ML23013A091: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 2: Line 2:
| number = ML23013A091
| number = ML23013A091
| issue date = 01/13/2023
| issue date = 01/13/2023
| title = Fourth 10-Year Interval, Second Period Owners Activity Report Number 3R23
| title = Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R23
| author name = Cox M
| author name = Cox M
| author affiliation = Arizona Public Service Co
| author affiliation = Arizona Public Service Co
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:10 CFR 50.55a Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 102-08561-MSC/CJS                                                             Mail Station 7636 January 13, 2023                                                             Tel: (623) 393-5753 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:10 CFR 50.55a
 
Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 102-08561-MSC/CJS Mail Station 7636 January 13, 2023 Tel: (623) 393-5753
 
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station Unit 3 Docket No. STN 50-530 Fourth 10-Year Interval, Second Period Owners Activity Report Number 3R23 Pursuant to Title 10 of the Code of Federal Regulations 50.55a and in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-532-5, Repair/Replacement Activity Documentation Requirements and Inservice Inspection Summary Report Preparation and Submission Section XI, Division 1, Arizona Public Service Company hereby submits the Owners Activity Report (Form OAR-1) for Unit 3 refueling outage 23 (3R23). The outage ended on November 10, 2022.
Palo Verde Nuclear Generating Station Unit 3 Docket No. STN 50-530 Fourth 10-Year Interval, Second Period Owners Activity Report Number 3R23
 
Pursuant to Title 10 of the Code of Federal Regulations 50.55a and in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-532-5, Repair/Replacement Activity Documentation Requirements and Inservice Inspection Summary Report Preparation and Submission Section XI, Division 1, Arizona Public Service Company hereby submits the Owners Activity Report (Form OAR-1) for Unit 3 refueling outage 23 (3R23). The outage ended on November 10, 2022.
 
No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5753.
No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5753.
Sincerely, Cox, Matthew                             Digitally signed by Cox, Matthew S(Z05628)
 
S(Z05628)                                 Date: 2023.01.13 08:00:41 -07'00' Matthew S. Cox Department Leader, Nuclear Regulatory Affairs MSC/CJS/cr
Sincerely, Cox, Matthew Digitally signed by Cox, Matthew S(Z05628)
S(Z05628) Date: 2023.01.13 08:00:41 -07'00'
 
Matthew S. Cox Department Leader, Nuclear Regulatory Affairs
 
MSC/CJS/cr


==Enclosure:==
==Enclosure:==
Unit 3 Twenty-Third Refueling Outage Owners Activity Report, Report 3R23 cc:   S. A. Morris           NRC Region IV Regional Administrator D. J. Galvin           NRC NRR Project Manager for PVNGS L. N. Merker           NRC Senior Resident Inspector for PVNGS A member of the STARS Alliance LLC Callaway
Unit 3 Twenty-Third Refueling Outage Owners Activity Report, Report 3R23
* Diablo Canyon
 
* Palo Verde
cc: S. A. Morris NRC Region IV Regional Administrator D. J. Galvin NRC NRR Project Manager for PVNGS L. N. Merker NRC Senior Resident Inspector for PVNGS
* Wolf Creek
 
A member of the STARS Alliance LLC Callaway Diablo Canyon Palo Verde Wolf Creek ENCLOSURE
 
Unit 3
 
Twenty-Third Refueling Outage Owners Activity Report
 
Report 3R23 FORM OAR-1 OWNERS ACTIVITY REPORT
 
Report Number: ________________________________________________________________________________________________3R23
 
Plant: ___________________________________________________________________________________________________________Palo Verde Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529
 
Unit No.: ___________ Commercial service date: ___________________ Refueling Outage No.: ___________________3 Jan 8, 1988 23 (if applicable)
Current inspection interval ______________________________________________________________________________________IWB, IWC, IWD, IWF = 4th / IWE = 3rd / IWL = 3rd / S.P.T. = 4th (1st, 2nd, 3rd, 4th, other)
Current inspection period _______________________________________________________________________________________IWB, IWC, IWD, IWF = 2nd / IWE = 2nd / IWL = 1st / S.P.T. = 2nd (1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________2013 Edition (IWE=2007 Ed., '08 Ad.)
 
