ML24290A105: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:Dominion Energy South Carolina. Inc.
{{#Wiki_filter:Dominion Energy South Carolina. Inc.
5000 Dominion Boulevard. G len Allen. VA 23060 Dom in io n DominionEnergy.com Energy c
5000 Dominion Boulevard. Glen Allen. VA 23060 DominionEnergy.com October 7, 2024 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 DOMINION ENERGY SOUTH CAROLINA VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 CORE OPERATING LIMITS REPORT VCSNS UNIT 1. CYCLE 29, REVISION 0 Serial No.:
 
NRNJHH:
October 7, 2024
Dominion Energyc Docket No.:
 
24-299 R1 50-395 License No.:
U. S. Nuclear Regulatory Commission Serial No.: 24-299 Attention: Document Control Desk NRNJHH: R1 Washington, DC 20555 Docket No.: 50-395 License No.: NPF-12
NPF-12 Pursuant to VCSNS Unit 1 Technical Specification 6.9.1.11, attached is a copy of the Core Operating Limits Report for VCSNS Unit 1, Cycle 29, Revision 0.
 
DOMINION ENERGY SOUTH CAROLINA VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 CORE OPERATING LIMITS REPORT VCSNS UNIT 1. CYCLE 29, R EVISION 0 Pursuant to VCSNS Unit 1 Technical Specification 6.9.1.11, attached is a copy of the Core Operating Limits Report for VCSNS Unit 1, Cycle 29, Revision 0.
If you have any questions or require additional information, please contact Julie Hough at (804) 273-3586.
If you have any questions or require additional information, please contact Julie Hough at (804) 273-3586.
 
James Holloway Vice President - Nuclear Engineering and Fleet Support  
James Holloway Vice President - Nuclear Engineering and Fleet Support


==Attachment:==
==Attachment:==
Core Operating Limits Report, COLR-V1 C29 Revision 0
Core Operating Limits Report, COLR-V1 C29 Revision 0 Commitments: None.  
 
Commitments: None.
Serial No.: 24-299 Docket No. : 50-395 Page 2 of 2
 
cc: U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1257


Mr. G. Edward Miller NRG Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738
cc:
U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1257 Mr. G. Edward Miller NRG Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. Zach M. Turner NRG Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 NRG Senior Resident Inspector V.C. Summer Nuclear Station Serial No.: 24-299 Docket No.: 50-395 Page 2 of 2


Mr. Zach M. Turner NRG Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738
ATTACHMENT Core Operating Limits Report COLR-V1C29 Revision 0 VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 DOMINION ENERGY SOUTH CAROLINA, INC.
Serial No.: 24-299 Docket No.: 50-395


NRG Senior Resident Inspector V.C. Summer Nuclear Station Serial No.: 24-299 Docket No.: 50-395
rt,, Dominion CORE OPERATING LIMITS REPORT Energy;,
 
NF-AA-NAF-203 Page 1 of 34 COLRNo.:
ATTACHMENT
Station I Unit/ Cycle / Pattern:
 
COLR-V1C29 Revision:
Core Operating Limits Report
0 V. C. Summer Unit 1, Cycle 29 Station Name:
 
Unit:
COLR-V1C29 Revision 0
Millstone North Anna Surry V. C. Summer ~
 
1 ~ 2 3 Basis Document and Screened as Part of:
VIRGIL C. SUMM ER NUCLEAR STATION UNIT 1 DOMINION ENERGY SOUTH CAROLINA, INC.
rt,, Dominion CORE OPERATING LIMITS REPORT Energy;, NF-AA-NAF-203 Page 1 of 34
 
COLRNo.: Station Revision: I Unit/ Cycle / Pattern:
COLR-V1C29 0 V. C. Summer Unit 1, Cycle 29
 
Station Name: Unit:
Millstone North Anna Surry V. C. Summer ~ 1 ~ 2 3  
 
Basis Document and Screened as Part of:
EVAL-ENG-RSE-V1C29, Revision 0, "Reload Safety Evaluatlon, V. C. Summer Unit 1 Cycle 29," September 2024
EVAL-ENG-RSE-V1C29, Revision 0, "Reload Safety Evaluatlon, V. C. Summer Unit 1 Cycle 29," September 2024


==Title:==
==Title:==
CORE OPERA TING LIMITS REPORT V. C. Summer Unit 1 Cycle 29
Preparing Organization:
Preparing Organization:
Nuclear Engineering and Fuel Print Name Below Signature Date
Print Name Below FSRC Approval:
CORE OPERA TING LIMITS REPORT V. C. Summer Unit 1 Cycle 29 Nuclear Engineering and Fuel Signature COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Date SepS,2024 SepS,2024 Sep9,2024 Sep 17,2024 Page 1 of34


SepS,2024
DOMINION ENERGY SOUTH CAROLINA VIRGIL C. SUMMER NUCLEAR STATION UNITl CORE OPERATING LIMITS REPORT FOR CYCLE29 REVISION0 SEPTEMBER 2024 COLR-VlC29, Revision0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 2 of34


SepS,2024
Section 1.0 2.0 3.0 Table of Contents Core Operating Limits Report Operating Limits 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Moderator Temperature Coefficient (Specification 3.1.1.3)
Shutdown Rod Insertion Limits (Specification 3.1.3.5)
Control Rod Insertion Limits (Specification 3.1.3.6)
Axial Flux Difference (Specification 3.2.1)
Heat Flux Hot Channel Factor - FQ(z) (Specification 3.2.2)
RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor - FfH (Specification 3.2.3)
Power Distribution Measurement Uncertainty (Specifications 3.2.2 and 3.2.3)
References COLR-V1C29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A 6
7 7
7 8
8 8
10 11 13 Page 3 of34


Sep9,2024
List of Tables Table Page Table 1.
RAOC W(z) at 150, 1000, 2000, 3000 MWD/MTU 19 Table 2.
RAOC W(z) at 4000, 5000, 6000, 8000 lVIWD/MTU 20 Table 3.
RAOC W(z) at 10000, 12000, 14000, 16000 MWD/MTU 21 Table 4.
RAOC W(z) at 18000, 20000 MWD/MTU 22 Table 5.
RAOC FQ Margin Decrease in Excess of2% Per 31 EFPD 23 Table 6.
Alternate RAOC W(z) at 150, 1000, 2000, 3000 MWD/MTU 24 Table 7.
Alternate RAOC W(z) at 4000, 5000, 6000, 8000 MWD/lVITU 25 Table 8.
Alternate RAOC W(z) at 10000, 12000, 14000, 16000 MWD/lVITU 26 Table 9.
Alternate RAOC W(z) at 18000, 20000 MWD/lVITU 27 Table 10.
Alternate RAOC FQ Margin Decrease in Excess of2% Per 31 EFPD 28 Table 11.
BASELOAD W(z) at 150, 1000, 2000, 3000 MWD/MTU 29 Table 12.
BASELOAD W(z) at 4000, 5000, 6000, 8000 MWD/MTU 30 Table 13.
BASELOAD W(z) at 10000, 12000, 14000, 16000 MWD/lVITU 31 Table 14.
BASELOAD W(z) at 18000, 20000 MWD/lVITU 32 Table 15.
BASELOAD FQ Margin Decrease in Excess of2% Per 31 EFPD 33 COLR-VlC29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 4 of34


FSRC Approval:
Figure Figure 1.
Sep 17,2024
Figure 2.
 
Figure 3.
COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 1 of34 DOMINION ENERGY SOUTH CAROLINA
Figure 4.
 
Figure 5.
VIRGIL C. SUMMER NUCLEAR STATION
Figure 6.
 
List of Figures Moderator Temperature Coefficient Versus Power Level Rod Group Insertion Limits Versus Thermal Power for Three Loop Operation Axial Flux Difference Limits as a Function of Rated Thermal Power K(z) - Normalized FQ(z) as a Function of Core Height Axial Flux Difference Limits as a Function of Rated Thermal Power (Alternate RAOC)
UNITl
RCS Total Flowrate vs. R for Three Loop Operation COLR-V1C29, Revision 0 14 15 16 17 18 34 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 5 of34  
 
CORE OPERATING LIMITS REPORT FOR CYCLE29
 
REVISION0
 
SEPTEMBER 2024
 
COLR-VlC29, Revision0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 2 of34 Table of Contents
 
Section
 
1.0 Core Operating Limits Report 6
 
2.0 Operating Limits 7
 
2.1 Moderator Temperature Coefficient (Specification 3.1.1.3) 7
 
2.2 Shutdown R od Insertion Limits (Specification 3.1.3.5) 7
 
2.3 Control Rod Insertion Limits (Specification 3.1.3.6) 8
 
2.4 Axial Flux Difference (Specification 3.2.1) 8
 
2.5 Heat Flux H ot Channel Factor - FQ(z) (Specification 3.2.2) 8
 
2.6 RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor - FfH (Specification 3.2.3) 10
 
2.7 Power Distribution Measurement Uncertainty (Specifications 3.2.2 and 3.2.3) 11
 
3.0 References 13
 
COLR-V1C29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 3 of34 List of Tables
 
Table Page Table 1. RAOC W(z) at 150, 1000, 2000, 3000 MWD/MTU 19
 
Table 2. RAOC W(z) at 4000, 5000, 6000, 8000 lVIWD/MTU 20
 
Table 3. RAOC W(z) at 10000, 12000, 14000, 16000 MWD/MTU 21
 
Table 4. RAOC W(z) at 18000, 20000 MWD/MTU 22
 
Table 5. RAOC FQ Margin Decrease in Excess of2% Per 31 EFPD 23
 
Table 6. Alternate RAOC W(z) at 150, 1000, 2000, 3000 MWD/MTU 24
 
Table 7. Alternate RAOC W(z) at 4000, 5000, 6000, 8000 MWD/lVITU 25
 
Table 8. Alternate RAOC W(z) at 10000, 12000, 14000, 16000 MWD/lVITU 26
 
Table 9. Alternate RAOC W(z) at 18000, 20000 MWD/lVITU 27
 
Table 10. Alternate RAOC FQ Margin Decrease in Excess of2% Per 31 EFPD 28
 
Table 11. BASELOAD W(z) at 150, 1000, 2000, 3000 MWD/MTU 29
 
Table 12. BASELOAD W(z) at 4000, 5000, 6000, 8000 MWD/MTU 30
 
Table 13. BASELOAD W(z) at 10000, 12000, 14000, 16000 MWD/lVITU 31
 
Table 14. BASELOAD W(z) at 18000, 20000 MWD/lVITU 32
 
Table 15. BASELOAD FQ Margin Decrease in Excess of2% Per 31 EFPD 33
 
COLR-VlC29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 4 of34 List of Figures
 
Figure
 
Figure 1. Moderator Temperature Coefficient Versus Power Level 14
 
Figure 2. Rod Group Insertion Limits Versus Thermal Power for Three Loop Operation 15
 
Figure 3. Axial Flux Difference Limits as a Function of Rated Thermal Power 16
 
Figure 4. K(z) - Normalized FQ(z) as a Function of Core Height 17
 
Figure 5. Axial Flux Difference Limits as a Function of Rated Thermal Power (Alternate RAOC) 18
 
Figure 6. RCS Total Flowrate vs. R for Three Loop Operation 34
 
COLR-V1C29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 5 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
1.0 Core Operating Limits Report
 
This Core Operating Limits Report (COLR) for V. C. Summer Station Cycle 29 has been prepared in accordance with the requirements of Technical Specification 6.9.1.11.


V. C. Summer Cycle 29 SEPTEMBER 2024 1.0 Core Operating Limits Report This Core Operating Limits Report (COLR) for V. C. Summer Station Cycle 29 has been prepared in accordance with the requirements of Technical Specification 6.9.1.11.
The Technical Specifications affected by this report are listed below:
The Technical Specifications affected by this report are listed below:
 
3.1.1.3 Moderator Temperature Coefficient 3.1.3.5 Shutdown Rod Insertion Limits 3.1.3.6 Control Rod Insertion Limits 3.2.1 Axial Flux Difference 3.2.2 Heat Flux Hot Channel Factor - FQ(z) 3.2.3 RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor The analytical methods used to determine the core operating limits are those previously approved by the NRC and discussed in the documents listed in the References Section.
3.1.1.3 Moderator Temperature Coefficient
 
3.1.3.5 Shutdown Rod Insertion Limits
 
3.1.3.6 Control Rod Insertion Limits
 
3.2. 1 Axial Flux Difference
 
3.2.2 Heat Flux Hot Channel Factor - FQ(z)
 
3.2.3 RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor
 
The analytical methods used to determine the core operating limits are those previously approved by the NRC and discussed in the documents listed in the References Section.
 
Cycle-specific values are presented in bold. Text in italics is provided for information only.
Cycle-specific values are presented in bold. Text in italics is provided for information only.
COLR-VIC29, Revision 0 EV AL-ENG-RSE-VI C29, Revision 0, Attachment A Page 6 of34


COLR-VIC29, Revision 0 EV AL-ENG-RSE-VI C29, Revision 0, Attachment A Page 6 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
V. C. Summer Cycle 29 SEPTEMBER 2024 2.0 Operating Limits The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the subsections which follow. These limits have been developed using the NRC-approved methodologies specified in Technical Specification 6.9.1.11.
 
2.1 Moderator Temperature Coefficient (Specification 3.1.1.3):
2.0 O p er at ing Li m its
 
The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the subsections which follow. These limits have been developed using the NRC-approved methodologies specified in Technical Specification 6.9.1.11.
 
2.1 M oderator Temperature Coefficient (Specification 3.1.1.3):
 
2.1.1 The Moderator Temperature Coefficient (MTC) limits are:
2.1.1 The Moderator Temperature Coefficient (MTC) limits are:
The BOL/ARO-MTC shall be less positive than the limits shown in Fi g ure 1.
The BOL/ARO-MTC shall be less positive than the limits shown in Figure 1.
The EOL/ARO/RTP-MTC shall be less negative than -4.8x10-4 Ak/k/°F (-48 pcm/0 F).
The EOL/ARO/RTP-MTC shall be less negative than -4.8x10-4 Ak/k/°F (-48 pcm/0F).
where: BOL stands for Beginning of Cycle Life ARO stands for All Rods Out RTP stands for RA TED THERMAL POWER EOL stands for End of Cycle Life
where:
 
BOL stands for Beginning of Cycle Life ARO stands for All Rods Out RTP stands for RA TED THERMAL POWER EOL stands for End of Cycle Life 2.1.2 The MTC Surveillance limit is:
2.1.2 The MTC Surveillance limit is:
The 300 ppm/ARO/RTP-MTC should be less negative than or equal to -4.1x10-.t Ak/k/°F
The 300 ppm/ARO/RTP-MTC should be less negative than or equal to -4.1x10-.t Ak/k/°F
(-41 pcm/0 F).
(-41 pcm/0F).
 
2.1.3 The Revised Predicted near-EOL 300 ppm MTC shall be calculated using the following algorithm from Reference 5:
2.1.3 The Revised Predicted near-EOL 300 ppm MTC shall be calculated using the following algorithm from Reference 5:
 
Revised Predicted MTC = Predicted MTC + AFD Correction*+ Predictive Correction**  
Revised Predicted MTC = Predicted MTC + AFD Correction*+ Predictive Correction**
*AFD Correction is 0.05 pcm/°F/%L'iAFD.  
* AFD Correction is 0.05 pcm/°F/%L'iAFD.
**Predictive Correction is -3 pcm/°F.
**Predictive Correction is -3 pcm/°F.
If the Revised Predicted MTC is less negative than the SR 4. l. l.3b limit of  
 
-4.lx10-4 Ak/k/°F, and all of the benchmark data contained in the surveillance procedure are met, then an MTC measurement in accordance with SR 4.1. l.3b is not required.
If the Revised Predicted MTC is less negative than the SR 4. l. l.3b limit of
2.2 Shutdown Rod Insertion Limits (Specification 3.1.3.5):
-4.lx10- 4 Ak/k/°F, and all of the benchmark data contained in the surveillance procedure are met, then an MTC measurement in accordance with SR 4.1. l.3b is not required.
 
2.2 Shutdown R od Insertion Limits (Specification 3.1.3.5):
 
The shutdown rods shall be withdrawn to at least 225 steps. The All Rods Out (ARO) position is 226 steps.
The shutdown rods shall be withdrawn to at least 225 steps. The All Rods Out (ARO) position is 226 steps.
COLR-VlC29, Revision 0 EVAL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 7 of34


COLR-VlC29, Revision 0 EVAL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 7 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
V. C. Summer Cycle 29 SEPTEMBER 2024 2.3 Control Rod Insertion Limits (Specification 3.1.3.6):
 
Control Bank A and B rods shall be withdrawn to at least 225 steps. Control Bank C and D Rod Insertion Limits are specified by Figure 2. Control rod overlap is 98 steps. The All Rods Out (ARO) position is 226 steps.
2.3 Control R od Insertion Limi ts (Specification 3.1.3.6):
 
Control Bank A and B rods shall be withdrawn to at least 225 steps. Control Bank C and D Rod Insertion Limits are specified by Fi g ure 2. Control rod overlap is 98 steps. The All Rods Out (ARO) position is 226 steps.
 
2.4 Axial Flux Difference (Specification 3.2.1):
2.4 Axial Flux Difference (Specification 3.2.1):
2.4.1 The Axial Flux Difference (AFD) Limits for Rela.'Ced Axial Offset Control (RAOC) operation are shown in Figure 3.
2.4.1 The Axial Flux Difference (AFD) Limits for Rela.'Ced Axial Offset Control (RAOC) operation are shown in Figure 3.
2.4.2 The Axial Flux Difference (AFD) target band during base load operations is:
2.4.2 The Axial Flux Difference (AFD) target band during base load operations is:
BOL - EOL (0 - 23,000 MWD/MTU): +/-5% about a m easured target value. The base load band will remain inside the RAOC band.
BOL - EOL (0 - 23,000 MWD/MTU): +/-5% about a measured target value. The base load band will remain inside the RAOC band.
 
2.4.3 The Axial Flux Difference (AFD) Limits for Alternate Relaxed Axial Offset Control (RAOC) operation are shown in Figure 5.
2.4.3 The Axial Flux Difference (AFD) Limits for Alternate Relaxed Axial Offset Control (RAOC) operation are shown in Figure 5.
2.4.4 The minimum allowable power level for base load operation, APLN°, is 75% of RATED THERMAL POWER.
2.5 Heat Flux Hot Channel Factor - FQ(z) (Specification 3.2.2):
fRlP FQ (Z) :s; _Q_ X K(Z) 0.5 2.5.1 F~TP = 2.50 for P> 0.5 for P ~ 0.5 P
Thennal Power where:
Rated Thennal Power 2.5.2 K(z) is equal to 1 for all core heights as shown in Figure 4.
COLR-VIC29, Revision 0 EVAL-ENG-RSE-VIC29, Revision 0, Attachment A Page 8 of34


2.4.4 The minimum allowable power level for base load operation, APLN°, is 75% of RATED THE RM AL POWER.
V. C. Summer Cycle 29 SEPTEMBER 2024 2.5.3 The discussion in TS 4.2.2.2.c and 4.2.2.2.f for this LCO requires the application of a cycle dependent non-equilibrium multiplier, W(Z), to the steady state FQ(Z). W(Z) values are calculated for each flux map using analytically derived FQ(Z) values (scaled by relative power), consistent with the methodology described in Reference 2. W(Z) accounts for power distribution transients encountered during normal operation FRTP FMiz) ::5 Q
 
X K(Z) forP > 0.5 PX W(z)
2.5 H eat Flux Hot Channel Factor - FQ(z) (Specification 3.2.2):
FRTP Thennal Power FMaCZ} ::S Q
 
X K(Z) for P ~ 0.5 where: P=
for P> 0.5
W( z) X 0.5 Rated Thennal Power 2.5.4 FSlP =2.50 2.5.5 K(z) is equal to 1 for all core heights as shown in Figure 4.
 
fRlP Power FQ (Z) :s; _Q_ X K(Z) 0.5 for P ~ 0.5 P __ Thennal where: Rated Thennal Power
 
2.5.1 F~TP = 2. 50 2.5.2 K(z) is equal to 1 for all core hei ghts as shown in Figure 4.
 
COLR-VIC29, Revision 0 EVAL-ENG-RSE-VIC29, Revision 0, Attachment A Page 8 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
2.5.3 The discussion in TS 4.2.2.2.c and 4.2.2.2.f for this LCO requires the application of a cycle dependent non-equilibrium multiplier, W(Z), to the steady state FQ(Z). W(Z) values are calculated for each flux map using analytically derived FQ(Z) values (scaled by relative power), consistent with the methodology described in Reference 2. W(Z) accounts for power distribution transients encountered during normal operation
 
FRTP FMiz) ::5 Q X K(Z) forP > 0.5 PX W(z)
 
FRTP Thennal Power FMaCZ} ::S Q X K(Z) for P ~ 0.5 where: P= W( z) X 0.5 Rated Thennal Power
 
2.5.4 FSlP =2.50
 
2.5.5 K(z) is equal to 1 for all core heights as shown in Figure 4.
 
The two equations calculate the maximum percent over the core height(z) that FQ(Z) exceeds its limit.
The two equations calculate the maximum percent over the core height(z) that FQ(Z) exceeds its limit.
F srr l
x 100 for P;;:: 0.5 l[
F QM(z) x W(z) l l
+xK(z)
I[
F QM( z) x lV( z) l I F
Kil' l
X 100 for P < 0.5
_Q_XK(z) 0.5 COLR-VlC29, Revision 0 EVAL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 9 of34


F QM(z) x W(z) l l F srr - l x 100 for P;;:: 0.5 l[ +xK(z)
V. C. Summer Cycle 29 SEPTEMBER 2024 2.5.6 Elevation dependent W(z) values for RAOC operation at 150, 1000, 2000, 3000, 4000, 5000, 6000, 8000, 10000, 12000, 14000, 16000, 18000, and 20000 MWD/MTU are shown in Tables 1 through 4, respectively. This information is sufficient to determine W(z) versus core height in the range of O MWD/MTU to EOL burnup through the use of three point interpolation. Table 5 shows FQ margin decreases for RAOC operation that are greater than 2% per 31 Effective Full Power Days (EFPD). These values shall be used to increase FQM(z) as per Surveillance Requirement 4.2.2.2.e. A 2% penalty factor shall be used at all bumups that are outside the range of Table 5.
 
F QM( z) x lV( z) l F Kil' - l X 100 for P < 0.5 I I[ _Q_XK(z) 0.5
 
COLR-VlC29, Revision 0 EVAL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 9 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
2.5.6 Elevation dependent W(z) values for RAOC operation at 150, 1000, 2000, 3000, 4000, 5000, 6000, 8000, 10000, 12000, 14000, 16000, 18000, and 20000 MWD/MTU are shown in Tables 1 through 4, respectively. This information is sufficient to determine W(z) versus core height in the range of O MWD/MTU to EOL burnup through the use of three point interpolation. Table 5 shows FQ margin decreases for RAOC operation that are greater than 2% per 31 Effective Full Power Days (EFPD). These values shall be used to increase FQM(z) as per Surveillance Requirement 4.2.2.2.e. A 2% penalty factor shall be used at all bumups that are outside the range of Table 5.
2.5.7 Elevation dependent W(z) values for Alternate RAOC operation at 150, 1000, 2000, 3000, 4000, 5000, 6000, 8000, 10000, 12000, 14000, 16000, 18000, and 20000 MWD/MTU are shown in Tables 6 through 9, respectively. This information is sufficient to determine W(z) versus core height in the range of O MWD/MTU to EOL bumup through the use of three point interpolation. Table 10 shows FQ margin decreases for RAOC operation that are greater than 2% per 31 Effective Full Power Days (EFPD). These values shall be used to increase Fl'(z) as per Surveillance Requirement 4.2.2.2.e. A 2% penalty factor shall be used at all bumups that are outside the range of Table 10.
2.5.7 Elevation dependent W(z) values for Alternate RAOC operation at 150, 1000, 2000, 3000, 4000, 5000, 6000, 8000, 10000, 12000, 14000, 16000, 18000, and 20000 MWD/MTU are shown in Tables 6 through 9, respectively. This information is sufficient to determine W(z) versus core height in the range of O MWD/MTU to EOL bumup through the use of three point interpolation. Table 10 shows FQ margin decreases for RAOC operation that are greater than 2% per 31 Effective Full Power Days (EFPD). These values shall be used to increase Fl'(z) as per Surveillance Requirement 4.2.2.2.e. A 2% penalty factor shall be used at all bumups that are outside the range of Table 10.
2.5.8 Elevation dependent W(z) values for Baseload operation between 75 and 100% of rated thermal power with the Section 2.4.2 specified target band about a measured target value at 150, 1000, 2000, 3000, 4000, 5000, 6000, 8000, 10000, 12000, 14000, 16000, 18000, and 20000 MWD/MTU are shown in Tables 11 through 14, respectively. This information is sufficient to determine W(z) versus core height for burnups in the range of 0 MWD/MTU to EOL bumup through the use of three point interpolation. Table 15 shows FQ margin decreases for base load operation that are greater than 2% per 31 Effective Full Power Days (EFPD). These values shall be used to increase FQM(z) as per Surveillance Requirement 4.2.2.4.e. A 2% penalty factor shall be used at all bumups that are outside the range of Table 15.
2.5.8 Elevation dependent W(z) values for Baseload operation between 75 and 100% of rated thermal power with the Section 2.4.2 specified target band about a measured target value at 150, 1000, 2000, 3000, 4000, 5000, 6000, 8000, 10000, 12000, 14000, 16000, 18000, and 20000 MWD/MTU are shown in Tables 11 through 14, respectively. This information is sufficient to determine W(z) versus core height for burnups in the range of 0 MWD/MTU to EOL bumup through the use of three point interpolation. Table 15 shows FQ margin decreases for base load operation that are greater than 2% per 31 Effective Full Power Days (EFPD). These values shall be used to increase FQM(z) as per Surveillance Requirement 4.2.2.4.e. A 2% penalty factor shall be used at all bumups that are outside the range of Table 15.
2.6 RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor - F~ (Specification 3.2.3):
2.6 RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor - F~ (Specification 3.2.3):
FN R=
~H FlkTP x (1 + PFl:-i x (1-P ))
where: P Thermal Power Rated Thermal Power 2.6. l
~~P = 1. 62 COLR-VlC29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 10 of34


R= ~H FN FlkTP x (1 + PFl:-i x (1-P )) where: P Thermal Power Rated Thermal Power
V. C. Summer Cycle 29 SEPTEMBER 2024 2.6.2 PF LIH = 0. 3 2.6.3 The Acceptable Operation Region from the combination of Reactor Coolant System total flow and R is provided in Figure 6.
 
2.7 Power Distribution Measurement Uncertainty (Specifications 3.2.2 and 3.2.3):
2.6. l ~~P = 1. 62 COLR-VlC29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 10 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
2.6.2 PF LIH = 0. 3 2.6.3 The Acceptable Operation Region from the combination of Reactor Coolant System total flow and R is provided in Figure 6.
 
2.7 Power Distribution M easurement Uncertainty (Specifications 3.2.2 and 3.2.3):
 
If the Power Distribution Monitoring System (PDMS) is OPERABLE, as defined in Technical Specification 3.3.3.11, the uncertainty, UrnH, to be applied to the Nuclear Enthalpy Rise Hot Channel Factor FNm shall be calculated by the following formula:
If the Power Distribution Monitoring System (PDMS) is OPERABLE, as defined in Technical Specification 3.3.3.11, the uncertainty, UrnH, to be applied to the Nuclear Enthalpy Rise Hot Channel Factor FNm shall be calculated by the following formula:
u,ill uf,lli = 1.0 +--
u,ill uf,lli = 1.0 +--
100 _0
100_0 where: u Ml = Uncertainty for enthalpy rise as defined in equation (5-19) in Reference 4 or 4.0, whichever is larger.
 
where: u Ml = Uncertainty for enthalpy rise as defined in equation (5-19) in Reference 4 or 4.0, whichever is larger.
 
