCS is a material environmental issue.
 
260                            Id. at 19.
 
261                            Id. at 47 n.16.
 
262                            Id. at 55-          59.
 
263                            Motion at 53.
 
53 First, Petitioner claims that the discussion of climate                                                                -change related sea level rise in the
 
2024 FSE IS                                                                                                            is cursory.                    264  It points to the NRC Staff            s discussion of the Fifth National Climate
 
Assessment and corresponding conclusion that this information did not paint a seriously different
 
picture from what was considered in the 2019 FSE IS                                                                                                                                          . Petitioner purports to dispute the basis for
 
this conclusion, but fails to engage with the conclusion itself or identify any reason the conclusion is
 
incorrect. Far more is required to demonstrate a genuine dispute.
 
Petitioner also criticizes the 2024 FSE IS                                                                                                                          for            allegedly failing to analyze the impacts of
 
overtopping the CCS.          265  However, that analysis is provided in the 2019 FS EIS                                                                                                                        . 266  Whereas,
 
Petitioner fails to engage with that analysis or explain any reason it is deficient in any way.
 
Likewise, Petitioner appears to criticize the length of the discussion of hurricane-                          related
 
environmental impacts. 267  But it does not explain why anything further is required. Petitioner does
 
not identify any requirement that allegedly is unmet and offers no explanation of why the
 
2024 FSE IS                                                                                                            purportedly falls short of that unidentified requirement.
 
As to rising temperatures, Petitioner also derides              th            e 2024 FSE IS                                                                                                                                              discussion as cursory and
 
general.          268  But its only specific criticism is that it does not discuss how rising temperatures and
 
drought caused by climate change will affect groundwater quality and to what extent.          269  However,
 
the discussion of cumulative impacts on water resources is found in Section                                    4.16.2 of the
 
2019 FSE IS                                                                                                            , which Petitioner did not challenge. As noted therein, [c]        limate change can impact
 
groundwater availability and quality as a result of changes in temperature and precipitation, as well
 
264                            Id. at 59.
 
265                            Id. at 60.
 
266                            See, e.g., 2019                                        FSEIS                      at A-39.
 
267                            Petition at 60, 62.
 
268                            Motion at 65.
 
269                            Id. at 66.
 
54 as due to sea level rise.            270  That statement is followed by several paragraphs of information, none
 
of which Petitioner engages with or disputes. Ultimately, Petitioner fails to explain why anything
 
further is required.
 
In sum, Petitioners conclusory criticisms of the 2024 FSE IS                                                                                                                              discussion of sea level rise
 
and hurricanes fail to supply the requisite demonstration of a genuine material dispute.
 
Accordingly, Contention 3-A is inadmissible because it fails to satisfy multiple criteria in 10
 
C.F.R. § 2.309(f)(1).
: 3.                                                                                                                                  Contention 3-B Is Inadmissible
 
If the Board finds that Petitioner satisfied the good cause standard for Contention 3-B, the
 
Board should nonetheless reject it because it is inadmissible. In Contention 3-B, Petitioner claims
 
the 2024 FSE IS                                                                                                                                              does not comply with NEPA because the NRC fail[ed] to adequately update its
 
evaluation of FPLs SAMA analysis to reflect the effects of climate change on accident risk.                                                                    271
 
The basis for Contention 3-B is the GAO Report, which Petitioner claims provides new and
 
significant information concerning climate change-                  related severe accident risks        272 and paints a
 
seriously different picture than the 2024                  FSE ISs evaluation of severe accident risks.      273  As
 
explained below, Contention 3-B is inadmissible because it raises issues outside the scope of this
 
license renewal proceeding and fails to raise a genuine dispute on a material issue.
 
270                            2019                                                                                FSEIS                      at 4-132. The 2024 FSEIS also address                      es this topic in Appendix E            noting that        [s]easonal, annual average, and extreme precipitation across the Southeast will continue to increas e and will be driven primarily by more extreme events with greater increases in global surface temperature.                            2024                                                            FSEIS at E-9. The 2024                                          FSEIS also recognizes projected increases in coastal flooding, the intensity of hurricanes, and sea level rise. Id.                                      at E-9 to E-10. The NRC Staff ultimately concludes that it did not identify any new information that would change the 2019 analysis and continues to rely on that analysis. Id                        . at E-11.
 
271                            Motion at 69.
 
272                            Id. at 70.
 
273                            Id. at 77.
 
55
: a.                                                                                                                                  Petitioners Spent Fuel Arguments Are Outside the Scope of This Proceeding
 
Contention 3-B relies, in part, on the GAO Reports discussion of increased flooding and
 
storm surge risks caused by climate change.274  Petitioner quotes the GAO Reports statements that
 
by exposing the facility to salt water for prolonged periods, flooding could degrade or corrode a
 
casks exterior, potentially posing risks to the environment                  275 and that flood waters could
 
interfere with heat removal from spent fuel pools by blocking ventilation ports with water.              276
 
Petitioner then argues that Turkey Point                                                  s    high vulnerability                                  to hurricane storm surges is
 
particularly troubling, as casks of spent nuclear fuel may remain on site after closure.                            277  In sum,
 
Petitioners flooding concern is entirely premised on                                        risks to spent fuel and spent fuel storage. Such
 
concern, as it relates to SAMAs, is outside the scope of a reactor license renewal          proceeding. The
 
Commission has made clear that SAMAs apply only to reactor accidents, not to spent fuel pool
 
accidents.            278  As a result, the portion of Contention 3-                                  B that claims the 2024 FSE IS                                                                                                                                                                      is deficient
 
because the SAMAs do not address increased flooding risks to the safe storage of spent fuel fail to
 
satisfy 10 C.F.R. § 2.309(f)(1)(iii).
: b.                                                                                                                                  Petitioners Arguments Regarding Sea Level Rise, Hurricanes, and Rising Temperatures Fail to Demonstrate a Genuine Dispute
 
Contention 3-B claims to challenge th                                            e 2024                                  FSEISs evaluation of FPLs SAMA analysis.
 
But Petitioner has not identified even one specific SAMA                                                          that it purports to challenge. And it has
 
not explained            how any unspecified SAMAs are insufficient to account for                                                                                      climate change or why
 
274                            Id. at 72-          73.
 
275                            Id. at 72 (quoting GAO Report at 19)  .
 
276                            Id. at 72-7        3 (quoting GAO Report at 19).
 
277                            Id. at 73.
 
278                            Entergy Nuclear Generation Co.                      (Pilgrim Nuclear Power Station), LBP-                    06-                                      23, 64 NRC 257,  291 (2006) (citing Fla. Power & Light Co. (            Turkey Point Nuclear Generating Plant, Units 3 and 4)  , CLI-01-17, 54 NRC 3, 21-          22 (2001)).
 
56 the analysis thereof would lead to any different outcome. As a threshold matter, this approach is
 
inadequate to                                raise a genuine dispute with regard to the adequacy of the SAMA.                    279  As a result,
 
Petitioner has not raised a genuine dispute with the 2024 FSE IS                                                                                                                        .
 
According to the Commission, a SAMA analysis rests largely on selected inputs and so it
 
may always be possible to conceive of alternative and more conservative inputs, whose use in the
 
analysis could result in greater estimated accident consequences.          280  But the Commission also
 
cautioned that SAMA adjudications would prove endless if hearings were triggered merely by
 
suggested alternative inputs and methodologies that conceivably could alter the cost-benefit
 
conclusions.          281  Thus, [a] contention proposing alternative inputs or methodologies must present
 
some factual or expert basis for why the proposed changes in the analysis are warranted
 
[o]therwise, there is no genuine material dispute with the SAMA analysis that was done, only a
 
proposal for an alternative NEPA analysis that may be no more accurate or meaningful.          282  U        nless
 
it looks genuinely plausible that inclusion of an additional factor or use of other assumptions or
 
models may change the cost-benefit conclusions for the SAMA candidates evalu          ated, no purpose
 
would be served to further refine the SAMA analysis, whose goal is only to determine what safety
 
enhancements are cost-effective to implement.                        283
 
While Petitioner makes vague arguments about including climate risks in the SAMA
 
analysis, these arguments fail to identify specific SAMAs or specific inputs that would change the
 
SAMA analysis. More specifically, at the beginning of each of the first three subsections in
 
279                            Nuclear Mgmt. Co., LLC (Monticello Nuclear Generating Plant), LBP                                                                          31, 62 NRC 735, 762 (2005).
 
280                            NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), CLI                                                    5, 75 NRC 301, 323 (2012).
 
281                            Id.
 
282                            Id.
 
283                            Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI            11, 71 NRC 287, 317 (2010).
 
57 Contention 3-B, related to Flooding-        related risks, Hurricane-                                    related risks, and Temperature-
 
related risks, Petitioner includes a rote assertion that The 2024                                                FSE IS fails to adequately update
 
its SAMA evaluation to reflect the [flooding/hurricane/temperature]-related effects of climate
 
change on accident risk.          284  Petitione                        r then provides a summary of the GAO report on each subject.
 
However, it does not engage with any portion of the SAMA analysis. It does not identify any
 
SAMA that potentially would be affected by flooding, or hurricanes, or ambient air temperature. It
 
does not explain the current parameters of those SAMAs or contrast those parameters with some
 
new parameter that allegedly should be used instead, or explain why the existing parameter is
 
materially insufficient. In other words, contrary to 10 C.F.R. § 2.309(f)(1)(vi), Petitioner has not
 
bothered to identify the specific portions          of the SAMA analysis that it disputes or any supporting
 
reasons to explain why those unidentified SAMAs fall short of some unspecified requirement in
 
Part 51. Simply put, Contention 3-B falls well short of what is needed for an admissible contention
 
on SAMAs.
 
Accordingly, Contention 3-B is inadmissible because it fails to satisfy multiple criteria in 10
 
C.F.R. § 2.309(f)(1).
 
V.                                                                                    THE BOARD SHOULD DENY THE WAIVER REQUEST
 
A.                                                                                    Legal Standards for Waivers
 
As the Commission has explained, Section                                                2.335(b) provides only a limited exception to
 
the NRCs    general prohibition against challenges to NRC rules or regulations in adjudicatory
 
proceedings. 285  In general, when the Commission decides to carv[e] out issues from adjudication,
 
284                            Motion at 72-          74.
 
285                            Exelon Generation Co., LLC (Limerick Generating Station, Units 1 and 2), CLI                7, 78 NRC 199, 206 (2013).
 
58 it does so carefully and deliberately pursuant to its broad statutory discretion to transact its
 
business broadly, through rulemaking, or case-by-case, through adjudication.          286  Thus, to challenge
 
the generic application of a rule, a petitioner seeking waiver must show that there is something
 
extraordinary about the subject matter of the proceeding such that the rule should not apply.          287
 
More specifically, to litigate an issue that otherwise would be outside the scope of an adjudication, a
 
petitioner must show that              special circumstances with respect to the subject matter of the particular
 
proceeding are such that the application of the rule or regulation (or a provision of it) would not
 
serve the purposes for which . . . [it] was adopted.              288  The waiver petitioner must include an
 
affidavit that states              with particularity the special circumstances that justify waiver of the rule.                      289
 
In 2005, in the Millstone license renewal proceeding, the Commission set forth a four-            part
 
test that it has long used in ruling on waiver petitions. 290  That test requires the petitioner to sho                        w
 
that:
 
(1)                                                                          The rules strict application would not serve the purposes for which it was adopted;
 
(2)                                                                          Special circumstances exist that were not considered, either explicitly or by necessary implication, in the rulemaking proceeding leading to the rule sought to be waived;
 
(3)                                                                          Those circumstances are unique to the facility rather than common to a large class of facilities; and
 
(4)                                                                          Waiver of the regulation is necessary to reach a significant safety (or environmental) problem. 291
 
286                            Id. at 207 (citations omitted).
 
287                            Id.
 
288                            Id. at 206-        07 (quoting 10 C.F.R. § 2.335(b)).
 
289                            Id. at 207 (quoting 10 C.F.R. § 2.335(b)).
 
290                            Dominion Nuclear Conn., Inc. (Millstone Nuclear Power Station, Units 2 and                      3), CLI-            05-                                      24, 62 NRC 551, 55  9-          60 (2005).
 
291                            See id.
 
59 All four Millstone elements must be met to justify a rule waiver.                                            292  The Commission has
 
noted that this purposefully places a substantial burden on waiver petitioners because t                he agency
 
will not set aside a duly          -promulgated regulation lightly, and because the Commissions
 
longstanding view is that in general, challenges to regulations are best evaluated through generic
 
means.          293  In the context of a Part 51 waiver, the Commission has held that a petitioner must
 
present specific, fact      -based claims . . . not mere allegations.          294  In other words, a waiver petition
 
is not an opportunity to embark upon a fishing expedition; waiver petitioners must make the
 
requisite presentation upfront                                                            .
 
B.                                                                                      Petitioners Waiver Request Should Be Denied
 
Petitioner seeks a waiver of 10 C.F.R. §§ 51.53(c)(3), 51.71(d) and Part 51 Subpart A,
 
Appendix B, in order to challenge the adequacy of the 2024 FSE IS                                                                                                                        s alleged failure to update the
 
SAMA analysis. 295  Petitioner claims that it requests a waiver in case the Board interprets those
 
regulations to preclude Petitioners Contention 3-B.
: 1.                                                                                                                                  The Board Should Deny the Waiver Request Because It Is Unnecessary
 
As explained above in Section III, the 2024 Rule does not impact this proceeding. In FPLs
 
view, a waiver is not needed for the Board to consider Contention 3-B. That contention challenges
 
a site-specific SAMA analysis in the 2024 FSEIS that does not rely on the 2024 Rule. Because a
 
waiver is not needed to challenge a site-specific analysis, the Waiver Request should be denied.
 
292                            See Limerick, CLI                                  7, 78 NRC at 208.
 
293                            Id.
 
294                            Interim Storage Partners LLC (WCS Consolidated Interim Storage Facility), CLI                      15, 92 NRC 491, 506 n.111 (2020) (quoting  Private Fuel Storage, LLC  (Indep. Spent Fuel Storage Inst  allation), CLI                                      22, 60 NRC 125, 134 (2004)).
 
295                            Waiver Request at 1.
 
60
: 2.                                                                                                                                  If the Board Determines a Waiver is Necessary to Consider Contention 3-B, It Should Deny the Waiver Request Because Petitioner Has Not Made the Requisite Prima Facie Showing
 
Alternatively, if the Board nevertheless concludes that 2024 Rule does apply and precludes
 
Contention 3-B absent a waiver, the Board should deny the Waiver Request because, as shown
 
below, Petitioner has not satisfied the requirements for a waiver.
: a.                                                                                                                                  Millstone Factor 1:  Purpose for Which the Regulation was Adopted
 
Petitioner failed to show that strict application of the rules would not serve the purpose for
 
which they were enacted. To the contrary, strict application of the new rules for SLR
 
environmental review          s would precisely serve the purpose for which those rules were enacted. The
 
new rules reflect the culmination of a two -year review by the NRC of environmental impacts during
 
one term of SLR. At the end of that process, the NRC determined that severe accidents should be
 
a Category 1 issue. According to NRC Staff                                    , after its review of new information it determined
 
that the overall risk posed by severe accidents is less than originally stated  by a significant
 
margin.                                  296  In addition, the NRC determined that new information in the 2024 GEIS did not
 
contribute sufficiently to the environmental impacts to warrant furth  er SAMA analysis because the
 
likelihood of finding cost-effective significant plant improvements is small.            297
 
The NRCs decision to categorize severe accidents as Category 1 issue was based on a
 
reasoned analysis, and Petitioner has not shown why the application of the new rule would not serve
 
the purpose for which it was adopted. In fact, the Waiver Request does not mention, discuss, or
 
analyze those purposes whatsoever. It merely makes the conclusory assertion that application of the
 
rule would preclude the admission of Contention 3-B, which Petitioner claims would therefore
 
296                            SECY                                      0017, Final Rule: Renewing Nuclear Power Plant Operating Licenses    Environmental Review at Encl. 1, p. 51 (Feb. 21, 2024) (ML23205A024) (emphasis added).
 
297                            Id.
 
61 undermine the safety purposes of the SAMA analysis.           298 However, SAMA analyses are
 
environmental reviews; they have no safety purpose whatsoever. Petitioner fundamentally
 
misunderstands the purpose of SAMA analyses, and identifies no reason that application of the rule
 
would not serve its purpose.
: b.                                                                                                                                   Millstone Factors 2 and 3: Special Circumstances Unique to the Plant
 
The second and third Millstone element                                                s require demonstration of a circumstance that was
 
not considered, either explicitly or by necessary implication, in the rulemaking proceeding leading
 
to the rule sought to be waived,           299 and that is specific to the plant. Petitioner claims the recent
 
publication of the GAO Report and its identification of Turkey Point as being at high risk for
 
flooding and high-intensity hurricanes constitute special circumstances.                 300 But the GAO Report,
 
and the occurrence of flooding and hurricanes at Turkey Point, is not such a circumstance.
 
The GAO Report is not a new and novel analysis of climate risk as Petitioner claims. As
 
explained above, the GAO Report compiled and summarized already available government data and
 
provided a high-level overview of climate risks generally. While the GAO document                                                       is new, the
 
underlying information and data have long been publicly available.
 