Date and revision of inspection plans ___________________________________________________________________________ISI=4/09/21 R1, IWE=10/3/18 R0, IWL=6/21/22 R0, SPT=6/21/18 R0


ENCLOSURE Unit 3 Twenty-Third Refueling Outage Owners Activity Report Report 3R23
Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ____________________________________________________________________________2013 Edition


FORM OAR-1 OWNERS ACTIVITY REPORT 3R23 Report Number: ________________________________________________________________________________________________
Palo Verde Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Plant: ___________________________________________________________________________________________________________
3 Unit No.: ___________                    Commercial service date: ___________________Jan 8, 1988                                                  23 Refueling Outage No.: ___________________
(if applicable)
IWB, IWC, IWD, IWF = 4th /                      IWE = 3rd / IWL = 3rd / S.P.T. = 4th Current inspection interval ______________________________________________________________________________________
(1st, 2nd, 3rd, 4th, other)
IWB, IWC, IWD, IWF = 2nd /                      IWE = 2nd / IWL = 1st / S.P.T. = 2nd Current inspection period _______________________________________________________________________________________
(1st, 2nd, 3rd) 2013 Edition (IWE=2007 Ed., '08 Ad.)
Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________
ISI=4/09/21 R1, IWE=10/3/18 R0, IWL=6/21/22 R0, SPT=6/21/18 R0 Date and revision of inspection plans ___________________________________________________________________________
Edition and Addenda of Section XI applicable to repair/replacement activities, 2013 Edition if different than the inspection plans ____________________________________________________________________________
Code Cases used for inspection and evaluation:
Code Cases used for inspection and evaluation:
N-532-5, N-722-1, N-716-1, N-845 (if applicable)
_____________________________________________________________________________________________N-532-5, N-722-1, N-716-1, N-845 (if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U3R23
 
_______________               conform to the requirements of Section XI.
CERTIFICATE OF CONFORMANCE
(refueling outage number)
 
Folley, Roy                                 Digitally signed by Folley, Roy C(Z07131)
I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of
C(Z07131)                                    Date: 2023.01.05 06:42:44
_______________ conform to the requirements of Section XI. U3R23 (refueling outage number)
                                                          -07'00' Signed _________________________________________________________                                                Date: _____________________________________
Folley, Roy Digitally signed by Folley, Roy C(Z07131)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by _____________________________
Date: 2023.01.05 06:42:44 Signed _________________________________________________________ Date: _____________________________________ C(Z07131)-07'00'
* Hartford, Connecticut of _______________________________                       have inspected the items described in this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
 
CERTIFICATE OF INSERVICE INSPECTION
 
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by _____________________________ of _______________________________ have inspected the items described in
* Hartford, Connecticut this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
                                                                                      7KH+DUWIRUG6WHDP%RLOHU,QVSHFWLRQDQG,QVXUDQFH&RPSDQ\
7KH+DUWIRUG6WHDP%RLOHU,QVSHFWLRQDQG,QVXUDQFH&RPSDQ\\
Digitally signed by Hogstrom,                          Hogstrom, Robert (YH2450)
Hogstrom, Digitally signed by Hogstrom, Robert (YH2450)
Robert (YH2450) Date:               -07'00' 2023.01.06 14:33:13
Robert (YH2450) Date: 2023.01.06 14:33:13
__________________________________________                                                                   1%&,15
__________________________________________ Commissions ____________________________________________________-07'00'1 %  & , 1 5
Commissions ____________________________________________________
 
(Inspectors Signature)                                                                       National Board, State, Province, and Endorsements
(Inspectors Signature) National Board, State, Province, and Endorsements Date: _____________________________________
                      
 
Date: _____________________________________
PV-E0796 Ver. 2 Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service
PV-E0796 Ver. 2
 
Examination Category and Item Description Evaluation Description Item Number None None None
 