If the Power Distribution Monitoring System is OPERABLE, as defined in Technical Specification 3.3.3.11, the uncertainty, UrQ, to be applied to the Heat Flux Hot Channel Factor FQ(z) shall be calculated by the following formula:
If the Power Distribution Monitoring System is OPERABLE, as defined in Technical Specification 3.3.3.11, the uncertainty, UrQ, to be applied to the Heat Flux Hot Channel Factor FQ(z) shall be calculated by the following formula:
UFQ = (1.0 + ~)- U 100.0 e
UFQ = (1.0 + ~)- U 100.0 e
where: U Q = Uncertainty for FQ(Z) = 5.0 when confirming F Q(z) for RAOC or Base Load operation, or as defined in equation (5-19) in Reference 4 for all other purposes.
where: U Q = Uncertainty for FQ(Z) = 5.0 when confirming F Q(z) for RAOC or Base Load operation, or as defined in equation (5-19) in Reference 4 for all other purposes.
U e = Engineering uncertainty factor.
U e  
 
= Engineering uncertainty factor.  
=1.03
=1.03 COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 11 of34


COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 11 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
V. C. Summer Cycle 29 SEPTEMBER 2024 If the Power Distribution Monitoring System is INOPERABLE, as defined in Technical Specification 3.3.3.11, the uncertainty, VFMJ, to be applied to the Nuclear Enthalpy Rise Hot Channel Factor FNMJ shall be calculated by the following formula:
U FMI = U FAffm where: U FMim = Base Fm measurement uncertainty.
=1.04 If the Power Distribution Monitoring System is INOPERABLE, as defined in Technical Specification 3.3.3.11, the uncertainty, UFQ, to be applied to the Heat Flux Hot Channel Factor FQ(z) shall be calculated by the following formula:
where: Uqu = Base FQ measurement uncertainty.
=1.05 U e
= Engineering uncertainty factor.
=1.03 COLR-VIC29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 12 of34  


If the Power Distribution Monitoring System is INOPERABLE, as defined in Technical Specification 3.3.3.11, the uncertainty, VFMJ, to be applied to the Nuclear Enthalpy Rise Hot Channel Factor FNMJ shall be calculated by the following formula:
V. C. Summer Cycle 29 SEPTEMBER 2024 3.0 References
 
U FMI = U FAffm
 
where: U FMim = Base Fm measurement uncertainty.
 
=1.04
 
If the Power Distribution Monitoring System is INOPERABLE, as defined in Technical Specification 3.3.3.11, the uncertainty, UFQ, to be applied to the Heat Flux Hot Channel Factor FQ(z) shall be calculated by the following formula:
 
where: Uqu = Base FQ measurement uncertainty.
 
=1.05 U e = Engineering uncertainty factor.
 
=1.03
 
COLR-VIC29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 12 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
3.0 References
: 1) WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 (W Proprietary).
: 1) WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 (W Proprietary).
Methodology for:
Methodology for:
TS 3.1.1.3 - Moderator Temperature Coefficient TS 3.1.3.5 - Shutdown Rod Inse1tion Limits TS 3.1.3.6 - Control Rod Insertion Limits TS 3.2.1 - Axial Flux Difference TS 3.2.2-Heat Flux Hot Channel Factor TS 3.2.3 - RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor
TS 3.1.1.3 - Moderator Temperature Coefficient TS 3.1.3.5 - Shutdown Rod Inse1tion Limits TS 3.1.3.6 - Control Rod Insertion Limits TS 3.2.1 - Axial Flux Difference TS 3.2.2-Heat Flux Hot Channel Factor TS 3.2.3 - RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor
: 2) WCAP-10216-P-A, Rev. IA, "Relaxation of Constant Axial Offset Control FQ Surveillance Technical Specification," February 1994 (W Proprietary).
: 2) WCAP-10216-P-A, Rev. IA, "Relaxation of Constant Axial Offset Control FQ Surveillance Technical Specification," February 1994 (W Proprietary).
Methodology for:
Methodology for:
TS 3.2.1 -Axial Flux Difference TS 3.2.2 - Heat Flux Hot Channel Factor
TS 3.2.1 -Axial Flux Difference TS 3.2.2 - Heat Flux Hot Channel Factor
: 3) WCAP-16996-P-A Revision 1, "Realistic LOCA Evaluation Methodology Applied to the Full Spectrum of Break Sizes (FULL SPECTRUM LOCA Methodology)," November 2016, (W Proprietary)
: 3) WCAP-16996-P-A Revision 1, "Realistic LOCA Evaluation Methodology Applied to the Full Spectrum of Break Sizes (FULL SPECTRUM LOCA Methodology)," November 2016, (W Proprietary)
Methodology for:
Methodology for:
TS 3.2.2-Heat Flux Hot Channel Factor
TS 3.2.2-Heat Flux Hot Channel Factor
Line 326: Line 188:
TS 3.2.2-Heat Flux Hot Channel Factor TS 3.2.3 - RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor TS 3.2.4-Quadrant Power Tilt Ratio
TS 3.2.2-Heat Flux Hot Channel Factor TS 3.2.3 - RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor TS 3.2.4-Quadrant Power Tilt Ratio
: 5) WCAP-13749-P-A, "Safety Evaluation Supporting the Conditional Exemption of the Most Negative EOL Moderator Temperature Coefficient," March 1997, (W Proprietary).
: 5) WCAP-13749-P-A, "Safety Evaluation Supporting the Conditional Exemption of the Most Negative EOL Moderator Temperature Coefficient," March 1997, (W Proprietary).
Methodology for:
Methodology for:
TS 3.1.1.3 - Moderator Temperature Coefficient
TS 3.1.1.3 - Moderator Temperature Coefficient
: 6) WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Reference Core Report," April 1995 (W Proprietary).
: 6) WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Reference Core Report," April 1995 (W Proprietary).
WCAP-12610-P-A & CENPD-404-P-A, Addendum IA, "Optimized ZIRLOTM," July 2006 (W Proprietary).
WCAP-12610-P-A & CENPD-404-P-A, Addendum IA, "Optimized ZIRLOTM," July 2006 (W Proprietary).
Methodology for:
Methodology for:
TS 3.2.2 - Heat Flux Hot Channel Factors
TS 3.2.2 - Heat Flux Hot Channel Factors COLR-VIC29, Revision 0 EVAL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 13 of34


COLR-VIC29, Revision 0 EVAL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 13 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
V. C. Summer Cycle 29 SEPTEMBER 2024 Figure 1.
Moderator Temperature Coefficient Versus Power Level 1.00 0.90 Unacceptable Operation 0.80 u:-
0
:Si!:
32: 0.70
<]
"f 0
0.60
:s.
\\
-m
*a Acceptable Operation ii 0.50 8
I!:! i 0.40
~
I-... i 0.30 "O
0
:ii:
~ \\
\\
0.20 0.10
\\
\\ \\
0.00 0
10 20 30 40 50 60 70 80 90 100 Percent of Rated Thennal Power COLR-V1C29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 14 of34  


Figure 1. Moderator Temperature Coefficient Versus Power Level
V. C. Summer Cycle 29 SEPTEMBER 2024 Figure 2. Rod Group Insertion Limits Versus Thermal Power for Three Loop Operation 230 I
I I
I 220 I
I (0.53, 225) I I
I I 1.
I I I I
210 I I I
200 I
I I
I
; (1.0, 194) 1-I l.,,j I
I 190 I
I I I
I i..i I
I 1,
180 170 I I I I I I I I
I I I BANKC!
I I
I I
I 160 I
I I I I I
I I I
I
~
I I I I I I I I
I 150
, 1 I
I
, I I
I I
IJ I
140 I
I
~
I I
130
~
I I I I
I I
C:.2120
*u;
~110 C.
$ 100 en I
I I I I I I
I I
I I I I I I I I I I I
I I
,_ 1 (0.0, 118) I I
I 1,
I I
I I
I I I
I I I
I I I
I I I C.
::::, 90 0...
I I
I I
(!) 80
"'C 0
I I I
I
, 1 I
I I
I I I I I I I
I I BANKO I 0:: 70 I I I
I I
I I I 60 I I I 1
I I I
I I I I I
50 I
I I I I
I I I I I
I I I i..i" I
I I I I I I
40 I I I I
I I
30 I
1" I
20 I
I 10 I
I I I I
I I I I I,
(0.048, 0)
I I
I I I
I 0
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Percent of Rated Thermal Power COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 15 of34


1.00
V. C. Summer Cycle 29 SEPTEMBER 2024 Figure 3.
 
Axial Flux Difference Limits as a Function of Rated Thermal Power Q.J s:
0.90
0 ll.
 
ni s
Unacceptable Operation 0.80
.c I-i 0...  
 
~
0 u:-
ll.
32: 0.70 :Si!:
120 100 80 60 40 20 0
 
-40 I <-8, 100)
<]
I r
 
J I Unacceptalle I
"f
I I I
 
J I I,
0 0.60
j I
:s. \\
(-22, 50)
-m Acceptable
-30  
* a Operation ii 0.50 8, I!:!
-20
i 0.40 ~ \\
-10 I
 
(+8, 100)  
I-~
\\,  
i 0.30 "O 0
\\
:ii: \\
Unacceptalle J  
0.20 \\
\\  
 
\\
0.10 \\
Acceptable I  
 
~  
0.00 0 10 20 30 40 50 60 70 80 90 100 \\
\\  
 
\\  
Percent of Rated Thennal Power
\\ '
 
I (+20. 5o)
COLR-V1C29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 14 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
I 0
 
10 20 30 Axial Flux Difference(% Lll)
Figure 2. Rod Group Insertion Limits Versus Thermal Power for Three Loop Operation
COLR-VIC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 16 of34 40
 
230 I I I I
 
220 I I (0.53, 225) I... I I I 1. I I I I 210 I I ' I...,
 
200 I I I,...,, I ; (1.0, 194) 1I l.,,j I I -
190 I ; I I I I i..i, I I 1, 180 I I,. I I I I I I,,
I I I... BANKC! I I I I.,.,, I ;...
170,. "
 
160 I,. I I I I I I I I, I ~ I I I I I I I I,... I 150, 1 I I, I I I I IJ I 140, I ' I
~ I I,.
~ I I I...
130, I I I '
C:,, I I I I I I ' I I I
.2120 I I I I I I I I I I I,, I I
...,_ 1
* u; (0.0, 118) I I I,.
~110 *- 1, I I C. I I I I ;
$ 100 en I I I I, I I I I I I C.
::::, 90 0,... I I I
(!) 80...,, I
"'C I I I I, 1 I I I 0:: 70 I I,, I I I 0 I I I I I I I ' I I BANKO I I..... I I... I I I I 60 I I I 1 I I I ' I
 
50 I I I I I I I I I I I I I i..i" I I I I I I I 40... I I I ; I I I
 
30 ; I 1" I 20... I 10 ' ' I I I I I I I I I I I, (0.048, 0) I I I I I 0 I... -
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Percent of Rated Thermal Power
 
COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 15 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
Figure 3. Axial Flux Difference Limits as a Function of R ated Ther m al Power
 
120
 
I <-8, 100) I (+8, 100) 100
 
r I \\,
J
 
I Un ac ceptalle I I \\ Unacceptalle J
 
80 I \\
... I \\
Q.J s: Acceptable I ~
ll. 0 J ni I \\
.c s I \\
I-60,
 
j \\
i I
.... 0
... (-22, 50) I (+20. 5o) I '
 
ll. ~ 40
 
20
 
0 -40 - 30 -20 -10 0 10 20 30 40
 
Axial Flux Difference(% Lll)
 
COLR-VIC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 16 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
Figure 4. K(z) - Normalized FQ(z) as a Function of Core H eigh t
 
1.10
 
1.00 I (0.o, 1.0 I I (6.o, 1.0) I I (12.1, 1.0) I I
 
0.90 I
 
0.80
 
0.70


V. C. Summer Cycle 29 SEPTEMBER 2024 Figure 4.
K(z) - Normalized FQ(z) as a Function of Core Height
...J w
...J w
tr a.. 0.60 l-a LI..
tr 1.10 1.00 0.90 0.80 0.70 a.. 0.60 l-a LI..  
"C
-~ 0.50 cu E 0 z N 0.40
~
0.30 0.20 0.10 0.00 I (0.o, 1.0 I 0
Bottom I
I 2
COLR-VlC29, Revision 0 I (6.o, 1.0) I 4
6 Core Height (ft)
EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A 8
I (12.1, 1.0) I 10 Page 17 of34 12 Top


"C
V. C. Summer Cycle 29 SEPTEMBER 2024 Figure 5.
-~ 0.50 cu E
Axial Flux Difference Limit as a Function of Rated Thermal Power (Alternate RAOC) 120  
z 0 N 0.40
! (-6, 100) !
~
I (+4, 100) I 100 I  
 
~
0.30
I  
 
\\
0.20
80
 
\\
0.10
H Unacceptable i
 
I I j  
0.00 0 2 4 6 8 10 12 Bottom Core Height (ft) Top
\\
 
I Unacceptable I
COLR-VlC29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 17 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
I I
 
I
Figure 5. Axial Flux Difference Limit as a Function of Rated Thermal Power (Alternate RAOC)
\\
 
GI  
120
 
! (-6, 100) ! I (+4, 100) I
 
100 I ~
I \\
 
i I H Unacceptable I j \\ I Unacceptable I I
80, \\
I \\ I,
 
GI /I Acceptable I\\


==
==
ll.. 0 "iii 60 I \\
0 ll..  
E
"iii 60 E...
.c GI I '
GI
I-
/I Acceptable I\\
,, s, \\
I
 
\\
0::: cu
I
-0 I (-20, 50) I 1(+16, 50 I
.c I-,, s  
-C GI 40 u
\\
ll.. GI
cu 0::: -
 
0 I (-20, 50) I 1(+16, 50 I C
20
GI 40 u...
 
GI ll..
0
20 0  
-40 -30 -20 -10 0 10 20 30 40
-40  
 
-30  
Axial Flux Difference (%..1-1)
-20  
 
-10 0
COLR-V1C29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 18 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
10 20 30 40 Axial Flux Difference (%..1-1)
 
COLR-V1C29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 18 of34  
Table 1. RAOC W(z) at 150, 1000, 2000, 3000 MWD/MTU
 
Core W(z) W(z) W(z) W(z) Core W{z) W(z) W(z) W(z)
Height 150 1000 2000 3000 Height 150 1000 2000 3000 (ft) MWd/ MWd/ MWd/ MWd/ (ft) MWd/ MWd/ MWd/ MWd/
MTU MTU MTU MTU MTU MTU MTU MTU 0.000 1.317 1.362 1.398 1.442 6.177 1.130 1.119 1.119 1.112 0.141 1.319 1.364 1.400 1.443 6.317 1.134 1.122 1.123 1.116 0.281 1.321 1.366 1.402 1.444 6.458 1.138 1.125 1.127 1.120 0.422 1.330 1.374 1.409 1.450 6.597 1.141 1.127 1.130 1.123 0.561 1.345 1.387 1.420 1.461 6.738 1.144 1.129 1.133 1.125 0.702 1.347 1.387 1.420 1.459 6.878 1.147 1.131 1.135 1.128 0.842 1.341 1.380 1.412 1.450 7.019 1.149 1.132 1.137 1.129 0.983 1.335 1.372 1.403 1.440 7.159 1.150 1.133 1.139 1.131 1.123 1.327 1.363 1.392 1.428 7.300 1.151 1.133 1.140 1.132 1.264 1.317 1.351 1.380 1.413 7.439 1.152 1.133 1.140 1.132 1.403 1.307 1.339 1.366 1.398 7.580 1.151 1.132 1.139 1.131 1.544 1.296 1.325 1.351 1.381 7.720 1.150 1.130 1.138 1.130 1.684 1.283 1.310 1.335 1.362 7.861 1.148 1.128 1.137 1.128 1.825 1.271 1.295 1.318 1.343 8.001 1.146 1.125 1.134 1.126 1.965 1.257 1.279 1.300 1.323 8.142 1.143 1.122 1.131 1.123 2.106 1.244 1.262 1.282 1.303 8.282 1.139 1.118 1.128 1.120 2.246 1.230 1.245 1.263 1.282 8.422 1.135 1.114 1.124 1.116 2.386 1.216 1.228 1.245 1.261 8.563 1.130 1.109 1.119 1.111 2.527 1.202 1.212 1.227 1.241 8.703 1.124 1.103 1.113 1.106 2.667 1.189 1.195 1.208 1.221 8.844 1.119 1.099 1.113 1.106 2.808 1.174 1.178 1.192 1.201 8.984 1.119 1.100 1.116 1.111 2.948 1.161 1.164 1.184 1.181 9.124 1.121 1.105 1.120 1.117 3.088 1.156 1.158 1.179 1.168 9.264 1.121 1.107 1.122 1.122 3.228 1.153 1.156 1.175 1.161 9.405 1.121 1.110 1.124 1.126 3.369 1.150 1.152 1.169 1.158 9.545 1.119 1.113 1.125 1.131 3.509 1.146 1.149 1.164 1.154 9.686 1.118 1.117 1.125 1.134 3.650 1.142 1.146 1.159 1.150 9.826 1.120 1.123 1.124 1.137 3.790 1.138 1.144 1.155 1.146 9.966 1.123 1.130 1.122 1.139 3.930 1.134 1.142 1.153 1.141 10.106 1.126 1.136 1.122 1.140 4.070 1.129 1.140 1.150 1.136 10.247 1.129 1.141 1.123 1.141 4.211 1.127 1.137 1.147 1.131 10.388 1.131 1.147 1.125 1.146 4.352 1.125 1.134 1.143 1.126 10.528 1.135 1.151 1.127 1.151 4.492 1.123 1.131 1.140 1.120 10.669 1.139 1.156 1.128 1.155 4.633 1.121 1.128 1.136 1.117 10.808 1.143 1.160 1.130 1.159 4.772 1.119 1.125 1.132 1.115 10.949 1.145 1.163 1.132 1.161 4.913 1.116 1.121 1.127 1.112 11.089 1.147 1.165 1.134 1.163 5.053 1.113 1.117 1.123 1.109 11.230 1.148 1.166 1.135 1.164 5.194 1.111 1.113 1.118 1.106 11.370 1.148 1.166 1.135 1.164 5.334 1.111 1.110 1.113 1.102 11.511 1.141 1.159 1.129 1.158 5.475 1.112 1.109 1.108 1.099 11.650 1.124 1.143 1.114 1.143 5.614 1.112 1.110 1.104 1.098 11.791 1.109 1.128 1.100 1.129 5.755 1.115 1.112 1.105 1.100 11.931 1.099 1.118 1.090 1.119 5.895 1.120 1.114 1.109 1.103 12.072 1.089 1.108 1.080 1.108 6.036 1.125 1.117 1.114 1.108
 
COLR-V1C29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 19 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
Table 2. RAOC W (z) at 4000, 5000, 6000, 8000 MWD/MTU
 
Core W(z) W(z) W(z) W(z) Core W(z) W{z) W(z) W{z)
Height 4000 5000 6000 8000 Height 4000 5000 6000 8000 MWd/ MWd/ MWd/ MWd/ MWd/ MWd/ MWd/ MWd/
(ft) MTU MTU MTU MTU (ft) MTU MTU MTU MTU 0.000 1.409 1.385 1.352 1.308 6.177 1.109 1.111 1.110 1.118 0.141 1.410 1.386 1.353 1.309 6.317 1.114 1.116 1.117 1.126 0.281 1.411 1.388 1.354 1.310 6.458 1.118 1.121 1.123 1.134 0.422 1.417 1.393 1.360 1.316 6.597 1.121 1.125 1.129 1.141 0.561 1.427 1.403 1.370 1.327 6.738 1.125 1.130 1.134 1.148 0.702 1.425 1.401 1.368 1.326 6.878 1.128 1.133 1.139 1.154 0.842 1.416 1.393 1.360 1.319 7.019 1.130 1.136 1.143 1.160 0.983 1.406 1.383 1.351 1.311 7.159 1.132 1.139 1.147 1.165 1.123 1.394 1.372 1.340 1.301 7.300 1.133 1.142 1.151 1.171 1.264 1.380 1.358 1.327 1.289 7.439 1.134 1.143 1.154 1.174 1.403 1.365 1.343 1.313 1.275 7.580 1.134 1.144 1.155 1.177 1.544 1.348 1.327 1.297 1.261 7.720 1.134 1.144 1.157 1.179 1.684 1.330 1.309 1.280 1.245 7.861 1.133 1.144 1.158 1.181 1.825 1.311 1.291 1.262 1.229 8.001 1.131 1.143 1.158 1.182 1.965 1.291 1.272 1.244 1.212 8.142 1. 129 1.141 1.157 1.182 2.106 1.271 1.252 1.226 1.195 8.282 1.126 1.139 1.156 1.181 2.246 1.250 1.232 1.207 1.177 8.422 1.123 1.136 1.154 1.180 2.386 1.230 1.212 1.188 1.160 8.563 1.119 1.132 1.151 1.178 2.527 1.210 1.193 1.169 1.142 8.703 1.114 1.128 1.148 1.175 2.667 1.189 1. 174 1.151 1.126 8.844 1.115 1.129 1.150 1.176 2.808 1.172 1.156 1.134 1.109 8.984 1.121 1.136 1.157 1.182 2.948 1.164 1.143 1.124 1.094 9.124 1.128 1.143 1.165 1.191 3.088 1.156 1.140 1.121 1.090 9.264 1.134 1.150 1.172 1.198 3.228 1.151 1.138 1.119 1.089 9.405 1.139 1.156 1.179 1.205 3.369 1.148 1.135 1.117 1.088 9.545 1.144 1.162 1.185 1.211 3.509 1.145 1.132 1.115 1.086 9.686 1.149 1.167 1.191 1.217 3.650 1.141 1.129 1.113 1.085 9.826 1.153 1.172 1.196 1.221 3.790 1.137 1.125 1.110 1.084 9.966 1.156 1.175 1.200 1.225 3.930 1.133 1.122 1.108 1.082 10.106 1.157 1.178 1.203 1.231 4.070 1.129 1.118 1.104 1.080 10.247 1.158 1.179 1.209 1.240 4.211 1.124 1.114 1.101 1.080 10.388 1.161 1.185 1.217 1.248 4.352 1.120 1.110 1.098 1.081 10.528 1.165 1.192 1.223 1.255 4.492 1.115 1.105 1.094 1.082 10.669 1.170 1.197 1.230 1.261 4.633 1.109 1.101 1.091 1.083 10.808 1.174 1.202 1.236 1.268 4.772 1.106 1.097 1.087 1.084 10.949 1.177 1.206 1.240 1.272 4.913 1.104 1.094 1.085 1.084 11.089 1.180 1.209 1.243 1.275 5.053 1.102 1.092 1.085 1.085 11.230 1.181 1.210 1.245 1.277 5.194 1.099 1.090 1.085 1.085 11.370 1.181 1.211 1.245 1.277 5.334 1.096 1.089 1.086 1.086 11.511 1.175 1.206 1.240 1.272 5.475 1.094 1.090 1.087 1.086 11.650 1.160 1.191 1.226 1.258 5.614 1.095 1.092 1.089 1.088 11.791 1.147 1.178 1.213 1.244 5.755 1.097 1.094 1.092 1.093 11.931 1. 137 1.168 1.203 1.234 5.895 1.100 1.098 1.097 1.101 12.072 1.127 1.158 1.193 1.223 6.036 1.104 1.105 1.103 1.110
 
COLR-V1C29, Rev ision 0 EVAL-ENG-RSE - V1C29, Revi s ion 0, Attachment A P a ge 20 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
Table 3. RAOC W(z) at 10000, 12000, 14000, 16000 M WD/MTU
 
Core W(z) W(z) W(z) W(z) Core W(z) W(z) W(z) W(z)
Height 10000 12000 14000 16000 Height 10000 12000 14000 16000 MWd/ MWd/ MWd/ MWd/ MWd/ MWd/ MWd/ MWd/
(ft) MTU MTU MTU MTU (ft) MTU MTU MTU MTU 0.000 1.254 1.206 1.188 1.175 6.177 1.127 1.139 1.152 1.162 0.141 1.256 1.208 1.190 1.177 6.317 1.137 1.147 1.161 1.169 0.281 1.257 1.210 1.193 1.179 6.458 1.146 1.156 1.169 1. 176 0.422 1.264 1.218 1.201 1.188 6.597 1.154 1.164 1.176 1.182 0.561 1.275 1.230 1.214 1.202 6.738 1.162 1.171 1.183 1.187 0.702 1.276 1.233 1.217 1.206 6.878 1.170 1.177 1.189 1.192 0.842 1.271 1.229 1.214 1.203 7.019 1.177 1.183 1.194 1.196 0.983 1.264 1.224 1.210 1.200 7.159 1.183 1.188 1.198 1.198 1.123 1.256 1.217 1.205 1.195 7.300 1.189 1.194 1.203 1.202 1.264 1.245 1.208 1.197 1.187 7.439 1.194 1.197 1.206 1.203 1.403 1.233 1.199 1.188 1.180 7.580 1.197 1.199 1.206 1.202 1.544 1.221 1.188 1.179 1.171 7.720 1.200 1.201 1.207 1.201 1.684 1.207 1.177 1.170 1.162 7.861 1.202 1.202 1.207 1.200 1.825 1.193 1.165 1.159 1.153 8.001 1.203 1.202 1.207 1.197 1.965 1.179 1.154 1.149 1.143 8.142 1.204 1.202 1.205 1.194 2.106 1.164 1.141 1.138 1.134 8.282 1.204 1.201 1.203 1.190 2.246 1.148 1.129 1.127 1.123 8.422 1.203 1.198 1.199 1.185 2.386 1.133 1.116 1.115 1.112 8.563 1.201 1.195 1.196 1.182 2.527 1.118 1.103 1.104 1.101 8.703 1.198 1.191 1.195 1.183 2.667 1.103 1.091 1.093 1.091 8.844 1.200 1.193 1.197 1.187 2.808 1.088 1.079 1.082 1.081 8.984 1.207 1.200 1.201 1.193 2.948 1.076 1.068 1.072 1.075 9.124 1.216 1.207 1.203 1.197 3.088 1.075 1.068 1.072 1.075 9.264 1.222 1.211 1.203 1.199 3.228 1.074 1.068 1.073 1.075 9.405 1.228 1.215 1.202 1.201 3.369 1.072 1.069 1.074 1.078 9.545 1.234 1.219 1.200 1.203 3.509 1.071 1.070 1.076 1.082 9.686 1.239 1.223 1.199 1.204 3.650 1.070 1.071 1.077 1.087 9.826 1.242 1.227 1.202 1.203 3.790 1.070 1.071 1.079 1.092 9.966 1.251 1.235 1.208 1.202 3.930 1.072 1.072 1.081 1.098 10.106 1.260 1.243 1.212 1.200 4.070 1.073 1.072 1.081 1.102 10.247 1.268 1.250 1.216 1.198 4.211 1.075 1.072 1.082 1.106 10.388 1.276 1.257 1.220 1.200 4.352 1.077 1.073 1.084 1.110 10.528 1.283 1.263 1.222 1.202 4.492 1.079 1.074 1.088 1.114 10.669 1.290 1.269 1.223 1.203 4.633 1.081 1.078 1.092 1.117 10.808 1.296 1.274 1.224 1.205 4.772 1.082 1.081 1.095 1.121 10.949 1.300 1.277 1.226 1.207 4.913 1.084 1.084 1.099 1.124 11.089 1.303 1.279 1.228 1.208 5.053 1.085 1.087 1.102 1.126 11.230 1.304 1.279 1.228 1.208 5.194 1.087 1.090 1.105 1.128 11.370 1.304 1.279 1.227 1.206 5.334 1.088 1.092 1.107 1.130 11.511 1.299 1.272 1.220 1.199 5.475 1.089 1.095 1.110 1.131 11.650 1.284 1.256 1.203 1.181 5.614 1.093 1.101 1.115 1.132 11.791 1.269 1.241 1.188 1.165 5.755 1.099 1.110 1.124 1.137 11.931 1.258 1.230 1.176 1.154 5.895 1.107 1.120 1.134 1.146 12.072 1.247 1.218 1.165 1.142 6.036 1.118 1.129 1.143 1.154
 
COLR-VIC29, Revision 0 EVAL-ENG-RSE-VI C29, Revision 0, Attachment A Page 21 of 34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
Table 4. RAOC W(z) at 18000, 20000 MWD/M TU
 