Even so, Petitioner identifies no information in the GAO Report that is surprising or
 
unexpected in the context of severe accident analysis. For example, Petitioner notes that the GAO
 
Report identified Turkey Point to be at risk of high-intensity hurricanes.                   301 But that is not new
 
information and does not constitute a special circumstance of which the NRC was unaware when
 
it promulgated the rule. Turkey Points ability to withstand flooding and strong hurricanes has been
 
298                             Waiver Request at 7.
 
299                             Millstone, CLI                                       24, 62 NRC at 559-                                                                                 60 (citation omitted).
 
300                             Waiver Request at 8.
 
301                             Id. at 8.
 
62 part of its design basis since the ti          me of its construction, and the NRC certainly considered the risk
 
of hurricanes in its GEIS analyses of postulated accidents. Ultimately, Petitioner identifies no new
 
circumstances that the NRC failed to consider in the rulemaking. And, indeed, it does not discuss
 
that rulemaking at all.
: c.                                                                                                  Millstone Factor 4:  Significant Problem
 
The fourth Millstone factor is that w                                                aiver of the regulation is necessary to reach a significant
 
safety (or environmental) problem. 302  Contrary to Petitioners claim, the GAO Report does not
 
analyze[] the increasing risk of severe accidents due to climate change.              303  The GAO Report                     
 
and specifically the portion cited by Petitioner, hereis a table summarizing government data on
 
potential impacts from climate change. The GAO Report does not perform any type of risk
 
analysis. And Petitioner fails to engage with or analyze the FSE IS or its updated analysis of severe
 
accidents or SAMAs or explain any reason that analysis is somehow deficient, much less why it
 
purportedly is a significant problem. As discussed above, the NRC has just completed a years-
 
long revision process to update the GEIS and determined that Severe Accidents are a Category 1
 
issue. The GAO Report does nothing to challenge that conclusion.


63 part of its design basis since the time of its construction, and the NRC certainly considered the risk of hurricanes in its GEIS analyses of postulated accidents. Ultimately, Petitioner identifies no new circumstances that the NRC failed to consider in the rulemaking. And, indeed, it does not discuss that rulemaking at all.
: c.
Millstone Factor 4: Significant Problem The fourth Millstone factor is that waiver of the regulation is necessary to reach a significant safety (or environmental) problem.302 Contrary to Petitioners claim, the GAO Report does not analyze[] the increasing risk of severe accidents due to climate change.303 The GAO Report and specifically the portion cited by Petitioner, hereis a table summarizing government data on potential impacts from climate change. The GAO Report does not perform any type of risk analysis. And Petitioner fails to engage with or analyze the FSEIS or its updated analysis of severe accidents or SAMAs or explain any reason that analysis is somehow deficient, much less why it purportedly is a significant problem. As discussed above, the NRC has just completed a years-long revision process to update the GEIS and determined that Severe Accidents are a Category 1 issue. The GAO Report does nothing to challenge that conclusion.
Accordingly, the Waiver Request should be denied.
Accordingly, the Waiver Request should be denied.
VI.
CONCLUSION Pursuant to 10 C.F.R. § 2.309(c) the Motion should be DENIED as to Contentions 1-A, 1-B, and 1-C and Contentions 3-A and 3-B because they are not based on new and materially different information than that previously available. The Motion should also be DENIED as to all contentions because Petitioner failed to propose an admissible contention.
302 Millstone, CLI-05-24, 62 NRC at 559-60.
303 Waiver Request at 9 (citing GAO Report at 55).


VI.                                                                 CONCLUSION
64 Respectfully submitted, Signed (electronically) by Scott D. Clausen SCOTT D. CLAUSEN, Esq.
 
MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Avenue, N.W.
Pursuant to 10 C.F.R. § 2.309(c) the Motion should be DENIED as to Contentions 1-A, 1-B,
Washington, D.C. 20004 (202) 739-5402 Scott.Clausen@morganlewis.com Executed in Accord with 10 C.F.R. § 2.304(d)
 
PAUL M. BESSETTE, Esq.
and 1-C and Contentions 3-                                            A and                                              3-B because they are not based on new and materially different
RYAN K. LIGHTY, Esq.
 
MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Avenue, N.W.
information than that previously available. The Motion should also be DENIED as to all
Washington, D.C. 20004 (202) 739-5796 (202) 739-5274 Paul.Bessette@morganlewis.com Ryan.Lighty@morganlewis.com Executed in Accord with 10 C.F.R. § 2.304(d)
 
contentions because Petitioner failed to propose an admissible contention.
 
302                            Millstone, CLI                                      24, 62 NRC at 559-                                                                                  60.
 
303                            Waiver Request at 9 (citing GAO Report at 55).
 
63 Respectfully submitted,
 
Signed (electronically) by Scott D. Clausen               Executed in Accord with 10 C.F.R. § 2.304(d)
SCOTT D. CLAUSEN, Esq.                                    PAUL M. BESSETTE, Esq.
M  ORGAN        , L  EWIS      & B  OCKIUS LLP          RYAN K. LIGHTY, Esq.
1111 Pennsylvania Avenue, N.W.                            M  ORGAN        , L  EWIS      & B  OCKIUS LLP Washington, D.C. 20004                                  1111 Pennsylvania Avenue, N.W.
(202) 739-5402                                            Washington, D.C. 20004 Scott.Clausen@morganlewis.com                            (202) 739-5796 (202) 739-5274 Paul.Bessette@morganlewis.com Ryan.Lighty@morganlewis.com
 
Executed in Accord with 10 C.F.R. § 2.304(d)
STEVEN HAMRICK, Esq.
STEVEN HAMRICK, Esq.
FLORIDA POWER & LIGHT COMPANY 801 Pennsylvania Ave., N.W. Suite 220 Washington, D.C. 20004 (202) 349-3496 Steven.Hamrick@fpl.com
FLORIDA POWER & LIGHT COMPANY 801 Pennsylvania Ave., N.W. Suite 220 Washington, D.C. 20004 (202) 349-3496 Steven.Hamrick@fpl.com Counsel for Florida Power & Light Company Dated in Washington, DC this 3rd day of June 2024  
 
Counsel for Florida Power & Light Company
 
Dated in Washington, DC this 3rd day of June 2024
 
64 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION
 
BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
 
In the matter of:                                                  Docket Nos. 50-250-SLR-2 and 50-251-SLR-2 FLORIDA POWER & LIGHT COMPANY
 
(Turkey Point Nuclear Generating Station,                          June 3, 2024 Units 3 and 4)
 
CERTIFICATE OF SERVICE
 
Pursuant to 10 C.F.R. § 2.305, I certify that, on this date, a copy of the foregoing Florida
 
Power & Light Companys Answer To Miami Waterkeepers Motion To Admit Amended And
 
New Contentions In Response To The NRCStaffs Final Site                                                                                            -Specific Environmental Impact
 
Statement was served upon the Electronic Information Exchange (the NRCs E-                      Filing System),


DB1/ 147754359 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the matter of:
FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating Station, Units 3 and 4)
Docket Nos. 50-250-SLR-2 and 50-251-SLR-2 June 3, 2024 CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I certify that, on this date, a copy of the foregoing Florida Power & Light Companys Answer To Miami Waterkeepers Motion To Admit Amended And New Contentions In Response To The NRC Staffs Final Site-Specific Environmental Impact Statement was served upon the Electronic Information Exchange (the NRCs E-Filing System),
in the above-captioned docket.
in the above-captioned docket.
Signed (electronically) by Scott D. Clausen SCOTT D. CLAUSEN, Esq.
Signed (electronically) by Scott D. Clausen SCOTT D. CLAUSEN, Esq.
M  ORGAN        , L  EWIS      & B  OCKIUS    LLP 1111 Pennsylvania Avenue, N.W.
MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Avenue, N.W.
Washington, D.C. 20004 (202) 739-5402 Scott.Clausen@morganlewis.com
Washington, D.C. 20004 (202) 739-5402 Scott.Clausen@morganlewis.com Counsel for Florida Power & Light Company}}
 
Counsel for Florida Power & Light Company
 
DB1/ 147754359}}

Latest revision as of 18:07, 24 November 2024

Applicants Answer to Petitioners Motion to Admit New and Amended Contentions on the Final Site-Specific Environmental Impact Statement
ML24155A267
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/03/2024
From: Bessette P, Clausen S, Hamrick S, Lighty R
Florida Power & Light Co, Morgan, Morgan, Lewis & Bockius, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
ASLBP 24-981-01-SLR-BD01, RAS 57039, 50-250-SLR-2, 50-251-SLR-2
Download: ML24155A267 (0)


Text

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the matter of:

FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating Station, Units 3 and 4)

Docket Nos. 50-250-SLR-2 and 50-251-SLR-2 June 3, 2024 FLORIDA POWER & LIGHT COMPANYS ANSWER TO MIAMI WATERKEEPERS MOTION TO ADMIT AMENDED AND NEW CONTENTIONS IN RESPONSE TO THE NRC STAFFS FINAL SITE-SPECIFIC ENVIRONMENTAL IMPACT STATEMENT RYAN K. LIGHTY, Esq.

PAUL M. BESSETTE, Esq.

SCOTT D. CLAUSEN, Esq.

MORGAN, LEWIS & BOCKIUS LLP STEVEN HAMRICK, Esq.

FLORIDA POWER & LIGHT COMPANY Counsel for Florida Power & Light Company

TABLE OF CONTENTS I.

INTRODUCTION............................................................................................................. 1 II.

BACKGROUND............................................................................................................... 3 III.

EFFECT OF THE PENDING PART 51 RULEMAKING................................................ 6 IV.

THE BOARD SHOULD DENY THE MOTION.............................................................. 9 A.

Legal Standards...................................................................................................... 9 B.

Contention 1-A (No-Action Alternative)............................................................. 10

1.

Contention 1-A Is Not Based on New and Materially Different Information.............................................................................................. 11

2.

Contention 1-A Is Inadmissible............................................................... 12 C.

Contention 1-B (Potable Water).......................................................................... 16

1.

Contention 1-B Is Not Based on New and Materially Different Information.............................................................................................. 16

2.

Contention 1-B Is Inadmissible............................................................... 17 D.

Contention 1-C (Groundwater Quality)............................................................... 22

1.

Contention 1-C Is Not Based on New and Materially Different Information.............................................................................................. 22

2.

Contention 1-C Is Inadmissible............................................................... 27 E.

Contention 2 (Endangered Species)..................................................................... 33

1.

Contention 2 Is Inadmissible................................................................... 34 F.

Contentions 3-A and 3-B (Climate Change)........................................................ 43

1.

Contentions 3-A and 3-B Are Not Based on New and Materially Different Information............................................................................... 43

2.

Contention 3-A Is Inadmissible............................................................... 50

3.

Contention 3-B Is Inadmissible............................................................... 55 V.

THE BOARD SHOULD DENY THE WAIVER REQUEST......................................... 58 A.

Legal Standards for Waivers................................................................................ 58 B.

Petitioners Waiver Request Should Be Denied.................................................. 60

1.

Under the Current Rule, the Board Should Deny the Waiver Request Because a Waiver Is Unnecessary............................................. 60

2.

Under the New Rule, the Board Should Deny the Waiver Request Because Petitioner Has Not Made the Requisite Prima Facie Showing................................................................................................... 61 VI.

CONCLUSION................................................................................................................ 63

1 I.

INTRODUCTION Pursuant to 10 C.F.R. § 2.309(i)(1), the Atomic Safety and Licensing Boards (Board)

March 26, 2024 Initial Scheduling Order,1 and the Boards May 21, 2024 Memorandum and Order,2 Florida Power & Light Company (FPL or Applicant) submits this Answer to Miami Waterkeepers (Petitioners) Motion to Admit Amended and New Contentions in Response to the NRC Staffs Final Site-Specific Environmental Impact Statement (Motion)3 and Petition for a Waiver of 10 C.F.R. § 51.53(c)(3) and 51.71(D) and 10 C.F.R. Par 51, Subpart A, Appendix B (Waiver Request)4 regarding the subsequent license renewal (SLR) application (SLRA) for Turkey Point Nuclear Generating Station Units 3 and 4 (Turkey Point). The Motion seeks the admission of one amended contention (with 3 sub-contentions) and two new contentions (one of which has 2 sub-contentions). Petitioners Waiver Request asks that the application of certain U.S.

Nuclear Regulatory Commission (NRC) environmental regulations be set aside for Contention 3-B. As explained in detail below, the Motion and Waiver Request should be denied in their entirety.

Petitioner seeks to challenge certain findings and conclusions in the Final Site-Specific Environmental Impact Statement (2024 FSEIS) issued on March 29, 2024.5 Contentions 1-A, 1-B, and 1-C challenge various aspects of the NRCs groundwater impacts analysis in the 2024 FSEIS. Contention 2 challenges the 2024 FSEISs analysis of the Miami cave crayfish, a 1

Initial Scheduling Order at 3 (Mar. 26, 2024) (unpublished) (ML24086A446) (Initial Scheduling Order).

2 Memorandum and Order (Requesting that Parties Address Applicability of Part 51 Amendments and Providing Notice of Dates for Possible Oral Argument) (May 21, 2024) (unpublished) (ML24142A105) (May 21 Order).

3 Miami Waterkeepers Motion to Admit Amended and New Contentions in Response to the NRC Staffs Final Site-Specific Environmental Impact Statement (May 8, 2024) (ML24129A220) (Motion).

4 Miami Waterkeepers Petition For Waiver Of 10 C.F.R. 51.53(C)(3) And 51.71(D) And 10 C.F.R. Part 51, Subpart A, Appendix B (May 8, 2024) (ML24129A221) (Waiver Request).

5 Id. at 1; Motion at 2.

2 species proposed for listing, but not yet listed under the Endangered Species Act (ESA). And Contentions 3-A and 3-B claim the NRC failed to consider certain climate change-related risks discussed in a recently issued report by the U.S. Government Accountability Office (GAO) on actions the NRC should consider regarding potential effects of climate change (the GAO Report).6 In sum, the Motion should be denied as to Contentions 1-A, 1-B, and 1-C, and Contentions 3-A and 3-B because they fail to meet the good cause standard for new or amended contentions in 10 C.F.R. § 2.309(c). In particular, those contentions are not based on new or materially different information. Each attempts to raise arguments that simply did not occur to Petitioner at the outset, or seeks to recycle or reinvigorate arguments Petitioner raised previously but were rejected.

Additionally, the Motion should be denied as to all of the contentions because none satisfy the admissibility requirements in 10 C.F.R. § 2.309(f). As an overarching matter, Contentions 1-A, 1-B, and 1-C fail to engage with or dispute the relevant portions of the 2024 FSEIS. These contentions largely reference outdated information without acknowledging or discussing the more recent data used by the NRC Staff in its analyses. Contention 2 largely relies on the claims presented in 1-B and 1-C, and is inadmissible for the same reason. And Contention 3 is based on a GAO Report that is little more than a compendium of long-available information that offers nothing to contest the discussion in the 2024 FSEISwhich the GAO Report does not purport to review or analyze. Ultimately, none of these contentions raise a genuine material dispute, and all of them fail to satisfy one or more of the admissibility criteria. For the reasons set forth below, the Board should deny Petitioners Motion and Waiver Request.

6 U.S. Government Accountability Office, Nuclear Power Plants, NRC Should Take Actions to Fully Consider the Potential Effects of Climate Change (Apr. 2024), https://www.gao.gov/products/gao-24-106326 (GAO Report).

3 II.

BACKGROUND Much of the background information relevant to this pleading has been provided previously in FPLs Answer Opposing Miami Waterkeepers Hearing Request and Petition to Intervene dated December 22, 2023 (FPL Answer).7 For the sake of brevity, that information is not republished again here. Instead, FPL incorporates by reference its discussions regarding the scope and objectives of the NRCs license renewal safety and environmental reviews,8 the history of the cooling canal system (CCS) and FPLs efforts to retract the hypersaline plume,9 and the procedural history of the Turkey Point SLRA through October 2023.10 The subsequent procedural history is summarized below.

Miami Waterkeeper filed its Request for Hearing and Petition to Intervene (Petition) on November 27, 2023.11 The Petition proposed five contentions based on alleged deficiencies in the draft Site-Specific Environmental Impact Statement for Turkey Points SLRA, issued on August 31, 2023 (2023 DSEIS).12 The Petition alleged that the 2023 DSEIS failed to: (1) take a hard look at the impacts to ground water caused by the continued operation of the CCS; (2) analyze the benefits of replacing the CCS with cooling towers; (3) adequately consider the cumulative impacts from climate change during the subsequent period of extended operations; (4) address whether the continued operations would impact the Miami cave crayfish; and (5) consider the effect 7

Florida Power and Light Companys Answer Opposing Miami Waterkeepers Hearing Request and Petition for Leave to Intervene (Dec. 22, 2023) (ML23356A156) (FPL Answer).

8 Id. at 3-4.

9 Id. at 9-10.

10 Id. at 4-9.

11 Request for Hearing and Petition to Intervene Submitted by Miami Waterkeeper (Nov. 27, 2023) (ML23331A971)

(Petition). The Petition was filed with 18 exhibits. (Package No. ML23332A301).

12 NUREG-1437, Supplement 5a, Second Renewal, Site Specific Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Draft Report for Comment (Aug. 31, 2023) (ML23242A216) (2023 DSEIS).

