ML24193A086: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:IMPEP Timeline | {{#Wiki_filter:IMPEP Timeline Overview Draft final report Draft IMPEP Report issued for factual comment 45 days after exit meeting. | ||
Comment period State or Region comment response to NRC 28 days after issued Draft Report. | |||
Draft IMPEP Report issued | Proposed final report Proposed final report to MRB at least 7 days prior to the MRB Meeting. | ||
MRB meeting MRB meeting 90 - 105 days after exit meeting. | |||
Issue final report Final IMPEP report issued 30 days after the MRB Meeting (CBJ metric).}} | |||
issued | |||
Latest revision as of 17:33, 24 November 2024
| ML24193A086 | |
| Person / Time | |
|---|---|
| Issue date: | 07/11/2024 |
| From: | NRC/NMSS/DMSST/ASPB |
| To: | |
| References | |
| Download: ML24193A086 (1) | |
Text
IMPEP Timeline Overview Draft final report Draft IMPEP Report issued for factual comment 45 days after exit meeting.
Comment period State or Region comment response to NRC 28 days after issued Draft Report.
Proposed final report Proposed final report to MRB at least 7 days prior to the MRB Meeting.
MRB meeting MRB meeting 90 - 105 days after exit meeting.
Issue final report Final IMPEP report issued 30 days after the MRB Meeting (CBJ metric).