Core W(z) W{z) Core W(z) W{z)
Height 18000 20000 Height 18000 20000 MWd/ MWd/ MWd/ MWd/
(ft) MTU MTU (ft) MTU MTU 0.000 1.202 1.215 6.177 1.176 1.201 0.141 1.204 1.217 6.317 1. 182 1.208 0.281 1.206 1.219 6.458 1.188 1.215 0.422 1.214 1.227 6.597 1.193 1.220 0.561 1.229 1.242 6.738 1.197 1.225 0.702 1.233 1.246 6.878 1.200 1.229 0.842 1.229 1.243 7.019 1.203 1.231 0.983 1.226 1.238 7.159 1.204 1.233 1.123 1.220 1.232 7.300 1.206 1.235 1.264 1.212 1.224 7.439 1.206 1.234 1.403 1.204 1.215 7.580 1.203 1.231 1.544 1.195 1.206 7.720 1.201 1.229 1.684 1.185 1.196 7.861 1.198 1.225 1.825 1.175 1.186 8.001 1.194 1.220 1.965 1.165 1.176 8.142 1.189 1.215 2.106 1.154 1.165 8.282 1.184 1.208 2.246 1.143 1.154 8.422 1.178 1.204 2.386 1.131 1.141 8.563 1.176 1.203 2.527 1.119 1.130 8.703 1.178 1.203 2.667 1.108 1.118 8.844 1.181 1.202 2.808 1.096 1.106 8.984 1.184 1.200 2.948 1.087 1.096 9.124 1.188 1.197 3.088 1.088 1.090 9.264 1.188 1.191 3.228 1.091 1.085 9.405 1.189 1.184 3.369 1.094 1.083 9.545 1.189 1.181 3.509 1.097 1.091 9.686 1.189 1.182 3.650 1.099 1.099 9.826 1.187 1.188 3.790 1.102 1.106 9.966 1.185 1.194 3.930 1.108 1.114 10.106 1.183 1.200 4.070 1.111 1.121 10.247 1.186 1.205 4.211 1.114 1.126 10.388 1.190 1.210 4.352 1.118 1.132 10.528 1.194 1.215 4.492 1.120 1. 138 10.669 1.199 1.219 4.633 1.122 1.143 10.808 1.204 1.223 4.772 1.126 1.147 10.949 1.206 1.225 4.913 1.131 1.152 11.089 1.207 1.225 5.053 1.135 1.155 11.230 1.207 1.225 5.194 1.140 1.158 11.370 1.205 1.222 5.334 1.143 1.161 11.511 1.197 1.214 5.475 1.146 1.164 11.650 1.179 1.195 5.614 1.149 1.168 11.791 1.163 1.177 5.755 1.154 1.175 11.931 1.151 1.165 5.895 1.161 1.183 12.072 1.140 1.153 6.036 1.169 1.193
 
COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 22 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
Table 5. RAOC FQ Margin Decrease in Excess of 2% Per 31 EFPD
 
Cycle B urnup Maximum Decrease Cycle Burnup Maximum Decrease (MWD/MTU) in FQ Marnin (MWD/MTU) in FQ Margin 150 1.0200 2728 1.0200
 
365 1.0208 6594 1.0200


580 1.0389 6809 1.0202
V. C. Summer Cycle 29 SEPTEMBER 2024 Table 1.
RAOC W(z) at 150, 1000, 2000, 3000 MWD/MTU Core W(z)
W(z)
W(z)
W(z)
Core W{z)
W(z)
W(z)
W(z)
Height 150 1000 2000 3000 Height 150 1000 2000 3000 (ft)
MWd/
MWd/
MWd/
MWd/
(ft)
MWd/
MWd/
MWd/
MWd/
MTU MTU MTU MTU MTU MTU MTU MTU 0.000 1.317 1.362 1.398 1.442 6.177 1.130 1.119 1.119 1.112 0.141 1.319 1.364 1.400 1.443 6.317 1.134 1.122 1.123 1.116 0.281 1.321 1.366 1.402 1.444 6.458 1.138 1.125 1.127 1.120 0.422 1.330 1.374 1.409 1.450 6.597 1.141 1.127 1.130 1.123 0.561 1.345 1.387 1.420 1.461 6.738 1.144 1.129 1.133 1.125 0.702 1.347 1.387 1.420 1.459 6.878 1.147 1.131 1.135 1.128 0.842 1.341 1.380 1.412 1.450 7.019 1.149 1.132 1.137 1.129 0.983 1.335 1.372 1.403 1.440 7.159 1.150 1.133 1.139 1.131 1.123 1.327 1.363 1.392 1.428 7.300 1.151 1.133 1.140 1.132 1.264 1.317 1.351 1.380 1.413 7.439 1.152 1.133 1.140 1.132 1.403 1.307 1.339 1.366 1.398 7.580 1.151 1.132 1.139 1.131 1.544 1.296 1.325 1.351 1.381 7.720 1.150 1.130 1.138 1.130 1.684 1.283 1.310 1.335 1.362 7.861 1.148 1.128 1.137 1.128 1.825 1.271 1.295 1.318 1.343 8.001 1.146 1.125 1.134 1.126 1.965 1.257 1.279 1.300 1.323 8.142 1.143 1.122 1.131 1.123 2.106 1.244 1.262 1.282 1.303 8.282 1.139 1.118 1.128 1.120 2.246 1.230 1.245 1.263 1.282 8.422 1.135 1.114 1.124 1.116 2.386 1.216 1.228 1.245 1.261 8.563 1.130 1.109 1.119 1.111 2.527 1.202 1.212 1.227 1.241 8.703 1.124 1.103 1.113 1.106 2.667 1.189 1.195 1.208 1.221 8.844 1.119 1.099 1.113 1.106 2.808 1.174 1.178 1.192 1.201 8.984 1.119 1.100 1.116 1.111 2.948 1.161 1.164 1.184 1.181 9.124 1.121 1.105 1.120 1.117 3.088 1.156 1.158 1.179 1.168 9.264 1.121 1.107 1.122 1.122 3.228 1.153 1.156 1.175 1.161 9.405 1.121 1.110 1.124 1.126 3.369 1.150 1.152 1.169 1.158 9.545 1.119 1.113 1.125 1.131 3.509 1.146 1.149 1.164 1.154 9.686 1.118 1.117 1.125 1.134 3.650 1.142 1.146 1.159 1.150 9.826 1.120 1.123 1.124 1.137 3.790 1.138 1.144 1.155 1.146 9.966 1.123 1.130 1.122 1.139 3.930 1.134 1.142 1.153 1.141 10.106 1.126 1.136 1.122 1.140 4.070 1.129 1.140 1.150 1.136 10.247 1.129 1.141 1.123 1.141 4.211 1.127 1.137 1.147 1.131 10.388 1.131 1.147 1.125 1.146 4.352 1.125 1.134 1.143 1.126 10.528 1.135 1.151 1.127 1.151 4.492 1.123 1.131 1.140 1.120 10.669 1.139 1.156 1.128 1.155 4.633 1.121 1.128 1.136 1.117 10.808 1.143 1.160 1.130 1.159 4.772 1.119 1.125 1.132 1.115 10.949 1.145 1.163 1.132 1.161 4.913 1.116 1.121 1.127 1.112 11.089 1.147 1.165 1.134 1.163 5.053 1.113 1.117 1.123 1.109 11.230 1.148 1.166 1.135 1.164 5.194 1.111 1.113 1.118 1.106 11.370 1.148 1.166 1.135 1.164 5.334 1.111 1.110 1.113 1.102 11.511 1.141 1.159 1.129 1.158 5.475 1.112 1.109 1.108 1.099 11.650 1.124 1.143 1.114 1.143 5.614 1.112 1.110 1.104 1.098 11.791 1.109 1.128 1.100 1.129 5.755 1.115 1.112 1.105 1.100 11.931 1.099 1.118 1.090 1.119 5.895 1.120 1.114 1.109 1.103 12.072 1.089 1.108 1.080 1.108 6.036 1.125 1.117 1.114 1.108 COLR-V1C29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 19 of34


794 1.0460 7023 1.0217
V. C. Summer Cycle 29 SEPTEMBER 2024 Table 2.
RAOC W(z) at 4000, 5000, 6000, 8000 MWD/MTU Core W(z)
W(z)
W(z)
W(z)
Core W(z)
W{z)
W(z)
W{z)
Height 4000 5000 6000 8000 Height 4000 5000 6000 8000 MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
(ft)
MTU MTU MTU MTU (ft)
MTU MTU MTU MTU 0.000 1.409 1.385 1.352 1.308 6.177 1.109 1.111 1.110 1.118 0.141 1.410 1.386 1.353 1.309 6.317 1.114 1.116 1.117 1.126 0.281 1.411 1.388 1.354 1.310 6.458 1.118 1.121 1.123 1.134 0.422 1.417 1.393 1.360 1.316 6.597 1.121 1.125 1.129 1.141 0.561 1.427 1.403 1.370 1.327 6.738 1.125 1.130 1.134 1.148 0.702 1.425 1.401 1.368 1.326 6.878 1.128 1.133 1.139 1.154 0.842 1.416 1.393 1.360 1.319 7.019 1.130 1.136 1.143 1.160 0.983 1.406 1.383 1.351 1.311 7.159 1.132 1.139 1.147 1.165 1.123 1.394 1.372 1.340 1.301 7.300 1.133 1.142 1.151 1.171 1.264 1.380 1.358 1.327 1.289 7.439 1.134 1.143 1.154 1.174 1.403 1.365 1.343 1.313 1.275 7.580 1.134 1.144 1.155 1.177 1.544 1.348 1.327 1.297 1.261 7.720 1.134 1.144 1.157 1.179 1.684 1.330 1.309 1.280 1.245 7.861 1.133 1.144 1.158 1.181 1.825 1.311 1.291 1.262 1.229 8.001 1.131 1.143 1.158 1.182 1.965 1.291 1.272 1.244 1.212 8.142 1.129 1.141 1.157 1.182 2.106 1.271 1.252 1.226 1.195 8.282 1.126 1.139 1.156 1.181 2.246 1.250 1.232 1.207 1.177 8.422 1.123 1.136 1.154 1.180 2.386 1.230 1.212 1.188 1.160 8.563 1.119 1.132 1.151 1.178 2.527 1.210 1.193 1.169 1.142 8.703 1.114 1.128 1.148 1.175 2.667 1.189 1.174 1.151 1.126 8.844 1.115 1.129 1.150 1.176 2.808 1.172 1.156 1.134 1.109 8.984 1.121 1.136 1.157 1.182 2.948 1.164 1.143 1.124 1.094 9.124 1.128 1.143 1.165 1.191 3.088 1.156 1.140 1.121 1.090 9.264 1.134 1.150 1.172 1.198 3.228 1.151 1.138 1.119 1.089 9.405 1.139 1.156 1.179 1.205 3.369 1.148 1.135 1.117 1.088 9.545 1.144 1.162 1.185 1.211 3.509 1.145 1.132 1.115 1.086 9.686 1.149 1.167 1.191 1.217 3.650 1.141 1.129 1.113 1.085 9.826 1.153 1.172 1.196 1.221 3.790 1.137 1.125 1.110 1.084 9.966 1.156 1.175 1.200 1.225 3.930 1.133 1.122 1.108 1.082 10.106 1.157 1.178 1.203 1.231 4.070 1.129 1.118 1.104 1.080 10.247 1.158 1.179 1.209 1.240 4.211 1.124 1.114 1.101 1.080 10.388 1.161 1.185 1.217 1.248 4.352 1.120 1.110 1.098 1.081 10.528 1.165 1.192 1.223 1.255 4.492 1.115 1.105 1.094 1.082 10.669 1.170 1.197 1.230 1.261 4.633 1.109 1.101 1.091 1.083 10.808 1.174 1.202 1.236 1.268 4.772 1.106 1.097 1.087 1.084 10.949 1.177 1.206 1.240 1.272 4.913 1.104 1.094 1.085 1.084 11.089 1.180 1.209 1.243 1.275 5.053 1.102 1.092 1.085 1.085 11.230 1.181 1.210 1.245 1.277 5.194 1.099 1.090 1.085 1.085 11.370 1.181 1.211 1.245 1.277 5.334 1.096 1.089 1.086 1.086 11.511 1.175 1.206 1.240 1.272 5.475 1.094 1.090 1.087 1.086 11.650 1.160 1.191 1.226 1.258 5.614 1.095 1.092 1.089 1.088 11.791 1.147 1.178 1.213 1.244 5.755 1.097 1.094 1.092 1.093 11.931 1.137 1.168 1.203 1.234 5.895 1.100 1.098 1.097 1.101 12.072 1.127 1.158 1.193 1.223 6.036 1.104 1.105 1.103 1.110 COLR-V1C29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 20 of34


1009 1.0438 7238 1.0239
V. C. Summer Cycle 29 SEPTEMBER 2024 Table 3.
RAOC W(z) at 10000, 12000, 14000, 16000 MWD/MTU Core W(z)
W(z)
W(z)
W(z)
Core W(z)
W(z)
W(z)
W(z)
Height 10000 12000 14000 16000 Height 10000 12000 14000 16000 MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
(ft)
MTU MTU MTU MTU (ft)
MTU MTU MTU MTU 0.000 1.254 1.206 1.188 1.175 6.177 1.127 1.139 1.152 1.162 0.141 1.256 1.208 1.190 1.177 6.317 1.137 1.147 1.161 1.169 0.281 1.257 1.210 1.193 1.179 6.458 1.146 1.156 1.169 1.176 0.422 1.264 1.218 1.201 1.188 6.597 1.154 1.164 1.176 1.182 0.561 1.275 1.230 1.214 1.202 6.738 1.162 1.171 1.183 1.187 0.702 1.276 1.233 1.217 1.206 6.878 1.170 1.177 1.189 1.192 0.842 1.271 1.229 1.214 1.203 7.019 1.177 1.183 1.194 1.196 0.983 1.264 1.224 1.210 1.200 7.159 1.183 1.188 1.198 1.198 1.123 1.256 1.217 1.205 1.195 7.300 1.189 1.194 1.203 1.202 1.264 1.245 1.208 1.197 1.187 7.439 1.194 1.197 1.206 1.203 1.403 1.233 1.199 1.188 1.180 7.580 1.197 1.199 1.206 1.202 1.544 1.221 1.188 1.179 1.171 7.720 1.200 1.201 1.207 1.201 1.684 1.207 1.177 1.170 1.162 7.861 1.202 1.202 1.207 1.200 1.825 1.193 1.165 1.159 1.153 8.001 1.203 1.202 1.207 1.197 1.965 1.179 1.154 1.149 1.143 8.142 1.204 1.202 1.205 1.194 2.106 1.164 1.141 1.138 1.134 8.282 1.204 1.201 1.203 1.190 2.246 1.148 1.129 1.127 1.123 8.422 1.203 1.198 1.199 1.185 2.386 1.133 1.116 1.115 1.112 8.563 1.201 1.195 1.196 1.182 2.527 1.118 1.103 1.104 1.101 8.703 1.198 1.191 1.195 1.183 2.667 1.103 1.091 1.093 1.091 8.844 1.200 1.193 1.197 1.187 2.808 1.088 1.079 1.082 1.081 8.984 1.207 1.200 1.201 1.193 2.948 1.076 1.068 1.072 1.075 9.124 1.216 1.207 1.203 1.197 3.088 1.075 1.068 1.072 1.075 9.264 1.222 1.211 1.203 1.199 3.228 1.074 1.068 1.073 1.075 9.405 1.228 1.215 1.202 1.201 3.369 1.072 1.069 1.074 1.078 9.545 1.234 1.219 1.200 1.203 3.509 1.071 1.070 1.076 1.082 9.686 1.239 1.223 1.199 1.204 3.650 1.070 1.071 1.077 1.087 9.826 1.242 1.227 1.202 1.203 3.790 1.070 1.071 1.079 1.092 9.966 1.251 1.235 1.208 1.202 3.930 1.072 1.072 1.081 1.098 10.106 1.260 1.243 1.212 1.200 4.070 1.073 1.072 1.081 1.102 10.247 1.268 1.250 1.216 1.198 4.211 1.075 1.072 1.082 1.106 10.388 1.276 1.257 1.220 1.200 4.352 1.077 1.073 1.084 1.110 10.528 1.283 1.263 1.222 1.202 4.492 1.079 1.074 1.088 1.114 10.669 1.290 1.269 1.223 1.203 4.633 1.081 1.078 1.092 1.117 10.808 1.296 1.274 1.224 1.205 4.772 1.082 1.081 1.095 1.121 10.949 1.300 1.277 1.226 1.207 4.913 1.084 1.084 1.099 1.124 11.089 1.303 1.279 1.228 1.208 5.053 1.085 1.087 1.102 1.126 11.230 1.304 1.279 1.228 1.208 5.194 1.087 1.090 1.105 1.128 11.370 1.304 1.279 1.227 1.206 5.334 1.088 1.092 1.107 1.130 11.511 1.299 1.272 1.220 1.199 5.475 1.089 1.095 1.110 1.131 11.650 1.284 1.256 1.203 1.181 5.614 1.093 1.101 1.115 1.132 11.791 1.269 1.241 1.188 1.165 5.755 1.099 1.110 1.124 1.137 11.931 1.258 1.230 1.176 1.154 5.895 1.107 1.120 1.134 1.146 12.072 1.247 1.218 1.165 1.142 6.036 1.118 1.129 1.143 1.154 COLR-VIC29, Revision 0 EVAL-ENG-RSE-VI C29, Revision 0, Attachment A Page 21 of 34


1224 1.0380 7453 1.0233
V. C. Summer Cycle 29 SEPTEMBER 2024 Table 4.
RAOC W(z) at 18000, 20000 MWD/MTU Core W(z)
W{z)
Core W(z)
W{z)
Height 18000 20000 Height 18000 20000 MWd/
MWd/
MWd/
MWd/
(ft)
MTU MTU (ft)
MTU MTU 0.000 1.202 1.215 6.177 1.176 1.201 0.141 1.204 1.217 6.317 1.182 1.208 0.281 1.206 1.219 6.458 1.188 1.215 0.422 1.214 1.227 6.597 1.193 1.220 0.561 1.229 1.242 6.738 1.197 1.225 0.702 1.233 1.246 6.878 1.200 1.229 0.842 1.229 1.243 7.019 1.203 1.231 0.983 1.226 1.238 7.159 1.204 1.233 1.123 1.220 1.232 7.300 1.206 1.235 1.264 1.212 1.224 7.439 1.206 1.234 1.403 1.204 1.215 7.580 1.203 1.231 1.544 1.195 1.206 7.720 1.201 1.229 1.684 1.185 1.196 7.861 1.198 1.225 1.825 1.175 1.186 8.001 1.194 1.220 1.965 1.165 1.176 8.142 1.189 1.215 2.106 1.154 1.165 8.282 1.184 1.208 2.246 1.143 1.154 8.422 1.178 1.204 2.386 1.131 1.141 8.563 1.176 1.203 2.527 1.119 1.130 8.703 1.178 1.203 2.667 1.108 1.118 8.844 1.181 1.202 2.808 1.096 1.106 8.984 1.184 1.200 2.948 1.087 1.096 9.124 1.188 1.197 3.088 1.088 1.090 9.264 1.188 1.191 3.228 1.091 1.085 9.405 1.189 1.184 3.369 1.094 1.083 9.545 1.189 1.181 3.509 1.097 1.091 9.686 1.189 1.182 3.650 1.099 1.099 9.826 1.187 1.188 3.790 1.102 1.106 9.966 1.185 1.194 3.930 1.108 1.114 10.106 1.183 1.200 4.070 1.111 1.121 10.247 1.186 1.205 4.211 1.114 1.126 10.388 1.190 1.210 4.352 1.118 1.132 10.528 1.194 1.215 4.492 1.120 1.138 10.669 1.199 1.219 4.633 1.122 1.143 10.808 1.204 1.223 4.772 1.126 1.147 10.949 1.206 1.225 4.913 1.131 1.152 11.089 1.207 1.225 5.053 1.135 1.155 11.230 1.207 1.225 5.194 1.140 1.158 11.370 1.205 1.222 5.334 1.143 1.161 11.511 1.197 1.214 5.475 1.146 1.164 11.650 1.179 1.195 5.614 1.149 1.168 11.791 1.163 1.177 5.755 1.154 1.175 11.931 1.151 1.165 5.895 1.161 1.183 12.072 1.140 1.153 6.036 1.169 1.193 COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 22 of34


1439 1.0343 7668 1.0247
V. C. Summer Cycle 29 SEPTEMBER 2024 Table 5.
RAOC FQ Margin Decrease in Excess of 2% Per 31 EFPD Cycle Burnup Maximum Decrease Cycle Burnup Maximum Decrease (MWD/MTU) in FQ Marnin (MWD/MTU) in FQ Margin 150 1.0200 2728 1.0200 365 1.0208 6594 1.0200 580 1.0389 6809 1.0202 794 1.0460 7023 1.0217 1009 1.0438 7238 1.0239 1224 1.0380 7453 1.0233 1439 1.0343 7668 1.0247 1654 1.0238 7883 1.0234 1868 1.0205 8097 1.0222 2083 1.0200 8312 1.0214 2298 1.0200 8527 1.0205 2513 1.0211 8742 1.0200 Note: All cycle burn ups outside the range of this table shall use a 1. 020 decrease in margin for compliance with Specification 4.2.2.2.e. Linear interpolation is adequate for intermediate cycle burnups.
COLR-VlC29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page23 of34


1654 1.0238 7883 1.0234
V. C. Summer Cycle 29 SEPTEMBER 2024 Table 6.
Alternate RAOC W(z) at 150, 1000, 2000, 3000 MWD/MTU Core W(z)
W(z)
W(z)
W(z)
Core W(z)
W(z)
W{z)
W{z)
Height 150 1000 2000 3000 Height 150 1000 2000 3000 (ft)
MWd/
MWd/
MWd/
MWd/
(ft)
MWd/
MWd/
MWd/
MWd/
MTU MTU MTU MTU MTU MTU MTU MTU 0.000 1.277 1.279 1.363 1.357 6.177 1.118 1.118 1.108 1.107 0.141 1.279 1.281 1.365 1.359 6.317 1.118 1.120 1.109 1.109 0.281 1.282 1.283 1.367 1.360 6.458 1.119 1.121 1.109 1.111 0.422 1.290 1.292 1.374 1.367 6.597 1.119 1.121 1.109 1.113 0.561 1.305 1.305 1.386 1.378 6.738 1.118 1.122 1.109 1.114 0.702 1.308 1.307 1.385 1.377 6.878 1.117 1.121 1.108 1.114 0.842 1.302 1.301 1.378 1.370 7.019 1.116 1.121 1.106 1.114 0.983 1.296 1.295 1.370 1.362 7.159 1.114 1.120 1.105 1.114 1.123 1.289 1.287 1.359 1.351 7.300 1.112 1.118 1.102 1.113 1.264 1.280 1.278 1.347 1.339 7.439 1.110 1.116 1.100 1.112 1.403 1.270 1.267 1.334 1.326 7.580 1.106 1.113 1.096 1.110 1.544 1.260 1.256 1.320 1.311 7.720 1.103 1.110 1.093 1.108 1.684 1.248 1.244 1.304 1.295 7.861 1.098 1.106 1.089 1.105 1.825 1.236 1.233 1.288 1.279 8.001 1.094 1.102 1.084 1.102 1.965 1.224 1.223 1.271 1.262 8.142 1.088 1.097 1.079 1.098 2.106 1.211 1.212 1.253 1.244 8.282 1.082 1.092 1.073 1.093 2.246 1.198 1.201 1.236 1.227 8.422 1.076 1.086 1.068 1.088 2.386 1.185 1.190 1.218 1.209 8.563 1.069 1.080 1.061 1.083 2.527 1.172 1.180 1.201 1.192 8.703 1.062 1.073 1.054 1.077 2.667 1.159 1.169 1.184 1.175 8.844 1.054 1.065 1.047 1.073 2.808 1.146 1.158 1.166 1.158 8.984 1.051 1.063 1.045 1.074 2.948 1.137 1.147 1.150 1.145 9.124 1.051 1.066 1.046 1.076 3.088 1.134 1.143 1.144 1.137 9.264 1.051 1.067 1.046 1.077 3.228 1.133 1.141 1.142 1.134 9.405 1.055 1.068 1.047 1.077 3.369 1.131 1.138 1.138 1.133 9.545 1.060 1.069 1.051 1.077 3.509 1.130 1.135 1.135 1.132 9.686 1.066 1.069 1.057 1.076 3.650 1.128 1.133 1.131 1.130 9.826 1.071 1.068 1.063 1.074 3.790 1.126 1.129 1.128 1.129 9.966 1.076 1.067 1.069 1.070 3.930 1.124 1.126 1.127 1.127 10.106 1.081 1.065 1.075 1.076 4.070 1.122 1.122 1.126 1.126 10.247 1.086 1.063 1.080 1.083 4.211 1.120 1.118 1.124 1.124 10.388 1.091 1.067 1.086 1.089 4.352 1.118 1.115 1.122 1.122 10.528 1.095 1.072 1.090 1.095 4.492 1.115 1.111 1.120 1.120 10.669 1.099 1.076 1.095 1.100 4.633 1.112 1.110 1.118 1.117 10.808 1.102 1.080 1.099 1.105 4.772 1.109 1.108 1.116 1.115 10.949 1.105 1.083 1.102 1.108 4.913 1.107 1.106 1.113 1.112 11.089 1.107 1.085 1.104 1.111 5.053 1.109 1.104 1.110 1.109 11.230 1.108 1.086 1.105 1.113 5.194 1.110 1.106 1.107 1.106 11.370 1.108 1.086 1.105 1.113 5.334 1.111 1.108 1.104 1.102 11.511 1.101 1.080 1.100 1.109 5.475 1.112 1.109 1.101 1.099 11.650 1.085 1.065 1.085 1.095 5.614 1.112 1.111 1.103 1.098 11.791 1.070 1.051 1.071 1.082 5.755 1.114 1.112 1.105 1.099 11.931 1.060 1.041 1.062 1.073 5.895 1.115 1.114 1.106 1.102 12.072 1.050 1.032 1.052 1.063 6.036 1.117 1.117 1.107 1.105 COLR-V1C29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 24 of 34


1868 1.0205 8097 1.0222
V. C. Summer Cycle 29 SEPTEMBER 2024 Table 7.
Alternate RAOC W(z) at 4000, 5000, 6000, 8000 MWD/MTU Core W(z)
W(z)
W{z)
W(z)
Core W{z)
W{z)
W(z)
W(z)
Height 4000 5000 6000 8000 Height 4000 5000 6000 8000 MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
MWdl (ft)
MTU MTU MTU MTU
{ft)
MTU MTU MTU MTU 0.000 1.350 1.332 1.293 1.234 6.177 1.107 1.106 1.107 1.112 0.141 1.352 1.333 1.295 1.235 6.317 1.109 1.109 1.112 1.118 0.281 1.353 1.335 1.296 1.237 6.458 1.112 1.112 1.116 1.124 0.422 1.359 1.341 1.302 1.243 6.597 1.113 1.115 1.120 1.130 0.561 1.370 1.351 1.313 1.254 6.738 1.115 1.118 1.124 1.135 0.702 1.369 1.350 1.312 1.254 6.878 1.116 1.120 1.127 1.139 0.842 1.362 1.343 1.306 1.249 7.019 1.117 1.121 1.130 1.143 0.983 1.353 1.335 1.298 1.242 7.159 1.117 1.122 1.132 1.146 1.123 1.343 1.324 1.289 1.233 7.300 1.117 1.123 1.134 1.150 1.264 1.331 1.312 1.277 1.223 7.439 1.116 1.123 1.135 1.152 1.403 1.317 1.299 1.265 1.211 7.580 1.115 1.122 1.135 1.153 1.544 1.302 1.284 1.251 1.198 7.720 1.113 1.121 1.135 1.154 1.684 1.287 1.269 1.237 1.185 7.861 1.110 1.120 1.134 1.154 1.825 1.270 1.252 1.221 1.171 8.001 1.108 1.117 1.133 1.154 1.965 1.253 1.236 1.206 1.156 8.142 1.104 1.115 1.131 1.153 2.106 1.235 1.218 1.190 1.141 8.282 1.100 1.111 1.128 1.151 2.246 1.217 1.201 1.173 1.126 8.422 1.096 1.108 1.125 1.148 2.386 1.200 1.183 1.157 1.111 8.563 1.091 1.103 1.121 1.145 2.527 1.182 1.166 1.141 1.096 8.703 1.085 1.098 1.117 1.142 2.667 1.165 1.149 1.126 1.082 8.844 1.083 1.097 1.116 1.140 2.808 1.148 1.132 1.110 1.068 8.984 1.084 1.098 1.118 1.141 2.948 1.131 1.117 1.095 1.057 9.124 1.087 1.102 1.123 1.148 3.088 1.124 1.109 1.090 1.056 9.264 1.089 1.104 1.125 1.152 3.228 1.122 1.107 1.089 1.056 9.405 1.090 1.106 1.127 1.156 3.369 1.121 1.107 1.089 1.056 9.545 1.090 1.107 1.129 1.160 3.509 1.120 1.106 1.088 1.056 9.686 1.090 1.107 1.129 1.163 3.650 1.119 1.105 1.088 1.056 9.826 1.088 1.106 1.129 1.166 3.790 1.118 1.104 1.087 1.056 9.966 1.086 1.104 1.127 1.167 3.930 1.116 1.103 1.087 1.057 10.106 1.087 1.105 1.130 1.175 4.070 1.115 1.102 1.086 1.059 10.247 1.093 1.107 1.135 1.181 4.211 1.114 1.100 1.085 1.062 10.388 1.100 1.114 1.140 1.188 4.352 1.112 1.099 1.085 1.065 10.528 1.106 1.120 1.144 1.193 4.492 1.110 1.097 1.083 1.068 10.669 1.111 1.126 1.147 1.199 4.633 1.108 1.095 1.082 1.071 10.808 1.116 1.131 1.151 1.203 4.772 1.106 1.093 1.082 1.074 10.949 1.120 1.135 1.153 1.206 4.913 1.104 1.090 1.082 1.076 11.089 1.123 1.138 1.154 1.208 5.053 1.102 1.088 1.083 1.079 11.230 1.125 1.140 1.154 1.210 5.194 1.099 1.088 1.085 1.082 11.370 1.126 1.141 1.155 1.209 5.334 1.096 1.088 1.086 1.084 11.511 1.121 1.136 1.150 1.204 5.475 1.094 1.090 1.087 1.086 11.650 1.108 1.123 1.137 1.189 5.614 1.095 1.092 1.089 1.088 11.791 1.095 1.110 1.124 1.176 5.755 1.097 1.094 1.092 1.092 11.931 1.086 1.101 1.114 1.165 5.895 1.100 1.097 1.097 1.099 12.072 1.077 1.092 1.105 1.155 6.036 1.104 1.102 1.102 1.106 COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 25 of34