4 of climate change on accident risk.13 FPL filed its answer on December 22, 2023,14 as did the NRC Staff.15 Both FPL and the NRC Staff and argued that the Petition should be dismissed because Miami Waterkeeper failed to submit an admissible contention.16 On March 7, 2024, the Board issued its decision (LBP-24-03) granting Petitioners hearing request and admitting a narrowed and reformulated Contention 1.17 As reformulated by the Board, the admitted contention of omission was:

The 2023 Draft SEIS fails to take a hard look at impacts to groundwater quality because it does not include an explanation for the Staffs conclusion that the uncertainty in retracting the hypersaline groundwater plume could result in moderate impacts.18 The Board dismissed the rest of Petitioners claims in Contention 1 as inadmissible because Miami Waterkeeper failed to provide sufficient information to raise a genuine, material dispute with the existing information in the [2023 DSEIS].19 The Board also found Contentions 2, 3, and 5 to be inadmissible because they did not raise a genuine, material dispute with the 2023 DSEIS.20 The Board found Contention 4 to be premature and stated that Petitioner would have an opportunity to advance any arguments regarding the agencys [ESA] compliance relative to the Miami cave crayfish in a new or amended contention when the Staff issues the [2024 FSEIS].21 13 See generally Petition.

14 See FPL Answer.

15 NRC Staff Answer Opposing Miami Waterkeepers Hearing Request (Dec. 22, 2023) (ML23356A162) (NRC Staff Answer).

16 See generally FPL Answer; NRC Staff Answer.

17 Fla. Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), LBP-24-03, 99 NRC __ (Mar. 7, 2024)

(slip op.).

18 Id. at __ (slip op. at 22).

19 Id. at __ (slip op. at 22).

20 Id. at __, __, and __ (slip op. at 24, 27, and 32).

21 Id. at __ (slip op. at 31).

5 After the Boards decision, the parties conferred and filed a joint motion regarding the hearing schedule, mandatory disclosures, and hearing file obligations for the proceeding, which the Board granted on March 26, 2024 (Joint Motion).22 The Boards Initial Scheduling Order provided a deadline for filing new or amended contentions based on the [2024 FSEIS].23 The NRC Staff published the 2024 FSEIS on March 29, 2024.24 The 2024 FSEIS expanded the discussion of impacts to groundwater and provided the basis for the Staffs conclusion that uncertainty in retracting the hypersaline groundwater plume could result in moderate impacts.25 This expanded discussion made the admitted contention of omission moot. As a result, the parties jointly filed an unopposed motion to dismiss the sole admitted contention,26 which the Board granted.27 Petitioner filed its Motion and Waiver Request on May 8, 2024. Petitioner seeks to admit three amended contentions (labeled Contentions 1-A, 1-B, and 1-C) and three new contentions (labeled Contentions 2, 3-A, and 3-B).28 Petitioners Waiver Request seeks a waiver of certain NRC environmental regulations to challenge the 2024 FSEISs evaluation of severe accident mitigation alternatives (SAMAs) in Contention 3-B.29 22 Initial Scheduling Order.

23 Id. at 2.

24 NUREG-1437, Supplement 5a, Second Renewal, Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Final Report (Mar. 29, 2024) (ML24087A061) (2024 FSEIS).

25 Id. at 2-38 to 2-40.

26 Joint Unopposed Motion to Dismiss Reformulated Contention 1 as Moot And Position of the NRC Staff and Miami Waterkeeper Regarding the Opportunity to File New or Amended Contentions (Apr. 4, 2024)

(ML24095A314).

27 Memorandum and Order (Granting Unopposed Motion to Dismiss Contention 1) (May 9, 2024) (unpublished)

(ML24130A205).

28 See generally Motion.

29 Waiver Request.

6 III.

THE ONGOING PART 51 RULEMAKING WILL HAVE NO IMPACT ON THIS ADJUDICATORY PROCEEDING On February 21, 2024, the NRC Staff submitted SECY-24-0017 to the Commission to obtain the Commissions approval to publish a final rule to amend 10 C.F.R. Part 51.30 The final rule would update Part 51, Appendix B, Table B-1 to codify Category 1 and Category 2 issues, which is supported by the revised Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Revision 2 (2024 GEIS).31 The Commission approved the publication of the final rule, subject to resolving comments from the Commissioners, on May 16, 2024.32 On May 21, 2024, the Board issued a Memorandum and Order asking the parties to address what impact, if any, the final rule may have on this proceeding if it takes effect during this adjudication.33 FPLs response is provided below.

The Part 51 rulemaking does not affect this proceeding. For SLR applications pending at the time CLI-22-3 was issued, the Commission established, by order, an alternative procedural pathway. That pathway permitted such applicants to submit a site-specific environmental report supplement, upon which the NRC would perform a site-specific review, instead of waiting for the staff to complete the rulemaking.34 As the Commission explained, applicants could submit a revised [ER] providing information on environmental impacts [for Category 1 issues] during the 30 SECY-24-0017, Final Rule: Renewing Nuclear Power Plant Operating LicensesEnvironmental Review (Feb.

21, 2024) (ML23302A150).

31 See NUREG-1437, Rev. 2, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Final Rule (Feb. 2024) (Vol. 1, ML23201A224) (NUREG-1437, Rev. 2).

32 SECY-24-0017, Commission Voting Record (May 16, 2024) (ML24137A131).

33 May 21 Order.

34 Fla. Power & Light Co. (Turkey Point Nuclear Generating Units 3 and 4), CLI-22-3, 95 NRC 40, 41-42 (2022).

7

[SLR] period.35 The Commissions intent in CLI-22-3 is clear: it provided an alternative pathway for applicants, separate and apart from the Part 51 rulemaking.

Moreover, the Commission endorsed this interpretation in its recent SRM. Specifically, as explained in the Comment Response Document provided as Appendix A to the 2024 GEIS, commenters requested clarification on this very issue. One commenter expressed concern that the rule could be construed as requiring the NRC to perform further environmental reviews to address the new final rule, potentially delaying the proceeding.36 As the commenter further noted, that would be inconsistent with Commission order CLl-22-3, in which the Commission provided applicants the option of proceeding with a site-specific environmental review that is not subject to the new final rule. In its response, the NRC assuaged this concern, explaining that:

Any application for an initial LR received before the effective date of the final rule will be processed under the current rule and the 2013 LR GEIS. Any application for an SLR received before the effective date of the final rule will be processed in accordance with Commission direction contained in CLI-22-02 [] and CLI-22-03 [].37 In its SRM, the Commission did not alter this (or any other) comment response, which reflects the Commissions endorsement of this interpretation of its orders.

Here, as envisioned by the Commission in CLI-22-3, FPL opted to pursue this alternative pathway and submitted a revised ER that provided updated site-specific information on the environmental impacts associated with a Turkey Point SLR period in lieu of waiting until the issuance of the updated GEIS. The NRC Staff then conducted its site-specific review, considering that information, and prepared the 2024 FSEIS in accordance with CLI-22-03.38 35 Id. at 41.

36 NUREG-1437, Rev. 2, App. A at A-317. Appendix A is contained in NUREG-1437, Rev. 2, Vol. 2 (Vol. 2 ML23201A225).

37 Id.

38 2024 FSEIS at xiv.

8 Given the plain text of CLI-22-3, and the Commission-endorsed confirmatory explanation of the intent of that order in the 2024 GEIS, the 2024 Rule cannot be interpreted as requiring the environmental review process for Turkey Point to begin anew, or to somehow become subject to a whole new set of requirements. Accordingly, the 2024 Rule will continue to have no effect on this proceeding even after it becomes effective.

As a general matter, the 2024 Rule would not affect the content of the 2024 FSEIS. Both the 2023 DSEIS and 2024 FSEIS proactively and voluntarily analyzed the new and revised environmental issues as defined in the new rule.39 In other words, there are no content gaps in the 2024 FSEIS even assuming the 2024 Rule would apply to Turkey Point. And the new or amended contentions proposed in the Motion also would be unaffected by the 2024 Rule. Contentions 1-A, 1-B, 1-C, 2, and 3-A pertain to site-specific analyses that will remain Category 2 (i.e., site-specific) issues after the new rule becomes effective. So, the 2024 Rule has no material impact on those contentions.

Contention 3-B pertains to the site-specific SAMA analysis in the 2024 FSEIS. When the 2024 Rule becomes effective, SAMA analyses will be considered a Category 1 issue.40 That means the generic SAMA analysis in the 2024 GEIS will be codified in Table B-1 and will be available for applicants to rely upon in future environmental reports, and for the NRC Staff to rely upon in future environmental impact statements. If so, then the analysis could not be challenged in an adjudicatory proceeding absent a waiver under 10 C.F.R. § 2.335.

Here, however, neither FPLs ER nor the 2024 FSEIS purport to rely on the codified SAMA analysis in the 2024 Rule. So even when the 2024 Rule becomes effective, as discussed in 39 2023 DSEIS at E-3; 2024 FSEIS at E-3.

40 See SRM, Encl. at 52-53, 102.

9 Section V below, a waiver is unnecessary for Contention 3-B because it purports to challenge the site-specific SAMA analysis presented in the 2024 FSEIS.41 And the 2024 Rule would not trigger the need for yet another supplement to the already-completed 2024 FSEIS.42 In sum, the 2024 Rule will have no impact on this adjudicatory proceeding.

IV.

THE BOARD SHOULD DENY THE MOTION A.

Legal Standards New contentions and amendments to prior contentions must meet the good cause standard in 10 C.F.R. § 2.309(c)(1). That regulation states that good cause exists to file new or amended contentions only if the petitioner can show: (1) the information on which the amended or new contention is based was not previously available; (2) the information on which the amended or new contention is based is materially different from information previously available; and (3) the amended or new contention is timely submitted based on the availability of the new information.43 The petitioner has the burden of proving that any new or amended contention meets the standards in 10 C.F.R. § 2.309(c)(1).44 Pursuant to the Initial Scheduling Order and April 26, 2024 Memorandum and Order Granting Motion for Extension of Time, motions to admit new and amended contentions challenging the 2024 FSEIS or the GAO Report were due within 40 days from the issuance of the 41 After the rule becomes effective, FPL or the NRC Staff could voluntarily supplement the ER or 2024 FSEIS to rely on the codified analyses. However, that has not occurred here.

42 Supplements to final EISs are governed by 10 C.F.R. § 51.92. Thereunder, supplements are required when new and significant information (e.g., something that would change an impact conclusion) arises before the proposed action has been taken. However, because the SAMA conclusion in the 2024 FSEIS is consistent with the SAMA conclusion in the 2024 Rule, the 2024 Rule is not new and significant information, and does not trigger the need for yet another supplemental EIS here.

43 10 C.F.R. § 2.309(c)(1)(i)-(iii).

44 AmerGen Energy Co., LLC (Oyster Creek Nuclear Generating Station), CLI-09-7, 69 NRC 235, 260-61 (2009).

10 2024 FSEIS.45 Because Petitioner filed its Motion 40 days after the NRC released the 2024 FSEIS, Petitioner has made its filing in a timely fashion and satisfied the third element of the good cause standard in Section 2.309(c)(1). But Petitioner must still show that its new and amended contentions are based on information not previously available (i.e., based on new facts)46 and that the information is materially different from previously available information.47 Additionally, 10 C.F.R. § 2.309(c)(4) provides that the new or amended contention must meet the applicable contention admissibility requirements in Section 2.309(f). Thus, if the new or amended contention is not based on new facts that are materially different from those previously available, then the Board need not analyze the contentions admissibility.

B.

Contention 1-A (No-Action Alternative)

In Contention 1-A, Petitioner alleges that the 2024 FSEIS fails to adequately analyze groundwater conditions for the No Action alternative, which should be the conditions present when the plant is not operational.48 Petitioner claims the NRC Staff failed to evaluate the baseline conditions for the no action alternative49 which for Turkey Point would be closure at the end of the licensing term and ending the use of the CCS as a heat sink.50 Contention 1-A should be rejected because Petitioner has not demonstrated satisfaction of Sections 2.309(c)(1), (c)(4), or (f)(1).

45 Initial Scheduling Order at 2.

46 Entergy Nuclear Gen. Co. (Pilgrim Nuclear Power Station), CLI-12-10, 75 NRC 479, 493 n.70 (2012) (emphasis partially omitted).

47 See 10 C.F.R. § 2.309(c)(1)(i)-(ii).

48 Motion at 7.

49 Id. at 8.

50 Id. at 9.

11

1.

Contention 1-A Is Not Based on New and Materially Different Information In Contention 1-A, Petitioner apparently seeks to challenge Section 3.2 of the 2024 FSEIS, titled Comparison of Alternatives, because it allegedly does not compare groundwater impacts to a no action alternative where the CCS is no longer used as a heat sink.51 Petitioner notes that Section 3.2 references the no-action alternative analysis in the 2019 FSEIS.52 Petitioner then seeks to challenge Section 4.6.2 of the 2019 FSEIS for allegedly failing to objectively analyze, using best available science, how environmental conditions would benefit from the no action alternative.53 However, the 2019 FSEIS is not new; Petitioner could have challenged it earlier in this proceeding. In fact, Petitioner raised a substantially similar challenge in its original Petition, which was rejected by the Board in LBP-24-03.54 Likewise, the statements from Section 3.2 of the 2024 FSEIS referenced by Petitioner contain identical text to that presented in Section 3.2 of the 2023 DSEIS.55 Thus, there is nothing new there either.

The only new information Petitioner mentions in Contention 1-A is new information that the Petitioner provided to the NRC.56 Petitioner alleges that this information appears somewhere between pages 2-24 and 2-40 of the 2024 FSEIS.57 However, that conclusory assertion is unaccompanied by any further explanation. Petitioner does not say, specifically, what that information is. It does not explain why it is new. And it does not allege that such unspecified information is materially different from information that was previously available regarding the no 51 Id. at 13.

52 Id.

53 Id. at 13-14.

54 Turkey Point, LBP-24-03, 99 NRC at __ (slip op. at 24-26) (rejecting proposed contention 2).

55 Compare 2024 FSEIS at 3-2 (first full paragraph, beginning [t]he NRC Staff evaluated...) with 2023 DSEIS at 3-2 (first full paragraph, beginning [t]he NRC Staff evaluated...).

56 Motion at 13.

57 Id.

12 action alternative.58 Ultimately, Petitioner simply has not met its affirmative burden to identify new and materially different information upon which Contention 1-A allegedly is based.

2.

Contention 1-A Is Inadmissible If the Board finds that Petitioner satisfied the good cause standard for Contention 1-A, the Board should nonetheless reject it as inadmissible.

As a general matter, Contention 1-A is not a model of clarity. It discusses and appears to conflate two concepts: the environmental baseline and the no-action alternative. As articulated in the caption for Contention 1-A, its primary claim is that the 2024 FSEIS fails to adequately analyze groundwater conditions for the no-action alternative.59 Petitioner also claims that the 2024 FSEIS does not compare groundwater impacts to a no action alternative where the CCS is no longer used as a heat sink.60 In the statement of the Contention itself, the issue being raised or controverted is whether the NRC Staff fully analyzed the difference between extending the license... and declining the application (i.e., the proposed action versus the no-action alternative).61 However, Petitioner devotes more than 5 pages of discussion to the (uncontroversial) proposition that an environmental impact statement (EIS) must contain an adequate discussion of the environmental baseline.62 And the basis statement for the contention argues that the NRC is required to compare the effects of the proposed action against a baseline of no action.63 58 More broadly, given that the discussion at pages 2-24 to 2-40 of the 2024 FSEIS relates to possible impacts of the proposed action, it is unclear how any new and materially different information on those pages would reveal any potentially new and material information regarding the no-action alternative, which is discussed primarily in the 2019 FSEIS and for which the NRC determined, in both the 2023 DSEIS and 2024 FSEIS (Sections 3.2), that no new and significant information exists.

59 Motion at 7.

60 Id. at 13.

61 Id. at 7.

62 Id. at 8-13.

63 Id. at 8.

13 This suggests Petitioner erroneously believes that the environmental baseline and the no action alternative are one and the same. But that is not the case. The environmental baseline is discussed primarily in Chapter 3 of the 2019 FSEIS.64 Whereas, the no-action alternative is discussed in various subsections of the 2019 FSEIS, including the discussion and comparison of alternatives in Chapters 2 and 5, and the discussion of environmental consequences, per resource area, throughout Chapter 4.65 As a threshold matter, Petitioners misunderstanding of the difference between the environmental baseline and the no-action alternative cannot give rise to an admissible contention. And as explained below, Contention 1-A does not raise a genuine dispute as to either one.

First, Petitioner claims that the NRC did not compare groundwater impacts to a no action alternative where the CCS is no longer used as a heat sink.66 But that assertion lacks the requisite support for an admissible contention and fails to demonstrate a genuine dispute because it is demonstrably untrue. The groundwater analysis for the no-action alternative is provided in Section 4.5.2.2 of the 2019 FSEIS.67 And Section 3.2 of the 2024 FSEIS, plainly titled Comparison of Alternatives,68 refers to Table 2-2 of the 2019 FSEIS, which provides a side-by-side comparison of groundwater impacts for the proposed action and the no-action alternative.69 64 See generally NUREG-1437, Supp. 5, Second Renewal, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 5, Second Renewal, Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Final Report at Ch. 3 (Oct. 2019) (ML19290H346) (2019 FSEIS).

See also generally, e.g., Reg. Guide 4.2, Supp. 1, Rev. 1 at 48 (June 2013) (ML13067A354) (explaining that the environmental baseline is presented in the affected environment discussion).

