{{#Wiki_filter:January 17, 2023
{{#Wiki_filter:David Rhoades
David Rhoades
Senior Vice President
Senior Vice President
Constellation Energy Generation, LLC
Constellation Energy Generation, LLC  
President and Chief Nuclear Office (CNO)
President and Chief Nuclear Office (CNO)  
Constellation Nuclear
Constellation Nuclear
4300 Winfield Road
4300 Winfield Road
Warrenville, IL 60555
Warrenville, IL 60555
SUBJECT:       QUAD CITIES NUCLEAR POWER STATION UNIT 1 - NOTIFICATION OF NRC
SUBJECT: QUAD CITIES NUCLEAR POWER STATION UNIT 1 - NOTIFICATION OF NRC  
                BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION
BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION  
                REPORT 05000254/2023002
REPORT 05000254/2023002
Dear David Rhoades:
Dear David Rhoades:
On March 27, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline
On March 27, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline  
Inservice Inspection Procedure 71111.08. This inspection is scheduled to be performed March
Inservice Inspection Procedure 71111.08. This inspection is scheduled to be performed March  
27, 2023, through March 31, 2023.
27, 2023, through March 31, 2023.
Experience has shown that this inspection is resource intensive both for the NRC inspector and
Experience has shown that this inspection is resource intensive both for the NRC inspector and  
your staff. In order to minimize the impact to your onsite resources, and to ensure a productive
your staff. In order to minimize the impact to your onsite resources, and to ensure a productive  
inspection for both sides, we have enclosed a request for documents needed for this inspection.
inspection for both sides, we have enclosed a request for documents needed for this inspection.  
These documents have been divided into two groups.
These documents have been divided into two groups.
The first group identifies information necessary to ensure that the inspector is adequately
The first group identifies information necessary to ensure that the inspector is adequately  
prepared. The second group identifies the information the inspector will need upon arrival at the
prepared. The second group identifies the information the inspector will need upon arrival at the  
site. It is important that all of these documents are up-to-date, and complete, in order to
site. It is important that all of these documents are up-to-date, and complete, in order to  
minimize the number of additional documents requested during the preparation and/or the
minimize the number of additional documents requested during the preparation and/or the  
onsite portions of the inspection.
onsite portions of the inspection.
We have discussed the schedule for inspection activities with your staff and understand that our
We have discussed the schedule for inspection activities with your staff and understand that our  
regulatory contact for this inspection will be R. Swart, of your organization. If there are any
regulatory contact for this inspection will be R. Swart, of your organization. If there are any  
questions about this inspection or the material requested, please contact the lead inspector
questions about this inspection or the material requested, please contact the lead inspector
John V. Bozga at 630-829-9613.
John V. Bozga at 630-829-9613.
This letter does not contain new or amended information collection requirements subject to the
This letter does not contain new or amended information collection requirements subject to the  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
requirements were approved by the Office of Management and Budget, Control Number
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a  
request for information or an information collection requirement unless the requesting document
request for information or an information collection requirement unless the requesting document  
displays a currently valid Office of Management and Budget Control Number.
displays a currently valid Office of Management and Budget Control Number.January 17, 2023
 
D. Rhoades 2
D. Rhoades                                       2
This letter and its enclosure will be made available for public inspection and copying at  
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,  
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
Exemptions, Requests for Withholding.
Exemptions, Requests for Withholding.
                                              Sincerely,
Sincerely,
                                                                        Signed by Bozga, John
John V. Bozga, Senior  
                                                                        on 01/17/23
Reactor Inspector  
                                              John V. Bozga, Senior
Division of Operating Reactor Safety
                                                  Reactor Inspector
Engineering Reactor Projects Branch
                                              Division of Operating Reactor Safety
                                              Engineering Reactor Projects Branch
Docket No. 50-254
Docket No. 50-254
License No. DPR-29
License No. DPR-29
Enclosure:
Enclosure:
Document Request for Baseline
Document Request for Baseline
  Inservice Inspection
Inservice Inspection
cc: Distribution via LISTSERV
cc: Distribution via LISTSERV
Signed by Bozga, John
on 01/17/23
D. Rhoades                                                        3