2083 1.0200 8312 1.0214
V. C. Summer Cycle 29 SEPTEMBER 2024 Table 8.
Alternate RAOC W(z) at 10000, 12000, 14000, 16000 MWD/MTU Core W(z)
W(z)
W(z)
W(z)
Core W(z)
W(z)
W(z)
W(z)
Height 10000 12000 14000 16000 Height 10000 12000 14000 16000 MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
(ft)
MTU MTU MTU MTU (ft)
MTU MTU MTU MTU 0.000 1.185 1.177 1.156 1.175 6.177 1.121 1.128 1.140 1.149 0.141 1.187 1.179 1.158 1.177 6.317 1.128 1.134 1.147 1.154 0.281 1.189 1.181 1.161 1.179 6.458 1.135 1.141 1.152 1.158 0.422 1.196 1.188 1.169 1.188 6.597 1.141 1.146 1.158 1.162 0.561 1.208 1.201 1.182 1.202 6.738 1.147 1.152 1.162 1.165 0.702 1.209 1.203 1.186 1.206 6.878 1.153 1.156 1.166 1.168 0.842 1.205 1.200 1.183 1.203 7.019 1.158 1.160 1.169 1.169 0.983 1.199 1.195 1.179 1.200 7.159 1.162 1.164 1.172 1.171 1.123 1.192 1.189 1.174 1.195 7.300 1.166 1.167 1.175 1.172 1.264 1.182 1.181 1.167 1.187 7.439 1.169 1.169 1.176 1.171 1.403 1.172 1.172 1.159 1.180 7.580 1.171 1.170 1.176 1.169 1.544 1.161 1.162 1.150 1.171 7.720 1.173 1.170 1.175 1.167 1.684 1.149 1.151 1.141 1.162 7.861 1.173 1.170 1.174 1.165 1.825 1.137 1.140 1.131 1.153 8.001 1.173 1.169 1.172 1.161 1.965 1.124 1.129 1.122 1.143 8.142 1.173 1.168 1.169 1.157 2.106 1.111 1.117 1.112 1.134 8.282 1.171 1.165 1.166 1.152 2.246 1.098 1.105 1.101 1.123 8.422 1.169 1.162 1.162 1.146 2.386 1.085 1.093 1.090 1.112 8.563 1.166 1.158 1.157 1.141 2.527 1.072 1.081 1.079 1.101 8.703 1.163 1.154 1.153 1.140 2.667 1.059 1.069 1.069 1.091 8.844 1.161 1.152 1.154 1.140 2.808 1.047 1.058 1.059 1.081 8.984 1.162 1.153 1.156 1.141 2.948 1.039 1.051 1.053 1.071 9.124 1.166 1.155 1.157 1.140 3.088 1.039 1.051 1.053 1.063 9.264 1.168 1.154 1.155 1.138 3.228 1.040 1.053 1.056 1.060 9.405 1.169 1.154 1.154 1.137 3.369 1.040 1.054 1.058 1.060 9.545 1.169 1.152 1.150 1.135 3.509 1.041 1.055 1.060 1.064 9.686 1.168 1.151 1.149 1.134 3.650 1.041 1.056 1.063 1.067 9.826 1.166 1.156 1.154 1.136 3.790 1.043 1.058 1.067 1.071 9.966 1.169 1.161 1.159 1.140 3.930 1.048 1.061 1.072 1.076 10.106 1.174 1.166 1.163 1.143 4.070 1.051 1.064 1.076 1.078 10.247 1.179 1.170 1.167 1.147 4.211 1.055 1.068 1.080 1.082 10.388 1.183 1.174 1.170 1.153 4.352 1.059 1.071 1.084 1.088 10.528 1.185 1.178 1.172 1.159 4.492 1.062 1.074 1.088 1.094 10.669 1.187 1.181 1.176 1.164 4.633 1.066 1.078 1.092 1.100 10.808 1.189 1.184 1.181 1.169 4.772 1.070 1.081 1.095 1.105 10.949 1.187 1.185 1.184 1.171 4.913 1.074 1.084 1.099 1.110 11.089 1.187 1.185 1.185 1.173 5.053 1.077 1.087 1.102 1.115 11.230 1.187 1.184 1.186 1.173 5.194 1.081 1.090 1.105 1.120 11.370 1.185 1.182 1.185 1.172 5.334 1.084 1.092 1.107 1.124 11.511 1.179 1.175 1.178 1.165 5.475 1.087 1.095 1.109 1.128 11.650 1.165 1.159 1.162 1.149 5.614 1.093 1.099 1.112 1.132 11.791 1.151 1.144 1.147 1.133 5.755 1.098 1.105 1.119 1.135 11.931 1.140 1.132 1.137 1.122 5.895 1.105 1.113 1.126 1.138 12.072 1.130 1.121 1.126 1.111 6.036 1.113 1.121 1.134 1.143 COLR-Vl C29, Revision 0 EVAL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 26 of34


2298 1.0200 8527 1.0205
V. C. Summer Cycle 29 SEPTEMBER 2024 Table 9.
Alternate RAOC \\V(z) at 18000, 20000 MWD/MTU Core W(z)
W(z)
Core W{z)
W{z)
Height 18000 20000 Height 18000 20000 MWd/
MWd/
MWd/
MWd/
(ft)
MTU MTU (ft)
MTU MTU 0.000 1.167 1.169 6.177 1.168 1.189 0.141 1.169 1.171 6.317 1.172 1.193 0.281 1.171 1.173 6.458 1.176 1.197 0.422 1.179 1.181 6.597 1.178 1.201 0.561 1.194 1.196 6.738 1.180 1.203 0.702 1.198 1.200 6.878 1.181 1.204 0.842 1.195 1.197 7.019 1.181 1.205 0.983 1.192 1.194 7.159 1.180 1.205 1.123 1.186 1.189 7.300 1.180 1.204 1.264 1.179 1.181 7.439 1.177 1.202 1.403 1.171 1.173 7.580 1.173 1.198 1.544 1.163 1.165 7.720 1.169 1.193 1.684 1.155 1.156 7.861 1.164 1.188 1.825 1.145 1.147 8.001 1.159 1.182 1.965 1.136 1.137 8.142 1.152 1.175 2.106 1.127 1.128 8.282 1.145 1.167 2.246 1.117 1.117 8.422 1.137 1.160 2.386 1.106 1.106 8.563 1.131 1.157 2.527 1.095 1.095 8.703 1.132 1.156 2.667 1.085 1.085 8.844 1.133 1.154 2.808 1.075 1.076 8.984 1.136 1.151 2.948 1.066 1.068 9.124 1.138 1.148 3.088 1.066 1.066 9.264 1.138 1.142 3.228 1.067 1.066 9.405 1.138 1.134 3.369 1.067 1.065 9.545 1.137 1.135 3.509 1.068 1.070 9.686 1.136 1.143 3.650 1.073 1.076 9.826 1.134 1.150 3.790 1.081 1.082 9.966 1.134 1.157 3.930 1.089 1.089 10.106 1.138 1.163 4.070 1.096 1.096 10.247 1.141 1.170 4.211 1.102 1.104 10.388 1.146 1.176 4.352 1.108 1.112 10.528 1.152 1.181 4.492 1.114 1.120 10.669 1.157 1.186 4.633 1.120 1.128 10.808 1.162 1.191 4.772 1.126 1.135 10.949 1.165 1.193 4.913 1.131 1.142 11.089 1.166 1.194 5.053 1.135 1.149 11.230 1.166 1.194 5.194 1.140 1.155 11.370 1.165 1.192 5.334 1.143 1.160 11.511 1.157 1.184 5.475 1.146 1.164 11.650 1.140 1.166 5.614 1.149 1.169 11.791 1.125 1.149 5.755 1.153 1.172 11.931 1.113 1.137 5.895 1.159 1.176 12.072 1.102 1.126 6.036 1.164 1.183 COLR-V 1 C29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 27 of34


2513 1.0211 8742 1.0200
V. C. Summer Cycle 29 SEPTEMBER 2024 Table 10.
Alternate RAOC FQ Margin Decrease in Excess of2% Per 31 EFPD Cycle Burnup Maximum Decrease Cycle Burnup Maximum Decrease (MWD/MTU) in FQ Margin (MWD/MTU) in FQ Margin 150 1.0200 9386 1.0306 365 1.0283 9601 1.0328 580 1.0446 9816 1.0322 794 1.0441 10031 1.0312 1009 1.0432 10245 1.0298 1224 1.0427 10460 1.0282 1439 1.0428 10675 1.0263 1654 1.0476 10890 1.0240 1868 1.0432 11104 1.0200 2083 1.0381 13252 1.0200 2298 1.0330 13467 1.0205 2513 1.0268 13682 1.0213 2728 1.0217 13897 1.0215 2942 1.0200 14112 1.0210 9171 1.0200 14326 1.0200 Note: All cycle burnups outside the range of this table shall use a 1.020 decrease in margin for compliance with Specification 4.2.2.2.e. Linear interpolation is adequate for intermediate cycle burnups.
COLR-VlC29, Revision 0 EVAL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 28 of34


Note : All cycle burn ups outside the range of this table shall use a 1. 020 decrease in margin for compliance with Specification 4.2.2.2.e. Linear interpolation is adequate for intermediate cycle burnups.
V. C. Summer Cycle 29 SEPTEMBER 2024 Table 11.
Baseload W(z) at 150, 1000, 2000, 3000 MWD/MTU Core W(z)
W(z}
W(z)
W(z)
Core W(z)
W(z)
W(z}
W(z)
Height 150 1000 2000 3000 Height 150 1000 2000 3000 (ft)
MWd/
MWd/
MWd/ MWd/
(ft}
MWd/
MWd/
MWd/
MWd/
MTU MTU MTU MTU MTU MTU MTU MTU 0.000 1.119 1.115 1.111 1.108 6.177 1.055 1.054 1.054 1.054 0.141 1.120 1.116 1.111 1.108 6.317 1.054 1.054 1.053 1.053 0.281 1.120 1.116 1.112 1.109 6.458 1.053 1.053 1.052 1.052 0.422 1.121 1.117 1.113 1.110 6.597 1.053 1.052 1.051 1.051 0.561 1.123 1.119 1.114 1.111 6.738 1.051 1.051 1.050 1.050 0.702 1.123 1.119 1.114 1.112 6.878 1.052 1.051 1.049 1.049 0.842 1.122 1.119 1.114 1.112 7.019 1.053 1.051 1.048 1.048 0.983 1.121 1.118 1.114 1.112 7.159 1.055 1.053 1.050 1.049 1.123 1.121 1.117 1.114 1.111 7.300 1.058 1.055 1.052 1.051 1.264 1.119 1.117 1.113 1.111 7.439 1.060 1.057 1.054 1.053 1.403 1.118 1.116 1.112 1.111 7.580 1.061 1.059 1.056 1.055 1.544 1.117 1.115 1.111 1.110 7.720 1.063 1.061 1.058 1.057 1.684 1.115 1.113 1.110 1.109 7.861 1.065 1.063 1.060 1.059 1.825 1.113 1.112 1.109 1.108 8.001 1.066 1.065 1.062 1.061 1.965 1.111 1.110 1.108 1.107 8.142 1.068 1.066 1.064 1.063 2.106 1.109 1.108 1.106 1.106 8.282 1.069 1.068 1.066 1.065 2.246 1.107 1.106 1.105 1.104 8.422 1.071 1.070 1.067 1.067 2.386 1.104 1.104 1.103 1.103 8.563 1.072 1.071 1.069 1.068 2.527 1.102 1.102 1.101 1.101 8.703 1.074 1.073 1.071 1.070 2.667 1.099 1.100 1.099 1.099 8.844 1.075 1.074 1.072 1.072 2.808 1.097 1.097 1.097 1.098 8.984 1.076 1.076 1.074 1.074 2.948 1.094 1.095 1.095 1.096 9.124 1.078 1.077 1.076 1.075 3.088 1.091 1.092 1.093 1.093 9.264 1.079 1.078 1.077 1.077 3.228 1.088 1.089 1.091 1.091 9.405 1.080 1.079 1.078 1.078 3.369 1.085 1.087 1.088 1.089 9.545 1.081 1.081 1.080 1.080 3.509 1.083 1.084 1.086 1.086 9.686 1.082 1.082 1.081 1.081 3.650 1.082 1.082 1.084 1.084 9.826 1.083 1.083 1.082 1.082 3.790 1.080 1.081 1.082 1.082 9.966 1.083 1.084 1.083 1.084 3.930 1.079 1.080 1.081 1.081 10.106 1.084 1.085 1.084 1.085 4.070 1.078 1.078 1.079 1.080 10.247 1.085 1.086 1.086 1.086 4.211 1.077 1.077 1.078 1.078 10.388 1.086 1.087 1.087 1.087 4.352 1.076 1.076 1.077 1.077 10.528 1.087 1.088 1.088 1.088 4.492 1.074 1.074 1.075 1.076 10.669 1.088 1.089 1.089 1.090 4.633 1.073 1.073 1.074 1.074 10.808 1.088 1.090 1.090 1.091 4.772 1.071 1.071 1.072 1.073 10.949 1.089 1.090 1.091 1.092 4.913 1.070 1.070 1.071 1.071 11.089 1.089 1.091 1.092 1.093 5.053 1.068 1.068 1.069 1.069 11.230 1.090 1.092 1.092 1.093 5.194 1.067 1.067 1.067 1.067 11.370 1.090 1.092 1.093 1.094 5.334 1.065 1.065 1.065 1.066 11.511 1.090 1.092 1.093 1.094 5.475 1.063 1.063 1.064 1.064 11.650 1.090 1.092 1.093 1.094 5.614 1.061 1.061 1.062 1.062 11.791 1.090 1.092 1.093 1.094 5.755 1.059 1.059 1.060 1.060 11.931 1.090 1.092 1.093 1.094 5.895 1.057 1.057 1.058 1.058 12.072 1.090 1.092 1.093 1.094 6.036 1.056 1.055 1.056 1.056 COLR-Vl C29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 29 of34


COL R-VlC29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page23 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
V. C. Summer Cycle 29 SEPTEi\\tlBER 2024 Table 12.
Baseload W(z) at 4000, 5000, 6000, 8000 MWD/MTU Core W(z)
W(z)
W(z)
W(z)
Core W(z)
W(z)
W(z)
W(z)
Height 4000 5000 6000 8000 Height 4000 5000 6000 8000 MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
(ft)
MTU MTU MTU MTU (ft)
MTU MTU MTU MTU 0.000 1.107 1.107 1.108 1.113 6.177 1.054 1.054 1.054 1.054 0.141 1.107 1.107 1.108 1.113 6.317 1.053 1.053 1.053 1.053 0.281 1.108 1.108 1.109 1.114 6.458 1.052 1.052 1.052 1.052 0.422 1.109 1.109 1.110 1.115 6.597 1.051 1.051 1.050 1.050 0.561 1.110 1.110 1.111 1.116 6.738 1.050 1.049 1.049 1.050 0.702 1.111 1.111 1.112 1.117 6.878 1.048 1.048 1.048 1.050 0.842 1.111 1.111 1.112 1.117 7.019 1.047 1.047 1.048 1.053 0.983 1.111 1.111 1.112 1.117 7.159 1.049 1.049 1.051 1.055 1.123 1.111 1.111 1.112 1.116 7.300 1.051 1.052 1.053 1.057 1.264 1.110 1.110 1.111 1.116 7.439 1.053 1.054 1.055 1.059 1.403 1.110 1.110 1.111 1.115 7.580 1.055 1.056 1.057 1.061 1.544 1.109 1.109 1.110 1.114 7.720 1.057 1.058 1.059 1.063 1.684 1.108 1.109 1.109 1.113 7.861 1.059 1.060 1.061 1.065 1.825 1.108 1.108 1.108 1.112 8.001 1.061 1.062 1.063 1.066 1.965 1.106 1.107 1.107 1.110 8.142 1.063 1.063 1.064 1.068 2.106 1.105 1.105 1.106 1.109 8.282 1.065 1.065 1.066 1.070 2.246 1.104 1.104 1.104 1.107 8.422 1.067 1.067 1.068 1.071 2.386 1.103 1.103 1.103 1.105 8.563 1.068 1.069 1.070 1.072 2.527 1.101 1.101 1.101 1.103 8.703 1.070 1.070 1.071 1.074 2.667 1.099 1.099 1.099 1.101 8.844 1.072 1.072 1.073 1.075 2.808 1.098 1.097 1.097 1.098 8.984 1.074 1.074 1.074 1.077 2.948 1.096 1.095 1.095 1.096 9.124 1.075 1.075 1.076 1.078 3.088 1.093 1.093 1.093 1.093 9.264 1.077 1.077 1.077 1.079 3.228 1.091 1.091 1.091 1.090 9.405 1.078 1.078 1.079 1.080 3.369 1.089 1.089 1.088 1.087 9.545 1.080 1.080 1.080 1.082 3.509 1.087 1.086 1.086 1.084 9.686 1.081 1.081 1.081 1.083 3.650 1.084 1.084 1.083 1.082 9.826 1.082 1.082 1.083 1.084 3.790 1.082 1.082 1.081 1.080 9.966 1.084 1.084 1.084 1.085 3.930 1.081 1.080 1.080 1.078 10.106 1.085 1.085 1.085 1.086 4.070 1.079 1.079 1.078 1.077 10.247 1.086 1.086 1.086 1.087 4.211 1.078 1.078 1.077 1.076 10.388 1.088 1.088 1.088 1.088 4.352 1.077 1.076 1.076 1.074 10.528 1.089 1.089 1.089 1.089 4.492 1.075 1.075 1.074 1.073 10.669 1.090 1.090 1.090 1.090 4.633 1.074 1.073 1.073 1.071 10.808 1.091 1.091 1.091 1.091 4.772 1.072 1.072 1.071 1.070 10.949 1.092 1.092 1.092 1.092 4.913 1.071 1.070 1.069 1.068 11.089 1.093 1.093 1.093 1.093 5.053 1.069 1.068 1.068 1.067 11.230 1.094 1.094 1.094 1.094 5.194 1.067 1.067 1.066 1.065 11.370 1.095 1.095 1.095 1.095 5.334 1.065 1.065 1.064 1.063 11.511 1.095 1.095 1.095 1.095 5.475 1.063 1.063 1.063 1.061 11.650 1.095 1.095 1.095 1.095 5.614 1.062 1.061 1.061 1.059 11.791 1.095 1.095 1.095 1.094 5.755 1.060 1.059 1.059 1.057 11.931 1.095 1.095 1.095 1.095 5.895 1.058 1.057 1.057 1.056 12.072 1.095 1.095 1.095 1.095 6.036 1.056 1.055 1.055 1.055 COLR-VlC29, Revision 0 EVAL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 30 of34  


Table 6. Alternate RAOC W(z) at 150, 1000, 2000, 3000 MWD/MTU
V. C. Summer Cycle 29 SEPTEwIBER 2024 Table 13.
Baseload W(z) at 10000, 12000, 14000, 16000 MWD/MTU Core W(z)
W(z)
W(z)
W(z)
Core W(z)
W(z)
W(z)
W(z)
Height 10000 12000 14000 16000 Height 10000 12000 14000 16000 MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
MWd/
(ft)
MTU MTU MTU MTU (ft)
MTU MTU MTU MTU 0.000 1.119 1.123 1.130 1.141 6.177 1.054 1.055 1.055 1.059 0.141 1.119 1.123 1.130 1.141 6.317 1.053 1.053 1.056 1.061 0.281 1.120 1.124 1.131 1.142 6.458 1.052 1.054 1.058 1.063 0.422 1.121 1.125 1.132 1.143 6.597 1.051 1.056 1.060 1.065 0.561 1.122 1.126 1.133 1.144 6.738 1.053 1.058 1.062 1.067 0.702 1.123 1.127 1.133 1.144 6.878 1.055 1.060 1.064 1.068 0.842 1.122 1.126 1.133 1.144 7.019 1.057 1.062 1.066 1.070 0.983 1.122 1.126 1.133 1.143 7.159 1.059 1.064 1.067 1.071 1.123 1.122 1.126 1.132 1.142 7.300 1.062 1.066 1.069 1.072 1.264 1.121 1.125 1.131 1.140 7.439 1.063 1.067 1.070 1.073 1.403 1.120 1.124 1.129 1.138 7.580 1.065 1.069 1.071 1.074 1.544 1.119 1.122 1.128 1.136 7.720 1.066 1.070 1.072 1.075 1.684 1.118 1.121 1.126 1.133 7.861 1.068 1.071 1.073 1.075 1.825 1.116 1.119 1.123 1.130 8.001 1.069 1.072 1.074 1.076 1.965 1.114 1.117 1.121 1.127 8.142 1.071 1.074 1.075 1.076 2.106 1.112 1.114 1.118 1.123 8.282 1.072 1.075 1.076 1.076 2.246 1.110 1.112 1.115 1.119 8.422 1.073 1.075 1.076 1.077 2.386 1.107 1.109 1.111 1.115 8.563 1.075 1.076 1.077 1.077 2.527 1.105 1.106 1.108 1.111 8.703 1.076 1.077 1.077 1.077 2.667 1.102 1.103 1.104 1.107 8.844 1.077 1.078 1.078 1.077 2.808 1.099 1.099 1.100 1.102 8.984 1.078 1.079 1.078 1.077 2.948 1.096 1.096 1.096 1.097 9.124 1.079 1.080 1.078 1.078 3.088 1.093 1.092 1.092 1.092 9.264 1.080 1.080 1.079 1.081 3.228 1.089 1.088 1.087 1.086 9.405 1.081 1.081 1.079 1.084 3.369 1.086 1.085 1.083 1.083 9.545 1.082 1.081 1.079 1.087 3.509 1.082 1.082 1.081 1.081 9.686 1.082 1.082 1.079 1.089 3.650 1.080 1.080 1.080 1.080 9.826 1.083 1.082 1.081 1.092 3.790 1.079 1.079 1.079 1.078 9.966 1.084 1.083 1.083 1.094 3.930 1.077 1.077 1.077 1.077 10.106 1.085 1.083 1.085 1.096 4.070 1.076 1.076 1.076 1.075 10.247 1.086 1.084 1.086 1.098 4.211 1.075 1.075 1.074 1.074 10.388 1.087 1.085 1.088 1.099 4.352 1.074 1.073 1.073 1.073 10.528 1.087 1.085 1.089 1.100 4.492 1.072 1.072 1.071 1.071 10.669 1.088 1.086 1.090 1.101 4.633 1.071 1.070 1.070 1.069 10.808 1.089 1.087 1.091 1.102 4.772 1.069 1.069 1.068 1.068 10.949 1.090 1.087 1.091 1.103 4.913 1.067 1.067 1.066 1.066 11.089 1.091 1.088 1.092 1.103 5.053 1.066 1.065 1.064 1.064 11.230 1.091 1.088 1.092 1.104 5.194 1.064 1.063 1.063 1.062 11.370 1.092 1.089 1.092 1.104 5.334 1.062 1.061 1.060 1.060 11.511 1.092 1.089 1.092 1.103 5.475 1.060 1.059 1.059 1.060 11.650 1.092 1.089 1.093 1.101 5.614 1.058 1.058 1.058 1.059 11.791 1.092 1.089 1.094 1.100 5.755 1.056 1.057 1.057 1.058 11.931 1.092 1.089 1.089 1.099 5.895 1.056 1.056 1.057 1.057 12.072 1.092 1.089 1.085 1.099 6.036 1.055 1.055 1.056 1.057 COLR-VIC29, Revision 0 EVAL-ENG-RSE-VI C29, Revision 0, Attachment A Page 31 of 34


Core W(z) W(z) W(z) W(z) Core W(z) W(z) W{z) W{z)
V. C. Summer Cycle 29 SEPTEMBER 2024 Table 14.
Height 150 1000 2000 3000 Height 150 1000 2000 3000 (ft) MWd/ MWd/ MWd/ MWd/ (ft) MWd/ MWd/ MWd/ MWd/
Baseload W(z) at 18000, 20000 MWD/MTU Core W(z)
MTU MTU MTU MTU MTU MTU MTU MTU 0.000 1.277 1.279 1.363 1.357 6.177 1.118 1.118 1.108 1.107 0. 141 1.279 1.281 1.365 1.359 6.317 1.118 1.120 1.109 1.109 0.281 1.282 1.283 1.367 1.360 6.458 1.119 1.121 1.109 1.111 0.422 1.290 1.292 1.374 1.367 6.597 1.119 1.121 1.109 1.113 0.561 1.305 1.305 1.386 1.378 6.738 1.118 1.122 1.109 1.114 0.702 1.308 1.307 1.385 1.377 6.878 1.117 1.121 1.108 1.114 0.842 1.302 1.301 1.378 1.370 7.019 1.116 1.121 1.106 1.114 0.983 1.296 1.295 1.370 1.362 7.159 1.114 1.120 1.105 1.114 1.123 1.289 1.287 1.359 1.351 7.300 1.112 1.118 1.102 1.113 1.264 1.280 1.278 1.347 1.339 7.439 1.110 1.116 1.100 1.112 1.403 1.270 1.267 1.334 1.326 7.580 1.106 1.113 1.096 1.110 1.544 1.260 1.256 1.320 1.311 7.720 1.103 1.110 1.093 1.108 1.684 1.248 1.244 1.304 1.295 7.861 1.098 1.106 1.089 1.105 1.825 1.236 1.233 1.288 1.279 8.001 1.094 1.102 1.084 1.102 1.965 1.224 1.223 1.271 1.262 8.142 1.088 1.097 1.079 1.098 2.106 1.211 1.212 1.253 1.244 8.282 1.082 1.092 1.073 1.093 2.246 1.198 1.201 1.236 1.227 8.422 1.076 1.086 1.068 1.088 2.386 1.185 1.190 1.218 1.209 8.563 1.069 1.080 1.061 1.083 2.527 1.172 1.180 1.201 1.192 8.703 1.062 1.073 1.054 1.077 2.667 1.159 1.169 1.184 1.175 8.844 1.054 1.065 1.047 1.073 2.808 1.146 1.158 1.166 1.158 8.984 1.051 1.063 1.045 1.074 2.948 1.137 1.147 1.150 1.145 9.124 1.051 1.066 1.046 1.076 3.088 1.134 1.143 1.144 1.137 9.264 1.051 1.067 1.046 1.077 3.228 1.133 1.141 1.142 1.134 9.405 1.055 1.068 1.047 1.077 3.369 1.131 1.138 1.138 1.133 9.545 1.060 1.069 1.051 1.077 3.509 1.130 1.135 1.135 1.132 9.686 1.066 1.069 1.057 1.076 3.650 1.128 1.133 1.131 1.130 9.826 1.071 1.068 1.063 1.074 3.790 1.126 1.129 1.128 1.129 9.966 1.076 1.067 1.069 1.070 3.930 1.124 1.126 1.127 1.127 10.106 1.081 1.065 1.075 1.076 4.070 1.122 1.122 1.126 1.126 10.247 1.086 1.063 1.080 1.083 4.211 1.120 1.118 1.124 1.124 10.388 1.091 1.067 1.086 1.089 4.352 1.118 1.115 1.122 1.122 10.528 1.095 1.072 1.090 1.095 4.492 1.115 1.111 1.120 1.120 10.669 1.099 1.076 1.095 1.100 4.633 1.112 1. 110 1.118 1.117 10.808 1.102 1.080 1.099 1.105 4.772 1.109 1.108 1.116 1.115 10.949 1.105 1.083 1.102 1.108 4.913 1.107 1.106 1.113 1.112 11.089 1.107 1.085 1.104 1.111 5.053 1.109 1.104 1.110 1.109 11.230 1.108 1.086 1.105 1.113 5.194 1.110 1.106 1.107 1.106 11.370 1.108 1.086 1.105 1.113 5.334 1.111 1.108 1.104 1.102 11.511 1.101 1.080 1.100 1.109 5.475 1.112 1.109 1.101 1.099 11.650 1.085 1.065 1.085 1.095 5.614 1.112 1.111 1.103 1.098 11.791 1.070 1.051 1.071 1.082 5.755 1.114 1.112 1.105 1.099 11.931 1.060 1.041 1.062 1.073 5.895 1.115 1.114 1.106 1.102 12.072 1.050 1.032 1.052 1.063 6.036 1.117 1.117 1.107 1. 105
W(z)
Core W(z)
W(z)
Height 18000 20000 Height 18000 20000 MWd/
MWd/
MWd/
MWd/
(ft)
MTU MTU (ft)
MTU MTU 0.000 1.148 1.158 6.177 1.064 1.058 0.141 1.149 1.158 6.317 1.066 1.058 0.281 1.149 1.158 6.458 1.068 1.059 0.422 1.150 1.159 6.597 1.069 1.061 0.561 1.151 1.161 6.738 1.071 1.062 0.702 1.151 1.160 6.878 1.072 1.063 0.842 1.150 1.159 7.019 1.073 1.064 0.983 1.149 1.158 7.159 1.074 1.065 1.123 1.148 1.156 7.300 1.075 1.066 1.264 1.146 1.154 7.439 1.076 1.067 1.403 1.143 1.151 7.580 1.076 1.068 1.544 1.141 1.148 7.720 1.077 1.068 1.684 1.138 1.144 7.861 1.077 1.068 1.825 1.134 1.140 8.001 1.077 1.069 1.965 1.130 1.135 8.142 1.077 1.069 2.106 1.126 1.130 8.282 1.077 1.069 2.246 1.122 1.125 8.422 1.077 1.069 2.386 1.117 1.120 8.563 1.077 1.069 2.527 1.112 1.114 8.703 1.077 1.070 2.667 1.107 1.108 8.844 1.076 1.070 2.808 1.102 1.102 8.984 1.077 1.070 2.948 1.097 1.096 9.124 1.079 1.071 3.088 1.091 1.090 9.264 1.083 1.074 3.228 1.086 1.085 9.405 1.086 1.078 3.369 1.083 1.083 9.545 1.088 1.081 3.509 1.081 1.080 9.686 1.091 1.084 3.650 1.080 1.078 9.826 1.093 1.087 3.790 1.079 1.076 9.966 1.096 1.090 3.930 1.077 1.074 10.106 1.098 1.093 4.070 1.076 1.071 10.247 1.099 1.095 4.211 1.074 1.069 10.388 1.101 1.097 4.352 1.073 1.067 10.528 1.102 1.099 4.492 1.071 1.065 10.669 1.103 1.100 4.633 1.069 1.062 10.808 1.104 1.102 4.772 1.067 1.060 10.949 1.105 1.102 4.913 1.065 1.057 11.089 1.105 1.103 5.053 1.063 1.057 11.230 1.105 1.104 5.194 1.062 1.058 11.370 1.105 1.105 5.334 1.062 1.058 11.511 1.105 1.111 5.475 1.061 1.058 11.650 1.103 1.118 5.614 1.060 1.058 11.791 1.101 1.116 5.755 1.059 1.058 11.931 1.101 1.105 5.895 1.059 1.058 12.072 1.101 1.094 6.036 1.061 1.058 COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 32 of 34