65 See generally 2019 FSEIS Ch. 4.

66 Motion at 13.

67 2019 FSEIS § 4.5.2.2. The no-action alternative and effects on groundwater is also discussed in Section 4.5.3.2 (p. 4-41), Section 4.5.7.2 (pp. 4-43 to 4-44), and Section 4.6.2.

68 2024 FSEIS at 3-1.

69 2019 FSEIS at 2-23 to 2-25.

14 Contrary to Petitioners claim, those impacts plainly have been compared. And Petitioner identifies no alleged error or deficiency in that comparison, which they ignore entirely.

Second, to the extent Petitioner claims that the 2024 FSEIS fails to adequately analyze the issue of groundwater resources for the no-action alternative, as suggested in the caption for Contention 1-A,70 it fails to articulate any specific dispute. In fact, as noted above, Petitioner appears entirely unaware that the analysis in Section 4.5.2.2 exists. Therein, the NRC states that the no action alternative would gradually reduce and eventually stop the discharge of condenser cooling water to the CCS.71 The NRC also states the no action alternative would result in a reduced thermal discharge and would reduce groundwater mounding beneath the CCS.72 Thus, under the no action alternative, the NRC would expect the amount of water needed to support freshening activities to comply with the consent orders could be reduced but probably not stopped.73 And the NRC expects that the operation of the recovery well system would need to continue until the initial remediation objectives are met.74 Petitioner does not acknowledge or dispute any of this information in Section 4.5.2.2; instead, Petitioner simply ignores it.

Third, Petitioners criticism of Section 4.6.2 of the 2019 FSEIS provides no support for the contention. Petitioner claims that, although Section 4.6.2 acknowledges the potential benefits of the no action alternative, it purportedly does not objectively analyze, using best available science, how environmental conditions would benefit from the no action alternative.75 As noted above, there is no reason Petitioner could not have raised this claim earlier, and thus it is inexcusably late.

70 Motion at 7.

71 2019 FSEIS at 4-37.

72 Id.

73 Id.

74 Id.

75 Motion at 13-14.

15 Nevertheless, as relevant to Contention 1-A, Petitioner offers no explanation of how this alleged defect provides a basis or support here. As explained by Petitioner, Contention 1-A asserts that the NRC Staff failed to adequately consider the differences in terms of groundwater contamination.

But Section 4.6.2 of the 2019 FSEIS pertains to Terrestrial Resources, not groundwater contamination. And Petitioner offers no explanation of why Section 4.6.2 was purportedly required to analyze groundwater contamination, which is evaluated elsewhere in the 2019 FSEIS.

Likewise, Petitioners claims regarding the environmental baseline fail to raise an admissible contention. Petitioner suggests that the discussion of the environmental baseline suffers from flaws76 and purports to contest[] the NRC Staffs reliance on an incorrect environmental baseline.77 The 2019 FSEIS sets the environmental baseline for the SLRA as the environment that currently exists at and around the Turkey Point site.78 This baseline included the impacts of past construction and operations of the plant and therefore, presented the nature of these past actions as well as ongoing actions.79 Relevant to this proceeding, Section 3.5.2 of the 2019 FSEIS discusses the environmental baseline for groundwater resources.80 This discussion explores the areas hydrology and aquifers;81 groundwater quality; past contamination and remediation efforts;82 and groundwater use, including recovery and injection wells.83 Although Petitioner offers vague 76 See, e.g., id. at 12-13 (claiming the baseline analysis... suffers from flaws.).

77 Id. at 15.

78 2019 FSEIS at 3-1.

79 Id. at 3-1.

80 Id. § 3.5.2.

81 Id. § 3.5.2.1.

82 Id. § 3.5.2.2.

83 Id. § 3.5.2.3

16 and conclusory assertions suggesting this baseline is somehow improper,84 Petitioner appears unaware of the existence of the actual environmental baseline discussion in the 2019 FSEIS. And Petitioner certainly has not identified any material dispute with that unacknowledged analysis.

Finally, Petitioner articulates no disagreement with the NRCs conclusion in the 2024 FSEIS that no new and significant information exists regarding the groundwater resources analysis for the no-action alternative. But, to the extent Petitioners oblique reference to that conclusion could be interpreted as a challenge, it would be inadmissible. Petitioner offers no explanation why that conclusion is wrong, points to no specific missing information, and fails to engage with the definition of significant.

In sum, Petitioner provides insufficient factual or expert support for Amended Contention 1-A, and supplies insufficient information to demonstrate the existence of a genuine dispute on a material issue of law or fact.

Accordingly, Amended Contention 1-A is inadmissible because it fails to satisfy multiple criteria in 10 C.F.R. § 2.309(f)(1).

C.

Contention 1-B (Potable Water)

Contention 1-B should be rejected because Petitioner has not satisfied Sections 2.309(c)(1),

(c)(4), or (f)(1).

1.

Contention 1-B Is Not Based on New and Materially Different Information In Amended Contention 1-B, Petitioner argues that the NRC employed the wrong standard to determine the impact of the CCS on drinking water and whether the hypersaline groundwater has destabilized the aquifer. But other than purporting to challenge the 2024 FSEIS, Petitioner has not 84 See Motion at 10-11 (discussing the need to analyze baseline data and claiming that [a]n agency cannot rely on future mitigation and monitoring to satisfy its duty to fully analyze the baseline conditions.).

17 shown that this contention is based on new information because the 2023 DSEIS uses the same standard.

The 2023 DSEIS, like the 2024 FSEIS, uses hypersalinity as a standard and looks at whether the hypersaline plume has destabilized the aquifer to prevent it use beneficial use as drinking water.

More specifically, the 2023 DSEIS states that with continued freshening of the CCS and continued operation of the [recovery well system (RWS)] to halt and retract the westward migration of that

[hypersaline] plume, the operation of Turkey Point Units 3 and 4 during the SLR term would not worsen the hypersaline groundwater plume outside the plant boundary, would not destabilize the groundwater resource, and would not adversely affect the beneficial uses of groundwater offsite by existing users.85 Using the hypersalinity standard, the 2023 DSEIS concluded that impacts on ground water quality during the SLR term would be SMALL unless FPL cannot retract the hypersaline plume to the CCS boundaries in which case they would be MODERATE.86 This is the same conclusion reached in the 2024 FSEIS.87 Thus, Petitioner has not shown the amended contention is based on new information. If Petitioner wanted to challenge the NRCs use of the hypersalinity standard, it should have done so when it filed its challenge to the 2023 DSEIS, because it used the same hypersalinity standard.

2.

Contention 1-B Is Inadmissible If the Board finds that Petitioner satisfied the good cause standard for Contention 1-B, the Board should nonetheless reject it because it is inadmissible.

85 2023 DSEIS at 2-31.

86 Id.

87 2024 FSEIS at 2-40 (concluding the impacts would be MODERATE if the hypersaline plume continues to extend outside the site boundary and SMALL if the hypersaline plume is retracted.).

18 In Contention 1-B, Petitioner alleges that the 2024 FSEIS employs the wrong standard to determine the impact of the CCS on potable water.88 According to Petitioner, the NRC inappropriately used a standard for hypersalinity rather than potability to reach its conclusion that the proposed action will have SMALL or MODERATE impacts to groundwater quality.89 Petitioner argues that because the Biscayne aquifer is a source of potable drinking water, the potable water standard must be used to determine whether the continued operation of the CCS will render potable portions of the Biscayne aquifer non-potable.90 As explained below, this contention is inadmissible for several reasons.

Petitioners basis for Amended Contention 1-B is based on either a misreading of the 2024 FSEIS or a carefully selected representation of the NRCs analysis. The NRCs analysis considers two reasonably foreseeable scenarios: (1) the hypersaline plume not expanding, but continuing to exist beyond the site boundary, and (2) the hypersaline plume being retracted to within the site boundary.91 Under the first scenario, the NRC Staff determined that impacts would be MODERATE based on the Biscayne aquifers classification as Class [G]-II (potable) groundwater west of the CCS.92 Under the second scenario, the NRC Staff determined the impacts would be SMALL based on the aquifers classification as Class G-III (non-potable) groundwater beneath the CCS.93 Thus, the staffs analysis is based, in part, on the location of the plume during the SLR term.

88 Motion at 16.

89 Id.

90 Id. at 17-18.

91 2024 FSEIS at 2-39.

92 Id. Class G-II groundwater is groundwater in an aquifer that can be used for potable water and has a total dissolved solids content of less than 10,000 mg/l. FLA. ADMIN. CODE ANN. R.62-520.410.

93 Id. at 2-40.

19 The NRC recognized that the extent (i.e., location) of the hypersaline plume and impacts to aquifer users are different but related concepts. The NRC found that the hypersaline plume in the shallow aquifer has largely been retracted to the FPL site boundary but extends 0.5 to 1.7 miles west in the deeper aquifer.94 In contrast, [t]he nearest public water supply wells are located about 6 mi[les] (9.7 km) from the northwest corner of the CCS.95 Based on this, the NRC concluded that, with continued freshening and operation of the recovery well system, operation of Turkey Point would not worsen the hypersaline groundwater plume outside the plant boundary, destabilize the groundwater resource, or adversely affect the beneficial uses of groundwater offsite by existing users.96 Petitioners chief complaint is that the NRC used the wrong standard (hypersalinity) to determine whether the continued CCS operation is sufficient to destabilize [a] drinking water resource.97 But the NRCs use of hypersalinity as a standard stems from the Florida Department of Environmental Protections (FDEP) Consent Order,98 and the recent FDEP Final Order rejecting challenges to Turkey Points recently renewed NPDES permit.99 The Consent Order used hypersalinity to gauge the CCSs influence on the saltwater interface,100 as does the Final Order.101 As discussed in the Final Order, the saltwater interface had already moved west of where the CCS is 94 Id. at 2-38.

95 Id.

96 Id.

97 Motion at 18.

98 Florida Dept of Envtl. Prot. v. Fla. Power & Light Co., OGC File No. 16-0241, Consent Order (Fla. Dept of Envtl. Prot. 2016) (ML16216A216) (Consent Order).

99 Florida Keys Aqueduct Auth. v. Fla. Power & Light, OGC File No. 20-0820, Consolidated Final Order (Fla. Dept of Envtl. Prot. 2022), https://floridadep.gov/sites/default/files/20-0820.pdf (Final Order).

100 Consent Order ¶ 19. The saltwater interface is the location in the aquifer at which Class G-II and G-II ground water intersect. Final Order, Exh. A (Amended Recommended Order) at 13.

101 Final Order, Exh. A at 23-24.

20 now located nearly two decades before the CCS was even constructed.102 In light of the fact that numerous activities, not just operation of the CCS bear on the movement of the saltwater interface, FDEP declined to require FPL to retract the saltwater interface (i.e., the potable water boundary).103 Instead, FDEP only requires FPL to retract the hypersaline plume,104 in order to ensure that it is no longer a factor in the location of the saltwater interface.105 Indeed, concerns regarding the impact of continued CCS operation on potable water supplies were at the core of the FDEP proceeding that resulted in issuance of the Final Order. And in that proceeding, FDEP concluded that there was reasonable assurance that all statutory and regulatory water quality requirements would be satisfied, given that implementation of the Consent Order will stop the westward movement of the saltwater interface, to the extent such movement is caused by the discharge of hypersaline water from the CCS into ground water.106 Thus, while the saltwater interface and hypersaline plume do not directly overlap, the Consent Order and Final Order represent a determination by the cognizant state authority that the location of the hypersaline plume is an appropriate proxy to determine the CCSs impact on the aquifer and its potable water users. Petitioner does not acknowledge or dispute any of this information. And it identifies no reason why the NRCs adoption of that same standard, as a proxy to evaluate whether CCS operation would destabilize the aquifer, is materially deficient.

Additionally, Petitioner argues that the NRC should have used Miami-Dade Countys drinking water standard, instead, because the Biscayne aquifer is used for that purpose.107 As a 102 Id. at 13 (By 1955, the saltwater interface already was located west of where the CCS is now located.).

103 Id. at 74 n.35.

104 Id.

105 Id. at 75 n.37 (emphasis added).

106 Id. at 77-78, 124.

107 Motion at 18-19.

21 general matter, however, the mere presentation of an alternative analysis method is not enough to demonstrate a material dispute. Petitioner then speculates that non-potable saltwater from the CCS somehow could reach and impair the currently-potable portion of the Biscayne Aquifer.

However, Petitioner cites no authority, and fails to offer so much as a simple explanation, for this dubious theory. Notably, both of these arguments ignore and fail to dispute relevant information in the 2024 FSEIS, including:

the fact that the nearest drinking water supply well is more than 4 miles beyond the furthest historical extent of the hypersaline plume;108 the fact that the hypersaline plume, at its current extent, has not affected drinking water;109 and the fact that [a] scenario where the plume would continue to expand overall within the Biscayne Aquifer was not considered by the staff because it is not reasonable given the available information and the aforementioned requirements that are subject to enforcement by State and local regulators.

In other words, Petitioner fails to acknowledge that drinking water is not currently impacted (by either the hypersaline plume or non-potable saltwater) and fails to engage with the NRCs well-reasoned conclusion that the current state is bounding. Far more is required to demonstrate a genuine dispute of material fact.

Ultimately, Petitioners preference for a different analysis method is not enough to demonstrate a material dispute with the 2024 DSEIS. And Petitioner has not otherwise engaged with or attempted to dispute the extensive information showing that the NRCs analysis method is reasonable and appropriate. For those reasons, Contention 1-B lacks the requisite support for an admissible contention and fails to raise a genuine dispute.

108 2024 FSEIS at 2-38.

109 Id. at 2-39.

22 Accordingly, Amended Contention 1-B is inadmissible because it fails to satisfy multiple criteria in 10 C.F.R. § 2.309(f)(1).

D.

Contention 1-C (Groundwater Quality)

Contention 1-C should be rejected because Petitioner has not demonstrated satisfaction of Sections 2.309(c)(1), (c)(4), or (f)(1).

1.

Contention 1-C Is Not Based on New and Materially Different Information In Contention 1-C, Petitioner claims that the 2024 FSEIS incorrectly concluded that the impacts of the proposed action on groundwater quality are SMALL to MODERATE.110 However, that conclusion to Section 2.8.3 of the 2024 FSEIS is not newthe exact same conclusion is presented in Section 2.8.3 of the 2023 DSEIS.111 And despite the NRC Staff adding several additional pages of discussion to Section 2.8.3, Petitioner does not point to any specific new information in that section as providing the basis for Contention 1-C. In fact, nothing in the discussion of Contention 1-C appears to meaningfully engage with or dispute one single word of new information in Section 2.8.3. Far more is required to demonstrate good cause for a new or amended contention.

As detailed below, Petitioner seeks to challenge information that appeared previously in documents of which the [Petitioner was] well aware.112 However, questions about that information 110 Motion at 21.

111 Compare 2024 FSEIS at 2-40 with 2023 DSEIS at 2-31.

112 See Hydro Res., Inc. (P.O. Box 15910, Rio Rancho, NM 87174), CLI-04-33, 60 NRC 581, 591 (2004).

23 should have been raised long ago.113 It was the [Petitioners] obligation to review the record carefully for any material information on this issue.114 As the Commission has explained:

If a party were free to raise new arguments once it realized that maybe there was something after all to a challenge it either originally opted not to make or which simply did not occur to it at the outset, NRC adjudicatory proceedings would prove endless. Thus, [petitioners]

have an obligation to review the record closely and to raise their arguments promptly. The Commission must insist that Intervenors and all parties be disciplined in their scrutiny of the record.115 Here, Petitioner seeks to challenge information that has long been available. Thus, it has not demonstrated good cause for submitting Contention 1-C.

a.

Challenges to Mitigation Measures Are Not New First, Petitioner seeks to recycle prior challenges to FPLs mitigation measures.116 Petitioner argues that the effect of the State-and County-ordered remediation activities, which include adding less-saline water to the CCS and extracting more-saline water from the Biscayne Aquifer, somehow increases the inland movement of the saltwater interface in the Biscayne aquifer.117 However, Petitioner identifies no new information about mitigation measures that allegedly arose after the 2023 DSEIS. In fact, it claims the opposite. Petitioner readily admits that it raised this concern in its comment letter in response to the 2023 DSEIS.118 That comment letter was submitted to the NRC on November 26, 2023, one day before Petitioner filed its Petition.119 If 113 See id.

114 See id.

115 Id. (quoting Duke Energy Corp. (McGuire Nuclear Station, Units 1 & 2; Catawba Nuclear Station, Units 1 & 2),

CLI-03-17, 58 NRC 419, 428-29 (2003)).

116 Motion at 22.

117 Id.

118 Id. at 22-23.

119 Letter from A. Siu, Policy Director, Miami Waterkeeper to NRC, Program Management, Announcements and Editing Staff, Notice of Intent for Public Comment on Draft Environmental Impact Statement NUREG-1437, Supplement 5a, Second Renewal, Site-Specific Environmental Impact Statement for License Renewal of Nuclear

24 Petitioner had this concern when it commented on the 2023 DSEIS, the time to raise a challenge on it was in its Petition.

And in fact, Petitioner did try to challenge these mitigation measures in its original Petition. However, the Board rejected that challenge because Petitioner failed to challenge the analyses in the Draft SEIS [or] show that the Staffs analyses are unreasonable.120 To the extent Petitioner is attempting to cure those defects in Contention 1-C, its attempt is untimely. The requirements of 10 C.F.R. § 2.309(c) do not provide for a second bite at the proverbial apple simply because Petitioner fell short on its first attempt.