D. Rhoades                                    3
Letter to David Rhoades from John V. Bozga dated January 17, 2023.
Letter to David Rhoades from John V. Bozga dated January 17, 2023.
SUBJECT:     QUAD CITIES NUCLEAR POWER STATION UNIT 1 - NOTIFICATION OF NRC
 
              BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION
SUBJECT:   QUAD CITIES NUCLEAR POWER STATION UNIT 1 - NOTIFICATION OF NRC
              REPORT 05000254/2023002
          BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION
          REPORT 05000254/2023002
 
DISTRIBUTION:
DISTRIBUTION:
Jessie Quichocho
Jessie Quichocho
Line 87: Line 89:
Allan Barker
Allan Barker
R3-DORS
R3-DORS
ADAMS Accession Number: ML23013A150
ADAMS Accession Number: ML23013A150
    Publicly Available     Non-Publicly Available       Sensitive Non-Sensitive
  Publicly Available             Non-Publicly Available             Sensitive Non-Sensitive
OFFICE       RIII
OFFICE     RIII
NAME         JBozga:sw
NAME       JBozga:sw
DATE         01/17/2023
DATE       01/17/2023
                                OFFICIAL RECORD COPY
                              OFFICIAL RECORD COPY
            BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
 


              BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Report:                05000254/2023002
Inspection Report:                05000254/2023002
Inspection Dates:                 March 27, 2023 - March 31, 2023
 
Inspection Procedures:             Inspection Procedure 71111-08, Inservice Inspection
 
Lead Inspector:                   John V. Bozga, DORS
Inspection Dates:                   March 27, 2023 - March 31, 2023
                                  630-829-9613
 
                                  john.bozga@nrc.gov
 
  A. Information for the In-Office Preparation Week
Inspection Procedures:         Inspection Procedure 71111-08, Inservice Inspection
 
 
Lead Inspector:                     John V. Bozga, DORS
                            630-829-9613
                            john.bozga@nrc.gov
 
 
  A.   Information for the In-Office Preparation Week
 
       The following information (electronic copy) is requested by March 13, 2023, to facilitate
       The following information (electronic copy) is requested by March 13, 2023, to facilitate
       the selection of specific items that will be reviewed during the onsite inspection week.
       the selection of specific items that will be reviewed during the onsite inspection week.
Line 109: Line 149:
       inspection. If you have any questions regarding this information, please call the inspector
       inspection. If you have any questions regarding this information, please call the inspector
       as soon as possible.
       as soon as possible.
      1. For the upcoming outage, a detailed schedule and description of:
              a. Non-Destructive Examinations (NDEs) planned for Class 1 and 2
                  Systems and containment, performed as part of your American Society
                  of MechanicalEngineers (ASME) Code Inservice Inspection (ISI)
                  Program (include edition and addenda of Code committed to), and
                  NDEs planned for other systems performed as part of a Risk-Informed
                  ISI Program, or other augmented inspection programs commitments, as
                  part of an industry initiative; and
              b. Welding on Code Class 1, 2, or 3 components. For each weld
                  examination, include the weld identification number, description of weld
                  (component name), category, class, type of exam and procedure number,
                  and date of examination.
      2. A copy of the NDE procedures and welding procedures used to perform the activities
            identified in A.1 (including NDE calibration and flaw characterization/sizing
            procedures and Welding Procedure Qualification Records). For ultrasonic
            examination procedures qualified in accordance with Appendix VIII, of Section XI
            of the ASME Code, provide documentation supporting the procedure qualification
            (e.g., the Electric Power Research Institute performance demonstration qualification
            summary sheets).
      3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations
            identified in A.1.
                                                                                          Enclosure


             BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
      1.  For the upcoming outage, a detailed schedule and description of:
     4. A copy of the 10-year ISI Program showing those required exams scheduled to be
 
            a.  Non-Destructive Examinations (NDEs) planned for Class 1 and 2
              Systems and containment, performed as part of your American Society
              of Mechanical Engineers (ASME) Code Inservice Inspection (ISI)
              Program (include edition and addenda of Code committed to), and
              NDEs planned for other systems performed as part of a Risk-Informed
              ISI Program, or other augmented inspection programs commitments, as
              part of an industry initiative; and
 
             b.  Welding on Code Class 1, 2, or 3 components. For each weld
              examination, include the weld identification number, description of weld
              (component name), category, class, type of exam and procedure number,
              and date of examination.
 