COLR-V1C29, Re v ision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 24 of 34 V. C. Summer Cycle 29 SEPTEMB E R 2024
V. C. Summer Cycle 29 SEPTEMBER 2024 Table 15.
BASELOAD FQ Margin Decrease in Excess of 2% Per 31 EFPD Cycle Burnup Maximum Decrease Cycle Burnup Maximum Decrease (MWD/MTU) in FQ Margin (MWD/MTU) in FQ Margin 150 1.0200 4661 1.0327 365 1.0207 4875 1.0361 580 1.0293 5090 1.0351 794 1.0309 5305 1.0340 1009 1.0327 5520 1.0331 1224 1.0338 5735 1.0316 1439 1.0339 5949 1.0297 1654 1.0339 6164 1.0278 1868 1.0341 6379 1.0260 2083 1.0357 6594 1.0246 2298 1.0387 6809 1.0250 2513 1.0375 7023 1.0254 2728 1.0334 7238 1.0247 2942 1.0295 7453 1.0243 3157 1.0258 7668 1.0239 3372 1.0249 7883 1.0238 3587 1.0250 8097 1.0238 3801 1.0258 8312 1.0236 4016 1.0271 8527 1.0216 4231 1.0285 8742 1.0200 4446 1.0298 Note: All cycle burnups outside the range of this table shall use a 1.020 decrease in margin for compliance with Specification 4.2.2.2.e. Linear interpolation is adequate for intermediate cycle burnups.
COLR-V1C29, Revision 0 EV AL-ENG-RSE-V l C29, Revision 0, Attachment A Page 33 of34


Table 7. Alternate RAOC W (z) at 4000, 5000, 6000, 8000 MWD/MTU
V. C. Summer Cycle 29 SEPTEMBER 2024 Figure 6. RCS Total Flowrate vs. R for Three Loop Operation 30.00 29.80 29.60 29.40  
 
~
Core W(z) W(z) W{z) W(z) Core W{z) W{z) W(z) W(z)
Height 4 000 5000 6000 8000 Height 4 000 5000 6000 8000 MWd/ MWd/ MWd/ MWd/ MWd/ MWd/ MWd/ MWdl (ft) MTU MTU MTU MTU {ft) MTU MTU MTU MTU 0.000 1.350 1.332 1.293 1.234 6.177 1.107 1.106 1.107 1.112 0.141 1.352 1.333 1.295 1.235 6.317 1.109 1.109 1.112 1.118 0.281 1.353 1.335 1.296 1.237 6.458 1.112 1.112 1.116 1.124 0.422 1.359 1.341 1.302 1.243 6.597 1.113 1.115 1.120 1. 130 0.561 1.370 1.351 1.313 1.254 6.738 1.115 1.118 1.124 1.135 0.702 1.369 1.350 1.312 1.254 6.878 1.116 1.120 1.127 1.139 0.842 1.362 1.343 1.306 1.249 7.019 1.117 1.121 1.130 1.143 0.983 1.353 1.335 1.298 1.242 7.159 1.117 1.122 1.132 1.146 1.123 1.343 1.324 1.289 1.233 7.300 1.117 1.123 1.134 1.150 1.264 1.331 1.312 1.277 1.223 7.439 1.116 1.123 1.135 1.152 1.403 1.317 1.299 1.265 1.211 7.580 1.115 1.122 1.135 1.153 1.544 1.302 1.284 1.251 1.198 7.720 1.113 1.121 1.135 1.154 1.684 1.287 1.269 1.237 1.185 7.861 1.110 1.120 1.134 1.154 1.825 1.270 1.252 1.221 1.171 8.001 1.108 1.117 1.133 1.154 1.965 1.253 1.236 1.206 1.156 8.142 1.104 1.115 1.131 1.153 2.106 1.235 1.218 1.190 1.141 8.282 1.100 1.111 1.128 1.151 2.246 1.217 1.201 1.173 1.126 8.422 1.096 1.108 1.125 1.148 2.386 1.200 1.183 1.157 1.111 8.563 1.091 1.103 1.121 1.145 2.527 1.182 1.166 1.141 1.096 8.703 1.085 1.098 1.117 1.142 2.667 1.165 1.149 1.126 1.082 8.844 1.083 1.097 1.116 1.140 2.808 1.148 1.132 1.110 1.068 8.984 1.084 1.098 1.118 1. 141 2.948 1.131 1.117 1.095 1.057 9.124 1.087 1.102 1.123 1.148 3.088 1.124 1.109 1.090 1.056 9.264 1.089 1.104 1.125 1.152 3.228 1.122 1.107 1.089 1.056 9.405 1.090 1.106 1.127 1.156 3.369 1.121 1.107 1.089 1.056 9.545 1.090 1.107 1.129 1.160 3.509 1.120 1.106 1.088 1.056 9.686 1.090 1.107 1.129 1.163 3.650 1.119 1.105 1.088 1.056 9.826 1.088 1.106 1.129 1.166 3.790 1.118 1.104 1.087 1.056 9.966 1.086 1.104 1.127 1.167 3.930 1.116 1.103 1.087 1.057 10.106 1.087 1.105 1.130 1.175 4.070 1.115 1.102 1.086 1.059 10.247 1.093 1.107 1.135 1.181 4.211 1.114 1.100 1.085 1.062 10.388 1.100 1.114 1.140 1.188 4.352 1.112 1.099 1.085 1.065 10.528 1.106 1.120 1.144 1.193 4.492 1.110 1.097 1.083 1.068 10.669 1.111 1.126 1.147 1.199 4.633 1.108 1.095 1.082 1.071 10.808 1.116 1.131 1.151 1.203 4.772 1.106 1.093 1.082 1.074 10.949 1.120 1.135 1.153 1.206 4.913 1.104 1.090 1.082 1.076 11.089 1.123 1.138 1.154 1.208 5.053 1.102 1.088 1.083 1.079 11.230 1.125 1.140 1.154 1.210 5.194 1.099 1.088 1.085 1.082 11.370 1.126 1.141 1.155 1.209 5.334 1.096 1.088 1.086 1.084 11.511 1.121 1.136 1.150 1.204 5.475 1.094 1.090 1.087 1.086 11.650 1.108 1.123 1.137 1.189 5.614 1.095 1.092 1.089 1.088 11.791 1.095 1.110 1.124 1.176 5.755 1.097 1.094 1.092 1.092 11.931 1.086 1.101 1.114 1.165 5.895 1.100 1.097 1.097 1.099 12.072 1.077 1.092 1.105 1.155 6.036 1.104 1.102 1.102 1.106
 
COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 25 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
Table 8. Alternate RAOC W(z) at 10000, 12000, 14000, 16000 MWD/MTU
 
Core W(z) W(z) W(z) W(z) Core W(z) W(z) W(z) W(z)
Height 10000 12000 14000 16000 Height 10000 12000 14000 16000 MWd/ MWd/ MWd/ MWd/ MWd/ MWd/ MWd/ MWd/
(ft) MTU MTU MTU MTU (ft) MTU MTU MTU MTU 0.000 1.185 1.177 1.156 1.175 6.177 1.121 1.128 1.140 1.149 0.141 1.187 1.179 1.158 1.177 6.317 1.128 1.134 1.147 1.154 0.281 1.189 1.181 1.161 1.179 6.458 1.135 1.141 1.152 1.158 0.422 1.196 1.188 1.169 1.188 6.597 1.141 1.146 1.158 1.162 0.561 1.208 1.201 1.182 1.202 6.738 1.147 1.152 1.162 1.165 0.702 1.209 1.203 1.186 1.206 6.878 1.153 1.156 1.166 1.168 0.842 1.205 1.200 1.183 1.203 7.019 1.158 1.160 1.169 1.169 0.983 1.199 1.195 1.179 1.200 7.159 1.162 1.164 1.172 1.171 1.123 1.192 1.189 1.174 1.195 7.300 1.166 1.167 1.175 1.172 1.264 1.182 1.181 1.167 1.187 7.439 1.169 1.169 1.176 1.171 1.403 1.172 1.172 1.159 1.180 7.580 1.171 1.170 1.176 1.169 1.544 1.161 1.162 1.150 1.171 7.720 1.173 1.170 1.175 1.167 1.684 1.149 1.151 1.141 1.162 7.861 1.173 1.170 1.174 1.165 1.825 1.137 1.140 1.131 1.153 8.001 1.173 1.169 1.172 1.161 1.965 1.124 1.129 1.122 1.143 8.142 1.173 1.168 1.169 1.157 2.106 1.111 1.117 1.112 1.134 8.282 1.171 1.165 1.166 1.152 2.246 1.098 1.105 1.101 1.123 8.422 1.169 1.162 1.162 1.146 2.386 1.085 1.093 1.090 1.112 8.563 1.166 1.158 1.157 1.141 2.527 1.072 1.081 1.079 1.101 8.703 1.163 1.154 1.153 1.140 2.667 1.059 1.069 1.069 1.091 8.844 1.161 1.152 1.154 1.140 2.808 1.047 1.058 1.059 1.081 8.984 1.162 1.153 1.156 1.141 2.948 1.039 1.051 1.053 1.071 9.124 1.166 1.155 1.157 1.140 3.088 1.039 1.051 1.053 1.063 9.264 1.168 1.154 1.155 1.138 3.228 1.040 1.053 1.056 1.060 9.405 1.169 1.154 1.154 1.137 3.369 1.040 1.054 1.058 1.060 9.545 1.169 1.152 1.150 1.135 3.509 1.041 1.055 1.060 1.064 9.686 1.168 1.151 1.149 1.134 3.650 1.041 1.056 1.063 1.067 9.826 1.166 1.156 1.154 1.136 3.790 1.043 1.058 1.067 1.071 9.966 1.169 1.161 1.159 1.140 3.930 1.048 1.061 1.072 1.076 10.106 1.174 1.166 1.163 1.143 4.070 1.051 1.064 1.076 1.078 10.247 1.179 1.170 1.167 1.147 4.211 1.055 1.068 1.080 1.082 10.388 1.183 1.174 1.170 1.153 4.352 1.059 1.071 1.084 1.088 10.528 1.185 1.178 1.172 1.159 4.492 1.062 1.074 1.088 1.094 10.669 1.187 1.181 1.176 1.164 4.633 1.066 1.078 1.092 1.100 10.808 1.189 1.184 1.181 1.169 4.772 1.070 1.081 1.095 1.105 10.949 1.187 1.185 1.184 1.171 4.913 1.074 1.084 1.099 1.110 11.089 1.187 1.185 1.185 1.173 5.053 1.077 1.087 1.102 1.115 11.230 1.187 1.184 1.186 1.173 5.194 1.081 1.090 1.105 1.120 11.370 1.185 1.182 1.185 1.172 5.334 1.084 1.092 1.107 1.124 11.511 1.179 1.175 1.178 1.165 5.475 1.087 1.095 1.109 1.128 11.650 1.165 1.159 1.162 1.149 5.614 1.093 1.099 1.112 1.132 11.791 1.151 1.144 1.147 1.133 5.755 1.098 1.105 1.119 1.135 11.931 1.140 1.132 1.137 1.122 5.895 1.105 1.113 1.126 1.138 12.072 1.130 1.121 1.126 1.111 6.036 1.113 1.121 1.134 1.143
 
COLR-Vl C29, Revision 0 EVAL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 26 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
Table 9. Alternate RAOC \\V(z) at 18000, 20000 MWD /MTU
 
Core W(z) W(z) Core W{z) W{z)
Height 18000 20000 Height 18000 20000 MWd/ MWd/ MWd/ MWd/
(ft) MTU MTU (ft) MTU MTU 0.000 1.167 1.169 6.177 1.168 1.189 0.141 1.169 1.171 6.317 1.172 1.193 0.281 1.171 1.173 6.458 1.176 1.197 0.422 1.179 1.181 6.597 1.178 1.201 0.561 1.194 1.196 6.738 1.180 1.203 0.702 1.198 1.200 6.878 1.181 1.204 0.842 1.195 1.197 7.019 1.181 1.205 0.983 1.192 1.194 7.159 1.180 1.205 1.123 1.186 1.189 7.300 1.180 1.204 1.264 1.179 1.181 7.439 1.177 1.202 1.403 1.171 1.173 7.580 1.173 1.198 1.544 1.163 1.165 7.720 1.169 1.193 1.684 1.155 1.156 7.861 1.164 1.188 1.825 1.145 1.147 8.001 1.159 1.182 1.965 1.136 1.137 8.142 1.152 1.175 2.106 1.127 1.128 8.282 1.145 1. 167 2.246 1.117 1.117 8.422 1.137 1.160 2.386 1.106 1.106 8.563 1.131 1.157 2.527 1.095 1.095 8.703 1.132 1.156 2.667 1.085 1.085 8.844 1.133 1.154 2.808 1.075 1.076 8.984 1.136 1.151 2.948 1.066 1.068 9.124 1.138 1.148 3.088 1.066 1.066 9.264 1.138 1.142 3.228 1.067 1.066 9.405 1.138 1.134 3.369 1.067 1.065 9.545 1.137 1.135 3.509 1.068 1.070 9.686 1.136 1.143 3.650 1.073 1.076 9.826 1.134 1.150 3.790 1.081 1.082 9.966 1.134 1.157 3.930 1.089 1.089 10.106 1.138 1.163 4.070 1.096 1.096 10.247 1.141 1.170 4.211 1.102 1.104 10.388 1.146 1.176 4.352 1.108 1.112 10.528 1.152 1.181 4.492 1.114 1.120 10.669 1.157 1.186 4.633 1.120 1.128 10.808 1.162 1.191 4.772 1.126 1.135 10.949 1.165 1.193 4.913 1.131 1.142 11.089 1.166 1.194 5.053 1.135 1.149 11.230 1.166 1.194 5.194 1.140 1.155 11.370 1.165 1.192 5.334 1.143 1.160 11.511 1.157 1.184 5.475 1. 146 1.164 11.650 1. 140 1.166 5.614 1.149 1.169 11.791 1.125 1.149 5.755 1.153 1.172 11.931 1.113 1.137 5.895 1.159 1.176 12.072 1.102 1.126 6.036 1.164 1.183
 
COLR-V 1 C29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 27 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
Table 10. Alternate RAOC FQ Margin Decrease in Excess of2% Per 31 EFPD
 
Cycle Burnup Maximum Decrease Cycle Burnup Maximum Decrease (MWD / MTU) in FQ Margin (MWD/MTU) in FQ M argin 150 1.0200 9386 1.0306
 
365 1.0283 9601 1.0328
 
580 1.0446 9816 1.0322
 
794 1.0441 10031 1.0312
 
1009 1.0432 10245 1.0298
 
1224 1.0427 10460 1.0282
 
1439 1.0428 10675 1.0263
 
1654 1.0476 10890 1.0240
 
1868 1.0432 11104 1.0200
 
2083 1.0381 13252 1.0200
 
2298 1.0330 13467 1.0205
 
2513 1.0268 13682 1.0213
 
2728 1.0217 13897 1.0215
 
2942 1.0200 14112 1.0210
 
9171 1.0200 14326 1.0200
 
Note : All cycle burnups outside the range of this table shall use a 1.020 decrease in margin for compliance with Specification 4.2.2.2.e. Linear interpolation is adequate for intermediate cycle burnups.
 
COLR-VlC29, Revision 0 EVAL-ENG-RSE-Vl C29, Revisio n 0, Attachment A Page 28 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
Table 11. Baseload W(z) at 150, 1000, 2000, 3000 MWD/MTU
 
Core W(z) W(z} W(z) W(z) Core W(z) W(z) W(z} W(z)
Height 150 1000 2000 3000 Height 150 1000 2000 3000 (ft) MWd/ MWd/ MWd/ MWd/ (ft} MW d/ MWd/ MWd/ MWd/
MTU MTU MT U MTU MTU MTU MTU MTU 0.000 1.119 1.115 1.111 1.108 6.177 1.055 1.054 1.054 1.054 0.141 1.120 1.116 1.111 1.108 6.317 1.054 1.054 1.053 1.053 0.281 1.120 1.116 1.112 1.109 6.458 1.053 1.053 1.052 1.052 0.422 1.121 1.117 1.113 1.110 6.597 1.053 1.052 1.051 1.051 0.561 1.123 1.119 1.114 1.111 6.738 1.051 1.051 1.050 1.050 0.702 1.123 1.119 1.114 1.112 6.878 1.052 1.051 1.049 1.049 0.842 1.122 1.119 1.114 1.112 7.019 1.053 1.051 1.048 1.048 0.983 1.121 1.118 1.114 1.112 7.159 1.055 1.053 1.050 1.049 1.123 1.121 1.117 1.114 1.111 7.300 1.058 1.055 1.052 1.051 1.264 1.119 1.117 1.113 1.111 7.439 1.060 1.057 1.054 1.053 1.403 1.118 1.116 1.112 1.111 7.580 1.061 1.059 1.056 1.055 1.544 1.117 1.115 1.111 1.110 7.720 1.063 1.061 1.058 1.057 1.684 1.115 1.113 1.110 1.109 7.861 1.065 1.063 1.060 1.059 1.825 1.113 1.112 1.109 1.108 8.001 1.066 1.065 1.062 1.061 1.965 1.111 1.110 1.108 1.107 8.142 1.068 1.066 1.064 1.063 2.106 1.109 1.108 1.106 1.106 8.282 1.069 1.068 1.066 1.065 2.246 1.107 1.106 1.105 1.104 8.422 1.071 1.070 1.067 1.067 2.386 1.104 1.104 1.103 1.103 8.563 1.072 1.071 1.069 1.068 2.527 1.102 1.102 1.101 1.101 8.703 1.074 1.073 1.071 1.070 2.667 1.099 1.100 1.099 1.099 8.844 1.075 1.074 1.072 1.072 2.808 1.097 1.097 1.097 1.098 8.984 1.076 1.076 1.074 1.074 2.948 1.094 1.095 1.095 1.096 9.124 1.078 1.077 1.076 1.075 3.088 1.091 1.092 1.093 1.093 9.264 1.079 1.078 1.077 1.077 3.228 1.088 1.089 1.091 1.091 9.405 1.080 1.079 1.078 1.078 3.369 1.085 1.087 1.088 1.089 9.545 1.081 1.081 1.080 1.080 3.509 1.083 1.084 1.086 1.086 9.686 1.082 1.082 1.081 1.081 3.650 1.082 1.082 1.084 1.084 9.826 1.083 1.083 1.082 1.082 3.790 1.080 1.081 1.082 1.082 9.966 1.083 1.084 1.083 1.084 3.930 1.079 1.080 1.081 1.081 10.106 1.084 1.085 1.084 1.085 4.070 1.078 1.078 1.079 1.080 10.247 1.085 1.086 1.086 1.086 4.211 1.077 1.077 1.078 1.078 10.388 1.086 1.087 1.087 1.087 4.352 1.076 1.076 1.077 1.077 10.528 1.087 1.088 1.088 1.088 4.492 1.074 1.074 1.075 1.076 10.669 1.088 1.089 1.089 1.090 4.633 1.073 1.073 1.074 1.074 10.808 1.088 1.090 1.090 1.091 4.772 1.071 1.071 1.072 1.073 10.949 1.089 1.090 1.091 1.092 4.913 1.070 1.070 1.071 1.071 11.089 1.089 1.091 1.092 1.093 5.053 1.068 1.068 1.069 1.069 11.230 1.090 1.092 1.092 1.093 5.194 1.067 1.067 1.067 1.067 11.370 1.090 1.092 1.093 1.094 5.334 1.065 1.065 1.065 1.066 11.511 1.090 1.092 1.093 1.094 5.475 1.063 1.063 1.064 1.064 11.650 1.090 1.092 1.093 1.094 5.614 1.061 1.061 1.062 1.062 11.791 1.090 1.092 1.093 1.094 5.755 1.059 1.059 1.060 1.060 11.931 1.090 1.092 1.093 1.094 5.895 1.057 1.057 1.058 1.058 12.072 1.090 1.092 1.093 1.094 6.036 1.056 1.055 1.056 1.056
 
COLR-Vl C29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 29 of34 V. C. Summer Cycle 29 SEPTEi\\tlBER 2024
 
Table 12. Baseload W(z) at 4000, 5000, 6000, 8000 MWD/M TU
 
Core W(z) W(z) W(z) W(z) Core W(z) W(z) W(z) W(z)
Height 4000 5000 6000 8000 H eight 4000 5000 6000 8000 MWd/ MWd/ MWd/ MWd/ MWd/ MWd/ MWd/ MWd/
(ft) MTU MTU MTU MTU (ft) MTU MTU MTU MTU 0.000 1.107 1.107 1.108 1.113 6.177 1.054 1.054 1.054 1.054 0.141 1.107 1.107 1.108 1.113 6.317 1.053 1.053 1.053 1.053 0.281 1.108 1.108 1.109 1.114 6.458 1.052 1.052 1.052 1.052 0.422 1.109 1.109 1.110 1.115 6.597 1.051 1.051 1.050 1.050 0.561 1.110 1.110 1.111 1.116 6.738 1.050 1.049 1.049 1.050 0.702 1.111 1.111 1.112 1.117 6.878 1.048 1.048 1.048 1.050 0.842 1.111 1.111 1.112 1.117 7.019 1.047 1.047 1.048 1.053 0.983 1.111 1.111 1.112 1.117 7.159 1.049 1.049 1.051 1.055 1.123 1.111 1.111 1.112 1.116 7.300 1.051 1.052 1.053 1.057 1.264 1.110 1.110 1.111 1.116 7.439 1.053 1.054 1.055 1.059 1.403 1.110 1.110 1.111 1.115 7.580 1.055 1.056 1.057 1.061 1.544 1.109 1.109 1.110 1.114 7.720 1.057 1.058 1.059 1.063 1.684 1.108 1.109 1.109 1.113 7.861 1.059 1.060 1.061 1.065 1.825 1.108 1.108 1.108 1.112 8.001 1.061 1.062 1.063 1.066 1.965 1.106 1.107 1.107 1.110 8.142 1.063 1.063 1.064 1.068 2.106 1.105 1.105 1.106 1.109 8.282 1.065 1.065 1.066 1.070 2.246 1.104 1.104 1.104 1.107 8.422 1.067 1.067 1.068 1.071 2.386 1.103 1.103 1.103 1.105 8.563 1.068 1.069 1.070 1.072 2.527 1.101 1.101 1.101 1.103 8.703 1.070 1.070 1.071 1.074 2.667 1.099 1.099 1.099 1.101 8.844 1.072 1.072 1.073 1.075 2.808 1.098 1.097 1.097 1.098 8.984 1.074 1.074 1.074 1.077 2.948 1.096 1.095 1.095 1.096 9.124 1.075 1.075 1.076 1.078 3.088 1.093 1.093 1.093 1.093 9.264 1.077 1.077 1.077 1.079 3.228 1.091 1.091 1.091 1.090 9.405 1.078 1.078 1.079 1.080 3.369 1.089 1.089 1.088 1.087 9.545 1.080 1.080 1.080 1.082 3.509 1.087 1.086 1.086 1.084 9.686 1.081 1.081 1.081 1.083 3.650 1.084 1.084 1.083 1.082 9.826 1.082 1.082 1.083 1.084 3.790 1.082 1.082 1.081 1.080 9.966 1.084 1.084 1.084 1.085 3.930 1.081 1.080 1.080 1.078 10.106 1.085 1.085 1.085 1.086 4.070 1.079 1.079 1.078 1.077 10.247 1.086 1.086 1.086 1.087 4.211 1.078 1.078 1.077 1.076 10.388 1.088 1.088 1.088 1.088 4.352 1.077 1.076 1.076 1.074 10.528 1.089 1.089 1.089 1.089 4.492 1.075 1.075 1.074 1.073 10.669 1.090 1.090 1.090 1.090 4.633 1.074 1.073 1.073 1.071 10.808 1.091 1.091 1.091 1.091 4.772 1.072 1.072 1.071 1.070 10.949 1.092 1.092 1.092 1.092 4.913 1.071 1.070 1.069 1.068 11.089 1.093 1.093 1.093 1.093 5.053 1.069 1.068 1.068 1.067 11.230 1.094 1.094 1.094 1.094 5.194 1.067 1.067 1.066 1.065 11.370 1.095 1.095 1.095 1.095 5.334 1.065 1.065 1.064 1.063 11.511 1.095 1.095 1.095 1.095 5.475 1.063 1.063 1.063 1.061 11.650 1.095 1.095 1.095 1.095 5.614 1.062 1.061 1.061 1.059 11.791 1.095 1.095 1.095 1.094 5.755 1.060 1.059 1.059 1.057 11.931 1.095 1.095 1.095 1.095 5.895 1.058 1.057 1.057 1.056 12.072 1.095 1.095 1.095 1.095 6.036 1.056 1.055 1.055 1.055
 
COLR-VlC29, Re v ision 0 EVAL-ENG-RSE-V l C29, Revi s ion 0, Attachment A Page 30 of34 V. C. Summer Cycle 29 SEPTEwIBER 2024
 