Likewise, these same arguments were presentedand rejectedin the Turkey Point NPDES renewal proceeding. For example, challengers there contented that the mitigation measures would increase[] the hydrostatic head of water seeping from the CCS and exacerbate the movement of the hypersaline plume.121 Simply put, these theories, and the information upon which they are based, simply are not new.

b.

The Petition Does Not Identify Any New Information Moreover, the limited portions of Section 2.8.3 of the 2024 FSEIS that are, in fact, cited in Contention 1-C do not contain any new information (much less, anything that is materially different).

Plants Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Draft Report for Comment, Docket Nos. 50-250 and 50-251; NRC-2022-0172 at Section II.B (Nov. 26, 2023)

(ML23333A022).

120 Turkey Point, LBP-24-03, 99 NRC at __ (slip op. at 22).

121 Final Order at 78 ¶ 302.

25 First, Petitioner criticizes the discussion for allegedly failing to adequately acknowledge the transport and fate of saline water emanating from the [CCS].122 But as Petitioner noted, it raised this concern in its comment letter,123 so this obviously is not new.

Second, it discusses the NRCs resolution of that comment in an appendix to the 2024 FSEIS.124 Petitioners apparent complaint is that the NRC did not make any changes from the 2023 DSEIS to the 2024 FSEIS to address that comment.125 As Petitioner concedes, this complaint also does not identify any new information in Section 2.8.3 that purportedly is being challenged.

Third, Petitioner notes that the analysis in Section 2.8.3 of the 2024 FSEIS posits two scenarios, one in which the plume is retracted to within the site boundary and one in which it is not.126 However, those are the same two scenarios described in Section 2.8.3 of the 2023 DSEIS.127 Fourth, Contention 1-C references the 2024 FSEIS for the values of the CCS salinity target (34 PSU), freshening well withdrawal allocation (10,950 MGY), and chloride concentration (19,000 mg/L) used in the NRC Staffs analysis.128 But those same values are also articulated in the 2023 DSEIS.129 That information is not new.

The Petition also devotes several pages to summarizing Dr. Nuttles Report (Nuttle Report). As detailed below, that document also does not purport to rely on or challenge any new information.

122 Motion at 22-23. See also id. at 22-25 (discussing the volume of saline water).

123 Id. at 23.

124 Id. at 23-24.

125 2024 FSEIS at A-45 to A-46.

126 Motion at 24-25 (citing 2024 FSEIS at 2-39).

127 2023 DSEIS at 2-22 to 2-31.

128 Motion at 31-32 n.120, 31 n.121, 32-33 n.124.

129 2023 DSEIS at 2-23 to 2-24.

26

c.

The Nuttle Report Does Not Identify Any New Information In his Report, Dr. Nuttle focuses on the design of the CCS and the conditions that existed over 50 years ago and on FPLs past remediation activities.130 For example, Dr. Nuttle claims that the volume of CCS water present in the aquifer exceeds the capacity of the RWS.131 But this is based on conditions that existed [b]etween 2009 and 2015, which is before the Consent Order and much of FPLs remediation efforts.132 Dr. Nuttle also discusses estimates for the volume of CCS water in the aquifer from 2013 but does not update this estimate to account for FPLs remediation work.133 Dr. Nuttle next discusses two groundwater modeling studiesone from 2009 and one from 2018that looked that the effect of CCS had on salt water intrusion.134 None of this is new information.

In fact, the Nuttle Report cites the 2024 FSEIS only three times. First, he cites the impact conclusion of SMALL to MODERATE.135 But, as noted above, that conclusion is not new.

Second, cites the Staffs conclusion in the 2024 FSEIS that continued operation during the SLR term would have no additional adverse effect on the beneficial use of groundwater offsite by existing users.136 But that conclusion is not new either. The 2023 DSEIS also concluded that continued operation during the SLR term would not adversely affect the beneficial uses of groundwater offsite by existing users.137 Third, he cites a table titled Table 2-4: Turkey Point 130 See id. at 3-25.

131 Motion, Attach. A at 17 (Nuttle Report).

132 Id.

133 Id.

134 Id. at 18-20.

135 Id. at 2 (citing 2024 FSEIS, page not specified).

136 Id. at 3 (citing 2024 FSEIS at 2-39).

137 2023 DSEIS at 2-31.

27 Groundwater Withdrawal Wells.138 But the exact same table was presented in the 2023 DSEIS.139 Dr. Nuttles discussion of pre-existing information fails to identify anything that is new, much less materially so. And he otherwise identifies no allegedly new information that forms the basis for his disagreement with these previously available conclusions and tables.

Notably, the 2023 DSEIS and 2024 FSEIS discuss extensive new information, including five years of updated monitoring well data. Both Petitioners and Dr. Nuttles failure to engage with the 2024 FSEISs discussion of that new information is particularly conspicuous because it directly refutes many of Dr. Nuttles assertions and conclusions.

Ultimately, nothing in the Motion or the Nuttle Report identifies any new information (much less, any that is materially different) to satisfy the good cause standard. Accordingly, the Motion should be denied to the extent it seeks admission of Contention 1-C.

2.

Contention 1-C Is Inadmissible If the Board finds that Petitioner satisfied the good cause standard for Contention 1-C, the Board should nonetheless reject it because it is inadmissible. In Contention 1-C, Petitioner seeks to challenge the groundwater quality discussion in Section 2.8.3 because it allegedly fails to consider (or adequately consider) the purported negative effects of the remediation measures ordered by the cognizant state and local regulators. However, these claims are inadmissible for multiple, overlapping reasons. As an overarching matter, Petitioner and Dr. Nuttle base their analysis on outdated information or bare speculation that pre-dates the availability of actual monitoring data related to the mitigation measures. This leaves their claims far short of satisfying the requirement in 10 C.F.R. § 2.309(f)(1)(v) to identify adequate support for their contention. Likewise, they largely 138 Nuttle Report at 14 (citing 2024 FSEIS at 2-1[8], tbl. 2-4).

139 2023 DSEIS at 2-17, tbl. 2-4.

28 ignore the extensive data analyzed or referenced in the 2024 FSEIS that is directly relevant to their claims (and which undermines or entirely refutes their speculative theories and outdated analyses).

By sidestepping this information, they have failed to raise a genuine dispute with the 2024 FSEIS on a material issue of fact or law, as required by 10 C.F.R. § 2.309(f)(1)(vi). Accordingly, Contention 1-C is inadmissible.

a.

Petitioners Claims Fail to Raise a Genuine Dispute Because They Are Based on Outdated Information and Fail to Acknowledge or Controvert the Updated Information in the 2024 FSEIS Dr. Nuttle claims that the volume of CCS water present in the aquifer exceeds the capacity of the RWS.140 According to his estimate, the estimated total volume of CCS water present in the aquifer is 123 billion gallons, whereas at the current rate of [RWS] pumping removing 123 billion gallons would take about 30 years. Extrapolating from his assertion, Dr. Nuttle believes the current rate of RWS pumping is approximately 11 million gallons per day (MGD).141 But, as noted in the 2024 FSEIS, the current rate is actually 15 MGD.142 And FPL has requested approval from State and local authorities to pump 22 MGD, essentially twice the value Dr. Nuttle used.143 However, he fails to acknowledge, engage with, or dispute this updated information, and fails to explain how or why his analysis remains relevant in light of it. Far more is required to raise a genuine dispute.

Petitioner and Dr. Nuttle also claim that the rate of discharge (i.e., seepage or leakage) from the CCS to the aquifer is 9 MGD.144 But these claims appear to be based on old estimates 140 Nuttle Report at 17.

141 123,000,000,000 divided by 30 years, divided by 365 days, is 11.232 MGD.

142 See 2024 FSEIS at 2-18, tbl. 2-4.

143 Id. at 2-34.

144 Motion at 31; Nuttle Report at 17.

29 from 2013, when the CCS was hypersaline and before the RWS became operational.145 These claims ignore recent actual monitoring data presented in the 2024 FSEIS that directly contradict Petitioners and Dr. Nuttles outdated estimates. The 2024 FSEIS discusses seepage data and states that from 2017 to 2023, there has been a net seepage of approximately 1.2 MGD out of the CCS.146 The 2024 FSEIS also states that for the most recent annual reporting period (June 2022 through May 2023), FPL reported a net seepage of approximately 4 MGD out of the CCS.147 In other words, the actual data from the monitoring wells shows that the net seepage is far below Petitioners and Dr. Nuttles outdated estimate of 9 MGD.148 This is all discussed in the 2024 FSEIS, but Petitioner and Dr. Nuttle ignore that discussion for their analysis.

Petitioner also speculates that there will still be a net addition of salt to the Biscayne Aquifer from the [CCS], even if the [RWS] works as designed.149 However, that theoretical speculation is unsupported and disregards the actual, available data showing the exact opposite.

Actual data from monitoring wells west of the CCS show decreases in chloride since remediation began.150 FPLs Remedial Action Annual Status Report (RAASR) - Year 5 (2023 RAASR)151 also explains that during the most recent annual reporting period,152 FPL removed 2.37 billion pounds of salt (1.18 million tons).153 In comparison, FPLs 2023 Annual Monitoring Report (cited 145 Nuttle Report at 17.

146 2024 FSEIS at 2-25.

147 Id.

148 Motion at 31; Nuttle Report at 17.

149 Motion at 23.

150 Petition, Exh. 9 at 3-10 to 3-21.

151 The RAASR is prepared annually to document compliance with the Consent Order and Consent Agreement and to document the results of the RWS. The RAASRs are public documents and the 2023 RAASR was referenced and relied upon in the 2024 FSEIS. The 2023 RAASR was attached as Exhibit 9 to the original Petition and Dr. Nuttle references a few limited portions of the 2023 RAASR in his May 2024 Report. See Nuttle Report.

152 The 2023 RAASR reporting period is from July 1, 2022, through June 30, 2023.

153 Id. at 2-4.

30 by both the 2024 FSEIS and Dr. Nuttle)154 acknowledges a net outflow of 62.7 tons of salt per day from the CCS, or approximately 23,000 tons of salt for the reporting period.155 While the annual reporting periods for the two reports are offset by one month, the data from publicly available reports upon which the 2024 FSEIS relies show that FPL is withdrawing significantly more salt than leaves the CCS (approximately 48 times more during the 2022-2023 timeframe alone: 23,000 tons annual outflow versus 1,100,000 tons annual withdrawal). Given this material information, which Petitioner ignores and fails to dispute, its net addition of salt argument fails to demonstrate a genuine dispute of material fact here.

As noted in the 2024 FSEIS, the NRC has considered actual monitoring data confirming that the remediation activities have largely halt[ed] the westward advance of the saltwater interface [i.e., not just the hypersaline plume] in the Biscayne Aquifer.156 Neither Petitioner nor Dr. Nuttle acknowledge or grapple with that new monitoring data. Far more is required to raise a genuine dispute.

b.

The Limited References to the 2024 FSEIS in Contention 1-C Fail to Demonstrate a Genuine Dispute As noted above, Petitioner and Dr. Nuttle reference certain limited portions of the 2024 FSEIS that do not contain any new information compared to what was available in the 2023 DSEIS. Aside from failing to provide the good cause required for a new contention, those references also fail to demonstrate a genuine dispute on a material issue of fact or law.

154 2024 FSEIS at 4-8; Nuttle Report at 26.

155 Turkey Point Clean Energy Center Annual Monitoring Report at 4-6 to 4-7 (Aug. 31, 2023),

https://ecmrer.miamidade.gov/hpi/search (Full-Text Search: 2023 Annual Monitoring Report; Facility Name:

Turkey Point; Case No.: HWR-01006; Folio: 3070270000010). The reporting period for the 2023 Annual Monitoring Report is from June 1, 2022, through May 31, 2023.

156 Id. at 2-30.

31 First, Petitioner criticizes Section 2.8.3 of the 2024 FSEIS for allegedly providing an inadequate analysis of the transport and fate of saline water emanating from the [CCS]157 and for only considering two scenarios related to the extent of the hypersaline plume.158 And it disputes the NRC Staffs conclusion in the 2024 FSEIS that continued operation during the SLR term would have no additional adverse effect on the beneficial use of groundwater offsite by existing users.159 However, Petitioner and Dr. Nuttle fail to acknowledge and controvert the information in the 2024 FSEIS relevant to these arguments. They disregard the fact that the goal of the RWS (in regard to the CCS) is not merely to intercept hypersaline water. Rather, its goal is to prevent additional CCS-sourced water, regardless of salinity (i.e., hypersaline, saline, brackish, or fresh), from moving inland.160 Furthermore, the analysis provided in the 2023 RAASR, upon which the NRC relied in developing the 2024 FSEIS, indicates that the RWS is highly effective in this regardbut Petitioner does not say a single word about that information.161 And as noted above, Petitioner fails to acknowledge or engage with the actual data underlying the 2024 FSEIS showing that the mitigation measures have halted the westward advance of the saltwater interface in the Biscayne Aquifer.162 157 Motion at 22-23. See also id. at 22-25 (discussing the volume of saline water).

158 Id. at 24-25 (citing 2024 FSEIS at 2-39). See also id. at 26 (citing 2024 FSEIS at 2-39).

159 Nuttle Report at 3 (citing 2024 FSEIS at 2-39).

160 2024 FSEIS at 2-30. See also Final Order, Exh. A at 69 (The RWS create[es] a hydraulic barrier such that none of the CCS water that seeps into ground water is able to move westward past the RWS. The extraction of the hypersaline ground water beneath the CCS reduces the driving force that contributed to lateral movement away from the CCS thereby halting the westward migration of hypersaline water from the CCS. Thus, since May 2018, the RWS has functionedand continues to functionas a hydrologic barrier that has halted the westward movement of hypersaline water from the CCS.).

161 The 2023 RAASR explains that RWS operations extend the hydraulic barrier effect of the interceptor ditch (ID) operation in the upper portion of the Biscayne aquifer to the base of the aquifer. Petition, Exh. 9 at 2-1. It also notes that particle tracking confirmed hypersaline water from the CCS is intercepted, captured, and contained beneath the CCS and no longer migrates into the compliance zone and that the RWS prevents water from the CCS from flowing through and westward past the RWS. Id. at 5-9. Petitioner and Dr. Nuttle ignore and do not dispute this discussion.

162 2024 FSEIS at 2-30 (emphasis added).

32 Given this fact-based conclusion, plus the extensive new monitoring data discussed in the 2024 FSEIS, which Petitioner disregards, and the information provided in FPLs response to Contention 1-B above, it is unclear why any further analysis would be required or what requirement allegedly is unmetand Petitioner provides no such explanation.

Second, Petitioner references its comment to the NRC on the 2023 DSEIS regarding its net addition of salt theory, and it claims that the NRCs response was merely to note that FPLs remedial action is subject to significant ongoing state and local oversight.163 Petitioner claims this response is inadequate because permit compliance, alone, is not a substitute for, and does not negate the requirement for NRC to weigh all environmental effects of the proposed action.164 However, Petitioner misreads the NRCs response to its comment. As noted above, Petitioners net addition of salt theory is factually unsupported and fails to confront or controvert actual data that undermines this theory. The NRCs comment response references the NRCs analysis of that data.165 So, far from merely asserting that its obligations are met due to permit compliance, the NRC updated its substantive analysis and weighed the associated environmental effects. Because Petitioner ignores that new information, it has not identified a genuine dispute with the 2024 FSEIS on that issue.

Third, Dr. Nuttle criticizes a table titled Table 2-4: Turkey Point Groundwater Withdrawal Wells, because it does not include a separate line item for operation of the Interceptor Ditch and because the NRC allegedly omitted this information from its assessment.166 Notably, the Board 163 Motion at 23-24.

164 Id. at 24 (quoting 10 C.F.R. § 51.71 n.3).

165 2024 FSEIS at A-46 (Section 2.8.3 of this site-specific EIS has been revised to reflect the status of FPLs remedial action based on the information provided in FPLs Year 5 Remedial Action Annual Status Report.).

166 Nuttle Report at 14 (citing 2024 FSEIS at 2-1[8], tbl. 2-4).

33 rejected a similar claim in LBP-24-03.167 More importantly, Petitioner submitted this criticism in its comment letter on the 2023 DSEIS and the NRC responded in the 2024 FSEIS. Specifically, the NRC noted that Sections 3.1 and 3.5 of the 2019 FSEIS describe the operation of the interceptor ditch in detail. The NRC Staff did not identify any new and significant information related to the impacts from operation of the interceptor ditch that would change the conclusions reached in the FSEIS.168 Petitioner fails to dispute these assertions. It also fails entirely to acknowledge the relevant discussion in the 2019 FSEIS regarding interceptor ditch operations.169 It fails to engage with the updated discussion of those operations in the 2023 RAASR, which describes FPLs proposed alternative operating procedure to reduce pumping operations.170 And it fails to controvert the NRCs conclusion that no new and significant information exists on that topic.171 Quite clearly, a petitioner cannot demonstrate a genuine dispute with information that it fails to acknowledge or discuss. And for that reason, Petitioner has not met its burden to do so here.

Accordingly, Amended Contention 1-C is inadmissible because it fails to satisfy multiple criteria in 10 C.F.R. § 2.309(f)(1).

E.

Contention 2 (Endangered Species)

Contention 2 should be rejected because Petitioner has not demonstrated satisfaction of Sections 2.309(c)(4) or (f)(1).

167 Turkey Point, LBP-24-03, 99 NRC at __ (slip op. at 22-23).

168 2024 FSEIS at A-49.