      2.  A copy of the NDE procedures and welding procedures used to perform the activities
          identified in A.1 (including NDE calibration and flaw characterization/sizing
          procedures and Welding Procedure Qualification Records). For ultrasonic
          examination procedures qualified in accordance with Appendix VIII, of Section XI
          of the ASME Code, provide documentation supporting the procedure qualification
          (e.g., the Electric Power Research Institute performance demonstration qualification
          summary sheets).
 
      3.  A copy of ASME Section XI, Code Relief Requests applicable to the examinations
          identified in A.1.
 
 
 
 
                                                                                  Enclosure
          BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
 
 
     4. A copy of the 10-year ISI Program showing those required exams scheduled to be
         performed this outage, and those which have been completed.
         performed this outage, and those which have been completed.
     5. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye
 
     5. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye
         penetrant), which have identified relevant indications on Code Class 1 and 2 systems
         penetrant), which have identified relevant indications on Code Class 1 and 2 systems
         since the beginning of the last refueling outage.
         since the beginning of the last refueling outage.
     6. List with short description of the welds in Code Class 1, 2 and 3 systems, which have
 
     6. List with short description of the welds in Code Class 1, 2 and 3 systems, which have
         been fabricated due to component repair/replacement activities since the beginning
         been fabricated due to component repair/replacement activities since the beginning
         of the last refueling outage and identify the system, weld number, and reference
         of the last refueling outage and identify the system, weld number, and reference
         applicable documentation (e.g., NIS-2 forms with definitions of system and
         applicable documentation (e.g., NIS-2 forms with definitions of system and
         component acronyms).
         component acronyms).
     7. If reactor vessel weld examinations required by the ASME Code are scheduled to
 
     7. If reactor vessel weld examinations required by the ASME Code are scheduled to
         occur during the inspection period, provide a detailed description of the welds to be
         occur during the inspection period, provide a detailed description of the welds to be
         examined, and the extent of the planned examination.
         examined, and the extent of the planned examination.
     8. List with description of ISI-related issues such as piping degradation or damage
 
     8. List with description of ISI-related issues such as piping degradation or damage
         (e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors
         (e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors
         identified in piping examinations that have been entered into your corrective action
         identified in piping examinations that have been entered into your corrective action
Line 154: Line 208:
         outage. In addition, include a list of corrective action records associated with reactor
         outage. In addition, include a list of corrective action records associated with reactor
         vessel and internals inspections since the beginning of the last refueling outage.
         vessel and internals inspections since the beginning of the last refueling outage.
     9. Copy of any Title 10 of the Code of Federal Regulations, Part 21 reports applicable to
 
     9. Copy of any Title 10 of the Code of Federal Regulations, Part 21 reports applicable to
         your structures, systems, or components within the scope of Section XI of the ASME
         your structures, systems, or components within the scope of Section XI of the ASME
         Code that have been identified since the beginning of the last refueling outage.
         Code that have been identified since the beginning of the last refueling outage.
     10. Point of contact information (name and site number) for the Inservice Inspection
 
     10.Point of contact information (name and site number) for the Inservice Inspection
         Program, Aging Management Programs, Site Welding Engineer, and Reactor
         Program, Aging Management Programs, Site Welding Engineer, and Reactor
         Internals Inspection ProgramsSite and vendor leads.
         Internals Inspection ProgramsSite and vendor leads.
B. Onsite Information to Be Provided to the Inspector on the First Day of the
  Inspection (e.g., Following the Entrance Meeting). Please Provide Hard
  Copies(e.g., Paper Records) of the Following Documents:
      1. For welds selected by the inspector from A.1.b and A.6 above, provide copies
          of the following documents:
          a. Document of the weld number and location (e.g., system, train, branch);
          b. Document with a detail of the weld construction (e.g., drawing);
          c. Applicable portions of the Design Specification and applicable
              Code of construction for the weldment (e.g., B31.1 or ASME
              Section III);
          d. Applicable Code Edition and Addenda for weld procedure qualification;
                                                2