Table 2 Abstract of Repair/Replacement Activities Required for Continued Service


Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category and           Item Description            Evaluation Description Item Number None                            None                          None
Code Repair/Replacement Class Component ID Description of Work Date Complete Plan Number PRESSURIZER SAFETY RELIEF VALVE 1 3JRCEPSV0200 Replace the pressurizer safety relief 11/07/2022 5356750-0 valve with a reconditioned spare PRESSURIZER SAFETY RELIEF VALVE 1 3JRCEPSV0201 Replace the pressurizer safety relief 11/07/2022 5356751-0 valve with a reconditioned spare PRESSURIZER SAFETY RELIEF VALVE 1 3JRCEPSV0202 Replace the pressurizer safety relief 11/07/2022 5356752-0 valve with a reconditioned spare PRESSURIZER SAFETY RELIEF VALVE.
1 3JRCEPSV0203 Replace the pressurizer safety relief 11/07/2022 5356753-0 valve with a reconditioned spare B TRAIN SDC RELIEF VALVE TO RDT 1 3JSIBPSV0169 Remove and test PSV by performing ST. 10/25/2022 5357319-0 ASME code parts will be replaced as needed based on surveillance test results PRESSURIZER 1 3MRCEX02 Replace pressurizer heater as needed. 11/7/2022 5423854-0 New heaters will be welded into place.
SIT 1B TO SAFETY VALVE 3JSIEPSV0241 2 3PSIEL230 Replace piping as required based on 7/29/2022 5398500-10 snoop or pressure testing.
ECWS HT EXCH B 3 3MEWBE01 Perform base metal weld repairs on EW 10/29/2022 5356621-1 "B" heat exchanger and associated nozzles based on inspection results.


Table 2 Abstract of Repair/Replacement Activities Required for Continued Service Code                                                                Date    Repair/Replacement Component ID                Description of Work Class                                                              Complete    Plan Number PRESSURIZER SAFETY RELIEF VALVE 1    3JRCEPSV0200                                              11/07/2022    5356750-0 Replace the pressurizer safety relief valve with a reconditioned spare PRESSURIZER SAFETY RELIEF VALVE 1    3JRCEPSV0201                                              11/07/2022    5356751-0 Replace the pressurizer safety relief valve with a reconditioned spare PRESSURIZER SAFETY RELIEF VALVE 1    3JRCEPSV0202                                              11/07/2022    5356752-0 Replace the pressurizer safety relief valve with a reconditioned spare PRESSURIZER SAFETY RELIEF VALVE.
1    3JRCEPSV0203                                              11/07/2022    5356753-0 Replace the pressurizer safety relief valve with a reconditioned spare B TRAIN SDC RELIEF VALVE TO RDT 1    3JSIBPSV0169    Remove and test PSV by performing ST. 10/25/2022    5357319-0 ASME code parts will be replaced as needed based on surveillance test results PRESSURIZER 1      3MRCEX02                                                11/7/2022      5423854-0 Replace pressurizer heater as needed.
New heaters will be welded into place.
SIT 1B TO SAFETY VALVE 3JSIEPSV0241 2      3PSIEL230                                              7/29/2022    5398500-10 Replace piping as required based on snoop or pressure testing.
ECWS HT EXCH B 3      3MEWBE01        Perform base metal weld repairs on EW    10/29/2022    5356621-1 "B" heat exchanger and associated nozzles based on inspection results.
1}}
1}}

Revision as of 12:39, 15 November 2024

Fourth 10-Year Interval, Second Period Owner’S Activity Report Number 3R23
ML23013A091
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/13/2023
From: Cox M
Arizona Public Service Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
102-08561-MSC/CJS
Download: ML23013A091 (1)


Text

10 CFR 50.55a

Palo Verde Nuclear Generating Station P.O. Box 52034 Phoenix, AZ 85072 102-08561-MSC/CJS Mail Station 7636 January 13, 2023 Tel: (623) 393-5753

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Palo Verde Nuclear Generating Station Unit 3 Docket No. STN 50-530 Fourth 10-Year Interval, Second Period Owners Activity Report Number 3R23

Pursuant to Title 10 of the Code of Federal Regulations 50.55a and in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-532-5, Repair/Replacement Activity Documentation Requirements and Inservice Inspection Summary Report Preparation and Submission Section XI, Division 1, Arizona Public Service Company hereby submits the Owners Activity Report (Form OAR-1) for Unit 3 refueling outage 23 (3R23). The outage ended on November 10, 2022.

No commitments are being made to the NRC by this letter. Should you need further information regarding this submittal, please contact me at (623) 393-5753.