169 2019 FSEIS 3-8 to 3-10.

170 Petition, Exh. 9 at 2-11.

171 2024 FSEIS at A-49.

34

1.

Contention 2 Is Inadmissible In Contention 2, Petitioner alleges that the 2024 FSEISs analysis of the potential impacts of Turkey Points continued operation during the renewal period on Miami cave crayfish is inadequate and its determination that continued operation is unlikely to adversely affect or jeopardize the Miami cave crayfish is unsupported.172 As the Board is aware, after the NRC published the 2023 DSEIS, the U.S. Fish and Wildlife Service (FWS) published a proposal in the Federal Register to list the Miami cave crayfish as a threatened species under the ESA.173 Petitioner challenged the 2023 DSEIS because it did not address the Miami cave crayfish.174 The Board rejected this contention as premature because it was impossible for the 2023 DSEIS to address something that occurred after it was published. The Board also said Petitioner would have an opportunity to advance ESA compliance in the FSEIS.175 Petitioner now challenges the 2024 FSEISs analysis. As discussed below, the new contention is inadmissible because it does not demonstrate a genuine dispute on a material issue of law or fact. A brief background discussion is also provided below.

The Miami Cave Crayfish: In the 2024 FSEIS, the NRC relied on information from the FWSs Federal Register notice, which reflects the best available scientific and commercial information available about the crayfishs life cycle, feeding, range, and possible factors that could affect it.176 The Miami cave crayfish is a small, freshwater, subterranean crayfish endemic to 172 Motion at 36.

173 Endangered and Threatened Wildlife and Plants; Threatened Species Status With Section 4(d) Rule for the Miami Cave Crayfish; Proposed Rule, 88 Fed. Reg. 64,856 (Sept. 20, 2023) (Proposed Listing).

174 Petition at 63-74.

175 Turkey Point, LBP-24-03, 99 NRC at __ (slip op. at 30-31).

176 2024 FSEIS at 2-63 to 2-64 (quoting Proposed Listing, 88 Fed. Reg. at 64,586 (stating the FWS reviewed the best available scientific and commercial information)).

35 southern and central Miami-Dade County.177 The species has been collected from wells in those areas at depths from 7.9 to 36 feet, but [d]espite significant sampling efforts, has not been found in groundwater wells of similar depths within Everglades National Park, which lies west of Turkey Point.178 The crayfish has not been found in the vicinity of Turkey Point, and its closest range lies approximately six kilometers to the northwest of the northern most part of the CCS.179 According to the FWS, the primary threat to the crayfish is saltwater intrusion associated with sea level rise.180 Other threats include modification of surface cover from agriculture, urbanization, and development; modification of karstic limestone from below-ground construction and infrastructure; aquifer drawdown from residential, agricultural, industrial, municipal, and recreational uses; and groundwater contamination by various anthropogenic sources.181 Duty to Confer on Proposed Species: The NRCs need to confer with the FWS on a proposed species is governed by 50 C.F.R. § 402.10. Section 402.10 states that a federal agency shall confer on any action which is likely to jeopardize the continued existence of any proposed species.182 Thus, if the NRC determines that the proposed action is not likely to jeopardize the crayfish, then the NRC need not confer with the FWS. As discussed below, the NRC concluded, based on its evaluation of FPLs efforts to both retract the legacy plume and prevent CCS water from moving westward beyond the CCS, that operation of the CCS during the SLR term is not likely to jeopardize the continued existence of the crayfish. Thus, NRC did not need to confer with the FWS.

177 Id. at 2-63.

178 Id.

179 Id. at 2-64.

180 Id. at 2-63 (emphasis added).

181 Id.

182 50 C.F.R. § 402.10(a) (emphasis added).

36 2024 FSEIS Evaluation of Miami Cave Crayfish: To determine the potential impacts to the crayfish during the SLR term, the NRC evaluated two potential impacts: (1) exposure to radionuclides and (2) habitat loss from saltwater intrusion.183 Because Petitioner challenges only the NRCs analysis and conclusions on saltwater intrusion, the 2024 FSEISs analysis of exposure to radionuclides is not at issue here.

On saltwater intrusion, the 2024 FSEIS points out the that the hypersaline plume does not currently overlap with the endemic range of the Miami cave crayfish.184 The NRC also discusses FPLs efforts to retract the legacy plume. According to the 2024 FSEIS, the data shows that since implementation of the RWS in 2018, the hypersaline plume in the upper layers of the aquifer has almost been fully retracted to within the FPL site boundary.185 In other words, FPL has been successful in retracting the legacy plume in the upper level of the aquifer.

As to the impacts from the CCS during the SLR term, the NRC found that with continued freshening of the CCS and continued operation of the RWS during the SLR term, it is likely that the CCS would not worsen the hypersaline groundwater plume outside the plant boundary, destabilize the groundwater resource, or adversely affect the beneficial uses of groundwater offsite by existing users.186 The NRC also found that continued freshening of the CCS during the SLR term would ensure that water originating from the CCS does not influence the saltwater/freshwater interface within the species range.187 183 2024 FSEIS at 2-65.

184 Id. at 2-67.

185 Id.

186 Id.

187 Id.

37 Based on the above factors, the NRC concluded that Miami cave crayfish are unlikely to experience measurable effects from saltwater intrusion associated with the proposed continued operation of Turkey Point during the SLR term.188 The NRC also concluded that all potential impacts on Miami cave crayfish from the proposed continued operation of Turkey Point during the SLR term would not be able to be meaningfully measured, detected, or evaluated, and would, therefore, be insignificant.189 To be clear, the NRC did not omit an evaluation of these effects; it squarely evaluated them and concluded that they were negligible.

a.

Petitioners Hypersalinity Arguments Are Unsupported and Fail to Demonstrate a Genuine Dispute According to Petitioner, the 2024 FSEIS is fundamentally deficient because it ma[de] no reference to the crayfishs intolerance to even low salinity levels.190 Petitioner claims that this failure means that the NRC did not use science-based standards for determining harmful impacts and that the 2024 FSEIS fails to consider the concept of a gradient of salinity throughout the aquifer.191 Petitioner also relies on its earlier arguments made in Contention 1 criticizing the NRCs analysis of the hypersaline plume to gauge the impacts of the CCS on the Biscayne Aquifer.

However, none of these arguments are adequately supported or demonstrate a genuine dispute on a material issue.

For example, Petitioner argues that the NRC improperly focuses on hypersalinity and therefore ignores the movement of the saltwater/freshwater interface caused by the CCS, echoing 188 Id.

189 Id.; see also U.S. Fish and Wildlife Service, Endangered Species Consultation Handbook at 3-12 to 3-13 (1998)

(describing discountable effects), https://www.fws.gov/sites/default/files/documents/endangered-species-consultation-handbook.pdf.

190 Motion at 42.

191 Id.

38 claims made in Contentions 1-B and 1-C.192 But as explained in FPLs corresponding discussions above, which are incorporated here by reference, the NRCs use of hypersalinity is based on the FDEPs use of hypersalinity to gauge the CCSs influence on the saltwater interface. As with Contentions 1-B and 1-C, Petitioner fails to provide any reasoned explanation for why that approach is technically inadequate or legally insufficient. In fact, it fails to engage with that information at all. In sum, many factors other than the CCS influence the saltwater interface; whereas, the cognizant state regulatory authority has determined that removing the hypersaline plume as a factor that affects that interface is sufficiently protective of potable water to fully satisfy all legal requirements. More than a mere disagreement with the NRCs method is required to demonstrate a genuine dispute, which Petitioner failed to do.

Given all of this, Petitioners criticism of the 2024 DSEIS for not referencing the crayfishs likely intolerance to speculative salinity thresholds, or not discussing salinity gradients, also fails to raise a genuine dispute. The thrust of the NRCs analysis is that mitigation measures have halted the expansion of the saltwater interface. Given that conclusion, which is based on underlying current data that Petitioner disregards entirely, it is unclear why any further analysis is needed to comply with NEPA. And Petitioner offers no explanation.

Petitioner also repeats various arguments from Contention 1-C that rely on outdated data and fail to acknowledge, consider, or dispute more recent data on those topics as presented or referenced in the 2024 FSEIS. For example, Petitioner recycles its argument that the CCS is continuing to flush large volumes of saline water into the aquifer.193 But as discussed above, Petitioners claim is directly refuted by evidence from FPLs monitoring wells, which Petitioner ignores. The data show 192 Id. at 41-44, 46-48.

193 Motion at 23.

39 that the RWS is extracting more saline water than Dr. Nuttle (and Petitioner) claim is being flushed from the CCS.194 Likewise, Petitioner claims that data from USGS wells prove that the saltwater interface is advancing.195 But those claims are based on data that is more than a decade old, well before the RWS became operational. And those claims fail to acknowledge or confront the new data considered in the 2024 FSEIS confirming that the saltwater interface has been halted. Because Petitioner simply ignores all of the extensive new monitoring data on these matters as discussed or referenced in the 2024 FSEIS, it has failed to raise a genuine dispute on this topic.

Furthermore, these recycled arguments already have been rejected by the cognizant state regulator. As noted above, challengers in the Turkey Point NPDES renewal proceeding before FDEP contented that the mitigation measures would increase[] the hydrostatic head of water seeping from the CCS and exacerbate the movement of the hypersaline plume.196 In rejecting that theory, the judge noted that it fails to take into account that... operation of the RWS prevents any water seeping from the CCS into ground water from moving west of the CCS.197 To the extent Petitioner wants to relitigate the outcome of the FDEP proceeding, it is in the wrong forum. And to the extent it has failed to acknowledge or dispute the extensive, updated data discussed in or underlying the 2024 FSEIS, it has failed to demonstrate a genuine dispute.

b.

Petitioners Cumulative Impact Arguments Are Unsupported and Fail to Demonstrate a Genuine Dispute According to Petitioner, the NRC needed to examine, analyze, and address the cumulative impacts from continued operation of the CCS during the SLR term coupled with the impacts of 194 See Petition, Exh. 9 at 2-1.

195 Id. at 43.

196 Final Order at 78 ¶ 302.

197 Id. ¶ 303.

40 rising sea levels.198 While FPL concedes that saltwater intrusion from rising sea levels will have far greater impact on the crayfish than water from the CCS, Petitioner fails to explain why any further analysis is required here.

As a general matter, these arguments are rooted in Petitioners defective arguments regarding the alleged volume of saline water exiting the CCS, secondary impacts of RWS operation, and the allegedly advancing saltwater interface.199 Those arguments are unsupported and fail to dispute the updated analytical data discussed or referenced in the 2024 FSEIS for all of the reasons explained above.

Ultimately, the NRC concludes (based on empirical data ignored by Petitioner) that the mitigation measures are expected to ensure that water originating from the CCS does not influence the Biscayne Aquifers saltwater/freshwater interface within the species range.200 Petitioner not only fails to engage with or dispute the data or analysis that led to that conclusion, but it also offers no competing analysis or data that purports to refute the NRCs conclusion. And if CCS water does not influence the saltwater interface, it is unclear what other SLR-related impact theoretically could combine with climate-change-based sea level rise to yield some unspecified cumulative impact.

And Petitioner offers no theory. Far more is required to demonstrate a genuine dispute.

c.

Petitioners Uncertainty Arguments Are Unsupported and Fail to Demonstrate a Genuine Dispute Finally, Petitioner highlights the inherent uncertainty in this type of analysis and alleges that this lack of information undermines the analysis in the 2024 FSEIS.201 Specifically, Petitioner 198 Id. at 44-46.

199 Motion at 45.

200 2024 FSEIS at 2-67.

201 Motion at 48.

41 notes that there is uncertainty in aquifer modeling and uncertainty regarding the crayfishs range.202 Petitioner then claims that these uncertainties somehow render the NRC Staffs analysis deficient.203 But Petitioner does not explain that conclusory assertion or reconcile it with NEPAs rule of reason.204 Far more is required to demonstrate a genuine dispute.

To the extent Petitioner complains about uncertainty regarding groundwater modeling, the NRC has plainly acknowledged and explained that uncertainty.205 NEPA does not require certitude.

To the contrary, disclosure of incomplete or unavailable information and significant uncertainties is all that NEPA requires.206 Petitioner fails to explain why anything more is required as to groundwater modeling here. Likewise, Petitioner fails to explain why uncertainty in the crayfishs range is material. Petitioner relies on the FWSs statement that the crayfish is highly unlikely to survive in even slightly salty water.207 If so, the then crayfishs current range does not include areas beyond the current saltwater interface; and as discussed in the 2024 FSEIS, continued operation of Turkey Point is not expected to contribute to further expansion of that interface during the SLR term. Petitioner does not explain why further precision in the exact range of the crayfish is necessary to evaluate the potential impacts of SLR.

202 Id. at 46-47.

203 Id. at 46.

204 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-22, 72 NRC 202, 208 (2010) (stating that NEPA requirements are tempered by a practical rule of reason. and [a]n [EIS] is not intended to be a research document.) (citations omitted).

205 See, e.g., FSEIS at 2-38 (However, the ultimate extent and timing of this retraction cannot be fully known. This recognition of uncertainty is based on a hard look at all of the relevant information available to date.).

206 Pilgrim, CLI-10-22, 72 NRC at 208.

207 Motion at 41-42.

42 At most, Petitioner offers a footnote citation to a licensing board decision for the proposition that agency analysis methodologies must be reasonable.208 But they make no attempt to explain why that standard is not met here. In fact, that decision appears to contradict their claim. As the licensing board explained:

NEPA requires that an agency take a hard look at the environmental consequences of a planned action. NEPA does not, however, require agencies to analyze every conceivable aspect of a proposed project.

Rather, NEPAs requisite hard look is subject to a rule of reason.

... Moreover, the Commission recognizes that an environmental impact statement is not a research document, and, in assessing foreseeable impacts, there will always be more data [that] could be gathered, so that agencies must have some discretion to draw the line and move forward with decisionmaking. In assessing these impacts, the agency is not required to use the best scientific methodology or study phenomena for which there are not yet standard methods of measurement or analysis.209 Petitioner fails to engage with any of these legal standards and offers no explanation about what more is purportedly required to satisfy the hard look requirement. It fails to explain what more is required regarding aquifer modeling for the analysis of potential impacts on the crayfish beyond the extensive work that already has been completed across many years of collection and analysis of vast amounts of data (the most recent of which Petitioner ignores) using state-of-the-art modeling (which Petitioner fails to dispute).

As the Commission has often explained, [o]ur boards do not sit to flyspeck environmental documents or to add details or nuances. If the ER (or EIS) on its face comes to grips with all 208 Id. at 48 n.187 (citing Powertech USA, Inc. (Dewey-Burdock in Situ Uranium Recovery Facility), LBP-17-9, 86 NRC 167, 191 (2017)).

209 Id. (citations omitted).

43 important considerations nothing more need be done.210 The NRCs analysis does so here; and Petitioners conclusory assertion otherwise is not enough to generate a genuine dispute.

Accordingly, Contention 2 is inadmissible because it fails to satisfy multiple criteria in 10 C.F.R. § 2.309(f)(1).

F.

Contentions 3-A and 3-B (Climate Change)

Contentions 3-A and 3-B both allege that the 2024 FSEIS failed to analyze the effects of climate change during the SLR period. Contention 3-A alleges that the 2024 FSEIS contains an inadequate discussion how climate change will exacerbate seal level rise, hurricanes, and increase temperatures and drought and how these climate-related impacts will affect Turkey point during the SLR period.211 Contention 3-B alleges that the NRC failed to adequately update its evaluation of FPLs SAMA analysis to reflect the effects of climate change on accident risk.212 Both Contention 3-A and 3-B rely on the recent GAO Report as a basis for each contention.

Contentions 3-A and 3-B should be rejected because Petitioner has not demonstrated satisfaction of Sections 2.309(c)(1), (c)(4), or (f)(1).

1.

Contentions 3-A and 3-B Are Not Based on New and Materially Different Information Petitioners stated basis for Contentions 3-A and 3-B is the GAO Report issued on April 2, 2024.213 According to Petitioner, the GAO Report was not previously available and 210 Systems Energy Res., Inc. (Early Site Permit for Grand Gulf ESP Site), CLI-05-4, 61 NRC 10, 13 (2005) (citation omitted).

211 Motion at 55-56.

212 Id. at 69.

213 Id. at 52-53.

44 therefore it satisfies the requirement that new contentions be based on new facts.214 Petitioner claims the GAO Report satisfies the materially different requirement in Section 2.309(c)(1)(ii) for new contentions because it provides information showing that it is genuinely plausible that consideration of the climate risks and associated environmental impacts identified in the report would change the NRC Staffs conclusions regarding climate change-related environmental impacts.215 Contrary to Petitioners claims, the GAO Report provides no new information on the anticipated effects of climate change. Even a cursory review of the GAO Report reveals that it relies on already existing data that was available to Petitioner before the hearing request deadline on November 27, 2023. In essence, the GAO Report is merely a compendium of historical information that has long been publicly available. Also contrary to Petitioners claim, the GAO Report provides no new analysis about the effects of climate change on nuclear reactors generally, or Turkey Point specifically. In short, the GAO Report is not based on new facts that are materially different and thus, Petitioner cannot demonstrate good cause for the new contentions. For these reasons, and as discussed below, and the Board should deny the Motion to admit Contentions 3-A and 3-B.

