{{#Wiki_filter:BRIEFING ON NUCLEAR REGULATORY RESEARCH PROGRAM Forward-looking Research Associated with Advanced Reactor Technologies Steve Chengelis Director, Future Fleet March 30, 2023 www.epri.com  © 2023 Electric Power Research Institute, Inc. All rights reserved.
{{#Wiki_filter:BRIEFING ON NUCLEAR REGULATORY RESEARCH PROGRAM Forward-looking Research Associated with Advanced Reactor Technologies


Advanced Reactor Roadmap - Strategy and Implementation Strategy A shared (industry-wide)           Align organizations and foster                                                   Serving government, academic, strategy to ensure the success       collaboration in implementing                                                           industrial, and public of advanced reactors                               the strategy                                                             stakeholders Timeline 2022                 February 2023                    April 2023                                     Summer 2023                       Ongoing Engaged industry           Issue Draft                     Issue Final                                   Example Roadmap                 Implement and stakeholders; analyzed       Roadmap for                       Roadmap                                       Action: Initiate 709           Maintain Action strategic elements           Review                         Document                                       Testing Program                     Plan 2                                           © 2023 Electric Power Research Institute, Inc. All rights reserved.
Steve Chengelis Director, Future Fleet
 
March 30, 2023
 
www.epri.com © 2023 Electric Power Research Institute, Inc. All rights reserved.
Advanced Reactor Roadmap - Strategy and Implementation Strategy
 
A shared (industry-wide) Align organizations and foster Serving government, academic, strategy to ensure the success collaboration in implementing industrial, and public of advanced reactors the strategy stakeholders
 
Timeline 2022 April 2023February 2023 Summer 2023 Ongoing
 
Engaged industry Issue Draft Issue Final Example Roadmap Implement and stakeholders; analyzed Roadmap for Roadmap Action: Initiate 709 Maintain Action strategic elements Review Document Testing Program Plan
 
2 © 2023 Electric Power Research Institute, Inc. All rights reserved.
Advanced Manufacturing and Materials
 
Identify, develop, qualify, & implement more economical manufacturing, inspection & new materials that enable:


Advanced Manufacturing and Materials GOAL&VALUE Identify, develop, qualify, & implement more economical manufacturing, inspection & new materials that enable:
Higher Quality Components l Reduced Lead Times l Alternative Supply Chains l Cost Competitiveness l Enable Deployment
Higher Quality Components l Reduced Lead Times l Alternative Supply Chains l Cost Competitiveness l Enable Deployment
* Mitigation Techniques
* Mitigation Techniques
Line 27: Line 42:
* Advanced Sensors
* Advanced Sensors
* Enhanced Specifications
* Enhanced Specifications
* Evaluate, Qualify, and Demonstrate Advanced Manufacturing Methods                             Normal force applied
* Evaluate, Qualify, and Demonstrate
* Additive Manufacturing                   Lateral motion                  Tool body
 
N ormal f orce applied Advanced Manufacturing Methods
* Additive Manufacturing Late ral moti on Tool body
* AR Materials Development
* AR Materials Development
* PM-HIP                                                                   Pressurized fluid Ball in hydrostatic bearing
 
* Materials Qualification
Pre ssuri ze d f luid
* Advanced Welding                                         Sample
* PM-HIP
* Materials Qualification Ball in hydrostatic bearing
* Advanced Welding Sample
* Degradation Mechanism
* Degradation Mechanism
* Mechanical Connections                                                                                               (MMM/MDM)
* Mechanical Connections (MMM/MDM)
* Advanced Cladding Material Performance                                                   New Materials Advanced Manufacturing                                and Inspection                                                       Development 3                                                       © 2023 Electric Power Research Institute, Inc. All rights reserved.
* Advanced Cladding Advanced Manufacturing Material Performance New Materials and Inspection Development
 
3 © 2023 Electric Power Research Institute, Inc. All rights reserved.
EPRI Project Development and Execution Guidance
 
EPRI Siting Guide
 
EPRI Owner-Operator EPRI Owner-Operator Mission Requirements Technology Specific Requirements
 
Planning Select Location
 
Need New Generation Define Mission Define Design Requirements Requirements (bid specs.)
Select Technology
 
EPRI Technology Assessment Guide


EPRI Project Development and Execution Guidance EPRI Siting Guide EPRI Owner-Operator                                                                              EPRI Owner-Operator Mission Requirements                                                                      Technology Specific Requirements Select Location Planning Need New Generation Define Mission                                                                            Define Design Requirements                                                                              Requirements (bid specs.)
4 © 2023 Electric Power Research Institute, Inc. All rights reserved.
Select Technology EPRI Technology Assessment Guide 4                                     © 2023 Electric Power Research Institute, Inc. All rights reserved.
TogetherShaping the Future of Energy


TogetherShaping the Future of Energy 5           © 2023 Electric Power Research Institute, Inc. All rights reserved.}}
5 © 2023 Electric Power Research Institute, Inc. All rights reserved.}}

Revision as of 02:54, 15 November 2024

M230330: Slides/Supporting Presentation Material - S. Chengelis - Briefing on Nuclear Regulatory Research Program
ML23083B944
Person / Time
Issue date: 03/30/2023
From:
NRC/OCM
To:
Shared Package
ML23067A027 List:
References
M230330
Download: ML23083B944 (5)


Text

BRIEFING ON NUCLEAR REGULATORY RESEARCH PROGRAM Forward-looking Research Associated with Advanced Reactor Technologies

Steve Chengelis Director, Future Fleet

March 30, 2023

www.epri.com © 2023 Electric Power Research Institute, Inc. All rights reserved.

Advanced Reactor Roadmap - Strategy and Implementation Strategy

A shared (industry-wide) Align organizations and foster Serving government, academic, strategy to ensure the success collaboration in implementing industrial, and public of advanced reactors the strategy stakeholders

Timeline 2022 April 2023February 2023 Summer 2023 Ongoing

Engaged industry Issue Draft Issue Final Example Roadmap Implement and stakeholders; analyzed Roadmap for Roadmap Action: Initiate 709 Maintain Action strategic elements Review Document Testing Program Plan

2 © 2023 Electric Power Research Institute, Inc. All rights reserved.

Advanced Manufacturing and Materials

Identify, develop, qualify, & implement more economical manufacturing, inspection & new materials that enable:

Higher Quality Components l Reduced Lead Times l Alternative Supply Chains l Cost Competitiveness l Enable Deployment

  • Mitigation Techniques
  • Risk-Informed Strategies
  • Advanced Sensors
  • Enhanced Specifications
  • Evaluate, Qualify, and Demonstrate

N ormal f orce applied Advanced Manufacturing Methods

  • Additive Manufacturing Late ral moti on Tool body
  • AR Materials Development

Pre ssuri ze d f luid

  • PM-HIP
  • Advanced Welding Sample
  • Degradation Mechanism
  • Mechanical Connections (MMM/MDM)
  • Advanced Cladding Advanced Manufacturing Material Performance New Materials and Inspection Development

3 © 2023 Electric Power Research Institute, Inc. All rights reserved.

EPRI Project Development and Execution Guidance

EPRI Siting Guide

EPRI Owner-Operator EPRI Owner-Operator Mission Requirements Technology Specific Requirements

Planning Select Location

Need New Generation Define Mission Define Design Requirements Requirements (bid specs.)

Select Technology

EPRI Technology Assessment Guide

4 © 2023 Electric Power Research Institute, Inc. All rights reserved.

TogetherShaping the Future of Energy

5 © 2023 Electric Power Research Institute, Inc. All rights reserved.