Sincerely, Cox, Matthew Digitally signed by Cox, Matthew S(Z05628)

S(Z05628) Date: 2023.01.13 08:00:41 -07'00'

Matthew S. Cox Department Leader, Nuclear Regulatory Affairs

MSC/CJS/cr

Enclosure:

Unit 3 Twenty-Third Refueling Outage Owners Activity Report, Report 3R23

cc: S. A. Morris NRC Region IV Regional Administrator D. J. Galvin NRC NRR Project Manager for PVNGS L. N. Merker NRC Senior Resident Inspector for PVNGS

A member of the STARS Alliance LLC Callaway Diablo Canyon Palo Verde Wolf Creek ENCLOSURE

Unit 3

Twenty-Third Refueling Outage Owners Activity Report

Report 3R23 FORM OAR-1 OWNERS ACTIVITY REPORT

Report Number: ________________________________________________________________________________________________3R23

Plant: ___________________________________________________________________________________________________________Palo Verde Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529

Unit No.: ___________ Commercial service date: ___________________ Refueling Outage No.: ___________________3 Jan 8, 1988 23 (if applicable)

Current inspection interval ______________________________________________________________________________________IWB, IWC, IWD, IWF = 4th / IWE = 3rd / IWL = 3rd / S.P.T. = 4th (1st, 2nd, 3rd, 4th, other)

Current inspection period _______________________________________________________________________________________IWB, IWC, IWD, IWF = 2nd / IWE = 2nd / IWL = 1st / S.P.T. = 2nd (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________2013 Edition (IWE=2007 Ed., '08 Ad.)

Date and revision of inspection plans ___________________________________________________________________________ISI=4/09/21 R1, IWE=10/3/18 R0, IWL=6/21/22 R0, SPT=6/21/18 R0

Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ____________________________________________________________________________2013 Edition

Code Cases used for inspection and evaluation:

_____________________________________________________________________________________________N-532-5, N-722-1, N-716-1, N-845 (if applicable)

CERTIFICATE OF CONFORMANCE

I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of

_______________ conform to the requirements of Section XI. U3R23 (refueling outage number)

Folley, Roy Digitally signed by Folley, Roy C(Z07131)

Date: 2023.01.05 06:42:44 Signed _________________________________________________________ Date: _____________________________________ C(Z07131)-07'00'

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by _____________________________ of _______________________________ have inspected the items described in

  • Hartford, Connecticut this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

7KH+DUWIRUG6WHDP%RLOHU,QVSHFWLRQDQG,QVXUDQFH&RPSDQ\\

Hogstrom, Digitally signed by Hogstrom, Robert (YH2450)

Robert (YH2450) Date: 2023.01.06 14:33:13

__________________________________________ Commissions ____________________________________________________-07'00'1 %  & , 1 5

(Inspectors Signature) National Board, State, Province, and Endorsements Date: _____________________________________

PV-E0796 Ver. 2 Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service

Examination Category and Item Description Evaluation Description Item Number None None None

Table 2 Abstract of Repair/Replacement Activities Required for Continued Service

Code Repair/Replacement Class Component ID Description of Work Date Complete Plan Number PRESSURIZER SAFETY RELIEF VALVE 1 3JRCEPSV0200 Replace the pressurizer safety relief 11/07/2022 5356750-0 valve with a reconditioned spare PRESSURIZER SAFETY RELIEF VALVE 1 3JRCEPSV0201 Replace the pressurizer safety relief 11/07/2022 5356751-0 valve with a reconditioned spare PRESSURIZER SAFETY RELIEF VALVE 1 3JRCEPSV0202 Replace the pressurizer safety relief 11/07/2022 5356752-0 valve with a reconditioned spare PRESSURIZER SAFETY RELIEF VALVE.

1 3JRCEPSV0203 Replace the pressurizer safety relief 11/07/2022 5356753-0 valve with a reconditioned spare B TRAIN SDC RELIEF VALVE TO RDT 1 3JSIBPSV0169 Remove and test PSV by performing ST. 10/25/2022 5357319-0 ASME code parts will be replaced as needed based on surveillance test results PRESSURIZER 1 3MRCEX02 Replace pressurizer heater as needed. 11/7/2022 5423854-0 New heaters will be welded into place.

SIT 1B TO SAFETY VALVE 3JSIEPSV0241 2 3PSIEL230 Replace piping as required based on 7/29/2022 5398500-10 snoop or pressure testing.

ECWS HT EXCH B 3 3MEWBE01 Perform base metal weld repairs on EW 10/29/2022 5356621-1 "B" heat exchanger and associated nozzles based on inspection results.

1