B.  Onsite Information to Be Provided to the Inspector on the First Day of the
    Inspection (e.g., Following the Entrance Meeting). Please Provide Hard
    Copies (e.g., Paper Records) of the Following Documents:
      1.  For welds selected by the inspector from A.1.b and A.6 above, provide copies
          of the following documents:
          a.  Document of the weld number and location (e.g., system, train, branch);
          b.  Document with a detail of the weld construction (e.g., drawing);
          c.  Applicable portions of the Design Specification and applicable
              Code of construction for the weldment (e.g., B31.1 or ASME
              Section III);
          d.  Applicable Code Edition and Addenda for weld procedure qualification;
                                            2
     BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
     BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
   e. Applicable weld procedure specifications and completed weld data sheets
 
        used to fabricate the welds;
 
   e. Applicable weld procedure specifications and completed weld data sheets
      used to fabricate the welds;
 
   f.  Copies of procedure qualification records supporting the weld
   f.  Copies of procedure qualification records supporting the weld
        procedure specifications;
      procedure     specifications;
   g. Copies of welders performance qualification records;
 
   h. Copies of mechanical test reports identified in the procedure
   g. Copies of welders performance qualification records;
        qualification records above;
 
   i.   Copies of the non-conformance reports for the selected welds;
   h. Copies of mechanical test reports identified in the procedure
   j. Access to radiographs and equipment to view radiographs of the selected
      qualification records above;
 
   i.   Copies of the non-conformance reports for the selected welds;
 
   j.   Access to radiographs and equipment to view radiographs of the selected
       welds;
       welds;
   k. ASME Code Section XI repair replacement plan and
 
        reconciliation for replacement components/materials;
   k.   ASME Code Section XI repair replacement plan and
   l. Certified Material Test Reports for replacement pressure boundary materials;
      reconciliation for replacement components/materials;
 
   l.   Certified Material Test Reports for replacement pressure boundary materials;
       and
       and
   m. Copies of the NDE required by the construction Code and the pre-service
   m. Copies of the NDE required by the construction Code and the pre-service
        examination records required by the ASME Code Section XI for the selected
      examination records required by the ASME Code Section XI for the selected
        welds.
      welds.
2. For the ISI-related corrective action issues selected by the inspector from
 
2. For the ISI-related corrective action issues selected by the inspector from
   Item A.8 above, provide a copy of the corrective actions and supporting
   Item A.8 above, provide a copy of the corrective actions and supporting
   documentation.
   documentation.
3. For the NDE reports with relevant indications on Code Class 1 and 2
 
3. For the NDE reports with relevant indications on Code Class 1 and 2
   systems selected by the inspector from Item A.5 above, provide a copy of
   systems selected by the inspector from Item A.5 above, provide a copy of
   the examination records and associated corrective action documents.
   the examination records and associated corrective action documents.
4. Updated schedules for Item A.1 (including schedule showing contingency
 
4. Updated schedules for Item A.1 (including schedule showing contingency
   repair plans if available).
   repair plans if available).
5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be
 
5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be
   examined during the outage. Also provide any drawings used by NDE vendors
   examined during the outage. Also provide any drawings used by NDE vendors
   to locate these welds.
   to locate these welds.
6. Provide copies of the following standards at the onsite U.S. Nuclear
 
6. Provide copies of the following standards at the onsite U.S. Nuclear
   Regulatory Commission inspection location for the duration of the
   Regulatory Commission inspection location for the duration of the
   inspection:
   inspection:
  a. Sections V, IX, and XI of the ASME Code with Editions applicable to
        the ISI Program and the Repair/Replacement Program; and
                                        3


              BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
  a.  Sections V, IX, and XI of the ASME Code with Editions applicable to
            b. Copy of the performance demonstration initiative (PDI) generic procedures
      the ISI Program and the Repair/Replacement Program; and
                withthe latest applicable Revisions that support site qualified ultrasonic
 
                examinationof piping welds and components (e.g., PDI-UT-1, PDI-UT-2,
 
                PDI-UT-3, PDI-UT-10 etc.).
 
 
 
 
 
                                    3
            BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
 
 
          b. Copy of the performance demonstration initiative (PDI) generic procedures
              with the latest applicable Revisions that support site qualified ultrasonic
              examination of piping welds and components (e.g., PDI-UT-1, PDI-UT-2,
              PDI-UT-3, PDI-UT-10 etc.).
 