As noted above, while the GAO Report is new, none of the data or reports it relied on are new. The GAO Report only summarizes (at a high level) and repackages government data and reports already available to Petitioner before it filed its Petition in November 2023. The GAO admits as much in describing its methodology for the report. To prepare the report, the GAO first reviewed its own past reports and then conducted a literature review for relevant articles published 214 Id. at 52; see Pilgrim, CLI-12-10, 75 NRC at 493 n.70 (new contentions must be based on new facts) (emphasis omitted).

215 Id. at 52.

45 from January 2012 through January 2023.216 The GAO specifically relied on the following government reports and national-level data sets from federal agencies for various climate-related hazards:217

  • the National Climate Assessment (for heat and cold hazards);218
  • the U.S. Forest Services Wildfire Hazard Potential (for wildfire hazards);220
  • the National Oceanic and Atmospheric Administrations (NOAA) Sea, Lake, and Overland Surges from Hurricane model (for storm surge);221 and
  • an interagency report on sea level rise.222 All of the reports and data above were available to Petitioner before it filed its Petition in November 2023. Indeed, Petitioner cited both the National Climate Assessment and the interagency report on sea level rise in its Petition.223 That Petitioner already cited these sources shows the information the GAO relied on for the report was previously available to Petitioner, and Petitioner 216 GAO Report at 42-43.

217 Id. at 43.

218 Id. at 44, 49-50 (citing the Fourth and Fifth National Climate Assessments). The GAO relied on the Fourth National Climate Assessment, which was published in 2018. See U.S. Global Change Research Program, Fourth National Climate Assessment (2018), https://nca2018.globalchange.gov/downloads. The Fifth National Climate Assessment was published on November 14, 2023 (https://nca2023.globalchange.gov), before Miami Waterkeeper filed its Petition. The GAO reviewed this assessment and identified no major differences major differences for the selected hazards. GAO Report at 44 n.9.

219 GAO Report at 44-45, 51 (citing FEMAs National Flood Hazard Layer, https://www.fema.gov/flood-maps/national-flood-hazard-layer).

220 Id. at 44, 50-51 (citing the Forest Services Wildfire Hazard Potential Map, https://www.firelab.org/

project/wildfire-hazard-potential).

221 Id. at 45, 52 (citing NOAAs Sea, Lake and Overland Surges from Hurricanes model, https://www.nhc.noaa.gov/surge/slosh.php#SMODEL).

222 Id. at 45, 52-53 (referencing W.V. Sweet et al., Global and Regional Sea Level Rise Scenarios for the United States: Updated Mean Projections and Extreme Water Level Probabilities Along U.S. Coastlines (Feb. 2022),

https://oceanservice.noaa.gov/hazards/sealevelrise/sealevelrise-tech-report-sections.html (Sea Level Report)).

223 Petition at 58 n. 228 (citing Donald J. Wuebbles et al., Climate Science Special Report: Fourth National Climate Assessment, U.S. Global Change Research Program 197, tbl. 6.4 (2017), https://science2017.globalchange.gov/

downloads/CSSR2017_FullReport.pdf; id. at 51 n.198 (citing Sea Level Report)).

46 knew how to access the information. As a result, Petitioner cannot satisfy the first element of the good cause standardthat the information was not previously availablein Section 2.309(c)(1).224 Petitioners failure to satisfy the first element of the three-part good cause standard for a new contention should, by itself, result in the Boards denial of the Motion.

Furthermore, the information in the GAO Report also is not materially different than previously available information. Even so, Petitioner claims that the GAO Report satisfies the materially different requirement because it provides materially different information about three specific categories of climate risks to Turkey Point: (1) flooding risks from rising sea levels and intensifying hurricanes; (2) safety risks from stronger hurricanes; and (3) increased salinity in the CCS because of rising temperatures and drought.225 As shown below, however, the GAO Report provides no materially different information on these climate-related impacts either generally or specific to Turkey Point. As a result, Petitioner cannot satisfy the second element of the good cause standard,226 and the Board should deny the Motion.

Sea Level Rise: According to Petitioner, the GAO Report provides materially different information about flooding risks due to sea level rise and intensifying hurricanes at Turkey Point.

To support this claim, Petitioner cites several findings in the GAO Report that Turkey Point is:

(1) susceptible to sea level rise, storm surges, and flooding;227 (2) located in a high flood hazard area;228 and (3) susceptible to storm surges from Category 4 and 5 hurricanes.229 Petitioner also 224 10 C.F.R. § 2.309(c)(1)(i) (a participant must demonstrate good cause by showing that: (i) the information upon which the filing is based was not previously available.).

225 Motion at 56-57.

226 10 C.F.R. § 2.309(c)(1)(ii).

227 Motion at 57.

228 Id.

229 Id.

47 claims that the GAO Report provides myriad information demonstrating the reasonably foreseeable risk of overtopping of the Turkey Point CCS. But nothing in the GAO Report on these risks is materially different from previously available information. In addition, these specific risks have already been analyzed by the NRC as part of CLB activities in response to the accident at the Fukushima Daiichi plant in Japan.230 And those CLB safety conclusions are beyond the scope of this proceeding.

First, the data cited in the GAO Report on sea level rise at Turkey Point is not materially different from previously available information. As noted above, the GAO relied on an interagency report from February 2022 on sea level rise,231 which is publicly available on NOAAs website.232 Not only was the report available when Petitioner filed its November 2023 Petition, but it cited the report in its Petition.233 The GAO Report does not contain any new analysis on sea level rise unique to Turkey Point, it merely repackaged the data. For example, the GAO Report includes a map showing projected sea level rise by coastal region (Figure 8 on page 24).234 But the data in this map is taken directly from the interagency report (Table 2.2 on page 19).235 The only change to the data made by the GAO was to convert the projected sea level rise from meters to feet.236 Converting meters to feet is not materially different information.

230 See Letter from R. Kuntz, NRC, to M. Nazar, NextEra Energy, Turkey Point Nuclear Generating Station, Unit Nos. 3 and 4 - Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation (TAC No. MF1114 and MF1115) (Dec. 4, 2014) (ML14324A816) (Flooding Reevaluation).

231 GAO Report at 23 n.32 (citing Sea Level Report).

232 See Sea Level Report.

233 See Petition at 51 n.198.

234 GAO Report at 24 fig. 8.

235 Sea Level Report at 19 tbl. 2.2. Moreover, Turkey Points coastal location had not previously been a secret.

236 Compare id. with GAO Report at 24 fig. 8.

48 Second, the GAO Report provides no new analysis of risks posed to Turkey Point from rising sea levels. Indeed, the only Turkey Point-specific statement on sea level rise in the GAO Report is in a footnote. In that footnote, the GAO notes that NOAA officials said that the plant is an example of a plant where, if unaddressed, sea level rise could lead to salt water intrusion into the plants cooling canals.237 This cursory statement is not materially different information. In fact, the 2019 FSEIS previously analyzed the potential for overtopping of the CCS.238 Third, the NRC has already reviewed flooding risks from storm surges at Turkey Point caused by more powerful storms and exacerbated by rising sea levels.239 But Petitioner does not engage with the NRCs analysis of these risks at Turkey Point, compare the information used in those analyses to the information in the GAO Report, or otherwise explain how the information in the GAO Report is new or materially different. It is Petitioners burden to demonstrate the existence of new and materially different information, and it has not done so here.

Hurricane Risk: It is simply not news that Turkey Point, located in South Florida, may experience strong hurricanes. Because of its location, Turkey Points CLB includes structures built to withstand such hurricanes and detailed hurricane readiness procedures that FPL must implement before the projected arrival of tropical storm force winds.240 The closest the GAO Report comes to discussing these procedures is providing a picture of a flood barrier at Turkey Point.241 That is not materially different information.

237 GAO Report at 23 n.31.

238 See, e.g., 2019 FSEIS at A-39.

239 See, e.g., Flooding Reevaluation at 13-15.

240 Id. at 7.

241 GAO Report at 19.

49 Rising Temperatures: Petitioner claims the GAO Report provides new, materially different information on the effect rising temperature may have on evaporation rates and, by extension, salinity levels in the CCS. In particular, Petitioner claims that the GAO Report warns that both rising temperatures and sea level rise could exacerbate saltwater intrusion into the CCS and local drinking water aquifers.242 Based on this, Petitioner argues that whereas the Board previously dismissed Petitioners concerns regarding the effects of rising temperatures, citing a lack of evidence that the rising temperature would increase salinity levels to the extent that would affect the environment, the GAO Report has specifically warned that such impacts are reasonably foreseeable.243 The GAO Report does little to apply any data on rising temperatures to Turkey Point, doing so in a small sidebar discussing the drought conditions in 2014 and the NRC-approved increase in cooling water temperature.244 But none of the data in the GAO Report is materially different from previously available information. For example, the 2019 FSEIS squarely discusses the relationship between ambient air temperatures and the CCS, as well as the aforementioned drought conditions in 2014.245 This information is neither new nor materially different from previously available information.

In the NRCs response to the GAO, the NRC noted that the GAO Reports recommendations are very broad but consistent with actions either underway or under development.246 And while the NRC said that the GAO report fairly characterized the NRCs regulatory structure, process, and strengths, the NRC did not agree with its conclusion that it does not address the impacts of climate 242 Motion at 63.

243 Id. at 63-64.

244 GAO Report at 15.

245 2019 FSEIS at 3-53 to 3-54.

246 GAO Report at 65.

50 change.247 In particular, the layers of conservatism, safety margins, and defense-in-depth policies are incorporated into NRCs processes and provide reasonable assurance regarding any plausible natural hazard for the operational lifetime of the reactor, including those that could result from climate change.248 The NRC also noted that its mission and delegated authority is focused on nuclear safety and, as such, it cannot impose requirements without a nuclear safety justification.249 At bottom, the GAO is an oversight agency that works for Congress to help the government save money and work more efficiently. The GAO is not a technical expert and merely produced a high-level summary of existing government data. And that data was available to Petitioner in November 2023. While the GAOs collection of these sources in a single document is new, the underlying data are not. And even to the extent that the GAO Report discusses potential climate change impacts to Turkey Point, it presents no materially different information from that already available. For these reasons, Petitioner has failed to show good cause for the new contentions, and the Board should deny the Motion for leave to file Contentions 3-A and 3-B.

Accordingly, the Motion should be denied as to Contentions 3-A and 3-B for Petitioners failure to demonstrate good cause as required by 10 C.F.R. § 2.309(c)(1).

2.

Contention 3-A Is Inadmissible If the Board finds that Petitioner satisfied the good cause standard for Contention 3-A, the Board should nonetheless reject it because it is inadmissible. Petitioner alleges that the 2024 FSEIS fails to adequately analyze climate change-related environmental impacts that are 247 Id.

248 Id.

249 Id.

51 reasonably foreseeable to occur during the [SLR] period.250 In particular, Petitioners claim sea level rise, storm surges and stronger hurricanes, and increased temperatures as climate-related impacts faced by Turkey Point during the SLR period. However, Petitioner fails to raise a genuine dispute on a material issue with the 2024 FSEIS.

a.

The GAO Report, Itself, Fails to Demonstrate a Genuine Dispute Because It Does Not Evaluate the 2024 FSEIS At most, the GAO Report presents a generalized discussion of potential gaps in the NRCs existing regulatory regime regarding climate change. But this sort of generalized discussion, that has no regulatory weight and presents no criticisms specific to the 2024 FSEIS, falls well short of satisfying the Commissions admissibility requirements.251 In past adjudicatory proceedings, petitioners have cited GAO reports as a purported basis for proposed contentions. Presiding officers have often found that such reports do not provide an independent basis for the admission of a contention because they do not pertain directly to the application being considered. For example, one licensing board found that a GAO report provided useful background on issues raised in a petition.252 But the board did not rely on the GAO report to admit a contention.253 The Commission has also not accorded much weight to generalized conclusions in GAO reports or claims extrapolated from these generalized conclusions. For example, in the recent 250 Motion at 53.

251 See Tenn. Valley Auth. (Bellefonte Nuclear Power Plant), LBP-08-16, 68 NRC 361, 388 (2008) (denying admission of a contention that relied on a GAO report because the contention failed to provide any evidence of environmental or safety concerns specific to the application and constituted no more than an inadmissible generalized grievance regarding NRCs enforcement and regulatory policies.).

252 Va. Elec. & Power Co. (North Anna Power Station, Unit 3), LBP-08-15, 68 NRC 294, 312 n.82 (2008) (discussing a GAO report on the status of low-level radioactive waste disposal availability and the pending closure of the Barnwell, South Carolina facility to non-Atlantic Compact states).

253 See id. at 293-325 (admitting a safety contention as a contention of omission but denying the environmental portion of the contention related to storage and disposal of low-level radioactive waste). The petitioner cited a GAO report on low-level radioactive waste disposal. The board found the GAO report provided some background but the GAO report did not provide a basis for the admitted contention. Id. at 312 n.82.

52 license transfer proceeding for the Palisades Nuclear Power Plant, the Commission found that the petitioners costs estimates, which came from industry-wide cost estimates in a GAO report, were too general to support an admissible contention.254 With this background, and as shown below, the GAO Report is too general to support an admissible contention.

As discussed above, the GAO relied on existing data to prepare a broad summary of known potential impacts from climate change for all nuclear plants. In other words, the GAO Report was not singularly, or even remotely focused on Turkey Point or the SLRA. While the GAO performed a site visit to Turkey Point and highlighted some climate-related risks to Turkey Point in the report, none of these risks were new or unknown before the GAO Report. And the generalized treatment of climate risks in the GAO Report lacks the necessary specificity to support an admissible contention.

For example, the GAO Report contains a sidebar on Heat and Drought at Turkey Point Nuclear Generating Station.255 This sidebar summarizes the drought conditions suffered by Turkey Point in 2014 and the NRCs decision to allow Turkey Point to exceed its maximum allowable intake temperature.256 The GAO Report then states that those high temperatures and drought at Turkey Point potentially created risks to local drinking water because of higher salinity levels in the CCS.257 The GAO Report then notes that FPL constructed a series of wells to decrease salinity levels in the CCS.258 In sum, the GAO Reports treatment of heat and drought is 254 Entergy Nuclear Operations. Inc. (Palisades Nuclear Power Plant and Big Rock Point Site), CLI-22-8, 96 NRC 1, 84 (2022) (While the GAO table is broadly cited as support for Joint Petitioners ultimate estimate... none of these categories are specifically identified as forming the basis for the... estimate developed by Joint Petitioners.).

255 GAO Report at 15.

256 Id.

257 Id.

258 Id.

53 entirely backward looking. It makes no attempt to use climate data to forecast what might happen in the future during the period of subsequently extended operations. This type of historical review simply fails to raise a genuine dispute with the 2024 FSEIS.

The GAO Report contains little other specific information on climate-related risks for Turkey Point. The other mentions of Turkey Point are in a footnote,259 a picture of a flood protection barrier,260 a statement about the NRCs safety review for Turkey Point Units 6 and 7,261 and in a table summarizing data for every nuclear plant.262 Thus, contrary to Petitioners claim that the GAO Report contains novel analysis of the effects of climate change on nuclear reactors,263 when it comes to Turkey Point, the GAO Report contains little analysis at all.

At bottom, the GAO Report offers little more than the type of generalized conclusions that past boards found insufficient to support an admissible contention.

b.

Petitioners Arguments Regarding Sea Level Rise, Hurricanes, and Rising Temperatures Fail to Demonstrate a Genuine Dispute Petitioner devotes several pages in Contention 3-A to discussing general information from the GAO Report regarding sea level rise, hurricanes, and rising temperatures. However, it offers only a few vague criticisms of the 2024 FSEIS on these topics. And as explained below, these criticisms are wholly insufficient to demonstrate a genuine dispute.

259 Id. at 23 n.31 (NOAA officials said that Turkey Point Nuclear Generating Station is an example of a plant where, if unaddressed, sea level rise could lead to saltwater intrusion into the plants cooling canals.). Regardless, the GAO Report does not indicate how saltwater intrusion into the saltwater CCS is a material environmental issue.

260 Id. at 19.

261 Id. at 47 n.16.

262 Id. at 55-59.

263 Motion at 53.

54 First, Petitioner claims that the discussion of climate-change related sea level rise in the 2024 FSEIS is cursory.264 It points to the NRC Staffs discussion of the Fifth National Climate Assessment and corresponding conclusion that this information did not paint a seriously different picture from what was considered in the 2019 FSEIS. Petitioner purports to dispute the basis for this conclusion, but fails to engage with the conclusion itself or identify any reason the conclusion is incorrect. Far more is required to demonstrate a genuine dispute.

Petitioner also criticizes the 2024 FSEIS for allegedly failing to analyze the impacts of overtopping the CCS.265 However, that analysis is provided in the 2019 FSEIS.266 Whereas, Petitioner fails to engage with that analysis or explain any reason it is deficient in any way.

Likewise, Petitioner appears to criticize the length of the discussion of hurricane-related environmental impacts.267 But it does not explain why anything further is required. Petitioner does not identify any requirement that allegedly is unmet and offers no explanation of why the 2024 FSEIS purportedly falls short of that unidentified requirement.

As to rising temperatures, Petitioner also derides the 2024 FSEIS discussion as cursory and general.268 But its only specific criticism is that it does not discuss how rising temperatures and drought caused by climate change will affect groundwater quality and to what extent.269 However, the discussion of cumulative impacts on water resources is found in Section 4.16.2 of the 2019 FSEIS, which Petitioner did not challenge. As noted therein, [c]limate change can impact groundwater availability and quality as a result of changes in temperature and precipitation, as well 264 Id. at 59.