Table 13. Baseload W(z) at 10000, 12000, 14000, 16000 MWD/MTU
 
Core W(z) W(z) W(z) W(z) Core W(z) W(z) W(z) W(z)
Height 10000 12000 14000 16000 Height 10000 12000 14000 16000 MWd/ MWd/ MWd/ MWd/ MWd/ MWd/ MWd/ MWd/
(ft) MTU MTU MTU MTU (ft) MTU MTU MTU MTU 0.000 1.119 1.123 1.130 1.141 6.177 1.054 1.055 1.055 1.059 0.141 1.119 1.123 1.130 1.141 6.317 1.053 1.053 1.056 1.061 0.281 1.120 1.124 1.131 1.142 6.458 1.052 1.054 1.058 1.063 0.422 1.121 1.125 1.132 1.143 6.597 1.051 1.056 1.060 1.065 0.561 1.122 1.126 1.133 1.144 6.738 1.053 1.058 1.062 1.067 0.702 1.123 1.127 1.133 1.144 6.878 1.055 1.060 1.064 1.068 0.842 1.122 1.126 1.133 1.144 7.019 1.057 1.062 1.066 1.070 0.983 1.122 1.126 1.133 1.143 7.159 1.059 1.064 1.067 1.071 1.123 1.122 1.126 1.132 1.142 7.300 1.062 1.066 1.069 1.072 1.264 1.121 1.125 1.131 1.140 7.439 1.063 1.067 1.070 1.073 1.403 1.120 1.124 1.129 1.138 7.580 1.065 1.069 1.071 1.074 1.544 1.119 1. 122 1.128 1. 136 7.720 1.066 1.070 1.072 1.075 1.684 1.118 1.121 1.126 1.133 7.861 1.068 1.071 1.073 1.075 1.825 1.116 1.119 1.123 1.130 8.001 1.069 1.072 1.074 1.076 1.965 1.114 1.117 1.121 1.127 8.142 1.071 1.074 1.075 1.076 2.106 1.112 1.114 1.118 1.123 8.282 1.072 1.075 1.076 1.076 2.246 1.110 1.112 1.115 1.119 8.422 1.073 1.075 1.076 1.077 2.386 1.107 1.109 1.111 1.115 8.563 1.075 1.076 1.077 1.077 2.527 1.105 1.106 1.108 1.111 8.703 1.076 1.077 1.077 1.077 2.667 1.102 1.103 1.104 1.107 8.844 1.077 1.078 1.078 1.077 2.808 1.099 1.099 1.100 1.102 8.984 1.078 1.079 1.078 1.077 2.948 1.096 1.096 1.096 1.097 9.124 1.079 1.080 1.078 1.078 3.088 1.093 1.092 1.092 1.092 9.264 1.080 1.080 1.079 1.081 3.228 1.089 1.088 1.087 1.086 9.405 1.081 1.081 1.079 1.084 3.369 1.086 1.085 1.083 1.083 9.545 1.082 1.081 1.079 1.087 3.509 1.082 1.082 1.081 1.081 9.686 1.082 1.082 1.079 1.089 3.650 1.080 1.080 1.080 1.080 9.826 1.083 1.082 1.081 1.092 3.790 1.079 1.079 1.079 1.078 9.966 1.084 1.083 1.083 1.094 3.930 1.077 1.077 1.077 1.077 10.106 1.085 1.083 1.085 1.096 4.070 1.076 1.076 1.076 1.075 10.247 1.086 1.084 1.086 1.098 4.211 1.075 1.075 1.074 1.074 10.388 1.087 1.085 1.088 1.099 4.352 1.074 1.073 1.073 1.073 10.528 1.087 1.085 1.089 1. 100 4.492 1.072 1.072 1.071 1.071 10.669 1.088 1.086 1.090 1. 101 4.633 1.071 1.070 1.070 1.069 10.808 1.089 1.087 1.091 1.102 4.772 1.069 1.069 1.068 1.068 10.949 1.090 1.087 1.091 1.103 4.913 1.067 1.067 1.066 1.066 11.089 1.091 1.088 1.092 1.103 5.053 1.066 1.065 1.064 1.064 11.230 1.091 1.088 1.092 1.104 5.194 1.064 1.063 1.063 1.062 11.370 1.092 1.089 1.092 1.104 5.334 1.062 1.061 1.060 1.060 11.511 1.092 1.089 1.092 1.103 5.475 1.060 1.059 1.059 1.060 11.650 1.092 1.089 1.093 1.101 5.614 1.058 1.058 1.058 1.059 11.791 1.092 1.089 1.094 1.100 5.755 1.056 1.057 1.057 1.058 11.931 1.092 1.089 1.089 1.099 5.895 1.056 1.056 1.057 1.057 12.072 1.092 1.089 1.085 1.099 6.036 1.055 1.055 1.056 1.057
 
COLR-VIC29, Revis ion 0 EVAL-ENG-RSE-VI C29, Revision 0, Attachment A Page 31 of 34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
Table 14. Baseload W(z) at 18000, 20000 MWD/MTU
 
Core W(z) W(z) Core W(z) W(z)
Height 18000 20000 Height 18000 20000 MWd/ MWd/ MWd/ MWd/
(ft) MTU MTU (ft) MTU MTU 0.000 1.148 1.158 6.177 1.064 1.058 0.141 1.149 1. 158 6.317 1.066 1.058 0.281 1.149 1.158 6.458 1.068 1.059 0.422 1.150 1.159 6.597 1.069 1.061 0.561 1.151 1.161 6.738 1.071 1.062 0.702 1.151 1.160 6.878 1.072 1.063 0.842 1.150 1.159 7.019 1.073 1.064 0.983 1.149 1.158 7.159 1.074 1.065 1.123 1.148 1.156 7.300 1.075 1.066 1.264 1.146 1.154 7.439 1.076 1.067 1.403 1.143 1.151 7.580 1.076 1.068 1.544 1.141 1.148 7.720 1.077 1.068 1.684 1.138 1.144 7.861 1.077 1.068 1.825 1.134 1.140 8.001 1.077 1.069 1.965 1.130 1.135 8.142 1.077 1.069 2. 106 1.126 1. 130 8.282 1.077 1.069 2.246 1.122 1.125 8.422 1.077 1.069 2.386 1.117 1.120 8.563 1.077 1.069 2.527 1.112 1.114 8.703 1.077 1.070 2.667 1.107 1.108 8.844 1.076 1.070 2.808 1.102 1.102 8.984 1.077 1.070 2.948 1.097 1.096 9.124 1.079 1.071 3.088 1.091 1.090 9.264 1.083 1.074 3.228 1.086 1.085 9.405 1.086 1.078 3.369 1.083 1.083 9.545 1.088 1.081 3.509 1.081 1.080 9.686 1.091 1.084 3.650 1.080 1.078 9.826 1.093 1.087 3.790 1.079 1.076 9.966 1.096 1.090 3.930 1.077 1.074 10.106 1.098 1.093 4.070 1.076 1.071 10.247 1.099 1.095 4.211 1.074 1.069 10.388 1.101 1.097 4.352 1.073 1.067 10.528 1.102 1.099 4.492 1.071 1.065 10.669 1.103 1.100 4.633 1.069 1.062 10.808 1.104 1.102 4.772 1.067 1.060 10.949 1.105 1.102 4.913 1.065 1.057 11.089 1.105 1.103 5.053 1.063 1.057 11.230 1.105 1.104 5.194 1.062 1.058 11.370 1.105 1.105 5.334 1.062 1.058 11.511 1.105 1.111 5.475 1.061 1.058 11.650 1.103 1.118 5.614 1.060 1.058 11.791 1.101 1.116 5.755 1.059 1.058 11.931 1.101 1.105 5.895 1.059 1.058 12.072 1.101 1.094 6.036 1.061 1.058
 
COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 32 of 34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
Table 15. BASELOAD FQ Margin Decrease in Excess of 2% Per 31 EFPD
 
Cycle Burnup Maximum Decrease Cycle B urnup Maximum Decrease (MWD/MTU) in FQ Margin ( MWD/MTU) in FQ Mar g in 150 1.0200 4661 1.0327
 
365 1.0207 4875 1.0361
 
580 1.0293 5090 1.0351
 
794 1.0309 5305 1.0340
 
1009 1.0327 5520 1.0331
 
1224 1.0338 5735 1.0316
 
1439 1.0339 5949 1.0297
 
1654 1.0339 6164 1.0278
 
1868 1.0341 6379 1.0260
 
2083 1.0357 6594 1.0246
 
2298 1.0387 6809 1.0250
 
2513 1.0375 7023 1.0254
 
2728 1.0334 7238 1.0247
 
2942 1.0295 7453 1.0243
 
3157 1.0258 7668 1.0239
 
3372 1.0249 7883 1.0238
 
3587 1.0250 8097 1.0238
 
3801 1.0258 8312 1.0236
 
4016 1.0271 8527 1.0216
 
4231 1.0285 8742 1.0200
 
4446 1.0298
 
Note: All cycle burnups outside the range of this table shall use a 1.020 decrease in margin for compliance with Specification 4.2.2.2.e. Linear interpolation is adequate for intermediate cycle burnups.
 
COLR-V1C29, Revision 0 EV AL-ENG-RS E - V l C29, Revision 0, Attachment A Page 33 of34 V. C. Summer Cycle 29 SEPTEMBER 2024
 
Figure 6. RCS Total Flowrate vs. R for Three Loop Operation
 
30.00
 
29.80
 
29.60
 
29.40
 
~
a..
a..
(!)
(!)  
 
'l:t" 29.20 w
'l:t" 29.20 w
0..... -
0
2 E  
- ! i 2 E
;: 29.00 0
;: 29.00 Acceptable Unacceptable 0 Operation Region Operation Region u:::
u:::
cu I I I
cu -
-0
0  
~ 28.80
~ 28.80
(.)
(.)
a::
a::
 
28.60 28.40 28.20 28.00 0.90 i
28.60
Acceptable Unacceptable Operation Region Operation Region I
 
I I
28.40
I I
 
I I
I I
 
I (1.00, 28.38) I I
I I '
I 0.95 1.00 1.05 R
 
=
I (1.00, 28.38) I 28.20 !
FN-delta-H/1.62[1.0 +
 
0.3(1.0 -
I 28.00 I 0.90 0.95 1.00 1.05 1.10
P)]
 
1.10 Measurement Uncertainty of 2.1 % for Flow (includes 0.1 % for feedwater venturi fouling) is included in this figure.
R = FN-delta-H/1.62[1.0 + 0.3(1.0 - P)]
Measurement Uncertainty of 2.1 % for Flow (includes 0.1 % for feedwater venturi fouling) is included in this figure.
 
COLR-VlC29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 34 of34}}
COLR-VlC29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 34 of34}}

Latest revision as of 10:11, 24 November 2024

Core Operating Limits Report VCSNS Unit 1 Cycle 29, Revision 0
ML24290A105
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 10/07/2024
From: James Holloway
Dominion Energy South Carolina
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
24-299
Download: ML24290A105 (1)


Text

Dominion Energy South Carolina. Inc.

5000 Dominion Boulevard. Glen Allen. VA 23060 DominionEnergy.com October 7, 2024 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 DOMINION ENERGY SOUTH CAROLINA VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 CORE OPERATING LIMITS REPORT VCSNS UNIT 1. CYCLE 29, REVISION 0 Serial No.:

NRNJHH:

Dominion Energyc Docket No.:

24-299 R1 50-395 License No.:

NPF-12 Pursuant to VCSNS Unit 1 Technical Specification 6.9.1.11, attached is a copy of the Core Operating Limits Report for VCSNS Unit 1, Cycle 29, Revision 0.

If you have any questions or require additional information, please contact Julie Hough at (804) 273-3586.

James Holloway Vice President - Nuclear Engineering and Fleet Support

Attachment:

Core Operating Limits Report, COLR-V1 C29 Revision 0 Commitments: None.

cc:

U.S. Nuclear Regulatory Commission, Region II Marquis One Tower 245 Peachtree Center Avenue, NE, Suite 1200 Atlanta, Georgia 30303-1257 Mr. G. Edward Miller NRG Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Mr. Zach M. Turner NRG Project Manager U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 NRG Senior Resident Inspector V.C. Summer Nuclear Station Serial No.: 24-299 Docket No.: 50-395 Page 2 of 2

ATTACHMENT Core Operating Limits Report COLR-V1C29 Revision 0 VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 DOMINION ENERGY SOUTH CAROLINA, INC.

Serial No.: 24-299 Docket No.: 50-395

rt,, Dominion CORE OPERATING LIMITS REPORT Energy;,

NF-AA-NAF-203 Page 1 of 34 COLRNo.:

Station I Unit/ Cycle / Pattern:

COLR-V1C29 Revision:

0 V. C. Summer Unit 1, Cycle 29 Station Name:

Unit:

Millstone North Anna Surry V. C. Summer ~

1 ~ 2 3 Basis Document and Screened as Part of:

EVAL-ENG-RSE-V1C29, Revision 0, "Reload Safety Evaluatlon, V. C. Summer Unit 1 Cycle 29," September 2024

Title:

Preparing Organization:

Print Name Below FSRC Approval:

CORE OPERA TING LIMITS REPORT V. C. Summer Unit 1 Cycle 29 Nuclear Engineering and Fuel Signature COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Date SepS,2024 SepS,2024 Sep9,2024 Sep 17,2024 Page 1 of34

DOMINION ENERGY SOUTH CAROLINA VIRGIL C. SUMMER NUCLEAR STATION UNITl CORE OPERATING LIMITS REPORT FOR CYCLE29 REVISION0 SEPTEMBER 2024 COLR-VlC29, Revision0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 2 of34

Section 1.0 2.0 3.0 Table of Contents Core Operating Limits Report Operating Limits 2.1 2.2 2.3 2.4 2.5 2.6 2.7 Moderator Temperature Coefficient (Specification 3.1.1.3)

Shutdown Rod Insertion Limits (Specification 3.1.3.5)

Control Rod Insertion Limits (Specification 3.1.3.6)

Axial Flux Difference (Specification 3.2.1)

Heat Flux Hot Channel Factor - FQ(z) (Specification 3.2.2)

RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor - FfH (Specification 3.2.3)

Power Distribution Measurement Uncertainty (Specifications 3.2.2 and 3.2.3)

References COLR-V1C29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A 6

7 7

7 8

8 8

10 11 13 Page 3 of34

List of Tables Table Page Table 1.

RAOC W(z) at 150, 1000, 2000, 3000 MWD/MTU 19 Table 2.

RAOC W(z) at 4000, 5000, 6000, 8000 lVIWD/MTU 20 Table 3.

RAOC W(z) at 10000, 12000, 14000, 16000 MWD/MTU 21 Table 4.

RAOC W(z) at 18000, 20000 MWD/MTU 22 Table 5.

RAOC FQ Margin Decrease in Excess of2% Per 31 EFPD 23 Table 6.

Alternate RAOC W(z) at 150, 1000, 2000, 3000 MWD/MTU 24 Table 7.

Alternate RAOC W(z) at 4000, 5000, 6000, 8000 MWD/lVITU 25 Table 8.

Alternate RAOC W(z) at 10000, 12000, 14000, 16000 MWD/lVITU 26 Table 9.

Alternate RAOC W(z) at 18000, 20000 MWD/lVITU 27 Table 10.

Alternate RAOC FQ Margin Decrease in Excess of2% Per 31 EFPD 28 Table 11.

BASELOAD W(z) at 150, 1000, 2000, 3000 MWD/MTU 29 Table 12.

BASELOAD W(z) at 4000, 5000, 6000, 8000 MWD/MTU 30 Table 13.

BASELOAD W(z) at 10000, 12000, 14000, 16000 MWD/lVITU 31 Table 14.

BASELOAD W(z) at 18000, 20000 MWD/lVITU 32 Table 15.

BASELOAD FQ Margin Decrease in Excess of2% Per 31 EFPD 33 COLR-VlC29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 4 of34

Figure Figure 1.

Figure 2.

Figure 3.

Figure 4.

Figure 5.

Figure 6.

List of Figures Moderator Temperature Coefficient Versus Power Level Rod Group Insertion Limits Versus Thermal Power for Three Loop Operation Axial Flux Difference Limits as a Function of Rated Thermal Power K(z) - Normalized FQ(z) as a Function of Core Height Axial Flux Difference Limits as a Function of Rated Thermal Power (Alternate RAOC)

RCS Total Flowrate vs. R for Three Loop Operation COLR-V1C29, Revision 0 14 15 16 17 18 34 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 5 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 1.0 Core Operating Limits Report This Core Operating Limits Report (COLR) for V. C. Summer Station Cycle 29 has been prepared in accordance with the requirements of Technical Specification 6.9.1.11.

The Technical Specifications affected by this report are listed below:

3.1.1.3 Moderator Temperature Coefficient 3.1.3.5 Shutdown Rod Insertion Limits 3.1.3.6 Control Rod Insertion Limits 3.2.1 Axial Flux Difference 3.2.2 Heat Flux Hot Channel Factor - FQ(z) 3.2.3 RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor The analytical methods used to determine the core operating limits are those previously approved by the NRC and discussed in the documents listed in the References Section.

Cycle-specific values are presented in bold. Text in italics is provided for information only.

COLR-VIC29, Revision 0 EV AL-ENG-RSE-VI C29, Revision 0, Attachment A Page 6 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 2.0 Operating Limits The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the subsections which follow. These limits have been developed using the NRC-approved methodologies specified in Technical Specification 6.9.1.11.

2.1 Moderator Temperature Coefficient (Specification 3.1.1.3):

2.1.1 The Moderator Temperature Coefficient (MTC) limits are:

The BOL/ARO-MTC shall be less positive than the limits shown in Figure 1.

The EOL/ARO/RTP-MTC shall be less negative than -4.8x10-4 Ak/k/°F (-48 pcm/0F).

where:

BOL stands for Beginning of Cycle Life ARO stands for All Rods Out RTP stands for RA TED THERMAL POWER EOL stands for End of Cycle Life 2.1.2 The MTC Surveillance limit is:

The 300 ppm/ARO/RTP-MTC should be less negative than or equal to -4.1x10-.t Ak/k/°F

(-41 pcm/0F).

2.1.3 The Revised Predicted near-EOL 300 ppm MTC shall be calculated using the following algorithm from Reference 5:

Revised Predicted MTC = Predicted MTC + AFD Correction*+ Predictive Correction**

  • AFD Correction is 0.05 pcm/°F/%L'iAFD.
    • Predictive Correction is -3 pcm/°F.

If the Revised Predicted MTC is less negative than the SR 4. l. l.3b limit of

-4.lx10-4 Ak/k/°F, and all of the benchmark data contained in the surveillance procedure are met, then an MTC measurement in accordance with SR 4.1. l.3b is not required.

2.2 Shutdown Rod Insertion Limits (Specification 3.1.3.5):

The shutdown rods shall be withdrawn to at least 225 steps. The All Rods Out (ARO) position is 226 steps.

COLR-VlC29, Revision 0 EVAL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 7 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 2.3 Control Rod Insertion Limits (Specification 3.1.3.6):

Control Bank A and B rods shall be withdrawn to at least 225 steps. Control Bank C and D Rod Insertion Limits are specified by Figure 2. Control rod overlap is 98 steps. The All Rods Out (ARO) position is 226 steps.

2.4 Axial Flux Difference (Specification 3.2.1):

2.4.1 The Axial Flux Difference (AFD) Limits for Rela.'Ced Axial Offset Control (RAOC) operation are shown in Figure 3.

2.4.2 The Axial Flux Difference (AFD) target band during base load operations is:

BOL - EOL (0 - 23,000 MWD/MTU): +/-5% about a measured target value. The base load band will remain inside the RAOC band.

2.4.3 The Axial Flux Difference (AFD) Limits for Alternate Relaxed Axial Offset Control (RAOC) operation are shown in Figure 5.

2.4.4 The minimum allowable power level for base load operation, APLN°, is 75% of RATED THERMAL POWER.

2.5 Heat Flux Hot Channel Factor - FQ(z) (Specification 3.2.2):

fRlP FQ (Z) :s; _Q_ X K(Z) 0.5 2.5.1 F~TP = 2.50 for P> 0.5 for P ~ 0.5 P

Thennal Power where:

Rated Thennal Power 2.5.2 K(z) is equal to 1 for all core heights as shown in Figure 4.

COLR-VIC29, Revision 0 EVAL-ENG-RSE-VIC29, Revision 0, Attachment A Page 8 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 2.5.3 The discussion in TS 4.2.2.2.c and 4.2.2.2.f for this LCO requires the application of a cycle dependent non-equilibrium multiplier, W(Z), to the steady state FQ(Z). W(Z) values are calculated for each flux map using analytically derived FQ(Z) values (scaled by relative power), consistent with the methodology described in Reference 2. W(Z) accounts for power distribution transients encountered during normal operation FRTP FMiz) ::5 Q

X K(Z) forP > 0.5 PX W(z)

FRTP Thennal Power FMaCZ} ::S Q

X K(Z) for P ~ 0.5 where: P=

W( z) X 0.5 Rated Thennal Power 2.5.4 FSlP =2.50 2.5.5 K(z) is equal to 1 for all core heights as shown in Figure 4.

The two equations calculate the maximum percent over the core height(z) that FQ(Z) exceeds its limit.

F srr l

x 100 for P;;:: 0.5 l[

F QM(z) x W(z) l l

+xK(z)

I[

F QM( z) x lV( z) l I F

Kil' l

X 100 for P < 0.5

_Q_XK(z) 0.5 COLR-VlC29, Revision 0 EVAL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 9 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 2.5.6 Elevation dependent W(z) values for RAOC operation at 150, 1000, 2000, 3000, 4000, 5000, 6000, 8000, 10000, 12000, 14000, 16000, 18000, and 20000 MWD/MTU are shown in Tables 1 through 4, respectively. This information is sufficient to determine W(z) versus core height in the range of O MWD/MTU to EOL burnup through the use of three point interpolation. Table 5 shows FQ margin decreases for RAOC operation that are greater than 2% per 31 Effective Full Power Days (EFPD). These values shall be used to increase FQM(z) as per Surveillance Requirement 4.2.2.2.e. A 2% penalty factor shall be used at all bumups that are outside the range of Table 5.

2.5.7 Elevation dependent W(z) values for Alternate RAOC operation at 150, 1000, 2000, 3000, 4000, 5000, 6000, 8000, 10000, 12000, 14000, 16000, 18000, and 20000 MWD/MTU are shown in Tables 6 through 9, respectively. This information is sufficient to determine W(z) versus core height in the range of O MWD/MTU to EOL bumup through the use of three point interpolation. Table 10 shows FQ margin decreases for RAOC operation that are greater than 2% per 31 Effective Full Power Days (EFPD). These values shall be used to increase Fl'(z) as per Surveillance Requirement 4.2.2.2.e. A 2% penalty factor shall be used at all bumups that are outside the range of Table 10.

2.5.8 Elevation dependent W(z) values for Baseload operation between 75 and 100% of rated thermal power with the Section 2.4.2 specified target band about a measured target value at 150, 1000, 2000, 3000, 4000, 5000, 6000, 8000, 10000, 12000, 14000, 16000, 18000, and 20000 MWD/MTU are shown in Tables 11 through 14, respectively. This information is sufficient to determine W(z) versus core height for burnups in the range of 0 MWD/MTU to EOL bumup through the use of three point interpolation. Table 15 shows FQ margin decreases for base load operation that are greater than 2% per 31 Effective Full Power Days (EFPD). These values shall be used to increase FQM(z) as per Surveillance Requirement 4.2.2.4.e. A 2% penalty factor shall be used at all bumups that are outside the range of Table 15.

2.6 RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor - F~ (Specification 3.2.3):

FN R=

~H FlkTP x (1 + PFl:-i x (1-P ))

where: P Thermal Power Rated Thermal Power 2.6. l

~~P = 1. 62 COLR-VlC29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 10 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 2.6.2 PF LIH = 0. 3 2.6.3 The Acceptable Operation Region from the combination of Reactor Coolant System total flow and R is provided in Figure 6.

2.7 Power Distribution Measurement Uncertainty (Specifications 3.2.2 and 3.2.3):

If the Power Distribution Monitoring System (PDMS) is OPERABLE, as defined in Technical Specification 3.3.3.11, the uncertainty, UrnH, to be applied to the Nuclear Enthalpy Rise Hot Channel Factor FNm shall be calculated by the following formula:

u,ill uf,lli = 1.0 +--

100_0 where: u Ml = Uncertainty for enthalpy rise as defined in equation (5-19) in Reference 4 or 4.0, whichever is larger.

If the Power Distribution Monitoring System is OPERABLE, as defined in Technical Specification 3.3.3.11, the uncertainty, UrQ, to be applied to the Heat Flux Hot Channel Factor FQ(z) shall be calculated by the following formula:

UFQ = (1.0 + ~)- U 100.0 e

where: U Q = Uncertainty for FQ(Z) = 5.0 when confirming F Q(z) for RAOC or Base Load operation, or as defined in equation (5-19) in Reference 4 for all other purposes.

U e

= Engineering uncertainty factor.

=1.03 COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 11 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 If the Power Distribution Monitoring System is INOPERABLE, as defined in Technical Specification 3.3.3.11, the uncertainty, VFMJ, to be applied to the Nuclear Enthalpy Rise Hot Channel Factor FNMJ shall be calculated by the following formula:

U FMI = U FAffm where: U FMim = Base Fm measurement uncertainty.

=1.04 If the Power Distribution Monitoring System is INOPERABLE, as defined in Technical Specification 3.3.3.11, the uncertainty, UFQ, to be applied to the Heat Flux Hot Channel Factor FQ(z) shall be calculated by the following formula:

where: Uqu = Base FQ measurement uncertainty.

=1.05 U e

= Engineering uncertainty factor.

=1.03 COLR-VIC29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 12 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 3.0 References

1) WCAP-9272-P-A, "Westinghouse Reload Safety Evaluation Methodology," July 1985 (W Proprietary).

Methodology for:

TS 3.1.1.3 - Moderator Temperature Coefficient TS 3.1.3.5 - Shutdown Rod Inse1tion Limits TS 3.1.3.6 - Control Rod Insertion Limits TS 3.2.1 - Axial Flux Difference TS 3.2.2-Heat Flux Hot Channel Factor TS 3.2.3 - RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor

2) WCAP-10216-P-A, Rev. IA, "Relaxation of Constant Axial Offset Control FQ Surveillance Technical Specification," February 1994 (W Proprietary).

Methodology for:

TS 3.2.1 -Axial Flux Difference TS 3.2.2 - Heat Flux Hot Channel Factor

3) WCAP-16996-P-A Revision 1, "Realistic LOCA Evaluation Methodology Applied to the Full Spectrum of Break Sizes (FULL SPECTRUM LOCA Methodology)," November 2016, (W Proprietary)

Methodology for:

TS 3.2.2-Heat Flux Hot Channel Factor

4) WCAP-12472-P-A, "BEACON Core Monitoring and Operations Support System," August, 1994, (W Proprietary).

Methodology for:

TS 3.2.2-Heat Flux Hot Channel Factor TS 3.2.3 - RCS Flow Rate and Nuclear Enthalpy Rise Hot Channel Factor TS 3.2.4-Quadrant Power Tilt Ratio

5) WCAP-13749-P-A, "Safety Evaluation Supporting the Conditional Exemption of the Most Negative EOL Moderator Temperature Coefficient," March 1997, (W Proprietary).

Methodology for:

TS 3.1.1.3 - Moderator Temperature Coefficient

6) WCAP-12610-P-A, "VANTAGE+ Fuel Assembly Reference Core Report," April 1995 (W Proprietary).

WCAP-12610-P-A & CENPD-404-P-A, Addendum IA, "Optimized ZIRLOTM," July 2006 (W Proprietary).

Methodology for:

TS 3.2.2 - Heat Flux Hot Channel Factors COLR-VIC29, Revision 0 EVAL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 13 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 Figure 1.

Moderator Temperature Coefficient Versus Power Level 1.00 0.90 Unacceptable Operation 0.80 u:-

0

Si!:

32: 0.70

<]

"f 0

0.60

s.

\\

-m

  • a Acceptable Operation ii 0.50 8

I!:! i 0.40

~

I-... i 0.30 "O

0

ii:

~ \\

\\

0.20 0.10

\\

\\ \\

0.00 0

10 20 30 40 50 60 70 80 90 100 Percent of Rated Thennal Power COLR-V1C29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 14 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 Figure 2. Rod Group Insertion Limits Versus Thermal Power for Three Loop Operation 230 I

I I

I 220 I

I (0.53, 225) I I

I I 1.

I I I I

210 I I I

200 I

I I

I

(1.0, 194) 1-I l.,,j I

I 190 I

I I I

I i..i I

I 1,

180 170 I I I I I I I I

I I I BANKC!

I I

I I

I 160 I

I I I I I

I I I

I

~

I I I I I I I I

I 150

, 1 I

I

, I I

I I

IJ I

140 I

I

~

I I

130

~

I I I I

I I

C:.2120

  • u;

~110 C.

$ 100 en I

I I I I I I

I I

I I I I I I I I I I I

I I

,_ 1 (0.0, 118) I I

I 1,

I I

I I

I I I

I I I

I I I

I I I C.

, 90 0...

I I

I I

(!) 80

"'C 0

I I I

I

, 1 I

I I

I I I I I I I

I I BANKO I 0:: 70 I I I

I I

I I I 60 I I I 1

I I I

I I I I I

50 I

I I I I

I I I I I

I I I i..i" I

I I I I I I

40 I I I I

I I

30 I

1" I

20 I

I 10 I

I I I I

I I I I I,

(0.048, 0)

I I

I I I

I 0

0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 Percent of Rated Thermal Power COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 15 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 Figure 3.