If you have questions regarding the information requested, please contact the lead inspector.
If you have questions regarding the information requested, please contact the lead inspector.
                                                4
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
                                            4
}}
}}

Revision as of 12:39, 15 November 2024

Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000254/2023002
ML23013A150
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 01/17/2023
From: John Bozga
NRC/RGN-III/DORS/ERPB
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2023002
Download: ML23013A150 (1)


See also: IR 05000254/2023002

Text

David Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Office (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: QUAD CITIES NUCLEAR POWER STATION UNIT 1 - NOTIFICATION OF NRC

BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION

REPORT 05000254/2023002

Dear David Rhoades:

On March 27, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline

Inservice Inspection Procedure 71111.08. This inspection is scheduled to be performed March

27, 2023, through March 31, 2023.

Experience has shown that this inspection is resource intensive both for the NRC inspector and

your staff. In order to minimize the impact to your onsite resources, and to ensure a productive

inspection for both sides, we have enclosed a request for documents needed for this inspection.

These documents have been divided into two groups.

The first group identifies information necessary to ensure that the inspector is adequately

prepared. The second group identifies the information the inspector will need upon arrival at the

site. It is important that all of these documents are up-to-date, and complete, in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for inspection activities with your staff and understand that our

regulatory contact for this inspection will be R. Swart, of your organization. If there are any

questions about this inspection or the material requested, please contact the lead inspector

John V. Bozga at 630-829-9613.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget Control Number.January 17, 2023

D. Rhoades 2

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

John V. Bozga, Senior

Reactor Inspector

Division of Operating Reactor Safety

Engineering Reactor Projects Branch

Docket No. 50-254

License No. DPR-29

Enclosure:

Document Request for Baseline

Inservice Inspection

cc: Distribution via LISTSERV

Signed by Bozga, John

on 01/17/23

D. Rhoades 3

Letter to David Rhoades from John V. Bozga dated January 17, 2023.

SUBJECT: QUAD CITIES NUCLEAR POWER STATION UNIT 1 - NOTIFICATION OF NRC

BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION

REPORT 05000254/2023002

DISTRIBUTION:

Jessie Quichocho

Marc Ferdas

RidsNrrDorlLpl3

RidsNrrPMQuadCities Resource

RidsNrrDroIrib Resource

John Giessner

Julio Lara

Diana Betancourt-Roldan

Allan Barker

R3-DORS

ADAMS Accession Number: ML23013A150

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

OFFICE RIII

NAME JBozga:sw

DATE 01/17/2023

OFFICIAL RECORD COPY

BASELINE INSERVICE INSPECTION DOCUMENT REQUEST

Inspection Report: 05000254/2023002

Inspection Dates: March 27, 2023 - March 31, 2023

Inspection Procedures: Inspection Procedure 71111-08, Inservice Inspection

Lead Inspector: John V. Bozga, DORS

630-829-9613

john.bozga@nrc.gov

A. Information for the In-Office Preparation Week

The following information (electronic copy) is requested by March 13, 2023, to facilitate

the selection of specific items that will be reviewed during the onsite inspection week.

The inspector will select specific items from the information requested below and request

a list of additional documents needed onsite to your staff. We request that the specific

items selected from the lists be available and ready for review on the first day of

inspection. If you have any questions regarding this information, please call the inspector

as soon as possible.

1. For the upcoming outage, a detailed schedule and description of:

a. Non-Destructive Examinations (NDEs) planned for Class 1 and 2

Systems and containment, performed as part of your American Society

of Mechanical Engineers (ASME) Code Inservice Inspection (ISI)

Program (include edition and addenda of Code committed to), and

NDEs planned for other systems performed as part of a Risk-Informed

ISI Program, or other augmented inspection programs commitments, as

part of an industry initiative; and

b. Welding on Code Class 1, 2, or 3 components. For each weld

examination, include the weld identification number, description of weld

(component name), category, class, type of exam and procedure number,

and date of examination.

2. A copy of the NDE procedures and welding procedures used to perform the activities

identified in A.1 (including NDE calibration and flaw characterization/sizing

procedures and Welding Procedure Qualification Records). For ultrasonic

examination procedures qualified in accordance with Appendix VIII, of Section XI

of the ASME Code, provide documentation supporting the procedure qualification

(e.g., the Electric Power Research Institute performance demonstration qualification

summary sheets).