265 Id. at 60.

266 See, e.g., 2019 FSEIS at A-39.

267 Petition at 60, 62.

268 Motion at 65.

269 Id. at 66.

55 as due to sea level rise.270 That statement is followed by several paragraphs of information, none of which Petitioner engages with or disputes. Ultimately, Petitioner fails to explain why anything further is required.

In sum, Petitioners conclusory criticisms of the 2024 FSEIS discussion of sea level rise and hurricanes fail to supply the requisite demonstration of a genuine material dispute.

Accordingly, Contention 3-A is inadmissible because it fails to satisfy multiple criteria in 10 C.F.R. § 2.309(f)(1).

3.

Contention 3-B Is Inadmissible If the Board finds that Petitioner satisfied the good cause standard for Contention 3-B, the Board should nonetheless reject it because it is inadmissible. In Contention 3-B, Petitioner claims the 2024 FSEIS does not comply with NEPA because the NRC fail[ed] to adequately update its evaluation of FPLs SAMA analysis to reflect the effects of climate change on accident risk.271 The basis for Contention 3-B is the GAO Report, which Petitioner claims provides new and significant information concerning climate change-related severe accident risks272 and paints a seriously different picture than the 2024 FSEISs evaluation of severe accident risks.273 As explained below, Contention 3-B is inadmissible because it raises issues outside the scope of this license renewal proceeding and fails to raise a genuine dispute on a material issue.

270 2019 FSEIS at 4-132. The 2024 FSEIS also addresses this topic in Appendix E noting that [s]easonal, annual average, and extreme precipitation across the Southeast will continue to increase and will be driven primarily by more extreme events with greater increases in global surface temperature. 2024 FSEIS at E-9. The 2024 FSEIS also recognizes projected increases in coastal flooding, the intensity of hurricanes, and sea level rise. Id. at E-9 to E-10. The NRC Staff ultimately concludes that it did not identify any new information that would change the 2019 analysis and continues to rely on that analysis. Id. at E-11.

271 Motion at 69.

272 Id. at 70.

273 Id. at 77.

56

a.

Petitioners Spent Fuel Arguments Are Outside the Scope of This Proceeding Contention 3-B relies, in part, on the GAO Reports discussion of increased flooding and storm surge risks caused by climate change.274 Petitioner quotes the GAO Reports statements that by exposing the facility to salt water for prolonged periods, flooding could degrade or corrode a casks exterior, potentially posing risks to the environment275 and that flood waters could interfere with heat removal from spent fuel pools by blocking ventilation ports with water.276 Petitioner then argues that Turkey Points high vulnerability to hurricane storm surges is particularly troubling, as casks of spent nuclear fuel may remain on site after closure.277 In sum, Petitioners flooding concern is entirely premised on risks to spent fuel and spent fuel storage. Such concern, as it relates to SAMAs, is outside the scope of a reactor license renewal proceeding. The Commission has made clear that SAMAs apply only to reactor accidents, not to spent fuel pool accidents.278 As a result, the portion of Contention 3-B that claims the 2024 FSEIS is deficient because the SAMAs do not address increased flooding risks to the safe storage of spent fuel fail to satisfy 10 C.F.R. § 2.309(f)(1)(iii).

b.

Petitioners Arguments Regarding Sea Level Rise, Hurricanes, and Rising Temperatures Fail to Demonstrate a Genuine Dispute Contention 3-B claims to challenge the 2024 FSEISs evaluation of FPLs SAMA analysis.

But Petitioner has not identified even one specific SAMA that it purports to challenge. And it has not explained how any unspecified SAMAs are insufficient to account for climate change or why 274 Id. at 72-73.

275 Id. at 72 (quoting GAO Report at 19).

276 Id. at 72-73 (quoting GAO Report at 19).

277 Id. at 73.

278 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), LBP-06-23, 64 NRC 257, 291 (2006) (citing Fla. Power & Light Co. (Turkey Point Nuclear Generating Plant, Units 3 and 4), CLI-01-17, 54 NRC 3, 21-22 (2001)).

57 the analysis thereof would lead to any different outcome. As a threshold matter, this approach is inadequate to raise a genuine dispute with regard to the adequacy of the SAMA.279 As a result, Petitioner has not raised a genuine dispute with the 2024 FSEIS.

According to the Commission, a SAMA analysis rests largely on selected inputs and so it may always be possible to conceive of alternative and more conservative inputs, whose use in the analysis could result in greater estimated accident consequences.280 But the Commission also cautioned that SAMA adjudications would prove endless if hearings were triggered merely by suggested alternative inputs and methodologies that conceivably could alter the cost-benefit conclusions.281 Thus, [a] contention proposing alternative inputs or methodologies must present some factual or expert basis for why the proposed changes in the analysis are warranted

[o]therwise, there is no genuine material dispute with the SAMA analysis that was done, only a proposal for an alternative NEPA analysis that may be no more accurate or meaningful.282 Unless it looks genuinely plausible that inclusion of an additional factor or use of other assumptions or models may change the cost-benefit conclusions for the SAMA candidates evaluated, no purpose would be served to further refine the SAMA analysis, whose goal is only to determine what safety enhancements are cost-effective to implement.283 While Petitioner makes vague arguments about including climate risks in the SAMA analysis, these arguments fail to identify specific SAMAs or specific inputs that would change the SAMA analysis. More specifically, at the beginning of each of the first three subsections in 279 Nuclear Mgmt. Co., LLC (Monticello Nuclear Generating Plant), LBP-05-31, 62 NRC 735, 762 (2005).

280 NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1), CLI-12-5, 75 NRC 301, 323 (2012).

281 Id.

282 Id.

283 Entergy Nuclear Generation Co. (Pilgrim Nuclear Power Station), CLI-10-11, 71 NRC 287, 317 (2010).

58 Contention 3-B, related to Flooding-related risks, Hurricane-related risks, and Temperature-related risks, Petitioner includes a rote assertion that The 2024 FSEIS fails to adequately update its SAMA evaluation to reflect the [flooding/hurricane/temperature]-related effects of climate change on accident risk.284 Petitioner then provides a summary of the GAO report on each subject.

However, it does not engage with any portion of the SAMA analysis. It does not identify any SAMA that potentially would be affected by flooding, or hurricanes, or ambient air temperature. It does not explain the current parameters of those SAMAs or contrast those parameters with some new parameter that allegedly should be used instead, or explain why the existing parameter is materially insufficient. In other words, contrary to 10 C.F.R. § 2.309(f)(1)(vi), Petitioner has not bothered to identify the specific portions of the SAMA analysis that it disputes or any supporting reasons to explain why those unidentified SAMAs fall short of some unspecified requirement in Part 51. Simply put, Contention 3-B falls well short of what is needed for an admissible contention on SAMAs.

Accordingly, Contention 3-B is inadmissible because it fails to satisfy multiple criteria in 10 C.F.R. § 2.309(f)(1).

V.

THE BOARD SHOULD DENY THE WAIVER REQUEST A.

Legal Standards for Waivers As the Commission has explained, Section 2.335(b) provides only a limited exception to the NRCs general prohibition against challenges to NRC rules or regulations in adjudicatory proceedings.285 In general, when the Commission decides to carv[e] out issues from adjudication, 284 Motion at 72-74.

285 Exelon Generation Co., LLC (Limerick Generating Station, Units 1 and 2), CLI-13-7, 78 NRC 199, 206 (2013).

59 it does so carefully and deliberately pursuant to its broad statutory discretion to transact its business broadly, through rulemaking, or case-by-case, through adjudication.286 Thus, to challenge the generic application of a rule, a petitioner seeking waiver must show that there is something extraordinary about the subject matter of the proceeding such that the rule should not apply.287 More specifically, to litigate an issue that otherwise would be outside the scope of an adjudication, a petitioner must show that special circumstances with respect to the subject matter of the particular proceeding are such that the application of the rule or regulation (or a provision of it) would not serve the purposes for which... [it] was adopted.288 The waiver petitioner must include an affidavit that states with particularity the special circumstances that justify waiver of the rule.289 In 2005, in the Millstone license renewal proceeding, the Commission set forth a four-part test that it has long used in ruling on waiver petitions.290 That test requires the petitioner to show that:

(1)

The rules strict application would not serve the purposes for which it was adopted; (2)

Special circumstances exist that were not considered, either explicitly or by necessary implication, in the rulemaking proceeding leading to the rule sought to be waived; (3)

Those circumstances are unique to the facility rather than common to a large class of facilities; and (4)

Waiver of the regulation is necessary to reach a significant safety (or environmental) problem.291 286 Id. at 207 (citations omitted).

287 Id.

288 Id. at 206-07 (quoting 10 C.F.R. § 2.335(b)).

289 Id. at 207 (quoting 10 C.F.R. § 2.335(b)).

290 Dominion Nuclear Conn., Inc. (Millstone Nuclear Power Station, Units 2 and 3), CLI-05-24, 62 NRC 551, 559-60 (2005).

291 See id.

60 All four Millstone elements must be met to justify a rule waiver.292 The Commission has noted that this purposefully places a substantial burden on waiver petitioners because the agency will not set aside a duly-promulgated regulation lightly, and because the Commissions longstanding view is that in general, challenges to regulations are best evaluated through generic means.293 In the context of a Part 51 waiver, the Commission has held that a petitioner must present specific, fact-based claims... not mere allegations.294 In other words, a waiver petition is not an opportunity to embark upon a fishing expedition; waiver petitioners must make the requisite presentation upfront.

B.

Petitioners Waiver Request Should Be Denied Petitioner seeks a waiver of 10 C.F.R. §§ 51.53(c)(3), 51.71(d) and Part 51 Subpart A, Appendix B, in order to challenge the adequacy of the 2024 FSEISs alleged failure to update the SAMA analysis.295 Petitioner claims that it requests a waiver in case the Board interprets those regulations to preclude Petitioners Contention 3-B.

1.

The Board Should Deny the Waiver Request Because It Is Unnecessary As explained above in Section III, the 2024 Rule does not impact this proceeding. In FPLs view, a waiver is not needed for the Board to consider Contention 3-B. That contention challenges a site-specific SAMA analysis in the 2024 FSEIS that does not rely on the 2024 Rule. Because a waiver is not needed to challenge a site-specific analysis, the Waiver Request should be denied.

292 See Limerick, CLI-13-7, 78 NRC at 208.

293 Id.

294 Interim Storage Partners LLC (WCS Consolidated Interim Storage Facility), CLI-20-15, 92 NRC 491, 506 n.111 (2020) (quoting Private Fuel Storage, LLC (Indep. Spent Fuel Storage Installation), CLI-04-22, 60 NRC 125, 134 (2004)).

295 Waiver Request at 1.

61

2.

If the Board Determines a Waiver is Necessary to Consider Contention 3-B, It Should Deny the Waiver Request Because Petitioner Has Not Made the Requisite Prima Facie Showing Alternatively, if the Board nevertheless concludes that 2024 Rule does apply and precludes Contention 3-B absent a waiver, the Board should deny the Waiver Request because, as shown below, Petitioner has not satisfied the requirements for a waiver.

a.

Millstone Factor 1: Purpose for Which the Regulation was Adopted Petitioner failed to show that strict application of the rules would not serve the purpose for which they were enacted. To the contrary, strict application of the new rules for SLR environmental reviews would precisely serve the purpose for which those rules were enacted. The new rules reflect the culmination of a two-year review by the NRC of environmental impacts during one term of SLR. At the end of that process, the NRC determined that severe accidents should be a Category 1 issue. According to NRC Staff, after its review of new information it determined that the overall risk posed by severe accidents is less than originally stated by a significant margin.296 In addition, the NRC determined that new information in the 2024 GEIS did not contribute sufficiently to the environmental impacts to warrant further SAMA analysis because the likelihood of finding cost-effective significant plant improvements is small.297 The NRCs decision to categorize severe accidents as Category 1 issue was based on a reasoned analysis, and Petitioner has not shown why the application of the new rule would not serve the purpose for which it was adopted. In fact, the Waiver Request does not mention, discuss, or analyze those purposes whatsoever. It merely makes the conclusory assertion that application of the rule would preclude the admission of Contention 3-B, which Petitioner claims would therefore 296 SECY-24-0017, Final Rule: Renewing Nuclear Power Plant Operating LicensesEnvironmental Review at Encl. 1, p. 51 (Feb. 21, 2024) (ML23205A024) (emphasis added).

297 Id.

62 undermine the safety purposes of the SAMA analysis.298 However, SAMA analyses are environmental reviews; they have no safety purpose whatsoever. Petitioner fundamentally misunderstands the purpose of SAMA analyses, and identifies no reason that application of the rule would not serve its purpose.

b.

Millstone Factors 2 and 3: Special Circumstances Unique to the Plant The second and third Millstone elements require demonstration of a circumstance that was not considered, either explicitly or by necessary implication, in the rulemaking proceeding leading to the rule sought to be waived,299 and that is specific to the plant. Petitioner claims the recent publication of the GAO Report and its identification of Turkey Point as being at high risk for flooding and high-intensity hurricanes constitute special circumstances.300 But the GAO Report, and the occurrence of flooding and hurricanes at Turkey Point, is not such a circumstance.

The GAO Report is not a new and novel analysis of climate risk as Petitioner claims. As explained above, the GAO Report compiled and summarized already available government data and provided a high-level overview of climate risks generally. While the GAO document is new, the underlying information and data have long been publicly available.

Even so, Petitioner identifies no information in the GAO Report that is surprising or unexpected in the context of severe accident analysis. For example, Petitioner notes that the GAO Report identified Turkey Point to be at risk of high-intensity hurricanes.301 But that is not new information and does not constitute a special circumstance of which the NRC was unaware when it promulgated the rule. Turkey Points ability to withstand flooding and strong hurricanes has been 298 Waiver Request at 7.

299 Millstone, CLI-05-24, 62 NRC at 559-60 (citation omitted).

300 Waiver Request at 8.

301 Id. at 8.

63 part of its design basis since the time of its construction, and the NRC certainly considered the risk of hurricanes in its GEIS analyses of postulated accidents. Ultimately, Petitioner identifies no new circumstances that the NRC failed to consider in the rulemaking. And, indeed, it does not discuss that rulemaking at all.

c.

Millstone Factor 4: Significant Problem The fourth Millstone factor is that waiver of the regulation is necessary to reach a significant safety (or environmental) problem.302 Contrary to Petitioners claim, the GAO Report does not analyze[] the increasing risk of severe accidents due to climate change.303 The GAO Report and specifically the portion cited by Petitioner, hereis a table summarizing government data on potential impacts from climate change. The GAO Report does not perform any type of risk analysis. And Petitioner fails to engage with or analyze the FSEIS or its updated analysis of severe accidents or SAMAs or explain any reason that analysis is somehow deficient, much less why it purportedly is a significant problem. As discussed above, the NRC has just completed a years-long revision process to update the GEIS and determined that Severe Accidents are a Category 1 issue. The GAO Report does nothing to challenge that conclusion.

Accordingly, the Waiver Request should be denied.

VI.

CONCLUSION Pursuant to 10 C.F.R. § 2.309(c) the Motion should be DENIED as to Contentions 1-A, 1-B, and 1-C and Contentions 3-A and 3-B because they are not based on new and materially different information than that previously available. The Motion should also be DENIED as to all contentions because Petitioner failed to propose an admissible contention.

302 Millstone, CLI-05-24, 62 NRC at 559-60.

303 Waiver Request at 9 (citing GAO Report at 55).

64 Respectfully submitted, Signed (electronically) by Scott D. Clausen SCOTT D. CLAUSEN, Esq.

MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Avenue, N.W.

Washington, D.C. 20004 (202) 739-5402 Scott.Clausen@morganlewis.com Executed in Accord with 10 C.F.R. § 2.304(d)

PAUL M. BESSETTE, Esq.

RYAN K. LIGHTY, Esq.

MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Avenue, N.W.

Washington, D.C. 20004 (202) 739-5796 (202) 739-5274 Paul.Bessette@morganlewis.com Ryan.Lighty@morganlewis.com Executed in Accord with 10 C.F.R. § 2.304(d)

STEVEN HAMRICK, Esq.

FLORIDA POWER & LIGHT COMPANY 801 Pennsylvania Ave., N.W. Suite 220 Washington, D.C. 20004 (202) 349-3496 Steven.Hamrick@fpl.com Counsel for Florida Power & Light Company Dated in Washington, DC this 3rd day of June 2024

DB1/ 147754359 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the matter of:

FLORIDA POWER & LIGHT COMPANY (Turkey Point Nuclear Generating Station, Units 3 and 4)

Docket Nos. 50-250-SLR-2 and 50-251-SLR-2 June 3, 2024 CERTIFICATE OF SERVICE Pursuant to 10 C.F.R. § 2.305, I certify that, on this date, a copy of the foregoing Florida Power & Light Companys Answer To Miami Waterkeepers Motion To Admit Amended And New Contentions In Response To The NRC Staffs Final Site-Specific Environmental Impact Statement was served upon the Electronic Information Exchange (the NRCs E-Filing System),

in the above-captioned docket.

Signed (electronically) by Scott D. Clausen SCOTT D. CLAUSEN, Esq.

MORGAN, LEWIS & BOCKIUS LLP 1111 Pennsylvania Avenue, N.W.

Washington, D.C. 20004 (202) 739-5402 Scott.Clausen@morganlewis.com Counsel for Florida Power & Light Company