Axial Flux Difference Limits as a Function of Rated Thermal Power Q.J s:

0 ll.

ni s

.c I-i 0...

~

ll.

120 100 80 60 40 20 0

-40 I <-8, 100)

I r

J I Unacceptalle I

I I I

J I I,

j I

(-22, 50)

-30

-20

-10 I

(+8, 100)

\\,

\\

Unacceptalle J

\\

\\

Acceptable I

~

\\

\\

\\ '

I (+20. 5o)

I 0

10 20 30 Axial Flux Difference(% Lll)

COLR-VIC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 16 of34 40

V. C. Summer Cycle 29 SEPTEMBER 2024 Figure 4.

K(z) - Normalized FQ(z) as a Function of Core Height

...J w

tr 1.10 1.00 0.90 0.80 0.70 a.. 0.60 l-a LI..

"C

-~ 0.50 cu E 0 z N 0.40

~

0.30 0.20 0.10 0.00 I (0.o, 1.0 I 0

Bottom I

I 2

COLR-VlC29, Revision 0 I (6.o, 1.0) I 4

6 Core Height (ft)

EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A 8

I (12.1, 1.0) I 10 Page 17 of34 12 Top

V. C. Summer Cycle 29 SEPTEMBER 2024 Figure 5.

Axial Flux Difference Limit as a Function of Rated Thermal Power (Alternate RAOC) 120

! (-6, 100) !

I (+4, 100) I 100 I

~

I

\\

80

\\

H Unacceptable i

I I j

\\

I Unacceptable I

I I

I

\\

GI

==

0 ll..

"iii 60 E...

GI

/I Acceptable I\\

I

\\

I

.c I-,, s

\\

cu 0::: -

0 I (-20, 50) I 1(+16, 50 I C

GI 40 u...

GI ll..

20 0

-40

-30

-20

-10 0

10 20 30 40 Axial Flux Difference (%..1-1)

COLR-V1C29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 18 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 Table 1.

RAOC W(z) at 150, 1000, 2000, 3000 MWD/MTU Core W(z)

W(z)

W(z)

W(z)

Core W{z)

W(z)

W(z)

W(z)

Height 150 1000 2000 3000 Height 150 1000 2000 3000 (ft)

MWd/

MWd/

MWd/

MWd/

(ft)

MWd/

MWd/

MWd/

MWd/

MTU MTU MTU MTU MTU MTU MTU MTU 0.000 1.317 1.362 1.398 1.442 6.177 1.130 1.119 1.119 1.112 0.141 1.319 1.364 1.400 1.443 6.317 1.134 1.122 1.123 1.116 0.281 1.321 1.366 1.402 1.444 6.458 1.138 1.125 1.127 1.120 0.422 1.330 1.374 1.409 1.450 6.597 1.141 1.127 1.130 1.123 0.561 1.345 1.387 1.420 1.461 6.738 1.144 1.129 1.133 1.125 0.702 1.347 1.387 1.420 1.459 6.878 1.147 1.131 1.135 1.128 0.842 1.341 1.380 1.412 1.450 7.019 1.149 1.132 1.137 1.129 0.983 1.335 1.372 1.403 1.440 7.159 1.150 1.133 1.139 1.131 1.123 1.327 1.363 1.392 1.428 7.300 1.151 1.133 1.140 1.132 1.264 1.317 1.351 1.380 1.413 7.439 1.152 1.133 1.140 1.132 1.403 1.307 1.339 1.366 1.398 7.580 1.151 1.132 1.139 1.131 1.544 1.296 1.325 1.351 1.381 7.720 1.150 1.130 1.138 1.130 1.684 1.283 1.310 1.335 1.362 7.861 1.148 1.128 1.137 1.128 1.825 1.271 1.295 1.318 1.343 8.001 1.146 1.125 1.134 1.126 1.965 1.257 1.279 1.300 1.323 8.142 1.143 1.122 1.131 1.123 2.106 1.244 1.262 1.282 1.303 8.282 1.139 1.118 1.128 1.120 2.246 1.230 1.245 1.263 1.282 8.422 1.135 1.114 1.124 1.116 2.386 1.216 1.228 1.245 1.261 8.563 1.130 1.109 1.119 1.111 2.527 1.202 1.212 1.227 1.241 8.703 1.124 1.103 1.113 1.106 2.667 1.189 1.195 1.208 1.221 8.844 1.119 1.099 1.113 1.106 2.808 1.174 1.178 1.192 1.201 8.984 1.119 1.100 1.116 1.111 2.948 1.161 1.164 1.184 1.181 9.124 1.121 1.105 1.120 1.117 3.088 1.156 1.158 1.179 1.168 9.264 1.121 1.107 1.122 1.122 3.228 1.153 1.156 1.175 1.161 9.405 1.121 1.110 1.124 1.126 3.369 1.150 1.152 1.169 1.158 9.545 1.119 1.113 1.125 1.131 3.509 1.146 1.149 1.164 1.154 9.686 1.118 1.117 1.125 1.134 3.650 1.142 1.146 1.159 1.150 9.826 1.120 1.123 1.124 1.137 3.790 1.138 1.144 1.155 1.146 9.966 1.123 1.130 1.122 1.139 3.930 1.134 1.142 1.153 1.141 10.106 1.126 1.136 1.122 1.140 4.070 1.129 1.140 1.150 1.136 10.247 1.129 1.141 1.123 1.141 4.211 1.127 1.137 1.147 1.131 10.388 1.131 1.147 1.125 1.146 4.352 1.125 1.134 1.143 1.126 10.528 1.135 1.151 1.127 1.151 4.492 1.123 1.131 1.140 1.120 10.669 1.139 1.156 1.128 1.155 4.633 1.121 1.128 1.136 1.117 10.808 1.143 1.160 1.130 1.159 4.772 1.119 1.125 1.132 1.115 10.949 1.145 1.163 1.132 1.161 4.913 1.116 1.121 1.127 1.112 11.089 1.147 1.165 1.134 1.163 5.053 1.113 1.117 1.123 1.109 11.230 1.148 1.166 1.135 1.164 5.194 1.111 1.113 1.118 1.106 11.370 1.148 1.166 1.135 1.164 5.334 1.111 1.110 1.113 1.102 11.511 1.141 1.159 1.129 1.158 5.475 1.112 1.109 1.108 1.099 11.650 1.124 1.143 1.114 1.143 5.614 1.112 1.110 1.104 1.098 11.791 1.109 1.128 1.100 1.129 5.755 1.115 1.112 1.105 1.100 11.931 1.099 1.118 1.090 1.119 5.895 1.120 1.114 1.109 1.103 12.072 1.089 1.108 1.080 1.108 6.036 1.125 1.117 1.114 1.108 COLR-V1C29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 19 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 Table 2.

RAOC W(z) at 4000, 5000, 6000, 8000 MWD/MTU Core W(z)

W(z)

W(z)

W(z)

Core W(z)

W{z)

W(z)

W{z)

Height 4000 5000 6000 8000 Height 4000 5000 6000 8000 MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

(ft)

MTU MTU MTU MTU (ft)

MTU MTU MTU MTU 0.000 1.409 1.385 1.352 1.308 6.177 1.109 1.111 1.110 1.118 0.141 1.410 1.386 1.353 1.309 6.317 1.114 1.116 1.117 1.126 0.281 1.411 1.388 1.354 1.310 6.458 1.118 1.121 1.123 1.134 0.422 1.417 1.393 1.360 1.316 6.597 1.121 1.125 1.129 1.141 0.561 1.427 1.403 1.370 1.327 6.738 1.125 1.130 1.134 1.148 0.702 1.425 1.401 1.368 1.326 6.878 1.128 1.133 1.139 1.154 0.842 1.416 1.393 1.360 1.319 7.019 1.130 1.136 1.143 1.160 0.983 1.406 1.383 1.351 1.311 7.159 1.132 1.139 1.147 1.165 1.123 1.394 1.372 1.340 1.301 7.300 1.133 1.142 1.151 1.171 1.264 1.380 1.358 1.327 1.289 7.439 1.134 1.143 1.154 1.174 1.403 1.365 1.343 1.313 1.275 7.580 1.134 1.144 1.155 1.177 1.544 1.348 1.327 1.297 1.261 7.720 1.134 1.144 1.157 1.179 1.684 1.330 1.309 1.280 1.245 7.861 1.133 1.144 1.158 1.181 1.825 1.311 1.291 1.262 1.229 8.001 1.131 1.143 1.158 1.182 1.965 1.291 1.272 1.244 1.212 8.142 1.129 1.141 1.157 1.182 2.106 1.271 1.252 1.226 1.195 8.282 1.126 1.139 1.156 1.181 2.246 1.250 1.232 1.207 1.177 8.422 1.123 1.136 1.154 1.180 2.386 1.230 1.212 1.188 1.160 8.563 1.119 1.132 1.151 1.178 2.527 1.210 1.193 1.169 1.142 8.703 1.114 1.128 1.148 1.175 2.667 1.189 1.174 1.151 1.126 8.844 1.115 1.129 1.150 1.176 2.808 1.172 1.156 1.134 1.109 8.984 1.121 1.136 1.157 1.182 2.948 1.164 1.143 1.124 1.094 9.124 1.128 1.143 1.165 1.191 3.088 1.156 1.140 1.121 1.090 9.264 1.134 1.150 1.172 1.198 3.228 1.151 1.138 1.119 1.089 9.405 1.139 1.156 1.179 1.205 3.369 1.148 1.135 1.117 1.088 9.545 1.144 1.162 1.185 1.211 3.509 1.145 1.132 1.115 1.086 9.686 1.149 1.167 1.191 1.217 3.650 1.141 1.129 1.113 1.085 9.826 1.153 1.172 1.196 1.221 3.790 1.137 1.125 1.110 1.084 9.966 1.156 1.175 1.200 1.225 3.930 1.133 1.122 1.108 1.082 10.106 1.157 1.178 1.203 1.231 4.070 1.129 1.118 1.104 1.080 10.247 1.158 1.179 1.209 1.240 4.211 1.124 1.114 1.101 1.080 10.388 1.161 1.185 1.217 1.248 4.352 1.120 1.110 1.098 1.081 10.528 1.165 1.192 1.223 1.255 4.492 1.115 1.105 1.094 1.082 10.669 1.170 1.197 1.230 1.261 4.633 1.109 1.101 1.091 1.083 10.808 1.174 1.202 1.236 1.268 4.772 1.106 1.097 1.087 1.084 10.949 1.177 1.206 1.240 1.272 4.913 1.104 1.094 1.085 1.084 11.089 1.180 1.209 1.243 1.275 5.053 1.102 1.092 1.085 1.085 11.230 1.181 1.210 1.245 1.277 5.194 1.099 1.090 1.085 1.085 11.370 1.181 1.211 1.245 1.277 5.334 1.096 1.089 1.086 1.086 11.511 1.175 1.206 1.240 1.272 5.475 1.094 1.090 1.087 1.086 11.650 1.160 1.191 1.226 1.258 5.614 1.095 1.092 1.089 1.088 11.791 1.147 1.178 1.213 1.244 5.755 1.097 1.094 1.092 1.093 11.931 1.137 1.168 1.203 1.234 5.895 1.100 1.098 1.097 1.101 12.072 1.127 1.158 1.193 1.223 6.036 1.104 1.105 1.103 1.110 COLR-V1C29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 20 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 Table 3.

RAOC W(z) at 10000, 12000, 14000, 16000 MWD/MTU Core W(z)

W(z)

W(z)

W(z)

Core W(z)

W(z)

W(z)

W(z)

Height 10000 12000 14000 16000 Height 10000 12000 14000 16000 MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

(ft)

MTU MTU MTU MTU (ft)

MTU MTU MTU MTU 0.000 1.254 1.206 1.188 1.175 6.177 1.127 1.139 1.152 1.162 0.141 1.256 1.208 1.190 1.177 6.317 1.137 1.147 1.161 1.169 0.281 1.257 1.210 1.193 1.179 6.458 1.146 1.156 1.169 1.176 0.422 1.264 1.218 1.201 1.188 6.597 1.154 1.164 1.176 1.182 0.561 1.275 1.230 1.214 1.202 6.738 1.162 1.171 1.183 1.187 0.702 1.276 1.233 1.217 1.206 6.878 1.170 1.177 1.189 1.192 0.842 1.271 1.229 1.214 1.203 7.019 1.177 1.183 1.194 1.196 0.983 1.264 1.224 1.210 1.200 7.159 1.183 1.188 1.198 1.198 1.123 1.256 1.217 1.205 1.195 7.300 1.189 1.194 1.203 1.202 1.264 1.245 1.208 1.197 1.187 7.439 1.194 1.197 1.206 1.203 1.403 1.233 1.199 1.188 1.180 7.580 1.197 1.199 1.206 1.202 1.544 1.221 1.188 1.179 1.171 7.720 1.200 1.201 1.207 1.201 1.684 1.207 1.177 1.170 1.162 7.861 1.202 1.202 1.207 1.200 1.825 1.193 1.165 1.159 1.153 8.001 1.203 1.202 1.207 1.197 1.965 1.179 1.154 1.149 1.143 8.142 1.204 1.202 1.205 1.194 2.106 1.164 1.141 1.138 1.134 8.282 1.204 1.201 1.203 1.190 2.246 1.148 1.129 1.127 1.123 8.422 1.203 1.198 1.199 1.185 2.386 1.133 1.116 1.115 1.112 8.563 1.201 1.195 1.196 1.182 2.527 1.118 1.103 1.104 1.101 8.703 1.198 1.191 1.195 1.183 2.667 1.103 1.091 1.093 1.091 8.844 1.200 1.193 1.197 1.187 2.808 1.088 1.079 1.082 1.081 8.984 1.207 1.200 1.201 1.193 2.948 1.076 1.068 1.072 1.075 9.124 1.216 1.207 1.203 1.197 3.088 1.075 1.068 1.072 1.075 9.264 1.222 1.211 1.203 1.199 3.228 1.074 1.068 1.073 1.075 9.405 1.228 1.215 1.202 1.201 3.369 1.072 1.069 1.074 1.078 9.545 1.234 1.219 1.200 1.203 3.509 1.071 1.070 1.076 1.082 9.686 1.239 1.223 1.199 1.204 3.650 1.070 1.071 1.077 1.087 9.826 1.242 1.227 1.202 1.203 3.790 1.070 1.071 1.079 1.092 9.966 1.251 1.235 1.208 1.202 3.930 1.072 1.072 1.081 1.098 10.106 1.260 1.243 1.212 1.200 4.070 1.073 1.072 1.081 1.102 10.247 1.268 1.250 1.216 1.198 4.211 1.075 1.072 1.082 1.106 10.388 1.276 1.257 1.220 1.200 4.352 1.077 1.073 1.084 1.110 10.528 1.283 1.263 1.222 1.202 4.492 1.079 1.074 1.088 1.114 10.669 1.290 1.269 1.223 1.203 4.633 1.081 1.078 1.092 1.117 10.808 1.296 1.274 1.224 1.205 4.772 1.082 1.081 1.095 1.121 10.949 1.300 1.277 1.226 1.207 4.913 1.084 1.084 1.099 1.124 11.089 1.303 1.279 1.228 1.208 5.053 1.085 1.087 1.102 1.126 11.230 1.304 1.279 1.228 1.208 5.194 1.087 1.090 1.105 1.128 11.370 1.304 1.279 1.227 1.206 5.334 1.088 1.092 1.107 1.130 11.511 1.299 1.272 1.220 1.199 5.475 1.089 1.095 1.110 1.131 11.650 1.284 1.256 1.203 1.181 5.614 1.093 1.101 1.115 1.132 11.791 1.269 1.241 1.188 1.165 5.755 1.099 1.110 1.124 1.137 11.931 1.258 1.230 1.176 1.154 5.895 1.107 1.120 1.134 1.146 12.072 1.247 1.218 1.165 1.142 6.036 1.118 1.129 1.143 1.154 COLR-VIC29, Revision 0 EVAL-ENG-RSE-VI C29, Revision 0, Attachment A Page 21 of 34

V. C. Summer Cycle 29 SEPTEMBER 2024 Table 4.

RAOC W(z) at 18000, 20000 MWD/MTU Core W(z)

W{z)

Core W(z)

W{z)

Height 18000 20000 Height 18000 20000 MWd/

MWd/

MWd/

MWd/

(ft)

MTU MTU (ft)

MTU MTU 0.000 1.202 1.215 6.177 1.176 1.201 0.141 1.204 1.217 6.317 1.182 1.208 0.281 1.206 1.219 6.458 1.188 1.215 0.422 1.214 1.227 6.597 1.193 1.220 0.561 1.229 1.242 6.738 1.197 1.225 0.702 1.233 1.246 6.878 1.200 1.229 0.842 1.229 1.243 7.019 1.203 1.231 0.983 1.226 1.238 7.159 1.204 1.233 1.123 1.220 1.232 7.300 1.206 1.235 1.264 1.212 1.224 7.439 1.206 1.234 1.403 1.204 1.215 7.580 1.203 1.231 1.544 1.195 1.206 7.720 1.201 1.229 1.684 1.185 1.196 7.861 1.198 1.225 1.825 1.175 1.186 8.001 1.194 1.220 1.965 1.165 1.176 8.142 1.189 1.215 2.106 1.154 1.165 8.282 1.184 1.208 2.246 1.143 1.154 8.422 1.178 1.204 2.386 1.131 1.141 8.563 1.176 1.203 2.527 1.119 1.130 8.703 1.178 1.203 2.667 1.108 1.118 8.844 1.181 1.202 2.808 1.096 1.106 8.984 1.184 1.200 2.948 1.087 1.096 9.124 1.188 1.197 3.088 1.088 1.090 9.264 1.188 1.191 3.228 1.091 1.085 9.405 1.189 1.184 3.369 1.094 1.083 9.545 1.189 1.181 3.509 1.097 1.091 9.686 1.189 1.182 3.650 1.099 1.099 9.826 1.187 1.188 3.790 1.102 1.106 9.966 1.185 1.194 3.930 1.108 1.114 10.106 1.183 1.200 4.070 1.111 1.121 10.247 1.186 1.205 4.211 1.114 1.126 10.388 1.190 1.210 4.352 1.118 1.132 10.528 1.194 1.215 4.492 1.120 1.138 10.669 1.199 1.219 4.633 1.122 1.143 10.808 1.204 1.223 4.772 1.126 1.147 10.949 1.206 1.225 4.913 1.131 1.152 11.089 1.207 1.225 5.053 1.135 1.155 11.230 1.207 1.225 5.194 1.140 1.158 11.370 1.205 1.222 5.334 1.143 1.161 11.511 1.197 1.214 5.475 1.146 1.164 11.650 1.179 1.195 5.614 1.149 1.168 11.791 1.163 1.177 5.755 1.154 1.175 11.931 1.151 1.165 5.895 1.161 1.183 12.072 1.140 1.153 6.036 1.169 1.193 COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 22 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 Table 5.

RAOC FQ Margin Decrease in Excess of 2% Per 31 EFPD Cycle Burnup Maximum Decrease Cycle Burnup Maximum Decrease (MWD/MTU) in FQ Marnin (MWD/MTU) in FQ Margin 150 1.0200 2728 1.0200 365 1.0208 6594 1.0200 580 1.0389 6809 1.0202 794 1.0460 7023 1.0217 1009 1.0438 7238 1.0239 1224 1.0380 7453 1.0233 1439 1.0343 7668 1.0247 1654 1.0238 7883 1.0234 1868 1.0205 8097 1.0222 2083 1.0200 8312 1.0214 2298 1.0200 8527 1.0205 2513 1.0211 8742 1.0200 Note: All cycle burn ups outside the range of this table shall use a 1. 020 decrease in margin for compliance with Specification 4.2.2.2.e. Linear interpolation is adequate for intermediate cycle burnups.

COLR-VlC29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page23 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 Table 6.

Alternate RAOC W(z) at 150, 1000, 2000, 3000 MWD/MTU Core W(z)

W(z)

W(z)

W(z)

Core W(z)

W(z)

W{z)

W{z)

Height 150 1000 2000 3000 Height 150 1000 2000 3000 (ft)

MWd/

MWd/

MWd/

MWd/

(ft)

MWd/

MWd/

MWd/

MWd/

MTU MTU MTU MTU MTU MTU MTU MTU 0.000 1.277 1.279 1.363 1.357 6.177 1.118 1.118 1.108 1.107 0.141 1.279 1.281 1.365 1.359 6.317 1.118 1.120 1.109 1.109 0.281 1.282 1.283 1.367 1.360 6.458 1.119 1.121 1.109 1.111 0.422 1.290 1.292 1.374 1.367 6.597 1.119 1.121 1.109 1.113 0.561 1.305 1.305 1.386 1.378 6.738 1.118 1.122 1.109 1.114 0.702 1.308 1.307 1.385 1.377 6.878 1.117 1.121 1.108 1.114 0.842 1.302 1.301 1.378 1.370 7.019 1.116 1.121 1.106 1.114 0.983 1.296 1.295 1.370 1.362 7.159 1.114 1.120 1.105 1.114 1.123 1.289 1.287 1.359 1.351 7.300 1.112 1.118 1.102 1.113 1.264 1.280 1.278 1.347 1.339 7.439 1.110 1.116 1.100 1.112 1.403 1.270 1.267 1.334 1.326 7.580 1.106 1.113 1.096 1.110 1.544 1.260 1.256 1.320 1.311 7.720 1.103 1.110 1.093 1.108 1.684 1.248 1.244 1.304 1.295 7.861 1.098 1.106 1.089 1.105 1.825 1.236 1.233 1.288 1.279 8.001 1.094 1.102 1.084 1.102 1.965 1.224 1.223 1.271 1.262 8.142 1.088 1.097 1.079 1.098 2.106 1.211 1.212 1.253 1.244 8.282 1.082 1.092 1.073 1.093 2.246 1.198 1.201 1.236 1.227 8.422 1.076 1.086 1.068 1.088 2.386 1.185 1.190 1.218 1.209 8.563 1.069 1.080 1.061 1.083 2.527 1.172 1.180 1.201 1.192 8.703 1.062 1.073 1.054 1.077 2.667 1.159 1.169 1.184 1.175 8.844 1.054 1.065 1.047 1.073 2.808 1.146 1.158 1.166 1.158 8.984 1.051 1.063 1.045 1.074 2.948 1.137 1.147 1.150 1.145 9.124 1.051 1.066 1.046 1.076 3.088 1.134 1.143 1.144 1.137 9.264 1.051 1.067 1.046 1.077 3.228 1.133 1.141 1.142 1.134 9.405 1.055 1.068 1.047 1.077 3.369 1.131 1.138 1.138 1.133 9.545 1.060 1.069 1.051 1.077 3.509 1.130 1.135 1.135 1.132 9.686 1.066 1.069 1.057 1.076 3.650 1.128 1.133 1.131 1.130 9.826 1.071 1.068 1.063 1.074 3.790 1.126 1.129 1.128 1.129 9.966 1.076 1.067 1.069 1.070 3.930 1.124 1.126 1.127 1.127 10.106 1.081 1.065 1.075 1.076 4.070 1.122 1.122 1.126 1.126 10.247 1.086 1.063 1.080 1.083 4.211 1.120 1.118 1.124 1.124 10.388 1.091 1.067 1.086 1.089 4.352 1.118 1.115 1.122 1.122 10.528 1.095 1.072 1.090 1.095 4.492 1.115 1.111 1.120 1.120 10.669 1.099 1.076 1.095 1.100 4.633 1.112 1.110 1.118 1.117 10.808 1.102 1.080 1.099 1.105 4.772 1.109 1.108 1.116 1.115 10.949 1.105 1.083 1.102 1.108 4.913 1.107 1.106 1.113 1.112 11.089 1.107 1.085 1.104 1.111 5.053 1.109 1.104 1.110 1.109 11.230 1.108 1.086 1.105 1.113 5.194 1.110 1.106 1.107 1.106 11.370 1.108 1.086 1.105 1.113 5.334 1.111 1.108 1.104 1.102 11.511 1.101 1.080 1.100 1.109 5.475 1.112 1.109 1.101 1.099 11.650 1.085 1.065 1.085 1.095 5.614 1.112 1.111 1.103 1.098 11.791 1.070 1.051 1.071 1.082 5.755 1.114 1.112 1.105 1.099 11.931 1.060 1.041 1.062 1.073 5.895 1.115 1.114 1.106 1.102 12.072 1.050 1.032 1.052 1.063 6.036 1.117 1.117 1.107 1.105 COLR-V1C29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 24 of 34

V. C. Summer Cycle 29 SEPTEMBER 2024 Table 7.

Alternate RAOC W(z) at 4000, 5000, 6000, 8000 MWD/MTU Core W(z)

W(z)

W{z)

W(z)

Core W{z)

W{z)

W(z)

W(z)

Height 4000 5000 6000 8000 Height 4000 5000 6000 8000 MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

MWdl (ft)

MTU MTU MTU MTU

{ft)

MTU MTU MTU MTU 0.000 1.350 1.332 1.293 1.234 6.177 1.107 1.106 1.107 1.112 0.141 1.352 1.333 1.295 1.235 6.317 1.109 1.109 1.112 1.118 0.281 1.353 1.335 1.296 1.237 6.458 1.112 1.112 1.116 1.124 0.422 1.359 1.341 1.302 1.243 6.597 1.113 1.115 1.120 1.130 0.561 1.370 1.351 1.313 1.254 6.738 1.115 1.118 1.124 1.135 0.702 1.369 1.350 1.312 1.254 6.878 1.116 1.120 1.127 1.139 0.842 1.362 1.343 1.306 1.249 7.019 1.117 1.121 1.130 1.143 0.983 1.353 1.335 1.298 1.242 7.159 1.117 1.122 1.132 1.146 1.123 1.343 1.324 1.289 1.233 7.300 1.117 1.123 1.134 1.150 1.264 1.331 1.312 1.277 1.223 7.439 1.116 1.123 1.135 1.152 1.403 1.317 1.299 1.265 1.211 7.580 1.115 1.122 1.135 1.153 1.544 1.302 1.284 1.251 1.198 7.720 1.113 1.121 1.135 1.154 1.684 1.287 1.269 1.237 1.185 7.861 1.110 1.120 1.134 1.154 1.825 1.270 1.252 1.221 1.171 8.001 1.108 1.117 1.133 1.154 1.965 1.253 1.236 1.206 1.156 8.142 1.104 1.115 1.131 1.153 2.106 1.235 1.218 1.190 1.141 8.282 1.100 1.111 1.128 1.151 2.246 1.217 1.201 1.173 1.126 8.422 1.096 1.108 1.125 1.148 2.386 1.200 1.183 1.157 1.111 8.563 1.091 1.103 1.121 1.145 2.527 1.182 1.166 1.141 1.096 8.703 1.085 1.098 1.117 1.142 2.667 1.165 1.149 1.126 1.082 8.844 1.083 1.097 1.116 1.140 2.808 1.148 1.132 1.110 1.068 8.984 1.084 1.098 1.118 1.141 2.948 1.131 1.117 1.095 1.057 9.124 1.087 1.102 1.123 1.148 3.088 1.124 1.109 1.090 1.056 9.264 1.089 1.104 1.125 1.152 3.228 1.122 1.107 1.089 1.056 9.405 1.090 1.106 1.127 1.156 3.369 1.121 1.107 1.089 1.056 9.545 1.090 1.107 1.129 1.160 3.509 1.120 1.106 1.088 1.056 9.686 1.090 1.107 1.129 1.163 3.650 1.119 1.105 1.088 1.056 9.826 1.088 1.106 1.129 1.166 3.790 1.118 1.104 1.087 1.056 9.966 1.086 1.104 1.127 1.167 3.930 1.116 1.103 1.087 1.057 10.106 1.087 1.105 1.130 1.175 4.070 1.115 1.102 1.086 1.059 10.247 1.093 1.107 1.135 1.181 4.211 1.114 1.100 1.085 1.062 10.388 1.100 1.114 1.140 1.188 4.352 1.112 1.099 1.085 1.065 10.528 1.106 1.120 1.144 1.193 4.492 1.110 1.097 1.083 1.068 10.669 1.111 1.126 1.147 1.199 4.633 1.108 1.095 1.082 1.071 10.808 1.116 1.131 1.151 1.203 4.772 1.106 1.093 1.082 1.074 10.949 1.120 1.135 1.153 1.206 4.913 1.104 1.090 1.082 1.076 11.089 1.123 1.138 1.154 1.208 5.053 1.102 1.088 1.083 1.079 11.230 1.125 1.140 1.154 1.210 5.194 1.099 1.088 1.085 1.082 11.370 1.126 1.141 1.155 1.209 5.334 1.096 1.088 1.086 1.084 11.511 1.121 1.136 1.150 1.204 5.475 1.094 1.090 1.087 1.086 11.650 1.108 1.123 1.137 1.189 5.614 1.095 1.092 1.089 1.088 11.791 1.095 1.110 1.124 1.176 5.755 1.097 1.094 1.092 1.092 11.931 1.086 1.101 1.114 1.165 5.895 1.100 1.097 1.097 1.099 12.072 1.077 1.092 1.105 1.155 6.036 1.104 1.102 1.102 1.106 COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 25 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 Table 8.