3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations

identified in A.1.

Enclosure

BASELINE INSERVICE INSPECTION DOCUMENT REQUEST

4. A copy of the 10-year ISI Program showing those required exams scheduled to be

performed this outage, and those which have been completed.

5. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye

penetrant), which have identified relevant indications on Code Class 1 and 2 systems

since the beginning of the last refueling outage.

6. List with short description of the welds in Code Class 1, 2 and 3 systems, which have

been fabricated due to component repair/replacement activities since the beginning

of the last refueling outage and identify the system, weld number, and reference

applicable documentation (e.g., NIS-2 forms with definitions of system and

component acronyms).

7. If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the inspection period, provide a detailed description of the welds to be

examined, and the extent of the planned examination.

8. List with description of ISI-related issues such as piping degradation or damage

(e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors

identified in piping examinations that have been entered into your corrective action

system since the beginning of the last refueling outage. Also, include a list of

corrective action records associated with foreign material introduced/identified in the

reactor vessel or reactor coolant system since the beginning of the last refueling

outage. In addition, include a list of corrective action records associated with reactor

vessel and internals inspections since the beginning of the last refueling outage.

9. Copy of any Title 10 of the Code of Federal Regulations, Part 21 reports applicable to

your structures, systems, or components within the scope of Section XI of the ASME

Code that have been identified since the beginning of the last refueling outage.

10.Point of contact information (name and site number) for the Inservice Inspection

Program, Aging Management Programs, Site Welding Engineer, and Reactor

Internals Inspection ProgramsSite and vendor leads.

B. Onsite Information to Be Provided to the Inspector on the First Day of the

Inspection (e.g., Following the Entrance Meeting). Please Provide Hard

Copies (e.g., Paper Records) of the Following Documents:

1. For welds selected by the inspector from A.1.b and A.6 above, provide copies

of the following documents:

a. Document of the weld number and location (e.g., system, train, branch);

b. Document with a detail of the weld construction (e.g., drawing);

c. Applicable portions of the Design Specification and applicable

Code of construction for the weldment (e.g., B31.1 or ASME

Section III);

d. Applicable Code Edition and Addenda for weld procedure qualification;

2

BASELINE INSERVICE INSPECTION DOCUMENT REQUEST

e. Applicable weld procedure specifications and completed weld data sheets

used to fabricate the welds;

f. Copies of procedure qualification records supporting the weld

procedure specifications;

g. Copies of welders performance qualification records;

h. Copies of mechanical test reports identified in the procedure

qualification records above;

i. Copies of the non-conformance reports for the selected welds;

j. Access to radiographs and equipment to view radiographs of the selected

welds;

k. ASME Code Section XI repair replacement plan and

reconciliation for replacement components/materials;

l. Certified Material Test Reports for replacement pressure boundary materials;

and

m. Copies of the NDE required by the construction Code and the pre-service

examination records required by the ASME Code Section XI for the selected

welds.

2. For the ISI-related corrective action issues selected by the inspector from

Item A.8 above, provide a copy of the corrective actions and supporting

documentation.

3. For the NDE reports with relevant indications on Code Class 1 and 2

systems selected by the inspector from Item A.5 above, provide a copy of

the examination records and associated corrective action documents.

4. Updated schedules for Item A.1 (including schedule showing contingency

repair plans if available).

5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be

examined during the outage. Also provide any drawings used by NDE vendors

to locate these welds.

6. Provide copies of the following standards at the onsite U.S. Nuclear

Regulatory Commission inspection location for the duration of the

inspection:

a. Sections V, IX, and XI of the ASME Code with Editions applicable to

the ISI Program and the Repair/Replacement Program; and

3

BASELINE INSERVICE INSPECTION DOCUMENT REQUEST

b. Copy of the performance demonstration initiative (PDI) generic procedures

with the latest applicable Revisions that support site qualified ultrasonic

examination of piping welds and components (e.g., PDI-UT-1, PDI-UT-2,

PDI-UT-3, PDI-UT-10 etc.).

If you have questions regarding the information requested, please contact the lead inspector.

4