Alternate RAOC W(z) at 10000, 12000, 14000, 16000 MWD/MTU Core W(z)

W(z)

W(z)

W(z)

Core W(z)

W(z)

W(z)

W(z)

Height 10000 12000 14000 16000 Height 10000 12000 14000 16000 MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

(ft)

MTU MTU MTU MTU (ft)

MTU MTU MTU MTU 0.000 1.185 1.177 1.156 1.175 6.177 1.121 1.128 1.140 1.149 0.141 1.187 1.179 1.158 1.177 6.317 1.128 1.134 1.147 1.154 0.281 1.189 1.181 1.161 1.179 6.458 1.135 1.141 1.152 1.158 0.422 1.196 1.188 1.169 1.188 6.597 1.141 1.146 1.158 1.162 0.561 1.208 1.201 1.182 1.202 6.738 1.147 1.152 1.162 1.165 0.702 1.209 1.203 1.186 1.206 6.878 1.153 1.156 1.166 1.168 0.842 1.205 1.200 1.183 1.203 7.019 1.158 1.160 1.169 1.169 0.983 1.199 1.195 1.179 1.200 7.159 1.162 1.164 1.172 1.171 1.123 1.192 1.189 1.174 1.195 7.300 1.166 1.167 1.175 1.172 1.264 1.182 1.181 1.167 1.187 7.439 1.169 1.169 1.176 1.171 1.403 1.172 1.172 1.159 1.180 7.580 1.171 1.170 1.176 1.169 1.544 1.161 1.162 1.150 1.171 7.720 1.173 1.170 1.175 1.167 1.684 1.149 1.151 1.141 1.162 7.861 1.173 1.170 1.174 1.165 1.825 1.137 1.140 1.131 1.153 8.001 1.173 1.169 1.172 1.161 1.965 1.124 1.129 1.122 1.143 8.142 1.173 1.168 1.169 1.157 2.106 1.111 1.117 1.112 1.134 8.282 1.171 1.165 1.166 1.152 2.246 1.098 1.105 1.101 1.123 8.422 1.169 1.162 1.162 1.146 2.386 1.085 1.093 1.090 1.112 8.563 1.166 1.158 1.157 1.141 2.527 1.072 1.081 1.079 1.101 8.703 1.163 1.154 1.153 1.140 2.667 1.059 1.069 1.069 1.091 8.844 1.161 1.152 1.154 1.140 2.808 1.047 1.058 1.059 1.081 8.984 1.162 1.153 1.156 1.141 2.948 1.039 1.051 1.053 1.071 9.124 1.166 1.155 1.157 1.140 3.088 1.039 1.051 1.053 1.063 9.264 1.168 1.154 1.155 1.138 3.228 1.040 1.053 1.056 1.060 9.405 1.169 1.154 1.154 1.137 3.369 1.040 1.054 1.058 1.060 9.545 1.169 1.152 1.150 1.135 3.509 1.041 1.055 1.060 1.064 9.686 1.168 1.151 1.149 1.134 3.650 1.041 1.056 1.063 1.067 9.826 1.166 1.156 1.154 1.136 3.790 1.043 1.058 1.067 1.071 9.966 1.169 1.161 1.159 1.140 3.930 1.048 1.061 1.072 1.076 10.106 1.174 1.166 1.163 1.143 4.070 1.051 1.064 1.076 1.078 10.247 1.179 1.170 1.167 1.147 4.211 1.055 1.068 1.080 1.082 10.388 1.183 1.174 1.170 1.153 4.352 1.059 1.071 1.084 1.088 10.528 1.185 1.178 1.172 1.159 4.492 1.062 1.074 1.088 1.094 10.669 1.187 1.181 1.176 1.164 4.633 1.066 1.078 1.092 1.100 10.808 1.189 1.184 1.181 1.169 4.772 1.070 1.081 1.095 1.105 10.949 1.187 1.185 1.184 1.171 4.913 1.074 1.084 1.099 1.110 11.089 1.187 1.185 1.185 1.173 5.053 1.077 1.087 1.102 1.115 11.230 1.187 1.184 1.186 1.173 5.194 1.081 1.090 1.105 1.120 11.370 1.185 1.182 1.185 1.172 5.334 1.084 1.092 1.107 1.124 11.511 1.179 1.175 1.178 1.165 5.475 1.087 1.095 1.109 1.128 11.650 1.165 1.159 1.162 1.149 5.614 1.093 1.099 1.112 1.132 11.791 1.151 1.144 1.147 1.133 5.755 1.098 1.105 1.119 1.135 11.931 1.140 1.132 1.137 1.122 5.895 1.105 1.113 1.126 1.138 12.072 1.130 1.121 1.126 1.111 6.036 1.113 1.121 1.134 1.143 COLR-Vl C29, Revision 0 EVAL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 26 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 Table 9.

Alternate RAOC \\V(z) at 18000, 20000 MWD/MTU Core W(z)

W(z)

Core W{z)

W{z)

Height 18000 20000 Height 18000 20000 MWd/

MWd/

MWd/

MWd/

(ft)

MTU MTU (ft)

MTU MTU 0.000 1.167 1.169 6.177 1.168 1.189 0.141 1.169 1.171 6.317 1.172 1.193 0.281 1.171 1.173 6.458 1.176 1.197 0.422 1.179 1.181 6.597 1.178 1.201 0.561 1.194 1.196 6.738 1.180 1.203 0.702 1.198 1.200 6.878 1.181 1.204 0.842 1.195 1.197 7.019 1.181 1.205 0.983 1.192 1.194 7.159 1.180 1.205 1.123 1.186 1.189 7.300 1.180 1.204 1.264 1.179 1.181 7.439 1.177 1.202 1.403 1.171 1.173 7.580 1.173 1.198 1.544 1.163 1.165 7.720 1.169 1.193 1.684 1.155 1.156 7.861 1.164 1.188 1.825 1.145 1.147 8.001 1.159 1.182 1.965 1.136 1.137 8.142 1.152 1.175 2.106 1.127 1.128 8.282 1.145 1.167 2.246 1.117 1.117 8.422 1.137 1.160 2.386 1.106 1.106 8.563 1.131 1.157 2.527 1.095 1.095 8.703 1.132 1.156 2.667 1.085 1.085 8.844 1.133 1.154 2.808 1.075 1.076 8.984 1.136 1.151 2.948 1.066 1.068 9.124 1.138 1.148 3.088 1.066 1.066 9.264 1.138 1.142 3.228 1.067 1.066 9.405 1.138 1.134 3.369 1.067 1.065 9.545 1.137 1.135 3.509 1.068 1.070 9.686 1.136 1.143 3.650 1.073 1.076 9.826 1.134 1.150 3.790 1.081 1.082 9.966 1.134 1.157 3.930 1.089 1.089 10.106 1.138 1.163 4.070 1.096 1.096 10.247 1.141 1.170 4.211 1.102 1.104 10.388 1.146 1.176 4.352 1.108 1.112 10.528 1.152 1.181 4.492 1.114 1.120 10.669 1.157 1.186 4.633 1.120 1.128 10.808 1.162 1.191 4.772 1.126 1.135 10.949 1.165 1.193 4.913 1.131 1.142 11.089 1.166 1.194 5.053 1.135 1.149 11.230 1.166 1.194 5.194 1.140 1.155 11.370 1.165 1.192 5.334 1.143 1.160 11.511 1.157 1.184 5.475 1.146 1.164 11.650 1.140 1.166 5.614 1.149 1.169 11.791 1.125 1.149 5.755 1.153 1.172 11.931 1.113 1.137 5.895 1.159 1.176 12.072 1.102 1.126 6.036 1.164 1.183 COLR-V 1 C29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 27 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 Table 10.

Alternate RAOC FQ Margin Decrease in Excess of2% Per 31 EFPD Cycle Burnup Maximum Decrease Cycle Burnup Maximum Decrease (MWD/MTU) in FQ Margin (MWD/MTU) in FQ Margin 150 1.0200 9386 1.0306 365 1.0283 9601 1.0328 580 1.0446 9816 1.0322 794 1.0441 10031 1.0312 1009 1.0432 10245 1.0298 1224 1.0427 10460 1.0282 1439 1.0428 10675 1.0263 1654 1.0476 10890 1.0240 1868 1.0432 11104 1.0200 2083 1.0381 13252 1.0200 2298 1.0330 13467 1.0205 2513 1.0268 13682 1.0213 2728 1.0217 13897 1.0215 2942 1.0200 14112 1.0210 9171 1.0200 14326 1.0200 Note: All cycle burnups outside the range of this table shall use a 1.020 decrease in margin for compliance with Specification 4.2.2.2.e. Linear interpolation is adequate for intermediate cycle burnups.

COLR-VlC29, Revision 0 EVAL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 28 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 Table 11.

Baseload W(z) at 150, 1000, 2000, 3000 MWD/MTU Core W(z)

W(z}

W(z)

W(z)

Core W(z)

W(z)

W(z}

W(z)

Height 150 1000 2000 3000 Height 150 1000 2000 3000 (ft)

MWd/

MWd/

MWd/ MWd/

(ft}

MWd/

MWd/

MWd/

MWd/

MTU MTU MTU MTU MTU MTU MTU MTU 0.000 1.119 1.115 1.111 1.108 6.177 1.055 1.054 1.054 1.054 0.141 1.120 1.116 1.111 1.108 6.317 1.054 1.054 1.053 1.053 0.281 1.120 1.116 1.112 1.109 6.458 1.053 1.053 1.052 1.052 0.422 1.121 1.117 1.113 1.110 6.597 1.053 1.052 1.051 1.051 0.561 1.123 1.119 1.114 1.111 6.738 1.051 1.051 1.050 1.050 0.702 1.123 1.119 1.114 1.112 6.878 1.052 1.051 1.049 1.049 0.842 1.122 1.119 1.114 1.112 7.019 1.053 1.051 1.048 1.048 0.983 1.121 1.118 1.114 1.112 7.159 1.055 1.053 1.050 1.049 1.123 1.121 1.117 1.114 1.111 7.300 1.058 1.055 1.052 1.051 1.264 1.119 1.117 1.113 1.111 7.439 1.060 1.057 1.054 1.053 1.403 1.118 1.116 1.112 1.111 7.580 1.061 1.059 1.056 1.055 1.544 1.117 1.115 1.111 1.110 7.720 1.063 1.061 1.058 1.057 1.684 1.115 1.113 1.110 1.109 7.861 1.065 1.063 1.060 1.059 1.825 1.113 1.112 1.109 1.108 8.001 1.066 1.065 1.062 1.061 1.965 1.111 1.110 1.108 1.107 8.142 1.068 1.066 1.064 1.063 2.106 1.109 1.108 1.106 1.106 8.282 1.069 1.068 1.066 1.065 2.246 1.107 1.106 1.105 1.104 8.422 1.071 1.070 1.067 1.067 2.386 1.104 1.104 1.103 1.103 8.563 1.072 1.071 1.069 1.068 2.527 1.102 1.102 1.101 1.101 8.703 1.074 1.073 1.071 1.070 2.667 1.099 1.100 1.099 1.099 8.844 1.075 1.074 1.072 1.072 2.808 1.097 1.097 1.097 1.098 8.984 1.076 1.076 1.074 1.074 2.948 1.094 1.095 1.095 1.096 9.124 1.078 1.077 1.076 1.075 3.088 1.091 1.092 1.093 1.093 9.264 1.079 1.078 1.077 1.077 3.228 1.088 1.089 1.091 1.091 9.405 1.080 1.079 1.078 1.078 3.369 1.085 1.087 1.088 1.089 9.545 1.081 1.081 1.080 1.080 3.509 1.083 1.084 1.086 1.086 9.686 1.082 1.082 1.081 1.081 3.650 1.082 1.082 1.084 1.084 9.826 1.083 1.083 1.082 1.082 3.790 1.080 1.081 1.082 1.082 9.966 1.083 1.084 1.083 1.084 3.930 1.079 1.080 1.081 1.081 10.106 1.084 1.085 1.084 1.085 4.070 1.078 1.078 1.079 1.080 10.247 1.085 1.086 1.086 1.086 4.211 1.077 1.077 1.078 1.078 10.388 1.086 1.087 1.087 1.087 4.352 1.076 1.076 1.077 1.077 10.528 1.087 1.088 1.088 1.088 4.492 1.074 1.074 1.075 1.076 10.669 1.088 1.089 1.089 1.090 4.633 1.073 1.073 1.074 1.074 10.808 1.088 1.090 1.090 1.091 4.772 1.071 1.071 1.072 1.073 10.949 1.089 1.090 1.091 1.092 4.913 1.070 1.070 1.071 1.071 11.089 1.089 1.091 1.092 1.093 5.053 1.068 1.068 1.069 1.069 11.230 1.090 1.092 1.092 1.093 5.194 1.067 1.067 1.067 1.067 11.370 1.090 1.092 1.093 1.094 5.334 1.065 1.065 1.065 1.066 11.511 1.090 1.092 1.093 1.094 5.475 1.063 1.063 1.064 1.064 11.650 1.090 1.092 1.093 1.094 5.614 1.061 1.061 1.062 1.062 11.791 1.090 1.092 1.093 1.094 5.755 1.059 1.059 1.060 1.060 11.931 1.090 1.092 1.093 1.094 5.895 1.057 1.057 1.058 1.058 12.072 1.090 1.092 1.093 1.094 6.036 1.056 1.055 1.056 1.056 COLR-Vl C29, Revision 0 EVAL-ENG-RSE-V1C29, Revision 0, Attachment A Page 29 of34

V. C. Summer Cycle 29 SEPTEi\\tlBER 2024 Table 12.

Baseload W(z) at 4000, 5000, 6000, 8000 MWD/MTU Core W(z)

W(z)

W(z)

W(z)

Core W(z)

W(z)

W(z)

W(z)

Height 4000 5000 6000 8000 Height 4000 5000 6000 8000 MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

(ft)

MTU MTU MTU MTU (ft)

MTU MTU MTU MTU 0.000 1.107 1.107 1.108 1.113 6.177 1.054 1.054 1.054 1.054 0.141 1.107 1.107 1.108 1.113 6.317 1.053 1.053 1.053 1.053 0.281 1.108 1.108 1.109 1.114 6.458 1.052 1.052 1.052 1.052 0.422 1.109 1.109 1.110 1.115 6.597 1.051 1.051 1.050 1.050 0.561 1.110 1.110 1.111 1.116 6.738 1.050 1.049 1.049 1.050 0.702 1.111 1.111 1.112 1.117 6.878 1.048 1.048 1.048 1.050 0.842 1.111 1.111 1.112 1.117 7.019 1.047 1.047 1.048 1.053 0.983 1.111 1.111 1.112 1.117 7.159 1.049 1.049 1.051 1.055 1.123 1.111 1.111 1.112 1.116 7.300 1.051 1.052 1.053 1.057 1.264 1.110 1.110 1.111 1.116 7.439 1.053 1.054 1.055 1.059 1.403 1.110 1.110 1.111 1.115 7.580 1.055 1.056 1.057 1.061 1.544 1.109 1.109 1.110 1.114 7.720 1.057 1.058 1.059 1.063 1.684 1.108 1.109 1.109 1.113 7.861 1.059 1.060 1.061 1.065 1.825 1.108 1.108 1.108 1.112 8.001 1.061 1.062 1.063 1.066 1.965 1.106 1.107 1.107 1.110 8.142 1.063 1.063 1.064 1.068 2.106 1.105 1.105 1.106 1.109 8.282 1.065 1.065 1.066 1.070 2.246 1.104 1.104 1.104 1.107 8.422 1.067 1.067 1.068 1.071 2.386 1.103 1.103 1.103 1.105 8.563 1.068 1.069 1.070 1.072 2.527 1.101 1.101 1.101 1.103 8.703 1.070 1.070 1.071 1.074 2.667 1.099 1.099 1.099 1.101 8.844 1.072 1.072 1.073 1.075 2.808 1.098 1.097 1.097 1.098 8.984 1.074 1.074 1.074 1.077 2.948 1.096 1.095 1.095 1.096 9.124 1.075 1.075 1.076 1.078 3.088 1.093 1.093 1.093 1.093 9.264 1.077 1.077 1.077 1.079 3.228 1.091 1.091 1.091 1.090 9.405 1.078 1.078 1.079 1.080 3.369 1.089 1.089 1.088 1.087 9.545 1.080 1.080 1.080 1.082 3.509 1.087 1.086 1.086 1.084 9.686 1.081 1.081 1.081 1.083 3.650 1.084 1.084 1.083 1.082 9.826 1.082 1.082 1.083 1.084 3.790 1.082 1.082 1.081 1.080 9.966 1.084 1.084 1.084 1.085 3.930 1.081 1.080 1.080 1.078 10.106 1.085 1.085 1.085 1.086 4.070 1.079 1.079 1.078 1.077 10.247 1.086 1.086 1.086 1.087 4.211 1.078 1.078 1.077 1.076 10.388 1.088 1.088 1.088 1.088 4.352 1.077 1.076 1.076 1.074 10.528 1.089 1.089 1.089 1.089 4.492 1.075 1.075 1.074 1.073 10.669 1.090 1.090 1.090 1.090 4.633 1.074 1.073 1.073 1.071 10.808 1.091 1.091 1.091 1.091 4.772 1.072 1.072 1.071 1.070 10.949 1.092 1.092 1.092 1.092 4.913 1.071 1.070 1.069 1.068 11.089 1.093 1.093 1.093 1.093 5.053 1.069 1.068 1.068 1.067 11.230 1.094 1.094 1.094 1.094 5.194 1.067 1.067 1.066 1.065 11.370 1.095 1.095 1.095 1.095 5.334 1.065 1.065 1.064 1.063 11.511 1.095 1.095 1.095 1.095 5.475 1.063 1.063 1.063 1.061 11.650 1.095 1.095 1.095 1.095 5.614 1.062 1.061 1.061 1.059 11.791 1.095 1.095 1.095 1.094 5.755 1.060 1.059 1.059 1.057 11.931 1.095 1.095 1.095 1.095 5.895 1.058 1.057 1.057 1.056 12.072 1.095 1.095 1.095 1.095 6.036 1.056 1.055 1.055 1.055 COLR-VlC29, Revision 0 EVAL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 30 of34

V. C. Summer Cycle 29 SEPTEwIBER 2024 Table 13.

Baseload W(z) at 10000, 12000, 14000, 16000 MWD/MTU Core W(z)

W(z)

W(z)

W(z)

Core W(z)

W(z)

W(z)

W(z)

Height 10000 12000 14000 16000 Height 10000 12000 14000 16000 MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

MWd/

(ft)

MTU MTU MTU MTU (ft)

MTU MTU MTU MTU 0.000 1.119 1.123 1.130 1.141 6.177 1.054 1.055 1.055 1.059 0.141 1.119 1.123 1.130 1.141 6.317 1.053 1.053 1.056 1.061 0.281 1.120 1.124 1.131 1.142 6.458 1.052 1.054 1.058 1.063 0.422 1.121 1.125 1.132 1.143 6.597 1.051 1.056 1.060 1.065 0.561 1.122 1.126 1.133 1.144 6.738 1.053 1.058 1.062 1.067 0.702 1.123 1.127 1.133 1.144 6.878 1.055 1.060 1.064 1.068 0.842 1.122 1.126 1.133 1.144 7.019 1.057 1.062 1.066 1.070 0.983 1.122 1.126 1.133 1.143 7.159 1.059 1.064 1.067 1.071 1.123 1.122 1.126 1.132 1.142 7.300 1.062 1.066 1.069 1.072 1.264 1.121 1.125 1.131 1.140 7.439 1.063 1.067 1.070 1.073 1.403 1.120 1.124 1.129 1.138 7.580 1.065 1.069 1.071 1.074 1.544 1.119 1.122 1.128 1.136 7.720 1.066 1.070 1.072 1.075 1.684 1.118 1.121 1.126 1.133 7.861 1.068 1.071 1.073 1.075 1.825 1.116 1.119 1.123 1.130 8.001 1.069 1.072 1.074 1.076 1.965 1.114 1.117 1.121 1.127 8.142 1.071 1.074 1.075 1.076 2.106 1.112 1.114 1.118 1.123 8.282 1.072 1.075 1.076 1.076 2.246 1.110 1.112 1.115 1.119 8.422 1.073 1.075 1.076 1.077 2.386 1.107 1.109 1.111 1.115 8.563 1.075 1.076 1.077 1.077 2.527 1.105 1.106 1.108 1.111 8.703 1.076 1.077 1.077 1.077 2.667 1.102 1.103 1.104 1.107 8.844 1.077 1.078 1.078 1.077 2.808 1.099 1.099 1.100 1.102 8.984 1.078 1.079 1.078 1.077 2.948 1.096 1.096 1.096 1.097 9.124 1.079 1.080 1.078 1.078 3.088 1.093 1.092 1.092 1.092 9.264 1.080 1.080 1.079 1.081 3.228 1.089 1.088 1.087 1.086 9.405 1.081 1.081 1.079 1.084 3.369 1.086 1.085 1.083 1.083 9.545 1.082 1.081 1.079 1.087 3.509 1.082 1.082 1.081 1.081 9.686 1.082 1.082 1.079 1.089 3.650 1.080 1.080 1.080 1.080 9.826 1.083 1.082 1.081 1.092 3.790 1.079 1.079 1.079 1.078 9.966 1.084 1.083 1.083 1.094 3.930 1.077 1.077 1.077 1.077 10.106 1.085 1.083 1.085 1.096 4.070 1.076 1.076 1.076 1.075 10.247 1.086 1.084 1.086 1.098 4.211 1.075 1.075 1.074 1.074 10.388 1.087 1.085 1.088 1.099 4.352 1.074 1.073 1.073 1.073 10.528 1.087 1.085 1.089 1.100 4.492 1.072 1.072 1.071 1.071 10.669 1.088 1.086 1.090 1.101 4.633 1.071 1.070 1.070 1.069 10.808 1.089 1.087 1.091 1.102 4.772 1.069 1.069 1.068 1.068 10.949 1.090 1.087 1.091 1.103 4.913 1.067 1.067 1.066 1.066 11.089 1.091 1.088 1.092 1.103 5.053 1.066 1.065 1.064 1.064 11.230 1.091 1.088 1.092 1.104 5.194 1.064 1.063 1.063 1.062 11.370 1.092 1.089 1.092 1.104 5.334 1.062 1.061 1.060 1.060 11.511 1.092 1.089 1.092 1.103 5.475 1.060 1.059 1.059 1.060 11.650 1.092 1.089 1.093 1.101 5.614 1.058 1.058 1.058 1.059 11.791 1.092 1.089 1.094 1.100 5.755 1.056 1.057 1.057 1.058 11.931 1.092 1.089 1.089 1.099 5.895 1.056 1.056 1.057 1.057 12.072 1.092 1.089 1.085 1.099 6.036 1.055 1.055 1.056 1.057 COLR-VIC29, Revision 0 EVAL-ENG-RSE-VI C29, Revision 0, Attachment A Page 31 of 34

V. C. Summer Cycle 29 SEPTEMBER 2024 Table 14.

Baseload W(z) at 18000, 20000 MWD/MTU Core W(z)

W(z)

Core W(z)

W(z)

Height 18000 20000 Height 18000 20000 MWd/

MWd/

MWd/

MWd/

(ft)

MTU MTU (ft)

MTU MTU 0.000 1.148 1.158 6.177 1.064 1.058 0.141 1.149 1.158 6.317 1.066 1.058 0.281 1.149 1.158 6.458 1.068 1.059 0.422 1.150 1.159 6.597 1.069 1.061 0.561 1.151 1.161 6.738 1.071 1.062 0.702 1.151 1.160 6.878 1.072 1.063 0.842 1.150 1.159 7.019 1.073 1.064 0.983 1.149 1.158 7.159 1.074 1.065 1.123 1.148 1.156 7.300 1.075 1.066 1.264 1.146 1.154 7.439 1.076 1.067 1.403 1.143 1.151 7.580 1.076 1.068 1.544 1.141 1.148 7.720 1.077 1.068 1.684 1.138 1.144 7.861 1.077 1.068 1.825 1.134 1.140 8.001 1.077 1.069 1.965 1.130 1.135 8.142 1.077 1.069 2.106 1.126 1.130 8.282 1.077 1.069 2.246 1.122 1.125 8.422 1.077 1.069 2.386 1.117 1.120 8.563 1.077 1.069 2.527 1.112 1.114 8.703 1.077 1.070 2.667 1.107 1.108 8.844 1.076 1.070 2.808 1.102 1.102 8.984 1.077 1.070 2.948 1.097 1.096 9.124 1.079 1.071 3.088 1.091 1.090 9.264 1.083 1.074 3.228 1.086 1.085 9.405 1.086 1.078 3.369 1.083 1.083 9.545 1.088 1.081 3.509 1.081 1.080 9.686 1.091 1.084 3.650 1.080 1.078 9.826 1.093 1.087 3.790 1.079 1.076 9.966 1.096 1.090 3.930 1.077 1.074 10.106 1.098 1.093 4.070 1.076 1.071 10.247 1.099 1.095 4.211 1.074 1.069 10.388 1.101 1.097 4.352 1.073 1.067 10.528 1.102 1.099 4.492 1.071 1.065 10.669 1.103 1.100 4.633 1.069 1.062 10.808 1.104 1.102 4.772 1.067 1.060 10.949 1.105 1.102 4.913 1.065 1.057 11.089 1.105 1.103 5.053 1.063 1.057 11.230 1.105 1.104 5.194 1.062 1.058 11.370 1.105 1.105 5.334 1.062 1.058 11.511 1.105 1.111 5.475 1.061 1.058 11.650 1.103 1.118 5.614 1.060 1.058 11.791 1.101 1.116 5.755 1.059 1.058 11.931 1.101 1.105 5.895 1.059 1.058 12.072 1.101 1.094 6.036 1.061 1.058 COLR-VlC29, Revision 0 EVAL-ENG-RSE-VlC29, Revision 0, Attachment A Page 32 of 34

V. C. Summer Cycle 29 SEPTEMBER 2024 Table 15.

BASELOAD FQ Margin Decrease in Excess of 2% Per 31 EFPD Cycle Burnup Maximum Decrease Cycle Burnup Maximum Decrease (MWD/MTU) in FQ Margin (MWD/MTU) in FQ Margin 150 1.0200 4661 1.0327 365 1.0207 4875 1.0361 580 1.0293 5090 1.0351 794 1.0309 5305 1.0340 1009 1.0327 5520 1.0331 1224 1.0338 5735 1.0316 1439 1.0339 5949 1.0297 1654 1.0339 6164 1.0278 1868 1.0341 6379 1.0260 2083 1.0357 6594 1.0246 2298 1.0387 6809 1.0250 2513 1.0375 7023 1.0254 2728 1.0334 7238 1.0247 2942 1.0295 7453 1.0243 3157 1.0258 7668 1.0239 3372 1.0249 7883 1.0238 3587 1.0250 8097 1.0238 3801 1.0258 8312 1.0236 4016 1.0271 8527 1.0216 4231 1.0285 8742 1.0200 4446 1.0298 Note: All cycle burnups outside the range of this table shall use a 1.020 decrease in margin for compliance with Specification 4.2.2.2.e. Linear interpolation is adequate for intermediate cycle burnups.

COLR-V1C29, Revision 0 EV AL-ENG-RSE-V l C29, Revision 0, Attachment A Page 33 of34

V. C. Summer Cycle 29 SEPTEMBER 2024 Figure 6. RCS Total Flowrate vs. R for Three Loop Operation 30.00 29.80 29.60 29.40

~

a..

(!)

'l:t" 29.20 w

0..... -

2 E

29.00 0

u:::

cu -

0

~ 28.80

(.)

a::

28.60 28.40 28.20 28.00 0.90 i

Acceptable Unacceptable Operation Region Operation Region I

I I

I I

I I

I (1.00, 28.38) I I

I 0.95 1.00 1.05 R

=

FN-delta-H/1.62[1.0 +

0.3(1.0 -

P)]

1.10 Measurement Uncertainty of 2.1 % for Flow (includes 0.1 % for feedwater venturi fouling) is included in this figure.

COLR-VlC29, Revision 0 EV AL-ENG-RSE-Vl C29, Revision 0, Attachment A Page 34 of34